Kuljinder Kaur Int. Journal of Engineering Research and Applications www.ijera.com
ISSN: 2248-9622, Vol. 6, Issue 1, (Part - 2) January 2016, pp.31-34
www.ijera.com 31|P a g e
Calculation and comparison of circuit breaker parameters in
Power World Simulator
Kuljinder Kaur, Er. Simerpreet Singh
Department of Electrical Engineering Bhai Gurdas Institute of Engineering and Technology Sangrur, India
Department of Electrical Engineering Bhai Gurdas Institute of Engineering and Technology Sangrur, India
ABSTRACT
A circuit breaker has ratings that an engineer uses for their application. These ratings define circuit breaker
performance characteristics. A good understanding of Ratings allow the electrical engineer to make a proper
comparison of various circuit breaker designs.
In this research work, the different ratings of circuit breaker were calculated. The other objective of this work
was comparison between ratings of existing circuit breaker and calculated ratings in POWER WORLD
SIMULATOR. Further, the impact of time delay in circuit breaker was studied. These calculations were
performed for rated current of 400 & 630 Amps. The results performed in POWER WORLD SIMULATOR
were shown better and information gained from the analysis can be used for proper relay selection, settings,
performances and coordination.
I. INTRODUCTION
A circuit breaker is piece of equipment which
can make or break a circuit either manually or by
remote control under normal conditions, break a
circuit automatically under fault conditions, make a
circuit either manually or by remote control under
fault conditions.
A circuit breaker has three ratings viz. breaking
capacity, making capacity and short time capacity.
Breaking capacity is current r.m.s that a circuit
breaker is capable of breaking at given recovery
voltage and under specified conditions. Recovery
voltage is the normal frequency r.m.s voltage that
appears across the contacts of the circuit breaker after
final arc extinction. The breaking capacity is always
stated at the r.m.s value of fault current at the instant
of contact separation. It is expressed in units of
MVA.
Making capacity is the peak value of current
during the first value of current wave after the closer
of circuit breaker. The making capacity depends upon
ability to withstand and close successfully against the
effects of electromagnetic forces. These forces are
proportional to the square of maximum instantaneous
current on closing. It is expressed in terms of kA.
Short-time rating is the period for which the
circuit breaker is able to carry fault current while
remaining closed. The short-time rating of a circuit
breaker depends upon its ability to withstand electro-
magnetic force effects and temperature rise. The
circuit breakers have a specified limit of 3 seconds
when the ratio of symmetrical breaking current to the
rated normal current does not exceed 40. However, if
this ratio is more than 40, then the specified limit is 1
second.
The circuit breakers are classified into below
categories-
OIL CIRCUIT BREAKER which employ some
insulating oil for arc extinction.
AIR- BLAST CIRCUIT BREAKER in which high
pressure air-blast is used for extinguishing the arc.
SULPHUR HEXAFLUROIDE CIRCUIT
BREAKER in which sulphur hexafluoride gas is used
for arc extinction.
VACUUM CIRCUIT BREAKER in which vacuum
is used for arc extinction.
The circuit breaker used in this work is SF6 Circuit
Breaker. Vacuum Circuit Breaker incorporates a
specially designed and completely sealed Interrupter
to perform its basic function of opening as well as
closing when called upon to do so, both under normal
operating conditions and under fault conditions such
as short circuit. Since, SF6 offers the highest
insulating strength; it has far superior arc quenching
properties than any other medium.
The calculation of circuit breaker ratings is based on
the symmetrical fault or three phase fault. A fault
which gives rise to equal fault currents in the lines
with 120 degree displacement is known as three
phase fault or symmetrical fault. Faults could happen
when a phase establishes a connection with another
phase, lightning, insulation deterioration, wind
damage, trees falling across lines, etc.
The effects of fault on power system are:
1. Due to overheating and mechanical forces
developed by faults, electrical equipments such as
bus-bars, generators and transformers may be
damaged.
RESEARCH ARTICLE OPEN ACCESS
Kuljinder Kaur Int. Journal of Engineering Research and Applications www.ijera.com
ISSN: 2248-9622, Vol. 6, Issue 1, (Part - 2) January 2016, pp.31-34
www.ijera.com 32|P a g e
2. The voltage profile of the system may be reduced
to unacceptable limits as a result of fault. A
frequency drop may lead to instability.
These ratings are used by the engineer to determine
the ability of the circuit breaker to protect it and other
devices and to coordinate with other circuit breakers
so the system will trip selectively. These calculations
are performed on 132 kV transmission system,
Kotakpura for 400 and 630 Amps.
The single line diagram of 132 kV transmission
systems, Kotakpura is shown in figure1.
Figure1: 11- Bus 132 kV transmission systems
II. PROBLEM FORMULATION
A. Calculation of circuit breaker parameters
The bus model of 132kv substation, kotakpura is
implemented and executed using POWER WORLD
SIMULATOR. All calculations are performed in per
unit system. By imposing the three phase balanced
fault, fault current is calculated in Power World
Simulator. Different formulae for calculation of
circuit breaker parameters are given below:
1. Breaking capacity = √3×V×I×10-6
(MVA)
Where,
V is line voltage in volts
I is the rated breaking current in Amps
2. Rated Symmetrical breaking Current
=
𝑅𝑢𝑝𝑡𝑢𝑟𝑖𝑛𝑔 𝑐𝑎𝑝𝑎𝑐𝑖𝑡𝑦
3 ×rated voltage
(kA)
3. Making capacity
= 2.55 × symmetrical breaking current (kA)
4. AC component of short circuit current
= √2 × symmetrical breaking current (A)
5. DC component of short circuit current
= 50% of AC component of short circuit current
Or
=
1
2
× AC component of short circuit current (A)
6. Short time rating
= √ [(AC component of short circuit current/√2)2
+
(DC component of short circuit current) 2
] (kA)
B. IMPORTANT DEFINITIONS
ARC VOLTAGE: It is the voltage that appears across
the contacts of the circuit breaker during the arcing
period.
RESTRIKING VOLTAGE: It is the transient voltage
that appears across the contacts at or near zero
current during arcing period.
RECOVERY VOLTAGE: It is the normal frequency
r.m.s voltage that appears across the contacts of the
circuit breaker after final arc extinction.
BREAKING CAPACITY: It is current r.m.s that a
circuit breaker is capable of breaking at given
recovery voltage and under specified conditions.
MAKING CAPACITY: The peak value of current
during the first cycle of current wave after the closure
of circuit breaker is known as making capacity.
SHORT-TIME RATING: It is the period for which
the circuit breaker is able to carry fault current while
remaining closed.
NORMAL CURRENT RATING: It is the r.m.s value
of current which the circuit breaker is capable of
carrying continuously at its rated frequency under
specified conditions.
C. Standard Parameters
