5. SDP: Project Status
For IFAD - ‘Problem Project’
status due to slow progress on
key milestones
MTR October 2014 proposed
changes in design to achieve
project goals
6. Key recommendations
Revise Project approach to engage with private
sector
abandon the requirement that the PSCs be required to purchase
and sell seeds locally
explore opportunities throughout the value chain
Seed growers
commission studies to identify sites suitable for successful seed
production for SGGs
enable medium sized farmers to join the Programme with
suitable plots and skills for seed growing, on a pilot basis
Rural finance
restructure SGGs and GPGs to make them compatible with
ABSUMI
provide support and improve coordination with ABSUMI&Bara’ah
7. Key recommendations (cont’d)
Commission value chain studies - urgent
Strengthen Project management
strengthen the PCU with a PPP consultant - urgent
strengthen the extension teams for farming as a
business.
Revise Project design
joint IFAD and Government of The Sudan mission in
early 2015 to finalise revised Project design upon
recruitment of the PPP consultant
8. The new vision for SDP
GPG
ARC
Registered seed
Foundation seed
SGG
Certified seed
PSC
PSC
• mgt of
storage
• processing
groundnut, sesame, cowpea
sorghum & millet
hybrids & OPVs
Informal
distribution
V
a
l
u
e
c
h
a
i
n
s
t
u
d
y
• Processors
• Feed
• Food
FARMING AS A BUSINESS
9. Components - Overview
Policy and
Law
FSA
ARC - Supply
of registered
seed
Farming groups
and extension
Private sector
engagement
Rural Finance
Farming groups
and extension
Private sector
engagement
Rural Finance
Project
Coordination
and
Management
10. Component 1
Policy and
Law
FSA
ARC - Supply
of registered
seed
Farming groups
and extension
Private sector
engagement
Rural Finance
Farming groups
and extension
Private sector
engagement
Rural Finance
Project
Coordination
and
Management
11. Component 1: Institutional and
Regulatory Environment Strengthening
and Development
Status:
Slow progress in 2014
Serious delays in procurement
Main outcomes should be completed in
2015
12. Component 1: Institutional and
Regulatory Environment Strengthening
and Development
Seed Policy and Plan
Seed Act and UPOV
Compliance
ISTA accreditation of the lab
Seed Inspectors accredited on
State level
13. Component 2
Policy and
Law
FSA
ARC - Supply
of registered
seed
Farming groups
and extension
Private sector
engagement
Rural Finance
Farming groups
and extension
Private sector
engagement
Rural Finance
Project
Coordination
and
Management
14. Component 2: ARC
Status
Little improvement in ARC capacity to produce registered seeds -
groundnut and sesame in particular
Procurement still delayed
ARC trained on participatory research
ARC conducted a successful 2014 season of participatory
research
Recommendations
ARC distribute the participatory research results in March
ARC develop a protocol for PR including criteria for assessment,
sex-disaggregation and analysis etc to consider women
perceptions and preferences and ARC Staff to be sensitized on
gender issues
ARC follow up on procurement and requests for internal/external
15. Component 2: Extension sub-
team
Status
Good support to the 7 SGGs in 2014
Adopted MTR recommendations on development of
database and communication plan
Recommendations
more involvement of ARC in extension and FFS training
Conduct annual adoption survey
Complete communication plan in advance of season
Conduct cost benefit analysis
Inclusion of baby trials besides mother trials for
comparison
Reform SGGs to ABSUMI model
Develop graduation criteria
Develop a seed buyer database (name, mobile, facilities
etc)
16. Component 2: Seed Grower
Groups
Status
7 SGGs, planned 1,300, planted 988, inspected 937, certified
801
Mid size farmers included in the SDP as seed growers
Sold seed to project or locally
Recommendations
Ensure SGGs have PSC demonstrations in 2015
SGG business plans should be developed for each crop/location
detailing the incremental costs and benefits for seed vs. grain
production
Reform SGGs to fit ABSUMI model – link to seasonal loans
Conduct Farming as a Business training
Facilitate linkage between ARC, SGGs, traders and PSCs –
WFP?
