LINDSEY
EMERGENCY RESTORATION SYSTEM
Technical Feasibility Study
Information and Data Worksheet
After completely filling out this 6-page information and data worksheet, return this
by E-mail or facsimile transmission to:
Lindsey Manufacturing Company
P.O. Box 877,
760 N. Georgia Ave.
Azusa, CA 91702 USA
www.Lindsey-usa.com
Telephone: 001 626-969-3471
Fax: 001 626-969-3177
E-mail: SCortez@Lindsey-usa.com
If you have additional questions, you may contact us by either phone, fax or e-
mail. An example is given on pages 7 and 8.
When ready, the ERS Technical Feasibility Study should be sent to the following
person: (Please fill in all yellow boxes )
Name:
Title:
Company:
Electric Utility Manufacturer
Consultant Contractor
Type of
Business:
(Check)
Agent/Representative Other
Mailing
Address:
Country:
Phone: Fax:
E-mail:
1
Technical Feasibility Study
Information and Data Worksheet
The following information will be used to prepare a technical feasibility proposal
for the Lindsey Emergency Restoration System (ERS). The information
requested in this questionnaire is the minimum required for assembling a
proposal. A worksheet should be prepared for each voltage level as well as for
each critical line. Any additional information or expansion on any item would be
beneficial.
How to Complete This Form: Fill in each yellow box below with the appropriate
number. If there are two boxes, fill in the first box with a number and the second
box with a unit of measure.
For example:
Conductor Weight 1.35 Kg/m
1. General Information
Transmission Line Voltage kV, line to line
Structure Type (“X” one or more of A through F, see sketches below)
A B C D E F
Typical or Average Conductor Height at Tower (“X” below)
X
A
X
B
X
C
E
X
D
X
F (Other, make sketch and Fax)
2
2. Failure Scenarios
Fill in one or more of the failure scenarios below that you would like to have
analyzed.
A. Tangent Suspension Tower Failure Scenario:
Number of Suspension Towers Destroyed *
Number of Circuits to be Restored (1 or 2)
Typical Span Length Between Towers
*Note: When one suspension tower is destroyed, we will assume damage to the two adjacent structures
B. Angle or Tension Tower Failure Scenario:
Total Line Angle at the Tower (Degrees) *
Number of Circuits to be Restored (1 or 2)
Typical Span Length Between Towers
*Note: When one angle tower is destroyed, we will assume damage to the two adjacent structures
C. Other Failure Scenarios: (Describe and/or sketch additional failure scenarios below.)
Example: Destroyed 0
15Double circuit 150
line angle Damaged
tower destroyed with 420m and
350m spans to adjacent
suspension towers that are
damaged. One circuit to
be restored. 400m
350m
400m
Damaged
420m
3
3. Conductor and Overhead Shield Wire Data
Note: If the Shield Wire is not needed leave the Shield Wire yellow boxes blank
Conductor Name or Description:
Number of Sub-Conductors per Phase (i.e.: 1, 2, 3 or 4)
Required Data Conductor Shield Wire
Diameter
Weight per Unit Length (i.e.: kg/m)
4. Insulation
Typically, the level of insulation on the Emergency Restoration Structure (ERS) is
less than on a permanent structure since long term contamination performance is
not required. Check below the Leakage Distance Requirements for the ERS
Structure. Include any special requirements (Altitude, etc) in question 8.
Recommended Specific Leakage
IEC Publication 815
(mm/kV phase-phase)
North American Practice
ANSI Standard 985
(in/kV phase-ground)
CHECK
ONE
Level I 16 Light 1”
Level II 20 Medium 1.25”
Level III 25 High 1.5-1.75”
Level IV 31 Very High 2”
5. Loading Parameters
The loading criteria for the Emergency Structure should consider the length of
time that the structure will be in service. Designing for a 50 to 100 year return
storm may limit the structure, while a 10 or 25 year return storm may be more
realistic. Typically, either a heavy vertical load (ice) or a horizontal wind load will
control the design of the Emergency Structure.
Case l
Heavy Vertical
Case ll
Wind
