Scheduling By Using Fuzzy Logic in Manufacturing Miss. Ashwini. A. Mate1, Dr. I. P. Keswani2 Department of industrial engineering RKNEC, NAGPUR Department of industrial engineering RKNEC, NAGPUR Abstract This paper represents the scheduling process in furniture manufacturing unit. It gives the fuzzy logic application in flexible manufacturing system. Flexible manufacturing systems are production system in furniture manufacturing unit. FMS consist of same multipurpose numerically controlled machines. Here in this project the scheduling has been done in FMS by using fuzzy logic tool in Matlab software. The fuzzy logic based scheduling model in this paper will deals with the job and best alternative route selection with multi-criteria of machine. Here two criteria for job and sequencing and routing with rules. This model is applicable to the scheduling of any manufacturing industry. Keywords: Scheduling, FMS, Fuzzy logic, matlab, sequencing, processes, routing. 
I. Introduction 
As we know whenever we planned the manufacturing system we consider the design criteria such as the system efficiency , the system will be efficient in all the way in production. All such criteria cannot be achieved untill the design production , planning scheduling and controlling steps work well. A FMS can be defined as production system consisting of identical multipurpose numerically controlled machine (work stations). FMS is a manufacturing system in which there is some amount of flexibility that allows the system to react in the case of changes. FMS works for automated material and tools handling system , load and unload stations, inspection stations , storage areas and a hierarchical control system. Generally when time is being planned , the objective is to design a system which will be efficient in the production of the entire range of parts. A FMS provides the efficiency of automated high- volume mass production. Scheduling in an FMS environment is more complex and difficult than in a conventional manufacturing environment. Scheduling of FMS determine an optimal schedule and controlling an FMS is considered as difficult task. Fuzzy set theory was introduced in 1965 by zadeh. Fuzzy logic approaches easily deal with uncertain and incomplete information and human experts, knowledge can be easily coded into fuzzy logic approaches for scheduling FMS is consider due to its ability to deal uncertain and incomplete information and with multi objective problem. 
II. Review of Literature 
2.1.JIPING NIU, JOHN DARTNALL.[1] gives the idea regarding fuzzy –mrp-ii deals with uncertantity and imprecision. Fuzzy –mrp –II shows all of the information for the decision makers allowing them to consider all possibilities of the orders. 
2.2 SANJOY PETROVIC and CAROLE FAYAD[2] This paper deals with the load- balancing of m/c in a real-world job scheduling algorithm allocates jobs ,splits into lots on identical m/c with objectives to reduce job total throughput time and to improve m/c utilization. 2.3. RIPON KUMAR CHAKRABORETY AND MD.A.AKHTAR HASSEN.[3] This paper work demonstrated interactive fuzzy based genetic algorithmic approach solving a two products and two period aggregate production planning with some vulnerable managerial contraries like imprecise demands, variable manufacture cost etc… here the Author Employee different unique genetic algorithm parameters scrupulously for solving non deterministic Polynomials problem like app problems. 2.4 PARAMOT SRINOI,A/PROF. ABRAHIM SHAYAN, DR. FATMAEH GHOTB[4]. This paper present research project under taken as industrial institutes switchburne in the area of fuzzy scheduling. In this paper fuzzy based schedule model deal with the parts routing problem. Model with select best alternative route with multi criteria scheduling through an approach based on fuzzy logic. 2.5. DUSAN TEODORNIC.[5]. the paper represent classification and analysis the result achieved using fuzzy logic to model complex traffic and transportation process. fuzzy logic is shown to be very promising mathematically approach to modeling traffic and transportation process characterized by subjectivity, ambiguity, uncertainty and imprecision. 
RESEARCH ARTICLE OPEN ACCESS
Miss. Ashwini. A. Mate Int. Journal of Engineering Research and Applications www.ijera.com 
ISSN : 2248-9622, Vol. 4, Issue 7( Version 6), July 2014, pp.104-111 
www.ijera.com 105 | P a g e 
2.6 by MANISH AGRAWAL.[6] Here washing machine are common feature today Indian household. The most important utility customer can drive from washing machine. the paper represent idea of controlling the washing time using fuzzy logic control. The paper describes the produce that can be used to get the suitable time for different cloths. the process is based entirely on principle of taking no precise inputs From the sensor, subjecting them to fuzzy arithemats and obtaining crisp value of washing time. It is quite clear from the paper itself that this method can be used in practice to further automates the washing machine. Never the less, this method though with much larger number of inputs parameters and further complex situation is be used qty the giants like LG and Samsung. 2.7 ZIAUL HASSAN SERNEABAT, NABILA CHOUDHURY, DR. A.K.M.MASUD[7]. This paper gives the study of simulation of FMS.FMS is the production system consisting of identical multipurpose numerically controlled m/cs. Here the model prioritize the job and select the best alternative route with multi-criteria scheduling through an approach based on fuzzy logic and with the help of rules the sequence of the jobs are done and the best route is selected. 
III. Fuzzy logic Approach to FMS 
The present industrial trend of manufacturing low cost low-to-medium volumes of modular products with high variability demands manufacturing systems with flexibility and low delivery times. This lead to manufacturing systems with small batch productions, low setup times and many decisional degrees of freedom. The scheduling problem consists of several decisional points. A first division into three parts can be made: Timing: that is, when to insert a part into the system; Sequencing: that is, defining the order with which different parts (batches, orders) are inserted into the system; Routing: that is, defining the route (machine) for a part in presence of alternatives. 
Fuzzy logic has the ability to simultaneously consider multiple criteria. Furthermore, the advantage of the fuzzy logic system approach is that it incorporates both numerical and linguistic variables. In this paper, we apply fuzzy logic to simulate FMS. The fuzzy based simulation, in this paper, is designed to solve the problem of determine the job sequence and selecting the best part route. In particular, we will show how to obtain the simulation via a proposed fuzzy model as shown in figure 1. 
Fig. 1 Structure of a Fuzzy Logic System 
IV. A CASE FOUND IN INDUSTRY 
As the space wood is the furniture manufacturing industry ,here we found the various problem related scheduling after visiting the industry. For tackling the various problem we applying the fuzzy logic application to get the schedule for performing various operation in manufacturing unit. The Fuzzy scheduler considers two particular rules in the scheduling problem: Sequencing of job and routing. The sequencing of jobs was approached using fuzzy controllers having rules with two parameters (Processing time and, Due date) and one consequent. 
The fuzzy system determine the route for each job loading in a machine , so that whenever the load station or the machine are free the job with the highest priority go through various operation. The decisional point that was considered is the routing problem, that is, the choice of one among many possible routes. In the problem considered this is equivalent to choosing the machine for next processing of a job, among the possible alternatives for that job The various operation done in industry:. 1-cutting 2-cnc operation 3-moulding 4-laying 5-sanding 6-glueing 7-foiling 8-inspection 9-packing The following assumptions on the Flexible Manufacturing System were made:
Miss. Ashwini. A. Mate Int. Journal of Engineering Research and Applications www.ijera.com 
ISSN : 2248-9622, Vol. 4, Issue 7( Version 6), July 2014, pp.104-111 
www.ijera.com 106 | P a g e 
1. Tool management is not considered, i.e. it is supposed that all the tools are available where needed. 2. Failure of workstations and/or transport systems is not considered, i.e., the machines and/or transport subsystem are not subject to failure. 3. Orders arrive to the FMS as Poisson processes with a fixed inter-arrival time. 4. Production of orders occurs in batches, and the movement of the whole batch is considered, so that batch dimensions are not important. 5. Setup times are independent of the order in which operations are executed, i.e. they are constant and embodied in the operation times of each job (batch). 6. There are as many pallets and fixtures as are needed (this assumption is mitigated by the fact that the number of jobs in the system is constantly controlled). 7. The routing of every job is random and directly defined as a sequence of workstations the job has to go through. Thus, the route of a job is not defined in terms of the operations needed by the job. In other words, every operation corresponds directly to the workstation that will execute it, i.e., the routing is defined as a sequence of workstations. 8. There can be multiple routing choices, i.e. at a certain point a job can be equivalently sent to different workstations (as specified in its routing plan) having different processing times. 9. Loading, unloading and processing times are random. 10. Due dates are assigned according to the total processing time of a job. 11. Each workstation can work only one job at a time. 12. The transport system is composed of fork lift truck and each fork lift truck can transport only one sheet at a time. 
