SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN
BACHELOR OF QUANTITY SURVEYING (HONOURS)
Construction Technology 1 (QSB 1514 / BLD60104) & Building Material (BLD62003)
Assignment (Group Assignment, maximum 10 members)
Total percentage (BLD60104): 25%
Total percentage (BLD62003): 20%
Deadline: 12 pm, Week 12
As a professional quantity surveyor, you need to advise your client on all the
elements of buildings in term of its cost taking into consideration of the building
appearance. Your client proposed to build a single-storey bungalow in Subang Jaya.
By taking the proposed building as an object of the study in this assignment, your
group needs to produce the following:
Part 1
You need to design the building yourself by taking into consideration its loading and space.
Items that need to be designed are its foundation, floor, walls, ceilings, windows and doors,
ironmongeries, space ladder (handrail and baluster), shelves, counter and cabinet and
others. You need to propose a suitable type for each of the items stated above to complete
the design of a bungalow. The entire proposal needs to be supported with an explanation of
the description together with reason of choosing. You also need to sketch and label the main
components of the bungalow design together with photo or diagrams.
Part 2
Next students must examine the materials that are used in these spaces. Observe the floor,
walls, ceilings, windows and doors, space ladder (handrail and baluster), shelves, counter
and cabinet and others. Explain about the suitability of materials used for each space. You
may also include the layout plan of the building to help portray the spaces and materials
proposed.
All pictures and descriptions must be creatively arranged and to occupy the A3 size board.
Each panel must state the name, student id no and title of assignments. The numbers of
board are limited to not more than 10 pieces. Marks will be given individually, based on
verbal and board presentation.

More Related Content

Viewers also liked

Web Hacking With Burp Suite 101
Web Hacking With Burp Suite 101Web Hacking With Burp Suite 101
Web Hacking With Burp Suite 101Zack Meyers
 
IRS Reporting Requirement 6055 And 6056
IRS Reporting Requirement 6055 And 6056IRS Reporting Requirement 6055 And 6056
IRS Reporting Requirement 6055 And 6056TeemWurk
 
Syphilis(Treponema pallidum)
Syphilis(Treponema pallidum)Syphilis(Treponema pallidum)
Syphilis(Treponema pallidum)heart4kurd
 
Biochemical tests for gram positive cocci
Biochemical tests for gram positive cocciBiochemical tests for gram positive cocci
Biochemical tests for gram positive cocciAman Ullah
 
Biochemical reactions
Biochemical     reactionsBiochemical     reactions
Biochemical reactionsSaumya Singh
 

Viewers also liked (7)

Power point (1)
Power point (1)Power point (1)
Power point (1)
 
Web Hacking With Burp Suite 101
Web Hacking With Burp Suite 101Web Hacking With Burp Suite 101
Web Hacking With Burp Suite 101
 
IRS Reporting Requirement 6055 And 6056
IRS Reporting Requirement 6055 And 6056IRS Reporting Requirement 6055 And 6056
IRS Reporting Requirement 6055 And 6056
 
Syphilis(Treponema pallidum)
Syphilis(Treponema pallidum)Syphilis(Treponema pallidum)
Syphilis(Treponema pallidum)
 
Burp Suite Starter
Burp Suite StarterBurp Suite Starter
Burp Suite Starter
 
Biochemical tests for gram positive cocci
Biochemical tests for gram positive cocciBiochemical tests for gram positive cocci
Biochemical tests for gram positive cocci
 
Biochemical reactions
Biochemical     reactionsBiochemical     reactions
Biochemical reactions
 

Similar to Integrated assignment ct1 and bm aug15 (1)

SEM 6 : BTECH 2 PROJECT 2
SEM 6 : BTECH 2 PROJECT 2SEM 6 : BTECH 2 PROJECT 2
SEM 6 : BTECH 2 PROJECT 2Darshiini Vig
 
Building con 1 (arc 1523) project 2 brief aug 2014 (1)
Building con 1 (arc 1523) project 2 brief aug 2014 (1)Building con 1 (arc 1523) project 2 brief aug 2014 (1)
Building con 1 (arc 1523) project 2 brief aug 2014 (1)Anthony Chew
 
