An analysis of two case studies to understand the process improvement Presented by Priyaashree Rakesh Vishaal Indranil Rohit Prasad Surya CMMI
Introduction The CMMI is a framework for business process improvement It is NOT an engineering development standard or a development life cycle There are currently three "flavours" of CMMI called constellations.   -CMMI for Development - 22 Process Areas. -CMMI for Acquisition - 21 Process Areas. -CMMI for Services    - 24 Process Areas. The three constellations share 16 "core" process areas. Process Areas are organized in two main ways, called "Representations“. Staged Continuous  Maturity Level and Capability Level
Brief History of CMMI In the 1980s a Standish Group study found that over 30% of all large software projects failed to be delivered, and, of the remaining, nearly 80% failed to come in on time and budget To beat these odds, and to lower the overall cost of buying software, the Department of Defense funded the Software Engineering Institute (SEI) at Carnegie Mellon University to find ways to help defense contractors build software more economically. Result became the Capability Maturity Model for software, or CMM. Today, the CMM/CMMI are the de facto standard for software management throughout the Federal government and is internationally recognized as a very powerful business tool and competitive differentiator.
CMMI : few structural concepts The SEI identified 25 total process areas and put them into the CMMI.   There are two ways to apply the 25 processes depending on which approach suits the development shop best.  They can choose to apply pre-determined processes in a specific sequence to achieve "maturity" in managing development, or, they can choose the processes most important to their business and apply the necessary rigor to achieve a "capability" for managing development. The "maturity" scale has 5 levels And, the "capability" scale has 6 levels the "maturity" levels are pre-defined, the approach is called "staged."  The "capability" approach is called "continuous" because the performance of the processes are tied to business objectives
Case Study 1 GENERAL MOTORS Implementation of CMMI for acquisition
Objective and Solution  BUSINESS CHALLENGES: GM has been acquiring and not developing  IT-solutions for decades. It had to evolve constantly with changing business need. Implementation of the model required structural change  and following global standard practices. CMMI  SOLUTION: GM recognized that it must excel in Requirements ,architecture and Project management to be a successful acquirer and customer.
Implementation  Requirements: Acquirer ownership of requirement is essential and acquirer must be skilled in requirement engineering Action: established requirement team and requirement prototyping is done Architecture:  Architectural philosophy varies within supplier base Action:  Enterprise level system engineering team built and cross area/functional architecture planning meeting held Project management: better relationship with customers was necessary for the acquisition PM Action: integrated GM and supplier project plan, Standard peer and acceptance review was done. BENEFIT: General motors was the first commercial enterprise to be appraised utilizing CMMI- ACQ  The best practices encompassed in the CMMI-ACQ drove quality  throughout the IT acquisition model of GM
Case Study 2 Implementation by a leading telecom  giant to improve the quality of the entire software development process
Objective and Challenge  Objective:  Improve the quality of the entire software development process and ensure CMMI Level 2 process quality for all key process areas (KPAs) Business Challenge: ,[object Object]
Absence of formal estimation processes
Lack of proper documentation
No rationale for estimates - incorrect estimations

More Related Content

What's hot

Integrated View Of Qai - Induction ppt
 Integrated View Of Qai - Induction ppt Integrated View Of Qai - Induction ppt
Integrated View Of Qai - Induction ppt
QAIites
 

What's hot (20)

Applying Capability Maturity Model Integration (CMMI) for Your Company Proces...
Applying Capability Maturity Model Integration (CMMI) for Your Company Proces...Applying Capability Maturity Model Integration (CMMI) for Your Company Proces...
Applying Capability Maturity Model Integration (CMMI) for Your Company Proces...
 
Capability Maturity Model Integrity (CMMI)
Capability Maturity Model Integrity (CMMI)Capability Maturity Model Integrity (CMMI)
Capability Maturity Model Integrity (CMMI)
 
CMMi level 3 presentation
CMMi level 3 presentationCMMi level 3 presentation
CMMi level 3 presentation
 
Capability maturity model
Capability maturity modelCapability maturity model
Capability maturity model
 
CMMI v 1.2 Basics
CMMI v 1.2 BasicsCMMI v 1.2 Basics
CMMI v 1.2 Basics
 
Cmmi - An overview
Cmmi - An overviewCmmi - An overview
Cmmi - An overview
 
CMMI
CMMICMMI
CMMI
 
Capability Maturity Model Integration (CMMI)
Capability Maturity Model Integration (CMMI)Capability Maturity Model Integration (CMMI)
Capability Maturity Model Integration (CMMI)
 