13. Neither the weight of a piece nor the dimension of a batch affects the speed of fork lift truck which is assumed to be constant. 
14. Every workstation has one input buffer and no output buffer, therefore it will be free as soon as there is one free trolley that can transport the processed job to another workstation. 15. Delays in accessing the state information are neglected. 16. Among all the possible scheduling rules the following are considered: · Sequencing for a job (selection of a piece among those waiting to receive service from a machine); · Routing decisions concerning the next required workstation. 
V. Problem Definition 
When a manufacturing unit produce a product as per customer order. For production process they need schedule, planning. They schedule to placed product at right time. As problem found in industry is improper scheduling. There is no allocation of job at proper machine at proper time. When the job is available at the machine the other machine were idle and the due to this the productivity of the industry lack behind. As there are 4 CNC machine which are fully automated as program feed to the machine they work but after completion of one job the machine were idle and this cause the less productivity. To reduce the such kind of problem this model gave the proper schedule for every job. 
The FMS described in this paper consists of 4 different CNC machining centers ,three panel saw with finite local buffer capacity, all capable of performing the required operations on each part type, a load/unload station and material handling system with a fork lift truck which can load one pallet at a time. The system produces two different part types, A and B as shown in Table 1. It is assumed that it takes 3 minutes to load and unload a part on a pallet at load/unload station. The time to cross the distance between two consecutive MCs is assumed to be 0.5 minute. The arrangement of the FMC hardware is shown in Figure 2. 
Fig. 2 Diagram of the Case Study 
Each machine is capable of performing different operations, but no machine can process more than one part at a time. Each part type has several alternative routings. Operations are
Miss. Ashwini. A. Mate Int. Journal of Engineering Research and Applications www.ijera.com 
ISSN : 2248-9622, Vol. 4, Issue 7( Version 6), July 2014, pp.104-111 
www.ijera.com 107 | P a g e 
not divided or interrupted when started. Set up times are independent of the job sequence and can be included in processing times. The scheduling problem is to decide the sequence of the jobs and which alternative routes should be selected for each job. 
VI. The Fuzzy Based Model : 
Proposed approach of this research is to identify different scheduling parameters such as, Processing time, for Job sequencing and processing time for routing and construct their membership functions and fuzzy rules. Using these membership functions and fuzzy rules a fuzzy interference system (FIS) is developed to identify the best route using MATLAB fuzzy logic toolbox. The variables are selected to identify the job, named, processing Time (PT),. All the variables are assigned with triangular membership function and divided into three zones: Small, Medium and High. The output of these 
variables is priority varying from 0 to 1. The priority variable is also assigned with triangular membership function and divided into 9 portions. Minimum (MN), Negative Low (NL), Low (LO), Negative Average (NA), Average (AV), Positive Average (PA), High (HI), Positive High (PH) and Maximum (MX).The variable are selected to identify the best route, Processing Time (PT). All the variables are assigned with triangular membership function and divided into three zones : Small, Medium and High. The output of these variables is priority varying from 0 to 1. The priority variable is also assigned with triangular membership function and divided into 9 portions. Minimum (MN), Negative Low (NL), Low (LO), Negative Average (NA), Average (AV), Positive Average (PA), High (HI), 
Positive High (PH) and Maximum (MX). 
Fig a 
Fig b
Miss. Ashwini. A. Mate Int. Journal of Engineering Research and Applications www.ijera.com 
ISSN : 2248-9622, Vol. 4, Issue 7( Version 6), July 2014, pp.104-111 
www.ijera.com 108 | P a g e 
Fig c 
Fig d 
Fig e
Miss. Ashwini. A. Mate Int. Journal of Engineering Research and Applications www.ijera.com 
ISSN : 2248-9622, Vol. 4, Issue 7( Version 6), July 2014, pp.104-111 
www.ijera.com 109 | P a g e 
Fig f Fig. Membership functions of fuzzy input variables 
In case of route selection, the variables of processing time, Similar to job sequencing, the total number of possible ordered pairs of these states is 27 and for each of these ordered pairs of states, we have to determine and appropriate state of variable route priority. The decision table is given below: Inference Rules for Route Selection using two Inputs and One Output The route priority criteria now used to derive fuzzy inference rules shown as an example: 1. If (Processing Time is Small) then (Route Priority is Maximum) .......... 27. If (Processing Time is High) then (Route Priority is Minimum) 
VII. The experiment and Result 
Two jobs are considered here with different processing times, due dates. They are determined based on customer requirements and the cost of the raw materials needed to finish the jobs. Processing time here is the ideal time, means time needed if it was machined in just one machine. The overall system comprises 4 different CNC machining centers (MCs), all capable of performing the required operations on each part type, a load/unload station and material handling system with one fork lift truck which can carry one pallet at a time. The system produces two different part types, A, B . It is assumed that it takes 3 minutes to load and unload a part on a pallet at load/unload station. Processing time for Job A - 11.96 hrs 
processing time for job B -11.86.hrs
Miss. Ashwini. A. Mate Int. Journal of Engineering Research and Applications www.ijera.com 
ISSN : 2248-9622, Vol. 4, Issue 7( Version 6), July 2014, pp.104-111 
www.ijera.com 110 | P a g e 
Fig for job B 
Fig for job A
Miss. Ashwini. A. Mate Int. Journal of Engineering Research and Applications www.ijera.com 
ISSN : 2248-9622, Vol. 4, Issue 7( Version 6), July 2014, pp.104-111 
www.ijera.com 111 | P a g e 
Routes obtained: Job A: 1-1-3-4-5 1-2-3-4-5 1-3-3-4-5 1-4-3-4-5 2-1-3-4-5 2-2-3-4-5 2-3-3-4-5 2-4-3-4-5 3-1-3-4-5 3-2-3-4-5 3-3-3-4-5 3-4-3-4-5 FOR JOB B: 1-1-3-4-5 1-2-3-4-5 1-3-3-4-5 1-4-3-4-5 2-1-3-4-5 2-2-3-4-5 2-3-3-4-5 2-4-3-4-5 3-1-3-4-5 3-2-3-4-5 3-3-3-4-5 3-4-3-4-5 Routes obtained by fuzzy model 
VIII. Conclusion and Recommendation 
The work presented in this paper was directed towards investigating the applicability of fuzzy techniques as a decision aid in the short-term control of flexible manufacturing systems. For this purpose a flexible manufacturing system for two jobs composed of four machines, one fork lift truck, one load and one unload station and with routings and arrivals with fixed statistical characteristics was considered. A fuzzy scheduler for job sequencing and routing was developed. This scheduler uses fuzzy logic systems as well as fuzzy multiple attribute decision-making techniques. The thesis was done to increase performance by using fuzzy techniques and also in giving a systematic design procedure that takes into account multiple objectives and needs no interface with linguistic directions from human experts. In this research, job A having the first priority and routing.. Again, only job priority and routing are taken into account, some other criteria‟s can also be added. Several parameters are used to design the problem, but, yet there may be other parameters which can be added to make the model more accurate. Here, triangular membership functions were 
used. There are some other membership functions which could give different results. All possible rules are taken, but if more parameters were added, number of the rules would have been increased. All this changes may lead the model to better results. 
Reference 
[1] „Application Of Fuzzy Mrp-ii In Fast Moving Consumer Goods Manufacturing Industry.”. Jiping Niu 1,John Dartell2. Faculty of Engineering, University of Technology, Sydney 15 Broadway, Ultimo, NSW, 2007, AUSTRALIA 
[2] ‟ A Genetic Algorithm For Job Shop Scheduling With Load Balancing.” Sanjoy Petrovic1 And Carole Fayad2 
[3] ”Solving An Aggregate Production Planning Problem By Using Basal Genetic Algorithm Approach”. Ripon Kumar Chakraborety1 And Md. Aktar Hassen2. International Journal of Fuzzy Logic Systems (IJFLS) Vol.3, No1, January 2013 
[4] „Scheduling Of Flexible Manufacturing Systems Using Fuzzy Logic,‟ Pramot srinoi prof.Ebrahimshayan1, Dr.Fatemehghot2, School Of Mathematical Sciences.2004 
[5] “Fuzzy Logic System Transportation”. Dusan Teodornic1. 11 may 1998. 
[6] ‟ Fuzzy Logic Control of Washing Machine „.Manish Agrawal1. 
[7] ”Simulation Of Flexible Manufacturing Using Fuzzy Logic.” Zaiul Hassan Serneabat1, Nabila Chowdhury2 And Dr. A.K.M. Mausud3.