TABLE I: THREE CORE ARMOURED CABLE
(COPPER CONDUCTOR) PARAMETERS AS PER
IEC 60502-2.
TABLE II: IMPULSE AND POWER FREQUENCY
WITHSTAND VOLTAGE AS PER IEC 60071 AND
60298
Normal
operating
voltage
(kV rms)
Rated
voltage
(kV
rms)
Rated
power-
frequency
withstand
voltage
(kV rms)
Rated lightning
impulse
withstand
voltage1.2/50 µs
50 Hz(kV peak)
list 1
list2
10 t0 11 12 28
60
75
Nomina
l Area
of
conduct
ors
Thickn
ess of
Insulat
ion
Conduc
tor
resistan
ce (R)
Conduc
tor
Reacta
nce (X)
Shunt
Chargin
g
Capacita
nce
(B)
300
sq.mm 3.4 mm
0.0797
Ω/km
0.086
Ω/km
0.53
µF/km
Kuljinder Kaur Int. Journal of Engineering Research and Applications www.ijera.com
ISSN: 2248-9622, Vol. 6, Issue 1, (Part - 2) January 2016, pp.31-34
www.ijera.com 33|P a g e
III. RESULTS AND DISCUSSION
The single line diagram of 132 kV transmission
systems, Kotakpura is shown in figure1. Table III &
V shows the calculated circuit breaker parameters of
11 bus 132 kV transmission system using POWER
WORLD SIMULATOR. Table IV shows comparison
between existing circuit breaker ratings and
calculated ratings. Graph I & II shows the impact of
time delay on frequency of circuit breaker.
TABLE III: CIRCUIT BREAKER PARAMETERS
FOR RATED CURRENT 400AMP
TABLE IV: COMPARISON BETWEEN EXISTING
AND CALCULATED CIRCUIT BREAKER
RATINGS
TABLE V: CIRCUIT BREAKER PARAMETERS
FOR RATED CURRENT 630AMP
In Table IV, Comparison between existing circuit
breaker ratings and calculated ratings using power
world simulator is performed. It is concluded that by
using POWER WORLD SIMULATOR TOOL we
can get better results than existing results. On account
of these results, further selection of equipments can
be done.
Graph I: frequency versus time graph for 2 cycles
Speed_Gen 1 #1gfedcb
109876543210
50.2
50.18
50.16
50.14
50.12
50.1
50.08
50.06
50.04
50.02
50
49.98
49.96
49.94
49.92
bu
s
nu
m
be
r
short
circu
it
curr
ent
(kA)
Breaki
ng
capaci
ty
(MVA
)
Rated
Symme
trical
breakin
g
Curren
t (kA)
Making
capacit
y (kA)
AC
compo
nent of
short
circuit
curren
t(A)
DC
compo
nent of
short
circuit
curren
t(A)
shor
t
time
ratin
g
(kA)
1
2.79
5
639.02 2.794 7.1247 3.95 1.975 3.42
2
31.3
21
596.74 31.325 79.88 44.3 22.15
38.3
6
3
40.1
94
765.8 40.2 102.51 56.85 28.43
49.2
4
5
40.1
95
765.8 40.2 102.51 56.85 28.43
49.2
4
6
40.1
95
765.8 40.2 102.51 56.85 28.43
49.2
4
7
40.1
95
765.8 40.2 102.51 56.85 28.43
49.2
4
8
40.1
95
765.8 40.2 102.51 56.85 28.43
49.2
4
9
40.1
95
765.8 40.2 102.51 56.85 28.43
49.2
4
10
40.1
95
765.8 40.2 102.51 56.85 28.43
49.2
4
12
40.1
95
765.8 40.2 102.51 56.85 28.43
49.2
4
13
40.1
95
765.8 40.2 102.51 56.85 28.43
49.2
4
Parameters
Existing
circuit
breaker
ratings
calculated
ratings using
power world
simulator
Rated voltage (kV) 12 12
Frequency (Hz) 50 50
Rated current (A) 630 630
Making capacity
(kA)
62.5 79.96
Symmetrical
breaking capacity
(kA)
25 31.4
Short time rating
for 3 seconds (kA)
25 38.41
Operating Duty
cycle
O-0.3-CO-
3-CO
O-0.3-CO-3-
CO
bu
s
nu
m
be
r
short
circuit
curren
t
(kA)
Break
ing
capac
ity
(MV
A)
Rated
Symmet
rical
breakin
g
Current
(kA)
Making
capacity
(kA)
AC
compo
nent of
short
circuit
curren
t(A)
DC
compon
ent of
short
circuit
current(
A)
short
time
rating
(kA)
1 2.798 639.7 2.797 7.1323 3.956 1.978 3.425
2 31.356 597.4 31.359 79.9654 44.35 22.175 38.41
3 39.386 750.4 39.391 100.447 55.71 27.855
48.24
6
5 39.386 750.4 39.391 100.447 55.71 27.855
48.24
6
6 39.386 750.4 39.391 100.447 55.71 27.855
48.24
6
7 39.386 750.4 39.391 100.447 55.71 27.855
48.24
6
8 39.386 750.4 39.391 100.447 55.71 27.855
48.24
6
9 39.386 750.4 39.391 100.447 55.71 27.855
48.24
6
10 39.386 750.4 39.391 100.447 55.71 27.855
48.24
6
12 39.386 750.4 39.391 100.447 55.71 27.855
48.24
6
13 39.386 750.4 39.391 100.447 55.71 27.855
48.24
6
Kuljinder Kaur Int. Journal of Engineering Research and Applications www.ijera.com
ISSN: 2248-9622, Vol. 6, Issue 1, (Part - 2) January 2016, pp.31-34
www.ijera.com 34|P a g e
Graph II: frequency versus time graph for 3 cycles
When three phase balanced is imposed on bus
three, the effect on frequency is more for 3 cycles as
compared to 2 cycles. Therefore, time to clear fault is
greater for 3 cycles as compared to 2 cycles as shown
in graph I & II above.
IV. CONCLUSION
As power system designing is very serious issue
and complex in nature, so it very necessary to design
a system with excellent protective system. Now- a -
days, the parallel transmission lines are increasing
which leads to decrease in resistance. As a result,
impedance of system is also decreasing and hence
short circuit level is increasing day by day. To avoid
this problem the circuit breaker should be able to
withstand the short circuit currents. In this paper,
circuit breaker parameters are calculated and
compared with existing circuit breakers ratings.
Hence, better results are calculated using POWER
WORLD-SIMULATOR.
REFERENCES
[1] Adnan Kakilli, “System Analysis With The
Mva Method For Symmetrical Three-Phase
Faults,” Marmara University Technical
Education Faculty, Istanbul, Turkey, 2013.
[2] André D. Filomena , Mariana Resener b,
Rodrigo H. Salim c, Arturo S. Bretas d,
“Distribution systems fault analysis
considering fault resistance estimation”
International journal of Electrical Power
and Energy Systems,Vol-33,PP 1326-
1335,Year 2011.
[3] Boris cintula, žaneta eleschová, anton beláň,
“3-phase Short Circuit Impact in Various
Length of Power Line on Transient Stability
of Synchronous Generator,” Recent
advances in energy, environment &
economic development, 2007.
[4] Božidar Filipovi-Gri1, Ivo Ugleši1, Dalibor
Filipovi-Gri, “Analysis of Transient
Recovery Voltage in 400 kV SF6 Circuit
Breaker Due to Transmission Line Faults,”
International Review of Electrical
Engineering (I.R.E.E.), Vol. 6, PP 2652-
2658, 5 September-October 2011.
[5] F. Castellanos, Member IEEE and R. Dillah,
“Short Circuit Analysis in the Phase Domain
for Distribution Networks,” 2008.
[6] Christoph Meyer, Peter Köllensperger, Rik
W. De Doncker, “Design of a Novel Low
Loss Fault Current Limiter for Medium-
Voltage Systems,” IEEE 2004.
[7] David D. Roybal, P.E. Senior Member,
IEEE Eaton Electrical 3697 Mount Diablo
Boulevard Lafayette, “circuit breaker
interrupting capacity and short-time current
ratings,” IEEE IAS Pulp and Paper Industry
Conference in Victoria, PP 130-134, July
2004.
[8] David B. Durocher, “Understanding Circuit
Breaker Design and Operation to Improve
Safety and Reliability In Underground
Mining,” IEEE 2011.
[9] Debniloy De1, Shivanjali A. Mishra2,
Aditya Kar3 and Sheila Mahapatra4, “Short
Circuit Analysis of a Power Grid using
MiPower Software,” Advance in Electronic
and Electric Engineering, Volume 4, pp.
253-258, 2014.
[10] Demetrios Tziouvaras, “Analysis of
Complex Power System Faults and
Operating Conditions,” IEEE Transactions
on Power Delivery, Volume 12, Issue 1, pp.
134-143, 2003.
[11] Simmi Bhadauria, Kirpal Singh Doad,
“Numerical Techniques For Bus Bar
Protection,” International Journal of
Engineering Research and Applications
(IJERA) ISSN: Vol-152, No-6, PP 82-85. ,
march 2014.
Speed_Gen 1 #1gfedcb
109876543210
50.3
50.28
50.26
50.24
50.22
50.2
50.18
50.16
50.14
50.12
50.1
50.08
50.06
50.04
50.02
50
49.98
49.96
49.94
49.92
49.9

