TIMBERING IN TRENCHES
When the depth of trench is large, or when the sub-soil is loose, the
sides of the trench may cave in. The problem can be solved by adopting
a suitable method of timbering. Timbering of trenches, sometimes also
known as shoring consists of providing timber planks or boards and
struts to give temporary support to the sides of the trench. Timbering of
deep trenches can be done with the help of the following methods:
1. Stay bracing.
2. Box sheeting
3. Vertical sheeting
4. Runner system
5. Sheet piling.
3
1. Stay bracing. This method (Fig. 2.31) is used for supporting the
sides or a bench excavated in fairly firm soil, when the depth of
excavation does not exceed about 2 metres. The method consists of
placing vertical sheets (called sheathing) or polling boards opposite
each other against the two walls of the trench and holding them in
position by one or two rows of struts. The sheets are placed at an
interval of 2 to 4 metres and generally, they extend to the full height of
the trench. The polling boards may have width of about 200 mm and
thickness of 44 to 50 mm. The struts may have size 1OO x 100 mm
for trench up to 2 m width and 200 x 200 mm for trench up to 4 m
width.
4
FIG. 2.31 STAY BRACING.
5
2. Box sheeting. This method is adopted in loose soils, when the depth
of excavation does not exceed 4 metres. Fig. 2.32 (a) shows the box like
structure, consisting of vertical sheets placed very near to each other
(some times touching each other) and keeping them in position by
longitudinal rows (usually two) of Wales. Struts are then provided across
the Wales.
Another system of box sheeting, shown in Fig. 2.32(b), is adopted for
very loose soils. In this system, the sheeting is provided longitudinally,
and they are supported by vertical Wales and horizontal struts [Fig.
2.32 (b)]. If the height is more, braces are also provided along with
struts.
6
7
3. Vertical sheeting. This system is adopted for deep trenches (up to
10 m depth) in soft ground. The method is similar to the box sheeting
[Fig. 2.32 (a)] except that the excavation is carried out in stages and at
the end of each stage, an offset is provided, so that the width of the
trench goes on decreasing as the depth increases. Each stage is limited
to about 3 m in height and the offset may vary from 25 to 50 cm per
stage. For each stage, separate vertical sheeting, supported by
horizontal wailings and struts are provided (Fig. 2.33).
4. Runner system. This system is used in extremely loose and soft
ground, which needs immediate support as excavation progresses. The
system is similar to vertical sheeting of box system, except that in the
place of vertical sheeting, runners, made of long thick wooden sheets
or planks with iron shoe at the ends, are provided. Wales and struts are
provided as usual (Fig. 2.34). These runners are driven about 30 cm in
advance of the progress of the work, by hammering
8
9
5. Sheet piling. This method is adopted when (i) soil to be excavated
is soft or loose (ii) depth of excavation is large (iii) width of trench is
also large and (iv) there is sub-soil water. Sheet piles are designed to
resist lateral earth pressure. These are driven in the ground by
mechanical means (pile driving equipment). They can be used for
excavating to a very large depth.
10
Shoring is the construction of a temporary structure to support
temporarily an unsafe structure. These support walls laterally. They can be
used under the following circumstances:
•When walls bulge out
•When walls crack due to unequal settlement of foundation and repairs are
to be carried out to the cracked wall.
•When an adjacent structure needs pulling down.
•When openings are to be newly made or enlarged in a wall.
Types of shoring
•Raking shores
•Flying shores
•Dead shores
SHORING
11
RAKING SHORES
In this method, inclined members known as rakers are used to give
lateral supports to walls. A raking shore consists of the following
components:
•Rakers or inclined member
•Wall plate
•Needles
•Cleats
•Bracing
•Sole plate
12
13
FLYING SHORES
It is a system of providing temporary supports to the party walls of the
two buildings where the intermediate building is to be pulled down and
rebuilt. All types of arrangements of supporting the unsafe structure in
which the shores do not reach the ground come under this category.
They flying shore consists of wall plates, needles, cleats, horizontal
struts (commonly known as horizontal shores) and inclined struts
arranged in different forms which varies with the situation. In this
system also the wall plates are placed against the wall and secured to it.
A horizontal strut is placed between the wall plates and is supported by
a system of needle and cleats. The inclined struts are supported by the
needle at their top and by straining pieces at their feet. The straining
piece is also known as straining sill and is spiked to the horizontal
shore. The width of straining piece is the same as that of the strut.
14
15
16
DEAD SHORES
This is the system of shoring which is used to render vertical support
to walls and roofs, floors, etc when the lower part of a wall has been
removed for the purpose of providing an opening in the wall or to
rebuild a defective load bearing wall in a structure. The dead shore
consists of an arrangement of beams and posts which are required to
support the weight of the structure above and transfer same to the
ground on firm foundation below.
17
18
When opening in the wall are to be made, holes are cut in the wall at
such a height as to allow sufficient space for insertion of the beam or
girder that will be provided permanently to carry the weight of the
structure above. Distance at which the holes are cut depends upon the
type of masonry and it varies from 1.2m to 1.8m centre. Beams called