More Related Content

What's hot

AN EFFICIENT HEURISTIC ALGORITHM FOR FLEXIBLE JOB SHOP SCHEDULING WITH MAINTE...
AN EFFICIENT HEURISTIC ALGORITHM FOR FLEXIBLE JOB SHOP SCHEDULING WITH MAINTE...AN EFFICIENT HEURISTIC ALGORITHM FOR FLEXIBLE JOB SHOP SCHEDULING WITH MAINTE...
AN EFFICIENT HEURISTIC ALGORITHM FOR FLEXIBLE JOB SHOP SCHEDULING WITH MAINTE...mathsjournal
 
SIMULATION AND COMPARISON ANALYSIS OF DUE DATE ASSIGNMENT METHODS USING SCHED...
SIMULATION AND COMPARISON ANALYSIS OF DUE DATE ASSIGNMENT METHODS USING SCHED...SIMULATION AND COMPARISON ANALYSIS OF DUE DATE ASSIGNMENT METHODS USING SCHED...
SIMULATION AND COMPARISON ANALYSIS OF DUE DATE ASSIGNMENT METHODS USING SCHED...IJCSES Journal
 
EFFICIENT SCHEDULING STRATEGY USING COMMUNICATION AWARE SCHEDULING FOR PARALL...
EFFICIENT SCHEDULING STRATEGY USING COMMUNICATION AWARE SCHEDULING FOR PARALL...EFFICIENT SCHEDULING STRATEGY USING COMMUNICATION AWARE SCHEDULING FOR PARALL...
EFFICIENT SCHEDULING STRATEGY USING COMMUNICATION AWARE SCHEDULING FOR PARALL...ijdpsjournal
 
Kubota, n. 1994: genetic algorithm with age structure and its application to ...
Kubota, n. 1994: genetic algorithm with age structure and its application to ...Kubota, n. 1994: genetic algorithm with age structure and its application to ...
Kubota, n. 1994: genetic algorithm with age structure and its application to ...ArchiLab 7
 
Modeling of assembly line balancing for optimized number of stations and time
Modeling of assembly line balancing for optimized number of stations and timeModeling of assembly line balancing for optimized number of stations and time
Modeling of assembly line balancing for optimized number of stations and timeIAEME Publication
 
Stochastic scheduling
Stochastic schedulingStochastic scheduling
Stochastic schedulingSSA KPI
 
IJREI_Selection model for material handling equipment’s used in flexible manu...
IJREI_Selection model for material handling equipment’s used in flexible manu...IJREI_Selection model for material handling equipment’s used in flexible manu...
IJREI_Selection model for material handling equipment’s used in flexible manu...Husain Mehdi
 
6 intelligent design of a dynamic machine layout
6   intelligent design of a dynamic machine layout6   intelligent design of a dynamic machine layout
6 intelligent design of a dynamic machine layoutQuốc Lê
 
Novel Heuristics for no-Wait Two Stage Multiprocessor Flow Shop with Probable...
Novel Heuristics for no-Wait Two Stage Multiprocessor Flow Shop with Probable...Novel Heuristics for no-Wait Two Stage Multiprocessor Flow Shop with Probable...
Novel Heuristics for no-Wait Two Stage Multiprocessor Flow Shop with Probable...IRJET Journal
 
A GUI-driven prototype for synthesizing self-adaptation decision
A GUI-driven prototype for synthesizing self-adaptation decisionA GUI-driven prototype for synthesizing self-adaptation decision
A GUI-driven prototype for synthesizing self-adaptation decisionjournalBEEI
 
A Model for Optimum Scheduling Of Non-Resumable Jobs on Parallel Production M...
A Model for Optimum Scheduling Of Non-Resumable Jobs on Parallel Production M...A Model for Optimum Scheduling Of Non-Resumable Jobs on Parallel Production M...
A Model for Optimum Scheduling Of Non-Resumable Jobs on Parallel Production M...IOSR Journals
 
Nitt paper A fuzzy multi-objective based un-related parallel Machine Schedu...
Nitt paper   A fuzzy multi-objective based un-related parallel Machine Schedu...Nitt paper   A fuzzy multi-objective based un-related parallel Machine Schedu...
Nitt paper A fuzzy multi-objective based un-related parallel Machine Schedu...Arudhra N
 

What's hot (14)

E43062837
E43062837E43062837
E43062837
 
AN EFFICIENT HEURISTIC ALGORITHM FOR FLEXIBLE JOB SHOP SCHEDULING WITH MAINTE...
AN EFFICIENT HEURISTIC ALGORITHM FOR FLEXIBLE JOB SHOP SCHEDULING WITH MAINTE...AN EFFICIENT HEURISTIC ALGORITHM FOR FLEXIBLE JOB SHOP SCHEDULING WITH MAINTE...
AN EFFICIENT HEURISTIC ALGORITHM FOR FLEXIBLE JOB SHOP SCHEDULING WITH MAINTE...
 
