SlideShare a Scribd company logo
1 of 5
Download to read offline
SIX SIGMA                                                           FACTSHEET


Six Sigma aims to maximise customer satisfaction and
minimise defects.


WHAT IS SIX SIGMA?                                                     WHAT IS SIX SIGMA?       1
In statistical terms, the purpose of Six Sigma is to reduce            HOW DOES SIX SIGMA WORK? 1
process variation so that virtually all the products or services
provided meet or exceed customer expectations. This is defined         PROCESS IMPROVEMENT
as being only 3.4 defects per million occurrences.                     IN DETAIL                3


Six Sigma was developed by Motorola in the 1980s but has its roots
in Statistical Process Control (SPC), which first appeared in 1920s.


HOW DOES SIX SIGMA WORK?
There are three basic elements to Six Sigma:
● Process improvement
● Process design/re-design
● Process management

Each of the above three elements is examined in more detail below.

Process improvement
The purpose of process improvement is to eliminate the root
causes of performance deficiencies in processes that already
exist in the organisation. These performance deficiencies may be
causing real problems for the organisation, or may be preventing
it from working as efficiently and effectively as it could.

To eliminate these deficiencies a five-step approach is used.
DEFINE – a serious problem is identified and a project team is
formed and given the responsibility and resources for solving
the problem.
MEASURE – data that describes accurately how the process is
working currently is gathered and analysed in order to produce
some preliminary ideas about what might be causing the problem.
ANALYSE – based upon these preliminary ideas, theories are
generated as to what might be causing the problem and, by
testing these theories, root causes are identified.
IMPROVE – root causes are removed by means of designing and
implementing changes to the offending process.
CONTROL – new controls are designed and implemented to
prevent the original problem from returning and to hold the
gains made by the improvement.

More details of these five steps are given later in this document.
                                                                                                1
SIX SIGMA                                         FACTSHEET




Process design/re-design
Sometimes simply improving existing processes is not enough,
and, therefore, new processes will need to be designed, or
existing processes will need to be re-designed. There are
several reasons why this could be necessary:
● An organisation may choose to replace, rather than repair,
  one or more of its core processes.
● An organisation discovers, during an improvement project,
  that simply improving an existing process will never deliver
  the level of quality its customers are demanding.
● An organisation identifies an opportunity to offer an entirely
  new product or service.

As with process improvement, a five-step approach is used to
design/re-design a process:
DEFINE – identify the goals for the new process, taking into
account the customer requirements.
MATCH – develop a set of performance requirements for the
new process that match these goals.
ANALYSE – carry out an analysis of these performance
requirements for the new process, and based upon this produce
an outline design for the new process.
DESIGN & IMPLEMENT – work this outline design up into a
detailed design for the new process, and then implement it.
VERIFY – make sure the new process performs as required and
introduce controls to ensure it keeps performing that way.

Process management
Because it requires a fundamental change in the way an
organisation is structured and managed, process management is
often the most challenging and time-consuming part of Six Sigma.

In general, process management consists of:
● Defining processes, key customer requirements, and process
   “owners”.
● Measuring performance against customer requirements and
   key performance indicators.
● Analysing data to enhance measures and refine the process
   management mechanisms.
● Controlling process performance by monitoring process
   inputs, process operation, and process outputs, and
   responding quickly to problems and process variations.




                                                                   2
SIX SIGMA                                        FACTSHEET




PROCESS IMPROVEMENT IN DETAIL
Since process improvement is the most frequently used aspect
of Six Sigma, this section looks at part one – Process
Improvement – in more detail.

Step 1 – Define
Having identified the improvement project to be carried out, the
project needs to be established by carrying out the following
activities:
● PREPARE A PROBLEM STATEMENT - this statement must
  describe the problem in specific terms that identify: what is
  wrong; what is the visible evidence of the problem – the
  symptoms; how serious is the problem, expressed in
  quantifiable and measurable terms; how large is the problem
  – can it be addressed by a single, manageable size
  improvement project or will it need to be sub-divided into
  several smaller, manageable projects.
● PREPARE A MISSION STATEMENT - this statement must
  describe what is going to be done about the problem, ie, the
  objective of the improvement project. The mission statement
  should contain the same variable and unit of measure as does
  the problem statement.
● SELECT A PROJECT TEAM - the project team selected should
  be a cross-functional team that spans all functions upon
  which the improvement project will have an impact, both
  direct and indirect.