17. Component 2: Farmer Field
Schools
Status
SDP recruited a national consultant to technically support
the extension sub-teams and build their capacities as
facilitators in the establishment and management of FFS
Seven FFSs were established by extension sub-teams: 2
in NK and 5 in SK
No implementation during season in SK and partial in NK
Recommendations
Recruit consultant by April to develop FFS manual and
conduct ToT
Consultant to ideally provide support and further training as
required during the season
Conduct FFS as needed, every two weeks at most
18. Component 3
Policy and
Law
FSA
ARC - Supply
of registered
seed
Farming groups
and extension
Private sector
engagement
Rural Finance
Farming groups
and extension
Private sector
engagement
Rural Finance
Project
Coordination
and
Management
19. Component 3: MDETs
Status
Six LETs, 74 communities, 105 groups and 205 demos
Trained in creating knowledge with farmers, communication
skills, gender in agriculture, seed testing and community
development/participation
GPG database developed
Recommendations:
Finalise recruitment of consultant for training needs assessment
(March)
Conduct identified training
Use contact farmers to host PSC demos
Develop new demos for 2015 that show incremental impact of
improved seeds + seed dressing + fertiliser
Revisiting roles and responsibilities of the MDETs and sub teams
to meet “Farming as Business” requirements.
MDETs and M&E to agree on standard units of measurement for
use in knowledge sharing, presentations etc.
20. Component 3: Grain Producers
Groups
Status
105 GPGs have been formed (NK 42, SK 63) with 8,362
household members (39% women participation)
GPGs cover 100% of target farmer groups and 80% of
target beneficiaries for 2014. Target figure same in 2015
SK 96%, NK 93% contact farmer demonstration plots
approved
Demonstration plot field days and exchange visits used as
seed promotion activities
Recommendations
Urgently reform SGGs to fit ABSUMI model, link to
seasonal loans
Train GPGs on Farming as a Business
Develop linkages to SGGs, traders and PSCs – WFP?
21. Comp 3: PPP – Creation of Effective
Demand – Prerequisite for Increasing
Supply
5 Key ingredients for increasing effective demand:
Understanding of improved seed
pre-MTR: demos limited to a few ARC released varieties
2015 and on: demos include PSC plus ARC varieties
Understanding of improved inputs
pre-MTR: demos limited to micro-dosing
2015 and on: demos include herbicides, planters, harvesters, etc
Access to Markets
pre-MTR: GPGs – no activities SGGs – model for linkages with PSCs
unworkable
2015 and on: GPGS: Value Chain studies identify improved market opportunities
SGGS: Commercial Linkages between SGGs and PSCs
Farming as a Business (FAAB)
pre-MTR: No activities
2015 and on: FAAB TOT for extension workers, then roll-out to GPGs and
SGGs
Access to Production Finance
pre-MTR: No activities
2015 and on: 1) ABSUMI production finance piloted 2) Value Chain input
finance explored
22. Increasing Supply – Key
Ingredients
Farmers have access to improved seed through many
channels:
saved improved seed (esp. for SPV such as sesame,
groundnuts)
local improved seed from neighbours (esp. for SPVs)
Farmers/Traders who informally select seed, can be adequate
GPG F1 seed better
SGG “pre-certified” seed even better
Certified seed supply from PSCs is key when:
Locally available OPVs have deteriorated
New OPV varieties are available
Hybrids are adopted
Pre MTR: unworkable; production of fully certified seed by SGGs
sold to PSCs and then sold back to GPGs
23. How SDP Will Increase Improved
Seed Supply: 2015 and on
SGGs will be facilitated to form links to supply
seed to PSCs
SGGs will receive basic or certified seed from
PSCs
PSCs will make decisions on source of basic or
certified seed to supply SGGs
SGGs may retain some “pre-certified” seed
that can be sold informally and locally
24. How SDP Will Increase Improved
Seed Supply: 2015 and on
GPGs that use certified seed for older improved OPVs
may retain some seed for local informal sale – this is
okay!
PSCs facilitated to demonstrate and supply the best
new/pure OPV and hybrid certified seed through a
diversity of supply channels.
