SlideShare a Scribd company logo
1 of 9
ISSAM KHODER AGHA
Email: issam_117@hotmail.com
Mobile No. Sultanate ofOman 00968 91243126/
0096171555546/009613733236
Citizenship: Lebanese
Date of Birth: 11th June 1984
ACADEMIC BACKGROUND
 2002-2003 Bac II General Science
North Lebanon College – Tripoli, Lebanon
 2003-2007 Bachelors of Science Degree in Applied Science
Building and Civil Engineering
University of Belize – Belize City
 2005-2007 Bachelors of Science Degree in Physical Education
University of Belize – Belize City
PROFESSIONAL EXPERIENCE
 July 2007-November 2011
Island Waves Digging Works L.L.C. (Dubai, U.A.E)
 December 2011-Upto 2014
Huta Marine L.L.C (Eastern division Saudi Arabia)
 September 2014 to Till Date
Sarooj Construction LLC (Sultanate of Oman/Muscat)
PROJECT DETAILS
Duration:-
September 2014 to Till Date
Project:-
Design and construction of the sea outfall of new darsait STP and Auzaibah central
pump station.
Client:-
Haya Water
Location:-
Muscat / Oman
ISSAM KHODER AGHA
Email: issam_117@hotmail.com
Mobile No. Sultanate ofOman 00968 91243126/
0096171555546/009613733236
Position:-
Project Manager
Job Description:
 Project Planning
 Conceptualize the detailed project reports; taking off documents, Microsoft Project
execution program and project execution plans after thorough discussion with clients,
project evaluation.
 Establish the time span of project execution as per client specifics.
 List down the resource needs for projects, after considering the budgetary parameters
set.
 Monitor/Discuss project status review every day with engineers.
 Site & Construction Management
 Follow up of site works, coordination with client / authorities, progress of works and
resolving daily issues with execution of works.Monitoring shop drawings,
engineering design and monthly interim valuations.
 Follow up all necessary permits with all related authorities.
 Mobilize all necessary resources for onshore and offshore.
 Execution of onshore pipe line (1.6 km) of HDPE 1.6m diameter using but fusion
welding.
 Construction of 2 breakwater.
 Managing the project cost control.
 Dredging of 2.4 km for the both sea outfall.
 Construction the launching ramp includes the railway.
 Sinking of 6km of 1.6m diameter of HDPE pipes from -6m up to -55m
including all fitting and diffusers.
 Construction of 1300 concrete collar of different dimension for the HDPE pipe.
 Construction of 2 hydraulic structures for both sites.
 Driving of sheet piles of length 400 m for auzaibah cofferdam and darsait
cofferdam.
 Contract Management
 Preparation & floating of work orders to contractors/subcontractors,
evaluation of offers, techno- commercial discussion & finalization of contract
in view of project schedule.
 Resolve of all techno-commercial disputes and clarifications during execution
of project.
 Preparing contract budgets & ensuring that the same is not exceeded.
 Resolve of disputes with clients, contractors and statutory bodies.
ISSAM KHODER AGHA
Email: issam_117@hotmail.com
Mobile No. Sultanate ofOman 00968 91243126/
0096171555546/009613733236
 Management Skills
Ability to overview situations, continuously monitoring activity, cost and
performance, making careful detailed plans, Able to priorities and delegate
tasks, working independently or as part of a team, Ability to compile &
analyze Key Performance Indicators.
 Key Competencies and Skills
Negotiating contracts, Estimating and pricing, Problem solving, Analytical
skills networking.
 Co-ordination
 Co- ordination with consultants and client to ascertain technical specifications
and construction related essentials, based on the prevalent rules.
 Relationship management with other departments.
 Quality Control:
 Coordination of Quality Control & assurance at site by liaison with Materials
In-charge.
 Quality Control and assurance including laboratory testing. Monitoring
standards and keeping records.
 Check laboratory testing procedures, Schedule, details of tests and establish
laboratory at site.
 Check and monitor laboratory functioning at site and take remedial action in
case of deficiencies.
 HSE and Security:
 Site safety monitoring and assurance including medical and firefighting
arrangements.
 Maintain Site security.
ISSAM KHODER AGHA
Email: issam_117@hotmail.com
Mobile No. Sultanate ofOman 00968 91243126/
0096171555546/009613733236
PROJECT DETAILS
Duration:-
December 2012 up to 2014
Project:-
Quarraya Power Plant
Client:-
Samsung
Location:-
Dammam Saudi Arabia
Position:-
Project Manager
Job Description:
 Dredging and reclamation for intake GRP pipe line of 1.3 km using cutter head
dredger, to sea outfall of 800m length each.
 Installation of 2.9 km of grp pipe line of 4m diameter.
 Installation of 600m break water.
 Follow up of site works, coordination with client / authorities, progress of
works and resolving daily issues with execution of works. Monitoring shop
drawings, engineering design and monthly interim valuations.
 Managing the project cost control
 Handing over and commissioning.
 Co-ordination
 Co- ordination with consultants and client to ascertain technical specifications
and construction related essentials, based on the prevalent rules.
 Relationship management with other departments.
 Quality Control:
 Coordination of Quality Control & assurance at site by liaison with Materials
In-charge.
ISSAM KHODER AGHA
Email: issam_117@hotmail.com
Mobile No. Sultanate ofOman 00968 91243126/
0096171555546/009613733236
 Quality Control and assurance including laboratory testing. Monitoring
standards and keeping records.
 Check laboratory testing procedures, Schedule, details of tests and establish
laboratory at site.
 Check and monitor laboratory functioning at site and take remedial action in
case of deficiencies.
 HSE and Security:
 Site safety monitoring and assurance including medical and firefighting
arrangements.
 Maintain Site security.
PROJECT DETAILS
Duration:-
December 2011 up to 2012
Project:-
611 Zamil New Ship Yard
Client:-
Zamil Offshore
Location:-
Dammam port-Saudi Arabia
Position:-
Construction Manager
Job Description:
 Dredging and reclamation.
 Ship lift platform.
 690m quay wall.
ISSAM KHODER AGHA
Email: issam_117@hotmail.com
Mobile No. Sultanate ofOman 00968 91243126/
0096171555546/009613733236
PROJECT DETAILS
Duration:-
September 2010 up to November 2011
Project:-
ADM-199 nuclear power plant
Client:-
Siemens.
Location:-
Abu Dhabi, UAE.
Position:-
Project Engineer
Job Description:
 Responsibility - follow up of site works, coordination with main contractor /
client / authorities, progress of works and resolving daily issues with execution
of works. Monitoring shop drawings, engineering design and monthly interim
valuations.
 Pipe laying fiber glass 7.5 km to the intake pump.
 Networking with applying the entire required test.
 Retaining walls and concrete works.
PROJECT DETAILS
Duration:-
September 2009 up to September 2010
Project:-
DS-124 Al Khawanije Sewerage & Drainage (C81)
ISSAM KHODER AGHA
Email: issam_117@hotmail.com
Mobile No. Sultanate ofOman 00968 91243126/
0096171555546/009613733236
Client:-
Mabani Delma
Location:-
Khawanije, Dubai, UAE
Position:-
Project Engineer
Job Description:
 Follow up of site works, coordination with main contractor / client / authorities,
progress of works and resolving daily issues with execution of works.
Monitoring shop drawings, engineering design and monthly interim
valuations.
 Approved from Dubai municipality in civil works and infrastructure.
 Shut down and connections in networking system.
 Applying dewatering system in 45%of the project.
 Handing over and commissioning.
 Pipe laying and manhole works.
 Air test, deflection test, water test, pressure test, chlorine test, bacteria test.
PROJECT DETAILS
Duration:-
February 2008 up to September 2009
Project:-
Interchange No. 8 on Sheikh Zayed Road.
Client:-
Shimzu Co-operation
Location:-
Jebel Ali Interchange No. 8,UAE
Position:-
Project Engineer
ISSAM KHODER AGHA
Email: issam_117@hotmail.com
Mobile No. Sultanate ofOman 00968 91243126/
0096171555546/009613733236
Job Description:
 Co-ordinating with main contractor and concerned authorities, along with
follow up of daily progress of earthworks, pipe laying, pressure tests and
handing over and coordination with subcontractors.
 43 bridge with all the required finishing work.
PROJECT DETAILS
Duration:-
July 2007 up to February 2008
Project:-
Dubai land Roads PH-1 – Roads at the Tiger woods’ Dubai-UAE.
Client:-
Khan Saheb
Location:-
Lihbab Road (Phase-1
Position:-
Site Engineer
Job Description:
 Follow up of daily progress of earthworks, pipe laying , pressure tests and
handing over and coordination with subcontractors.
 Mine works design and exution of works.
LINGUISTIC SKILLS
Native Arabic – Advance spoken and written
English – Spoken and written
Others – French, English Kriol, Spanish
COMPUTER SKILLS
ISSAM KHODER AGHA
Email: issam_117@hotmail.com
Mobile No. Sultanate ofOman 00968 91243126/
0096171555546/009613733236
Microsoft office (Word, Excel, PowerPoint, AutoCAD & Internet).
REFERENCE
Available upon request