Step 2 – Measure
During this Measure step, symptoms of the problem that exists
are identified and a baseline measurement of current and recent
performance is established. Also, a map of how the process that
is producing the problem operates is developed.

However, the real purpose of this step is to analyse the symptoms
and then to confirm, or modify, the mission statement based
upon the results of this analysis. In Six Sigma a symptom is
defined as the outward, observable evidence of a problem. It is
an output of the process that is producing the problem.

If a symptom like this occurs on an ongoing basis, it signals a
chronic, underlying quality problem that needs to be addressed.
To address such a problem, first of all, the symptom needs to be
analysed in the following manner:




                                                                    3
SIX SIGMA                                            FACTSHEET




● Develop operational definitions
● Measure the symptom
● Define the boundaries – that is, the scope of the improvement
  project
● Concentrate on the vital few – those sources of error thought
  to be largely responsible for the problem. It is time
  consuming to attempt to tackle all possible sources, and the
  result may not justify the effort.

Once the above analysis of the symptoms has been completed,
the mission statement should be revisited to confirm that it is
still applicable, or to modify it to make it applicable. The results
of the analysis may reveal that the problem is somewhat
different from the one that was originally described; or that the
improvement project is too large and needs to be broken down
into more manageable parts.

Step 3 – Analyse
During this Analyse step, theories about the causes of the
problem are formulated, these theories are tested, and, finally
the root causes of the problem are identified.

● FORMULATING THE THEORIES – the project team
  brainstorms possible theories, documents them, and then
  organises them in the form of a cause-and-effect diagram.
● TESTING THE THEORIES – before any theory can be accepted as
  true, it must be systematically tested. Any data required to test
  a particular theory, that is not available, must first be collected.
  If the data collected demonstrates that a particular theory is
  clearly not important, then that theory can be eliminated.
● IDENTIFYING THE ROOT CAUSE(S) – once testing has been
  completed, the root cause(s) of the problem should be able to
  be determined.

Once found, the removal of the real root cause(s) will sharply
reduce or eliminate the problem/deficiency.

Step 4 – Improve
During this Improve step, several sequential activities are
performed and these are described below.

● EVALUATION OF ALTERNATIVES – alternative improvement
  methods are evaluated to determine which method will best
  remove, or reduce the effect of, the root cause(s) of the




                                                                         4
SIX SIGMA                                                       FACTSHEET




    problem. This evaluation is carried out using a set of
    evaluation criteria such as cost, impact, cost/benefit ratio,
    cultural impact etc
●   DESIGN OF THE IMPROVEMENT – an improvement method
    has been selected, the improvement process is designed by
    confirm that the improvement achieves the project goals;
    determining the required resources; specify the procedures
    and the other changes required; assessing human resource
    requirements to determine whether any training/re-training is
    required.
●   PLAN FOR “CULTURAL RESISTANCE” – by their very nature,
    improvement efforts create change in an organisation and
    “cultural resistance” is a natural consequence of change.
    Therefore, dealing with this potential cultural resistance needs
    to be factored into the improvement project plan.
●   PROVE EFFECTIVENESS – before an improvement is finally
    adopted, it must be proven effective under operating
    conditions. This could be done with a pilot test; a dry run,
    which doesn’t involve delivery to the customer; an acceptance
    test; a simulation
●   IMPLEMENT – this involves introducing the proposed change
    to the people that will make it work. This demands: a clear
    plan; a description of the change; an explanation indicating
    why the change is necessary; involvement of those affected;
    the change.

The most important parts of implementation, though, are good
planning, good preparation, and good cooperation between all
of the individuals concerned.

