SlideShare a Scribd company logo
1 of 111
1
1
Importance of geometric design
•The geometric design of a highway deals with the
dimensions and layout of visible features of the highway
such as alignment, sight distance and intersection.
The main objective of highway design is to provide optimum
efficiency in traffic operation with maximum safety at reasonable
cost.
•
• Geometric design of highways
elements :
 Cross section elements
 Sight distance considerations
 Horizontal alignment details
 Vertical alignment details
 Intersection elements
deals with following
2
FACTORS AFFECTING HIGHWAY
GEOMETRICS DESIGN
•
•
•
•
•
Design speed
Topography
Traffic factors
Design hourly volume and capacity
Environmental and other factors
Design speed
•In India different speed standards have
for different class of road.
been assigned
• The maximum safe speed of vehicles used for
the road geometrics design is known as design
speed. 3
Design speed is important for the following…
 Sight distance
 Super Elevation
 Radius of horizontal curve
 Extra widening of pavement
 Length of valley curves
4
topography
• Classified based on the general
 Plane terrain- <10%
 Rolling terrain- 10-25%
 Mountainous terrain- 25-60%
 Steep terrain- >60%
slope of the country.
Traffic factor
• Vehicular characteristics and human
road users.
characteristics of
• Different vehicle classes have different speed and
acceleration characteristics, different dimensions and
weight .
Human factor includes the physical, mental and
psychological characteristics of driver and pedestrian.
•
5
Topography(Cont.)
8/16/2016 Highway Geometric Design 25
6
Topography(Cont.)
8/16/2016 Highway Geometric Design 26
7
Topography(Cont.)
8/16/2016 Highway Geometric Design 27
8
Steep terrain slope >60%
9
Design hourly volume and capacity
•
•
Traffic flow fluctuating with time
Low value during off-peak hours to the highest
value during the peak hour.
• It is uneconomical to
traffic flow.
design the roadwayforpeak
Environmental factors
Aesthetics
Landscaping
Air pollution
Noise pollution
10
Cross Section Of Road And Its
Componentss
•
•
•
•
•
•
•
•
•
•
Carriageway
Shoulder
Side slope
Berm
Boundary stone
Side drain
Roadway or formation width
Right of way
Building line
Control line
11
Cross-section of Road
12
1. Carriage way:-
The width of pavement way on which vehicles travel is called Carriage
way or pavement width.
Width of carriageway is determined on the basis of the width of the
vehicle and the minimum side clearance for safety.
As per IRC specification, the maximum width of vehicle is 2.44m.
Formation width is the top of width of the highway embankment
excluding the side drains.
Formation width = width of carriage way + width of shoulders
2. Formation width:-
13
Carriage way
Formation width
14
Two lane two-way road
carriageway
15
WIDTH OF ROADWAY OF VARIOUS CLASSES OF ROADS
SL. No. Road classification Roadway wisth
Plane and rolling terrain Mountainous and steep
terrain
1 NH & SH
a) Single lane 12
b) two lane 12
6.25
8.80
2 MDR
a) Single lane 9
b) two lane 9
4.75
4.75
3 ODR
a) Single lane 7.5
b) two lane 9
4.75
4.75
4 Village roads-single lane 7.5 4
WIDTH OF CARRIAGEWAY
SL. NO. Class of road Width of carriageway in ‘m’
1 Single lane 3.75
2 Two lane without raised kerbs 7.0
3 Two lane with raised kerbs 7.5
4 Intermediate lane 5.5
5 Multilane pavement 3.5/lane
16
 Shoulders are provided along the road edge to serve as an
emergency lane for vehicles .
 As per IRC, the min. width of shoulder should be 2.5m.
 Uses :
 Repair of broken down vehicles
 Overtaking operations
 To act as an emergency lane
 For future widening of road
 For temp. diversion of traffic during road repair etc
It should have sufficient load bearing capacity even in wet weather.
The surface of the should be rougher than the traffic lanes so that
vehicles are discouraged to use the shoulder as a regular traffic.
The colour should be different from that of the pavement so
as to be distinct.
Shoulders
17
shoulders
18
Treated
shoulderunTreated
shoulder
19
20
21
5. Side slope:-
The slope of earthwork in filling or in cutting is called Side
slope. It imparts stability to the earthwork.
• For Filling:
Normally, 1:2
• For cutting:
Type of soil Slope
1:1 to
1:1/2
Ordinary soil
Broken Rock
Soft Rock
1:1/2 to 1:1/4
1:1/4 to 1:1/8
Hard Rock Approx. Perpendicular
22
23
6. Berm:-
The distance between the road toe and the inner edge of
borrow pit is called berm.
It prevents the erosion of embankment soil.
7. Boundary stone :-
To indicate the boundary of land acquired for road, stones
are driven in to the ground at about 30m distance on either
side from the center line of the road. These stones are
known as boundary stone.
24
25
8. Side drain:-
For the drainage of rainwater, drains are provided on either
side of the road. Normally, side drains are required for the
road in cutting. For road in embankment, side drain is not
necessary.
9. Building line:-
The distance from the center line of road on either side,
within which construction of buildings is not permitted is
called Building line.
26
27
10.Control line:-
At the locations like bank, hospital, factory, theatre,
etc. on the road, where more people gather
disturbance to the traffic will be more.
Purposes :
For future widening of road
To reduce the chance of accidents
To relieve residents from noise pollution
To prevent disturbance to the traffic by nearby residents
 The distance from the centre line to such building is called control
line.
28
Type of road B.L(m) C.L(m)
NH, SH 40 75
MDR 30 55
ODR 20 35
VR 12 24
29
Cross section of different types of road as per IRC :
30
31
Cross slope or camber:
• It is the slope provided to the road surface in the
transverse direction to drain off the rain water
from the road surface.
To prevent the entry of surface water into the
subgrade soil through pavement.
To prevent the entry of water into the bituminous
pavement layer.
To remove the rain water from the pavement
surface as quick as possible and to allow the
pavement to get dry soon after the rain.
It is expressed as a percentage or 1V:Nh.
It depends on the pavement surface and amount
of rainfall.
•
•
•
•
•
32
Shape of the cross slope:
•
•
•
Parabolic shape(fast moving vehicle)
Straight line
Combination of parabolic and straight line
Recommended values of camber for different types of road surface
Sl no. Type of road surface Range of camber in areas of rain
fall range
heavy light
1 Cement concrete and high type 1 in 50(2%)
bituminous pavement
1 in 60(1.7%)
2 Thin bituminous surface 1 in 40(2.5%) 1 in 50(2%)
3 Water bound macadam(WBM) and gravel I in 33(3%)
pavement
1 in 40(2.5%)
4 Earth 1 in 25(4%) 1 in 33(3%) 33
34
SIGHT DISTANCE
35
Definition :
 The actual distance along the road surface , which a driver
from a specified height above the carriageway has visibility of
stationary or moving object is known as sight distance.
2
 Restrictions to sight distance may be caused as shown in fig.
• Sight distance at horizontal curve
http://www.tpub.com/inteng/11.htm16.gif 3
36
• Sight distance at vertical curve
http://www.msha.gov/training/surfhaul/images/slide6.jpg
3
7
37
• Sight distance at intersection
3
8
http://onlinemanuals.txdot.gov/txdotmanuals/rdw/images/3-2.png 38
39
4
0
40
Stoppingsightdistance
(SSD)
41
Definition : The minimum sight distance available on a highway
to stop a vehicle travelling at design speed , safely without
collision with any other obstruction is called stopping distance.
