International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 –
6340(Print), ISSN 0976 – 6359(Online) Volume 5, Issue 1, January (2014), © IAEME
1
POTENTIAL STUDY ADDRESSING SHORTAGE OF POWER AND
ECONOMIC GROWTH THROUGH FORESEEABLE SOLAR POWER
Eshan Ahuja1
, Dr. Navin Kumar Kohli2
, Sidharth Ahuja3
1
Mechanical Engineering Dept. Australian National University, Canberra, Australia
2
MP Power Management Co. Ltd., India
3
BE electrical Engineering, India
ABSTRACT
India is densely populated and has high solar insolation, an ideal combination for using solar
power in India. India is already a leader in wind power generation. India is now one of the top five
solar energy developments worldwide as per Ernst & Young’s renewable energy attractiveness
index. As per report by WATO-India, 2012, the Indian Renewable Energy business market is
experiencing a growth rate of 15 %/yr and the opportunities for private investments are estimated to
be of about USD 34 billion. Solar is becoming financially viable for commercial and industrial
sectors ,which is leading the power deficient southern states of the country such as Tamil Nadu and
Kerala suffering from rising costs of conventional power to gradually shift towards solar energy so
as to have long-term solutions for their power needs. Thus, these developments give indication for a
good future for solar development. The initiation of Jawaharlal Nehru National Solar Mission
(JNNSM) is one of the eight missions of India that makes clear the nation’s vision for solar
technology. This 19 billion USD plan was launched on the 11th January, 2010 by the Prime Minister
of India. The future energy mix is expected to have a reduced contribution of indigenous coal as an
energy source due to higher costs, logistic constraints, poor quality and dependence on imported coal
to run thermal power plants. The country thus faces possibility of severe energy supply constraints
and is in need of alternative energy sources. An endeavored is made through this contributing paper
whether we could foresee better future energy mix of India.
Key words: Renewable Energy, Conventional Power, JNNSM and Future Energy Mix.
INTRODUCTION
India had a peak power shortage of 9.3% during the five years plan ending in 2012 when over
50,000 MW new generation capacity was commissioned. The capacity addition target during the
INTERNATIONAL JOURNAL OF MECHANICAL ENGINEERING
AND TECHNOLOGY (IJMET)
ISSN 0976 – 6340 (Print)
ISSN 0976 – 6359 (Online)
Volume 5, Issue 1, January (2014), pp. 01-09
© IAEME: www.iaeme.com/ijmet.asp
Journal Impact Factor (2013): 5.7731 (Calculated by GISI)
www.jifactor.com
IJMET
© I A E M E
International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 –
6340(Print), ISSN 0976 – 6359(Online) Volume 5, Issue 1, January (2014), © IAEME
2
12th plan period from 2012-17 is estimated at 88,537 MW. Current Population of India is estimated
to be 1.27 billion, growing @ of 1.6%/yr. In the past besides substantial increase in installed
electricity capacity, demand outplayed supply. Currently, official peak deficits are above 12 % and
may increase further over a long run. More than 25% of the population is living with no access to
electricity. Those with access often have to cope with long blackouts. This is likely to be case in the
foreseeable future making energy accesses a continuous and growing problem.
Table 1: Energy Demand Projection of India
Source Unit 1991-92 2009-10 2020-21
Electricity TWh 231 725 1300
Coal Mt. 229 690 1345
Natural Gas b cum 18.6 65 130
Petro-Products Mt. 57 165 335
This Steep growth in demand of energy sources is pervasive requiring serious efforts by
Government of India (GOI) to ensure India’s future energy security. The future energy mix of India
is expected to have a reduced contribution of indigenous coal as an energy source due to higher
costs, logistic constraints, poor quality and dependence on imported coal to run thermal power
plants. The country thus faces possibility of severe energy supply constraints and is in a dire need of
alternative energy sources. [3] The following discussions would help experts in foreseeing the
sustainable future of this totally free energy on long run.
ADDRESSING SOLAR POWER ISSUES IN INDIA
India is densely populated and has high solar insolation, an ideal combination for using solar
power in India. India is already a leader in wind power generation. As per Ernst & Young’s report,
India is among top 5 destinations worldwide for solar energy development renewable energy
attractiveness index. Indian Renewable Energy business market is experiencing a growth rate of 15
%/yr & opportunities for private investments are estimated of about USD 34 bill. India has a solar
power reception of around 5 Trillion Kwh/yr. [4] [5]
Various incentives and individual solar policies rolled out by states which include capital/ interest
subsidy, accelerated depreciation, nil/concessional excise and customs duties, and Generation Based
Incentives or feed-in-tariff. Apart from this, Indian Renewable Energy Development Agency
(IREDA) and other public sector agencies are also actively funding renewable energy projects. Solar
is becoming financially viable for commercial and industrial sectors ,which is leading the power
deficient southern states of the country such as Tamil Nadu and Kerala suffering from rising costs of
conventional power to gradually shift towards solar energy so as to have long-term solutions for their
power needs. Thus, to confront these above mentioned issues leading to future Energy threats in the
nation and to efficiently and economically utilize the enormous untapped potential solar energy
availability in India, National Action Plan on Climate Change (NAPCC) introduced JNNSM.
JNNSM is one of the eight missions of India’s NAPCC that elucidates the nation’s vision for solar
technology. The Mission document for phase II issued in December, 2012. [6] The target of mission
is:
i. Policy framework for deployment of 20,000 MW of grid connected solar power by 2022
ii. 1000MW by 2017 and 2000 MW by 2022 off grid solar power
iii. Achievement of 15 mill m2 solar thermal collector area by 2017 & 20 mill m2 by 2022.
iv. Deployment of 20 million solar lighting systems for rural areas by 2022.
International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 –
6340(Print), ISSN 0976 – 6359(Online) Volume 5, Issue 1, January (2014), © IAEME
3
v. Creating favorable conditions for solar manufacturing capability for indigenous production &
market leadership by 4-5GW of installed capacity by 2017.
Through JNNSM, India is aimed at reducing the cost of solar power generation in the long
run. Large scale deployment goals, aggressive R&D and domestic production of critical raw
materials, components and products would help to achieve grid tariff parity by 2022.
Table 2: Phase-wise Distribution of Targets in JNNSM
Source Till
2009
Phase 1
(2012-13)
Cumulative Target
Phase 2, (2013-17)
Cumulative Target
Phase 3, (2017-22)
Grid-connected
(MW)
6 1100 10000 20000
Off-Grid (MW) 2.4 200 1000 2000
Thermal Collectors
(Million m2)
3.1 7 15 20
Solar Lighting
Systems (million)
1.3 5 10 20
The Mission proposed a mechanism of “bundling” relatively expensive solar power with
power coal based stations (cheaper in comparison) for the facilitation of the grid connected solar
power generation. For each MW of installed capacity of solar power for which an agreement (PPA)
is signed. The Power Ministry allocated an equivalent amount of MW capacity from the unallocated
quota of coal based stations and then NVVN supplies this “bundled” power to the Distribution
Utilities. This Scheme is referred to as the 'Bundling Scheme'. Second phase targets majorly consists
of 1000MW Off-grid and 10000 MW Grid connected solar power installment which is to be
implemented in a 5 yrs. span from 2013-2017. There is no more power available to bundle as in
phase 1 so instead projects will be selected under the RfS and shall be given VGF (Viability Gap
Funding) made available through India’s NCEF (national clean energy fund). Under the VGF
mechanism bidders estimate the cost of their projects and the government funds the difference
between that and the projected returns, in this instance the fixed rate in the power purchase
agreement, distribution is as follows:
• 50 % on successful commissioning of the full capacity
• Balance 50 % progressively over next 5 years subject to plant meeting generation
requirements (CUF within specified range).
The projects as per RfS are to be installed across nine cities in India and out of 10 GW target
to be achieved 4GW is under Central scheme & 6 GW under various State specific schemes. SECI
shall enter into Power Purchase Agreement (PPA) with the Bidders selected for purchase of solar
power on a 25 yrs. agreement as per the terms, conditions and provisions of the RfS. The bidding
process under this scheme is divided in Part-A (DCR)-375 MW or Part-B (Open)-375MW. Bidders
can apply for Projects either under A, B or both. The difference between the parts is that A has the
conditions of “Domestic Content Requirement” i.e. the solar power plant would have to use solar
cells and modules manufactured in India and thus has a funding support directly by the Central GOI
and cheaper International loans available with imported components. [7]
International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 –
6340(Print), ISSN 0976 – 6359(Online) Volume 5, Issue 1, January (2014), © IAEME
4
POLICY REGULATORY FRAMEWORK AND ANALYSIS
Currently, there are a variety of incentives that reduce the cost of solar electricity. A 30%
investment tax credit and accelerated depreciation which significantly reduce the LCOE of Solar PV
and Thermal. In many states in India, rebates/concessions and other incentives are added to the
incentives. The custom duties and excise duties concessions/exemptions also made available on
specific capital equipment, critical materials, components and project imports. [7]
The tremendous interest from developers for NSM led to the competitive bidding for projects and a
subsequent fall in tariffs was seen at the time of Bidding done by different states.
Table 3: Fall in the tariffs as per competitive bidding done by several States in India (INR/Kwh)
Tariff Rate TN UP Phase1
Feb
2010
NSM2
Feb
2011
KN
Aug
2011
RJ
Nov
2012
TN
Dec
2012
AP
Dec
2012
KN
Sep
2013