More Related Content

What's hot

Power Quality Variations in Distribution Circuits
Power Quality Variations in Distribution CircuitsPower Quality Variations in Distribution Circuits
Power Quality Variations in Distribution CircuitsRaja Adapa
 
Overvoltage phenomenon
Overvoltage phenomenonOvervoltage phenomenon
Overvoltage phenomenonSwaminathan P
 
Design & performance of six pulse voltage multipliers 2
Design & performance of six pulse voltage multipliers 2Design & performance of six pulse voltage multipliers 2
Design & performance of six pulse voltage multipliers 2IAEME Publication
 
Effect of Voltage Sag on an Induction Motor
Effect of Voltage Sag on an Induction MotorEffect of Voltage Sag on an Induction Motor
Effect of Voltage Sag on an Induction Motorijtsrd
 
TRANSFORMER WINDING DEFORMATION ANALYSIS USING SFRA TECHNIQUE
TRANSFORMER WINDING DEFORMATION ANALYSIS USING SFRA TECHNIQUETRANSFORMER WINDING DEFORMATION ANALYSIS USING SFRA TECHNIQUE
TRANSFORMER WINDING DEFORMATION ANALYSIS USING SFRA TECHNIQUEJournal For Research
 
POWER SYSTEM PLANNING AND DESIGN. DESIGN OF EHV TRANSMISSION LINES & BUNDLED ...
POWER SYSTEM PLANNING AND DESIGN. DESIGN OF EHV TRANSMISSION LINES & BUNDLED ...POWER SYSTEM PLANNING AND DESIGN. DESIGN OF EHV TRANSMISSION LINES & BUNDLED ...
POWER SYSTEM PLANNING AND DESIGN. DESIGN OF EHV TRANSMISSION LINES & BUNDLED ...Jobin Abraham
 
Short circuit test in brief
Short circuit test in briefShort circuit test in brief
Short circuit test in briefMuthar Hussain
 