CMMI
CMMICMMI
CMMI
 
A Simple Introduction To CMMI For Beginer
A Simple Introduction To CMMI For BeginerA Simple Introduction To CMMI For Beginer
A Simple Introduction To CMMI For Beginer
 
Getting Started With CMMi level 3
Getting Started With CMMi level 3Getting Started With CMMi level 3
Getting Started With CMMi level 3
 
CMMI V2.0
CMMI V2.0CMMI V2.0
CMMI V2.0
 
Integrated View Of Qai - Induction ppt
 Integrated View Of Qai - Induction ppt Integrated View Of Qai - Induction ppt
Integrated View Of Qai - Induction ppt
 
The True Costs and Benefits of CMMI Level 5
The True Costs and Benefits of CMMI Level 5The True Costs and Benefits of CMMI Level 5
The True Costs and Benefits of CMMI Level 5
 
CMMI for Development
CMMI for DevelopmentCMMI for Development
CMMI for Development
 
Capability Maturity Model Integration
Capability Maturity Model IntegrationCapability Maturity Model Integration
Capability Maturity Model Integration
 
Cmmi Dev 2
Cmmi Dev 2Cmmi Dev 2
Cmmi Dev 2
 
CMMI CONSULTING
CMMI CONSULTINGCMMI CONSULTING
CMMI CONSULTING
 
CMMi for Services lecture
CMMi for Services lectureCMMi for Services lecture
CMMi for Services lecture
 
CMMI Project Planning Presentation
CMMI Project Planning PresentationCMMI Project Planning Presentation
CMMI Project Planning Presentation
 

Similar to Cmmi Final

QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2
handbook
 
Deepak_Jain_12NOV15
Deepak_Jain_12NOV15Deepak_Jain_12NOV15
Deepak_Jain_12NOV15
Deepak Jain
 
Software process improvement.ppt
Software process improvement.pptSoftware process improvement.ppt
Software process improvement.ppt
ImXaib
 

Similar to Cmmi Final (20)

Applicability of CMMI for Small to Medium Enterprises
Applicability of CMMI for Small to Medium EnterprisesApplicability of CMMI for Small to Medium Enterprises
Applicability of CMMI for Small to Medium Enterprises
 
CMMI for Development Workshop
CMMI for Development WorkshopCMMI for Development Workshop
CMMI for Development Workshop
 
CMMI V1.3
CMMI V1.3CMMI V1.3
CMMI V1.3
 
150110746014
150110746014150110746014
150110746014
 
QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2
 
Six sigma control in total quality management copy
Six sigma control in total quality management   copySix sigma control in total quality management   copy
Six sigma control in total quality management copy
 
Cmmi and Agile v1.4 (1)
Cmmi and Agile v1.4 (1)Cmmi and Agile v1.4 (1)
Cmmi and Agile v1.4 (1)
 
Capability Maturity Model (CMM).pptx
Capability Maturity Model (CMM).pptxCapability Maturity Model (CMM).pptx
Capability Maturity Model (CMM).pptx
 
Sigma sdlc
Sigma sdlcSigma sdlc
Sigma sdlc
 
The Quality Standard: ISO 9000 , CMM and Six Sigma
The Quality Standard: ISO 9000 , CMM and Six SigmaThe Quality Standard: ISO 9000 , CMM and Six Sigma
The Quality Standard: ISO 9000 , CMM and Six Sigma
 
Deepak_Jain_12NOV15
Deepak_Jain_12NOV15Deepak_Jain_12NOV15
Deepak_Jain_12NOV15
 
Process improvement for General Counsel and Law Firms
Process improvement for General Counsel and Law FirmsProcess improvement for General Counsel and Law Firms
Process improvement for General Counsel and Law Firms
 
RKMILLER_PI-BA_7-16
RKMILLER_PI-BA_7-16RKMILLER_PI-BA_7-16
RKMILLER_PI-BA_7-16
 
Six Sigma - A Presentation by Akshay Anand
Six Sigma - A Presentation by Akshay AnandSix Sigma - A Presentation by Akshay Anand
Six Sigma - A Presentation by Akshay Anand
 
Six Sigma .pdf
Six Sigma .pdfSix Sigma .pdf
Six Sigma .pdf
 
CMMi & IT Governance
CMMi & IT GovernanceCMMi & IT Governance
CMMi & IT Governance
 
Oracle-NAIO: A CMMI based Process Improvement
Oracle-NAIO: A CMMI based Process ImprovementOracle-NAIO: A CMMI based Process Improvement
Oracle-NAIO: A CMMI based Process Improvement
 