needles are placed in the holes and are supported by vertical props
called dead shores at their ends on either side of the wall. The needles
may be of timber or steel and are of sufficient section to carry the load
above.
19
The method of underpinning help to strengthen the foundation of
an existing building or any other infrastructure. These involve
installation of permanent or temporary support to an already held
foundation so that additional depth and bearing capacity is achieved.
UNDERPINNING
The process of providing a new foundation below an existing
foundation of an existing foundation, without endangering the
stability of an existing structure.
20
1. Mass Concrete Underpinning Method (Pit
Method)
•Mass concrete underpinning method is the traditional method of
underpinning, as it has been followed by centuries. The method
involves extending the old foundation till it reaches a stable
stratum.
•The soil below the existing foundation is excavated in a controlled
manner through stages or pins. When strata suitable is reached, the
excavation is filled with concrete and kept for curing, before next
excavation starts.
•In order to transfer the load from old foundation to new one, a
new pin is provided by means of placing dry sand-cement pack.
This is a low-cost method suitable for the shallow foundation.
21
22
Pile Method of Underpinning
In this method, piles are driven on adjacent sides of the wall that
supports the weak foundation. A needle or pin penetrates through the
wall that is in turn connected to the piles as shown in figure-3.
These needles behave like pile caps. Settlement in soil due to water
clogging or clayey nature can be treated by this method.
23
24
Underpinning By Cantilever Needle Beam Method
Figure-2 represents the arrangement of cantilever pit method of
underpinning, which is an extension of pit method. If the foundation
has to be extended only to one side and the plan possess a stronger
interior column, this method can be used for underpinning.
Advantages of Cantilever Needle Beam Method:
•Faster than traditional method
•One side access only
•High load carrying capability
Disadvantages:
•Digging found uneconomical when existing foundation is deep
•Constraint in access restricts the use of needle beams
25
When wall or column or other structural member of building
exceeds 1.5m, a temporary structures are needed to support the
platform over which workmen can work and material can kept.
These temporary structures constructed very close to wall, is in the
form of timber or steel framework, called Scaffolding.
SCAFFOLDING
26
•Standards
•Ledgers
•Braces
•Putlogs
•Transoms
•Bridle
•Boarding
•Guard rail
•Toe board
COMPONENT PARTS
27
1. Single scaffolding or brick layers scaffolding
2. Double scaffolding or mason’s scaffolding
3. Cantilever or needle scaffolding
4. Suspended scaffolding
5. Trestle scaffolding
6. Steel scaffolding
7. Patented scaffolding
TYPES OF SCAFFOLDING
28
1. SINGLE SCAFFOLDING OR BRICK
LAYERS SCAFFOLDING
29
30
Single Scaffolding
Single scaffolding is generally used for brick masonry and is also called
as brick layer’s scaffolding. Single scaffolding consists of standards,
ledgers, putlogs etc., which is parallel to the wall at a distance of about
1.2 m. Distance between the standards is about 2 to 2.5 m. Ledgers
connect the standards at vertical interval of 1.2 to 1.5 m. Putlogs are
taken out from the hole left in the wall to one end of the ledgers.
Putlogs are placed at an interval of 1.2 to 1.5 m.
2. DOUBLE SCAFFOLDING OR
MASON’S SCAFFOLDING
31
32
Double Scaffolding
Double Scaffolding is generally used for stone masonry so, it is also
called as mason’s scaffolding. In stone walls, it is hard to make holes in
the wall to support putlogs. So, two rows of scaffolding is constructed
to make it strong. The first row is 20 – 30 cm away from the wall and
the other one is 1m away from the first row. Then putlogs are placed
which are supported by the both frames. To make it more strong
rakers and cross braces are provided. This is also called as independent
scaffolding.
3. CANTILEVER OR NEEDLE
SCAFFOLDING
33
34
Cantilever Scaffolding:
This a type of scaffolding in which the standards are supported on series
of needles and these needles are taken out through holes in the wall. This
is called single frame type scaffolding. In the other type needles are
strutted inside the floors through the openings and this is called
independent or double frame type scaffolding. Care should be taken while
construction of cantilever scaffolding.
Generally cantilever scaffoldings are used under conditions such
as
•When the ground does not having the capacity to support standards.
•When the Ground near the wall is to be free from traffic.
•When upper part of the wall is under construction.
Light weight scaffolding used for repair works like painting,
pointing etc.
The working platform is suspended from roofs by means of
wire ropes or chains.
Platform can be raised or lowered at any desired level.
4.SUSPENDED SCAFFOLDING
35
This is also used for repair works inside the room, up to height
of 5m.
The working platform is supported on the top of movable
contrivances like tripods, ladders may be mounted on wheels.
5.TRESTLE SCAFFOLDING
36
Wooden members are replaced by steel tubes and rope lashings are
replaced by steel couplets or fittings.
Such scaffolding can be erected and dismantled rapidly.
It has greater strength, greater durability and higher fire resistance.
Can be used for stone and brick masonry construction.
6.STEEL SCAFFOLDING
37
Market available scaffoldings.
Equipped with special couplings, frames.
Working platform is supported on brackets which can be adjusted
at any suitable height
7.PATENTED
SCAFFOLDING
38
39