https://encrypted-tbn1.gstatic.com/images?q=tbn:ANd9GcQFKpIxAAAbJH3n64ECpY2EHIf-
mjYUXedmQ0WUPheL5hqfngHS 7
42
http://www.ite.org/css/online/img/Figure10-5.jpg 43
•For the purpose of measuring stopping sight distance , IRC
has suggest clear sight triangle as shown in fig. ,
Factorsaffectingstoppingsightdistance
44
1) speed of vehicle:
45
https://encrypted/tbn1.gstatic.com/images?q=tbn:ANd9GcTJk56HWGT5GXbpWSsGFElb5384HgIeyKfqcB4cqKwu9xy69dSm
2) total reaction time of the driver :
46
http://www.hk/phy.org/contextual/mechanics/kin/eq_motion/6-01.gif
3) friction resistance between the road &tyres :
47https://www.koroad.or.kr/images/en/img_know38.jpg
4) gradient of road:
48
http://webarchive.nationalarchives.gov.uk/20061101091400/http://ordnancesurv
ey.co.uk/images/userImages/misc/education/gradient.gif 49
Analysisof
SSD:
50
Lagdistance
• reaction time is known as lag distance .
• Reaction time of the driver is the time
taken from the instant the object is visible to
the driver to the instant the brakes are
effectively applied.
51
Definition : The distance travelled by the vehicle during the total
16http://www.hk/phy.org/contextual/mechanics/kin/eq_motion/6-01.gif
WhatisPIEVTheory?
52
Acc. To PIEV theory the total reaction time of the driver is split
into four parts .
52
1) Perception time :
It is the time required for the sensations received by the
eyes or ears to be transmitted to the brain through the
nervous system .
2) Intellection time :
 It is the time required for understanding the situation.
53
53
http://www.arrivealive.co.za/images/stoppingdistance.jpg
https://m2.behance.net/rendition/pm/703187/disp/859cc9a079eca4b5556af04b
3aa6215c.png
54
54
3) Emotion time :
 it is time elapsed during emotional sensations & Disturbance
such as fear , anger ,etc. with reference to the situation .
4) Volition time :
 volition time is the time taken for the final action.
Lag distance = v * t
55
Where, v = speed of vehicle in m/s
t = total reaction time (s) [ as per IRC t = 2.5 s ]
g= acceleration due to gravity = 9.8 m/sec2
f= coefficient of friction (0.4 to 0.35) 55
Braking distance= v²/2gf
SSD=lag distance + braking distance
•
•
Two-way traffic single lane road: SSD=2*SSD
In one-way traffic with single or more lane or two-
way traffic with more than single lane: Minimum
SSD= SSD
Table 2.6: Coefficient of longitudinal friction
Speed, kmph 30 40 50 60 ˃80
Longitudinal
coefficient of
friction
0.40 0.38 0.37 0.36 0.35
SSD= V.t + v²/2gf
56
Example-1
• Calculate the safe stopping sight distance for design
speed of 50kmph for(a) two-way traffic on two lane
road (b)two-way traffic on single lane road
Example-2
• Calculate the minimum sight distance required to avoid
a head on collision of two cars approaching from
opposite direction at 90 and 60kmph.coefficient
friction of 0.7 and a brake efficiency of 50%, in either
case
Example-3
• Calculate the stopping sight distance on a highway at
descending gradient of 2% for design speed of 80
kmph, assume other data as per IRC specification.
a
OVERTAKING SIGHT DISTANCE
 The minimum distanceopen to thevision of thedriver
of a vehicle intending to overtake slow vehicle ahead
with safety against the traffic of opposite direction is
known as the minimum overtaking sight
distance(OSD)orthe safe passing sightdistance.
The overtaking sight distance or OSD is the distance
measured along the centre of the road which a driver
with his eye level 1.2m above the road surfacecan see the
topof an object 1.2m above the road surface
59
Factors on which overtaking sight distance
depends:
•Minimum OSD required for the safe overtaking
depends on:
a. Speed of overtaking, overtaken vehicle and vehicle
coming from opposite direction if any.
b. Skill and reaction time of the driver.
c. Distance between overtaking and overtaken vehicles.
d. Rate of acceleration of overtaking vehicle
e. Gradient of the road if any.
Analysis of OSD on a two lane road with
two way traffic:
60
wheret is the reaction time of thedriver in second= 2 sec.
62
•From A1 to A2, the distance ‘d1’ (m) travelledby
overtaking vehicle Aat reduced speed ‘vb’ (m/s)
during reaction time ‘t’(sec),
d1= vb X t
• IRC suggest reaction time t of driver as 2 sec ,
d1= 2vb
•From A2 to A3, vehicle Astarts accelerating, shift
to adjoining lane, overtakes vehicle B, and shift
back to its original lane during overtaking time ‘T’
(sec) and travel distance ‘d2’(m).
63
•From A2 to A3, the distance ‘d2’ (m) is further
split into three parts viz;
d2= (s+b+s)
d2= (b+2s)
•The minimum spacing ‘s’ (m)between vehicles
depends on their speed and is given by empirical
formula,
s=(0.7vb + 6)
•The distance covered by the slow vehicle B
travelling at a speed of ‘vb’ (m/s) in time ‘T’(sec) is,
b= vb X T
• The overtaking time ‘T’ (sec) is calculatedas;
d2=(b+2s)=(vbT+aT2/2)
b=vb T , 2s=aT2/2
•From C1 to C2, distance travelled by vehicle C
moving at design speed ‘v’ (m/s) during time ‘T’
(sec) is given by,
d3=v X T
64
65
• Thus overtaking sight distance (OSD) is,
OSD=(d1+d2+d3)
OSD= (vb X t) + (vb X T +2s) +(v X T)
• If speed is in kmph,
OSD= (0.28Vb X t)+(0.28Vb X T+2s)+(0.28V X T)
•In case speed of overtaken vehicle is not given it
is assumed 16 kmph less than design speed of the
highway.
where,
s=spacing of vehicles
t=reaction time of driver = 2sec
v =design speed in m/sec
V= design speed in kmph
vb=initial speed of overtaking vehicle in m/sec
Vb=initial speed of overtaking vehicle in
Kmph
A=average acceleration in kmph/sec
a=average acceleration in m/sec2
66
67
Super elevation (e):
•In order to counteract the effect of centrifugal
force and to reduce the tendency of the vehicle to
overturn or skid, the outer edge of the pavement is
raised with respect to the inner edge, thus providing
a transverse slope throughout the length of the
horizontal curve.
•This transverse inclination to the pavement
surface is known as Super elevation or cant or
banking.
68
• Therefore, the general equation for the design of
super elevation is given by,
e + f = v²∕gR
70
• If ‘V’ speed of the vehicle is in kmph,
e + f = V²∕ 127R
where,
e=rate of Superelevation=tanӨ
f = design value of lateral friction
coefficient = 0.15
v = speed of the vehicle, m/sec
R = radius of the horizontal curve, m
g = acceleration due to gravity = 9.81 m/sec²
71
Maximum Superelevation
•Indian Roads Congress (IRC) had fixed the
maximum limit of Superelevation in plan and
rolling terrains and is snow bound areas as 7.0 %.
•On hill roads not bound by snow a maximum
Superelevation upto10% is recommended.
•On urban road stretches with frequent
intersections, it may be necessary to limit the
maximum Superelevation to 4.0 %.
72
Widening of pavement on horizontal curves:
On horizontal curves, especially when they are
Less than 300m radii, it is common to widen the pavement
slightly more than the normal width.
• Widening is needed for the following reasons:
a. An automobile has a rigid wheel base and only the front
wheels can be turned, when this vehicle takes a turn to
negotiate a horizontal curve, the rear wheel do not follow
the same path as that of the front wheels. This phenomenon
is called off tracking.
73
b.While two vehicle cross or overtake at horizontal curve
there is psychological tendency to maintain a greater
clearance between the vehicle for safety.
c.For greater visibility at curve, the driver have tendency
not to follow the central path of the lane, but to use the