Building con 1 (arc 1523) project 2 brief aug 2014
Building con 1 (arc 1523) project 2 brief aug 2014Building con 1 (arc 1523) project 2 brief aug 2014
Building con 1 (arc 1523) project 2 brief aug 2014Preston Liew
 
Building con 1 (arc1523) project 2 brief august 2015
Building con 1 (arc1523) project 2 brief   august 2015Building con 1 (arc1523) project 2 brief   august 2015
Building con 1 (arc1523) project 2 brief august 2015Chow Hong Da
 
Building con 1 (arc1523) project 2 brief
Building con 1 (arc1523) project 2 brief   Building con 1 (arc1523) project 2 brief
Building con 1 (arc1523) project 2 brief Darshiini Vig
 
SEM 6 : BTECH 2 PROJECT 1
SEM 6 : BTECH 2 PROJECT 1SEM 6 : BTECH 2 PROJECT 1
SEM 6 : BTECH 2 PROJECT 1Darshiini Vig
 
ITD Drawing final project studio unit living
ITD Drawing final project studio unit livingITD Drawing final project studio unit living
ITD Drawing final project studio unit livingashleyyeap
 
Itdproject3brief 150625045740-lva1-app6892
Itdproject3brief 150625045740-lva1-app6892Itdproject3brief 150625045740-lva1-app6892
Itdproject3brief 150625045740-lva1-app6892Darryl Harvey
 
ITD Drawing final project studio unit living_january 2015
ITD Drawing final project studio unit living_january 2015ITD Drawing final project studio unit living_january 2015
ITD Drawing final project studio unit living_january 2015Madeline Liew
 
Drawing final project studio unit living_july 2015 (1)
Drawing final project studio unit living_july 2015 (1)Drawing final project studio unit living_july 2015 (1)
Drawing final project studio unit living_july 2015 (1)Flenny Wong
 
ITD FINAL PROJECT
ITD FINAL PROJECT ITD FINAL PROJECT
ITD FINAL PROJECT shensin1015
 
Drawing final project studio unit living_july 2015
Drawing final project studio unit living_july 2015Drawing final project studio unit living_july 2015
Drawing final project studio unit living_july 2015瑞田 吳
 
Drawing final project studio unit living_july 2015
Drawing final project studio unit living_july 2015Drawing final project studio unit living_july 2015
Drawing final project studio unit living_july 2015Hanis A.Badri
 
Drawing final project studio unit living_july 2015
Drawing final project studio unit living_july 2015Drawing final project studio unit living_july 2015
Drawing final project studio unit living_july 2015Lam Yu
 
Drawing final project studio unit living_july 2015
Drawing final project studio unit living_july 2015Drawing final project studio unit living_july 2015
Drawing final project studio unit living_july 2015Sarah Esa
 
Drawing final project studio unit living_july 2015
Drawing final project studio unit living_july 2015Drawing final project studio unit living_july 2015
Drawing final project studio unit living_july 2015Jamie Lee
 
Drawing final project studio unit living_july 2015
Drawing final project studio unit living_july 2015Drawing final project studio unit living_july 2015
Drawing final project studio unit living_july 2015Ong Ke Qi
 
Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015Leon Lim
 
ITD Finale Brief
ITD Finale BriefITD Finale Brief
ITD Finale BriefTamZhaoWei
 
ITD Final Project - Drawing Basic Space
ITD Final Project - Drawing Basic SpaceITD Final Project - Drawing Basic Space
ITD Final Project - Drawing Basic SpaceNatalie Yunxian
 

Similar to Integrated assignment ct1 and bm aug15 (1) (20)