Radial Ice Thickness*
Wind Speed or Pressure on Conductor
Sub-Conductor Tension
Shield Wire Tension
Wind Speed or Pressure on One Face of
the ERS Structure
*Note: A relative Ice Density of 0.914 is assumed unless specified otherwise in Section 8.
4
5. Loading Parameters (Continued)
Case l
Heavy Vertical
Case ll
Wind
Vertical Overload Safety Factor
Horizontal Overload Safety Factor
Tension Overload Safety Factor
6. Soil and Anchoring Conditions
Indicate the approximate percentage of the type of soil encountered along the
transmission line right-of-ways. Also indicate if anchors should be supplied for
these locations, and if so your preference.
Type of Soil %
Sound Hard Rock
Normal: Medium Dense Clay
Peat, Swamp or Wet Lands
Total 100%
Type of Anchors to be Supplied with ERS YES NO
Rock Anchors with Hydraulic Rock Drill and Accessories
Manta-Ray Anchors with Hydraulic Jack Hammer and Accessories
Manually Installed Buried Cross Plate Anchors
Swamp Type Helix Screw Anchors for Manual or Truck Installation
Other:
Other Comments on Soils or Requirements for Anchoring:
5
7. Methods of Construction
Check the method(s) that will need to be used in constructing the ERS. This will
help determine the accessories and additional tools required with a complete
system.
Construction Method
Most Likely
Used All of the
Time
Will Need to be
Used in a few
Special Cases
Manual Labor Only
Small Truck Mounted Cranes and Winches
Large Cranes
Helicopters
Additional comments on preferred/required methods of construction:
8. Additional Information
Indicate any special circumstances, requirements or limitations that should be
considered when planning an Emergency Restoration System. This information
might include right-of-way constraints, special terrain problems, equipment
limitations, desired brand of polymers insulators, etc.
6
EXAMPLE
1. General Information
Transmission Line Voltage 400 kV, line to line
Structure Type (“X” one or more of A through F, see sketches below)
A X B X C D E F
Typical or Average Conductor Height at Tower (“X” below) 30 m
2. Failure Scenarios
A. Tangent Suspension Tower Failure Scenario:
Number of Suspension Towers Destroyed * 4
Number of Circuits to be Restored (1 or 2) 1
Typical Span Length Between Towers 375 m
*Note: When one suspension tower is destroyed, we will assume damage to the two adjacent structures
B. Angle or Tension Tower Failure Scenario:
Total Line Angle at the Tower (Degrees) * 30
Number of Circuits to be Restored (1 or 2) 1
Typical Span Length Between Towers 375 m
3. Conductor and Overhead Shield Wire Data
Conductor Name or Description: ASTR 570
Number of Sub-Conductors per Phase (i.e.: 1, 2, 3 or 4) 2
Required Data Conductor Shield Wire
Diameter 3.105 mm
Weight per Unit Length (i.e.: kg/m) 1.574 Kg/m
4. Insulation
Recommended Specific Leakage
IEC Publication 815
(mm/kV phase-phase)
North American Practice
ANSI Standard 985
(in/kV phase-ground)
CHECK
ONE
Level II 20 Medium 1.25” X
5. Loading Parameters
Case l
Heavy Vertical
Case ll
Wind
Radial Ice Thickness* 2 cm 0
Wind Speed or Pressure on Conductor 180 Pa 570 Pa
Sub-Conductor Tension 42.9 kN 27.5 kN
Shield Wire Tension
Wind Speed or Pressure on One Face of the
ERS Structure
300 Pa 1200 Pa
7
8
Case l
Heavy Vertical
Case ll
Wind
Vertical Overload Safety Factor 1.5 1.5
Horizontal Overload Safety Factor 1.5 1.5
Tension Overload Safety Factor 1.5 1.5
6. Soil and Anchoring Conditions
Type of Soil %
Sound Hard Rock 5
Normal: Medium Dense Clay 80
Peat, Swamp or Wet Lands 15
Total 100%
Type of Anchors to be Supplied with ERS YES NO
Rock Anchors with Hydraulic Rock Drill and Accessories X
Manta-Ray Anchors with Hydraulic Jack Hammer and Accessories X
Manually Installed Buried Cross Plate Anchors X
Swamp Type Helix Screw Anchors for Manual or Truck Installation X
7. Methods of Construction
Construction Method
Most Likely Used
All of the Time
Will Need to be
Used in a few
Special Cases
Manual Labor Only X
Small Truck Mounted Cranes and Winches X
Large Cranes
Helicopters X