outer side at the beginning of the curve.
d.At higher speed superelevation and lateral friction
cannot counteract centrifugal force and skidding may
occur.
74
Analysis of extra widening on horizontal curves:
The extra widening of pavement on
horizontal curves is divided into two parts:
a. Mechanical widening/Off tracking
b. Psychological widening
a. Mechanical widening/Off tracking (Wm):
75
76
•If road having ‘n’ traffic lanes and ‘n’ vehiclescan
travel simultaneously, mechanical widening reqd. is
given by,
Wm = nl2/ 2R
Where,
R = Mean radius of the curve in m,
n=no. of traffic lanes
l = Length of Wheel base of longest vehicle , m
(l = 6.0 m or 6.1m for commercial vehicles)
V= design speed, kmph
b. Psychological widening (Wps):
An empirical formula has been recommended
by IRC for deciding the additional psychological
widening.
•The psychological widening is given by the
formula:
77
• The total extra widening is given by,
We=Wm + Wps
where,
n=no. of traffic lanes
l = length of wheel base =6.1 or 6 m
V=design speed kmph
R = radius of the horizontal curve, m
78
Horizontal transition curves
 When a non circular curve is introduce between a
straight and a circular curve has a varying radius which
decreases from infinity at the straight end (tangent
point) to the desired radius of the circular curve at the
other end (curve point) for the gradual introduction of
centrifugal force is known as transition curve.
Objectives for providing transition curve
 To introduce gradually the centrifugal force between
the tangent point and the beginning of the circular
curve, avoiding sudden jerk on the vehicle. This
increases the comfort of passengers.
 To enable the driver turn the steering gradually for his
own comfort and security
 To provide gradual introduction of super elevation
 To provide gradual introduction of extra widening.
 To enhance the aesthetic appearance of the road.
Type of transition curve
 spiral or clothoid
 cubic parabola
 Lemniscate
Length of transition curve
 Case-1:Rate of change of centrifugal
acceleration
 Where,
 Ls= length of transition curve in ‘m’
 C= allowable rate of change of centrifugal
accleration,
 R= Radius of the circular curve in ‘m’
 case-2:Rate of introduction of super-elevation
 If the pavement is rotated about the center line.
If the pavement is rotated about the inner edge
 Where ,
 W is the width of pavement
 We is the extra widening
 Rate of change of superelevation of 1 in N
 case-3:By empirical formula
 According to IRC standards:
 For plane and rolling terrain:
 For mountainous and steep
 terrain:
 NOTE: The design length of transition curve(Ls) will
be the highest value of case-1,2 and 3
86
Gradients:
•Gradient is the rate of rise or fall along the
length of road with respect to the horizontal.
•It is expressed as a ratio of 1 in n or also as
percentage such as n%.
‘
87
The following are the various factors which
govern the selection of gradient in the
alignment of a road.
1. Nature of ground
2. Nature of traffic
3. Drainage required.
4. The type of road surface.
5. The total height to be curved.
1. Ruling Gradient: The gradient usually adopted while
making the alignment of a road is called as ruling
Gradient.
2. Limiting Gradient:
The gradient steeper then the ruling which may be
used in restricted road lengths where the later is not
feasible is called maximum or Limiting Gradient.
3. Exceptional Gradient:
The gradient steeper than the limiting which may be
used in short lengths of the road only in extra ordinary
situtation is called as Exceptional Gradient.
4. Average Gradient: The total rise or fall between any
two points along the alignment of a road divided by the
horizontal distance between them is called Average
Gradient.
5. Floating Gradient:
The gradient on which a motor vehicle moving with a
constant speed, continues to descend with the same
speed without any application of power or brakes is
called Floating Gradient.
6. Minimum Gradient:
The minimum desirable slope essential for effective
drainage of rain water from the road surface is called
Minimum Gradient.
Grade compensation
 At the horizontal curve, due to the turning angle α of the
vehicle, the curve resistance develop is equal to T(1-
Cosα).
 Thus grade compensation can be defined as the reduction
in gradient at the horizontal curve because of the
additional tractive force required due to curve resistance
(T−Tcosα), which is intended to offset the extra tractive
force involved at the curve.
93
 IRC gave the following specification for the grade
compensation.
1.Grade compensation is not required for grades
flatter than 4% because the loss of tractive force
is negligible.
2.Grade compensation is (30+R)/R %, where ‘R’
is the radius of the horizontal curve in meters.
3.The maximum grade compensation is limited to
75/R%.
95
Vertical Curves:
•The vertical curves used in highway may be
classified into two categories:
a. Summit curves or crest curves
b. Valley curves or sag curves
‘
a. Summit curves or crest curves:
‘
96
97
Length of summit curve:
•While designing the length the parabolic summit
curves, it is necessary to consider SSD and OSD
Separately.
‘
98
•Length of summit curve for stopping sight
distance (SSD):
Two cases are considered in deciding the length:
a. When L>SSD
b. When L<SSD
‘
a. When L > SSD
The general equation for length of curve
is given by:
• Substituting the value of H=1.2m and h=0.15m,
‘
99
b. When L < SSD
The general equation for length of curve is
given by:
• Substituting the value of H=1.2m and h=0.15m,
•The minimum radius of the parabolic summit
curve is calculated from relation R=L/N
‘
100
101
•Length of summit curve for overtaking sight
distance (OSD):
Two cases are considered in deciding the length:
a. When L > OSD
b. When L < OSD
‘
a. When L > OSD
The general equation for length of curve
is given by:
• Substituting the value of H=1.2m,
‘
120
b. When L < OSD
The general equation for length of curve
is given by:
• Substituting the value of H=1.2m,
‘
103
104
wher
e,
• N= deviation angle i.e. algebraic
difference between two grade
• H=height of driver eye above carriageway i.e.
• 1.2 m
• h=height of object above carriageway i.e. 0.15
m L=length of summit curve, m
• S=sight distance i.e. SSD or OSD
105
Length of valley curve:
•The important factors to be considered in valley
curve design are:
a.Impact free movement of vehicles at design
speed or comfort to passenger.
b.Providing adequate sight distance under head
lights of vehicles for night driving
c.Locating lowest point of valley curve for
providing suitable cross drainage facilities
‘
b. Valley curves or sag curves:
‘
106
a. Length of valley transition curve for comfort
condition:
Total length of valley curve is given by:
If ‘V’ is inkmph,
‘
107
108
where,
v or V= design speed in m/sec or kmph
C=allowable rate of change of centrifugal
acceleration=0.6 m/sec3
L=length of valley curve=2Ls
N= deviation angle i.e. algebraic difference
between two grade
109
b. Length of valley curve for head light sight
distance:
•The length of valley curve for head light sight
distance may be determined for two condition:
a. When L > SSD
b. When L < SSD
‘
a. When L > SSD
The general equation for length of valley
curve is given by:‘
110
b. When L < SSD
The general equation for length of valley
curve is given by:
where,
N= deviation angle i.e. algebraic difference
between two grade
L=total length of valley curve, m
S=SSD, m
‘
111