More Related Content

What's hot (20)

Arches
ArchesArches
Arches
 
Shoring
ShoringShoring
Shoring
 
Roofs
RoofsRoofs
Roofs
 
Types of pitched roofs
Types of pitched roofsTypes of pitched roofs
Types of pitched roofs
 
Retaining Walls
Retaining WallsRetaining Walls
Retaining Walls
 
Doors and windows
Doors and windowsDoors and windows
Doors and windows
 
Brick walling and joints
Brick walling and jointsBrick walling and joints
Brick walling and joints
 
SCAFFOLDING SHORING & UNDERPINNING
SCAFFOLDING SHORING & UNDERPINNINGSCAFFOLDING SHORING & UNDERPINNING
SCAFFOLDING SHORING & UNDERPINNING
 
Temporary Work in Building Construction
Temporary Work in Building ConstructionTemporary Work in Building Construction
Temporary Work in Building Construction
 
Floors
FloorsFloors
Floors
 
REINFORCED CEMENT CONCRETE
REINFORCED CEMENT CONCRETEREINFORCED CEMENT CONCRETE
REINFORCED CEMENT CONCRETE
 
Stone Masonry BUILDING CONSTRUCTION
Stone Masonry BUILDING CONSTRUCTIONStone Masonry BUILDING CONSTRUCTION
Stone Masonry BUILDING CONSTRUCTION
 
Stairs Ppt
Stairs PptStairs Ppt
Stairs Ppt
 
Chapter 8 floorings
Chapter 8 flooringsChapter 8 floorings
Chapter 8 floorings
 
Surface finishes(1)
Surface finishes(1)Surface finishes(1)
Surface finishes(1)
 
Foundation types
Foundation typesFoundation types
Foundation types
 
Damp Proof Course
Damp Proof Course Damp Proof Course
Damp Proof Course
 
Roof truss
Roof trussRoof truss
Roof truss
 
Setting out of building
Setting out of buildingSetting out of building
Setting out of building
 