More Related Content

What's hot

Vacuum Circuit Breakers Testing Methods
Vacuum Circuit Breakers Testing MethodsVacuum Circuit Breakers Testing Methods
Vacuum Circuit Breakers Testing MethodsAli Sepehri
 
Hybrid HVDC Circuit Breaker Definitions
Hybrid HVDC Circuit Breaker  DefinitionsHybrid HVDC Circuit Breaker  Definitions
Hybrid HVDC Circuit Breaker DefinitionsAli Sepehri
 
Grounding pad mounted transformers
Grounding   pad mounted transformersGrounding   pad mounted transformers
Grounding pad mounted transformersJimmy Chaparro
 
AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100Ali Sepehri
 
SOLID STATE AC DRIVES ,UNIT V,ME (PE&D),ANNAUNIVERSITY SYLLABUS
SOLID STATE AC DRIVES ,UNIT V,ME (PE&D),ANNAUNIVERSITY SYLLABUSSOLID STATE AC DRIVES ,UNIT V,ME (PE&D),ANNAUNIVERSITY SYLLABUS
SOLID STATE AC DRIVES ,UNIT V,ME (PE&D),ANNAUNIVERSITY SYLLABUSDr SOUNDIRARAJ N
 
Electrical Lessons learned
Electrical Lessons learnedElectrical Lessons learned
Electrical Lessons learnedmichaeljmack
 
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)Power System Operation
 
Edwin Newsletter on transformer failures on 13 October 2015
Edwin Newsletter on transformer failures on 13 October 2015Edwin Newsletter on transformer failures on 13 October 2015
Edwin Newsletter on transformer failures on 13 October 2015Edwin Low
 
Modern substation design
Modern substation designModern substation design
Modern substation designrajesh18001 R
 
HV tower design 3
HV tower design 3HV tower design 3
HV tower design 3Thy Khy
 
Lv switchgear & lv cable sizing
Lv switchgear & lv cable sizingLv switchgear & lv cable sizing
Lv switchgear & lv cable sizingAsif Eqbal
 
A mini project on the transmission tower
A mini project on the transmission towerA mini project on the transmission tower
A mini project on the transmission towernaqeeb04
 
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...Ali Sepehri
 
Numerical analysis of short circuit testing & verification of a MCCB.
Numerical analysis of short circuit testing & verification of a MCCB.Numerical analysis of short circuit testing & verification of a MCCB.
Numerical analysis of short circuit testing & verification of a MCCB.Rajeev Kumar Raj
 
Speed control of dc motor conventional methods and solid state control
Speed control of dc motor conventional methods and solid state controlSpeed control of dc motor conventional methods and solid state control
Speed control of dc motor conventional methods and solid state controlDr SOUNDIRARAJ N
 
Short-Circuit Protective Device Coordination & Arc Flash Analysis
Short-Circuit Protective Device Coordination & Arc Flash AnalysisShort-Circuit Protective Device Coordination & Arc Flash Analysis
Short-Circuit Protective Device Coordination & Arc Flash AnalysisPower System Operation
 
Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...Engineers Australia
 

What's hot (19)

Tes p-122.08-r0
Tes p-122.08-r0Tes p-122.08-r0
Tes p-122.08-r0
 
Vacuum Circuit Breakers Testing Methods
Vacuum Circuit Breakers Testing MethodsVacuum Circuit Breakers Testing Methods
Vacuum Circuit Breakers Testing Methods
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
Hybrid HVDC Circuit Breaker Definitions
Hybrid HVDC Circuit Breaker  DefinitionsHybrid HVDC Circuit Breaker  Definitions
Hybrid HVDC Circuit Breaker Definitions
 
Grounding pad mounted transformers
Grounding   pad mounted transformersGrounding   pad mounted transformers
Grounding pad mounted transformers
 
AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100AC Circuit Breakers Routine Tests according to IEC 62271-100
AC Circuit Breakers Routine Tests according to IEC 62271-100
 
SOLID STATE AC DRIVES ,UNIT V,ME (PE&D),ANNAUNIVERSITY SYLLABUS
SOLID STATE AC DRIVES ,UNIT V,ME (PE&D),ANNAUNIVERSITY SYLLABUSSOLID STATE AC DRIVES ,UNIT V,ME (PE&D),ANNAUNIVERSITY SYLLABUS
SOLID STATE AC DRIVES ,UNIT V,ME (PE&D),ANNAUNIVERSITY SYLLABUS
 
Electrical Lessons learned
Electrical Lessons learnedElectrical Lessons learned
Electrical Lessons learned
 
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
 
Edwin Newsletter on transformer failures on 13 October 2015
Edwin Newsletter on transformer failures on 13 October 2015Edwin Newsletter on transformer failures on 13 October 2015
Edwin Newsletter on transformer failures on 13 October 2015
 
Modern substation design
Modern substation designModern substation design
Modern substation design
 
HV tower design 3
HV tower design 3HV tower design 3
HV tower design 3
 
Lv switchgear & lv cable sizing
Lv switchgear & lv cable sizingLv switchgear & lv cable sizing
Lv switchgear & lv cable sizing
 
A mini project on the transmission tower
A mini project on the transmission towerA mini project on the transmission tower
A mini project on the transmission tower
 
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
High Voltage Gas Insulated Substation (GIS) Routine Tests According to IEEE C...
 
Numerical analysis of short circuit testing & verification of a MCCB.
Numerical analysis of short circuit testing & verification of a MCCB.Numerical analysis of short circuit testing & verification of a MCCB.
Numerical analysis of short circuit testing & verification of a MCCB.
 
Speed control of dc motor conventional methods and solid state control
Speed control of dc motor conventional methods and solid state controlSpeed control of dc motor conventional methods and solid state control
Speed control of dc motor conventional methods and solid state control
 
Short-Circuit Protective Device Coordination & Arc Flash Analysis
Short-Circuit Protective Device Coordination & Arc Flash AnalysisShort-Circuit Protective Device Coordination & Arc Flash Analysis
Short-Circuit Protective Device Coordination & Arc Flash Analysis
 
Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...
 

Similar to Lindsey ERS Questionnaire

Electrical component at airport for airfield lighting circuit
Electrical component at airport for airfield lighting circuitElectrical component at airport for airfield lighting circuit
Electrical component at airport for airfield lighting circuitRLarivee
 
Asce 7 10 presentation on seismic bracing for mep systems
Asce 7 10 presentation on seismic bracing for mep systemsAsce 7 10 presentation on seismic bracing for mep systems
Asce 7 10 presentation on seismic bracing for mep systemsmichaeljmack
 
Electrical Engineering Basics - What Design Engineers Need to Know
Electrical Engineering Basics - What Design Engineers Need to KnowElectrical Engineering Basics - What Design Engineers Need to Know
Electrical Engineering Basics - What Design Engineers Need to Knowmilestoneseng
 
Fire Pump Short Circuit and WIC Considerations
Fire Pump Short Circuit and WIC ConsiderationsFire Pump Short Circuit and WIC Considerations
Fire Pump Short Circuit and WIC ConsiderationsJames S Nasby
 
presentation defence and police and JMV LPS LTD
 presentation  defence and police  and JMV LPS LTD presentation  defence and police  and JMV LPS LTD
presentation defence and police and JMV LPS LTDMahesh Chandra Manav
 
Grounding pad mounted transformers
Grounding   pad mounted transformersGrounding   pad mounted transformers
Grounding pad mounted transformersJimmy Chaparro
 
Jmv presentation national desaster management authority
Jmv  presentation  national desaster management authorityJmv  presentation  national desaster management authority
Jmv presentation national desaster management authorityMahesh Chandra Manav
 
presentation national desaster management and JMV LPS Ltd
 presentation  national desaster management  and JMV LPS Ltd presentation  national desaster management  and JMV LPS Ltd
presentation national desaster management and JMV LPS LtdMahesh Chandra Manav
 