Step 5 – Control
During this Control step, controls are put in place to ensure that
the gains that have been achieved will continue and the
problem will not recur. To do this the following activities need to
be carried out.
● Design effective quality controls
● Foolproof the improvement
● Audit the controls.




For more information on Achieving best practice in your business:
● Visit our website at www.dti.gov.uk/bestpractice
● Call us on 0870 150 2500 to order from our range of free
  best practice publications or visit www.dti.gov.uk/publications
● Contact your local Business Link adviser by visiting the website at
  www.businesslink.gov.uk or calling 0845 600 9 006
Published by the Department of Trade and Industry. www.dti.gov.uk
© Crown Copyright. 04/04                                                        5

More Related Content

What's hot

How pdca cycle used in context of TQM
How pdca cycle used in context of TQMHow pdca cycle used in context of TQM
How pdca cycle used in context of TQM
Akhil Padiga
 
Six sigma project management construction
Six sigma project management constructionSix sigma project management construction
Six sigma project management construction
Christine Kim
 
Process management (improvement)
Process management (improvement)Process management (improvement)
Process management (improvement)
Faisal Syukrillah
 
Process approach to Management system. Improvemnet proposition. Shortened.
Process approach to Management system. Improvemnet proposition. Shortened.Process approach to Management system. Improvemnet proposition. Shortened.
Process approach to Management system. Improvemnet proposition. Shortened.
Elena Petrova
 
Quality management system questionnaire
Quality management system questionnaireQuality management system questionnaire
Quality management system questionnaire
selinasimpson351
 

What's hot (20)

PDCA Cycle
PDCA CyclePDCA Cycle
PDCA Cycle
 
Ch28
Ch28Ch28
Ch28
 
The process approach (and business process management)
The process approach (and business process management)The process approach (and business process management)
The process approach (and business process management)
 
Statistical process control (spc)
Statistical process control (spc)Statistical process control (spc)
Statistical process control (spc)
 
Lean six sigma - Waste elimination (Yellow Belt)
Lean six sigma - Waste elimination (Yellow Belt)Lean six sigma - Waste elimination (Yellow Belt)
Lean six sigma - Waste elimination (Yellow Belt)
 
Six Sigma Principle and Methods
Six Sigma Principle and MethodsSix Sigma Principle and Methods
Six Sigma Principle and Methods
 
Project Quality Management Plan Checklist PowerPoint Presentation Slides
Project Quality Management Plan Checklist PowerPoint Presentation SlidesProject Quality Management Plan Checklist PowerPoint Presentation Slides
Project Quality Management Plan Checklist PowerPoint Presentation Slides
 
Project quality management
Project quality managementProject quality management
Project quality management
 
Ch 7(spi)intro tocm-mi2013
Ch 7(spi)intro tocm-mi2013Ch 7(spi)intro tocm-mi2013
Ch 7(spi)intro tocm-mi2013
 
How pdca cycle used in context of TQM
How pdca cycle used in context of TQMHow pdca cycle used in context of TQM
How pdca cycle used in context of TQM
 
Six sigma project management construction
Six sigma project management constructionSix sigma project management construction
Six sigma project management construction
 
Process management (improvement)
Process management (improvement)Process management (improvement)
Process management (improvement)
 
Quality management essay
Quality management essayQuality management essay
Quality management essay
 
Six sigma
Six sigma Six sigma
Six sigma
 
Tqm ch 06
Tqm ch 06Tqm ch 06
Tqm ch 06
 
Project quality management.ppt msm
Project quality management.ppt msmProject quality management.ppt msm
Project quality management.ppt msm
 
Process Improvement
Process ImprovementProcess Improvement
Process Improvement
 
Understand dmaic
Understand dmaicUnderstand dmaic
Understand dmaic
 
Process approach to Management system. Improvemnet proposition. Shortened.
Process approach to Management system. Improvemnet proposition. Shortened.Process approach to Management system. Improvemnet proposition. Shortened.
Process approach to Management system. Improvemnet proposition. Shortened.
 