VGF
Min. tariff 4.84 4.48 10.95 7.49 7.94 6.45 5.97 6.49 5.51 -
Max. tariff 9.85 7.1 12.76 9.44 8.5 8.45 17.95 10.98 Not
given
-
Weighted
average
5.57 5.53 12.12 8.77 8.34 7.59 8.28 6.49 5.51 5.45
* 1 Crore (Cr) INR =168,595 AUD @ 1 AUD=59.31INR
COST IMPACT OF SOLAR POWER
The capital cost of solar power project in India decreased from around Rs 25 Cr/MW in the
year 2009 to the present cost of Rs 8.0 Cr/MW. [2] The manufacturing cost of solar power during
past 5 to 6 years has seen dramatic changed in India. It was mainly because the capacity installed in
the year 2006-07 was only 2.11 MW to 35.5 MW in 2009-10 and now it is more than 3000 MW. In
these periods, demand for solar equipments, panels was met from import from other countries. After
declaration of Solar Mission, the manufacturing of panels, films have started production in India.
From the various regulations issued by CERC, the cost of manufacturing of solar plant as envisages
are collected and plotted as below:
Figure 1: Decline in Solar manufacturing cost (past six years)
* 1 Crore (Cr) INR =168,595 AUD @ 1 AUD=59.31INR
International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976
6340(Print), ISSN 0976 – 6359(Online)
Here, the cost of solar thermal was stagnant from 2010 to 2012 then started decreasing
because in India the progress on solar thermal was not up to the level as envisaged in those years but
after the implementation of 1st phase of the JNNSM the nation was
manufacturing hub for solar equipment, the solar plants were being manufactured based on
indigenous items and there was involvement of some of the large Solar Cell producers of India such
as Moser Baer, Indo -Solar, BHEL, CEL, an
were achieved thereby significantly reducing the capital cost of manufacturing.
COST IMPLICATION AND PROJECTIONS
The Central Electricity Regulatory Commission (CERC) released the new benchmark capital
cost for Solar PV plants i.e. Rs 8 Cr/MW
come, it would further drop gradually.
whereas in the case of Solar Thermal it is about 10
cost of solar Thermal & PV are assumed to be 8% and 10 % respectively instead of actual 10
due to possible barriers especially of VGF Mechanism, hindering
capital cost of coal is assumed according to the present cost in the
MW i.e. INR 5.5 Cr/MW with further increasing cost rate of around 8 % every year up to 2020
However, the solar cost has been assumed to be stagnated after few years.
The fig here shows the trend of declining solar costs over the past years. The feasibility of
implementation of JNNSM and its positive implications can be seen when compared with the trend
of thermal capital cost.
Figure 2: Comparing Projected Capital Cost of Solar Thermal & PV with Thermal Project (Rs Crore
/ MW). * 1 Crore (Cr) INR =168,595 AUD @ 1 AUD=59.31INR
According to the projections Solar PV will become competitive with Conventional at the
completion of the yr 2016 at a cost approx. Rs 6.50 Cr. /MW and will start decreasing further up to
5.20 or nearby and will become stagnant, whereas in the case of Solar Thermal the competitive yr
will be 2018 at a cost of Rs 7.25 Cr. /MW.
Thermal will majorly come from economies of scale in the solar plant size, manufacturing industry,
International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976
6359(Online) Volume 5, Issue 1, January (2014), © IAEME
5
Here, the cost of solar thermal was stagnant from 2010 to 2012 then started decreasing
because in India the progress on solar thermal was not up to the level as envisaged in those years but
after the implementation of 1st phase of the JNNSM the nation was progressively becoming the
manufacturing hub for solar equipment, the solar plants were being manufactured based on
indigenous items and there was involvement of some of the large Solar Cell producers of India such
Solar, BHEL, CEL, and Solar Semiconductor thus, the manufacturing targets
were achieved thereby significantly reducing the capital cost of manufacturing.
COST IMPLICATION AND PROJECTIONS
The Central Electricity Regulatory Commission (CERC) released the new benchmark capital
Rs 8 Cr/MW for the financial year (FY) 2013-14. [2]
would further drop gradually. The drop in the cost is ranging from 15
whereas in the case of Solar Thermal it is about 10-15%. In this study, to be safer,
cost of solar Thermal & PV are assumed to be 8% and 10 % respectively instead of actual 10
due to possible barriers especially of VGF Mechanism, hindering unforeseen situations.
ssumed according to the present cost in the NTPC Daripalli
MW i.e. INR 5.5 Cr/MW with further increasing cost rate of around 8 % every year up to 2020
However, the solar cost has been assumed to be stagnated after few years.
the trend of declining solar costs over the past years. The feasibility of
implementation of JNNSM and its positive implications can be seen when compared with the trend
Comparing Projected Capital Cost of Solar Thermal & PV with Thermal Project (Rs Crore
* 1 Crore (Cr) INR =168,595 AUD @ 1 AUD=59.31INR
According to the projections Solar PV will become competitive with Conventional at the
6 at a cost approx. Rs 6.50 Cr. /MW and will start decreasing further up to
5.20 or nearby and will become stagnant, whereas in the case of Solar Thermal the competitive yr
will be 2018 at a cost of Rs 7.25 Cr. /MW. Overall, this rapid decrease in the cos
Thermal will majorly come from economies of scale in the solar plant size, manufacturing industry,
International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 –
© IAEME
Here, the cost of solar thermal was stagnant from 2010 to 2012 then started decreasing
because in India the progress on solar thermal was not up to the level as envisaged in those years but
progressively becoming the
manufacturing hub for solar equipment, the solar plants were being manufactured based on
indigenous items and there was involvement of some of the large Solar Cell producers of India such
d Solar Semiconductor thus, the manufacturing targets
The Central Electricity Regulatory Commission (CERC) released the new benchmark capital
[2] In the years to
15-25% per annum
, to be safer, the drop in the
cost of solar Thermal & PV are assumed to be 8% and 10 % respectively instead of actual 10-15%
unforeseen situations. The thermal
NTPC Daripalli Plant of 1600
MW i.e. INR 5.5 Cr/MW with further increasing cost rate of around 8 % every year up to 2020
the trend of declining solar costs over the past years. The feasibility of
implementation of JNNSM and its positive implications can be seen when compared with the trend
Comparing Projected Capital Cost of Solar Thermal & PV with Thermal Project (Rs Crore
According to the projections Solar PV will become competitive with Conventional at the
6 at a cost approx. Rs 6.50 Cr. /MW and will start decreasing further up to
5.20 or nearby and will become stagnant, whereas in the case of Solar Thermal the competitive yr
Overall, this rapid decrease in the cost of solar PV &
Thermal will majorly come from economies of scale in the solar plant size, manufacturing industry,
International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976
6340(Print), ISSN 0976 – 6359(Online)
learning experience. Other factors like
improvements in the performance of the solar
30% could be possible.
In the year 2010-11 when JNNSM was launched the solar power capacity of India was only
35.15 MW. In comparison to the 1000MW Target of Phase 1 the achieved capacity rose up by 65
i.e. 1645MW and thereafter if the further capacity addition is projected at the rate of 40 to 50% up to
2017. The Phase II, at the 2017 level projected capacity will be around 8327 MW and by 2022
capacity addition would be around 35000 MW.
FORESEEABLE SOLAR SCENARIO OF INDIA
It is seen that the RPO requirement from 2011 to 2013 was 0.25% the target of 1536 MW
was met in the year 2013 with around increase of 6% as 1643 MW.
other additional solar power capacity additions by various states, REC mechanism as well as the
recent announced 4000 MW solar UMPP are used and thus, the actual further growth rate is expected
to be above 7 % but for analyzing the target for future years
of 6 % is assumed.
Figure 3:
From the projections, it can be seen that the mission target of capacity addition of 20,000
MW (20GW) for 2022 will be achieved well before during 2019
this target well before or say during the 2021
and shall meet the RPO in time. The
CERC/SERC. Procuring solar power could save money in the long run even if the current cost of
solar electricity is higher than grid prices.
consumer. Hence, there is no single fra
International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976
6359(Online) Volume 5, Issue 1, January (2014), © IAEME
6
like advances in R&D, indigenous equipments manufacturing and
improvements in the performance of the solar field. By 2020, capital cost reductions of more than
11 when JNNSM was launched the solar power capacity of India was only
35.15 MW. In comparison to the 1000MW Target of Phase 1 the achieved capacity rose up by 65
i.e. 1645MW and thereafter if the further capacity addition is projected at the rate of 40 to 50% up to
he Phase II, at the 2017 level projected capacity will be around 8327 MW and by 2022
capacity addition would be around 35000 MW.
FORESEEABLE SOLAR SCENARIO OF INDIA
It is seen that the RPO requirement from 2011 to 2013 was 0.25% the target of 1536 MW
was met in the year 2013 with around increase of 6% as 1643 MW. To support the RPO mechanism
other additional solar power capacity additions by various states, REC mechanism as well as the
recent announced 4000 MW solar UMPP are used and thus, the actual further growth rate is expected
the target for future years under the base line scenario growth rate
: Projections of Solar RPO compliance
From the projections, it can be seen that the mission target of capacity addition of 20,000
achieved well before during 2019-20. India is going ahead to achieve
this target well before or say during the 2021-2022, the solar capacity would be around 36,000 MW
The electricity prices are increasing around 5-10% every
CERC/SERC. Procuring solar power could save money in the long run even if the current cost of
solar electricity is higher than grid prices. In India, the power tariffs vary by state and also the type of
consumer. Hence, there is no single frame of reference for grid parity.
International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 –