Jmv presentation national desaster management authority
Jmv  presentation  national desaster management authorityJmv  presentation  national desaster management authority
Jmv presentation national desaster management authorityMahesh Chandra Manav
 
LS Busway Catalogue
LS Busway CatalogueLS Busway Catalogue
LS Busway Cataloguehairxoawn
 
CRITERIA FOR OVERHEAD TRANSMISSION LINE AMPACITY RATINGS
CRITERIA FOR OVERHEAD TRANSMISSION LINE AMPACITY RATINGSCRITERIA FOR OVERHEAD TRANSMISSION LINE AMPACITY RATINGS
CRITERIA FOR OVERHEAD TRANSMISSION LINE AMPACITY RATINGSArchili Kokhtashvili
 
cable sizing.ppt
cable sizing.pptcable sizing.ppt
cable sizing.pptChadWood16
 
OH_constandard_Internet.pdf
OH_constandard_Internet.pdfOH_constandard_Internet.pdf
OH_constandard_Internet.pdfRaufAhmed29
 
Fts onload disconnector switch
Fts onload disconnector switchFts onload disconnector switch
Fts onload disconnector switchJoeChueng
 
SG104136BEN_B07_Brochure_UR6-10-15 T_0415
SG104136BEN_B07_Brochure_UR6-10-15 T_0415SG104136BEN_B07_Brochure_UR6-10-15 T_0415
SG104136BEN_B07_Brochure_UR6-10-15 T_0415Patrick Volluz
 
Elastimold - Cable Connectors, Joints, Terminations Catalogue
Elastimold - Cable Connectors, Joints, Terminations CatalogueElastimold - Cable Connectors, Joints, Terminations Catalogue
Elastimold - Cable Connectors, Joints, Terminations CatalogueThorne & Derrick International
 

Similar to Lindsey ERS Questionnaire (20)

H046044147
H046044147H046044147
H046044147
 
Cable sizing.pptx
Cable sizing.pptxCable sizing.pptx
Cable sizing.pptx
 
Electrical component at airport for airfield lighting circuit
Electrical component at airport for airfield lighting circuitElectrical component at airport for airfield lighting circuit
Electrical component at airport for airfield lighting circuit
 
Asce 7 10 presentation on seismic bracing for mep systems
Asce 7 10 presentation on seismic bracing for mep systemsAsce 7 10 presentation on seismic bracing for mep systems
Asce 7 10 presentation on seismic bracing for mep systems
 
Electrical Engineering Basics - What Design Engineers Need to Know
Electrical Engineering Basics - What Design Engineers Need to KnowElectrical Engineering Basics - What Design Engineers Need to Know
Electrical Engineering Basics - What Design Engineers Need to Know
 
Fire Pump Short Circuit and WIC Considerations
Fire Pump Short Circuit and WIC ConsiderationsFire Pump Short Circuit and WIC Considerations
Fire Pump Short Circuit and WIC Considerations
 
presentation defence and police and JMV LPS LTD
 presentation  defence and police  and JMV LPS LTD presentation  defence and police  and JMV LPS LTD
presentation defence and police and JMV LPS LTD
 
Grounding pad mounted transformers
Grounding   pad mounted transformersGrounding   pad mounted transformers
Grounding pad mounted transformers
 
Jmv presentation national desaster management authority
Jmv  presentation  national desaster management authorityJmv  presentation  national desaster management authority
Jmv presentation national desaster management authority
 
presentation national desaster management and JMV LPS Ltd
 presentation  national desaster management  and JMV LPS Ltd presentation  national desaster management  and JMV LPS Ltd
presentation national desaster management and JMV LPS Ltd
 
Jmv presentation national desaster management authority
Jmv  presentation  national desaster management authorityJmv  presentation  national desaster management authority
Jmv presentation national desaster management authority
 
LS Busway Catalogue
LS Busway CatalogueLS Busway Catalogue
LS Busway Catalogue
 
Cable Sizing Calculations
Cable Sizing CalculationsCable Sizing Calculations
Cable Sizing Calculations
 