More Related Content

What's hot

Chapter 2 traffic studies
Chapter 2 traffic studiesChapter 2 traffic studies
Chapter 2 traffic studiesAnkit Patel
 
Introduction to highway engineering
Introduction to highway engineeringIntroduction to highway engineering
Introduction to highway engineeringAavani Thampi
 
Highway Horizontal Alignment
Highway Horizontal AlignmentHighway Horizontal Alignment
Highway Horizontal AlignmentAkshathaBhandary
 
Elements of road x-section
Elements of road x-section Elements of road x-section
Elements of road x-section Rana Ibrahim
 
Design principles of traffic signal
Design principles of traffic signalDesign principles of traffic signal
Design principles of traffic signalBhavya Patel
 
Chapter 1 traffic characterstics
Chapter 1 traffic charactersticsChapter 1 traffic characterstics
Chapter 1 traffic charactersticsAnkit Patel
 
Traffic studies and importance
Traffic studies and importance Traffic studies and importance
Traffic studies and importance SACHIN NAGAYACH
 
Chapter 3 geometric design
Chapter 3 geometric  designChapter 3 geometric  design
Chapter 3 geometric designBashaFayissa1
 
Horizontal curve- IRC 38
Horizontal curve- IRC 38Horizontal curve- IRC 38
Horizontal curve- IRC 38Surabhi Suman
 
Highway geometric design
Highway geometric designHighway geometric design
Highway geometric designNikunj Hindocha
 
Introduction to transportation engineering
Introduction to transportation engineeringIntroduction to transportation engineering
Introduction to transportation engineeringCivil Zone
 
Overtaking sight distance
Overtaking sight distanceOvertaking sight distance
Overtaking sight distanceAglaia Connect
 
Geometrical design of highways
Geometrical design of highwaysGeometrical design of highways
Geometrical design of highwaysFresher Thinking
 
Traffic Volume Studies
Traffic Volume StudiesTraffic Volume Studies
Traffic Volume StudiesMd Tanvir Alam
 
Tre be civil
Tre be civilTre be civil
Tre be civilRahul
 
2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTU
2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTU2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTU
2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTUVATSAL PATEL
 

What's hot (20)

Highway planning and alignment
Highway planning and alignmentHighway planning and alignment
Highway planning and alignment
 
Chapter 2 traffic studies
Chapter 2 traffic studiesChapter 2 traffic studies
Chapter 2 traffic studies
 
Introduction to highway engineering
Introduction to highway engineeringIntroduction to highway engineering
Introduction to highway engineering
 
Highway Horizontal Alignment
Highway Horizontal AlignmentHighway Horizontal Alignment
Highway Horizontal Alignment
 
Elements of road x-section
Elements of road x-section Elements of road x-section
Elements of road x-section
 
Design principles of traffic signal
Design principles of traffic signalDesign principles of traffic signal
Design principles of traffic signal
 
Chapter 1 traffic characterstics
Chapter 1 traffic charactersticsChapter 1 traffic characterstics
Chapter 1 traffic characterstics
 
Traffic studies and importance
Traffic studies and importance Traffic studies and importance
Traffic studies and importance
 
Traffic engineering 2
Traffic engineering 2Traffic engineering 2
Traffic engineering 2
 
Chapter 3 geometric design
Chapter 3 geometric  designChapter 3 geometric  design
Chapter 3 geometric design
 
Highway Materials Unit-III
Highway Materials  Unit-IIIHighway Materials  Unit-III
Highway Materials Unit-III
 
Horizontal curve- IRC 38
Horizontal curve- IRC 38Horizontal curve- IRC 38
Horizontal curve- IRC 38
 
Highway geometric design
Highway geometric designHighway geometric design
Highway geometric design
 
Introduction to transportation engineering
Introduction to transportation engineeringIntroduction to transportation engineering
Introduction to transportation engineering
 
Highway Alignment
Highway Alignment Highway Alignment
Highway Alignment
 
Overtaking sight distance
Overtaking sight distanceOvertaking sight distance
Overtaking sight distance
 
Geometrical design of highways
Geometrical design of highwaysGeometrical design of highways
Geometrical design of highways
 
Traffic Volume Studies
Traffic Volume StudiesTraffic Volume Studies
Traffic Volume Studies
 
Tre be civil
Tre be civilTre be civil
Tre be civil
 
2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTU
2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTU2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTU
2.1 HIGHWAY TRANSPORTATION : HIGHWAY PLANNING AND DEVELOPMENT (TRE) 3150611 GTU
 

Similar to Chapter 2 Road geometrics

Geometric design of highway
Geometric design of highwayGeometric design of highway
Geometric design of highwayholegajendra
 
Geometric design of highway
Geometric design of highwayGeometric design of highway
Geometric design of highwayJunaid Jamadar
 
intro to alignment.pptx
intro to alignment.pptxintro to alignment.pptx
intro to alignment.pptxCIVILSWATHI
 
Transportation engineering module 2 ppt.
Transportation engineering module 2 ppt.Transportation engineering module 2 ppt.
Transportation engineering module 2 ppt.RAJENDRAKUMARSHETTAR
 
Geometric design of highway
Geometric design of  highwayGeometric design of  highway
Geometric design of highwayPratikShinde113
 
Transportation Engineering -21CV52- Module 2
Transportation Engineering -21CV52- Module 2Transportation Engineering -21CV52- Module 2
Transportation Engineering -21CV52- Module 2Mithesh Kumar
 
geometric design ppt unit 3 (1).ppt
geometric design ppt unit 3 (1).pptgeometric design ppt unit 3 (1).ppt
geometric design ppt unit 3 (1).pptGate20241
 
Unit- 3 Highway Geometric design
Unit- 3 Highway Geometric designUnit- 3 Highway Geometric design
Unit- 3 Highway Geometric designRNRANGANATH
 
highway engineering/ transportation engineering-I
highway engineering/ transportation engineering-Ihighway engineering/ transportation engineering-I
highway engineering/ transportation engineering-ISubrat Padhy
 
Transportation engg
Transportation enggTransportation engg
Transportation enggSubrat Padhy
 
3. HIGHWAY GEOMETRIC DESIGN.pdf
3. HIGHWAY GEOMETRIC DESIGN.pdf3. HIGHWAY GEOMETRIC DESIGN.pdf
3. HIGHWAY GEOMETRIC DESIGN.pdfMdZeeshanAhmad10
 
Transportation Engineering
Transportation EngineeringTransportation Engineering
Transportation EngineeringBhanu Rekha
 
widening of flexible pavement AND construction of drainage system
widening of flexible pavement AND construction of drainage systemwidening of flexible pavement AND construction of drainage system
widening of flexible pavement AND construction of drainage systemeakram akhtar
 
Chapter 1 Introduction to road
Chapter 1 Introduction to roadChapter 1 Introduction to road
Chapter 1 Introduction to roadKHUSHBU SHAH
 

Similar to Chapter 2 Road geometrics (20)

Geometric design of highway
Geometric design of highwayGeometric design of highway
Geometric design of highway
 
Geometric design of highway
Geometric design of highwayGeometric design of highway
Geometric design of highway
 
intro to alignment.pptx
intro to alignment.pptxintro to alignment.pptx
intro to alignment.pptx
 
Transportation engineering module 2 ppt.
Transportation engineering module 2 ppt.Transportation engineering module 2 ppt.
Transportation engineering module 2 ppt.
 