© IAEME
advances in R&D, indigenous equipments manufacturing and
field. By 2020, capital cost reductions of more than
11 when JNNSM was launched the solar power capacity of India was only
35.15 MW. In comparison to the 1000MW Target of Phase 1 the achieved capacity rose up by 65 %
i.e. 1645MW and thereafter if the further capacity addition is projected at the rate of 40 to 50% up to
he Phase II, at the 2017 level projected capacity will be around 8327 MW and by 2022
It is seen that the RPO requirement from 2011 to 2013 was 0.25% the target of 1536 MW
o support the RPO mechanism
other additional solar power capacity additions by various states, REC mechanism as well as the
recent announced 4000 MW solar UMPP are used and thus, the actual further growth rate is expected
under the base line scenario growth rate
From the projections, it can be seen that the mission target of capacity addition of 20,000
20. India is going ahead to achieve
2022, the solar capacity would be around 36,000 MW
10% every year by the
CERC/SERC. Procuring solar power could save money in the long run even if the current cost of
In India, the power tariffs vary by state and also the type of
International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976
6340(Print), ISSN 0976 – 6359(Online)
Figure 4: Solar LCOE through competitive bidding done by several States in India
From the above illustration, the average LCOE received through competitive bidding is
around Rs 5.5 /kWh in spite of Govt. has fixed the L
average LCOE tariff for electricity in India was Rs 3.8 per kWh in 2011
cost of Rs 4.87 per kWh. The gap between the average tariff and average cost per unit was Rs 1.08
per kWh, or 22 per cent of the cost per uni
of electricity has ranged from between 20 per cent and 30 per cent. Continuing the same projections
for unit cost by filling gap with 10% average increase per kWh for further five years, it would
in fig shown. For Comparing Average cost of Electricity in India with the Solar PV LCOE it is
assumed that the Solar PV LCOE will be stagnant after the year 2014
Figure 5:
* 1 Crore (Cr) INR =168,595 A
Thus, the result can be achieved
be cheaper and with grid parity, it will continue to provide electricity with no fuel cost and with
minimal maintenance for 25 years or more.
value of solar greater over time. Over 25 years, the savings from solar grow significantly and will be
free forever and forever.
International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976
6359(Online) Volume 5, Issue 1, January (2014), © IAEME
7
Solar LCOE through competitive bidding done by several States in India
From the above illustration, the average LCOE received through competitive bidding is
around Rs 5.5 /kWh in spite of Govt. has fixed the LCOE rate around Rs 8/kWh.
average LCOE tariff for electricity in India was Rs 3.8 per kWh in 2011-12, as against an average
cost of Rs 4.87 per kWh. The gap between the average tariff and average cost per unit was Rs 1.08
per kWh, or 22 per cent of the cost per unit. The gap between average tariff and average cost per unit
of electricity has ranged from between 20 per cent and 30 per cent. Continuing the same projections
for unit cost by filling gap with 10% average increase per kWh for further five years, it would
For Comparing Average cost of Electricity in India with the Solar PV LCOE it is
assumed that the Solar PV LCOE will be stagnant after the year 2014-15.
: Grid Parity Solar Vs. electricity Price
* 1 Crore (Cr) INR =168,595 AUD @ 1 AUD=59.31INR
can be achieved in year 2014 or in the worst case 2015 when solar rate would
be cheaper and with grid parity, it will continue to provide electricity with no fuel cost and with
minimal maintenance for 25 years or more. Grid prices typically increase, however, making the
Over 25 years, the savings from solar grow significantly and will be
International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 –
© IAEME
Solar LCOE through competitive bidding done by several States in India
From the above illustration, the average LCOE received through competitive bidding is
Furthermore, the
12, as against an average
cost of Rs 4.87 per kWh. The gap between the average tariff and average cost per unit was Rs 1.08
t. The gap between average tariff and average cost per unit
of electricity has ranged from between 20 per cent and 30 per cent. Continuing the same projections
for unit cost by filling gap with 10% average increase per kWh for further five years, it would be like
For Comparing Average cost of Electricity in India with the Solar PV LCOE it is
in year 2014 or in the worst case 2015 when solar rate would
be cheaper and with grid parity, it will continue to provide electricity with no fuel cost and with
Grid prices typically increase, however, making the
Over 25 years, the savings from solar grow significantly and will be
International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 –
6340(Print), ISSN 0976 – 6359(Online) Volume 5, Issue 1, January (2014), © IAEME
8
SUMMARY OF RESULTS AND FINDINGS
The Solar PV will become competitive with Conventional at the completion of the yr 2016 at
a cost of about Rs 6.50 Cr. /MW and Solar Thermal in 2018 at a cost of Rs 7.25 Cr. /MW, moreover
in the Mission completion year 2022 the costs of Solar PV & Solar Thermal would be around 5.23 &
6.59 respectively.
• The average LCOE received through competitive bidding was around Rs 5.5 /kWh in spite of
Govt. fixed the LCOE rate around Rs 8/kWh.
• Mission’s solar capacity target of 20,000MW will be achieved around 20018-2019 and till
2022 the projected capacity would be around 35,000MW.
• RPO Target of 3% from an initial 0.25 % and a capacity of about 34000 MW will be
achieved in the year 2021-2022.
India had a peak power shortage of 9.3% during the five years ending in 2012 when over
50,000 MW new generation capacity was commissioned. The capacity addition target during the
12th plan period (2012-17) is estimated at 88,537 MW comprising of 26,182 MW that is backed by
the central government, 15,530 MW that is backed by the various state governments and 46,825 MW
that is expected from the private sector. However, no previous plan period in India has seen a
capacity addition equal to or greater than what was planned. Most experts therefore expect less to be
actually achieved. The easiest way for SEBs to improve their financial health is to raise tariffs to a
level that truly reflects their generation, transmission and distribution costs. States like Tamil Nadu,
Odisha, Jharkhand, Kerala and Delhi have already raised tariffs by as much as 15-30% in the past
year. With costs rising and the financial health of distribution companies deteriorating, further
increases of tariffs across the country are expected.
The aim can be achieved in year 2014 or in the worst case 2015 when solar rate would be
cheaper and with grid parity, it will continue to provide electricity with no fuel cost and with
minimal maintenance for 25 years or more. Grid prices typically increase, however, making the
value of solar greater over time. The chart illustrates the Grid electricity is cheaper after few years.
Over 25 years, the savings from solar grow significantly and will be free forever and forever. Solar
power can be considered to be a safe investment and is recognized as such in most mature markets
such as Germany where the lenders are willing to provide 100% non-recourse debt. Solar power is
already cheaper than grid power for commercial consumers in Maharashtra, Delhi and Kerala even
without any subsidy. Unsubsidized solar power is already feasible in some parts of the country. As
prices for grid power are expected to increase and cost for solar power is expected to fall, more and
more states and customer segments will find investing in solar a lucrative option.
REFERENCES
[1] Bettina Weiss, P. S. I., 2013. JNNSM pathway, September, 9 2013.
[2] deo, s. j. s. v., 2013. Central Electricity Regulatory Commission Indian Government. [Online]
Available at: http://www.cercind.gov.in/2013/orders/SO243.pdf.
[3] EIA, 2013. US. energy information admministration India Overview. [Online] Available at:
http://www.eia.gov/countries/cab.cfm?fips=IN.
[4] WATO-India, 2012. Renewable Energy in India, Mumbai: Government of western australia.
woods, l., 2013. PVTECH. [Online] Available at:
http://www.pv-tech.org/news/china_introduces_tariff_zones_6478.
[5] Ramachandra, T. V. J. R. &. K. G., 2011. Hotspots of solar potential in India.. Renewable
and Sustainable Energy Reviews, 15(6), pp. 3178-3186.
International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 –
6340(Print), ISSN 0976 – 6359(Online) Volume 5, Issue 1, January (2014), © IAEME
9
[6] MNRE, 2010. Guidelines for Selection of New Grid connected Solar Power Projects.
[Online] Available at:
http://www.mnre.gov.in/file-manager/UserFiles/jnnsm_gridconnected_25072010.pdf.
[7] MNRE, 2013. Further Revised Draft of Guidelines for setting up of 750 MW Grid Solar PV
power projects with Viability Gap Funding (VGF) under JNNSM Phase II, Batch I. Available
at: http://mnre.gov.in/file-manager/UserFiles/further-revised-VGF_750MW_Guidelines_for-
grid-solar-power-projects.pdf .
[8] Eshan et al, “India’s Reliance on Energy Sources: An Overview Study towards Sustainability
by 2022”, International Journal of Engineering Innovation & Research, Nov-Dec 2013,
Volume 2, Issue 6, ISSN: 2277 – 5668.
[9] K. Balachander and Dr. P. Vijayakumar, “Economic Analysis, Modeling and Simulation of
Photovoltaic Fuel Cell Hybrid Renewable Electric System for Smart Grid Distributed
Generation System”, International Journal of Mechanical Engineering & Technology
(IJMET), Volume 3, Issue 1, 2012, pp. 179 - 186, ISSN Print: 0976 – 6340, ISSN Online:
0976 – 6359.
[10] Eshan Ahuja and Dr. Navin Kumar Kohli, “Emission Reductions using Application of
Conservation & Energy Efficiency Strategies in Energy Inefficient Australian’s Households”,
International Journal of Advanced Research in Engineering & Technology (IJARET),
Volume 4, Issue 6, 2013, pp. 110 - 117, ISSN Print: 0976-6480, ISSN Online: 0976-6499.
[11] Navin Kumar Kohli and Eshan Ahuja, “Performance Prediction in Hawt Wind Power
Turbine”, International Journal of Mechanical Engineering & Technology (IJMET),
Volume 2, Issue 2, 2011, pp. 14 - 24, ISSN Print: 0976 – 6340, ISSN Online: 0976 – 6359.