CRITERIA FOR OVERHEAD TRANSMISSION LINE AMPACITY RATINGS
CRITERIA FOR OVERHEAD TRANSMISSION LINE AMPACITY RATINGSCRITERIA FOR OVERHEAD TRANSMISSION LINE AMPACITY RATINGS
CRITERIA FOR OVERHEAD TRANSMISSION LINE AMPACITY RATINGS
 
cable sizing.ppt
cable sizing.pptcable sizing.ppt
cable sizing.ppt
 
OH_constandard_Internet.pdf
OH_constandard_Internet.pdfOH_constandard_Internet.pdf
OH_constandard_Internet.pdf
 
Fts onload disconnector switch
Fts onload disconnector switchFts onload disconnector switch
Fts onload disconnector switch
 
SG104136BEN_B07_Brochure_UR6-10-15 T_0415
SG104136BEN_B07_Brochure_UR6-10-15 T_0415SG104136BEN_B07_Brochure_UR6-10-15 T_0415
SG104136BEN_B07_Brochure_UR6-10-15 T_0415
 
Designing a cable_tray
Designing a cable_trayDesigning a cable_tray
Designing a cable_tray
 
Elastimold - Cable Connectors, Joints, Terminations Catalogue
Elastimold - Cable Connectors, Joints, Terminations CatalogueElastimold - Cable Connectors, Joints, Terminations Catalogue
Elastimold - Cable Connectors, Joints, Terminations Catalogue
 

More from Lindsey-USA Transmission and Manufacturing Co.

More from Lindsey-USA Transmission and Manufacturing Co. (16)

Distribution Rollers Multi Conductor
Distribution Rollers Multi ConductorDistribution Rollers Multi Conductor
Distribution Rollers Multi Conductor
 
Distribution Specialty Stringing Rollers
Distribution Specialty Stringing Rollers Distribution Specialty Stringing Rollers
Distribution Specialty Stringing Rollers
 
Distributed horizontal Dumping Roller
Distributed horizontal Dumping RollerDistributed horizontal Dumping Roller
Distributed horizontal Dumping Roller
 
Ferc1000 march
Ferc1000 marchFerc1000 march
Ferc1000 march
 
Ers ladwp
Ers ladwpErs ladwp
Ers ladwp
 
Ers public-power
Ers public-powerErs public-power
Ers public-power
 
Pole Line Hardware Fail Safe Bases
Pole Line Hardware Fail Safe BasesPole Line Hardware Fail Safe Bases
Pole Line Hardware Fail Safe Bases
 
Pole Line Hardware Dead End Adapter
Pole Line Hardware Dead End AdapterPole Line Hardware Dead End Adapter
Pole Line Hardware Dead End Adapter
 
Pole Line Hardware
Pole Line HardwarePole Line Hardware
Pole Line Hardware
 
Tie top-vertical-clamps-10-2015
Tie top-vertical-clamps-10-2015Tie top-vertical-clamps-10-2015
Tie top-vertical-clamps-10-2015
 
Dynamic line rating as a means to enhance transmission grid resilience
Dynamic line rating as a means to enhance transmission grid resilienceDynamic line rating as a means to enhance transmission grid resilience
Dynamic line rating as a means to enhance transmission grid resilience
 
Canductors clamps
Canductors clampsCanductors clamps
Canductors clamps
 
Determining Crossing Conductor Clearance Using Line-Mounted LiDAR
 Determining Crossing Conductor Clearance Using Line-Mounted LiDAR  Determining Crossing Conductor Clearance Using Line-Mounted LiDAR
Determining Crossing Conductor Clearance Using Line-Mounted LiDAR
 
07 t 005-ers-public-power
07 t 005-ers-public-power07 t 005-ers-public-power
07 t 005-ers-public-power
 
07 t 002-control-risk
07 t 002-control-risk07 t 002-control-risk
07 t 002-control-risk
 
Dynamic line rating as a means to enhance transmission grid resilience
Dynamic line rating as a means to enhance transmission grid resilienceDynamic line rating as a means to enhance transmission grid resilience
Dynamic line rating as a means to enhance transmission grid resilience
 

Recently uploaded

Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 

Recently uploaded (20)

Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 

Lindsey ERS Questionnaire

  • 1. LINDSEY EMERGENCY RESTORATION SYSTEM Technical Feasibility Study Information and Data Worksheet After completely filling out this 6-page information and data worksheet, return this by E-mail or facsimile transmission to: Lindsey Manufacturing Company P.O. Box 877, 760 N. Georgia Ave. Azusa, CA 91702 USA www.Lindsey-usa.com Telephone: 001 626-969-3471 Fax: 001 626-969-3177 E-mail: SCortez@Lindsey-usa.com If you have additional questions, you may contact us by either phone, fax or e- mail. An example is given on pages 7 and 8. When ready, the ERS Technical Feasibility Study should be sent to the following person: (Please fill in all yellow boxes ) Name: Title: Company: Electric Utility Manufacturer Consultant Contractor Type of Business: (Check) Agent/Representative Other Mailing Address: Country: Phone: Fax: E-mail: 1
  • 2. Technical Feasibility Study Information and Data Worksheet The following information will be used to prepare a technical feasibility proposal for the Lindsey Emergency Restoration System (ERS). The information requested in this questionnaire is the minimum required for assembling a proposal. A worksheet should be prepared for each voltage level as well as for each critical line. Any additional information or expansion on any item would be beneficial. How to Complete This Form: Fill in each yellow box below with the appropriate number. If there are two boxes, fill in the first box with a number and the second box with a unit of measure. For example: Conductor Weight 1.35 Kg/m 1. General Information Transmission Line Voltage kV, line to line Structure Type (“X” one or more of A through F, see sketches below) A B C D E F Typical or Average Conductor Height at Tower (“X” below) X A X B X C E X D X F (Other, make sketch and Fax) 2
  • 3. 2. Failure Scenarios Fill in one or more of the failure scenarios below that you would like to have analyzed. A. Tangent Suspension Tower Failure Scenario: Number of Suspension Towers Destroyed * Number of Circuits to be Restored (1 or 2) Typical Span Length Between Towers *Note: When one suspension tower is destroyed, we will assume damage to the two adjacent structures B. Angle or Tension Tower Failure Scenario: Total Line Angle at the Tower (Degrees) * Number of Circuits to be Restored (1 or 2) Typical Span Length Between Towers *Note: When one angle tower is destroyed, we will assume damage to the two adjacent structures C. Other Failure Scenarios: (Describe and/or sketch additional failure scenarios below.) Example: Destroyed 0 15Double circuit 150 line angle Damaged tower destroyed with 420m and 350m spans to adjacent suspension towers that are damaged. One circuit to be restored. 400m 350m 400m Damaged 420m 3
  • 4. 3. Conductor and Overhead Shield Wire Data Note: If the Shield Wire is not needed leave the Shield Wire yellow boxes blank Conductor Name or Description: Number of Sub-Conductors per Phase (i.e.: 1, 2, 3 or 4) Required Data Conductor Shield Wire Diameter Weight per Unit Length (i.e.: kg/m) 4. Insulation Typically, the level of insulation on the Emergency Restoration Structure (ERS) is less than on a permanent structure since long term contamination performance is not required. Check below the Leakage Distance Requirements for the ERS Structure. Include any special requirements (Altitude, etc) in question 8. Recommended Specific Leakage IEC Publication 815 (mm/kV phase-phase) North American Practice ANSI Standard 985 (in/kV phase-ground) CHECK ONE Level I 16 Light 1” Level II 20 Medium 1.25” Level III 25 High 1.5-1.75” Level IV 31 Very High 2” 5. Loading Parameters The loading criteria for the Emergency Structure should consider the length of time that the structure will be in service. Designing for a 50 to 100 year return storm may limit the structure, while a 10 or 25 year return storm may be more realistic. Typically, either a heavy vertical load (ice) or a horizontal wind load will control the design of the Emergency Structure. Case l Heavy Vertical Case ll Wind Radial Ice Thickness* Wind Speed or Pressure on Conductor Sub-Conductor Tension Shield Wire Tension Wind Speed or Pressure on One Face of the ERS Structure *Note: A relative Ice Density of 0.914 is assumed unless specified otherwise in Section 8. 4