Quality management system questionnaire
Quality management system questionnaireQuality management system questionnaire
Quality management system questionnaire
 

Viewers also liked

Συστήματα Ψηφιακών Ηλεκτρονικών κεφάλαιο 4
Συστήματα Ψηφιακών Ηλεκτρονικών κεφάλαιο 4 Συστήματα Ψηφιακών Ηλεκτρονικών κεφάλαιο 4
Συστήματα Ψηφιακών Ηλεκτρονικών κεφάλαιο 4
Dimitris Kantzavelos
 
IQC 2013 - Junior Finals - Round 4 - Current Affairs (Islamic World)
IQC 2013 - Junior Finals - Round 4 - Current Affairs (Islamic World)IQC 2013 - Junior Finals - Round 4 - Current Affairs (Islamic World)
IQC 2013 - Junior Finals - Round 4 - Current Affairs (Islamic World)
Javed Hassan
 
Sumul project(dhaval bhakta)
Sumul project(dhaval bhakta)Sumul project(dhaval bhakta)
Sumul project(dhaval bhakta)
dhaval27
 
IQC 2013 - Senior Finals - Round 4 - Current Affairs (Islamic World)
IQC 2013 - Senior Finals - Round 4 - Current Affairs (Islamic World)IQC 2013 - Senior Finals - Round 4 - Current Affairs (Islamic World)
IQC 2013 - Senior Finals - Round 4 - Current Affairs (Islamic World)
Javed Hassan
 

Viewers also liked (18)

IQC 2013 - Senior Finals - Round 5 - Mecca, Medina & Caliphs
IQC 2013 - Senior Finals - Round 5 - Mecca, Medina & CaliphsIQC 2013 - Senior Finals - Round 5 - Mecca, Medina & Caliphs
IQC 2013 - Senior Finals - Round 5 - Mecca, Medina & Caliphs
 
Vision of rapture of a 8 years old girl
Vision of rapture of a 8 years old girlVision of rapture of a 8 years old girl
Vision of rapture of a 8 years old girl
 
κεφαλαιο 3'
κεφαλαιο 3'κεφαλαιο 3'
κεφαλαιο 3'
 
New owner's clinic12.10
New owner's clinic12.10New owner's clinic12.10
New owner's clinic12.10
 
Συστήματα Ψηφιακών Ηλεκτρονικών κεφάλαιο 4
Συστήματα Ψηφιακών Ηλεκτρονικών κεφάλαιο 4 Συστήματα Ψηφιακών Ηλεκτρονικών κεφάλαιο 4
Συστήματα Ψηφιακών Ηλεκτρονικών κεφάλαιο 4
 
arpit health-sector in india
arpit health-sector in indiaarpit health-sector in india
arpit health-sector in india
 
Iran In Prophecy
Iran In ProphecyIran In Prophecy
Iran In Prophecy
 
Gog & Magog War Coincide With The Coming 4 Blood Moon
Gog & Magog War Coincide With The Coming 4 Blood MoonGog & Magog War Coincide With The Coming 4 Blood Moon
Gog & Magog War Coincide With The Coming 4 Blood Moon
 
IQC 2013 - Junior Finals - Round 4 - Current Affairs (Islamic World)
IQC 2013 - Junior Finals - Round 4 - Current Affairs (Islamic World)IQC 2013 - Junior Finals - Round 4 - Current Affairs (Islamic World)
IQC 2013 - Junior Finals - Round 4 - Current Affairs (Islamic World)
 
The Four Horsemen
The Four HorsemenThe Four Horsemen
The Four Horsemen
 
Sumul project(dhaval bhakta)
Sumul project(dhaval bhakta)Sumul project(dhaval bhakta)
Sumul project(dhaval bhakta)
 
Corporate culture
Corporate cultureCorporate culture
Corporate culture
 
IQC 2013 - Junior Finals - Round 2 - Basics of Islam
IQC 2013 - Junior Finals - Round 2 - Basics of IslamIQC 2013 - Junior Finals - Round 2 - Basics of Islam
IQC 2013 - Junior Finals - Round 2 - Basics of Islam
 