More Related Content

What's hot

Modern Energy Transport - Country Analysis India
Modern Energy Transport - Country Analysis IndiaModern Energy Transport - Country Analysis India
Modern Energy Transport - Country Analysis IndiaAdityaDesai77
 
Indian future of Renewable energy
Indian future of Renewable energyIndian future of Renewable energy
Indian future of Renewable energyH Janardan Prabhu
 
Deployment of micro grids in india
Deployment of micro grids in indiaDeployment of micro grids in india
Deployment of micro grids in indiaAjeet1364
 
Power sector in India
Power sector in IndiaPower sector in India
Power sector in IndiaDaya Kherwar
 
State of Art Technologies in Power Distribution
State of Art Technologies in Power DistributionState of Art Technologies in Power Distribution
State of Art Technologies in Power DistributionIRJET Journal
 
A road to mitigate energy demand until 2030 & acquisition of Bangladesh in po...
A road to mitigate energy demand until 2030 & acquisition of Bangladesh in po...A road to mitigate energy demand until 2030 & acquisition of Bangladesh in po...
A road to mitigate energy demand until 2030 & acquisition of Bangladesh in po...Kazi Tanvir
 
Energy Storage - Is the Time Ripe for India-As Published
Energy Storage - Is the Time Ripe for India-As PublishedEnergy Storage - Is the Time Ripe for India-As Published
Energy Storage - Is the Time Ripe for India-As Publishedjrosh
 
India power transmission & distribution sector opportunity outlook 2025
India power transmission & distribution sector opportunity outlook 2025India power transmission & distribution sector opportunity outlook 2025
India power transmission & distribution sector opportunity outlook 2025Rajesh Sarma
 
Indian Power Sector - Industry Analysis
Indian Power Sector - Industry AnalysisIndian Power Sector - Industry Analysis
Indian Power Sector - Industry AnalysisArjun Yadav
 
STUDY ON NDIAN POWER SECTOR WITH SPECIAL EMPHASIS ON POWER TRANSFORMERS & SOL...
STUDY ON NDIAN POWER SECTOR WITH SPECIAL EMPHASIS ON POWER TRANSFORMERS & SOL...STUDY ON NDIAN POWER SECTOR WITH SPECIAL EMPHASIS ON POWER TRANSFORMERS & SOL...
STUDY ON NDIAN POWER SECTOR WITH SPECIAL EMPHASIS ON POWER TRANSFORMERS & SOL...libin paul
 
Analytical study of the scope of nuclear energy in indian energy scenario
Analytical study of the scope of nuclear energy in indian energy scenarioAnalytical study of the scope of nuclear energy in indian energy scenario
Analytical study of the scope of nuclear energy in indian energy scenarioIAEME Publication
 
Solar Power Market 2015
Solar Power Market 2015Solar Power Market 2015
Solar Power Market 2015Naresh Baluja
 
Power Sector - India - Sample
Power Sector - India - SamplePower Sector - India - Sample
Power Sector - India - SampleNetscribes, Inc.
 
Renewable Energy Sector Funding
Renewable Energy Sector FundingRenewable Energy Sector Funding
Renewable Energy Sector FundingResurgent India
 
Industrial Analysis on power Industry
Industrial Analysis on power IndustryIndustrial Analysis on power Industry
Industrial Analysis on power IndustrySiva Konduri
 
Will Demand for Power Slowdown in India? -In-depth Analysis by Mirdul Amin
Will Demand for Power Slowdown in India? -In-depth Analysis by Mirdul AminWill Demand for Power Slowdown in India? -In-depth Analysis by Mirdul Amin
Will Demand for Power Slowdown in India? -In-depth Analysis by Mirdul AminMirdul Amin Sarkar
 
Power Transmission and Distribution Sector in India
Power Transmission and Distribution Sector in IndiaPower Transmission and Distribution Sector in India
Power Transmission and Distribution Sector in IndiaAditya Goyal
 

What's hot (20)

Modern Energy Transport - Country Analysis India
Modern Energy Transport - Country Analysis IndiaModern Energy Transport - Country Analysis India
Modern Energy Transport - Country Analysis India
 
Indian future of Renewable energy
Indian future of Renewable energyIndian future of Renewable energy
Indian future of Renewable energy
 
Deployment of micro grids in india
Deployment of micro grids in indiaDeployment of micro grids in india
Deployment of micro grids in india
 
Power sector in India
Power sector in IndiaPower sector in India
Power sector in India
 
State of Art Technologies in Power Distribution
State of Art Technologies in Power DistributionState of Art Technologies in Power Distribution
State of Art Technologies in Power Distribution
 
A road to mitigate energy demand until 2030 & acquisition of Bangladesh in po...
A road to mitigate energy demand until 2030 & acquisition of Bangladesh in po...A road to mitigate energy demand until 2030 & acquisition of Bangladesh in po...
A road to mitigate energy demand until 2030 & acquisition of Bangladesh in po...
 
Energy Storage - Is the Time Ripe for India-As Published
Energy Storage - Is the Time Ripe for India-As PublishedEnergy Storage - Is the Time Ripe for India-As Published
Energy Storage - Is the Time Ripe for India-As Published
 
Distance MBA (Power Management)
Distance MBA (Power Management)Distance MBA (Power Management)
Distance MBA (Power Management)
 
India power transmission & distribution sector opportunity outlook 2025
India power transmission & distribution sector opportunity outlook 2025India power transmission & distribution sector opportunity outlook 2025
India power transmission & distribution sector opportunity outlook 2025
 
Indian Power Sector - Industry Analysis
Indian Power Sector - Industry AnalysisIndian Power Sector - Industry Analysis
Indian Power Sector - Industry Analysis
 
STUDY ON NDIAN POWER SECTOR WITH SPECIAL EMPHASIS ON POWER TRANSFORMERS & SOL...
STUDY ON NDIAN POWER SECTOR WITH SPECIAL EMPHASIS ON POWER TRANSFORMERS & SOL...STUDY ON NDIAN POWER SECTOR WITH SPECIAL EMPHASIS ON POWER TRANSFORMERS & SOL...
STUDY ON NDIAN POWER SECTOR WITH SPECIAL EMPHASIS ON POWER TRANSFORMERS & SOL...
 