SEM 6 : BTECH 2 PROJECT 2
SEM 6 : BTECH 2 PROJECT 2SEM 6 : BTECH 2 PROJECT 2
SEM 6 : BTECH 2 PROJECT 2
 
Building con 1 (arc 1523) project 2 brief aug 2014 (1)
Building con 1 (arc 1523) project 2 brief aug 2014 (1)Building con 1 (arc 1523) project 2 brief aug 2014 (1)
Building con 1 (arc 1523) project 2 brief aug 2014 (1)
 
Building con 1 (arc 1523) project 2 brief aug 2014
Building con 1 (arc 1523) project 2 brief aug 2014Building con 1 (arc 1523) project 2 brief aug 2014
Building con 1 (arc 1523) project 2 brief aug 2014
 
Building con 1 (arc1523) project 2 brief august 2015
Building con 1 (arc1523) project 2 brief   august 2015Building con 1 (arc1523) project 2 brief   august 2015
Building con 1 (arc1523) project 2 brief august 2015
 
Building con 1 (arc1523) project 2 brief
Building con 1 (arc1523) project 2 brief   Building con 1 (arc1523) project 2 brief
Building con 1 (arc1523) project 2 brief
 
SEM 6 : BTECH 2 PROJECT 1
SEM 6 : BTECH 2 PROJECT 1SEM 6 : BTECH 2 PROJECT 1
SEM 6 : BTECH 2 PROJECT 1
 
ITD Drawing final project studio unit living
ITD Drawing final project studio unit livingITD Drawing final project studio unit living
ITD Drawing final project studio unit living
 
Itdproject3brief 150625045740-lva1-app6892
Itdproject3brief 150625045740-lva1-app6892Itdproject3brief 150625045740-lva1-app6892
Itdproject3brief 150625045740-lva1-app6892
 
ITD Drawing final project studio unit living_january 2015
ITD Drawing final project studio unit living_january 2015ITD Drawing final project studio unit living_january 2015
ITD Drawing final project studio unit living_january 2015
 
Drawing final project studio unit living_july 2015 (1)
Drawing final project studio unit living_july 2015 (1)Drawing final project studio unit living_july 2015 (1)
Drawing final project studio unit living_july 2015 (1)
 
ITD FINAL PROJECT
ITD FINAL PROJECT ITD FINAL PROJECT
ITD FINAL PROJECT
 
Drawing final project studio unit living_july 2015
Drawing final project studio unit living_july 2015Drawing final project studio unit living_july 2015
Drawing final project studio unit living_july 2015
 
Drawing final project studio unit living_july 2015
Drawing final project studio unit living_july 2015Drawing final project studio unit living_july 2015
Drawing final project studio unit living_july 2015
 
Drawing final project studio unit living_july 2015
Drawing final project studio unit living_july 2015Drawing final project studio unit living_july 2015
Drawing final project studio unit living_july 2015
 
Drawing final project studio unit living_july 2015
Drawing final project studio unit living_july 2015Drawing final project studio unit living_july 2015
Drawing final project studio unit living_july 2015
 
Drawing final project studio unit living_july 2015
Drawing final project studio unit living_july 2015Drawing final project studio unit living_july 2015
Drawing final project studio unit living_july 2015
 
Drawing final project studio unit living_july 2015
Drawing final project studio unit living_july 2015Drawing final project studio unit living_july 2015
Drawing final project studio unit living_july 2015
 
Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015Drawing final project studio unit living_january 2015
Drawing final project studio unit living_january 2015
 
ITD Finale Brief
ITD Finale BriefITD Finale Brief
ITD Finale Brief
 
ITD Final Project - Drawing Basic Space
ITD Final Project - Drawing Basic SpaceITD Final Project - Drawing Basic Space
ITD Final Project - Drawing Basic Space
 

More from KhangWei Chin

Site Surveying report2 traversing
Site Surveying report2 traversingSite Surveying report2 traversing
Site Surveying report2 traversingKhangWei Chin
 
