International Journal of Technical Research and Applications e-ISSN: 2320-8163,
www.ijtra.com Volume 3, Issue 4 (July-August 2015), PP. 21-23
21 | P a g e
THE CONSTRUCTION PROCEDURE AND
ADVANTAGE OF THE RAIL CABLE-LIFTING
CONSTRUCTION METHOD AND THE
CABLE-HOISTING METHOD
Ji Ce Zeng
School of civil engineering and architecture
Chongqing Jiaotong University
Chongqing, China
277199895@qq.com
Abstract:The cable-hoisting method and rail cable-lifting
method are widely used in the construction of suspension bridge.
This paper takes a suspension bridge in Hunan as an example,
and expounds the two construction methods, and analyzes their
respective merits and disadvantages.
Key words : suspension bridge rail cable-lifting
cable-hoisting
I. ENGINEERING SITUATION
The bridge is steel truss girder suspension bridge, the
main bridge spans to 900 meters, truss width is 27.0 meters,
truss height is 8 meters, approach bridge(5*30m) is designed
in south shore , another approach bridge(8*30m) is also
designed in north shore; both sides of the Straits are used with
gravity anchor, door-type reinforce concrete tower, dig
cast-in-place circular pile foundation.
Deck to the bottom of the River, vertical distance is about
200m, river width of maximum is 400m, accounting for the
main cross 44.4%, average slope rate of gully length is about
0.66 (height / length).
Lifting saddle is arranged in perpetual suspended cable,
which dose not occupy the sling steel truss connecting holes.
It is convenient for connection of cable head and segmental
beam. Meanwhile, it can reduce operation steps of removing
suspended saddle and installing the main girder when beam
section is being installed saddle. It is also can be able to
reduce the lifting height of steel truss girder and improve
construction efficiency.
II. CABLE-HOISTING CONSTRUCTION METHOD
A. Design of cable-hoisting system
The main cable crane spans to 900m, the side span is
155m in south shore, the side span is 258m in north shore,
both sides of the anchorage are anchored by gravity anchor.
The steel tower is assembled by steel tubes. The section
weight of steel truss girder is calculated by 160t.
Working principle of the cable crane machine is along
the cross bridge to arrange two sets of main cable, each main
cable is composed of steel wire rope 10 Phi 60.5, both ends of
which are anchored in the gravity anchor on both sides of
bridge. Each main cable respectively hangs the two supporting
car in midair. At both ends of the bridge, the traction winch
and lift winch pull lifting trolley in the bearing cable to roll
and lift steel truss girder, which makes girder construction
completed. There are 8 sports cars during the working frame
of the cable crane, and the erection of each section of the steel
truss girder is shared 4 sports cars (i.e., 4 lifting points) and
hoisted synchronously
Suspension rope design and related parameters of single cable
Project
Specification
for wire rope
(mm)
form for wire
rope
Unit weight
(kg.m﹣¹)
Breaking
tension(kN)
Modulus
elasticity
(MPa)
Load-bearing cable 10×Φ60.5 6×37S+IWR 1284.3 2075 10500
the sling Φ32 6×37S+IWR 389.0 546.5 10500
Traction cable 2×Φ36 6×37S+IWR 437.0 701.9 10500
B. Cable crane tower Cable crane tower is used in scheme that assembles
International Journal of Technical Research and Applications e-ISSN: 2320-8163,
www.ijtra.com Volume 3, Issue 4 (July-August 2015), PP. 21-23
22 | P a g e
steel pipe column in bridge tower, each tower with 4 Phi 600
* 10 is made of seamless steel pipe column, flat joint by phi
300 x 8 of the seamless steel pipe, bracing by Phi 200 x 8
seamless steel tube composed of space lattice system, which
plays a part in supporting in bridge cable tower, tower has
height of 13m. tower is made of the total amount of 54t steel.
Its material is Q345 steel. Steel tube tower is connected with
the tower frame, in order to increase the overall stability of
the tower. At the same time, a transverse eight wind is
designed, wind-bearing wire rope with 4 Phi 32 per bank is
selected. In order to reduce the longitudinal direction of the
bridge tower deviation, unilateral set Phi 60.5 pressure
tower wire rope.
C. Hoisting construction
Steel truss girder in assembling field is assembled,
when steel truss girder ships load- segment, with floating
box controlling the water-level, the top of floating box lies
alongside the wharf, and pressure from the ship's load levels
system position. At the same time, the floating box and
wharves should be fixed and connected, waiting for flat car
on board.
III. RAIL CABLE-LIFTING CONSTRUCTION
METHOD
A. Equipment And Assembling
The equipment mainly composed of the following parts:
beam-transporting trolley, saddle, cable, crane, zenith trolley,
a winch etc.
The beam-transporting trolley is the most core
equipment in this project, which composed of the pulley
group, the triangular distribution beam and the rectangular
distribution beam.
B. Saddle
The effect of cable saddle is to provide support, and
will convert load from cable to cable. The design of crane
saddle incorporate characteristics of pin type sling, with
moving the saddle to the direction of top and using the cable
clamp as a fulcrum to place it at the top, which make saddle
not occupy space of connecting hole of the lower cable
clamp. It also uses both sides of the longitudinal
positioning lock to ensure the lateral stability and it is
convenient for construction. The saddle is composed of a
longitudinal beam and a saddle beam.
C. Cable
Rail cable is considered as beam-transporting orbit and
the lifeline of the whole system, it is also the parts that has
highest safety risk coefficient. Its internal force changes
complexly and shows different characteristics on various
construction conditions, in order to meet need of its function
and have enough safety and operability, after calculating, the
staff used Phi 60 wire rope galvanized and sealed. Four
single, independent of each other, one end fixedly, one end
through the pulley group + keeping four rail cable force
basically the same and remain constant with counterweight
block.
D. Crane
The bridge had two sets of hydraulic loading crane for
lifting type cable, a cable carrier crane by a steel truss beam,
two pedrail-walking mechanism on the main cable, two sets
of hydraulic lifting equipment (including lifting and traction
jacks, hydraulic pump station, control system and steel wire
take-up device), with a lifting pole beam, power generation
equipment parts.
E. Construction Procedure
The installation and construction method of flexible
cable net steel truss beam is used for erection of steel truss
beam in the section of hoisting. The main construction steps
are:
1. The main cable and permanent slings are used for
supporting, horizontal cable is set up , with
anchored in the rock mass.
2. A steel pipe Bailey platform is built at the pile cap
on both sides, steel truss girder assembling
platform is made of Bailey platform and the rest
space of pile cap.
3. After lifting section that has been assembled, and
then those sections are suspended under the
carriage beam trolley.
4. Transporting vertically to the corresponding sling
by rail sling
5. The section of the steel truss girder is suspended
from the cable borne crane, and the carriage beam
carriage is exited.
6. Adjusting spatial position of the segment, and beam
butt has been installed, and pin sling.
7. The beam in mid of bridge is first installed and then
symmetrically installed from mid of bridge to the
sides of bank until the full bridge is linked.
The advantages of rail cable-lifting construction method
and cable-hoisting method
1. The assembling field of the steel truss is arranged
International Journal of Technical Research and Applications e-ISSN: 2320-8163,
www.ijtra.com Volume 3, Issue 4 (July-August 2015), PP. 21-23
23 | P a g e
on the platform. Compared with the cable hoisting,
it can reduce the lifting height of the steel truss
girder and the construction time, and improve the
safety of the construction. At the same time, two
pieces of steel truss girder can be installed, which
can shorten the construction time and bring the
recessive economic benefits.
2. Transport and erection of the steel truss girder have
high construction efficiency, cost savings.
3. The rail cable is used as the main cable as the
support, with the good wind stability, the quality of
construction can be controllable
4. Compared to the cables, rail cable needs less
bearing steel wire rope.
5. When using cable-hoisting method, it needs more
operators, and cable-hoisting system technology is
complex, it has high demands for the operation and
personnel quality . Rail cable has a high degree of
automation, it needs less operators when moving
the beam. Construction technology is stable, the
impact of environment is small, easy to
standardized operation.
IV. CONCLUSION
Rail cable-lifting construction method and
cable-hoisting construction method is more and more mature,
but there are still many places should be improved, such as
whether rail cable-lifting construction method can cancel
cable carrying crane or not, in terms with controlling the
main cable wire linearity in cable-hoisting construction
method
REFERENCES
[1]. Jianhui Lv. Hui Zhang. long span concrete filled steel tube
arch bridge cable-hoisting construction technology [J] -
Science and technology and engineering 2009,9 (4)
[2]. Shiming Liu. Yongjian Liu. Xiaorong Yao. concrete filled
steel tubular arch bridge cable- hoisting construction
optimization [J] - Highway Traffic Science and technology
in 2012, 29 (7)
[3]. Jinming Huang. cable hoisting system in steel truss arch
bridge hook in construction application [journal article] -
the western traffic science and technology 2012 (2)
[4]. Dong liang Zhou. Construction control study [J] highway
and 2012 trucks hoisting of long span arch bridge (1)
Huaqiang
[5]. Jian gen Lv. The main span of 368m Zhang Hui lifting
Maocaojie Bridge Construction Technology [J] 2009 rib
arch construction technology, 40 (2)
[6]. Zheng zhou Cao. Yu tao Feng. Chongqing Chaoyang
complex bridge hoisting cable tower, tower integration
research [J] 2010 (07) of bridge construction.
[7]. Jun wei Tian. large span concrete filled steel tubular arch
bridge construction control [J] highway and automotive
2012 rib hoisting (1)
[8]. Hong tian Du. Zhong Ming. concrete filled steel tube arch
bridge arch rib hoisting process temperature change on Rib
Alignment Effect [J] - Railway Standard arch design 2008
(3)
[9]. Jian hong LI . Jing Sheng. cable hoisting method of
reinforced concrete arch bridge construction error analysis
[J] - Sichuan building 2009,29 (6)