Chapter 4 (d) hollow concrete block masonry
Chapter 4 (d) hollow concrete block masonryChapter 4 (d) hollow concrete block masonry
Chapter 4 (d) hollow concrete block masonry
 

Similar to Chapter 11 temporary works

Notes on introduction and design ofTEMPORARY WORKS (BTECH).pdf
Notes on introduction and design ofTEMPORARY WORKS (BTECH).pdfNotes on introduction and design ofTEMPORARY WORKS (BTECH).pdf
Notes on introduction and design ofTEMPORARY WORKS (BTECH).pdfVICTOR A. KIPLAGAT
 
ABC 1st Week(2hrs
ABC 1st Week(2hrsABC 1st Week(2hrs
ABC 1st Week(2hrspal892241
 
Chapter 3 shallow foundations
Chapter 3 shallow foundationsChapter 3 shallow foundations
Chapter 3 shallow foundationsKHUSHBU SHAH
 
Unit iii braced_cuts
Unit iii braced_cutsUnit iii braced_cuts
Unit iii braced_cutsGimmick
 
Construction of substructure
Construction of substructureConstruction of substructure
Construction of substructureguasiya
 
Secant piled walls dsign - تصميم خوازيق الجدران الساندة - ميكرو بايل
Secant piled walls  dsign - تصميم خوازيق الجدران الساندة - ميكرو بايلSecant piled walls  dsign - تصميم خوازيق الجدران الساندة - ميكرو بايل
Secant piled walls dsign - تصميم خوازيق الجدران الساندة - ميكرو بايلDr.youssef hamida
 
Floor and wall ties
Floor and wall tiesFloor and wall ties
Floor and wall tiesSaratMishra4
 
Foundation Rehabilitation
Foundation RehabilitationFoundation Rehabilitation
Foundation RehabilitationAani4
 
soil retention in construction -Group 7 powerpoint
    soil retention in construction -Group 7 powerpoint    soil retention in construction -Group 7 powerpoint
soil retention in construction -Group 7 powerpointLawin Langat
 
Braced cut in deep excavation
Braced cut in deep excavationBraced cut in deep excavation
Braced cut in deep excavationYogesh Pandey
 
Braced cuts in deep excavation
Braced cuts in deep excavationBraced cuts in deep excavation
Braced cuts in deep excavationRakesh Reddy
 

Similar to Chapter 11 temporary works (20)

BCT - Module 5 special work
BCT - Module 5 special workBCT - Module 5 special work
BCT - Module 5 special work
 
Notes on introduction and design ofTEMPORARY WORKS (BTECH).pdf
Notes on introduction and design ofTEMPORARY WORKS (BTECH).pdfNotes on introduction and design ofTEMPORARY WORKS (BTECH).pdf
Notes on introduction and design ofTEMPORARY WORKS (BTECH).pdf
 
ABC 1st Week(2hrs
ABC 1st Week(2hrsABC 1st Week(2hrs
ABC 1st Week(2hrs
 
Chapter 3 shallow foundations
Chapter 3 shallow foundationsChapter 3 shallow foundations
Chapter 3 shallow foundations
 
Shoring.pdf
Shoring.pdfShoring.pdf
Shoring.pdf
 
Unit iii braced_cuts
Unit iii braced_cutsUnit iii braced_cuts
Unit iii braced_cuts
 
Deep excavations
Deep excavationsDeep excavations
Deep excavations
 
Construction of substructure
Construction of substructureConstruction of substructure
Construction of substructure
 
Theory of structures
Theory of structuresTheory of structures
Theory of structures
 
Secant piled walls dsign - تصميم خوازيق الجدران الساندة - ميكرو بايل
Secant piled walls  dsign - تصميم خوازيق الجدران الساندة - ميكرو بايلSecant piled walls  dsign - تصميم خوازيق الجدران الساندة - ميكرو بايل
Secant piled walls dsign - تصميم خوازيق الجدران الساندة - ميكرو بايل
 