Bs1 assignment march 2016
Bs1 assignment   march 2016Bs1 assignment   march 2016
Bs1 assignment march 2016KhangWei Chin
 
Building Services Report 2016
Building Services Report 2016Building Services Report 2016
Building Services Report 2016KhangWei Chin
 
CT2 Individual Assignment Brief
CT2 Individual Assignment BriefCT2 Individual Assignment Brief
CT2 Individual Assignment BriefKhangWei Chin
 
CT2 Building Material Group Assignement
CT2 Building Material Group AssignementCT2 Building Material Group Assignement
CT2 Building Material Group AssignementKhangWei Chin
 
Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015KhangWei Chin
 
Itinerary for site visit (2)
Itinerary for site visit (2)Itinerary for site visit (2)
Itinerary for site visit (2)KhangWei Chin
 
Site visit report qs semester 1
Site visit report   qs semester 1Site visit report   qs semester 1
Site visit report qs semester 1KhangWei Chin
 
Principle of Economics Module Outline
Principle of Economics Module OutlinePrinciple of Economics Module Outline
Principle of Economics Module OutlineKhangWei Chin
 
Basic Accounting Module Outline
Basic Accounting Module OutlineBasic Accounting Module Outline
Basic Accounting Module OutlineKhangWei Chin
 
Principle of Economics Research Analysis
Principle of Economics Research AnalysisPrinciple of Economics Research Analysis
Principle of Economics Research AnalysisKhangWei Chin
 
Basic Accounting Ratio Analysis Assignment Brief
Basic Accounting Ratio Analysis Assignment BriefBasic Accounting Ratio Analysis Assignment Brief
Basic Accounting Ratio Analysis Assignment BriefKhangWei Chin
 
Basic Accounting Assignment Ratio Analysis
Basic Accounting Assignment Ratio AnalysisBasic Accounting Assignment Ratio Analysis
Basic Accounting Assignment Ratio AnalysisKhangWei Chin
 
Intro To Business Charity Drive Report
Intro To Business Charity Drive ReportIntro To Business Charity Drive Report
Intro To Business Charity Drive ReportKhangWei Chin
 
Introduction To Business Charity Drive Assignment Brief
Introduction To Business Charity Drive Assignment BriefIntroduction To Business Charity Drive Assignment Brief
Introduction To Business Charity Drive Assignment BriefKhangWei Chin
 
Introduction To Business, Business Plan Presentation
Introduction To Business, Business Plan PresentationIntroduction To Business, Business Plan Presentation
Introduction To Business, Business Plan PresentationKhangWei Chin
 
Introduction To Business Course Outline
Introduction To Business Course OutlineIntroduction To Business Course Outline
Introduction To Business Course OutlineKhangWei Chin
 
Social psychology Video Presentation Slides
Social psychology Video Presentation SlidesSocial psychology Video Presentation Slides
Social psychology Video Presentation SlidesKhangWei Chin
 
Social Psychology Video Shooting Report
Social Psychology Video Shooting ReportSocial Psychology Video Shooting Report
Social Psychology Video Shooting ReportKhangWei Chin
 

More from KhangWei Chin (20)

Site Surveying report2 traversing
Site Surveying report2 traversingSite Surveying report2 traversing
Site Surveying report2 traversing
 
Bs1 assignment march 2016
Bs1 assignment   march 2016Bs1 assignment   march 2016
Bs1 assignment march 2016
 
Building Services Report 2016
Building Services Report 2016Building Services Report 2016
Building Services Report 2016
 
CT2 Individual Assignment Brief
CT2 Individual Assignment BriefCT2 Individual Assignment Brief
CT2 Individual Assignment Brief
 
CT2 Building Material Group Assignement
CT2 Building Material Group AssignementCT2 Building Material Group Assignement
CT2 Building Material Group Assignement
 
Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015Integrated assignment m1 ct1 and bm aug2015
Integrated assignment m1 ct1 and bm aug2015
 