SIMULATION AND COMPARISON ANALYSIS OF DUE DATE ASSIGNMENT METHODS USING SCHED...
SIMULATION AND COMPARISON ANALYSIS OF DUE DATE ASSIGNMENT METHODS USING SCHED...SIMULATION AND COMPARISON ANALYSIS OF DUE DATE ASSIGNMENT METHODS USING SCHED...
SIMULATION AND COMPARISON ANALYSIS OF DUE DATE ASSIGNMENT METHODS USING SCHED...
 
EFFICIENT SCHEDULING STRATEGY USING COMMUNICATION AWARE SCHEDULING FOR PARALL...
EFFICIENT SCHEDULING STRATEGY USING COMMUNICATION AWARE SCHEDULING FOR PARALL...EFFICIENT SCHEDULING STRATEGY USING COMMUNICATION AWARE SCHEDULING FOR PARALL...
EFFICIENT SCHEDULING STRATEGY USING COMMUNICATION AWARE SCHEDULING FOR PARALL...
 
Kubota, n. 1994: genetic algorithm with age structure and its application to ...
Kubota, n. 1994: genetic algorithm with age structure and its application to ...Kubota, n. 1994: genetic algorithm with age structure and its application to ...
Kubota, n. 1994: genetic algorithm with age structure and its application to ...
 
Modeling of assembly line balancing for optimized number of stations and time
Modeling of assembly line balancing for optimized number of stations and timeModeling of assembly line balancing for optimized number of stations and time
Modeling of assembly line balancing for optimized number of stations and time
 
Stochastic scheduling
Stochastic schedulingStochastic scheduling
Stochastic scheduling
 
IJREI_Selection model for material handling equipment’s used in flexible manu...
IJREI_Selection model for material handling equipment’s used in flexible manu...IJREI_Selection model for material handling equipment’s used in flexible manu...
IJREI_Selection model for material handling equipment’s used in flexible manu...
 
K017446974
K017446974K017446974
K017446974
 
6 intelligent design of a dynamic machine layout
6   intelligent design of a dynamic machine layout6   intelligent design of a dynamic machine layout
6 intelligent design of a dynamic machine layout
 
Novel Heuristics for no-Wait Two Stage Multiprocessor Flow Shop with Probable...
Novel Heuristics for no-Wait Two Stage Multiprocessor Flow Shop with Probable...Novel Heuristics for no-Wait Two Stage Multiprocessor Flow Shop with Probable...
Novel Heuristics for no-Wait Two Stage Multiprocessor Flow Shop with Probable...
 
A GUI-driven prototype for synthesizing self-adaptation decision
A GUI-driven prototype for synthesizing self-adaptation decisionA GUI-driven prototype for synthesizing self-adaptation decision
A GUI-driven prototype for synthesizing self-adaptation decision
 
A Model for Optimum Scheduling Of Non-Resumable Jobs on Parallel Production M...
A Model for Optimum Scheduling Of Non-Resumable Jobs on Parallel Production M...A Model for Optimum Scheduling Of Non-Resumable Jobs on Parallel Production M...
A Model for Optimum Scheduling Of Non-Resumable Jobs on Parallel Production M...
 
Nitt paper A fuzzy multi-objective based un-related parallel Machine Schedu...
Nitt paper   A fuzzy multi-objective based un-related parallel Machine Schedu...Nitt paper   A fuzzy multi-objective based un-related parallel Machine Schedu...
Nitt paper A fuzzy multi-objective based un-related parallel Machine Schedu...
 

Viewers also liked

6months industrial training in fuzzy logic, jalandhar
6months industrial training in fuzzy logic, jalandhar6months industrial training in fuzzy logic, jalandhar
6months industrial training in fuzzy logic, jalandhardeepikakaler1
 
Fuzzy introduction
Fuzzy introductionFuzzy introduction
Fuzzy introductionVivek Kumar
 
Application of fuzzy logic
Application of fuzzy logicApplication of fuzzy logic
Application of fuzzy logicViraj Patel
 
Pid controller tuning using fuzzy logic
Pid controller tuning using fuzzy logicPid controller tuning using fuzzy logic
Pid controller tuning using fuzzy logicRoni Roshni
 
Expert system neural fuzzy system
Expert system neural fuzzy systemExpert system neural fuzzy system
Expert system neural fuzzy systemJamil S. Alagha
 
Fuzzy Logic Ppt
Fuzzy Logic PptFuzzy Logic Ppt
Fuzzy Logic Pptrafi
 
Fuzzy Logic in the Real World
Fuzzy Logic in the Real WorldFuzzy Logic in the Real World
Fuzzy Logic in the Real WorldBCSLeicester
 
Inference on the Semantic Web
Inference on the Semantic WebInference on the Semantic Web
Inference on the Semantic WebMyungjin Lee
 
A Survey of Software Reusability
A Survey of Software ReusabilityA Survey of Software Reusability
A Survey of Software ReusabilityIJERA Editor
 
absorption, Cu2+ : glass, emission, excitation, XRD
absorption, Cu2+ : glass, emission, excitation, XRDabsorption, Cu2+ : glass, emission, excitation, XRD
absorption, Cu2+ : glass, emission, excitation, XRDIJERA Editor
 
SPSNYC - Authentication, Authorization, and Identity – More than meets the eye…
SPSNYC - Authentication, Authorization, and Identity – More than meets the eye…SPSNYC - Authentication, Authorization, and Identity – More than meets the eye…
SPSNYC - Authentication, Authorization, and Identity – More than meets the eye…Scott Hoag
 
SPSRIC - SharePoint 2013 – A brief overview for IT Pros
SPSRIC - SharePoint 2013 – A brief overview for IT ProsSPSRIC - SharePoint 2013 – A brief overview for IT Pros
SPSRIC - SharePoint 2013 – A brief overview for IT ProsScott Hoag
 
Improving Power Efficiency in Cooperative Diversity and Mimo Systems by Using...
Improving Power Efficiency in Cooperative Diversity and Mimo Systems by Using...Improving Power Efficiency in Cooperative Diversity and Mimo Systems by Using...
Improving Power Efficiency in Cooperative Diversity and Mimo Systems by Using...IJERA Editor
 
Flexible ac transmission systems (FACTS), network congestion, Ordinal Optimiz...
Flexible ac transmission systems (FACTS), network congestion, Ordinal Optimiz...Flexible ac transmission systems (FACTS), network congestion, Ordinal Optimiz...
Flexible ac transmission systems (FACTS), network congestion, Ordinal Optimiz...IJERA Editor
 

Viewers also liked (20)

6months industrial training in fuzzy logic, jalandhar
6months industrial training in fuzzy logic, jalandhar6months industrial training in fuzzy logic, jalandhar
6months industrial training in fuzzy logic, jalandhar
 