Floor and wall ties
Floor and wall tiesFloor and wall ties
Floor and wall ties
 
Group no 9
Group no 9Group no 9
Group no 9
 
Foundation Rehabilitation
Foundation RehabilitationFoundation Rehabilitation
Foundation Rehabilitation
 
soil retention in construction -Group 7 powerpoint
    soil retention in construction -Group 7 powerpoint    soil retention in construction -Group 7 powerpoint
soil retention in construction -Group 7 powerpoint
 
1.2 Diaphragm walls.pptx
1.2 Diaphragm walls.pptx1.2 Diaphragm walls.pptx
1.2 Diaphragm walls.pptx
 
Retaining wall
Retaining wallRetaining wall
Retaining wall
 
Braced cut in deep excavation
Braced cut in deep excavationBraced cut in deep excavation
Braced cut in deep excavation
 
Temporary works
Temporary worksTemporary works
Temporary works
 
Braced cuts in deep excavation
Braced cuts in deep excavationBraced cuts in deep excavation
Braced cuts in deep excavation
 
Module 3
Module 3Module 3
Module 3
 

More from KHUSHBU SHAH

PLANE TABLE SURVEY
PLANE TABLE SURVEYPLANE TABLE SURVEY
PLANE TABLE SURVEYKHUSHBU SHAH
 
DEMOLITION & DISMANTLING OF WORK
DEMOLITION & DISMANTLING OF WORKDEMOLITION & DISMANTLING OF WORK
DEMOLITION & DISMANTLING OF WORKKHUSHBU SHAH
 
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARETIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWAREKHUSHBU SHAH
 
Bridge Engineering
Bridge EngineeringBridge Engineering
Bridge EngineeringKHUSHBU SHAH
 
Chapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackChapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackKHUSHBU SHAH
 
Chapter 6 Points,crossings and yards
Chapter 6 Points,crossings and yardsChapter 6 Points,crossings and yards
Chapter 6 Points,crossings and yardsKHUSHBU SHAH
 
Chapter 5 Introduction to railway
Chapter 5 Introduction to railwayChapter 5 Introduction to railway
Chapter 5 Introduction to railwayKHUSHBU SHAH
 
Chapter 4 Drainge and maintenance of road
Chapter 4 Drainge and maintenance of roadChapter 4 Drainge and maintenance of road
Chapter 4 Drainge and maintenance of roadKHUSHBU SHAH
 
Chapter 2 Road geometrics
Chapter 2 Road geometricsChapter 2 Road geometrics
Chapter 2 Road geometricsKHUSHBU SHAH
 
Chapter 1 Introduction to road
Chapter 1 Introduction to roadChapter 1 Introduction to road
Chapter 1 Introduction to roadKHUSHBU SHAH
 
Equipment management
Equipment managementEquipment management
Equipment managementKHUSHBU SHAH
 
Material management
Material managementMaterial management
Material managementKHUSHBU SHAH
 
Chapter 8 introduction to construction equipments
Chapter 8 introduction to construction equipmentsChapter 8 introduction to construction equipments
Chapter 8 introduction to construction equipmentsKHUSHBU SHAH
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formworkKHUSHBU SHAH
 
Chapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavationsChapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavationsKHUSHBU SHAH
 
Chapter 2 coffer-dam
Chapter 2 coffer-damChapter 2 coffer-dam
Chapter 2 coffer-damKHUSHBU SHAH
 
Chapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSChapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSKHUSHBU SHAH
 
Chapter 13 green building
Chapter 13 green buildingChapter 13 green building
Chapter 13 green buildingKHUSHBU SHAH
 

More from KHUSHBU SHAH (20)

PLANE TABLE SURVEY
PLANE TABLE SURVEYPLANE TABLE SURVEY
PLANE TABLE SURVEY
 
DEMOLITION & DISMANTLING OF WORK
DEMOLITION & DISMANTLING OF WORKDEMOLITION & DISMANTLING OF WORK
DEMOLITION & DISMANTLING OF WORK
 
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARETIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
 