More Related Content

What's hot

Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisorJames Ct
 
CV( Affendy Ali )040515new
CV( Affendy Ali )040515newCV( Affendy Ali )040515new
CV( Affendy Ali )040515newaffendy ali
 
Amer Zubair - QS
Amer Zubair - QSAmer Zubair - QS
Amer Zubair - QSAmer Zubair
 
شهادة-خبرة-مهندس-مجدى
شهادة-خبرة-مهندس-مجدىشهادة-خبرة-مهندس-مجدى
شهادة-خبرة-مهندس-مجدىMagdy Ali
 
6. Khatib & Alami Experiance Latter
6. Khatib & Alami Experiance Latter6. Khatib & Alami Experiance Latter
6. Khatib & Alami Experiance LatterAsim Iqbal
 
Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leonardo David
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)Ahmed Youssef
 
ABDUL MAJID KANDHIR (CIVIL INSPECTOR)
ABDUL MAJID KANDHIR (CIVIL INSPECTOR)ABDUL MAJID KANDHIR (CIVIL INSPECTOR)
ABDUL MAJID KANDHIR (CIVIL INSPECTOR)ABDUL MAJID KANDHIR
 

What's hot (19)

Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisor
 
CV( Affendy Ali )040515new
CV( Affendy Ali )040515newCV( Affendy Ali )040515new
CV( Affendy Ali )040515new
 
PALANIIAPPAN CV (1)
PALANIIAPPAN CV (1)PALANIIAPPAN CV (1)
PALANIIAPPAN CV (1)
 
Rezume ongky
Rezume ongkyRezume ongky
Rezume ongky
 
Amer Zubair - QS
Amer Zubair - QSAmer Zubair - QS
Amer Zubair - QS
 
CIVIL ENGR.C.V
CIVIL ENGR.C.VCIVIL ENGR.C.V
CIVIL ENGR.C.V
 
Certificate Format Samples
Certificate Format Samples Certificate Format Samples
Certificate Format Samples
 
شهادة-خبرة-مهندس-مجدى
شهادة-خبرة-مهندس-مجدىشهادة-خبرة-مهندس-مجدى
شهادة-خبرة-مهندس-مجدى
 
c.v M_Helal 8-2016
c.v M_Helal  8-2016c.v M_Helal  8-2016
c.v M_Helal 8-2016
 
6. Khatib & Alami Experiance Latter
6. Khatib & Alami Experiance Latter6. Khatib & Alami Experiance Latter
6. Khatib & Alami Experiance Latter
 
Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)
 
UPDATED CV 1
UPDATED CV 1UPDATED CV 1
UPDATED CV 1
 
razwan ali cv
razwan ali cvrazwan ali cv
razwan ali cv
 
CV Chenna
CV ChennaCV Chenna
CV Chenna
 
HOSS. C.V.
HOSS.  C.V.HOSS.  C.V.
HOSS. C.V.
 