Analytical study of the scope of nuclear energy in indian energy scenario
Analytical study of the scope of nuclear energy in indian energy scenarioAnalytical study of the scope of nuclear energy in indian energy scenario
Analytical study of the scope of nuclear energy in indian energy scenario
 
Solar Power Market 2015
Solar Power Market 2015Solar Power Market 2015
Solar Power Market 2015
 
Power Sector - India - Sample
Power Sector - India - SamplePower Sector - India - Sample
Power Sector - India - Sample
 
Renewable Energy Sector Funding
Renewable Energy Sector FundingRenewable Energy Sector Funding
Renewable Energy Sector Funding
 
Industrial Analysis on power Industry
Industrial Analysis on power IndustryIndustrial Analysis on power Industry
Industrial Analysis on power Industry
 
Will Demand for Power Slowdown in India? -In-depth Analysis by Mirdul Amin
Will Demand for Power Slowdown in India? -In-depth Analysis by Mirdul AminWill Demand for Power Slowdown in India? -In-depth Analysis by Mirdul Amin
Will Demand for Power Slowdown in India? -In-depth Analysis by Mirdul Amin
 
Power Transmission and Distribution Sector in India
Power Transmission and Distribution Sector in IndiaPower Transmission and Distribution Sector in India
Power Transmission and Distribution Sector in India
 
Solar PV in_2009_Bharath
Solar PV in_2009_BharathSolar PV in_2009_Bharath
Solar PV in_2009_Bharath
 
Global Solar PV Market Outlook for 2017
Global Solar PV Market Outlook for 2017Global Solar PV Market Outlook for 2017
Global Solar PV Market Outlook for 2017
 

Viewers also liked

Siero Autologo - Protocollo Sperimentale
Siero Autologo - Protocollo SperimentaleSiero Autologo - Protocollo Sperimentale
Siero Autologo - Protocollo SperimentaleFilippo Fassio
 
I cibi ed il nostro sistema immunitario - probiotici
I cibi ed il nostro sistema immunitario - probioticiI cibi ed il nostro sistema immunitario - probiotici
I cibi ed il nostro sistema immunitario - probioticiFilippo Fassio
 

Viewers also liked (6)

8)shock
8)shock8)shock
8)shock
 
Siero Autologo - Protocollo Sperimentale
Siero Autologo - Protocollo SperimentaleSiero Autologo - Protocollo Sperimentale
Siero Autologo - Protocollo Sperimentale
 
Adrenaline_logo
Adrenaline_logoAdrenaline_logo
Adrenaline_logo
 
Anaphylaxis & Allergy Nsc
Anaphylaxis & Allergy NscAnaphylaxis & Allergy Nsc
Anaphylaxis & Allergy Nsc
 
Anaphylaxis
AnaphylaxisAnaphylaxis
Anaphylaxis
 
I cibi ed il nostro sistema immunitario - probiotici
I cibi ed il nostro sistema immunitario - probioticiI cibi ed il nostro sistema immunitario - probiotici
I cibi ed il nostro sistema immunitario - probiotici
 

Similar to POTENTIAL STUDY ADDRESSING SHORTAGE OF POWER AND ECONOMIC GROWTH THROUGH FORESEEABLE SOLAR POWER

Download India nuclear power sector generation and investment opportunity out...
Download India nuclear power sector generation and investment opportunity out...Download India nuclear power sector generation and investment opportunity out...
Download India nuclear power sector generation and investment opportunity out...KuicK Research
 
Integrating Renewable Energy in Smart Grid: Opportunity, Challenges and Progr...
Integrating Renewable Energy in Smart Grid: Opportunity, Challenges and Progr...Integrating Renewable Energy in Smart Grid: Opportunity, Challenges and Progr...
Integrating Renewable Energy in Smart Grid: Opportunity, Challenges and Progr...IRJET Journal
 
Rbsa Research Report rise of solar power in India
Rbsa Research Report  rise of solar power in IndiaRbsa Research Report  rise of solar power in India
Rbsa Research Report rise of solar power in IndiaRBSA Advisors
 
Renewable energy - India- future
Renewable energy - India- futureRenewable energy - India- future
Renewable energy - India- futureH Janardan Prabhu
 
Non-conventional Energy Sources in Present Power Sector in India
Non-conventional Energy Sources in Present Power Sector in IndiaNon-conventional Energy Sources in Present Power Sector in India
Non-conventional Energy Sources in Present Power Sector in IndiaIRJET Journal
 
Renewables Country Profile - India
Renewables Country Profile - IndiaRenewables Country Profile - India
Renewables Country Profile - IndiaFINERGREEN
 
Presentation on ONE SUN ONE WORLD ONE GRID (OSOWOG) policy making
Presentation on ONE SUN ONE WORLD ONE GRID (OSOWOG) policy makingPresentation on ONE SUN ONE WORLD ONE GRID (OSOWOG) policy making
Presentation on ONE SUN ONE WORLD ONE GRID (OSOWOG) policy makingArpit Kurel
 
Heijunka iim ahmedabad-cleantech
Heijunka iim ahmedabad-cleantechHeijunka iim ahmedabad-cleantech
Heijunka iim ahmedabad-cleantechAkshay Gautam
 
IRJET- SOLAR POWER: Challenges, Mission and Potential of Solar Power in India
IRJET- SOLAR POWER: Challenges, Mission and Potential of Solar Power in IndiaIRJET- SOLAR POWER: Challenges, Mission and Potential of Solar Power in India
IRJET- SOLAR POWER: Challenges, Mission and Potential of Solar Power in IndiaIRJET Journal
 
Solar talk presentation final
Solar talk presentation finalSolar talk presentation final
Solar talk presentation finalStartling Solar
 
Development of renewable energy 55 59_62_71
Development of renewable energy 55 59_62_71Development of renewable energy 55 59_62_71
Development of renewable energy 55 59_62_71domsr
 
India power transmission & distribution sector opportunity outlook 2025
India power transmission & distribution sector opportunity outlook 2025India power transmission & distribution sector opportunity outlook 2025
India power transmission & distribution sector opportunity outlook 2025Rajesh Sarma
 
Forecasting and scheduling of wind and solar power generation in india
Forecasting and scheduling of wind and solar power generation in indiaForecasting and scheduling of wind and solar power generation in india
Forecasting and scheduling of wind and solar power generation in indiaDas A. K.
 

Similar to POTENTIAL STUDY ADDRESSING SHORTAGE OF POWER AND ECONOMIC GROWTH THROUGH FORESEEABLE SOLAR POWER (20)

Download India nuclear power sector generation and investment opportunity out...
Download India nuclear power sector generation and investment opportunity out...Download India nuclear power sector generation and investment opportunity out...
Download India nuclear power sector generation and investment opportunity out...
 
Integrating Renewable Energy in Smart Grid: Opportunity, Challenges and Progr...
Integrating Renewable Energy in Smart Grid: Opportunity, Challenges and Progr...Integrating Renewable Energy in Smart Grid: Opportunity, Challenges and Progr...
Integrating Renewable Energy in Smart Grid: Opportunity, Challenges and Progr...
 
Ijesdmv4n3 18
Ijesdmv4n3 18Ijesdmv4n3 18
Ijesdmv4n3 18
 
Ijesdmv4n3 18
Ijesdmv4n3 18Ijesdmv4n3 18
Ijesdmv4n3 18
 
Rbsa Research Report rise of solar power in India
Rbsa Research Report  rise of solar power in IndiaRbsa Research Report  rise of solar power in India
Rbsa Research Report rise of solar power in India
 
Renewable energy - India- future
Renewable energy - India- futureRenewable energy - India- future
Renewable energy - India- future
 
Non-conventional Energy Sources in Present Power Sector in India
Non-conventional Energy Sources in Present Power Sector in IndiaNon-conventional Energy Sources in Present Power Sector in India
Non-conventional Energy Sources in Present Power Sector in India
 
Renewables Country Profile - India
Renewables Country Profile - IndiaRenewables Country Profile - India
Renewables Country Profile - India
 
Presentation on ONE SUN ONE WORLD ONE GRID (OSOWOG) policy making
Presentation on ONE SUN ONE WORLD ONE GRID (OSOWOG) policy makingPresentation on ONE SUN ONE WORLD ONE GRID (OSOWOG) policy making
Presentation on ONE SUN ONE WORLD ONE GRID (OSOWOG) policy making
 
KPMG Rising Sun 2012 Report
KPMG Rising Sun 2012 ReportKPMG Rising Sun 2012 Report
KPMG Rising Sun 2012 Report
 
The Rising Sun II
The Rising Sun IIThe Rising Sun II
The Rising Sun II
 
Vamshi tech ppt
Vamshi tech pptVamshi tech ppt
Vamshi tech ppt
 
Heijunka iim ahmedabad-cleantech
Heijunka iim ahmedabad-cleantechHeijunka iim ahmedabad-cleantech
Heijunka iim ahmedabad-cleantech
 