More Related Content

What's hot

STATIC AND DYNAMIC ANALYSIS OF CABLE-STAYED SUSPENSION HYBRID BRIDGE & VALIDA...
STATIC AND DYNAMIC ANALYSIS OF CABLE-STAYED SUSPENSION HYBRID BRIDGE & VALIDA...STATIC AND DYNAMIC ANALYSIS OF CABLE-STAYED SUSPENSION HYBRID BRIDGE & VALIDA...
STATIC AND DYNAMIC ANALYSIS OF CABLE-STAYED SUSPENSION HYBRID BRIDGE & VALIDA...IAEME Publication
 
BUILDING STRUCTURE ASSIGNMENT 1
BUILDING STRUCTURE ASSIGNMENT 1BUILDING STRUCTURE ASSIGNMENT 1
BUILDING STRUCTURE ASSIGNMENT 1Nur Zaas
 
Final report design of a pedestrian bridge - fall 2009
Final report   design of a pedestrian bridge - fall 2009Final report   design of a pedestrian bridge - fall 2009
Final report design of a pedestrian bridge - fall 2009Sanamau Waitogu
 
Cable stay bridge construction
Cable stay bridge constructionCable stay bridge construction
Cable stay bridge constructionBalkrishan Kushwah
 
Cable stayed bridges of prestressed concrete.
Cable stayed bridges of prestressed concrete.Cable stayed bridges of prestressed concrete.
Cable stayed bridges of prestressed concrete.Franco Bontempi
 
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...Rajesh Prasad
 
Munger rail cum road bridge
Munger rail cum road bridgeMunger rail cum road bridge
Munger rail cum road bridgejaiveer singh
 
Uses of Larsa 4 d and Lusas 4 D models for Implementation of Cable Stayed ...
Uses of Larsa   4 d and Lusas  4 D models for Implementation of Cable Stayed ...Uses of Larsa   4 d and Lusas  4 D models for Implementation of Cable Stayed ...
Uses of Larsa 4 d and Lusas 4 D models for Implementation of Cable Stayed ...Rajesh Prasad
 
my project on chenab bridge
my project on chenab bridge my project on chenab bridge
my project on chenab bridge Taseem mir
 
IRJET- Design of Railway Foot Over Bridge (Shelu)
IRJET- Design of Railway Foot Over Bridge (Shelu)IRJET- Design of Railway Foot Over Bridge (Shelu)
IRJET- Design of Railway Foot Over Bridge (Shelu)IRJET Journal
 
Final Report (Balsa Wood Bridge Design)
Final Report (Balsa Wood Bridge Design)Final Report (Balsa Wood Bridge Design)
Final Report (Balsa Wood Bridge Design)Josia Tannos, EIT
 
Building structure project 1 report
Building structure project 1 reportBuilding structure project 1 report
Building structure project 1 reportAdelinetingg
 
Calculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridgeCalculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridgeMohammed Abdelkawy
 
accelerated bridge construction(ABC)
accelerated bridge construction(ABC)accelerated bridge construction(ABC)
accelerated bridge construction(ABC)varun km
 

What's hot (20)

Steel structures failure
Steel structures failureSteel structures failure
Steel structures failure
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
STATIC AND DYNAMIC ANALYSIS OF CABLE-STAYED SUSPENSION HYBRID BRIDGE & VALIDA...
STATIC AND DYNAMIC ANALYSIS OF CABLE-STAYED SUSPENSION HYBRID BRIDGE & VALIDA...STATIC AND DYNAMIC ANALYSIS OF CABLE-STAYED SUSPENSION HYBRID BRIDGE & VALIDA...
STATIC AND DYNAMIC ANALYSIS OF CABLE-STAYED SUSPENSION HYBRID BRIDGE & VALIDA...
 