CV FAISAL
CV FAISALCV FAISAL
CV FAISAL
 
A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)
 
LATEST SHORT CV 2015
LATEST SHORT CV 2015LATEST SHORT CV 2015
LATEST SHORT CV 2015
 
ABDUL MAJID KANDHIR (CIVIL INSPECTOR)
ABDUL MAJID KANDHIR (CIVIL INSPECTOR)ABDUL MAJID KANDHIR (CIVIL INSPECTOR)
ABDUL MAJID KANDHIR (CIVIL INSPECTOR)
 

Viewers also liked

Formular de candidatură și profil de evaluator independent
Formular de candidatură și profil de evaluator independentFormular de candidatură și profil de evaluator independent
Formular de candidatură și profil de evaluator independentTunde Csata
 
Prezentare inaugurare Parcul Culorilor 16 06 2016
Prezentare inaugurare Parcul Culorilor 16 06 2016Prezentare inaugurare Parcul Culorilor 16 06 2016
Prezentare inaugurare Parcul Culorilor 16 06 2016Tunde Csata
 
How Jazz Musicians Improvise
How Jazz Musicians ImproviseHow Jazz Musicians Improvise
How Jazz Musicians ImproviseMike Asimos
 
Universidad nacional de chimborazo
Universidad nacional de chimborazoUniversidad nacional de chimborazo
Universidad nacional de chimborazodanielapasquel
 
The Pill at Work
The Pill at Work The Pill at Work
The Pill at Work alexhalll
 
Long Beach Grows presentation for environmental committee 10-18-11 agenda ite...
Long Beach Grows presentation for environmental committee 10-18-11 agenda ite...Long Beach Grows presentation for environmental committee 10-18-11 agenda ite...
Long Beach Grows presentation for environmental committee 10-18-11 agenda ite...Long Beach Grows
 
Volunteering Your Way Up the Career Ladder
Volunteering Your Way Up the Career LadderVolunteering Your Way Up the Career Ladder
Volunteering Your Way Up the Career LadderTodd DeLuca, MTSC
 
Resumen bae bloque 3
Resumen bae bloque 3Resumen bae bloque 3
Resumen bae bloque 3SEDIC
 
Надежда Керимова - "Современные тенденции благоустройства городских территори...
Надежда Керимова - "Современные тенденции благоустройства городских территори...Надежда Керимова - "Современные тенденции благоустройства городских территори...
Надежда Керимова - "Современные тенденции благоустройства городских территори...Проектная группа 8
 
Проектная группа 8 - Формирование общественных пространств на территории заводов
Проектная группа 8 - Формирование общественных пространств на территории заводовПроектная группа 8 - Формирование общественных пространств на территории заводов
Проектная группа 8 - Формирование общественных пространств на территории заводовПроектная группа 8
 
City as a Service: How to Design a New Urban Experience - Yegor Korobeynikov ...
City as a Service: How to Design a New Urban Experience - Yegor Korobeynikov ...City as a Service: How to Design a New Urban Experience - Yegor Korobeynikov ...
City as a Service: How to Design a New Urban Experience - Yegor Korobeynikov ...Service Design Network
 

Viewers also liked (19)

la nube
la nubela nube
la nube
 
Formular de candidatură și profil de evaluator independent
Formular de candidatură și profil de evaluator independentFormular de candidatură și profil de evaluator independent
Formular de candidatură și profil de evaluator independent
 
Prezentare inaugurare Parcul Culorilor 16 06 2016
Prezentare inaugurare Parcul Culorilor 16 06 2016Prezentare inaugurare Parcul Culorilor 16 06 2016
Prezentare inaugurare Parcul Culorilor 16 06 2016
 
Dia de bicicletar
Dia de bicicletarDia de bicicletar
Dia de bicicletar
 
How Jazz Musicians Improvise
How Jazz Musicians ImproviseHow Jazz Musicians Improvise
How Jazz Musicians Improvise
 
Toll pay
Toll payToll pay
Toll pay
 
Creative commons computacion
Creative commons computacionCreative commons computacion
Creative commons computacion
 
Accion fb
Accion fbAccion fb
Accion fb
 
Universidad nacional de chimborazo
Universidad nacional de chimborazoUniversidad nacional de chimborazo
Universidad nacional de chimborazo
 
The Pill at Work
The Pill at Work The Pill at Work
The Pill at Work
 
Davies COM
Davies COMDavies COM
Davies COM
 
Long Beach Grows presentation for environmental committee 10-18-11 agenda ite...
Long Beach Grows presentation for environmental committee 10-18-11 agenda ite...Long Beach Grows presentation for environmental committee 10-18-11 agenda ite...
Long Beach Grows presentation for environmental committee 10-18-11 agenda ite...
 
