A Vehicle Loading Crane is a crane mounted on a vehicle for the purpose
of loading and unloading the vehicle.
These are also used for more traditional crane operations where the load
is lifted:
From the vehicle to an elevated area at a workplace, for example lifting
packs of timber from the vehicle directly to a building floor.
Both to and from locations remote from the vehicle on which the crane is
mounted.
Into place and held while it is connected to a structure e.g. installing a
sign.
Vehicle loading crane controls should be:
Self-centring, constant pressure controls so operation of the crane stops
when the operator releases the control, and permanently marked with clear,
visible symbols
Suitable risk control measures should prevent operators being crushed
between the crane boom and the operator’s control panel. These may
include:
Using remote controls
Relocating the controls on the vehicle
Installing physical barriers
Vehicle loading cranes manufactured should be fitted with a load
indicator appropriate for the capacity of the crane. It should:
Warn the crane operator when the load exceeds 90 per cent of the
rated capacity
Give a separate and different warning to the 90 per cent load
warning to the crane operator and people near the crane if the rated
capacity is exceeded.
Both warnings should be continuous.
In Vehicle Loading Crane Course operators must be trained and
competent in operating the crane. Training should cover the controls,
instruments, working load limits, load charts, safe working
procedures for slinging and lifting and any operating limitations of
each type of crane they operate.
A person must hold a high risk work licence to operate a vehicle
loading crane that has a capacity of 10 metre tonnes or more. This
can be a:
Vehicle Loading Crane HRW Licence, or
One of the four slewing mobile crane HRW licences .
When selecting the set-up location for the vehicle loading crane a
check should include that:
There are no underground services or recently backfilled excavations
that may affect the stability of the crane
The crane can be set up level the crane should only be operated
when level.
There is a safe distance between the boom over its full range of
movement and overhead electric lines and other obstacles.

More Related Content

Similar to Information about Vehicle Loading Crane

2000 08 safe use of mobile cranes in construction sites
2000 08 safe use of mobile cranes in construction sites2000 08 safe use of mobile cranes in construction sites
2000 08 safe use of mobile cranes in construction sites
Prastowo Priyatmoko
 
Safe use of Mobile Cranes
Safe use of Mobile CranesSafe use of Mobile Cranes
Safe use of Mobile Cranes
Mihajlo Stupar
 
NGI-Cranes-Part 01
NGI-Cranes-Part 01NGI-Cranes-Part 01
NGI-Cranes-Part 01
lifecombo
 
wilfredo guila resume crane operator
wilfredo guila resume crane operatorwilfredo guila resume crane operator
wilfredo guila resume crane operator
wilfredo guila
 

Similar to Information about Vehicle Loading Crane (20)

MEWP TRAINING 27.07.2022.pptx
MEWP TRAINING 27.07.2022.pptxMEWP TRAINING 27.07.2022.pptx
MEWP TRAINING 27.07.2022.pptx
 
MEWP TRAINING.pptx
MEWP TRAINING.pptxMEWP TRAINING.pptx
MEWP TRAINING.pptx
 
Crane Safety Tips for Construction Project..pdf
Crane Safety Tips for Construction Project..pdfCrane Safety Tips for Construction Project..pdf
Crane Safety Tips for Construction Project..pdf
 
Truck crane training bill brown
Truck crane training bill brownTruck crane training bill brown
Truck crane training bill brown
 
Quality Control Operator Training &.pptx
Quality Control Operator Training &.pptxQuality Control Operator Training &.pptx
Quality Control Operator Training &.pptx
 
Safe lifting practices
Safe lifting practicesSafe lifting practices
Safe lifting practices
 
2000 08 safe use of mobile cranes in construction sites
2000 08 safe use of mobile cranes in construction sites2000 08 safe use of mobile cranes in construction sites
2000 08 safe use of mobile cranes in construction sites
 
apm-et13e-chapter-18-powered-industrial-trucks.ppt
apm-et13e-chapter-18-powered-industrial-trucks.pptapm-et13e-chapter-18-powered-industrial-trucks.ppt
apm-et13e-chapter-18-powered-industrial-trucks.ppt
 