Bridge Engineering
Bridge EngineeringBridge Engineering
Bridge Engineering
 
Chapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackChapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway track
 
Chapter 6 Points,crossings and yards
Chapter 6 Points,crossings and yardsChapter 6 Points,crossings and yards
Chapter 6 Points,crossings and yards
 
Chapter 5 Introduction to railway
Chapter 5 Introduction to railwayChapter 5 Introduction to railway
Chapter 5 Introduction to railway
 
Chapter 4 Drainge and maintenance of road
Chapter 4 Drainge and maintenance of roadChapter 4 Drainge and maintenance of road
Chapter 4 Drainge and maintenance of road
 
Chapter 2 Road geometrics
Chapter 2 Road geometricsChapter 2 Road geometrics
Chapter 2 Road geometrics
 
Chapter 1 Introduction to road
Chapter 1 Introduction to roadChapter 1 Introduction to road
Chapter 1 Introduction to road
 
Equipment management
Equipment managementEquipment management
Equipment management
 
Labour management
Labour managementLabour management
Labour management
 
Material management
Material managementMaterial management
Material management
 
Chapter 8 introduction to construction equipments
Chapter 8 introduction to construction equipmentsChapter 8 introduction to construction equipments
Chapter 8 introduction to construction equipments
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formwork
 
Chapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavationsChapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavations
 
Chapter 3 caisson
Chapter 3 caissonChapter 3 caisson
Chapter 3 caisson
 
Chapter 2 coffer-dam
Chapter 2 coffer-damChapter 2 coffer-dam
Chapter 2 coffer-dam
 
Chapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSChapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONS
 
Chapter 13 green building
Chapter 13 green buildingChapter 13 green building
Chapter 13 green building
 

Recently uploaded

Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfphamnguyenenglishnb
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxAshokKarra1
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxCarlos105
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptxiammrhaywood
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 

Recently uploaded (20)

Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptx
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 