Bundle conductors in transmission line
Bundle conductors in transmission line Bundle conductors in transmission line
Bundle conductors in transmission line chandan kumar
 
Concept of energy transmission & distribution
Concept of energy transmission & distribution Concept of energy transmission & distribution
Concept of energy transmission & distribution ZunAib Ali
 
Grounding pad mounted transformers
Grounding   pad mounted transformersGrounding   pad mounted transformers
Grounding pad mounted transformersJimmy Chaparro
 
Control of Dvr with Battery Energy Storage System Using Srf Theory
Control of Dvr with Battery Energy Storage System Using Srf TheoryControl of Dvr with Battery Energy Storage System Using Srf Theory
Control of Dvr with Battery Energy Storage System Using Srf TheoryIJERA Editor
 
bi directional intelligent semiconductor transformer P
bi directional intelligent semiconductor transformer Pbi directional intelligent semiconductor transformer P
bi directional intelligent semiconductor transformer Ppranavchathannoor
 
Ppt of ehv ac transmission
Ppt of ehv ac transmissionPpt of ehv ac transmission
Ppt of ehv ac transmissionSumit Kumar
 
Le.h insulation coordination - Digsilent
Le.h insulation coordination - DigsilentLe.h insulation coordination - Digsilent
Le.h insulation coordination - DigsilentGilberto Mejía
 
New bhgat ram ppt 7793005660
New bhgat ram ppt 7793005660New bhgat ram ppt 7793005660
New bhgat ram ppt 7793005660bhagat ram meena
 
Smart transformer and Analog transformer.
Smart transformer and Analog transformer.Smart transformer and Analog transformer.
Smart transformer and Analog transformer.Hossain Al Kayum
 
Chapter 3 transmission line performance
Chapter 3  transmission line performanceChapter 3  transmission line performance
Chapter 3 transmission line performancefiraoltemesgen1
 

What's hot (20)

Power Quality Variations in Distribution Circuits
Power Quality Variations in Distribution CircuitsPower Quality Variations in Distribution Circuits
Power Quality Variations in Distribution Circuits
 
Ce31533536
Ce31533536Ce31533536
Ce31533536
 
Overvoltage phenomenon
Overvoltage phenomenonOvervoltage phenomenon
Overvoltage phenomenon
 
Akt tl design01
Akt tl design01Akt tl design01
Akt tl design01
 
Design & performance of six pulse voltage multipliers 2
Design & performance of six pulse voltage multipliers 2Design & performance of six pulse voltage multipliers 2
Design & performance of six pulse voltage multipliers 2
 
Effect of Voltage Sag on an Induction Motor
Effect of Voltage Sag on an Induction MotorEffect of Voltage Sag on an Induction Motor
Effect of Voltage Sag on an Induction Motor
 
TRANSFORMER WINDING DEFORMATION ANALYSIS USING SFRA TECHNIQUE
TRANSFORMER WINDING DEFORMATION ANALYSIS USING SFRA TECHNIQUETRANSFORMER WINDING DEFORMATION ANALYSIS USING SFRA TECHNIQUE
TRANSFORMER WINDING DEFORMATION ANALYSIS USING SFRA TECHNIQUE
 
POWER SYSTEM PLANNING AND DESIGN. DESIGN OF EHV TRANSMISSION LINES & BUNDLED ...
POWER SYSTEM PLANNING AND DESIGN. DESIGN OF EHV TRANSMISSION LINES & BUNDLED ...POWER SYSTEM PLANNING AND DESIGN. DESIGN OF EHV TRANSMISSION LINES & BUNDLED ...
POWER SYSTEM PLANNING AND DESIGN. DESIGN OF EHV TRANSMISSION LINES & BUNDLED ...
 
Short circuit test in brief
Short circuit test in briefShort circuit test in brief
Short circuit test in brief
 
Bundle conductors in transmission line
Bundle conductors in transmission line Bundle conductors in transmission line
Bundle conductors in transmission line
 
Concept of energy transmission & distribution
Concept of energy transmission & distribution Concept of energy transmission & distribution
Concept of energy transmission & distribution
 
Grounding pad mounted transformers
Grounding   pad mounted transformersGrounding   pad mounted transformers
Grounding pad mounted transformers
 
Control of Dvr with Battery Energy Storage System Using Srf Theory
Control of Dvr with Battery Energy Storage System Using Srf TheoryControl of Dvr with Battery Energy Storage System Using Srf Theory
Control of Dvr with Battery Energy Storage System Using Srf Theory
 
Tl book
Tl bookTl book
Tl book
 
bi directional intelligent semiconductor transformer P
bi directional intelligent semiconductor transformer Pbi directional intelligent semiconductor transformer P
bi directional intelligent semiconductor transformer P
 
Ppt of ehv ac transmission
Ppt of ehv ac transmissionPpt of ehv ac transmission
Ppt of ehv ac transmission
 
Le.h insulation coordination - Digsilent
Le.h insulation coordination - DigsilentLe.h insulation coordination - Digsilent
Le.h insulation coordination - Digsilent
 
New bhgat ram ppt 7793005660
New bhgat ram ppt 7793005660New bhgat ram ppt 7793005660
New bhgat ram ppt 7793005660
 
Smart transformer and Analog transformer.
Smart transformer and Analog transformer.Smart transformer and Analog transformer.
Smart transformer and Analog transformer.
 