BUILDING STRUCTURE ASSIGNMENT 1
BUILDING STRUCTURE ASSIGNMENT 1BUILDING STRUCTURE ASSIGNMENT 1
BUILDING STRUCTURE ASSIGNMENT 1
 
Final report design of a pedestrian bridge - fall 2009
Final report   design of a pedestrian bridge - fall 2009Final report   design of a pedestrian bridge - fall 2009
Final report design of a pedestrian bridge - fall 2009
 
Cable stay bridge construction
Cable stay bridge constructionCable stay bridge construction
Cable stay bridge construction
 
Cable stayed bridges of prestressed concrete.
Cable stayed bridges of prestressed concrete.Cable stayed bridges of prestressed concrete.
Cable stayed bridges of prestressed concrete.
 
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
Cable Stay Bridge construction at Bardhman using LARSA and LUSAS four dimensi...
 
BOGIBEEL BRIDGE
BOGIBEEL BRIDGEBOGIBEEL BRIDGE
BOGIBEEL BRIDGE
 
Munger rail cum road bridge
Munger rail cum road bridgeMunger rail cum road bridge
Munger rail cum road bridge
 
Metal structures
Metal  structures Metal  structures
Metal structures
 
Uses of Larsa 4 d and Lusas 4 D models for Implementation of Cable Stayed ...
Uses of Larsa   4 d and Lusas  4 D models for Implementation of Cable Stayed ...Uses of Larsa   4 d and Lusas  4 D models for Implementation of Cable Stayed ...
Uses of Larsa 4 d and Lusas 4 D models for Implementation of Cable Stayed ...
 
my project on chenab bridge
my project on chenab bridge my project on chenab bridge
my project on chenab bridge
 
IRJET- Design of Railway Foot Over Bridge (Shelu)
IRJET- Design of Railway Foot Over Bridge (Shelu)IRJET- Design of Railway Foot Over Bridge (Shelu)
IRJET- Design of Railway Foot Over Bridge (Shelu)
 
Rail bridge and composite girder bridge analysis
Rail bridge and composite girder bridge analysisRail bridge and composite girder bridge analysis
Rail bridge and composite girder bridge analysis
 
Final Report (Balsa Wood Bridge Design)
Final Report (Balsa Wood Bridge Design)Final Report (Balsa Wood Bridge Design)
Final Report (Balsa Wood Bridge Design)
 
Building structure project 1 report
Building structure project 1 reportBuilding structure project 1 report
Building structure project 1 report
 
Calculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridgeCalculation note suez canal cable stayed bridge
Calculation note suez canal cable stayed bridge
 
accelerated bridge construction(ABC)
accelerated bridge construction(ABC)accelerated bridge construction(ABC)
accelerated bridge construction(ABC)
 
Steel structures
Steel structuresSteel structures
Steel structures
 

Viewers also liked

Using powerpoint at exhibitions presentation
Using powerpoint at exhibitions presentationUsing powerpoint at exhibitions presentation
Using powerpoint at exhibitions presentationLorna Rose
 
Tipos de traducción
Tipos de traducciónTipos de traducción
Tipos de traducciónLeiram Azul
 
Royal catalogue
Royal catalogueRoyal catalogue
Royal catalogueNavy9393
 
My last vacations Leonardo castro malaver
My last vacations Leonardo castro malaverMy last vacations Leonardo castro malaver
My last vacations Leonardo castro malaverleonik2510
 
Caterer | Asian Restaurants - Chef Patricks Kitchen
Caterer | Asian Restaurants - Chef Patricks KitchenCaterer | Asian Restaurants - Chef Patricks Kitchen
Caterer | Asian Restaurants - Chef Patricks KitchenLance Libot
 
Material Testing Equipments - Gemarc Enterprises
Material Testing Equipments - Gemarc EnterprisesMaterial Testing Equipments - Gemarc Enterprises
Material Testing Equipments - Gemarc EnterprisesLance Libot
 
TheBigBreakdu proposal-C(incNoor)
TheBigBreakdu proposal-C(incNoor)TheBigBreakdu proposal-C(incNoor)
TheBigBreakdu proposal-C(incNoor)Richard Pope
 

Viewers also liked (20)

Using powerpoint at exhibitions presentation
Using powerpoint at exhibitions presentationUsing powerpoint at exhibitions presentation
Using powerpoint at exhibitions presentation
 
Tipos de traducción
Tipos de traducciónTipos de traducción
Tipos de traducción
 
KEY DETERMINANTS FOR SUCCESSFUL PROJECT IMPLEMENTATION IN THE INDUSTRIAL AREA...
KEY DETERMINANTS FOR SUCCESSFUL PROJECT IMPLEMENTATION IN THE INDUSTRIAL AREA...KEY DETERMINANTS FOR SUCCESSFUL PROJECT IMPLEMENTATION IN THE INDUSTRIAL AREA...
KEY DETERMINANTS FOR SUCCESSFUL PROJECT IMPLEMENTATION IN THE INDUSTRIAL AREA...
 
Abledate
AbledateAbledate
Abledate
 
A STUDY OF DECISION TREE ENSEMBLES AND FEATURE SELECTION FOR STEEL PLATES FAU...
A STUDY OF DECISION TREE ENSEMBLES AND FEATURE SELECTION FOR STEEL PLATES FAU...A STUDY OF DECISION TREE ENSEMBLES AND FEATURE SELECTION FOR STEEL PLATES FAU...
A STUDY OF DECISION TREE ENSEMBLES AND FEATURE SELECTION FOR STEEL PLATES FAU...
 