Solar power - A developer prespective
Solar power - A developer prespectiveSolar power - A developer prespective
Solar power - A developer prespective
 
Energy scenario in India
Energy scenario in IndiaEnergy scenario in India
Energy scenario in India
 
IRJET- SOLAR POWER: Challenges, Mission and Potential of Solar Power in India
IRJET- SOLAR POWER: Challenges, Mission and Potential of Solar Power in IndiaIRJET- SOLAR POWER: Challenges, Mission and Potential of Solar Power in India
IRJET- SOLAR POWER: Challenges, Mission and Potential of Solar Power in India
 
Solar talk presentation final
Solar talk presentation finalSolar talk presentation final
Solar talk presentation final
 
Development of renewable energy 55 59_62_71
Development of renewable energy 55 59_62_71Development of renewable energy 55 59_62_71
Development of renewable energy 55 59_62_71
 
India power transmission & distribution sector opportunity outlook 2025
India power transmission & distribution sector opportunity outlook 2025India power transmission & distribution sector opportunity outlook 2025
India power transmission & distribution sector opportunity outlook 2025
 
Forecasting and scheduling of wind and solar power generation in india
Forecasting and scheduling of wind and solar power generation in indiaForecasting and scheduling of wind and solar power generation in india
Forecasting and scheduling of wind and solar power generation in india
 

More from IAEME Publication

IAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME Publication
 
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...IAEME Publication
 
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSIAEME Publication
 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSIAEME Publication
 
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSDETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSIAEME Publication
 
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSIAEME Publication
 
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOVOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOIAEME Publication
 
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IAEME Publication
 
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYVISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYIAEME Publication
 
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...IAEME Publication
 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEIAEME Publication
 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...IAEME Publication
 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...IAEME Publication
 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...IAEME Publication
 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...IAEME Publication
 
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...IAEME Publication
 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...IAEME Publication
 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...IAEME Publication
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...IAEME Publication
 
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTA MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTIAEME Publication
 

More from IAEME Publication (20)

IAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdf
 
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
 
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
 
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSDETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
 
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
 
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOVOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
 
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
 
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYVISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
 
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICE
 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
 
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
 
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTA MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
 

Recently uploaded

(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...Call Girls in Nagpur High Profile
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 

Recently uploaded (20)