Chapter 3 transmission line performance
Chapter 3  transmission line performanceChapter 3  transmission line performance
Chapter 3 transmission line performance
 

Viewers also liked

2010_COLEMAN_COMPANY_CASE_STUDY
2010_COLEMAN_COMPANY_CASE_STUDY2010_COLEMAN_COMPANY_CASE_STUDY
2010_COLEMAN_COMPANY_CASE_STUDYAAKASH AMATYA
 
Hardware y software
Hardware y softwareHardware y software
Hardware y softwareWichoo Weroo
 
2012 Walkability Survey Report
2012 Walkability Survey Report2012 Walkability Survey Report
2012 Walkability Survey ReportAdams Carroll
 
FEA based Dissipation Energy and Temperature Distribution of Rubber Bushing
FEA based Dissipation Energy and Temperature Distribution of Rubber BushingFEA based Dissipation Energy and Temperature Distribution of Rubber Bushing
FEA based Dissipation Energy and Temperature Distribution of Rubber BushingIJERA Editor
 
Venue rental profit maximization excel sheet
Venue rental profit maximization excel sheetVenue rental profit maximization excel sheet
Venue rental profit maximization excel sheetLori Tantawi
 
Water Quality Index for Assessment of Rudrasagar Lake Ecosystem, India
Water Quality Index for Assessment of Rudrasagar Lake Ecosystem, IndiaWater Quality Index for Assessment of Rudrasagar Lake Ecosystem, India
Water Quality Index for Assessment of Rudrasagar Lake Ecosystem, IndiaIJERA Editor
 

Viewers also liked (11)

Puisi
PuisiPuisi
Puisi
 
2010_COLEMAN_COMPANY_CASE_STUDY
2010_COLEMAN_COMPANY_CASE_STUDY2010_COLEMAN_COMPANY_CASE_STUDY
2010_COLEMAN_COMPANY_CASE_STUDY
 
Hardware y software
Hardware y softwareHardware y software
Hardware y software
 
2012 Walkability Survey Report
2012 Walkability Survey Report2012 Walkability Survey Report
2012 Walkability Survey Report
 
FEA based Dissipation Energy and Temperature Distribution of Rubber Bushing
FEA based Dissipation Energy and Temperature Distribution of Rubber BushingFEA based Dissipation Energy and Temperature Distribution of Rubber Bushing
FEA based Dissipation Energy and Temperature Distribution of Rubber Bushing
 
Venue rental profit maximization excel sheet
Venue rental profit maximization excel sheetVenue rental profit maximization excel sheet
Venue rental profit maximization excel sheet
 
D013112636
D013112636D013112636
D013112636
 
Balanço de incertezas
Balanço de incertezasBalanço de incertezas
Balanço de incertezas
 
B013111321
B013111321B013111321
B013111321
 
Water Quality Index for Assessment of Rudrasagar Lake Ecosystem, India
Water Quality Index for Assessment of Rudrasagar Lake Ecosystem, IndiaWater Quality Index for Assessment of Rudrasagar Lake Ecosystem, India
Water Quality Index for Assessment of Rudrasagar Lake Ecosystem, India
 
A013110112
A013110112A013110112
A013110112
 

Similar to Calculation and comparison of circuit breaker parameters in Power World Simulator

Dq31551563
Dq31551563Dq31551563
Dq31551563IJMER
 
Inspection of voltage sags and voltage swells incident in power quality probl...
Inspection of voltage sags and voltage swells incident in power quality probl...Inspection of voltage sags and voltage swells incident in power quality probl...
Inspection of voltage sags and voltage swells incident in power quality probl...IRJET Journal
 
final year project report
final year project reportfinal year project report
final year project reportAnuj Kumar
 
Evaluation of reactances and time constants of synchronous generator
Evaluation of reactances and time constants of synchronous generatorEvaluation of reactances and time constants of synchronous generator
Evaluation of reactances and time constants of synchronous generatoreSAT Publishing House
 
Short-Circuit calculation -Ppt-Slides - Copy.ppt
Short-Circuit calculation -Ppt-Slides - Copy.pptShort-Circuit calculation -Ppt-Slides - Copy.ppt
Short-Circuit calculation -Ppt-Slides - Copy.pptJatmylHarnero1
 
H7 SHORT-CIRCUIT EMERSON EDUARDO RODRIGUES.pdf
H7 SHORT-CIRCUIT EMERSON EDUARDO RODRIGUES.pdfH7 SHORT-CIRCUIT EMERSON EDUARDO RODRIGUES.pdf
H7 SHORT-CIRCUIT EMERSON EDUARDO RODRIGUES.pdfEMERSON EDUARDO RODRIGUES
 
A Study on Protection of Cables by Solkor Differential Protection Relay with ...
A Study on Protection of Cables by Solkor Differential Protection Relay with ...A Study on Protection of Cables by Solkor Differential Protection Relay with ...
A Study on Protection of Cables by Solkor Differential Protection Relay with ...IJERA Editor
 
Lightning Characteristics and Impulse Voltage.
Lightning Characteristics and Impulse Voltage.Lightning Characteristics and Impulse Voltage.
Lightning Characteristics and Impulse Voltage.Milton Sarker
 
Design aspects of high voltage transmission line
Design aspects of high voltage transmission lineDesign aspects of high voltage transmission line
Design aspects of high voltage transmission linejournalBEEI
 
Fault analysis in power system using power systems computer aided design
Fault analysis in power system using power systems computer aided designFault analysis in power system using power systems computer aided design
Fault analysis in power system using power systems computer aided designIJAAS Team
 
Kumaresh_ISLANDING.pptx
Kumaresh_ISLANDING.pptxKumaresh_ISLANDING.pptx
Kumaresh_ISLANDING.pptxRishikabhakat
 
Numerical analysis of short circuit testing & verification of a MCCB.
Numerical analysis of short circuit testing & verification of a MCCB.Numerical analysis of short circuit testing & verification of a MCCB.
Numerical analysis of short circuit testing & verification of a MCCB.Rajeev Kumar Raj
 
CPRI-Power quality report
CPRI-Power quality reportCPRI-Power quality report
CPRI-Power quality reportNageswar Rao
 

Similar to Calculation and comparison of circuit breaker parameters in Power World Simulator (20)

Dq31551563
Dq31551563Dq31551563
Dq31551563
 
Inspection of voltage sags and voltage swells incident in power quality probl...
Inspection of voltage sags and voltage swells incident in power quality probl...Inspection of voltage sags and voltage swells incident in power quality probl...
Inspection of voltage sags and voltage swells incident in power quality probl...
 
final year project report
final year project reportfinal year project report
final year project report
 
Evaluation of reactances and time constants of synchronous generator
Evaluation of reactances and time constants of synchronous generatorEvaluation of reactances and time constants of synchronous generator
Evaluation of reactances and time constants of synchronous generator
 