Royal catalogue
Royal catalogueRoyal catalogue
Royal catalogue
 
A STUDY ON THE FRESH PROPERTIES OF SCC WITH FLY ASH
A STUDY ON THE FRESH PROPERTIES OF SCC WITH FLY ASHA STUDY ON THE FRESH PROPERTIES OF SCC WITH FLY ASH
A STUDY ON THE FRESH PROPERTIES OF SCC WITH FLY ASH
 
PARENTING STYLES AS A PREDICTORS OF ACADEMIC ACHIEVEMENT OF STUDENTS
PARENTING STYLES AS A PREDICTORS OF ACADEMIC ACHIEVEMENT OF STUDENTSPARENTING STYLES AS A PREDICTORS OF ACADEMIC ACHIEVEMENT OF STUDENTS
PARENTING STYLES AS A PREDICTORS OF ACADEMIC ACHIEVEMENT OF STUDENTS
 
WEB PAGE RANKING BASED ON TEXT SUBSTANCE OF LINKED PAGES
WEB PAGE RANKING BASED ON TEXT SUBSTANCE OF LINKED PAGESWEB PAGE RANKING BASED ON TEXT SUBSTANCE OF LINKED PAGES
WEB PAGE RANKING BASED ON TEXT SUBSTANCE OF LINKED PAGES
 
PRODUCTION OF HARD SHEETS FROM MUNICIPAL SOLID WASTE
PRODUCTION OF HARD SHEETS FROM MUNICIPAL SOLID WASTEPRODUCTION OF HARD SHEETS FROM MUNICIPAL SOLID WASTE
PRODUCTION OF HARD SHEETS FROM MUNICIPAL SOLID WASTE
 
My last vacations Leonardo castro malaver
My last vacations Leonardo castro malaverMy last vacations Leonardo castro malaver
My last vacations Leonardo castro malaver
 
chintakunta_infy
chintakunta_infychintakunta_infy
chintakunta_infy
 
Caterer | Asian Restaurants - Chef Patricks Kitchen
Caterer | Asian Restaurants - Chef Patricks KitchenCaterer | Asian Restaurants - Chef Patricks Kitchen
Caterer | Asian Restaurants - Chef Patricks Kitchen
 
AMIGOS
AMIGOSAMIGOS
AMIGOS
 
ANALYSIS OF WATER OF RAIGARH AREA WITH SPECIAL REFERENCE TO HEAVY METALS
ANALYSIS OF WATER OF RAIGARH AREA WITH SPECIAL REFERENCE TO HEAVY METALSANALYSIS OF WATER OF RAIGARH AREA WITH SPECIAL REFERENCE TO HEAVY METALS
ANALYSIS OF WATER OF RAIGARH AREA WITH SPECIAL REFERENCE TO HEAVY METALS
 
TIME EFFICIENT BAYLIS-HILLMAN REACTION ON STEROIDAL NUCLEUS OF WITHAFERIN-A T...
TIME EFFICIENT BAYLIS-HILLMAN REACTION ON STEROIDAL NUCLEUS OF WITHAFERIN-A T...TIME EFFICIENT BAYLIS-HILLMAN REACTION ON STEROIDAL NUCLEUS OF WITHAFERIN-A T...
TIME EFFICIENT BAYLIS-HILLMAN REACTION ON STEROIDAL NUCLEUS OF WITHAFERIN-A T...
 
APPRAISAL AND ANALOGY OF MODIFIED DE-NOISING AND LOCAL ADAPTIVE WAVELET IMAGE...
APPRAISAL AND ANALOGY OF MODIFIED DE-NOISING AND LOCAL ADAPTIVE WAVELET IMAGE...APPRAISAL AND ANALOGY OF MODIFIED DE-NOISING AND LOCAL ADAPTIVE WAVELET IMAGE...
APPRAISAL AND ANALOGY OF MODIFIED DE-NOISING AND LOCAL ADAPTIVE WAVELET IMAGE...
 
Material Testing Equipments - Gemarc Enterprises
Material Testing Equipments - Gemarc EnterprisesMaterial Testing Equipments - Gemarc Enterprises
Material Testing Equipments - Gemarc Enterprises
 
TheBigBreakdu proposal-C(incNoor)
TheBigBreakdu proposal-C(incNoor)TheBigBreakdu proposal-C(incNoor)
TheBigBreakdu proposal-C(incNoor)
 
DATA HIDING IMAGES USING SPREAD SPECTRUM IN CLOUD COMPUTING
DATA HIDING IMAGES USING SPREAD SPECTRUM IN CLOUD COMPUTINGDATA HIDING IMAGES USING SPREAD SPECTRUM IN CLOUD COMPUTING
DATA HIDING IMAGES USING SPREAD SPECTRUM IN CLOUD COMPUTING
 

Similar to THE CONSTRUCTION PROCEDURE AND ADVANTAGE OF THE RAIL CABLE-LIFTING CONSTRUCTION METHOD AND THE CABLE-HOISTING METHOD

Case study on signature bridge ppt (1)
Case study on signature bridge ppt (1)Case study on signature bridge ppt (1)
Case study on signature bridge ppt (1)varun km
 
Gaurav-Jhalani-Seminar-ppt.pptx
Gaurav-Jhalani-Seminar-ppt.pptxGaurav-Jhalani-Seminar-ppt.pptx
Gaurav-Jhalani-Seminar-ppt.pptxSanjeevGupta660170
 
Calculation Note Final
Calculation Note FinalCalculation Note Final
Calculation Note FinalMohamed Elfike
 
Design and Analysis of Transmission Tower at Allahabad
Design and Analysis of Transmission Tower at AllahabadDesign and Analysis of Transmission Tower at Allahabad
Design and Analysis of Transmission Tower at AllahabadAbhijit Kumar
 
Design of Transmission Tower
Design of Transmission TowerDesign of Transmission Tower
Design of Transmission TowerAbhijit Kumar
 
analysis-and-design-of-four-leg-steel-tr-9e5db9cf.pdf
analysis-and-design-of-four-leg-steel-tr-9e5db9cf.pdfanalysis-and-design-of-four-leg-steel-tr-9e5db9cf.pdf
analysis-and-design-of-four-leg-steel-tr-9e5db9cf.pdfAbdulwahedalsafany
 