(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 

POTENTIAL STUDY ADDRESSING SHORTAGE OF POWER AND ECONOMIC GROWTH THROUGH FORESEEABLE SOLAR POWER

  • 1. International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 – 6340(Print), ISSN 0976 – 6359(Online) Volume 5, Issue 1, January (2014), © IAEME 1 POTENTIAL STUDY ADDRESSING SHORTAGE OF POWER AND ECONOMIC GROWTH THROUGH FORESEEABLE SOLAR POWER Eshan Ahuja1 , Dr. Navin Kumar Kohli2 , Sidharth Ahuja3 1 Mechanical Engineering Dept. Australian National University, Canberra, Australia 2 MP Power Management Co. Ltd., India 3 BE electrical Engineering, India ABSTRACT India is densely populated and has high solar insolation, an ideal combination for using solar power in India. India is already a leader in wind power generation. India is now one of the top five solar energy developments worldwide as per Ernst & Young’s renewable energy attractiveness index. As per report by WATO-India, 2012, the Indian Renewable Energy business market is experiencing a growth rate of 15 %/yr and the opportunities for private investments are estimated to be of about USD 34 billion. Solar is becoming financially viable for commercial and industrial sectors ,which is leading the power deficient southern states of the country such as Tamil Nadu and Kerala suffering from rising costs of conventional power to gradually shift towards solar energy so as to have long-term solutions for their power needs. Thus, these developments give indication for a good future for solar development. The initiation of Jawaharlal Nehru National Solar Mission (JNNSM) is one of the eight missions of India that makes clear the nation’s vision for solar technology. This 19 billion USD plan was launched on the 11th January, 2010 by the Prime Minister of India. The future energy mix is expected to have a reduced contribution of indigenous coal as an energy source due to higher costs, logistic constraints, poor quality and dependence on imported coal to run thermal power plants. The country thus faces possibility of severe energy supply constraints and is in need of alternative energy sources. An endeavored is made through this contributing paper whether we could foresee better future energy mix of India. Key words: Renewable Energy, Conventional Power, JNNSM and Future Energy Mix. INTRODUCTION India had a peak power shortage of 9.3% during the five years plan ending in 2012 when over 50,000 MW new generation capacity was commissioned. The capacity addition target during the INTERNATIONAL JOURNAL OF MECHANICAL ENGINEERING AND TECHNOLOGY (IJMET) ISSN 0976 – 6340 (Print) ISSN 0976 – 6359 (Online) Volume 5, Issue 1, January (2014), pp. 01-09 © IAEME: www.iaeme.com/ijmet.asp Journal Impact Factor (2013): 5.7731 (Calculated by GISI) www.jifactor.com IJMET © I A E M E
  • 2. International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 – 6340(Print), ISSN 0976 – 6359(Online) Volume 5, Issue 1, January (2014), © IAEME 2 12th plan period from 2012-17 is estimated at 88,537 MW. Current Population of India is estimated to be 1.27 billion, growing @ of 1.6%/yr. In the past besides substantial increase in installed electricity capacity, demand outplayed supply. Currently, official peak deficits are above 12 % and may increase further over a long run. More than 25% of the population is living with no access to electricity. Those with access often have to cope with long blackouts. This is likely to be case in the foreseeable future making energy accesses a continuous and growing problem. Table 1: Energy Demand Projection of India Source Unit 1991-92 2009-10 2020-21 Electricity TWh 231 725 1300 Coal Mt. 229 690 1345 Natural Gas b cum 18.6 65 130 Petro-Products Mt. 57 165 335 This Steep growth in demand of energy sources is pervasive requiring serious efforts by Government of India (GOI) to ensure India’s future energy security. The future energy mix of India is expected to have a reduced contribution of indigenous coal as an energy source due to higher costs, logistic constraints, poor quality and dependence on imported coal to run thermal power plants. The country thus faces possibility of severe energy supply constraints and is in a dire need of alternative energy sources. [3] The following discussions would help experts in foreseeing the sustainable future of this totally free energy on long run. ADDRESSING SOLAR POWER ISSUES IN INDIA India is densely populated and has high solar insolation, an ideal combination for using solar power in India. India is already a leader in wind power generation. As per Ernst & Young’s report, India is among top 5 destinations worldwide for solar energy development renewable energy attractiveness index. Indian Renewable Energy business market is experiencing a growth rate of 15 %/yr & opportunities for private investments are estimated of about USD 34 bill. India has a solar power reception of around 5 Trillion Kwh/yr. [4] [5] Various incentives and individual solar policies rolled out by states which include capital/ interest subsidy, accelerated depreciation, nil/concessional excise and customs duties, and Generation Based Incentives or feed-in-tariff. Apart from this, Indian Renewable Energy Development Agency (IREDA) and other public sector agencies are also actively funding renewable energy projects. Solar is becoming financially viable for commercial and industrial sectors ,which is leading the power deficient southern states of the country such as Tamil Nadu and Kerala suffering from rising costs of conventional power to gradually shift towards solar energy so as to have long-term solutions for their power needs. Thus, to confront these above mentioned issues leading to future Energy threats in the nation and to efficiently and economically utilize the enormous untapped potential solar energy availability in India, National Action Plan on Climate Change (NAPCC) introduced JNNSM. JNNSM is one of the eight missions of India’s NAPCC that elucidates the nation’s vision for solar technology. The Mission document for phase II issued in December, 2012. [6] The target of mission is: i. Policy framework for deployment of 20,000 MW of grid connected solar power by 2022 ii. 1000MW by 2017 and 2000 MW by 2022 off grid solar power iii. Achievement of 15 mill m2 solar thermal collector area by 2017 & 20 mill m2 by 2022. iv. Deployment of 20 million solar lighting systems for rural areas by 2022.
  • 3. International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 – 6340(Print), ISSN 0976 – 6359(Online) Volume 5, Issue 1, January (2014), © IAEME 3 v. Creating favorable conditions for solar manufacturing capability for indigenous production & market leadership by 4-5GW of installed capacity by 2017. Through JNNSM, India is aimed at reducing the cost of solar power generation in the long run. Large scale deployment goals, aggressive R&D and domestic production of critical raw materials, components and products would help to achieve grid tariff parity by 2022. Table 2: Phase-wise Distribution of Targets in JNNSM Source Till 2009 Phase 1 (2012-13) Cumulative Target Phase 2, (2013-17) Cumulative Target Phase 3, (2017-22) Grid-connected (MW) 6 1100 10000 20000 Off-Grid (MW) 2.4 200 1000 2000 Thermal Collectors (Million m2) 3.1 7 15 20 Solar Lighting Systems (million) 1.3 5 10 20 The Mission proposed a mechanism of “bundling” relatively expensive solar power with power coal based stations (cheaper in comparison) for the facilitation of the grid connected solar power generation. For each MW of installed capacity of solar power for which an agreement (PPA) is signed. The Power Ministry allocated an equivalent amount of MW capacity from the unallocated quota of coal based stations and then NVVN supplies this “bundled” power to the Distribution Utilities. This Scheme is referred to as the 'Bundling Scheme'. Second phase targets majorly consists of 1000MW Off-grid and 10000 MW Grid connected solar power installment which is to be implemented in a 5 yrs. span from 2013-2017. There is no more power available to bundle as in phase 1 so instead projects will be selected under the RfS and shall be given VGF (Viability Gap Funding) made available through India’s NCEF (national clean energy fund). Under the VGF mechanism bidders estimate the cost of their projects and the government funds the difference between that and the projected returns, in this instance the fixed rate in the power purchase agreement, distribution is as follows: • 50 % on successful commissioning of the full capacity • Balance 50 % progressively over next 5 years subject to plant meeting generation requirements (CUF within specified range). The projects as per RfS are to be installed across nine cities in India and out of 10 GW target to be achieved 4GW is under Central scheme & 6 GW under various State specific schemes. SECI shall enter into Power Purchase Agreement (PPA) with the Bidders selected for purchase of solar power on a 25 yrs. agreement as per the terms, conditions and provisions of the RfS. The bidding process under this scheme is divided in Part-A (DCR)-375 MW or Part-B (Open)-375MW. Bidders can apply for Projects either under A, B or both. The difference between the parts is that A has the conditions of “Domestic Content Requirement” i.e. the solar power plant would have to use solar cells and modules manufactured in India and thus has a funding support directly by the Central GOI and cheaper International loans available with imported components. [7]
  • 4. International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 – 6340(Print), ISSN 0976 – 6359(Online) Volume 5, Issue 1, January (2014), © IAEME 4 POLICY REGULATORY FRAMEWORK AND ANALYSIS Currently, there are a variety of incentives that reduce the cost of solar electricity. A 30% investment tax credit and accelerated depreciation which significantly reduce the LCOE of Solar PV and Thermal. In many states in India, rebates/concessions and other incentives are added to the incentives. The custom duties and excise duties concessions/exemptions also made available on specific capital equipment, critical materials, components and project imports. [7] The tremendous interest from developers for NSM led to the competitive bidding for projects and a subsequent fall in tariffs was seen at the time of Bidding done by different states. Table 3: Fall in the tariffs as per competitive bidding done by several States in India (INR/Kwh) Tariff Rate TN UP Phase1 Feb 2010 NSM2 Feb 2011 KN Aug 2011 RJ Nov 2012 TN Dec 2012 AP Dec 2012 KN Sep 2013 VGF Min. tariff 4.84 4.48 10.95 7.49 7.94 6.45 5.97 6.49 5.51 - Max. tariff 9.85 7.1 12.76 9.44 8.5 8.45 17.95 10.98 Not given - Weighted average 5.57 5.53 12.12 8.77 8.34 7.59 8.28 6.49 5.51 5.45 * 1 Crore (Cr) INR =168,595 AUD @ 1 AUD=59.31INR COST IMPACT OF SOLAR POWER The capital cost of solar power project in India decreased from around Rs 25 Cr/MW in the year 2009 to the present cost of Rs 8.0 Cr/MW. [2] The manufacturing cost of solar power during past 5 to 6 years has seen dramatic changed in India. It was mainly because the capacity installed in the year 2006-07 was only 2.11 MW to 35.5 MW in 2009-10 and now it is more than 3000 MW. In these periods, demand for solar equipments, panels was met from import from other countries. After declaration of Solar Mission, the manufacturing of panels, films have started production in India. From the various regulations issued by CERC, the cost of manufacturing of solar plant as envisages are collected and plotted as below: Figure 1: Decline in Solar manufacturing cost (past six years) * 1 Crore (Cr) INR =168,595 AUD @ 1 AUD=59.31INR