PSCs facilitated to demonstrate and supply improved
seeds for other rainfed cash and food security crops
(Sunflower, Watermelon, Pigeon Pea, Hibiscus)
Chemicals and equipment that will raise productivity
and lower risk of farmers
Through diverse supply channels
Directly – bulk sales to GPGs
Agro dealers
Traders
25. 2015 and on: New Roles and
Responsibilites
ARC:
PR includes new PSC seed varieties
ARC production and supply of basic seed is
negotiated with PSCs, not SDP
SGG:
SGGs helped to negotiate directly with PSCs
SGGs may retain some seed for local sale
FAAB training
Access to credit facilitated
26. 2015 and on: Roles and
Responsibilites
GPG:
Linked to PSCs and supply chain/service providers for
seed/inputs/equipment
Linked with market opportunities
FAAB training
Access to Finance facilitated
ABS:
Linked to PSCs for financing seed production and
marketing seed/inputs/equipment
Linked to seed/input/equipment supply chain for
financing opportunities
27. 2015 and on: Roles and
Responsibilites
PSCs (and input/equipment suppliers):
Role #1: Buyers of seed from SGGs
linked to SGGs, and linkage supported
no restrictions on marketing of seed
purchased from SGGs
no restrictions on source of higher class of
seeds
Role #2: Suppliers of seed, inputs, equipment
Demonstrations facilitated by SDP
Linkage to supply chain/service providers
facilitated by SDP
No restrictions on source of certified seeds
28. Component 3: Rural Finance
Main problems at MTR were lack of financing linkages
(a) due to absence of suitable partners in the project areas
(b) lack of suitable product
(c) lack of harmony of GPG/SGG structure ABSUMI methodology
MTR recommended
(a) establishment of 2 new ABSUMI units in Abu Juibeha & Al Rahad
(b) design of a new seasonal loan product for men’s groups
(c) restructuring of GPG/SGG to meet ABSUMI criteria
(d) disbursement of more than 1,500 seasonal loans in 2015.
Main areas of progress were;
(a) Budget for two new units were approved by ABS HQ
(b) Seasonal loan product developed by ABSUMI
(c) RF manager formalised for SDP
29. Component 3: Rural Finance
(cont’d)
Lack of timely action by SDP has resulted in slow progress
and emergency situation related to:
(a) establishing the two ABSUMI units
(b) restructuring the SGG/SPGs at the community level
(c) dilution of the MTR recommendation on ABSUMI
methodology, resulting in higher risk
Recommendations:
(a) restructure GPGs/SGGs through extension teams by
mid April
(b) organise vehicles and equipment to start-up ABSUMI
Units on emergency basis by end of April
(c) Ensure disbursement of ABSUMI/Baraah loans to 1,400
farming households from around 75 groups in
approximately 30 communities in the 4 SDP Localities
31. WSRMP: Project status
Satisfactory implementation and
impact
Two Year Extension and top up
financing
Closing 31 December 2016
New financing: USD 3.2 million IFAD
grant
32. WSRMP top-up: delay in start-
up
Not yet countersigned by GoS
Majority of activities to start at
beginning of 3rd quarter
Implications
All planned hafirs and wateryards
implemented in construction season
2016
Other activities: abiding by tighter
schedule
33. Advance
WSRMP advance set at EUR 500,000
This means appr 15 WAs over a 18 month
period
In the case of slightest delay, with most
infrastructure works lumped for the
construction season 2015-2016
shortage of funds
stoppage in works
MOFNE may consider requesting an increase
to the advance
34. Overview of Project
components
Rangeland
s &
pastures
Water
supply
Land recl.
& water &
soil
conservati
on
Livestock
activities
Fishery
activities
Rural
Financial
Services
Marketing
Community
Developmen
t and
Extension
Rural
Feeder
Roads
Mgt and
coordination
35. Component 1: Natural Resource
Management
Rangeland
s &
pastures
Water
supply
Land recl.