Analysis of cable stayed bridges
Analysis of cable stayed bridgesAnalysis of cable stayed bridges
Analysis of cable stayed bridgesParamaAthmeka
 
Building Structure Project 1 Fettuccine Bridge
Building Structure Project 1 Fettuccine BridgeBuilding Structure Project 1 Fettuccine Bridge
Building Structure Project 1 Fettuccine BridgeColby Hooi
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Rajesh Prasad
 
Millau via duct presentation full analysis
Millau via duct presentation full analysisMillau via duct presentation full analysis
Millau via duct presentation full analysisMohammad Ali
 
Bandra Worli sea link
Bandra Worli sea linkBandra Worli sea link
Bandra Worli sea linkKAVYA H
 
Analyze and design of suspension bridge using sap2000
Analyze and design of suspension bridge using sap2000Analyze and design of suspension bridge using sap2000
Analyze and design of suspension bridge using sap2000vivatechijri
 
Parametric Study on Curved Bridges Subjected to Seismic Loading
Parametric Study on Curved Bridges Subjected to Seismic LoadingParametric Study on Curved Bridges Subjected to Seismic Loading
Parametric Study on Curved Bridges Subjected to Seismic LoadingIRJET Journal
 
The Performance Evaluation of Concrete Filled Steel Tubular Arch Bridge
The Performance Evaluation of Concrete Filled Steel Tubular Arch BridgeThe Performance Evaluation of Concrete Filled Steel Tubular Arch Bridge
The Performance Evaluation of Concrete Filled Steel Tubular Arch BridgeIJERA Editor
 
The Performance Evaluation of Concrete Filled Steel Tubular Arch Bridge
The Performance Evaluation of Concrete Filled Steel Tubular Arch BridgeThe Performance Evaluation of Concrete Filled Steel Tubular Arch Bridge
The Performance Evaluation of Concrete Filled Steel Tubular Arch BridgeIJERA Editor
 

Similar to THE CONSTRUCTION PROCEDURE AND ADVANTAGE OF THE RAIL CABLE-LIFTING CONSTRUCTION METHOD AND THE CABLE-HOISTING METHOD (20)

Case study on signature bridge ppt (1)
Case study on signature bridge ppt (1)Case study on signature bridge ppt (1)
Case study on signature bridge ppt (1)
 
Gaurav-Jhalani-Seminar-ppt.pptx
Gaurav-Jhalani-Seminar-ppt.pptxGaurav-Jhalani-Seminar-ppt.pptx
Gaurav-Jhalani-Seminar-ppt.pptx
 
Calculation Note Final
Calculation Note FinalCalculation Note Final
Calculation Note Final
 
Design and Analysis of Transmission Tower at Allahabad
Design and Analysis of Transmission Tower at AllahabadDesign and Analysis of Transmission Tower at Allahabad
Design and Analysis of Transmission Tower at Allahabad
 
Design of Transmission Tower
Design of Transmission TowerDesign of Transmission Tower
Design of Transmission Tower
 
Bandra worli sealink pdf
Bandra worli sealink pdfBandra worli sealink pdf
Bandra worli sealink pdf
 
analysis-and-design-of-four-leg-steel-tr-9e5db9cf.pdf
analysis-and-design-of-four-leg-steel-tr-9e5db9cf.pdfanalysis-and-design-of-four-leg-steel-tr-9e5db9cf.pdf
analysis-and-design-of-four-leg-steel-tr-9e5db9cf.pdf
 
Analysis of cable stayed bridges
Analysis of cable stayed bridgesAnalysis of cable stayed bridges
Analysis of cable stayed bridges
 
Building Structure Project 1 Fettuccine Bridge
Building Structure Project 1 Fettuccine BridgeBuilding Structure Project 1 Fettuccine Bridge
Building Structure Project 1 Fettuccine Bridge
 
Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...Presentation on construction of cable stay bridge - a modern technique for su...
Presentation on construction of cable stay bridge - a modern technique for su...
 
Bridge-SIT-01.pptx
Bridge-SIT-01.pptxBridge-SIT-01.pptx
Bridge-SIT-01.pptx
 
Millau via duct presentation full analysis
Millau via duct presentation full analysisMillau via duct presentation full analysis
Millau via duct presentation full analysis
 
Bandra Worli sea link
Bandra Worli sea linkBandra Worli sea link
Bandra Worli sea link
 
Bridge-SGI-01_Pranoti.pdf
Bridge-SGI-01_Pranoti.pdfBridge-SGI-01_Pranoti.pdf
Bridge-SGI-01_Pranoti.pdf
 
Analyze and design of suspension bridge using sap2000
Analyze and design of suspension bridge using sap2000Analyze and design of suspension bridge using sap2000
Analyze and design of suspension bridge using sap2000
 
Suspension bridge
Suspension bridgeSuspension bridge
Suspension bridge
 
Parametric Study on Curved Bridges Subjected to Seismic Loading
Parametric Study on Curved Bridges Subjected to Seismic LoadingParametric Study on Curved Bridges Subjected to Seismic Loading
Parametric Study on Curved Bridges Subjected to Seismic Loading
 
The Performance Evaluation of Concrete Filled Steel Tubular Arch Bridge
The Performance Evaluation of Concrete Filled Steel Tubular Arch BridgeThe Performance Evaluation of Concrete Filled Steel Tubular Arch Bridge
The Performance Evaluation of Concrete Filled Steel Tubular Arch Bridge
 
The Performance Evaluation of Concrete Filled Steel Tubular Arch Bridge
The Performance Evaluation of Concrete Filled Steel Tubular Arch BridgeThe Performance Evaluation of Concrete Filled Steel Tubular Arch Bridge
The Performance Evaluation of Concrete Filled Steel Tubular Arch Bridge
 
Chenab bridge ppt
Chenab bridge pptChenab bridge ppt
Chenab bridge ppt
 

More from International Journal of Technical Research & Application

More from International Journal of Technical Research & Application (20)

STUDY & PERFORMANCE OF METAL ON METAL HIP IMPLANTS: A REVIEW
STUDY & PERFORMANCE OF METAL ON METAL HIP IMPLANTS: A REVIEWSTUDY & PERFORMANCE OF METAL ON METAL HIP IMPLANTS: A REVIEW
STUDY & PERFORMANCE OF METAL ON METAL HIP IMPLANTS: A REVIEW
 
EXPONENTIAL SMOOTHING OF POSTPONEMENT RATES IN OPERATION THEATRES OF ADVANCED...
EXPONENTIAL SMOOTHING OF POSTPONEMENT RATES IN OPERATION THEATRES OF ADVANCED...EXPONENTIAL SMOOTHING OF POSTPONEMENT RATES IN OPERATION THEATRES OF ADVANCED...
EXPONENTIAL SMOOTHING OF POSTPONEMENT RATES IN OPERATION THEATRES OF ADVANCED...
 