Safety Tip: 10 Steps to Safer Crane Operation
Safety Tip: 10 Steps to Safer Crane OperationSafety Tip: 10 Steps to Safer Crane Operation
Safety Tip: 10 Steps to Safer Crane Operation
 
Safe use of Mobile Cranes
Safe use of Mobile CranesSafe use of Mobile Cranes
Safe use of Mobile Cranes
 
1910.179 osha class
1910.179 osha class1910.179 osha class
1910.179 osha class
 
Mechanical Handling updated.ppt
Mechanical Handling updated.pptMechanical Handling updated.ppt
Mechanical Handling updated.ppt
 
E20815
E20815E20815
E20815
 
NGI-Cranes-Part 01
NGI-Cranes-Part 01NGI-Cranes-Part 01
NGI-Cranes-Part 01
 
Working at Heights
Working at Heights Working at Heights
Working at Heights
 
How to Operate a Scissor Lift? - BVM Transport
How to Operate a Scissor Lift? - BVM TransportHow to Operate a Scissor Lift? - BVM Transport
How to Operate a Scissor Lift? - BVM Transport
 
Aerial and scissor lift safety 2
Aerial and scissor lift safety 2Aerial and scissor lift safety 2
Aerial and scissor lift safety 2
 
apm-et13e-chapter-16-hoisting-and-conveying-equipment.ppt
apm-et13e-chapter-16-hoisting-and-conveying-equipment.pptapm-et13e-chapter-16-hoisting-and-conveying-equipment.ppt
apm-et13e-chapter-16-hoisting-and-conveying-equipment.ppt
 
wilfredo guila resume crane operator
wilfredo guila resume crane operatorwilfredo guila resume crane operator
wilfredo guila resume crane operator
 
www.scanrent.com.au
www.scanrent.com.au www.scanrent.com.au
www.scanrent.com.au
 

Recently uploaded

Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
EADTU
 
SURVEY I created for uni project research
SURVEY I created for uni project researchSURVEY I created for uni project research
SURVEY I created for uni project research
CaitlinCummins3
 
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
中 央社
 

Recently uploaded (20)

VAMOS CUIDAR DO NOSSO PLANETA! .
VAMOS CUIDAR DO NOSSO PLANETA!                    .VAMOS CUIDAR DO NOSSO PLANETA!                    .
VAMOS CUIDAR DO NOSSO PLANETA! .
 
Supporting Newcomer Multilingual Learners
Supporting Newcomer  Multilingual LearnersSupporting Newcomer  Multilingual Learners
Supporting Newcomer Multilingual Learners
 
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
 
ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...
ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...
ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...
 
Major project report on Tata Motors and its marketing strategies
Major project report on Tata Motors and its marketing strategiesMajor project report on Tata Motors and its marketing strategies
Major project report on Tata Motors and its marketing strategies
 
Scopus Indexed Journals 2024 - ISCOPUS Publications
Scopus Indexed Journals 2024 - ISCOPUS PublicationsScopus Indexed Journals 2024 - ISCOPUS Publications
Scopus Indexed Journals 2024 - ISCOPUS Publications
 
MOOD STABLIZERS DRUGS.pptx
MOOD     STABLIZERS           DRUGS.pptxMOOD     STABLIZERS           DRUGS.pptx
MOOD STABLIZERS DRUGS.pptx
 
8 Tips for Effective Working Capital Management
8 Tips for Effective Working Capital Management8 Tips for Effective Working Capital Management
8 Tips for Effective Working Capital Management
 
Improved Approval Flow in Odoo 17 Studio App
Improved Approval Flow in Odoo 17 Studio AppImproved Approval Flow in Odoo 17 Studio App
Improved Approval Flow in Odoo 17 Studio App
 
male presentation...pdf.................
male presentation...pdf.................male presentation...pdf.................
male presentation...pdf.................
 