Software process improvement.ppt
Software process improvement.pptSoftware process improvement.ppt
Software process improvement.ppt
 
Chapter 13 Software Process Quality
Chapter 13 Software Process QualityChapter 13 Software Process Quality
Chapter 13 Software Process Quality
 
Enterprise Project Management and the US Armed Forces - EPC Group
Enterprise Project Management and the US Armed Forces - EPC GroupEnterprise Project Management and the US Armed Forces - EPC Group
Enterprise Project Management and the US Armed Forces - EPC Group
 

Recently uploaded

What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...
srcw2322l101
 
Constitution of Company Article of Association
Constitution of Company Article of AssociationConstitution of Company Article of Association
Constitution of Company Article of Association
seri bangash
 

Recently uploaded (20)

Sedex Members Ethical Trade Audit (SMETA) Measurement Criteria
Sedex Members Ethical Trade Audit (SMETA) Measurement CriteriaSedex Members Ethical Trade Audit (SMETA) Measurement Criteria
Sedex Members Ethical Trade Audit (SMETA) Measurement Criteria
 
Unveiling the Dynamic Gemini_ Personality Traits and Sign Dates.pptx
Unveiling the Dynamic Gemini_ Personality Traits and Sign Dates.pptxUnveiling the Dynamic Gemini_ Personality Traits and Sign Dates.pptx
Unveiling the Dynamic Gemini_ Personality Traits and Sign Dates.pptx
 
PitchBook’s Guide to VC Funding for Startups
PitchBook’s Guide to VC Funding for StartupsPitchBook’s Guide to VC Funding for Startups
PitchBook’s Guide to VC Funding for Startups
 
Pitch Deck Teardown: Terra One's $7.5m Seed deck
Pitch Deck Teardown: Terra One's $7.5m Seed deckPitch Deck Teardown: Terra One's $7.5m Seed deck
Pitch Deck Teardown: Terra One's $7.5m Seed deck
 
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdfInnomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
Innomantra Viewpoint - Building Moonshots : May-Jun 2024.pdf
 
What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...What is paper chromatography, principal, procedure,types, diagram, advantages...
What is paper chromatography, principal, procedure,types, diagram, advantages...
 
بروفايل شركة ميار الخليج للاستشارات الهندسية.pdf
بروفايل شركة ميار الخليج للاستشارات الهندسية.pdfبروفايل شركة ميار الخليج للاستشارات الهندسية.pdf
بروفايل شركة ميار الخليج للاستشارات الهندسية.pdf
 
Unlock Your TikTok Potential: Free TikTok Likes with InstBlast
Unlock Your TikTok Potential: Free TikTok Likes with InstBlastUnlock Your TikTok Potential: Free TikTok Likes with InstBlast
Unlock Your TikTok Potential: Free TikTok Likes with InstBlast
 
TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024
 
Revolutionizing Industries: The Power of Carbon Components
Revolutionizing Industries: The Power of Carbon ComponentsRevolutionizing Industries: The Power of Carbon Components
Revolutionizing Industries: The Power of Carbon Components
 
How Do Venture Capitalists Make Decisions?
How Do Venture Capitalists Make Decisions?How Do Venture Capitalists Make Decisions?
How Do Venture Capitalists Make Decisions?
 
Event Report - IBM Think 2024 - It is all about AI and hybrid
Event Report - IBM Think 2024 - It is all about AI and hybridEvent Report - IBM Think 2024 - It is all about AI and hybrid
Event Report - IBM Think 2024 - It is all about AI and hybrid
 
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
Meaningful Technology for Humans: How Strategy Helps to Deliver Real Value fo...
 
The Truth About Dinesh Bafna's Situation.pdf
The Truth About Dinesh Bafna's Situation.pdfThe Truth About Dinesh Bafna's Situation.pdf
The Truth About Dinesh Bafna's Situation.pdf
 
Constitution of Company Article of Association
Constitution of Company Article of AssociationConstitution of Company Article of Association
Constitution of Company Article of Association
 
8 Questions B2B Commercial Teams Can Ask To Help Product Discovery
8 Questions B2B Commercial Teams Can Ask To Help Product Discovery8 Questions B2B Commercial Teams Can Ask To Help Product Discovery
8 Questions B2B Commercial Teams Can Ask To Help Product Discovery
 
Raising Seed Capital by Steve Schlafman at RRE Ventures
Raising Seed Capital by Steve Schlafman at RRE VenturesRaising Seed Capital by Steve Schlafman at RRE Ventures
Raising Seed Capital by Steve Schlafman at RRE Ventures
 