IQC 2013 - Senior Finals - Round 4 - Current Affairs (Islamic World)
IQC 2013 - Senior Finals - Round 4 - Current Affairs (Islamic World)IQC 2013 - Senior Finals - Round 4 - Current Affairs (Islamic World)
IQC 2013 - Senior Finals - Round 4 - Current Affairs (Islamic World)
 
IQC 2013 - Junior Finals - Round 3 - Sahabas
IQC 2013 - Junior Finals - Round 3 - SahabasIQC 2013 - Junior Finals - Round 3 - Sahabas
IQC 2013 - Junior Finals - Round 3 - Sahabas
 
IQC 2013 - Senior Finals - Round 1 - Quran
IQC 2013 - Senior Finals - Round 1 - QuranIQC 2013 - Senior Finals - Round 1 - Quran
IQC 2013 - Senior Finals - Round 1 - Quran
 
Aliens and fallen_angels
Aliens and fallen_angelsAliens and fallen_angels
Aliens and fallen_angels
 
Formación de usuarios 2011
Formación de usuarios 2011Formación de usuarios 2011
Formación de usuarios 2011
 

Similar to Sixsigmadtifactsheet

Basic Six Sigma Presentation
Basic Six Sigma PresentationBasic Six Sigma Presentation
Basic Six Sigma Presentation
vivekissar
 

Similar to Sixsigmadtifactsheet (20)

Introduction to Six Sigma.pptx
Introduction to Six Sigma.pptxIntroduction to Six Sigma.pptx
Introduction to Six Sigma.pptx
 
Continous process improvement
Continous process improvementContinous process improvement
Continous process improvement
 
Bb training improve_print
Bb training improve_printBb training improve_print
Bb training improve_print
 
Six sigma.ppt
Six sigma.pptSix sigma.ppt
Six sigma.ppt
 
Dit yvol5iss28
Dit yvol5iss28Dit yvol5iss28
Dit yvol5iss28
 
Lean Six Sigma Foundations
Lean Six Sigma FoundationsLean Six Sigma Foundations
Lean Six Sigma Foundations
 
Applying Lean Sigma Into Validation
Applying Lean Sigma Into ValidationApplying Lean Sigma Into Validation
Applying Lean Sigma Into Validation
 
Road to cpi #2
Road to cpi #2Road to cpi #2
Road to cpi #2
 
Six sigma QMS
Six sigma QMS Six sigma QMS
Six sigma QMS
 
Basic Six Sigma Presentation
Basic Six Sigma PresentationBasic Six Sigma Presentation
Basic Six Sigma Presentation
 
APPLYING DMAIC TO PROCESS IMPROVEMENT’S.
APPLYING DMAIC TO PROCESS IMPROVEMENT’S. APPLYING DMAIC TO PROCESS IMPROVEMENT’S.
APPLYING DMAIC TO PROCESS IMPROVEMENT’S.
 
Ppt total quality management
Ppt total quality managementPpt total quality management
Ppt total quality management
 
Lean Six Sigma Leadership 062507
Lean Six Sigma Leadership 062507Lean Six Sigma Leadership 062507
Lean Six Sigma Leadership 062507
 
Six Sigma and Construction Industry
Six Sigma and Construction IndustrySix Sigma and Construction Industry
Six Sigma and Construction Industry
 
Qc story
Qc storyQc story
Qc story
 
Module 4_Session 5.pptx_Operations Management
Module 4_Session 5.pptx_Operations ManagementModule 4_Session 5.pptx_Operations Management
Module 4_Session 5.pptx_Operations Management
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Six Sigma By :Rajeev
Six Sigma By :RajeevSix Sigma By :Rajeev
Six Sigma By :Rajeev
 
Process Improvement Teams.pptx
Process Improvement Teams.pptxProcess Improvement Teams.pptx
Process Improvement Teams.pptx
 
Project Quality - Chapter 1.pptx
Project Quality - Chapter 1.pptxProject Quality - Chapter 1.pptx
Project Quality - Chapter 1.pptx
 

Recently uploaded

Recently uploaded (20)

Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
Philosophy of china and it's charactistics
Philosophy of china and it's charactisticsPhilosophy of china and it's charactistics
Philosophy of china and it's charactistics
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 