Fuzzy introduction
Fuzzy introductionFuzzy introduction
Fuzzy introduction
 
Presentation2
Presentation2Presentation2
Presentation2
 
Fuzzy logic
Fuzzy logicFuzzy logic
Fuzzy logic
 
Application of fuzzy logic
Application of fuzzy logicApplication of fuzzy logic
Application of fuzzy logic
 
Pid controller tuning using fuzzy logic
Pid controller tuning using fuzzy logicPid controller tuning using fuzzy logic
Pid controller tuning using fuzzy logic
 
Expert system neural fuzzy system
Expert system neural fuzzy systemExpert system neural fuzzy system
Expert system neural fuzzy system
 
Fuzzy Logic Ppt
Fuzzy Logic PptFuzzy Logic Ppt
Fuzzy Logic Ppt
 
Fuzzy Logic in the Real World
Fuzzy Logic in the Real WorldFuzzy Logic in the Real World
Fuzzy Logic in the Real World
 
Inference on the Semantic Web
Inference on the Semantic WebInference on the Semantic Web
Inference on the Semantic Web
 
A Survey of Software Reusability
A Survey of Software ReusabilityA Survey of Software Reusability
A Survey of Software Reusability
 
I045034956
I045034956I045034956
I045034956
 
absorption, Cu2+ : glass, emission, excitation, XRD
absorption, Cu2+ : glass, emission, excitation, XRDabsorption, Cu2+ : glass, emission, excitation, XRD
absorption, Cu2+ : glass, emission, excitation, XRD
 
SPSNYC - Authentication, Authorization, and Identity – More than meets the eye…
SPSNYC - Authentication, Authorization, and Identity – More than meets the eye…SPSNYC - Authentication, Authorization, and Identity – More than meets the eye…
SPSNYC - Authentication, Authorization, and Identity – More than meets the eye…
 
SPSRIC - SharePoint 2013 – A brief overview for IT Pros
SPSRIC - SharePoint 2013 – A brief overview for IT ProsSPSRIC - SharePoint 2013 – A brief overview for IT Pros
SPSRIC - SharePoint 2013 – A brief overview for IT Pros
 
Z044168189
Z044168189Z044168189
Z044168189
 
Improving Power Efficiency in Cooperative Diversity and Mimo Systems by Using...
Improving Power Efficiency in Cooperative Diversity and Mimo Systems by Using...Improving Power Efficiency in Cooperative Diversity and Mimo Systems by Using...
Improving Power Efficiency in Cooperative Diversity and Mimo Systems by Using...
 
J44085557
J44085557J44085557
J44085557
 
Flexible ac transmission systems (FACTS), network congestion, Ordinal Optimiz...
Flexible ac transmission systems (FACTS), network congestion, Ordinal Optimiz...Flexible ac transmission systems (FACTS), network congestion, Ordinal Optimiz...
Flexible ac transmission systems (FACTS), network congestion, Ordinal Optimiz...
 
L045076774
L045076774L045076774
L045076774
 

Similar to Scheduling By Using Fuzzy Logic in Manufacturing

Investigating and Classifying the Applications of Flexible Manufacturing Syst...
Investigating and Classifying the Applications of Flexible Manufacturing Syst...Investigating and Classifying the Applications of Flexible Manufacturing Syst...
Investigating and Classifying the Applications of Flexible Manufacturing Syst...IOSR Journals
 
Comparison of Dynamic Scheduling Techniques in Flexible Manufacturing System
Comparison of Dynamic Scheduling Techniques in Flexible Manufacturing SystemComparison of Dynamic Scheduling Techniques in Flexible Manufacturing System
Comparison of Dynamic Scheduling Techniques in Flexible Manufacturing SystemIJERA Editor
 
C0362015022
C0362015022C0362015022
C0362015022theijes
 
Quasi-Static Evaluation of a Modular and Reconfigurable Manufacturing Cell
Quasi-Static Evaluation of a Modular and Reconfigurable Manufacturing CellQuasi-Static Evaluation of a Modular and Reconfigurable Manufacturing Cell
Quasi-Static Evaluation of a Modular and Reconfigurable Manufacturing CellHillary Green
 
Improving layout and workload of manufacturing system using Delmia Quest simu...
Improving layout and workload of manufacturing system using Delmia Quest simu...Improving layout and workload of manufacturing system using Delmia Quest simu...
Improving layout and workload of manufacturing system using Delmia Quest simu...AM Publications
 
Fms literature review
Fms literature reviewFms literature review
Fms literature reviewdhandeesh
 
Planning and Scheduling of a Corrugated Cardboard Manufacturing Process in IoT
Planning and Scheduling of a Corrugated Cardboard Manufacturing Process in IoTPlanning and Scheduling of a Corrugated Cardboard Manufacturing Process in IoT
Planning and Scheduling of a Corrugated Cardboard Manufacturing Process in IoTijtsrd
 
AN ADVANCED PRODUCTION PLANNING AND SCHEDULING SYSTEM FOR BATCH PROCESS INDUSTRY
AN ADVANCED PRODUCTION PLANNING AND SCHEDULING SYSTEM FOR BATCH PROCESS INDUSTRYAN ADVANCED PRODUCTION PLANNING AND SCHEDULING SYSTEM FOR BATCH PROCESS INDUSTRY
AN ADVANCED PRODUCTION PLANNING AND SCHEDULING SYSTEM FOR BATCH PROCESS INDUSTRYEmily Smith
 
Improving the Performance of Mapping based on Availability- Alert Algorithm U...
Improving the Performance of Mapping based on Availability- Alert Algorithm U...Improving the Performance of Mapping based on Availability- Alert Algorithm U...
Improving the Performance of Mapping based on Availability- Alert Algorithm U...AM Publications
 
Optimization of Assembly Line and Plant Layout in a Mass Production Industry...
	Optimization of Assembly Line and Plant Layout in a Mass Production Industry...	Optimization of Assembly Line and Plant Layout in a Mass Production Industry...
Optimization of Assembly Line and Plant Layout in a Mass Production Industry...inventionjournals
 
Modeling and Analysis of Flexible Manufacturing System with FlexSim
Modeling and Analysis of Flexible Manufacturing System with FlexSimModeling and Analysis of Flexible Manufacturing System with FlexSim
Modeling and Analysis of Flexible Manufacturing System with FlexSimijceronline
 
Simulation of Process Scheduling Algorithms
Simulation of Process Scheduling AlgorithmsSimulation of Process Scheduling Algorithms
Simulation of Process Scheduling Algorithmsijtsrd
 
2015 job shop-scheduling uain heurstic bottle neck shift
2015 job shop-scheduling uain heurstic bottle neck shift2015 job shop-scheduling uain heurstic bottle neck shift
2015 job shop-scheduling uain heurstic bottle neck shiftKassu Jilcha (PhD)
 

Similar to Scheduling By Using Fuzzy Logic in Manufacturing (20)

Bo24437446
Bo24437446Bo24437446
Bo24437446
 
G04502040047
G04502040047G04502040047
G04502040047
 
Investigating and Classifying the Applications of Flexible Manufacturing Syst...
Investigating and Classifying the Applications of Flexible Manufacturing Syst...Investigating and Classifying the Applications of Flexible Manufacturing Syst...
Investigating and Classifying the Applications of Flexible Manufacturing Syst...
 