POSTPONEMENT OF SCHEDULED GENERAL SURGERIES IN A TERTIARY CARE HOSPITAL - A T...
POSTPONEMENT OF SCHEDULED GENERAL SURGERIES IN A TERTIARY CARE HOSPITAL - A T...POSTPONEMENT OF SCHEDULED GENERAL SURGERIES IN A TERTIARY CARE HOSPITAL - A T...
POSTPONEMENT OF SCHEDULED GENERAL SURGERIES IN A TERTIARY CARE HOSPITAL - A T...
 
STUDY OF NANO-SYSTEMS FOR COMPUTER SIMULATIONS
STUDY OF NANO-SYSTEMS FOR COMPUTER SIMULATIONSSTUDY OF NANO-SYSTEMS FOR COMPUTER SIMULATIONS
STUDY OF NANO-SYSTEMS FOR COMPUTER SIMULATIONS
 
ENERGY GAP INVESTIGATION AND CHARACTERIZATION OF KESTERITE CU2ZNSNS4 THIN FIL...
ENERGY GAP INVESTIGATION AND CHARACTERIZATION OF KESTERITE CU2ZNSNS4 THIN FIL...ENERGY GAP INVESTIGATION AND CHARACTERIZATION OF KESTERITE CU2ZNSNS4 THIN FIL...
ENERGY GAP INVESTIGATION AND CHARACTERIZATION OF KESTERITE CU2ZNSNS4 THIN FIL...
 
POD-PWM BASED CAPACITOR CLAMPED MULTILEVEL INVERTER
POD-PWM BASED CAPACITOR CLAMPED MULTILEVEL INVERTERPOD-PWM BASED CAPACITOR CLAMPED MULTILEVEL INVERTER
POD-PWM BASED CAPACITOR CLAMPED MULTILEVEL INVERTER
 
DIGITAL COMPRESSING OF A BPCM SIGNAL ACCORDING TO BARKER CODE USING FPGA
DIGITAL COMPRESSING OF A BPCM SIGNAL ACCORDING TO BARKER CODE USING FPGADIGITAL COMPRESSING OF A BPCM SIGNAL ACCORDING TO BARKER CODE USING FPGA
DIGITAL COMPRESSING OF A BPCM SIGNAL ACCORDING TO BARKER CODE USING FPGA
 
MODELLING THE IMPACT OF FLOODING USING GEOGRAPHIC INFORMATION SYSTEM AND REMO...
MODELLING THE IMPACT OF FLOODING USING GEOGRAPHIC INFORMATION SYSTEM AND REMO...MODELLING THE IMPACT OF FLOODING USING GEOGRAPHIC INFORMATION SYSTEM AND REMO...
MODELLING THE IMPACT OF FLOODING USING GEOGRAPHIC INFORMATION SYSTEM AND REMO...
 
AN EXPERIMENTAL STUDY ON SEPARATION OF WATER FROM THE ATMOSPHERIC AIR
AN EXPERIMENTAL STUDY ON SEPARATION OF WATER FROM THE ATMOSPHERIC AIRAN EXPERIMENTAL STUDY ON SEPARATION OF WATER FROM THE ATMOSPHERIC AIR
AN EXPERIMENTAL STUDY ON SEPARATION OF WATER FROM THE ATMOSPHERIC AIR
 
LI-ION BATTERY TESTING FROM MANUFACTURING TO OPERATION PROCESS
LI-ION BATTERY TESTING FROM MANUFACTURING TO OPERATION PROCESSLI-ION BATTERY TESTING FROM MANUFACTURING TO OPERATION PROCESS
LI-ION BATTERY TESTING FROM MANUFACTURING TO OPERATION PROCESS
 
QUALITATIVE RISK ASSESSMENT AND MITIGATION MEASURES FOR REAL ESTATE PROJECTS ...
QUALITATIVE RISK ASSESSMENT AND MITIGATION MEASURES FOR REAL ESTATE PROJECTS ...QUALITATIVE RISK ASSESSMENT AND MITIGATION MEASURES FOR REAL ESTATE PROJECTS ...
QUALITATIVE RISK ASSESSMENT AND MITIGATION MEASURES FOR REAL ESTATE PROJECTS ...
 
SCOPE OF REPLACING FINE AGGREGATE WITH COPPER SLAG IN CONCRETE- A REVIEW
SCOPE OF REPLACING FINE AGGREGATE WITH COPPER SLAG IN CONCRETE- A REVIEWSCOPE OF REPLACING FINE AGGREGATE WITH COPPER SLAG IN CONCRETE- A REVIEW
SCOPE OF REPLACING FINE AGGREGATE WITH COPPER SLAG IN CONCRETE- A REVIEW
 
IMPLEMENTATION OF METHODS FOR TRANSACTION IN SECURE ONLINE BANKING
IMPLEMENTATION OF METHODS FOR TRANSACTION IN SECURE ONLINE BANKINGIMPLEMENTATION OF METHODS FOR TRANSACTION IN SECURE ONLINE BANKING
IMPLEMENTATION OF METHODS FOR TRANSACTION IN SECURE ONLINE BANKING
 
EFFECT OF TRANS-SEPTAL SUTURE TECHNIQUE VERSUS NASAL PACKING AFTER SEPTOPLASTY
EFFECT OF TRANS-SEPTAL SUTURE TECHNIQUE VERSUS NASAL PACKING AFTER SEPTOPLASTYEFFECT OF TRANS-SEPTAL SUTURE TECHNIQUE VERSUS NASAL PACKING AFTER SEPTOPLASTY
EFFECT OF TRANS-SEPTAL SUTURE TECHNIQUE VERSUS NASAL PACKING AFTER SEPTOPLASTY
 
EVALUATION OF DRAINAGE WATER QUALITY FOR IRRIGATION BY INTEGRATION BETWEEN IR...
EVALUATION OF DRAINAGE WATER QUALITY FOR IRRIGATION BY INTEGRATION BETWEEN IR...EVALUATION OF DRAINAGE WATER QUALITY FOR IRRIGATION BY INTEGRATION BETWEEN IR...
EVALUATION OF DRAINAGE WATER QUALITY FOR IRRIGATION BY INTEGRATION BETWEEN IR...
 