& water &
soil
conservati
on
Livestock
activities
Fishery
activities
Rural
Financial
Services
Marketing
Community
Developmen
t and
Extension
Rural
Feeder
Roads
Mgt and
coordination
36. Sub–Component 1.1. Rangelands and
Pastures – stock routes
Status
Re-demarcation of stock routes remains an issue
The Stock Route Co-management Mechanism is in
place but seems still to be effective
The interstate committee has recommended a
consultative workshop for the SRCM to be held in
March 2015
Recommendations
WSRMP details the reasons to why re-demarcation is
needed and where it is through disagreement,
determines how to resolve these issues
The SRCM meeting should be held as a matter of
urgency
37. Sub–Component 1.1.
Rangelands and Pastures –
Conflict Resolution Centers
Status
The CRC model has worked well in NK and has broadened its
remit to include resolution of crop damage, land disputes
CRC require additional training
Conflict Resolution Unit in NK has been set-up but is not yet
functional
Recommendations
Clarify the roles and responsibilities of the different SRCM
committees and of each committee member
Conduct additional training for CRC committees
Postpone the expansion of the NK CRU model to SK and WK is
until an evaluation of the success of the NK unit done
The next supervision mission evaluates if the workload of the NK
CRCs is too much to maintain its voluntary basis or if a system of
38. Sub–Component 1.1.
Rangelands and Pastures –
Rangelands
WSRMP has adopted in full the
recommendation to only invest in land
rehabilitation in community (hema) rangeland
where control and management can be better
enforced
All recommendations adopted
39. Sub–Component 1.2. Water
Supply
Status
Only visited one hafir - well had some standing water but it
was being diverted to a pond for animal watering
Water fee is based on ability to pay with 3 payment costs in
the village
Recommendations
to deepen and enlarge the silting basin storage of hafirs in
order to provide extra water above the ground level
To review if the capture and use of waste water to irrigate
small-scale vegetable gardens by women is feasible, or if
this will increase the draw-down on the hafir water supply
too quickly
Assess if a unified acceptable water tariff rate on cost-
recovery basis is feasible, or if communities should set
40. Sub–Component 1.3. Land
Reclamation and Water and soil
Conservation
Status
Continuing chisel ploughing in Hema lands
Sand dune fixation liked by the communities but what was seen
in the field was not well established
Progress on re-forestation and avoid deforestation activities (e.g.
SSB, fruit trees)
Recommendations
Plant tree and shrub seeds earlier than the current March
planting date, so that the seedlings are much bigger when
transplanted in July/August
Continue training on the importance of watering and managing
the newly transplanted seedlings.
Conduct thematic study on the cumulative investments in sand
dune fixation, water provision, SBB and fruit and high value tree
production on village life, job creation, change in living
conditions, school attendance etc.
41. Sub–Component 1.4. Livestock
activities
Status
Most of the suggested Agreed Actions have not been
addressed with two being proposed for
implementation in the Additional Financing project:
Guar production system for goat production
Provide further support to fisheries activities.
Recommendations
Add budget for the Guar goat activities or delete it from the
project extension
The May 2015 Mission assesses the relevance of the May
2104 recommendations now that some of these activities may
not be included in the WSRMP extension.
42. Sub–Component 1.4. Livestock
activities
Status
Most of the suggested Agreed Actions have not been
addressed with two being proposed for
implementation in the Additional Financing project:
Guar production system for goat production
Provide further support to fisheries activities.
Recommendations
Add budget for the Guar goat activities or delete it from the
project extension
The May 2015 Mission assesses the relevance of the May
2104 recommendations now that some of these activities may
not be included in the WSRMP extension.
43. Component 2: Rural Finance and
Marketing
Rangeland
s &
pastures
Water
supply
Land recl.
& water &
soil
conservati
on
Livestock
activities
Fishery
activities
Rural
Financial
Services
Marketing
Community
Developmen
t and
Extension
Rural
Feeder
Roads
Mgt and
coordination
44. Comp 2: Rural Finance
Areas of progress
Development of MF Units accepted by States
30 CTs trained as a part of strengthening the STs for project sustainability
245 new SCGs formed inside project areas and 337 SCGs formed outside.
Total 1,417 SCGs in 255 Villages, 27,367 members, SDG 3.3 million savings.