Short-Circuit calculation -Ppt-Slides - Copy.ppt
Short-Circuit calculation -Ppt-Slides - Copy.pptShort-Circuit calculation -Ppt-Slides - Copy.ppt
Short-Circuit calculation -Ppt-Slides - Copy.ppt
 
If3415111540
If3415111540If3415111540
If3415111540
 
Dk36667674
Dk36667674Dk36667674
Dk36667674
 
Introduction to mv switchgear
Introduction to mv switchgearIntroduction to mv switchgear
Introduction to mv switchgear
 
Dy34760764
Dy34760764Dy34760764
Dy34760764
 
H7 SHORT-CIRCUIT EMERSON EDUARDO RODRIGUES.pdf
H7 SHORT-CIRCUIT EMERSON EDUARDO RODRIGUES.pdfH7 SHORT-CIRCUIT EMERSON EDUARDO RODRIGUES.pdf
H7 SHORT-CIRCUIT EMERSON EDUARDO RODRIGUES.pdf
 
A Study on Protection of Cables by Solkor Differential Protection Relay with ...
A Study on Protection of Cables by Solkor Differential Protection Relay with ...A Study on Protection of Cables by Solkor Differential Protection Relay with ...
A Study on Protection of Cables by Solkor Differential Protection Relay with ...
 
Lightning Characteristics and Impulse Voltage.
Lightning Characteristics and Impulse Voltage.Lightning Characteristics and Impulse Voltage.
Lightning Characteristics and Impulse Voltage.
 
Design aspects of high voltage transmission line
Design aspects of high voltage transmission lineDesign aspects of high voltage transmission line
Design aspects of high voltage transmission line
 
Fault analysis in power system using power systems computer aided design
Fault analysis in power system using power systems computer aided designFault analysis in power system using power systems computer aided design
Fault analysis in power system using power systems computer aided design
 
Cascade Protection with Transient Voltage copy
Cascade Protection with Transient Voltage copyCascade Protection with Transient Voltage copy
Cascade Protection with Transient Voltage copy
 
Circuit Breakers
Circuit BreakersCircuit Breakers
Circuit Breakers
 
Ek33821826
Ek33821826Ek33821826
Ek33821826
 
Kumaresh_ISLANDING.pptx
Kumaresh_ISLANDING.pptxKumaresh_ISLANDING.pptx
Kumaresh_ISLANDING.pptx
 
Numerical analysis of short circuit testing & verification of a MCCB.
Numerical analysis of short circuit testing & verification of a MCCB.Numerical analysis of short circuit testing & verification of a MCCB.
Numerical analysis of short circuit testing & verification of a MCCB.
 
CPRI-Power quality report
CPRI-Power quality reportCPRI-Power quality report
CPRI-Power quality report
 

Recently uploaded

Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 

Recently uploaded (20)

Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 

Calculation and comparison of circuit breaker parameters in Power World Simulator