AN INSIDE LOOK IN THE ELECTRICAL STRUCTURE OF THE BATTERY MANAGEMENT SYSTEM T...
AN INSIDE LOOK IN THE ELECTRICAL STRUCTURE OF THE BATTERY MANAGEMENT SYSTEM T...AN INSIDE LOOK IN THE ELECTRICAL STRUCTURE OF THE BATTERY MANAGEMENT SYSTEM T...
AN INSIDE LOOK IN THE ELECTRICAL STRUCTURE OF THE BATTERY MANAGEMENT SYSTEM T...
 
OPEN LOOP ANALYSIS OF CASCADED HBRIDGE MULTILEVEL INVERTER USING PDPWM FOR PH...
OPEN LOOP ANALYSIS OF CASCADED HBRIDGE MULTILEVEL INVERTER USING PDPWM FOR PH...OPEN LOOP ANALYSIS OF CASCADED HBRIDGE MULTILEVEL INVERTER USING PDPWM FOR PH...
OPEN LOOP ANALYSIS OF CASCADED HBRIDGE MULTILEVEL INVERTER USING PDPWM FOR PH...
 
PHYSICO-CHEMICAL AND BACTERIOLOGICAL ASSESSMENT OF RIVER MUDZIRA WATER IN MUB...
PHYSICO-CHEMICAL AND BACTERIOLOGICAL ASSESSMENT OF RIVER MUDZIRA WATER IN MUB...PHYSICO-CHEMICAL AND BACTERIOLOGICAL ASSESSMENT OF RIVER MUDZIRA WATER IN MUB...
PHYSICO-CHEMICAL AND BACTERIOLOGICAL ASSESSMENT OF RIVER MUDZIRA WATER IN MUB...
 
PERFORMANCE ANALYSIS OF MICROSTRIP PATCH ANTENNA USING COAXIAL PROBE FEED TEC...
PERFORMANCE ANALYSIS OF MICROSTRIP PATCH ANTENNA USING COAXIAL PROBE FEED TEC...PERFORMANCE ANALYSIS OF MICROSTRIP PATCH ANTENNA USING COAXIAL PROBE FEED TEC...
PERFORMANCE ANALYSIS OF MICROSTRIP PATCH ANTENNA USING COAXIAL PROBE FEED TEC...
 
OVERVIEW OF TCP PERFORMANCE IN SATELLITE COMMUNICATION NETWORKS
OVERVIEW OF TCP PERFORMANCE IN SATELLITE COMMUNICATION NETWORKSOVERVIEW OF TCP PERFORMANCE IN SATELLITE COMMUNICATION NETWORKS
OVERVIEW OF TCP PERFORMANCE IN SATELLITE COMMUNICATION NETWORKS
 

Recently uploaded

Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 

Recently uploaded (20)

Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 

THE CONSTRUCTION PROCEDURE AND ADVANTAGE OF THE RAIL CABLE-LIFTING CONSTRUCTION METHOD AND THE CABLE-HOISTING METHOD

  • 1. International Journal of Technical Research and Applications e-ISSN: 2320-8163, www.ijtra.com Volume 3, Issue 4 (July-August 2015), PP. 21-23 21 | P a g e THE CONSTRUCTION PROCEDURE AND ADVANTAGE OF THE RAIL CABLE-LIFTING CONSTRUCTION METHOD AND THE CABLE-HOISTING METHOD Ji Ce Zeng School of civil engineering and architecture Chongqing Jiaotong University Chongqing, China 277199895@qq.com Abstract:The cable-hoisting method and rail cable-lifting method are widely used in the construction of suspension bridge. This paper takes a suspension bridge in Hunan as an example, and expounds the two construction methods, and analyzes their respective merits and disadvantages. Key words : suspension bridge rail cable-lifting cable-hoisting I. ENGINEERING SITUATION The bridge is steel truss girder suspension bridge, the main bridge spans to 900 meters, truss width is 27.0 meters, truss height is 8 meters, approach bridge(5*30m) is designed in south shore , another approach bridge(8*30m) is also designed in north shore; both sides of the Straits are used with gravity anchor, door-type reinforce concrete tower, dig cast-in-place circular pile foundation. Deck to the bottom of the River, vertical distance is about 200m, river width of maximum is 400m, accounting for the main cross 44.4%, average slope rate of gully length is about 0.66 (height / length). Lifting saddle is arranged in perpetual suspended cable, which dose not occupy the sling steel truss connecting holes. It is convenient for connection of cable head and segmental beam. Meanwhile, it can reduce operation steps of removing suspended saddle and installing the main girder when beam section is being installed saddle. It is also can be able to reduce the lifting height of steel truss girder and improve construction efficiency. II. CABLE-HOISTING CONSTRUCTION METHOD A. Design of cable-hoisting system The main cable crane spans to 900m, the side span is 155m in south shore, the side span is 258m in north shore, both sides of the anchorage are anchored by gravity anchor. The steel tower is assembled by steel tubes. The section weight of steel truss girder is calculated by 160t. Working principle of the cable crane machine is along the cross bridge to arrange two sets of main cable, each main cable is composed of steel wire rope 10 Phi 60.5, both ends of which are anchored in the gravity anchor on both sides of bridge. Each main cable respectively hangs the two supporting car in midair. At both ends of the bridge, the traction winch and lift winch pull lifting trolley in the bearing cable to roll and lift steel truss girder, which makes girder construction completed. There are 8 sports cars during the working frame of the cable crane, and the erection of each section of the steel truss girder is shared 4 sports cars (i.e., 4 lifting points) and hoisted synchronously Suspension rope design and related parameters of single cable Project Specification for wire rope (mm) form for wire rope Unit weight (kg.m﹣¹) Breaking tension(kN) Modulus elasticity (MPa) Load-bearing cable 10×Φ60.5 6×37S+IWR 1284.3 2075 10500 the sling Φ32 6×37S+IWR 389.0 546.5 10500 Traction cable 2×Φ36 6×37S+IWR 437.0 701.9 10500 B. Cable crane tower Cable crane tower is used in scheme that assembles
  • 2. International Journal of Technical Research and Applications e-ISSN: 2320-8163, www.ijtra.com Volume 3, Issue 4 (July-August 2015), PP. 21-23 22 | P a g e steel pipe column in bridge tower, each tower with 4 Phi 600 * 10 is made of seamless steel pipe column, flat joint by phi 300 x 8 of the seamless steel pipe, bracing by Phi 200 x 8 seamless steel tube composed of space lattice system, which plays a part in supporting in bridge cable tower, tower has height of 13m. tower is made of the total amount of 54t steel. Its material is Q345 steel. Steel tube tower is connected with the tower frame, in order to increase the overall stability of the tower. At the same time, a transverse eight wind is designed, wind-bearing wire rope with 4 Phi 32 per bank is selected. In order to reduce the longitudinal direction of the bridge tower deviation, unilateral set Phi 60.5 pressure tower wire rope. C. Hoisting construction Steel truss girder in assembling field is assembled, when steel truss girder ships load- segment, with floating box controlling the water-level, the top of floating box lies alongside the wharf, and pressure from the ship's load levels system position. At the same time, the floating box and wharves should be fixed and connected, waiting for flat car on board. III. RAIL CABLE-LIFTING CONSTRUCTION METHOD A. Equipment And Assembling The equipment mainly composed of the following parts: beam-transporting trolley, saddle, cable, crane, zenith trolley, a winch etc. The beam-transporting trolley is the most core equipment in this project, which composed of the pulley group, the triangular distribution beam and the rectangular distribution beam. B. Saddle The effect of cable saddle is to provide support, and will convert load from cable to cable. The design of crane saddle incorporate characteristics of pin type sling, with moving the saddle to the direction of top and using the cable clamp as a fulcrum to place it at the top, which make saddle not occupy space of connecting hole of the lower cable clamp. It also uses both sides of the longitudinal positioning lock to ensure the lateral stability and it is convenient for construction. The saddle is composed of a longitudinal beam and a saddle beam. C. Cable Rail cable is considered as beam-transporting orbit and the lifeline of the whole system, it is also the parts that has highest safety risk coefficient. Its internal force changes complexly and shows different characteristics on various construction conditions, in order to meet need of its function and have enough safety and operability, after calculating, the staff used Phi 60 wire rope galvanized and sealed. Four single, independent of each other, one end fixedly, one end through the pulley group + keeping four rail cable force basically the same and remain constant with counterweight block. D. Crane The bridge had two sets of hydraulic loading crane for lifting type cable, a cable carrier crane by a steel truss beam, two pedrail-walking mechanism on the main cable, two sets of hydraulic lifting equipment (including lifting and traction jacks, hydraulic pump station, control system and steel wire take-up device), with a lifting pole beam, power generation equipment parts. E. Construction Procedure The installation and construction method of flexible cable net steel truss beam is used for erection of steel truss beam in the section of hoisting. The main construction steps are: 1. The main cable and permanent slings are used for supporting, horizontal cable is set up , with anchored in the rock mass. 2. A steel pipe Bailey platform is built at the pile cap on both sides, steel truss girder assembling platform is made of Bailey platform and the rest space of pile cap. 3. After lifting section that has been assembled, and then those sections are suspended under the carriage beam trolley. 4. Transporting vertically to the corresponding sling by rail sling 5. The section of the steel truss girder is suspended from the cable borne crane, and the carriage beam carriage is exited. 6. Adjusting spatial position of the segment, and beam butt has been installed, and pin sling. 7. The beam in mid of bridge is first installed and then symmetrically installed from mid of bridge to the sides of bank until the full bridge is linked. The advantages of rail cable-lifting construction method and cable-hoisting method 1. The assembling field of the steel truss is arranged
  • 3. International Journal of Technical Research and Applications e-ISSN: 2320-8163, www.ijtra.com Volume 3, Issue 4 (July-August 2015), PP. 21-23 23 | P a g e on the platform. Compared with the cable hoisting, it can reduce the lifting height of the steel truss girder and the construction time, and improve the safety of the construction. At the same time, two pieces of steel truss girder can be installed, which can shorten the construction time and bring the recessive economic benefits. 2. Transport and erection of the steel truss girder have high construction efficiency, cost savings. 3. The rail cable is used as the main cable as the support, with the good wind stability, the quality of construction can be controllable 4. Compared to the cables, rail cable needs less bearing steel wire rope. 5. When using cable-hoisting method, it needs more operators, and cable-hoisting system technology is complex, it has high demands for the operation and personnel quality . Rail cable has a high degree of automation, it needs less operators when moving the beam. Construction technology is stable, the impact of environment is small, easy to standardized operation. IV. CONCLUSION Rail cable-lifting construction method and cable-hoisting construction method is more and more mature, but there are still many places should be improved, such as whether rail cable-lifting construction method can cancel cable carrying crane or not, in terms with controlling the main cable wire linearity in cable-hoisting construction method REFERENCES [1]. Jianhui Lv. Hui Zhang. long span concrete filled steel tube arch bridge cable-hoisting construction technology [J] - Science and technology and engineering 2009,9 (4) [2]. Shiming Liu. Yongjian Liu. Xiaorong Yao. concrete filled steel tubular arch bridge cable- hoisting construction optimization [J] - Highway Traffic Science and technology in 2012, 29 (7) [3]. Jinming Huang. cable hoisting system in steel truss arch bridge hook in construction application [journal article] - the western traffic science and technology 2012 (2) [4]. Dong liang Zhou. Construction control study [J] highway and 2012 trucks hoisting of long span arch bridge (1) Huaqiang [5]. Jian gen Lv. The main span of 368m Zhang Hui lifting Maocaojie Bridge Construction Technology [J] 2009 rib arch construction technology, 40 (2) [6]. Zheng zhou Cao. Yu tao Feng. Chongqing Chaoyang complex bridge hoisting cable tower, tower integration research [J] 2010 (07) of bridge construction. [7]. Jun wei Tian. large span concrete filled steel tubular arch bridge construction control [J] highway and automotive 2012 rib hoisting (1) [8]. Hong tian Du. Zhong Ming. concrete filled steel tube arch bridge arch rib hoisting process temperature change on Rib Alignment Effect [J] - Railway Standard arch design 2008 (3) [9]. Jian hong LI . Jing Sheng. cable hoisting method of reinforced concrete arch bridge construction error analysis [J] - Sichuan building 2009,29 (6)