Urubamba y sus distritos
Urubamba y sus distritosUrubamba y sus distritos
Urubamba y sus distritos
 
Volunteering Your Way Up the Career Ladder
Volunteering Your Way Up the Career LadderVolunteering Your Way Up the Career Ladder
Volunteering Your Way Up the Career Ladder
 
Bel fridges
Bel fridgesBel fridges
Bel fridges
 
Resumen bae bloque 3
Resumen bae bloque 3Resumen bae bloque 3
Resumen bae bloque 3
 
Надежда Керимова - "Современные тенденции благоустройства городских территори...
Надежда Керимова - "Современные тенденции благоустройства городских территори...Надежда Керимова - "Современные тенденции благоустройства городских территори...
Надежда Керимова - "Современные тенденции благоустройства городских территори...
 
Проектная группа 8 - Формирование общественных пространств на территории заводов
Проектная группа 8 - Формирование общественных пространств на территории заводовПроектная группа 8 - Формирование общественных пространств на территории заводов
Проектная группа 8 - Формирование общественных пространств на территории заводов
 
City as a Service: How to Design a New Urban Experience - Yegor Korobeynikov ...
City as a Service: How to Design a New Urban Experience - Yegor Korobeynikov ...City as a Service: How to Design a New Urban Experience - Yegor Korobeynikov ...
City as a Service: How to Design a New Urban Experience - Yegor Korobeynikov ...
 

Similar to Experienced Project Manager CV

Similar to Experienced Project Manager CV (20)

Robert W Kapp Resume
Robert W Kapp Resume Robert W Kapp Resume
Robert W Kapp Resume
 
Nadeem kumar cv
Nadeem kumar cvNadeem kumar cv
Nadeem kumar cv
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CV
 
AL SARABI CV
AL SARABI CVAL SARABI CV
AL SARABI CV
 
Abdullah's Resume
Abdullah's ResumeAbdullah's Resume
Abdullah's Resume
 
_RESUME HITESH P. DESAI 2015 (2)
_RESUME HITESH P. DESAI 2015 (2)_RESUME HITESH P. DESAI 2015 (2)
_RESUME HITESH P. DESAI 2015 (2)
 
Moayad c.v version 3
Moayad c.v version 3Moayad c.v version 3
Moayad c.v version 3
 
SANTOSH NAIR RESUME
SANTOSH NAIR RESUMESANTOSH NAIR RESUME
SANTOSH NAIR RESUME
 
jainco
jaincojainco
jainco
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 
navjay
navjaynavjay
navjay
 
Yahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialist
 
MCV
MCVMCV
MCV
 
Rengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15doneRengaraj nagappan cv aug 15done
Rengaraj nagappan cv aug 15done
 
Hamdi.62016.PDF
Hamdi.62016.PDFHamdi.62016.PDF
Hamdi.62016.PDF
 
Rozlan Ramli 2015
Rozlan Ramli 2015Rozlan Ramli 2015
Rozlan Ramli 2015
 
Ranjith cv
Ranjith cvRanjith cv
Ranjith cv
 
CV1
CV1CV1
CV1
 
CV Updated 8-10-16
CV Updated 8-10-16CV Updated 8-10-16
CV Updated 8-10-16
 
أغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEWأغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEW
 