  • 1. Kuljinder Kaur Int. Journal of Engineering Research and Applications www.ijera.com ISSN: 2248-9622, Vol. 6, Issue 1, (Part - 2) January 2016, pp.31-34 www.ijera.com 31|P a g e Calculation and comparison of circuit breaker parameters in Power World Simulator Kuljinder Kaur, Er. Simerpreet Singh Department of Electrical Engineering Bhai Gurdas Institute of Engineering and Technology Sangrur, India Department of Electrical Engineering Bhai Gurdas Institute of Engineering and Technology Sangrur, India ABSTRACT A circuit breaker has ratings that an engineer uses for their application. These ratings define circuit breaker performance characteristics. A good understanding of Ratings allow the electrical engineer to make a proper comparison of various circuit breaker designs. In this research work, the different ratings of circuit breaker were calculated. The other objective of this work was comparison between ratings of existing circuit breaker and calculated ratings in POWER WORLD SIMULATOR. Further, the impact of time delay in circuit breaker was studied. These calculations were performed for rated current of 400 & 630 Amps. The results performed in POWER WORLD SIMULATOR were shown better and information gained from the analysis can be used for proper relay selection, settings, performances and coordination. I. INTRODUCTION A circuit breaker is piece of equipment which can make or break a circuit either manually or by remote control under normal conditions, break a circuit automatically under fault conditions, make a circuit either manually or by remote control under fault conditions. A circuit breaker has three ratings viz. breaking capacity, making capacity and short time capacity. Breaking capacity is current r.m.s that a circuit breaker is capable of breaking at given recovery voltage and under specified conditions. Recovery voltage is the normal frequency r.m.s voltage that appears across the contacts of the circuit breaker after final arc extinction. The breaking capacity is always stated at the r.m.s value of fault current at the instant of contact separation. It is expressed in units of MVA. Making capacity is the peak value of current during the first value of current wave after the closer of circuit breaker. The making capacity depends upon ability to withstand and close successfully against the effects of electromagnetic forces. These forces are proportional to the square of maximum instantaneous current on closing. It is expressed in terms of kA. Short-time rating is the period for which the circuit breaker is able to carry fault current while remaining closed. The short-time rating of a circuit breaker depends upon its ability to withstand electro- magnetic force effects and temperature rise. The circuit breakers have a specified limit of 3 seconds when the ratio of symmetrical breaking current to the rated normal current does not exceed 40. However, if this ratio is more than 40, then the specified limit is 1 second. The circuit breakers are classified into below categories- OIL CIRCUIT BREAKER which employ some insulating oil for arc extinction. AIR- BLAST CIRCUIT BREAKER in which high pressure air-blast is used for extinguishing the arc. SULPHUR HEXAFLUROIDE CIRCUIT BREAKER in which sulphur hexafluoride gas is used for arc extinction. VACUUM CIRCUIT BREAKER in which vacuum is used for arc extinction. The circuit breaker used in this work is SF6 Circuit Breaker. Vacuum Circuit Breaker incorporates a specially designed and completely sealed Interrupter to perform its basic function of opening as well as closing when called upon to do so, both under normal operating conditions and under fault conditions such as short circuit. Since, SF6 offers the highest insulating strength; it has far superior arc quenching properties than any other medium. The calculation of circuit breaker ratings is based on the symmetrical fault or three phase fault. A fault which gives rise to equal fault currents in the lines with 120 degree displacement is known as three phase fault or symmetrical fault. Faults could happen when a phase establishes a connection with another phase, lightning, insulation deterioration, wind damage, trees falling across lines, etc. The effects of fault on power system are: 1. Due to overheating and mechanical forces developed by faults, electrical equipments such as bus-bars, generators and transformers may be damaged. RESEARCH ARTICLE OPEN ACCESS
  • 2. Kuljinder Kaur Int. Journal of Engineering Research and Applications www.ijera.com ISSN: 2248-9622, Vol. 6, Issue 1, (Part - 2) January 2016, pp.31-34 www.ijera.com 32|P a g e 2. The voltage profile of the system may be reduced to unacceptable limits as a result of fault. A frequency drop may lead to instability. These ratings are used by the engineer to determine the ability of the circuit breaker to protect it and other devices and to coordinate with other circuit breakers so the system will trip selectively. These calculations are performed on 132 kV transmission system, Kotakpura for 400 and 630 Amps. The single line diagram of 132 kV transmission systems, Kotakpura is shown in figure1. Figure1: 11- Bus 132 kV transmission systems II. PROBLEM FORMULATION A. Calculation of circuit breaker parameters The bus model of 132kv substation, kotakpura is implemented and executed using POWER WORLD SIMULATOR. All calculations are performed in per unit system. By imposing the three phase balanced fault, fault current is calculated in Power World Simulator. Different formulae for calculation of circuit breaker parameters are given below: 1. Breaking capacity = √3×V×I×10-6 (MVA) Where, V is line voltage in volts I is the rated breaking current in Amps 2. Rated Symmetrical breaking Current = 𝑅𝑢𝑝𝑡𝑢𝑟𝑖𝑛𝑔 𝑐𝑎𝑝𝑎𝑐𝑖𝑡𝑦 3 ×rated voltage (kA) 3. Making capacity = 2.55 × symmetrical breaking current (kA) 4. AC component of short circuit current = √2 × symmetrical breaking current (A) 5. DC component of short circuit current = 50% of AC component of short circuit current Or = 1 2 × AC component of short circuit current (A) 6. Short time rating = √ [(AC component of short circuit current/√2)2 + (DC component of short circuit current) 2 ] (kA) B. IMPORTANT DEFINITIONS ARC VOLTAGE: It is the voltage that appears across the contacts of the circuit breaker during the arcing period. RESTRIKING VOLTAGE: It is the transient voltage that appears across the contacts at or near zero current during arcing period. RECOVERY VOLTAGE: It is the normal frequency r.m.s voltage that appears across the contacts of the circuit breaker after final arc extinction. BREAKING CAPACITY: It is current r.m.s that a circuit breaker is capable of breaking at given recovery voltage and under specified conditions. MAKING CAPACITY: The peak value of current during the first cycle of current wave after the closure of circuit breaker is known as making capacity. SHORT-TIME RATING: It is the period for which the circuit breaker is able to carry fault current while remaining closed. NORMAL CURRENT RATING: It is the r.m.s value of current which the circuit breaker is capable of carrying continuously at its rated frequency under specified conditions. C. Standard Parameters TABLE I: THREE CORE ARMOURED CABLE (COPPER CONDUCTOR) PARAMETERS AS PER IEC 60502-2. TABLE II: IMPULSE AND POWER FREQUENCY WITHSTAND VOLTAGE AS PER IEC 60071 AND 60298 Normal operating voltage (kV rms) Rated voltage (kV rms) Rated power- frequency withstand voltage (kV rms) Rated lightning impulse withstand voltage1.2/50 µs 50 Hz(kV peak) list 1 list2 10 t0 11 12 28 60 75 Nomina l Area of conduct ors Thickn ess of Insulat ion Conduc tor resistan ce (R) Conduc tor Reacta nce (X) Shunt Chargin g Capacita nce (B) 300 sq.mm 3.4 mm 0.0797 Ω/km 0.086 Ω/km 0.53 µF/km