Geometric design of highway
Geometric design of  highwayGeometric design of  highway
Geometric design of highway
 
Transportation Engineering -21CV52- Module 2
Transportation Engineering -21CV52- Module 2Transportation Engineering -21CV52- Module 2
Transportation Engineering -21CV52- Module 2
 
Presentation sayed
Presentation sayedPresentation sayed
Presentation sayed
 
geometric design ppt unit 3 (1).ppt
geometric design ppt unit 3 (1).pptgeometric design ppt unit 3 (1).ppt
geometric design ppt unit 3 (1).ppt
 
Unit- 3 Highway Geometric design
Unit- 3 Highway Geometric designUnit- 3 Highway Geometric design
Unit- 3 Highway Geometric design
 
highway engineering/ transportation engineering-I
highway engineering/ transportation engineering-Ihighway engineering/ transportation engineering-I
highway engineering/ transportation engineering-I
 
Transportation engg
Transportation enggTransportation engg
Transportation engg
 
3. HIGHWAY GEOMETRIC DESIGN.pdf
3. HIGHWAY GEOMETRIC DESIGN.pdf3. HIGHWAY GEOMETRIC DESIGN.pdf
3. HIGHWAY GEOMETRIC DESIGN.pdf
 
transportation
transportationtransportation
transportation
 
Unit 2
Unit 2Unit 2
Unit 2
 
HIGHWAY ppt BY SHASHI SHEKHAR DBGI
HIGHWAY  ppt BY SHASHI SHEKHAR DBGIHIGHWAY  ppt BY SHASHI SHEKHAR DBGI
HIGHWAY ppt BY SHASHI SHEKHAR DBGI
 
Transportation Engineering
Transportation EngineeringTransportation Engineering
Transportation Engineering
 
Unit_II ARP.pptx
Unit_II ARP.pptxUnit_II ARP.pptx
Unit_II ARP.pptx
 
Highway construction and equipments
Highway construction and equipmentsHighway construction and equipments
Highway construction and equipments
 
widening of flexible pavement AND construction of drainage system
widening of flexible pavement AND construction of drainage systemwidening of flexible pavement AND construction of drainage system
widening of flexible pavement AND construction of drainage system
 
Chapter 1 Introduction to road
Chapter 1 Introduction to roadChapter 1 Introduction to road
Chapter 1 Introduction to road
 

More from KHUSHBU SHAH

PLANE TABLE SURVEY
PLANE TABLE SURVEYPLANE TABLE SURVEY
PLANE TABLE SURVEYKHUSHBU SHAH
 
DEMOLITION & DISMANTLING OF WORK
DEMOLITION & DISMANTLING OF WORKDEMOLITION & DISMANTLING OF WORK
DEMOLITION & DISMANTLING OF WORKKHUSHBU SHAH
 
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARETIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWAREKHUSHBU SHAH
 
Bridge Engineering
Bridge EngineeringBridge Engineering
Bridge EngineeringKHUSHBU SHAH
 
Chapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackChapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackKHUSHBU SHAH
 
Chapter 6 Points,crossings and yards
Chapter 6 Points,crossings and yardsChapter 6 Points,crossings and yards
Chapter 6 Points,crossings and yardsKHUSHBU SHAH
 
Chapter 5 Introduction to railway
Chapter 5 Introduction to railwayChapter 5 Introduction to railway
Chapter 5 Introduction to railwayKHUSHBU SHAH
 
Chapter 4 Drainge and maintenance of road
Chapter 4 Drainge and maintenance of roadChapter 4 Drainge and maintenance of road
Chapter 4 Drainge and maintenance of roadKHUSHBU SHAH
 
Equipment management
Equipment managementEquipment management
Equipment managementKHUSHBU SHAH
 
Material management
Material managementMaterial management
Material managementKHUSHBU SHAH
 
Chapter 8 introduction to construction equipments
Chapter 8 introduction to construction equipmentsChapter 8 introduction to construction equipments
Chapter 8 introduction to construction equipmentsKHUSHBU SHAH
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formworkKHUSHBU SHAH
 
Chapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavationsChapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavationsKHUSHBU SHAH
 
Chapter 2 coffer-dam
Chapter 2 coffer-damChapter 2 coffer-dam
Chapter 2 coffer-damKHUSHBU SHAH
 
Chapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSChapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSKHUSHBU SHAH
 
Chapter 13 green building
Chapter 13 green buildingChapter 13 green building
Chapter 13 green buildingKHUSHBU SHAH
 
Chapter 12 special treatments
Chapter 12 special treatmentsChapter 12 special treatments
Chapter 12 special treatmentsKHUSHBU SHAH
 
Chapter 11 temporary works
Chapter 11 temporary worksChapter 11 temporary works
Chapter 11 temporary worksKHUSHBU SHAH
 

More from KHUSHBU SHAH (20)

PLANE TABLE SURVEY
PLANE TABLE SURVEYPLANE TABLE SURVEY
PLANE TABLE SURVEY
 
DEMOLITION & DISMANTLING OF WORK
DEMOLITION & DISMANTLING OF WORKDEMOLITION & DISMANTLING OF WORK
DEMOLITION & DISMANTLING OF WORK
 
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARETIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
 
Bridge Engineering
Bridge EngineeringBridge Engineering
Bridge Engineering
 
Chapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackChapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway track
 
Chapter 6 Points,crossings and yards
Chapter 6 Points,crossings and yardsChapter 6 Points,crossings and yards
Chapter 6 Points,crossings and yards
 
Chapter 5 Introduction to railway
Chapter 5 Introduction to railwayChapter 5 Introduction to railway
Chapter 5 Introduction to railway
 
Chapter 4 Drainge and maintenance of road
Chapter 4 Drainge and maintenance of roadChapter 4 Drainge and maintenance of road
Chapter 4 Drainge and maintenance of road
 
Equipment management
Equipment managementEquipment management
Equipment management
 
Labour management
Labour managementLabour management
Labour management
 
Material management
Material managementMaterial management
Material management
 
Chapter 8 introduction to construction equipments
Chapter 8 introduction to construction equipmentsChapter 8 introduction to construction equipments
Chapter 8 introduction to construction equipments
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formwork
 
Chapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavationsChapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavations
 
Chapter 3 caisson
Chapter 3 caissonChapter 3 caisson
Chapter 3 caisson
 
Chapter 2 coffer-dam
Chapter 2 coffer-damChapter 2 coffer-dam
Chapter 2 coffer-dam
 
Chapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSChapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONS
 
Chapter 13 green building
Chapter 13 green buildingChapter 13 green building
Chapter 13 green building
 
Chapter 12 special treatments
Chapter 12 special treatmentsChapter 12 special treatments
Chapter 12 special treatments
 