Hyundai capital 2024 1q Earnings release
Hyundai capital 2024 1q Earnings releaseHyundai capital 2024 1q Earnings release
Hyundai capital 2024 1q Earnings release
 
HAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future ProspectsHAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future Prospects
 
Special Purpose Vehicle (Purpose, Formation & examples)
Special Purpose Vehicle (Purpose, Formation & examples)Special Purpose Vehicle (Purpose, Formation & examples)
Special Purpose Vehicle (Purpose, Formation & examples)
 

Cmmi Final

  • 1. An analysis of two case studies to understand the process improvement Presented by Priyaashree Rakesh Vishaal Indranil Rohit Prasad Surya CMMI
  • 2. Introduction The CMMI is a framework for business process improvement It is NOT an engineering development standard or a development life cycle There are currently three "flavours" of CMMI called constellations. -CMMI for Development - 22 Process Areas. -CMMI for Acquisition - 21 Process Areas. -CMMI for Services - 24 Process Areas. The three constellations share 16 "core" process areas. Process Areas are organized in two main ways, called "Representations“. Staged Continuous Maturity Level and Capability Level
  • 3. Brief History of CMMI In the 1980s a Standish Group study found that over 30% of all large software projects failed to be delivered, and, of the remaining, nearly 80% failed to come in on time and budget To beat these odds, and to lower the overall cost of buying software, the Department of Defense funded the Software Engineering Institute (SEI) at Carnegie Mellon University to find ways to help defense contractors build software more economically. Result became the Capability Maturity Model for software, or CMM. Today, the CMM/CMMI are the de facto standard for software management throughout the Federal government and is internationally recognized as a very powerful business tool and competitive differentiator.
  • 4. CMMI : few structural concepts The SEI identified 25 total process areas and put them into the CMMI.   There are two ways to apply the 25 processes depending on which approach suits the development shop best.  They can choose to apply pre-determined processes in a specific sequence to achieve "maturity" in managing development, or, they can choose the processes most important to their business and apply the necessary rigor to achieve a "capability" for managing development. The "maturity" scale has 5 levels And, the "capability" scale has 6 levels the "maturity" levels are pre-defined, the approach is called "staged."  The "capability" approach is called "continuous" because the performance of the processes are tied to business objectives
  • 5. Case Study 1 GENERAL MOTORS Implementation of CMMI for acquisition
  • 6. Objective and Solution BUSINESS CHALLENGES: GM has been acquiring and not developing IT-solutions for decades. It had to evolve constantly with changing business need. Implementation of the model required structural change and following global standard practices. CMMI SOLUTION: GM recognized that it must excel in Requirements ,architecture and Project management to be a successful acquirer and customer.
  • 7. Implementation Requirements: Acquirer ownership of requirement is essential and acquirer must be skilled in requirement engineering Action: established requirement team and requirement prototyping is done Architecture: Architectural philosophy varies within supplier base Action: Enterprise level system engineering team built and cross area/functional architecture planning meeting held Project management: better relationship with customers was necessary for the acquisition PM Action: integrated GM and supplier project plan, Standard peer and acceptance review was done. BENEFIT: General motors was the first commercial enterprise to be appraised utilizing CMMI- ACQ The best practices encompassed in the CMMI-ACQ drove quality throughout the IT acquisition model of GM
  • 8. Case Study 2 Implementation by a leading telecom giant to improve the quality of the entire software development process
  • 9.
  • 10. Absence of formal estimation processes
  • 11. Lack of proper documentation
  • 12. No rationale for estimates - incorrect estimations
  • 13. Change in project Plans during project
  • 14. High degree of post release defects handled by the support team – No feedback to Dev team
  • 15. Review process was inadequate enough to analyze the review data captured
  • 16. Any process addition or process improvement initiative was looked upon as a cost to the product lifecycle
  • 17.
  • 18. Process action teams - Address these gaps
  • 19. Looked at individual KPAs and tried to address the gaps in the same
  • 20. Requirement management measures and change management process were defined for the key projects
  • 21. In project planning, new project management roles were defined.
  • 22. A methodology for tracking effort was laid down and a tool was created and implemented to track efforts
  • 23. A new estimation methodology was drafted.
  • 24. Quality planning was also implemented along with core project metrics which were then regularly reviewed.
  • 25. A new approach to configuration management procedure was proposed along with necessary templates.
  • 26.
  • 27. The client was assessed at CMMI Level 2 maturity after implementing and practicing the recommended process changes.