  • 3. Kuljinder Kaur Int. Journal of Engineering Research and Applications www.ijera.com ISSN: 2248-9622, Vol. 6, Issue 1, (Part - 2) January 2016, pp.31-34 www.ijera.com 33|P a g e III. RESULTS AND DISCUSSION The single line diagram of 132 kV transmission systems, Kotakpura is shown in figure1. Table III & V shows the calculated circuit breaker parameters of 11 bus 132 kV transmission system using POWER WORLD SIMULATOR. Table IV shows comparison between existing circuit breaker ratings and calculated ratings. Graph I & II shows the impact of time delay on frequency of circuit breaker. TABLE III: CIRCUIT BREAKER PARAMETERS FOR RATED CURRENT 400AMP TABLE IV: COMPARISON BETWEEN EXISTING AND CALCULATED CIRCUIT BREAKER RATINGS TABLE V: CIRCUIT BREAKER PARAMETERS FOR RATED CURRENT 630AMP In Table IV, Comparison between existing circuit breaker ratings and calculated ratings using power world simulator is performed. It is concluded that by using POWER WORLD SIMULATOR TOOL we can get better results than existing results. On account of these results, further selection of equipments can be done. Graph I: frequency versus time graph for 2 cycles Speed_Gen 1 #1gfedcb 109876543210 50.2 50.18 50.16 50.14 50.12 50.1 50.08 50.06 50.04 50.02 50 49.98 49.96 49.94 49.92 bu s nu m be r short circu it curr ent (kA) Breaki ng capaci ty (MVA ) Rated Symme trical breakin g Curren t (kA) Making capacit y (kA) AC compo nent of short circuit curren t(A) DC compo nent of short circuit curren t(A) shor t time ratin g (kA) 1 2.79 5 639.02 2.794 7.1247 3.95 1.975 3.42 2 31.3 21 596.74 31.325 79.88 44.3 22.15 38.3 6 3 40.1 94 765.8 40.2 102.51 56.85 28.43 49.2 4 5 40.1 95 765.8 40.2 102.51 56.85 28.43 49.2 4 6 40.1 95 765.8 40.2 102.51 56.85 28.43 49.2 4 7 40.1 95 765.8 40.2 102.51 56.85 28.43 49.2 4 8 40.1 95 765.8 40.2 102.51 56.85 28.43 49.2 4 9 40.1 95 765.8 40.2 102.51 56.85 28.43 49.2 4 10 40.1 95 765.8 40.2 102.51 56.85 28.43 49.2 4 12 40.1 95 765.8 40.2 102.51 56.85 28.43 49.2 4 13 40.1 95 765.8 40.2 102.51 56.85 28.43 49.2 4 Parameters Existing circuit breaker ratings calculated ratings using power world simulator Rated voltage (kV) 12 12 Frequency (Hz) 50 50 Rated current (A) 630 630 Making capacity (kA) 62.5 79.96 Symmetrical breaking capacity (kA) 25 31.4 Short time rating for 3 seconds (kA) 25 38.41 Operating Duty cycle O-0.3-CO- 3-CO O-0.3-CO-3- CO bu s nu m be r short circuit curren t (kA) Break ing capac ity (MV A) Rated Symmet rical breakin g Current (kA) Making capacity (kA) AC compo nent of short circuit curren t(A) DC compon ent of short circuit current( A) short time rating (kA) 1 2.798 639.7 2.797 7.1323 3.956 1.978 3.425 2 31.356 597.4 31.359 79.9654 44.35 22.175 38.41 3 39.386 750.4 39.391 100.447 55.71 27.855 48.24 6 5 39.386 750.4 39.391 100.447 55.71 27.855 48.24 6 6 39.386 750.4 39.391 100.447 55.71 27.855 48.24 6 7 39.386 750.4 39.391 100.447 55.71 27.855 48.24 6 8 39.386 750.4 39.391 100.447 55.71 27.855 48.24 6 9 39.386 750.4 39.391 100.447 55.71 27.855 48.24 6 10 39.386 750.4 39.391 100.447 55.71 27.855 48.24 6 12 39.386 750.4 39.391 100.447 55.71 27.855 48.24 6 13 39.386 750.4 39.391 100.447 55.71 27.855 48.24 6
  • 4. Kuljinder Kaur Int. Journal of Engineering Research and Applications www.ijera.com ISSN: 2248-9622, Vol. 6, Issue 1, (Part - 2) January 2016, pp.31-34 www.ijera.com 34|P a g e Graph II: frequency versus time graph for 3 cycles When three phase balanced is imposed on bus three, the effect on frequency is more for 3 cycles as compared to 2 cycles. Therefore, time to clear fault is greater for 3 cycles as compared to 2 cycles as shown in graph I & II above. IV. CONCLUSION As power system designing is very serious issue and complex in nature, so it very necessary to design a system with excellent protective system. Now- a - days, the parallel transmission lines are increasing which leads to decrease in resistance. As a result, impedance of system is also decreasing and hence short circuit level is increasing day by day. To avoid this problem the circuit breaker should be able to withstand the short circuit currents. In this paper, circuit breaker parameters are calculated and compared with existing circuit breakers ratings. Hence, better results are calculated using POWER WORLD-SIMULATOR. REFERENCES [1] Adnan Kakilli, “System Analysis With The Mva Method For Symmetrical Three-Phase Faults,” Marmara University Technical Education Faculty, Istanbul, Turkey, 2013. [2] André D. Filomena , Mariana Resener b, Rodrigo H. Salim c, Arturo S. Bretas d, “Distribution systems fault analysis considering fault resistance estimation” International journal of Electrical Power and Energy Systems,Vol-33,PP 1326- 1335,Year 2011. [3] Boris cintula, žaneta eleschová, anton beláň, “3-phase Short Circuit Impact in Various Length of Power Line on Transient Stability of Synchronous Generator,” Recent advances in energy, environment & economic development, 2007. [4] Božidar Filipovi-Gri1, Ivo Ugleši1, Dalibor Filipovi-Gri, “Analysis of Transient Recovery Voltage in 400 kV SF6 Circuit Breaker Due to Transmission Line Faults,” International Review of Electrical Engineering (I.R.E.E.), Vol. 6, PP 2652- 2658, 5 September-October 2011. [5] F. Castellanos, Member IEEE and R. Dillah, “Short Circuit Analysis in the Phase Domain for Distribution Networks,” 2008. [6] Christoph Meyer, Peter Köllensperger, Rik W. De Doncker, “Design of a Novel Low Loss Fault Current Limiter for Medium- Voltage Systems,” IEEE 2004. [7] David D. Roybal, P.E. Senior Member, IEEE Eaton Electrical 3697 Mount Diablo Boulevard Lafayette, “circuit breaker interrupting capacity and short-time current ratings,” IEEE IAS Pulp and Paper Industry Conference in Victoria, PP 130-134, July 2004. [8] David B. Durocher, “Understanding Circuit Breaker Design and Operation to Improve Safety and Reliability In Underground Mining,” IEEE 2011. [9] Debniloy De1, Shivanjali A. Mishra2, Aditya Kar3 and Sheila Mahapatra4, “Short Circuit Analysis of a Power Grid using MiPower Software,” Advance in Electronic and Electric Engineering, Volume 4, pp. 253-258, 2014. [10] Demetrios Tziouvaras, “Analysis of Complex Power System Faults and Operating Conditions,” IEEE Transactions on Power Delivery, Volume 12, Issue 1, pp. 134-143, 2003. [11] Simmi Bhadauria, Kirpal Singh Doad, “Numerical Techniques For Bus Bar Protection,” International Journal of Engineering Research and Applications (IJERA) ISSN: Vol-152, No-6, PP 82-85. , march 2014. Speed_Gen 1 #1gfedcb 109876543210 50.3 50.28 50.26 50.24 50.22 50.2 50.18 50.16 50.14 50.12 50.1 50.08 50.06 50.04 50.02 50 49.98 49.96 49.94 49.92 49.9