An overview of the various scriptures in Hinduism
An overview of the various scriptures in HinduismAn overview of the various scriptures in Hinduism
An overview of the various scriptures in Hinduism
 
SURVEY I created for uni project research
SURVEY I created for uni project researchSURVEY I created for uni project research
SURVEY I created for uni project research
 
The Story of Village Palampur Class 9 Free Study Material PDF
The Story of Village Palampur Class 9 Free Study Material PDFThe Story of Village Palampur Class 9 Free Study Material PDF
The Story of Village Palampur Class 9 Free Study Material PDF
 
Observing-Correct-Grammar-in-Making-Definitions.pptx
Observing-Correct-Grammar-in-Making-Definitions.pptxObserving-Correct-Grammar-in-Making-Definitions.pptx
Observing-Correct-Grammar-in-Making-Definitions.pptx
 
When Quality Assurance Meets Innovation in Higher Education - Report launch w...
When Quality Assurance Meets Innovation in Higher Education - Report launch w...When Quality Assurance Meets Innovation in Higher Education - Report launch w...
When Quality Assurance Meets Innovation in Higher Education - Report launch w...
 
BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...
BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...
BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...
 
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
 
UChicago CMSC 23320 - The Best Commit Messages of 2024
UChicago CMSC 23320 - The Best Commit Messages of 2024UChicago CMSC 23320 - The Best Commit Messages of 2024
UChicago CMSC 23320 - The Best Commit Messages of 2024
 
Đề tieng anh thpt 2024 danh cho cac ban hoc sinh
Đề tieng anh thpt 2024 danh cho cac ban hoc sinhĐề tieng anh thpt 2024 danh cho cac ban hoc sinh
Đề tieng anh thpt 2024 danh cho cac ban hoc sinh
 
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
24 ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH SỞ GIÁO DỤC HẢI DƯ...
 

Information about Vehicle Loading Crane

  • 1.
  • 2. A Vehicle Loading Crane is a crane mounted on a vehicle for the purpose of loading and unloading the vehicle. These are also used for more traditional crane operations where the load is lifted: From the vehicle to an elevated area at a workplace, for example lifting packs of timber from the vehicle directly to a building floor. Both to and from locations remote from the vehicle on which the crane is mounted. Into place and held while it is connected to a structure e.g. installing a sign.
  • 3. Vehicle loading crane controls should be: Self-centring, constant pressure controls so operation of the crane stops when the operator releases the control, and permanently marked with clear, visible symbols Suitable risk control measures should prevent operators being crushed between the crane boom and the operator’s control panel. These may include: Using remote controls Relocating the controls on the vehicle Installing physical barriers
  • 4. Vehicle loading cranes manufactured should be fitted with a load indicator appropriate for the capacity of the crane. It should: Warn the crane operator when the load exceeds 90 per cent of the rated capacity Give a separate and different warning to the 90 per cent load warning to the crane operator and people near the crane if the rated capacity is exceeded. Both warnings should be continuous.
  • 5. In Vehicle Loading Crane Course operators must be trained and competent in operating the crane. Training should cover the controls, instruments, working load limits, load charts, safe working procedures for slinging and lifting and any operating limitations of each type of crane they operate. A person must hold a high risk work licence to operate a vehicle loading crane that has a capacity of 10 metre tonnes or more. This can be a: Vehicle Loading Crane HRW Licence, or One of the four slewing mobile crane HRW licences .
  • 6. When selecting the set-up location for the vehicle loading crane a check should include that: There are no underground services or recently backfilled excavations that may affect the stability of the crane The crane can be set up level the crane should only be operated when level. There is a safe distance between the boom over its full range of movement and overhead electric lines and other obstacles.