Production Scheduling in a Job Shop Environment with consideration of Transpo...
Production Scheduling in a Job Shop Environment with consideration of Transpo...Production Scheduling in a Job Shop Environment with consideration of Transpo...
Production Scheduling in a Job Shop Environment with consideration of Transpo...
 
Comparison of Dynamic Scheduling Techniques in Flexible Manufacturing System
Comparison of Dynamic Scheduling Techniques in Flexible Manufacturing SystemComparison of Dynamic Scheduling Techniques in Flexible Manufacturing System
Comparison of Dynamic Scheduling Techniques in Flexible Manufacturing System
 
C0362015022
C0362015022C0362015022
C0362015022
 
Quasi-Static Evaluation of a Modular and Reconfigurable Manufacturing Cell
Quasi-Static Evaluation of a Modular and Reconfigurable Manufacturing CellQuasi-Static Evaluation of a Modular and Reconfigurable Manufacturing Cell
Quasi-Static Evaluation of a Modular and Reconfigurable Manufacturing Cell
 
Improving layout and workload of manufacturing system using Delmia Quest simu...
Improving layout and workload of manufacturing system using Delmia Quest simu...Improving layout and workload of manufacturing system using Delmia Quest simu...
Improving layout and workload of manufacturing system using Delmia Quest simu...
 
30420140503003
3042014050300330420140503003
30420140503003
 
Fms literature review
Fms literature reviewFms literature review
Fms literature review
 
Unit6 55
Unit6 55Unit6 55
Unit6 55
 
Planning and Scheduling of a Corrugated Cardboard Manufacturing Process in IoT
Planning and Scheduling of a Corrugated Cardboard Manufacturing Process in IoTPlanning and Scheduling of a Corrugated Cardboard Manufacturing Process in IoT
Planning and Scheduling of a Corrugated Cardboard Manufacturing Process in IoT
 
Integration of process planning and scheduling comparison of models approach
Integration of process planning and scheduling comparison of models approachIntegration of process planning and scheduling comparison of models approach
Integration of process planning and scheduling comparison of models approach
 
AN ADVANCED PRODUCTION PLANNING AND SCHEDULING SYSTEM FOR BATCH PROCESS INDUSTRY
AN ADVANCED PRODUCTION PLANNING AND SCHEDULING SYSTEM FOR BATCH PROCESS INDUSTRYAN ADVANCED PRODUCTION PLANNING AND SCHEDULING SYSTEM FOR BATCH PROCESS INDUSTRY
AN ADVANCED PRODUCTION PLANNING AND SCHEDULING SYSTEM FOR BATCH PROCESS INDUSTRY
 
Improving the Performance of Mapping based on Availability- Alert Algorithm U...
Improving the Performance of Mapping based on Availability- Alert Algorithm U...Improving the Performance of Mapping based on Availability- Alert Algorithm U...
Improving the Performance of Mapping based on Availability- Alert Algorithm U...
 
Optimization of Assembly Line and Plant Layout in a Mass Production Industry...
	Optimization of Assembly Line and Plant Layout in a Mass Production Industry...	Optimization of Assembly Line and Plant Layout in a Mass Production Industry...
Optimization of Assembly Line and Plant Layout in a Mass Production Industry...
 
Modeling and Analysis of Flexible Manufacturing System with FlexSim
Modeling and Analysis of Flexible Manufacturing System with FlexSimModeling and Analysis of Flexible Manufacturing System with FlexSim
Modeling and Analysis of Flexible Manufacturing System with FlexSim
 
D0212326
D0212326D0212326
D0212326
 
Simulation of Process Scheduling Algorithms
Simulation of Process Scheduling AlgorithmsSimulation of Process Scheduling Algorithms
Simulation of Process Scheduling Algorithms
 
2015 job shop-scheduling uain heurstic bottle neck shift
2015 job shop-scheduling uain heurstic bottle neck shift2015 job shop-scheduling uain heurstic bottle neck shift
2015 job shop-scheduling uain heurstic bottle neck shift
 

Recently uploaded

Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 

Recently uploaded (20)

🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 

Scheduling By Using Fuzzy Logic in Manufacturing

  • 1. Miss. Ashwini. A. Mate Int. Journal of Engineering Research and Applications www.ijera.com ISSN : 2248-9622, Vol. 4, Issue 7( Version 6), July 2014, pp.104-111 www.ijera.com 104 | P a g e Scheduling By Using Fuzzy Logic in Manufacturing Miss. Ashwini. A. Mate1, Dr. I. P. Keswani2 Department of industrial engineering RKNEC, NAGPUR Department of industrial engineering RKNEC, NAGPUR Abstract This paper represents the scheduling process in furniture manufacturing unit. It gives the fuzzy logic application in flexible manufacturing system. Flexible manufacturing systems are production system in furniture manufacturing unit. FMS consist of same multipurpose numerically controlled machines. Here in this project the scheduling has been done in FMS by using fuzzy logic tool in Matlab software. The fuzzy logic based scheduling model in this paper will deals with the job and best alternative route selection with multi-criteria of machine. Here two criteria for job and sequencing and routing with rules. This model is applicable to the scheduling of any manufacturing industry. Keywords: Scheduling, FMS, Fuzzy logic, matlab, sequencing, processes, routing. I. Introduction As we know whenever we planned the manufacturing system we consider the design criteria such as the system efficiency , the system will be efficient in all the way in production. All such criteria cannot be achieved untill the design production , planning scheduling and controlling steps work well. A FMS can be defined as production system consisting of identical multipurpose numerically controlled machine (work stations). FMS is a manufacturing system in which there is some amount of flexibility that allows the system to react in the case of changes. FMS works for automated material and tools handling system , load and unload stations, inspection stations , storage areas and a hierarchical control system. Generally when time is being planned , the objective is to design a system which will be efficient in the production of the entire range of parts. A FMS provides the efficiency of automated high- volume mass production. Scheduling in an FMS environment is more complex and difficult than in a conventional manufacturing environment. Scheduling of FMS determine an optimal schedule and controlling an FMS is considered as difficult task. Fuzzy set theory was introduced in 1965 by zadeh. Fuzzy logic approaches easily deal with uncertain and incomplete information and human experts, knowledge can be easily coded into fuzzy logic approaches for scheduling FMS is consider due to its ability to deal uncertain and incomplete information and with multi objective problem. II. Review of Literature 2.1.JIPING NIU, JOHN DARTNALL.[1] gives the idea regarding fuzzy –mrp-ii deals with uncertantity and imprecision. Fuzzy –mrp –II shows all of the information for the decision makers allowing them to consider all possibilities of the orders. 2.2 SANJOY PETROVIC and CAROLE FAYAD[2] This paper deals with the load- balancing of m/c in a real-world job scheduling algorithm allocates jobs ,splits into lots on identical m/c with objectives to reduce job total throughput time and to improve m/c utilization. 2.3. RIPON KUMAR CHAKRABORETY AND MD.A.AKHTAR HASSEN.[3] This paper work demonstrated interactive fuzzy based genetic algorithmic approach solving a two products and two period aggregate production planning with some vulnerable managerial contraries like imprecise demands, variable manufacture cost etc… here the Author Employee different unique genetic algorithm parameters scrupulously for solving non deterministic Polynomials problem like app problems. 2.4 PARAMOT SRINOI,A/PROF. ABRAHIM SHAYAN, DR. FATMAEH GHOTB[4]. This paper present research project under taken as industrial institutes switchburne in the area of fuzzy scheduling. In this paper fuzzy based schedule model deal with the parts routing problem. Model with select best alternative route with multi criteria scheduling through an approach based on fuzzy logic. 2.5. DUSAN TEODORNIC.[5]. the paper represent classification and analysis the result achieved using fuzzy logic to model complex traffic and transportation process. fuzzy logic is shown to be very promising mathematically approach to modeling traffic and transportation process characterized by subjectivity, ambiguity, uncertainty and imprecision. RESEARCH ARTICLE OPEN ACCESS
  • 2. Miss. Ashwini. A. Mate Int. Journal of Engineering Research and Applications www.ijera.com ISSN : 2248-9622, Vol. 4, Issue 7( Version 6), July 2014, pp.104-111 www.ijera.com 105 | P a g e 2.6 by MANISH AGRAWAL.[6] Here washing machine are common feature today Indian household. The most important utility customer can drive from washing machine. the paper represent idea of controlling the washing time using fuzzy logic control. The paper describes the produce that can be used to get the suitable time for different cloths. the process is based entirely on principle of taking no precise inputs From the sensor, subjecting them to fuzzy arithemats and obtaining crisp value of washing time. It is quite clear from the paper itself that this method can be used in practice to further automates the washing machine. Never the less, this method though with much larger number of inputs parameters and further complex situation is be used qty the giants like LG and Samsung. 2.7 ZIAUL HASSAN SERNEABAT, NABILA CHOUDHURY, DR. A.K.M.MASUD[7]. This paper gives the study of simulation of FMS.FMS is the production system consisting of identical multipurpose numerically controlled m/cs. Here the model prioritize the job and select the best alternative route with multi-criteria scheduling through an approach based on fuzzy logic and with the help of rules the sequence of the jobs are done and the best route is selected. III. Fuzzy logic Approach to FMS The present industrial trend of manufacturing low cost low-to-medium volumes of modular products with high variability demands manufacturing systems with flexibility and low delivery times. This lead to manufacturing systems with small batch productions, low setup times and many decisional degrees of freedom. The scheduling problem consists of several decisional points. A first division into three parts can be made: Timing: that is, when to insert a part into the system; Sequencing: that is, defining the order with which different parts (batches, orders) are inserted into the system; Routing: that is, defining the route (machine) for a part in presence of alternatives. Fuzzy logic has the ability to simultaneously consider multiple criteria. Furthermore, the advantage of the fuzzy logic system approach is that it incorporates both numerical and linguistic variables. In this paper, we apply fuzzy logic to simulate FMS. The fuzzy based simulation, in this paper, is designed to solve the problem of determine the job sequence and selecting the best part route. In particular, we will show how to obtain the simulation via a proposed fuzzy model as shown in figure 1. Fig. 1 Structure of a Fuzzy Logic System IV. A CASE FOUND IN INDUSTRY As the space wood is the furniture manufacturing industry ,here we found the various problem related scheduling after visiting the industry. For tackling the various problem we applying the fuzzy logic application to get the schedule for performing various operation in manufacturing unit. The Fuzzy scheduler considers two particular rules in the scheduling problem: Sequencing of job and routing. The sequencing of jobs was approached using fuzzy controllers having rules with two parameters (Processing time and, Due date) and one consequent. The fuzzy system determine the route for each job loading in a machine , so that whenever the load station or the machine are free the job with the highest priority go through various operation. The decisional point that was considered is the routing problem, that is, the choice of one among many possible routes. In the problem considered this is equivalent to choosing the machine for next processing of a job, among the possible alternatives for that job The various operation done in industry:. 1-cutting 2-cnc operation 3-moulding 4-laying 5-sanding 6-glueing 7-foiling 8-inspection 9-packing The following assumptions on the Flexible Manufacturing System were made:
  • 3. Miss. Ashwini. A. Mate Int. Journal of Engineering Research and Applications www.ijera.com ISSN : 2248-9622, Vol. 4, Issue 7( Version 6), July 2014, pp.104-111 www.ijera.com 106 | P a g e 1. Tool management is not considered, i.e. it is supposed that all the tools are available where needed. 2. Failure of workstations and/or transport systems is not considered, i.e., the machines and/or transport subsystem are not subject to failure. 3. Orders arrive to the FMS as Poisson processes with a fixed inter-arrival time. 4. Production of orders occurs in batches, and the movement of the whole batch is considered, so that batch dimensions are not important. 5. Setup times are independent of the order in which operations are executed, i.e. they are constant and embodied in the operation times of each job (batch). 6. There are as many pallets and fixtures as are needed (this assumption is mitigated by the fact that the number of jobs in the system is constantly controlled). 7. The routing of every job is random and directly defined as a sequence of workstations the job has to go through. Thus, the route of a job is not defined in terms of the operations needed by the job. In other words, every operation corresponds directly to the workstation that will execute it, i.e., the routing is defined as a sequence of workstations. 8. There can be multiple routing choices, i.e. at a certain point a job can be equivalently sent to different workstations (as specified in its routing plan) having different processing times. 9. Loading, unloading and processing times are random. 10. Due dates are assigned according to the total processing time of a job. 11. Each workstation can work only one job at a time. 12. The transport system is composed of fork lift truck and each fork lift truck can transport only one sheet at a time. 13. Neither the weight of a piece nor the dimension of a batch affects the speed of fork lift truck which is assumed to be constant. 14. Every workstation has one input buffer and no output buffer, therefore it will be free as soon as there is one free trolley that can transport the processed job to another workstation. 15. Delays in accessing the state information are neglected. 16. Among all the possible scheduling rules the following are considered: · Sequencing for a job (selection of a piece among those waiting to receive service from a machine); · Routing decisions concerning the next required workstation. V. Problem Definition When a manufacturing unit produce a product as per customer order. For production process they need schedule, planning. They schedule to placed product at right time. As problem found in industry is improper scheduling. There is no allocation of job at proper machine at proper time. When the job is available at the machine the other machine were idle and the due to this the productivity of the industry lack behind. As there are 4 CNC machine which are fully automated as program feed to the machine they work but after completion of one job the machine were idle and this cause the less productivity. To reduce the such kind of problem this model gave the proper schedule for every job. The FMS described in this paper consists of 4 different CNC machining centers ,three panel saw with finite local buffer capacity, all capable of performing the required operations on each part type, a load/unload station and material handling system with a fork lift truck which can load one pallet at a time. The system produces two different part types, A and B as shown in Table 1. It is assumed that it takes 3 minutes to load and unload a part on a pallet at load/unload station. The time to cross the distance between two consecutive MCs is assumed to be 0.5 minute. The arrangement of the FMC hardware is shown in Figure 2. Fig. 2 Diagram of the Case Study Each machine is capable of performing different operations, but no machine can process more than one part at a time. Each part type has several alternative routings. Operations are
  • 4. Miss. Ashwini. A. Mate Int. Journal of Engineering Research and Applications www.ijera.com ISSN : 2248-9622, Vol. 4, Issue 7( Version 6), July 2014, pp.104-111 www.ijera.com 107 | P a g e not divided or interrupted when started. Set up times are independent of the job sequence and can be included in processing times. The scheduling problem is to decide the sequence of the jobs and which alternative routes should be selected for each job. VI. The Fuzzy Based Model : Proposed approach of this research is to identify different scheduling parameters such as, Processing time, for Job sequencing and processing time for routing and construct their membership functions and fuzzy rules. Using these membership functions and fuzzy rules a fuzzy interference system (FIS) is developed to identify the best route using MATLAB fuzzy logic toolbox. The variables are selected to identify the job, named, processing Time (PT),. All the variables are assigned with triangular membership function and divided into three zones: Small, Medium and High. The output of these variables is priority varying from 0 to 1. The priority variable is also assigned with triangular membership function and divided into 9 portions. Minimum (MN), Negative Low (NL), Low (LO), Negative Average (NA), Average (AV), Positive Average (PA), High (HI), Positive High (PH) and Maximum (MX).The variable are selected to identify the best route, Processing Time (PT). All the variables are assigned with triangular membership function and divided into three zones : Small, Medium and High. The output of these variables is priority varying from 0 to 1. The priority variable is also assigned with triangular membership function and divided into 9 portions. Minimum (MN), Negative Low (NL), Low (LO), Negative Average (NA), Average (AV), Positive Average (PA), High (HI), Positive High (PH) and Maximum (MX). Fig a Fig b
  • 5. Miss. Ashwini. A. Mate Int. Journal of Engineering Research and Applications www.ijera.com ISSN : 2248-9622, Vol. 4, Issue 7( Version 6), July 2014, pp.104-111 www.ijera.com 108 | P a g e Fig c Fig d Fig e
  • 6. Miss. Ashwini. A. Mate Int. Journal of Engineering Research and Applications www.ijera.com ISSN : 2248-9622, Vol. 4, Issue 7( Version 6), July 2014, pp.104-111 www.ijera.com 109 | P a g e Fig f Fig. Membership functions of fuzzy input variables In case of route selection, the variables of processing time, Similar to job sequencing, the total number of possible ordered pairs of these states is 27 and for each of these ordered pairs of states, we have to determine and appropriate state of variable route priority. The decision table is given below: Inference Rules for Route Selection using two Inputs and One Output The route priority criteria now used to derive fuzzy inference rules shown as an example: 1. If (Processing Time is Small) then (Route Priority is Maximum) .......... 27. If (Processing Time is High) then (Route Priority is Minimum) VII. The experiment and Result Two jobs are considered here with different processing times, due dates. They are determined based on customer requirements and the cost of the raw materials needed to finish the jobs. Processing time here is the ideal time, means time needed if it was machined in just one machine. The overall system comprises 4 different CNC machining centers (MCs), all capable of performing the required operations on each part type, a load/unload station and material handling system with one fork lift truck which can carry one pallet at a time. The system produces two different part types, A, B . It is assumed that it takes 3 minutes to load and unload a part on a pallet at load/unload station. Processing time for Job A - 11.96 hrs processing time for job B -11.86.hrs
  • 7. Miss. Ashwini. A. Mate Int. Journal of Engineering Research and Applications www.ijera.com ISSN : 2248-9622, Vol. 4, Issue 7( Version 6), July 2014, pp.104-111 www.ijera.com 110 | P a g e Fig for job B Fig for job A
  • 8. Miss. Ashwini. A. Mate Int. Journal of Engineering Research and Applications www.ijera.com ISSN : 2248-9622, Vol. 4, Issue 7( Version 6), July 2014, pp.104-111 www.ijera.com 111 | P a g e Routes obtained: Job A: 1-1-3-4-5 1-2-3-4-5 1-3-3-4-5 1-4-3-4-5 2-1-3-4-5 2-2-3-4-5 2-3-3-4-5 2-4-3-4-5 3-1-3-4-5 3-2-3-4-5 3-3-3-4-5 3-4-3-4-5 FOR JOB B: 1-1-3-4-5 1-2-3-4-5 1-3-3-4-5 1-4-3-4-5 2-1-3-4-5 2-2-3-4-5 2-3-3-4-5 2-4-3-4-5 3-1-3-4-5 3-2-3-4-5 3-3-3-4-5 3-4-3-4-5 Routes obtained by fuzzy model VIII. Conclusion and Recommendation The work presented in this paper was directed towards investigating the applicability of fuzzy techniques as a decision aid in the short-term control of flexible manufacturing systems. For this purpose a flexible manufacturing system for two jobs composed of four machines, one fork lift truck, one load and one unload station and with routings and arrivals with fixed statistical characteristics was considered. A fuzzy scheduler for job sequencing and routing was developed. This scheduler uses fuzzy logic systems as well as fuzzy multiple attribute decision-making techniques. The thesis was done to increase performance by using fuzzy techniques and also in giving a systematic design procedure that takes into account multiple objectives and needs no interface with linguistic directions from human experts. In this research, job A having the first priority and routing.. Again, only job priority and routing are taken into account, some other criteria‟s can also be added. Several parameters are used to design the problem, but, yet there may be other parameters which can be added to make the model more accurate. Here, triangular membership functions were used. There are some other membership functions which could give different results. All possible rules are taken, but if more parameters were added, number of the rules would have been increased. All this changes may lead the model to better results. Reference [1] „Application Of Fuzzy Mrp-ii In Fast Moving Consumer Goods Manufacturing Industry.”. Jiping Niu 1,John Dartell2. Faculty of Engineering, University of Technology, Sydney 15 Broadway, Ultimo, NSW, 2007, AUSTRALIA [2] ‟ A Genetic Algorithm For Job Shop Scheduling With Load Balancing.” Sanjoy Petrovic1 And Carole Fayad2 [3] ”Solving An Aggregate Production Planning Problem By Using Basal Genetic Algorithm Approach”. Ripon Kumar Chakraborety1 And Md. Aktar Hassen2. International Journal of Fuzzy Logic Systems (IJFLS) Vol.3, No1, January 2013 [4] „Scheduling Of Flexible Manufacturing Systems Using Fuzzy Logic,‟ Pramot srinoi prof.Ebrahimshayan1, Dr.Fatemehghot2, School Of Mathematical Sciences.2004 [5] “Fuzzy Logic System Transportation”. Dusan Teodornic1. 11 may 1998. [6] ‟ Fuzzy Logic Control of Washing Machine „.Manish Agrawal1. [7] ”Simulation Of Flexible Manufacturing Using Fuzzy Logic.” Zaiul Hassan Serneabat1, Nabila Chowdhury2 And Dr. A.K.M. Mausud3.