343 SCGs linked to financial institutions
Five village associations formed as pilot
ABSUMI
6 ABSUMI units are operational and 6 new units to be launched in 2015. Total
12 ABSUMI Units across 7 States by end of 2015.
Outreach to around 28,000 households
ABSUMI Issues
Defaults in Lawaga mainly due to restrictions in 2 wheeler mobility reflecting
poorly on overall ABSUMI performance
78% of portfolio concentrated on livestock activities
45. Comp 2: Rural Finance
Recommendations
Strengthen the associations
Continue SCG formation
Immediately address the repayment
problem in Lagawa
Diversification of the portfolio
46. Comp 2: Marketing
MTR recommendation: Construct/Rehabilitate
markets:
Rahad - done
Abu Gubeiha - done
Babanosa - done
El Obeid – done
Al Mazroob – escalation in price, to be finalized with top-
up financing
Training of Gov officials: to commence
immediately
Livestock Market Information System: to be
assessed by supervision mission 2015
47. Component 3: Community
Development and Extension
Rangeland
s &
pastures
Water
supply
Land recl.
& water &
soil
conservati
on
Livestock
activities
Fishery
activities
Rural
Financial
Services
Marketing
Community
Developmen
t and
Extension
Rural
Feeder
Roads
Mgt and
coordination
48. Comp 3: Community Dev. & Ext
Status:
Programme activities covered 143 communities (44
in NK, 19 in SK and 80 in WK).
9295 HHs benefited from the Programme
interventions
Programme activities focused on increasing
functionality of the communities (CDCs) to improve
social and productive services
Recommendations:
Provide additional efforts to include the nomads
Consolidation of the benefits and upscaling of the
success.
49. Status of the Extension:
MDETs continued rendering capacity building
programmes for community structures to confront
climate change, agric and livestock production.
LEN strengthened (58% active, with 85%
efficiency and 71% communities covered.
10759 families benefited from LEN.
Women fully involved.
Recommendations:
focus on benefits, impacts and sustainability.
Comp 3: Community Dev. & Ext
50. Component 3 – Community
Development and Extension
Community Development Communities
As noted in the previous mission the erosion of the purchasing
power of the revolving fund continues to impact negatively on the
ability of the CDC to make effective use of the revolving fund
In the Additional Financing the revolving fund is costed at USD
1,750 per CDC
Recommendations
Evaluate the revolving funds and see which can manage a top-
up, and/or if additional well performing SCGs should be
supported to invest in LPG
By the next mission the PCU provide a review and proposal for
the amount of the CDC revolving fund for existing and new
CDC’s
51. Component 4: Rural Feeder
Roads
Rangeland
s &
pastures
Water
supply
Land recl.
& water &
soil
conservati
on
Livestock
activities
Fishery
activities
Rural
Financial
Services
Marketing
Community
Developmen
t and
Extension
Rural
Feeder
Roads
Mgt and
coordination
52. Comp 4: Rural roads
USD 8.7 million OFID loan
Closing: 31 December 2014
Suspension of OFID portfolio
in October 2014
53. Comp 4: Rural roads (cont’d)
Elsimey – Elsamasim road for a length of 183 km
38% of works done
Payments for works completed before closing
OFID can process direct WA
OFID can reimburse gov payments from OFID loan
Payments for works completed past closing
Requires extension
OFID has (unofficially) confirmed that extension
may be considered retroactively
Escalation of cost (28%) mean that Gov. share of
road cost increases
Note: Pre MTR model severely limited seed choice available to farmers, and was not commercially workable for PSCs
F1 seed is 1st generation seed produced from certified seed
“Pre Certified” means seed grown according to regulations, but not necessarily tested.
1) PSCs will deal directly with ARC for needs (not SGG and not SDP).
Under Sudanese law, certified seed may be produced from certified seed under certain conditions.
Markets will likely be GoS and FAO/NGO, produced seeds will be older improved varieties of sorghum, millet, groundnuts, and sesame
Spoke yesterday with wfo and practical action – the project will explore the warehouse scheme
1) PSCs will deal directly with ARC for needs (not SGG and not SDP).
2) Under Sudanese law, certified seed may be produced from certified seed under certain conditions.
SGGs will always retain some of the seed, this just makes it transparent and controlled
SGGs will always retain some of the seed, this just makes it transparent and controlled
PSCs are expected to follow the GoS seed certification regulations
Role #1 and #2 are completely separated. Likely to be different crops, different varieties, and different companies participating in Role #1 and Role #2
You could be more sharp on the delays for the rf pcu part
Sharper that this is the only way to make the 2015 season, after which we have only one cycle left