Chapter 11 temporary works
Chapter 11 temporary worksChapter 11 temporary works
Chapter 11 temporary works
 

Recently uploaded

VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 

Recently uploaded (20)

VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 

Chapter 2 Road geometrics

  • 1. 1 1
  • 2. Importance of geometric design •The geometric design of a highway deals with the dimensions and layout of visible features of the highway such as alignment, sight distance and intersection. The main objective of highway design is to provide optimum efficiency in traffic operation with maximum safety at reasonable cost. • • Geometric design of highways elements :  Cross section elements  Sight distance considerations  Horizontal alignment details  Vertical alignment details  Intersection elements deals with following 2
  • 3. FACTORS AFFECTING HIGHWAY GEOMETRICS DESIGN • • • • • Design speed Topography Traffic factors Design hourly volume and capacity Environmental and other factors Design speed •In India different speed standards have for different class of road. been assigned • The maximum safe speed of vehicles used for the road geometrics design is known as design speed. 3
  • 4. Design speed is important for the following…  Sight distance  Super Elevation  Radius of horizontal curve  Extra widening of pavement  Length of valley curves 4
  • 5. topography • Classified based on the general  Plane terrain- <10%  Rolling terrain- 10-25%  Mountainous terrain- 25-60%  Steep terrain- >60% slope of the country. Traffic factor • Vehicular characteristics and human road users. characteristics of • Different vehicle classes have different speed and acceleration characteristics, different dimensions and weight . Human factor includes the physical, mental and psychological characteristics of driver and pedestrian. • 5
  • 10. Design hourly volume and capacity • • Traffic flow fluctuating with time Low value during off-peak hours to the highest value during the peak hour. • It is uneconomical to traffic flow. design the roadwayforpeak Environmental factors Aesthetics Landscaping Air pollution Noise pollution 10
  • 11. Cross Section Of Road And Its Componentss • • • • • • • • • • Carriageway Shoulder Side slope Berm Boundary stone Side drain Roadway or formation width Right of way Building line Control line 11
  • 13. 1. Carriage way:- The width of pavement way on which vehicles travel is called Carriage way or pavement width. Width of carriageway is determined on the basis of the width of the vehicle and the minimum side clearance for safety. As per IRC specification, the maximum width of vehicle is 2.44m. Formation width is the top of width of the highway embankment excluding the side drains. Formation width = width of carriage way + width of shoulders 2. Formation width:- 13
  • 15. Two lane two-way road carriageway 15
  • 16. WIDTH OF ROADWAY OF VARIOUS CLASSES OF ROADS SL. No. Road classification Roadway wisth Plane and rolling terrain Mountainous and steep terrain 1 NH & SH a) Single lane 12 b) two lane 12 6.25 8.80 2 MDR a) Single lane 9 b) two lane 9 4.75 4.75 3 ODR a) Single lane 7.5 b) two lane 9 4.75 4.75 4 Village roads-single lane 7.5 4 WIDTH OF CARRIAGEWAY SL. NO. Class of road Width of carriageway in ‘m’ 1 Single lane 3.75 2 Two lane without raised kerbs 7.0 3 Two lane with raised kerbs 7.5 4 Intermediate lane 5.5 5 Multilane pavement 3.5/lane 16
  • 17.  Shoulders are provided along the road edge to serve as an emergency lane for vehicles .  As per IRC, the min. width of shoulder should be 2.5m.  Uses :  Repair of broken down vehicles  Overtaking operations  To act as an emergency lane  For future widening of road  For temp. diversion of traffic during road repair etc It should have sufficient load bearing capacity even in wet weather. The surface of the should be rougher than the traffic lanes so that vehicles are discouraged to use the shoulder as a regular traffic. The colour should be different from that of the pavement so as to be distinct. Shoulders 17
  • 20. 20
  • 21. 21
  • 22. 5. Side slope:- The slope of earthwork in filling or in cutting is called Side slope. It imparts stability to the earthwork. • For Filling: Normally, 1:2 • For cutting: Type of soil Slope 1:1 to 1:1/2 Ordinary soil Broken Rock Soft Rock 1:1/2 to 1:1/4 1:1/4 to 1:1/8 Hard Rock Approx. Perpendicular 22
  • 23. 23
  • 24. 6. Berm:- The distance between the road toe and the inner edge of borrow pit is called berm. It prevents the erosion of embankment soil. 7. Boundary stone :- To indicate the boundary of land acquired for road, stones are driven in to the ground at about 30m distance on either side from the center line of the road. These stones are known as boundary stone. 24
  • 25. 25
  • 26. 8. Side drain:- For the drainage of rainwater, drains are provided on either side of the road. Normally, side drains are required for the road in cutting. For road in embankment, side drain is not necessary. 9. Building line:- The distance from the center line of road on either side, within which construction of buildings is not permitted is called Building line. 26
  • 27. 27
  • 28. 10.Control line:- At the locations like bank, hospital, factory, theatre, etc. on the road, where more people gather disturbance to the traffic will be more. Purposes : For future widening of road To reduce the chance of accidents To relieve residents from noise pollution To prevent disturbance to the traffic by nearby residents  The distance from the centre line to such building is called control line. 28
  • 29. Type of road B.L(m) C.L(m) NH, SH 40 75 MDR 30 55 ODR 20 35 VR 12 24 29
  • 30. Cross section of different types of road as per IRC : 30
  • 31. 31
  • 32. Cross slope or camber: • It is the slope provided to the road surface in the transverse direction to drain off the rain water from the road surface. To prevent the entry of surface water into the subgrade soil through pavement. To prevent the entry of water into the bituminous pavement layer. To remove the rain water from the pavement surface as quick as possible and to allow the pavement to get dry soon after the rain. It is expressed as a percentage or 1V:Nh. It depends on the pavement surface and amount of rainfall. • • • • • 32
  • 33. Shape of the cross slope: • • • Parabolic shape(fast moving vehicle) Straight line Combination of parabolic and straight line Recommended values of camber for different types of road surface Sl no. Type of road surface Range of camber in areas of rain fall range heavy light 1 Cement concrete and high type 1 in 50(2%) bituminous pavement 1 in 60(1.7%) 2 Thin bituminous surface 1 in 40(2.5%) 1 in 50(2%) 3 Water bound macadam(WBM) and gravel I in 33(3%) pavement 1 in 40(2.5%) 4 Earth 1 in 25(4%) 1 in 33(3%) 33
  • 34. 34
  • 35. SIGHT DISTANCE 35 Definition :  The actual distance along the road surface , which a driver from a specified height above the carriageway has visibility of stationary or moving object is known as sight distance. 2
  • 36.  Restrictions to sight distance may be caused as shown in fig. • Sight distance at horizontal curve http://www.tpub.com/inteng/11.htm16.gif 3 36
  • 37. • Sight distance at vertical curve http://www.msha.gov/training/surfhaul/images/slide6.jpg 3 7 37
  • 38. • Sight distance at intersection 3 8 http://onlinemanuals.txdot.gov/txdotmanuals/rdw/images/3-2.png 38
  • 39. 39