Experienced Project Manager CV

  • 1. ISSAM KHODER AGHA Email: issam_117@hotmail.com Mobile No. Sultanate ofOman 00968 91243126/ 0096171555546/009613733236 Citizenship: Lebanese Date of Birth: 11th June 1984 ACADEMIC BACKGROUND  2002-2003 Bac II General Science North Lebanon College – Tripoli, Lebanon  2003-2007 Bachelors of Science Degree in Applied Science Building and Civil Engineering University of Belize – Belize City  2005-2007 Bachelors of Science Degree in Physical Education University of Belize – Belize City PROFESSIONAL EXPERIENCE  July 2007-November 2011 Island Waves Digging Works L.L.C. (Dubai, U.A.E)  December 2011-Upto 2014 Huta Marine L.L.C (Eastern division Saudi Arabia)  September 2014 to Till Date Sarooj Construction LLC (Sultanate of Oman/Muscat) PROJECT DETAILS Duration:- September 2014 to Till Date Project:- Design and construction of the sea outfall of new darsait STP and Auzaibah central pump station. Client:- Haya Water Location:- Muscat / Oman
  • 2. ISSAM KHODER AGHA Email: issam_117@hotmail.com Mobile No. Sultanate ofOman 00968 91243126/ 0096171555546/009613733236 Position:- Project Manager Job Description:  Project Planning  Conceptualize the detailed project reports; taking off documents, Microsoft Project execution program and project execution plans after thorough discussion with clients, project evaluation.  Establish the time span of project execution as per client specifics.  List down the resource needs for projects, after considering the budgetary parameters set.  Monitor/Discuss project status review every day with engineers.  Site & Construction Management  Follow up of site works, coordination with client / authorities, progress of works and resolving daily issues with execution of works.Monitoring shop drawings, engineering design and monthly interim valuations.  Follow up all necessary permits with all related authorities.  Mobilize all necessary resources for onshore and offshore.  Execution of onshore pipe line (1.6 km) of HDPE 1.6m diameter using but fusion welding.  Construction of 2 breakwater.  Managing the project cost control.  Dredging of 2.4 km for the both sea outfall.  Construction the launching ramp includes the railway.  Sinking of 6km of 1.6m diameter of HDPE pipes from -6m up to -55m including all fitting and diffusers.  Construction of 1300 concrete collar of different dimension for the HDPE pipe.  Construction of 2 hydraulic structures for both sites.  Driving of sheet piles of length 400 m for auzaibah cofferdam and darsait cofferdam.  Contract Management  Preparation & floating of work orders to contractors/subcontractors, evaluation of offers, techno- commercial discussion & finalization of contract in view of project schedule.  Resolve of all techno-commercial disputes and clarifications during execution of project.  Preparing contract budgets & ensuring that the same is not exceeded.  Resolve of disputes with clients, contractors and statutory bodies.
  • 3. ISSAM KHODER AGHA Email: issam_117@hotmail.com Mobile No. Sultanate ofOman 00968 91243126/ 0096171555546/009613733236  Management Skills Ability to overview situations, continuously monitoring activity, cost and performance, making careful detailed plans, Able to priorities and delegate tasks, working independently or as part of a team, Ability to compile & analyze Key Performance Indicators.  Key Competencies and Skills Negotiating contracts, Estimating and pricing, Problem solving, Analytical skills networking.  Co-ordination  Co- ordination with consultants and client to ascertain technical specifications and construction related essentials, based on the prevalent rules.  Relationship management with other departments.  Quality Control:  Coordination of Quality Control & assurance at site by liaison with Materials In-charge.  Quality Control and assurance including laboratory testing. Monitoring standards and keeping records.  Check laboratory testing procedures, Schedule, details of tests and establish laboratory at site.  Check and monitor laboratory functioning at site and take remedial action in case of deficiencies.  HSE and Security:  Site safety monitoring and assurance including medical and firefighting arrangements.  Maintain Site security.