  • 5. 5. Loading Parameters (Continued) Case l Heavy Vertical Case ll Wind Vertical Overload Safety Factor Horizontal Overload Safety Factor Tension Overload Safety Factor 6. Soil and Anchoring Conditions Indicate the approximate percentage of the type of soil encountered along the transmission line right-of-ways. Also indicate if anchors should be supplied for these locations, and if so your preference. Type of Soil % Sound Hard Rock Normal: Medium Dense Clay Peat, Swamp or Wet Lands Total 100% Type of Anchors to be Supplied with ERS YES NO Rock Anchors with Hydraulic Rock Drill and Accessories Manta-Ray Anchors with Hydraulic Jack Hammer and Accessories Manually Installed Buried Cross Plate Anchors Swamp Type Helix Screw Anchors for Manual or Truck Installation Other: Other Comments on Soils or Requirements for Anchoring: 5
  • 6. 7. Methods of Construction Check the method(s) that will need to be used in constructing the ERS. This will help determine the accessories and additional tools required with a complete system. Construction Method Most Likely Used All of the Time Will Need to be Used in a few Special Cases Manual Labor Only Small Truck Mounted Cranes and Winches Large Cranes Helicopters Additional comments on preferred/required methods of construction: 8. Additional Information Indicate any special circumstances, requirements or limitations that should be considered when planning an Emergency Restoration System. This information might include right-of-way constraints, special terrain problems, equipment limitations, desired brand of polymers insulators, etc. 6
  • 7. EXAMPLE 1. General Information Transmission Line Voltage 400 kV, line to line Structure Type (“X” one or more of A through F, see sketches below) A X B X C D E F Typical or Average Conductor Height at Tower (“X” below) 30 m 2. Failure Scenarios A. Tangent Suspension Tower Failure Scenario: Number of Suspension Towers Destroyed * 4 Number of Circuits to be Restored (1 or 2) 1 Typical Span Length Between Towers 375 m *Note: When one suspension tower is destroyed, we will assume damage to the two adjacent structures B. Angle or Tension Tower Failure Scenario: Total Line Angle at the Tower (Degrees) * 30 Number of Circuits to be Restored (1 or 2) 1 Typical Span Length Between Towers 375 m 3. Conductor and Overhead Shield Wire Data Conductor Name or Description: ASTR 570 Number of Sub-Conductors per Phase (i.e.: 1, 2, 3 or 4) 2 Required Data Conductor Shield Wire Diameter 3.105 mm Weight per Unit Length (i.e.: kg/m) 1.574 Kg/m 4. Insulation Recommended Specific Leakage IEC Publication 815 (mm/kV phase-phase) North American Practice ANSI Standard 985 (in/kV phase-ground) CHECK ONE Level II 20 Medium 1.25” X 5. Loading Parameters Case l Heavy Vertical Case ll Wind Radial Ice Thickness* 2 cm 0 Wind Speed or Pressure on Conductor 180 Pa 570 Pa Sub-Conductor Tension 42.9 kN 27.5 kN Shield Wire Tension Wind Speed or Pressure on One Face of the ERS Structure 300 Pa 1200 Pa 7
  • 8. 8 Case l Heavy Vertical Case ll Wind Vertical Overload Safety Factor 1.5 1.5 Horizontal Overload Safety Factor 1.5 1.5 Tension Overload Safety Factor 1.5 1.5 6. Soil and Anchoring Conditions Type of Soil % Sound Hard Rock 5 Normal: Medium Dense Clay 80 Peat, Swamp or Wet Lands 15 Total 100% Type of Anchors to be Supplied with ERS YES NO Rock Anchors with Hydraulic Rock Drill and Accessories X Manta-Ray Anchors with Hydraulic Jack Hammer and Accessories X Manually Installed Buried Cross Plate Anchors X Swamp Type Helix Screw Anchors for Manual or Truck Installation X 7. Methods of Construction Construction Method Most Likely Used All of the Time Will Need to be Used in a few Special Cases Manual Labor Only X Small Truck Mounted Cranes and Winches X Large Cranes Helicopters X