Chapter 11 temporary works

  • 2. 2 TIMBERING IN TRENCHES When the depth of trench is large, or when the sub-soil is loose, the sides of the trench may cave in. The problem can be solved by adopting a suitable method of timbering. Timbering of trenches, sometimes also known as shoring consists of providing timber planks or boards and struts to give temporary support to the sides of the trench. Timbering of deep trenches can be done with the help of the following methods: 1. Stay bracing. 2. Box sheeting 3. Vertical sheeting 4. Runner system 5. Sheet piling.
  • 3. 3 1. Stay bracing. This method (Fig. 2.31) is used for supporting the sides or a bench excavated in fairly firm soil, when the depth of excavation does not exceed about 2 metres. The method consists of placing vertical sheets (called sheathing) or polling boards opposite each other against the two walls of the trench and holding them in position by one or two rows of struts. The sheets are placed at an interval of 2 to 4 metres and generally, they extend to the full height of the trench. The polling boards may have width of about 200 mm and thickness of 44 to 50 mm. The struts may have size 1OO x 100 mm for trench up to 2 m width and 200 x 200 mm for trench up to 4 m width.
  • 4. 4 FIG. 2.31 STAY BRACING.
  • 5. 5 2. Box sheeting. This method is adopted in loose soils, when the depth of excavation does not exceed 4 metres. Fig. 2.32 (a) shows the box like structure, consisting of vertical sheets placed very near to each other (some times touching each other) and keeping them in position by longitudinal rows (usually two) of Wales. Struts are then provided across the Wales. Another system of box sheeting, shown in Fig. 2.32(b), is adopted for very loose soils. In this system, the sheeting is provided longitudinally, and they are supported by vertical Wales and horizontal struts [Fig. 2.32 (b)]. If the height is more, braces are also provided along with struts.
  • 6. 6
  • 7. 7 3. Vertical sheeting. This system is adopted for deep trenches (up to 10 m depth) in soft ground. The method is similar to the box sheeting [Fig. 2.32 (a)] except that the excavation is carried out in stages and at the end of each stage, an offset is provided, so that the width of the trench goes on decreasing as the depth increases. Each stage is limited to about 3 m in height and the offset may vary from 25 to 50 cm per stage. For each stage, separate vertical sheeting, supported by horizontal wailings and struts are provided (Fig. 2.33). 4. Runner system. This system is used in extremely loose and soft ground, which needs immediate support as excavation progresses. The system is similar to vertical sheeting of box system, except that in the place of vertical sheeting, runners, made of long thick wooden sheets or planks with iron shoe at the ends, are provided. Wales and struts are provided as usual (Fig. 2.34). These runners are driven about 30 cm in advance of the progress of the work, by hammering
  • 8. 8
  • 9. 9 5. Sheet piling. This method is adopted when (i) soil to be excavated is soft or loose (ii) depth of excavation is large (iii) width of trench is also large and (iv) there is sub-soil water. Sheet piles are designed to resist lateral earth pressure. These are driven in the ground by mechanical means (pile driving equipment). They can be used for excavating to a very large depth.
  • 10. 10 Shoring is the construction of a temporary structure to support temporarily an unsafe structure. These support walls laterally. They can be used under the following circumstances: •When walls bulge out •When walls crack due to unequal settlement of foundation and repairs are to be carried out to the cracked wall. •When an adjacent structure needs pulling down. •When openings are to be newly made or enlarged in a wall. Types of shoring •Raking shores •Flying shores •Dead shores SHORING
  • 11. 11 RAKING SHORES In this method, inclined members known as rakers are used to give lateral supports to walls. A raking shore consists of the following components: •Rakers or inclined member •Wall plate •Needles •Cleats •Bracing •Sole plate
  • 12. 12
  • 13. 13 FLYING SHORES It is a system of providing temporary supports to the party walls of the two buildings where the intermediate building is to be pulled down and rebuilt. All types of arrangements of supporting the unsafe structure in which the shores do not reach the ground come under this category. They flying shore consists of wall plates, needles, cleats, horizontal struts (commonly known as horizontal shores) and inclined struts arranged in different forms which varies with the situation. In this system also the wall plates are placed against the wall and secured to it. A horizontal strut is placed between the wall plates and is supported by a system of needle and cleats. The inclined struts are supported by the needle at their top and by straining pieces at their feet. The straining piece is also known as straining sill and is spiked to the horizontal shore. The width of straining piece is the same as that of the strut.
  • 14. 14
  • 15. 15
  • 16. 16 DEAD SHORES This is the system of shoring which is used to render vertical support to walls and roofs, floors, etc when the lower part of a wall has been removed for the purpose of providing an opening in the wall or to rebuild a defective load bearing wall in a structure. The dead shore consists of an arrangement of beams and posts which are required to support the weight of the structure above and transfer same to the ground on firm foundation below.
  • 17. 17