Sixsigmadtifactsheet

  • 1. SIX SIGMA FACTSHEET Six Sigma aims to maximise customer satisfaction and minimise defects. WHAT IS SIX SIGMA? WHAT IS SIX SIGMA? 1 In statistical terms, the purpose of Six Sigma is to reduce HOW DOES SIX SIGMA WORK? 1 process variation so that virtually all the products or services provided meet or exceed customer expectations. This is defined PROCESS IMPROVEMENT as being only 3.4 defects per million occurrences. IN DETAIL 3 Six Sigma was developed by Motorola in the 1980s but has its roots in Statistical Process Control (SPC), which first appeared in 1920s. HOW DOES SIX SIGMA WORK? There are three basic elements to Six Sigma: ● Process improvement ● Process design/re-design ● Process management Each of the above three elements is examined in more detail below. Process improvement The purpose of process improvement is to eliminate the root causes of performance deficiencies in processes that already exist in the organisation. These performance deficiencies may be causing real problems for the organisation, or may be preventing it from working as efficiently and effectively as it could. To eliminate these deficiencies a five-step approach is used. DEFINE – a serious problem is identified and a project team is formed and given the responsibility and resources for solving the problem. MEASURE – data that describes accurately how the process is working currently is gathered and analysed in order to produce some preliminary ideas about what might be causing the problem. ANALYSE – based upon these preliminary ideas, theories are generated as to what might be causing the problem and, by testing these theories, root causes are identified. IMPROVE – root causes are removed by means of designing and implementing changes to the offending process. CONTROL – new controls are designed and implemented to prevent the original problem from returning and to hold the gains made by the improvement. More details of these five steps are given later in this document. 1
  • 2. SIX SIGMA FACTSHEET Process design/re-design Sometimes simply improving existing processes is not enough, and, therefore, new processes will need to be designed, or existing processes will need to be re-designed. There are several reasons why this could be necessary: ● An organisation may choose to replace, rather than repair, one or more of its core processes. ● An organisation discovers, during an improvement project, that simply improving an existing process will never deliver the level of quality its customers are demanding. ● An organisation identifies an opportunity to offer an entirely new product or service. As with process improvement, a five-step approach is used to design/re-design a process: DEFINE – identify the goals for the new process, taking into account the customer requirements. MATCH – develop a set of performance requirements for the new process that match these goals. ANALYSE – carry out an analysis of these performance requirements for the new process, and based upon this produce an outline design for the new process. DESIGN & IMPLEMENT – work this outline design up into a detailed design for the new process, and then implement it. VERIFY – make sure the new process performs as required and introduce controls to ensure it keeps performing that way. Process management Because it requires a fundamental change in the way an organisation is structured and managed, process management is often the most challenging and time-consuming part of Six Sigma. In general, process management consists of: ● Defining processes, key customer requirements, and process “owners”. ● Measuring performance against customer requirements and key performance indicators. ● Analysing data to enhance measures and refine the process management mechanisms. ● Controlling process performance by monitoring process inputs, process operation, and process outputs, and responding quickly to problems and process variations. 2
  • 3. SIX SIGMA FACTSHEET PROCESS IMPROVEMENT IN DETAIL Since process improvement is the most frequently used aspect of Six Sigma, this section looks at part one – Process Improvement – in more detail. Step 1 – Define Having identified the improvement project to be carried out, the project needs to be established by carrying out the following activities: ● PREPARE A PROBLEM STATEMENT - this statement must describe the problem in specific terms that identify: what is wrong; what is the visible evidence of the problem – the symptoms; how serious is the problem, expressed in quantifiable and measurable terms; how large is the problem – can it be addressed by a single, manageable size improvement project or will it need to be sub-divided into several smaller, manageable projects. ● PREPARE A MISSION STATEMENT - this statement must describe what is going to be done about the problem, ie, the objective of the improvement project. The mission statement should contain the same variable and unit of measure as does the problem statement. ● SELECT A PROJECT TEAM - the project team selected should be a cross-functional team