Assignment no.2
Assignment no.2 Assignment no.2
Assignment no.2
 
Itinerary for site visit (2)
Itinerary for site visit (2)Itinerary for site visit (2)
Itinerary for site visit (2)
 
Site visit report qs semester 1
Site visit report   qs semester 1Site visit report   qs semester 1
Site visit report qs semester 1
 
Principle of Economics Module Outline
Principle of Economics Module OutlinePrinciple of Economics Module Outline
Principle of Economics Module Outline
 
Basic Accounting Module Outline
Basic Accounting Module OutlineBasic Accounting Module Outline
Basic Accounting Module Outline
 
Principle of Economics Research Analysis
Principle of Economics Research AnalysisPrinciple of Economics Research Analysis
Principle of Economics Research Analysis
 
Basic Accounting Ratio Analysis Assignment Brief
Basic Accounting Ratio Analysis Assignment BriefBasic Accounting Ratio Analysis Assignment Brief
Basic Accounting Ratio Analysis Assignment Brief
 
Basic Accounting Assignment Ratio Analysis
Basic Accounting Assignment Ratio AnalysisBasic Accounting Assignment Ratio Analysis
Basic Accounting Assignment Ratio Analysis
 
Intro To Business Charity Drive Report
Intro To Business Charity Drive ReportIntro To Business Charity Drive Report
Intro To Business Charity Drive Report
 
Introduction To Business Charity Drive Assignment Brief
Introduction To Business Charity Drive Assignment BriefIntroduction To Business Charity Drive Assignment Brief
Introduction To Business Charity Drive Assignment Brief
 
Introduction To Business, Business Plan Presentation
Introduction To Business, Business Plan PresentationIntroduction To Business, Business Plan Presentation
Introduction To Business, Business Plan Presentation
 
Introduction To Business Course Outline
Introduction To Business Course OutlineIntroduction To Business Course Outline
Introduction To Business Course Outline
 
Social psychology Video Presentation Slides
Social psychology Video Presentation SlidesSocial psychology Video Presentation Slides
Social psychology Video Presentation Slides
 
Social Psychology Video Shooting Report
Social Psychology Video Shooting ReportSocial Psychology Video Shooting Report
Social Psychology Video Shooting Report
 

Recently uploaded

(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Recently uploaded (20)

(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

Integrated assignment ct1 and bm aug15 (1)

  • 1. SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN BACHELOR OF QUANTITY SURVEYING (HONOURS) Construction Technology 1 (QSB 1514 / BLD60104) & Building Material (BLD62003) Assignment (Group Assignment, maximum 10 members) Total percentage (BLD60104): 25% Total percentage (BLD62003): 20% Deadline: 12 pm, Week 12 As a professional quantity surveyor, you need to advise your client on all the elements of buildings in term of its cost taking into consideration of the building appearance. Your client proposed to build a single-storey bungalow in Subang Jaya. By taking the proposed building as an object of the study in this assignment, your group needs to produce the following: Part 1 You need to design the building yourself by taking into consideration its loading and space. Items that need to be designed are its foundation, floor, walls, ceilings, windows and doors, ironmongeries, space ladder (handrail and baluster), shelves, counter and cabinet and others. You need to propose a suitable type for each of the items stated above to complete the design of a bungalow. The entire proposal needs to be supported with an explanation of the description together with reason of choosing. You also need to sketch and label the main components of the bungalow design together with photo or diagrams. Part 2 Next students must examine the materials that are used in these spaces. Observe the floor, walls, ceilings, windows and doors, space ladder (handrail and baluster), shelves, counter and cabinet and others. Explain about the suitability of materials used for each space. You may also include the layout plan of the building to help portray the spaces and materials proposed. All pictures and descriptions must be creatively arranged and to occupy the A3 size board. Each panel must state the name, student id no and title of assignments. The numbers of board are limited to not more than 10 pieces. Marks will be given individually, based on verbal and board presentation.