  • 4. ISSAM KHODER AGHA Email: issam_117@hotmail.com Mobile No. Sultanate ofOman 00968 91243126/ 0096171555546/009613733236 PROJECT DETAILS Duration:- December 2012 up to 2014 Project:- Quarraya Power Plant Client:- Samsung Location:- Dammam Saudi Arabia Position:- Project Manager Job Description:  Dredging and reclamation for intake GRP pipe line of 1.3 km using cutter head dredger, to sea outfall of 800m length each.  Installation of 2.9 km of grp pipe line of 4m diameter.  Installation of 600m break water.  Follow up of site works, coordination with client / authorities, progress of works and resolving daily issues with execution of works. Monitoring shop drawings, engineering design and monthly interim valuations.  Managing the project cost control  Handing over and commissioning.  Co-ordination  Co- ordination with consultants and client to ascertain technical specifications and construction related essentials, based on the prevalent rules.  Relationship management with other departments.  Quality Control:  Coordination of Quality Control & assurance at site by liaison with Materials In-charge.
  • 5. ISSAM KHODER AGHA Email: issam_117@hotmail.com Mobile No. Sultanate ofOman 00968 91243126/ 0096171555546/009613733236  Quality Control and assurance including laboratory testing. Monitoring standards and keeping records.  Check laboratory testing procedures, Schedule, details of tests and establish laboratory at site.  Check and monitor laboratory functioning at site and take remedial action in case of deficiencies.  HSE and Security:  Site safety monitoring and assurance including medical and firefighting arrangements.  Maintain Site security. PROJECT DETAILS Duration:- December 2011 up to 2012 Project:- 611 Zamil New Ship Yard Client:- Zamil Offshore Location:- Dammam port-Saudi Arabia Position:- Construction Manager Job Description:  Dredging and reclamation.  Ship lift platform.  690m quay wall.
  • 6. ISSAM KHODER AGHA Email: issam_117@hotmail.com Mobile No. Sultanate ofOman 00968 91243126/ 0096171555546/009613733236 PROJECT DETAILS Duration:- September 2010 up to November 2011 Project:- ADM-199 nuclear power plant Client:- Siemens. Location:- Abu Dhabi, UAE. Position:- Project Engineer Job Description:  Responsibility - follow up of site works, coordination with main contractor / client / authorities, progress of works and resolving daily issues with execution of works. Monitoring shop drawings, engineering design and monthly interim valuations.  Pipe laying fiber glass 7.5 km to the intake pump.  Networking with applying the entire required test.  Retaining walls and concrete works. PROJECT DETAILS Duration:- September 2009 up to September 2010 Project:- DS-124 Al Khawanije Sewerage & Drainage (C81)
  • 7. ISSAM KHODER AGHA Email: issam_117@hotmail.com Mobile No. Sultanate ofOman 00968 91243126/ 0096171555546/009613733236 Client:- Mabani Delma Location:- Khawanije, Dubai, UAE Position:- Project Engineer Job Description:  Follow up of site works, coordination with main contractor / client / authorities, progress of works and resolving daily issues with execution of works. Monitoring shop drawings, engineering design and monthly interim valuations.  Approved from Dubai municipality in civil works and infrastructure.  Shut down and connections in networking system.  Applying dewatering system in 45%of the project.  Handing over and commissioning.  Pipe laying and manhole works.  Air test, deflection test, water test, pressure test, chlorine test, bacteria test. PROJECT DETAILS Duration:- February 2008 up to September 2009 Project:- Interchange No. 8 on Sheikh Zayed Road. Client:- Shimzu Co-operation Location:- Jebel Ali Interchange No. 8,UAE Position:- Project Engineer
  • 8. ISSAM KHODER AGHA Email: issam_117@hotmail.com Mobile No. Sultanate ofOman 00968 91243126/ 0096171555546/009613733236 Job Description:  Co-ordinating with main contractor and concerned authorities, along with follow up of daily progress of earthworks, pipe laying, pressure tests and handing over and coordination with subcontractors.  43 bridge with all the required finishing work. PROJECT DETAILS Duration:- July 2007 up to February 2008 Project:- Dubai land Roads PH-1 – Roads at the Tiger woods’ Dubai-UAE. Client:- Khan Saheb Location:- Lihbab Road (Phase-1 Position:- Site Engineer Job Description:  Follow up of daily progress of earthworks, pipe laying , pressure tests and handing over and coordination with subcontractors.  Mine works design and exution of works. LINGUISTIC SKILLS Native Arabic – Advance spoken and written English – Spoken and written Others – French, English Kriol, Spanish COMPUTER SKILLS
  • 9. ISSAM KHODER AGHA Email: issam_117@hotmail.com Mobile No. Sultanate ofOman 00968 91243126/ 0096171555546/009613733236 Microsoft office (Word, Excel, PowerPoint, AutoCAD & Internet). REFERENCE Available upon request