  • 41. Stoppingsightdistance (SSD) 41 Definition : The minimum sight distance available on a highway to stop a vehicle travelling at design speed , safely without collision with any other obstruction is called stopping distance. https://encrypted-tbn1.gstatic.com/images?q=tbn:ANd9GcQFKpIxAAAbJH3n64ECpY2EHIf- mjYUXedmQ0WUPheL5hqfngHS 7
  • 42. 42
  • 43. http://www.ite.org/css/online/img/Figure10-5.jpg 43 •For the purpose of measuring stopping sight distance , IRC has suggest clear sight triangle as shown in fig. ,
  • 45. 1) speed of vehicle: 45 https://encrypted/tbn1.gstatic.com/images?q=tbn:ANd9GcTJk56HWGT5GXbpWSsGFElb5384HgIeyKfqcB4cqKwu9xy69dSm
  • 46. 2) total reaction time of the driver : 46 http://www.hk/phy.org/contextual/mechanics/kin/eq_motion/6-01.gif
  • 47. 3) friction resistance between the road &tyres : 47https://www.koroad.or.kr/images/en/img_know38.jpg
  • 48. 4) gradient of road: 48
  • 51. Lagdistance • reaction time is known as lag distance . • Reaction time of the driver is the time taken from the instant the object is visible to the driver to the instant the brakes are effectively applied. 51 Definition : The distance travelled by the vehicle during the total 16http://www.hk/phy.org/contextual/mechanics/kin/eq_motion/6-01.gif
  • 52. WhatisPIEVTheory? 52 Acc. To PIEV theory the total reaction time of the driver is split into four parts . 52
  • 53. 1) Perception time : It is the time required for the sensations received by the eyes or ears to be transmitted to the brain through the nervous system . 2) Intellection time :  It is the time required for understanding the situation. 53 53
  • 55. 3) Emotion time :  it is time elapsed during emotional sensations & Disturbance such as fear , anger ,etc. with reference to the situation . 4) Volition time :  volition time is the time taken for the final action. Lag distance = v * t 55 Where, v = speed of vehicle in m/s t = total reaction time (s) [ as per IRC t = 2.5 s ] g= acceleration due to gravity = 9.8 m/sec2 f= coefficient of friction (0.4 to 0.35) 55
  • 56. Braking distance= v²/2gf SSD=lag distance + braking distance • • Two-way traffic single lane road: SSD=2*SSD In one-way traffic with single or more lane or two- way traffic with more than single lane: Minimum SSD= SSD Table 2.6: Coefficient of longitudinal friction Speed, kmph 30 40 50 60 ˃80 Longitudinal coefficient of friction 0.40 0.38 0.37 0.36 0.35 SSD= V.t + v²/2gf 56
  • 57. Example-1 • Calculate the safe stopping sight distance for design speed of 50kmph for(a) two-way traffic on two lane road (b)two-way traffic on single lane road Example-2 • Calculate the minimum sight distance required to avoid a head on collision of two cars approaching from opposite direction at 90 and 60kmph.coefficient friction of 0.7 and a brake efficiency of 50%, in either case Example-3 • Calculate the stopping sight distance on a highway at descending gradient of 2% for design speed of 80 kmph, assume other data as per IRC specification. a
  • 58. OVERTAKING SIGHT DISTANCE  The minimum distanceopen to thevision of thedriver of a vehicle intending to overtake slow vehicle ahead with safety against the traffic of opposite direction is known as the minimum overtaking sight distance(OSD)orthe safe passing sightdistance. The overtaking sight distance or OSD is the distance measured along the centre of the road which a driver with his eye level 1.2m above the road surfacecan see the topof an object 1.2m above the road surface
  • 59. 59 Factors on which overtaking sight distance depends: •Minimum OSD required for the safe overtaking depends on: a. Speed of overtaking, overtaken vehicle and vehicle coming from opposite direction if any. b. Skill and reaction time of the driver. c. Distance between overtaking and overtaken vehicles. d. Rate of acceleration of overtaking vehicle e. Gradient of the road if any.
  • 60. Analysis of OSD on a two lane road with two way traffic: 60
  • 61. wheret is the reaction time of thedriver in second= 2 sec.
  • 62. 62 •From A1 to A2, the distance ‘d1’ (m) travelledby overtaking vehicle Aat reduced speed ‘vb’ (m/s) during reaction time ‘t’(sec), d1= vb X t • IRC suggest reaction time t of driver as 2 sec , d1= 2vb •From A2 to A3, vehicle Astarts accelerating, shift to adjoining lane, overtakes vehicle B, and shift back to its original lane during overtaking time ‘T’ (sec) and travel distance ‘d2’(m).
  • 63. 63 •From A2 to A3, the distance ‘d2’ (m) is further split into three parts viz; d2= (s+b+s) d2= (b+2s) •The minimum spacing ‘s’ (m)between vehicles depends on their speed and is given by empirical formula, s=(0.7vb + 6) •The distance covered by the slow vehicle B travelling at a speed of ‘vb’ (m/s) in time ‘T’(sec) is, b= vb X T
  • 64. • The overtaking time ‘T’ (sec) is calculatedas; d2=(b+2s)=(vbT+aT2/2) b=vb T , 2s=aT2/2 •From C1 to C2, distance travelled by vehicle C moving at design speed ‘v’ (m/s) during time ‘T’ (sec) is given by, d3=v X T 64
  • 65. 65 • Thus overtaking sight distance (OSD) is, OSD=(d1+d2+d3) OSD= (vb X t) + (vb X T +2s) +(v X T) • If speed is in kmph, OSD= (0.28Vb X t)+(0.28Vb X T+2s)+(0.28V X T) •In case speed of overtaken vehicle is not given it is assumed 16 kmph less than design speed of the highway.
  • 66. where, s=spacing of vehicles t=reaction time of driver = 2sec v =design speed in m/sec V= design speed in kmph vb=initial speed of overtaking vehicle in m/sec Vb=initial speed of overtaking vehicle in Kmph A=average acceleration in kmph/sec a=average acceleration in m/sec2 66
  • 67. 67 Super elevation (e): •In order to counteract the effect of centrifugal force and to reduce the tendency of the vehicle to overturn or skid, the outer edge of the pavement is raised with respect to the inner edge, thus providing a transverse slope throughout the length of the horizontal curve. •This transverse inclination to the pavement surface is known as Super elevation or cant or banking.
  • 68. 68
  • 69.
  • 70. • Therefore, the general equation for the design of super elevation is given by, e + f = v²∕gR 70 • If ‘V’ speed of the vehicle is in kmph, e + f = V²∕ 127R where, e=rate of Superelevation=tanӨ f = design value of lateral friction coefficient = 0.15 v = speed of the vehicle, m/sec R = radius of the horizontal curve, m g = acceleration due to gravity = 9.81 m/sec²
  • 71. 71 Maximum Superelevation •Indian Roads Congress (IRC) had fixed the maximum limit of Superelevation in plan and rolling terrains and is snow bound areas as 7.0 %. •On hill roads not bound by snow a maximum Superelevation upto10% is recommended. •On urban road stretches with frequent intersections, it may be necessary to limit the maximum Superelevation to 4.0 %.
  • 72. 72 Widening of pavement on horizontal curves: On horizontal curves, especially when they are Less than 300m radii, it is common to widen the pavement slightly more than the normal width. • Widening is needed for the following reasons: a. An automobile has a rigid wheel base and only the front wheels can be turned, when this vehicle takes a turn to negotiate a horizontal curve, the rear wheel do not follow the same path as that of the front wheels. This phenomenon is called off tracking.
  • 73. 73 b.While two vehicle cross or overtake at horizontal curve there is psychological tendency to maintain a greater clearance between the vehicle for safety. c.For greater visibility at curve, the driver have tendency not to follow the central path of the lane, but to use the outer side at the beginning of the curve. d.At higher speed superelevation and lateral friction cannot counteract centrifugal force and skidding may occur.