  • 18. 18 When opening in the wall are to be made, holes are cut in the wall at such a height as to allow sufficient space for insertion of the beam or girder that will be provided permanently to carry the weight of the structure above. Distance at which the holes are cut depends upon the type of masonry and it varies from 1.2m to 1.8m centre. Beams called needles are placed in the holes and are supported by vertical props called dead shores at their ends on either side of the wall. The needles may be of timber or steel and are of sufficient section to carry the load above.
  • 19. 19 The method of underpinning help to strengthen the foundation of an existing building or any other infrastructure. These involve installation of permanent or temporary support to an already held foundation so that additional depth and bearing capacity is achieved. UNDERPINNING The process of providing a new foundation below an existing foundation of an existing foundation, without endangering the stability of an existing structure.
  • 20. 20 1. Mass Concrete Underpinning Method (Pit Method) •Mass concrete underpinning method is the traditional method of underpinning, as it has been followed by centuries. The method involves extending the old foundation till it reaches a stable stratum. •The soil below the existing foundation is excavated in a controlled manner through stages or pins. When strata suitable is reached, the excavation is filled with concrete and kept for curing, before next excavation starts. •In order to transfer the load from old foundation to new one, a new pin is provided by means of placing dry sand-cement pack. This is a low-cost method suitable for the shallow foundation.
  • 21. 21
  • 22. 22 Pile Method of Underpinning In this method, piles are driven on adjacent sides of the wall that supports the weak foundation. A needle or pin penetrates through the wall that is in turn connected to the piles as shown in figure-3. These needles behave like pile caps. Settlement in soil due to water clogging or clayey nature can be treated by this method.
  • 23. 23
  • 24. 24 Underpinning By Cantilever Needle Beam Method Figure-2 represents the arrangement of cantilever pit method of underpinning, which is an extension of pit method. If the foundation has to be extended only to one side and the plan possess a stronger interior column, this method can be used for underpinning. Advantages of Cantilever Needle Beam Method: •Faster than traditional method •One side access only •High load carrying capability Disadvantages: •Digging found uneconomical when existing foundation is deep •Constraint in access restricts the use of needle beams
  • 25. 25
  • 26. When wall or column or other structural member of building exceeds 1.5m, a temporary structures are needed to support the platform over which workmen can work and material can kept. These temporary structures constructed very close to wall, is in the form of timber or steel framework, called Scaffolding. SCAFFOLDING 26
  • 28. 1. Single scaffolding or brick layers scaffolding 2. Double scaffolding or mason’s scaffolding 3. Cantilever or needle scaffolding 4. Suspended scaffolding 5. Trestle scaffolding 6. Steel scaffolding 7. Patented scaffolding TYPES OF SCAFFOLDING 28
  • 29. 1. SINGLE SCAFFOLDING OR BRICK LAYERS SCAFFOLDING 29
  • 30. 30 Single Scaffolding Single scaffolding is generally used for brick masonry and is also called as brick layer’s scaffolding. Single scaffolding consists of standards, ledgers, putlogs etc., which is parallel to the wall at a distance of about 1.2 m. Distance between the standards is about 2 to 2.5 m. Ledgers connect the standards at vertical interval of 1.2 to 1.5 m. Putlogs are taken out from the hole left in the wall to one end of the ledgers. Putlogs are placed at an interval of 1.2 to 1.5 m.
  • 31. 2. DOUBLE SCAFFOLDING OR MASON’S SCAFFOLDING 31
  • 32. 32 Double Scaffolding Double Scaffolding is generally used for stone masonry so, it is also called as mason’s scaffolding. In stone walls, it is hard to make holes in the wall to support putlogs. So, two rows of scaffolding is constructed to make it strong. The first row is 20 – 30 cm away from the wall and the other one is 1m away from the first row. Then putlogs are placed which are supported by the both frames. To make it more strong rakers and cross braces are provided. This is also called as independent scaffolding.
  • 33. 3. CANTILEVER OR NEEDLE SCAFFOLDING 33
  • 34. 34 Cantilever Scaffolding: This a type of scaffolding in which the standards are supported on series of needles and these needles are taken out through holes in the wall. This is called single frame type scaffolding. In the other type needles are strutted inside the floors through the openings and this is called independent or double frame type scaffolding. Care should be taken while construction of cantilever scaffolding. Generally cantilever scaffoldings are used under conditions such as •When the ground does not having the capacity to support standards. •When the Ground near the wall is to be free from traffic. •When upper part of the wall is under construction.
  • 35. Light weight scaffolding used for repair works like painting, pointing etc. The working platform is suspended from roofs by means of wire ropes or chains. Platform can be raised or lowered at any desired level. 4.SUSPENDED SCAFFOLDING 35
  • 36. This is also used for repair works inside the room, up to height of 5m. The working platform is supported on the top of movable contrivances like tripods, ladders may be mounted on wheels. 5.TRESTLE SCAFFOLDING 36
  • 37. Wooden members are replaced by steel tubes and rope lashings are replaced by steel couplets or fittings. Such scaffolding can be erected and dismantled rapidly. It has greater strength, greater durability and higher fire resistance. Can be used for stone and brick masonry construction. 6.STEEL SCAFFOLDING 37
  • 38. Market available scaffoldings. Equipped with special couplings, frames. Working platform is supported on brackets which can be adjusted at any suitable height 7.PATENTED SCAFFOLDING 38
  • 39. 39