that spans all functions upon which the improvement project will have an impact, both direct and indirect. Step 2 – Measure During this Measure step, symptoms of the problem that exists are identified and a baseline measurement of current and recent performance is established. Also, a map of how the process that is producing the problem operates is developed. However, the real purpose of this step is to analyse the symptoms and then to confirm, or modify, the mission statement based upon the results of this analysis. In Six Sigma a symptom is defined as the outward, observable evidence of a problem. It is an output of the process that is producing the problem. If a symptom like this occurs on an ongoing basis, it signals a chronic, underlying quality problem that needs to be addressed. To address such a problem, first of all, the symptom needs to be analysed in the following manner: 3
  • 4. SIX SIGMA FACTSHEET ● Develop operational definitions ● Measure the symptom ● Define the boundaries – that is, the scope of the improvement project ● Concentrate on the vital few – those sources of error thought to be largely responsible for the problem. It is time consuming to attempt to tackle all possible sources, and the result may not justify the effort. Once the above analysis of the symptoms has been completed, the mission statement should be revisited to confirm that it is still applicable, or to modify it to make it applicable. The results of the analysis may reveal that the problem is somewhat different from the one that was originally described; or that the improvement project is too large and needs to be broken down into more manageable parts. Step 3 – Analyse During this Analyse step, theories about the causes of the problem are formulated, these theories are tested, and, finally the root causes of the problem are identified. ● FORMULATING THE THEORIES – the project team brainstorms possible theories, documents them, and then organises them in the form of a cause-and-effect diagram. ● TESTING THE THEORIES – before any theory can be accepted as true, it must be systematically tested. Any data required to test a particular theory, that is not available, must first be collected. If the data collected demonstrates that a particular theory is clearly not important, then that theory can be eliminated. ● IDENTIFYING THE ROOT CAUSE(S) – once testing has been completed, the root cause(s) of the problem should be able to be determined. Once found, the removal of the real root cause(s) will sharply reduce or eliminate the problem/deficiency. Step 4 – Improve During this Improve step, several sequential activities are performed and these are described below. ● EVALUATION OF ALTERNATIVES – alternative improvement methods are evaluated to determine which method will best remove, or reduce the effect of, the root cause(s) of the 4
  • 5. SIX SIGMA FACTSHEET problem. This evaluation is carried out using a set of evaluation criteria such as cost, impact, cost/benefit ratio, cultural impact etc ● DESIGN OF THE IMPROVEMENT – an improvement method has been selected, the improvement process is designed by confirm that the improvement achieves the project goals; determining the required resources; specify the procedures and the other changes required; assessing human resource requirements to determine whether any training/re-training is required. ● PLAN FOR “CULTURAL RESISTANCE” – by their very nature, improvement efforts create change in an organisation and “cultural resistance” is a natural consequence of change. Therefore, dealing with this potential cultural resistance needs to be factored into the improvement project plan. ● PROVE EFFECTIVENESS – before an improvement is finally adopted, it must be proven effective under operating conditions. This could be done with a pilot test; a dry run, which doesn’t involve delivery to the customer; an acceptance test; a simulation ● IMPLEMENT – this involves introducing the proposed change to the people that will make it work. This demands: a clear plan; a description of the change; an explanation indicating why the change is necessary; involvement of those affected; the change. The most important parts of implementation, though, are good planning, good preparation, and good cooperation between all of the individuals concerned. Step 5 – Control During this Control step, controls are put in place to ensure that the gains that have been achieved will continue and the problem will not recur. To do this the following activities need to be carried out. ● Design effective quality controls ● Foolproof the improvement ● Audit the controls. For more information on Achieving best practice in your business: ● Visit our website at www.dti.gov.uk/bestpractice ● Call us on 0870 150 2500 to order from our range of free best practice publications or visit www.dti.gov.uk/publications ● Contact your local Business Link adviser by visiting the website at www.businesslink.gov.uk or calling 0845 600 9 006 Published by the Department of Trade and Industry. www.dti.gov.uk © Crown Copyright. 04/04 5