  • 74. 74 Analysis of extra widening on horizontal curves: The extra widening of pavement on horizontal curves is divided into two parts: a. Mechanical widening/Off tracking b. Psychological widening
  • 75. a. Mechanical widening/Off tracking (Wm): 75
  • 76. 76 •If road having ‘n’ traffic lanes and ‘n’ vehiclescan travel simultaneously, mechanical widening reqd. is given by, Wm = nl2/ 2R Where, R = Mean radius of the curve in m, n=no. of traffic lanes l = Length of Wheel base of longest vehicle , m (l = 6.0 m or 6.1m for commercial vehicles) V= design speed, kmph
  • 77. b. Psychological widening (Wps): An empirical formula has been recommended by IRC for deciding the additional psychological widening. •The psychological widening is given by the formula: 77
  • 78. • The total extra widening is given by, We=Wm + Wps where, n=no. of traffic lanes l = length of wheel base =6.1 or 6 m V=design speed kmph R = radius of the horizontal curve, m 78
  • 79. Horizontal transition curves  When a non circular curve is introduce between a straight and a circular curve has a varying radius which decreases from infinity at the straight end (tangent point) to the desired radius of the circular curve at the other end (curve point) for the gradual introduction of centrifugal force is known as transition curve.
  • 80. Objectives for providing transition curve  To introduce gradually the centrifugal force between the tangent point and the beginning of the circular curve, avoiding sudden jerk on the vehicle. This increases the comfort of passengers.  To enable the driver turn the steering gradually for his own comfort and security  To provide gradual introduction of super elevation  To provide gradual introduction of extra widening.  To enhance the aesthetic appearance of the road.
  • 81.
  • 82. Type of transition curve  spiral or clothoid  cubic parabola  Lemniscate
  • 83. Length of transition curve  Case-1:Rate of change of centrifugal acceleration  Where,  Ls= length of transition curve in ‘m’  C= allowable rate of change of centrifugal accleration,  R= Radius of the circular curve in ‘m’
  • 84.  case-2:Rate of introduction of super-elevation  If the pavement is rotated about the center line. If the pavement is rotated about the inner edge  Where ,  W is the width of pavement  We is the extra widening  Rate of change of superelevation of 1 in N
  • 85.  case-3:By empirical formula  According to IRC standards:  For plane and rolling terrain:  For mountainous and steep  terrain:  NOTE: The design length of transition curve(Ls) will be the highest value of case-1,2 and 3
  • 86. 86 Gradients: •Gradient is the rate of rise or fall along the length of road with respect to the horizontal. •It is expressed as a ratio of 1 in n or also as percentage such as n%. ‘
  • 87. 87 The following are the various factors which govern the selection of gradient in the alignment of a road. 1. Nature of ground 2. Nature of traffic 3. Drainage required. 4. The type of road surface. 5. The total height to be curved.
  • 88. 1. Ruling Gradient: The gradient usually adopted while making the alignment of a road is called as ruling Gradient. 2. Limiting Gradient: The gradient steeper then the ruling which may be used in restricted road lengths where the later is not feasible is called maximum or Limiting Gradient. 3. Exceptional Gradient: The gradient steeper than the limiting which may be used in short lengths of the road only in extra ordinary situtation is called as Exceptional Gradient.
  • 89.
  • 90. 4. Average Gradient: The total rise or fall between any two points along the alignment of a road divided by the horizontal distance between them is called Average Gradient. 5. Floating Gradient: The gradient on which a motor vehicle moving with a constant speed, continues to descend with the same speed without any application of power or brakes is called Floating Gradient. 6. Minimum Gradient: The minimum desirable slope essential for effective drainage of rain water from the road surface is called Minimum Gradient.
  • 91.
  • 92. Grade compensation  At the horizontal curve, due to the turning angle α of the vehicle, the curve resistance develop is equal to T(1- Cosα).  Thus grade compensation can be defined as the reduction in gradient at the horizontal curve because of the additional tractive force required due to curve resistance (T−Tcosα), which is intended to offset the extra tractive force involved at the curve.
  • 93. 93  IRC gave the following specification for the grade compensation. 1.Grade compensation is not required for grades flatter than 4% because the loss of tractive force is negligible. 2.Grade compensation is (30+R)/R %, where ‘R’ is the radius of the horizontal curve in meters. 3.The maximum grade compensation is limited to 75/R%.
  • 94.
  • 95. 95 Vertical Curves: •The vertical curves used in highway may be classified into two categories: a. Summit curves or crest curves b. Valley curves or sag curves ‘
  • 96. a. Summit curves or crest curves: ‘ 96
  • 97. 97 Length of summit curve: •While designing the length the parabolic summit curves, it is necessary to consider SSD and OSD Separately. ‘
  • 98. 98 •Length of summit curve for stopping sight distance (SSD): Two cases are considered in deciding the length: a. When L>SSD b. When L<SSD ‘
  • 99. a. When L > SSD The general equation for length of curve is given by: • Substituting the value of H=1.2m and h=0.15m, ‘ 99
  • 100. b. When L < SSD The general equation for length of curve is given by: • Substituting the value of H=1.2m and h=0.15m, •The minimum radius of the parabolic summit curve is calculated from relation R=L/N ‘ 100
  • 101. 101 •Length of summit curve for overtaking sight distance (OSD): Two cases are considered in deciding the length: a. When L > OSD b. When L < OSD ‘
  • 102. a. When L > OSD The general equation for length of curve is given by: • Substituting the value of H=1.2m, ‘ 120
  • 103. b. When L < OSD The general equation for length of curve is given by: • Substituting the value of H=1.2m, ‘ 103
  • 104. 104 wher e, • N= deviation angle i.e. algebraic difference between two grade • H=height of driver eye above carriageway i.e. • 1.2 m • h=height of object above carriageway i.e. 0.15 m L=length of summit curve, m • S=sight distance i.e. SSD or OSD
  • 105. 105 Length of valley curve: •The important factors to be considered in valley curve design are: a.Impact free movement of vehicles at design speed or comfort to passenger. b.Providing adequate sight distance under head lights of vehicles for night driving c.Locating lowest point of valley curve for providing suitable cross drainage facilities ‘
  • 106. b. Valley curves or sag curves: ‘ 106
  • 107. a. Length of valley transition curve for comfort condition: Total length of valley curve is given by: If ‘V’ is inkmph, ‘ 107
  • 108. 108 where, v or V= design speed in m/sec or kmph C=allowable rate of change of centrifugal acceleration=0.6 m/sec3 L=length of valley curve=2Ls N= deviation angle i.e. algebraic difference between two grade
  • 109. 109 b. Length of valley curve for head light sight distance: •The length of valley curve for head light sight distance may be determined for two condition: a. When L > SSD b. When L < SSD ‘
  • 110. a. When L > SSD The general equation for length of valley curve is given by:‘ 110
  • 111. b. When L < SSD The general equation for length of valley curve is given by: where, N= deviation angle i.e. algebraic difference between two grade L=total length of valley curve, m S=SSD, m ‘ 111