  • 5. International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 6340(Print), ISSN 0976 – 6359(Online) Here, the cost of solar thermal was stagnant from 2010 to 2012 then started decreasing because in India the progress on solar thermal was not up to the level as envisaged in those years but after the implementation of 1st phase of the JNNSM the nation was manufacturing hub for solar equipment, the solar plants were being manufactured based on indigenous items and there was involvement of some of the large Solar Cell producers of India such as Moser Baer, Indo -Solar, BHEL, CEL, an were achieved thereby significantly reducing the capital cost of manufacturing. COST IMPLICATION AND PROJECTIONS The Central Electricity Regulatory Commission (CERC) released the new benchmark capital cost for Solar PV plants i.e. Rs 8 Cr/MW come, it would further drop gradually. whereas in the case of Solar Thermal it is about 10 cost of solar Thermal & PV are assumed to be 8% and 10 % respectively instead of actual 10 due to possible barriers especially of VGF Mechanism, hindering capital cost of coal is assumed according to the present cost in the MW i.e. INR 5.5 Cr/MW with further increasing cost rate of around 8 % every year up to 2020 However, the solar cost has been assumed to be stagnated after few years. The fig here shows the trend of declining solar costs over the past years. The feasibility of implementation of JNNSM and its positive implications can be seen when compared with the trend of thermal capital cost. Figure 2: Comparing Projected Capital Cost of Solar Thermal & PV with Thermal Project (Rs Crore / MW). * 1 Crore (Cr) INR =168,595 AUD @ 1 AUD=59.31INR According to the projections Solar PV will become competitive with Conventional at the completion of the yr 2016 at a cost approx. Rs 6.50 Cr. /MW and will start decreasing further up to 5.20 or nearby and will become stagnant, whereas in the case of Solar Thermal the competitive yr will be 2018 at a cost of Rs 7.25 Cr. /MW. Thermal will majorly come from economies of scale in the solar plant size, manufacturing industry, International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 6359(Online) Volume 5, Issue 1, January (2014), © IAEME 5 Here, the cost of solar thermal was stagnant from 2010 to 2012 then started decreasing because in India the progress on solar thermal was not up to the level as envisaged in those years but after the implementation of 1st phase of the JNNSM the nation was progressively becoming the manufacturing hub for solar equipment, the solar plants were being manufactured based on indigenous items and there was involvement of some of the large Solar Cell producers of India such Solar, BHEL, CEL, and Solar Semiconductor thus, the manufacturing targets were achieved thereby significantly reducing the capital cost of manufacturing. COST IMPLICATION AND PROJECTIONS The Central Electricity Regulatory Commission (CERC) released the new benchmark capital Rs 8 Cr/MW for the financial year (FY) 2013-14. [2] would further drop gradually. The drop in the cost is ranging from 15 whereas in the case of Solar Thermal it is about 10-15%. In this study, to be safer, cost of solar Thermal & PV are assumed to be 8% and 10 % respectively instead of actual 10 due to possible barriers especially of VGF Mechanism, hindering unforeseen situations. ssumed according to the present cost in the NTPC Daripalli MW i.e. INR 5.5 Cr/MW with further increasing cost rate of around 8 % every year up to 2020 However, the solar cost has been assumed to be stagnated after few years. the trend of declining solar costs over the past years. The feasibility of implementation of JNNSM and its positive implications can be seen when compared with the trend Comparing Projected Capital Cost of Solar Thermal & PV with Thermal Project (Rs Crore * 1 Crore (Cr) INR =168,595 AUD @ 1 AUD=59.31INR According to the projections Solar PV will become competitive with Conventional at the 6 at a cost approx. Rs 6.50 Cr. /MW and will start decreasing further up to 5.20 or nearby and will become stagnant, whereas in the case of Solar Thermal the competitive yr will be 2018 at a cost of Rs 7.25 Cr. /MW. Overall, this rapid decrease in the cos Thermal will majorly come from economies of scale in the solar plant size, manufacturing industry, International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 – © IAEME Here, the cost of solar thermal was stagnant from 2010 to 2012 then started decreasing because in India the progress on solar thermal was not up to the level as envisaged in those years but progressively becoming the manufacturing hub for solar equipment, the solar plants were being manufactured based on indigenous items and there was involvement of some of the large Solar Cell producers of India such d Solar Semiconductor thus, the manufacturing targets The Central Electricity Regulatory Commission (CERC) released the new benchmark capital [2] In the years to 15-25% per annum , to be safer, the drop in the cost of solar Thermal & PV are assumed to be 8% and 10 % respectively instead of actual 10-15% unforeseen situations. The thermal NTPC Daripalli Plant of 1600 MW i.e. INR 5.5 Cr/MW with further increasing cost rate of around 8 % every year up to 2020 the trend of declining solar costs over the past years. The feasibility of implementation of JNNSM and its positive implications can be seen when compared with the trend Comparing Projected Capital Cost of Solar Thermal & PV with Thermal Project (Rs Crore According to the projections Solar PV will become competitive with Conventional at the 6 at a cost approx. Rs 6.50 Cr. /MW and will start decreasing further up to 5.20 or nearby and will become stagnant, whereas in the case of Solar Thermal the competitive yr Overall, this rapid decrease in the cost of solar PV & Thermal will majorly come from economies of scale in the solar plant size, manufacturing industry,
  • 6. International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 6340(Print), ISSN 0976 – 6359(Online) learning experience. Other factors like improvements in the performance of the solar 30% could be possible. In the year 2010-11 when JNNSM was launched the solar power capacity of India was only 35.15 MW. In comparison to the 1000MW Target of Phase 1 the achieved capacity rose up by 65 i.e. 1645MW and thereafter if the further capacity addition is projected at the rate of 40 to 50% up to 2017. The Phase II, at the 2017 level projected capacity will be around 8327 MW and by 2022 capacity addition would be around 35000 MW. FORESEEABLE SOLAR SCENARIO OF INDIA It is seen that the RPO requirement from 2011 to 2013 was 0.25% the target of 1536 MW was met in the year 2013 with around increase of 6% as 1643 MW. other additional solar power capacity additions by various states, REC mechanism as well as the recent announced 4000 MW solar UMPP are used and thus, the actual further growth rate is expected to be above 7 % but for analyzing the target for future years of 6 % is assumed. Figure 3: From the projections, it can be seen that the mission target of capacity addition of 20,000 MW (20GW) for 2022 will be achieved well before during 2019 this target well before or say during the 2021 and shall meet the RPO in time. The CERC/SERC. Procuring solar power could save money in the long run even if the current cost of solar electricity is higher than grid prices. consumer. Hence, there is no single fra International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 6359(Online) Volume 5, Issue 1, January (2014), © IAEME 6 like advances in R&D, indigenous equipments manufacturing and improvements in the performance of the solar field. By 2020, capital cost reductions of more than 11 when JNNSM was launched the solar power capacity of India was only 35.15 MW. In comparison to the 1000MW Target of Phase 1 the achieved capacity rose up by 65 i.e. 1645MW and thereafter if the further capacity addition is projected at the rate of 40 to 50% up to he Phase II, at the 2017 level projected capacity will be around 8327 MW and by 2022 capacity addition would be around 35000 MW. FORESEEABLE SOLAR SCENARIO OF INDIA It is seen that the RPO requirement from 2011 to 2013 was 0.25% the target of 1536 MW was met in the year 2013 with around increase of 6% as 1643 MW. To support the RPO mechanism other additional solar power capacity additions by various states, REC mechanism as well as the recent announced 4000 MW solar UMPP are used and thus, the actual further growth rate is expected the target for future years under the base line scenario growth rate : Projections of Solar RPO compliance From the projections, it can be seen that the mission target of capacity addition of 20,000 achieved well before during 2019-20. India is going ahead to achieve this target well before or say during the 2021-2022, the solar capacity would be around 36,000 MW The electricity prices are increasing around 5-10% every CERC/SERC. Procuring solar power could save money in the long run even if the current cost of solar electricity is higher than grid prices. In India, the power tariffs vary by state and also the type of consumer. Hence, there is no single frame of reference for grid parity. International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 – © IAEME advances in R&D, indigenous equipments manufacturing and field. By 2020, capital cost reductions of more than 11 when JNNSM was launched the solar power capacity of India was only 35.15 MW. In comparison to the 1000MW Target of Phase 1 the achieved capacity rose up by 65 % i.e. 1645MW and thereafter if the further capacity addition is projected at the rate of 40 to 50% up to he Phase II, at the 2017 level projected capacity will be around 8327 MW and by 2022 It is seen that the RPO requirement from 2011 to 2013 was 0.25% the target of 1536 MW o support the RPO mechanism other additional solar power capacity additions by various states, REC mechanism as well as the recent announced 4000 MW solar UMPP are used and thus, the actual further growth rate is expected under the base line scenario growth rate From the projections, it can be seen that the mission target of capacity addition of 20,000 20. India is going ahead to achieve 2022, the solar capacity would be around 36,000 MW 10% every year by the CERC/SERC. Procuring solar power could save money in the long run even if the current cost of In India, the power tariffs vary by state and also the type of
  • 7. International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 6340(Print), ISSN 0976 – 6359(Online) Figure 4: Solar LCOE through competitive bidding done by several States in India From the above illustration, the average LCOE received through competitive bidding is around Rs 5.5 /kWh in spite of Govt. has fixed the L average LCOE tariff for electricity in India was Rs 3.8 per kWh in 2011 cost of Rs 4.87 per kWh. The gap between the average tariff and average cost per unit was Rs 1.08 per kWh, or 22 per cent of the cost per uni of electricity has ranged from between 20 per cent and 30 per cent. Continuing the same projections for unit cost by filling gap with 10% average increase per kWh for further five years, it would in fig shown. For Comparing Average cost of Electricity in India with the Solar PV LCOE it is assumed that the Solar PV LCOE will be stagnant after the year 2014 Figure 5: * 1 Crore (Cr) INR =168,595 A Thus, the result can be achieved be cheaper and with grid parity, it will continue to provide electricity with no fuel cost and with minimal maintenance for 25 years or more. value of solar greater over time. Over 25 years, the savings from solar grow significantly and will be free forever and forever. International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 6359(Online) Volume 5, Issue 1, January (2014), © IAEME 7 Solar LCOE through competitive bidding done by several States in India From the above illustration, the average LCOE received through competitive bidding is around Rs 5.5 /kWh in spite of Govt. has fixed the LCOE rate around Rs 8/kWh. average LCOE tariff for electricity in India was Rs 3.8 per kWh in 2011-12, as against an average cost of Rs 4.87 per kWh. The gap between the average tariff and average cost per unit was Rs 1.08 per kWh, or 22 per cent of the cost per unit. The gap between average tariff and average cost per unit of electricity has ranged from between 20 per cent and 30 per cent. Continuing the same projections for unit cost by filling gap with 10% average increase per kWh for further five years, it would For Comparing Average cost of Electricity in India with the Solar PV LCOE it is assumed that the Solar PV LCOE will be stagnant after the year 2014-15. : Grid Parity Solar Vs. electricity Price * 1 Crore (Cr) INR =168,595 AUD @ 1 AUD=59.31INR can be achieved in year 2014 or in the worst case 2015 when solar rate would be cheaper and with grid parity, it will continue to provide electricity with no fuel cost and with minimal maintenance for 25 years or more. Grid prices typically increase, however, making the Over 25 years, the savings from solar grow significantly and will be International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 – © IAEME Solar LCOE through competitive bidding done by several States in India From the above illustration, the average LCOE received through competitive bidding is Furthermore, the 12, as against an average cost of Rs 4.87 per kWh. The gap between the average tariff and average cost per unit was Rs 1.08 t. The gap between average tariff and average cost per unit of electricity has ranged from between 20 per cent and 30 per cent. Continuing the same projections for unit cost by filling gap with 10% average increase per kWh for further five years, it would be like For Comparing Average cost of Electricity in India with the Solar PV LCOE it is in year 2014 or in the worst case 2015 when solar rate would be cheaper and with grid parity, it will continue to provide electricity with no fuel cost and with Grid prices typically increase, however, making the Over 25 years, the savings from solar grow significantly and will be
  • 8. International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 – 6340(Print), ISSN 0976 – 6359(Online) Volume 5, Issue 1, January (2014), © IAEME 8 SUMMARY OF RESULTS AND FINDINGS The Solar PV will become competitive with Conventional at the completion of the yr 2016 at a cost of about Rs 6.50 Cr. /MW and Solar Thermal in 2018 at a cost of Rs 7.25 Cr. /MW, moreover in the Mission completion year 2022 the costs of Solar PV & Solar Thermal would be around 5.23 & 6.59 respectively. • The average LCOE received through competitive bidding was around Rs 5.5 /kWh in spite of Govt. fixed the LCOE rate around Rs 8/kWh. • Mission’s solar capacity target of 20,000MW will be achieved around 20018-2019 and till 2022 the projected capacity would be around 35,000MW. • RPO Target of 3% from an initial 0.25 % and a capacity of about 34000 MW will be achieved in the year 2021-2022. India had a peak power shortage of 9.3% during the five years ending in 2012 when over 50,000 MW new generation capacity was commissioned. The capacity addition target during the 12th plan period (2012-17) is estimated at 88,537 MW comprising of 26,182 MW that is backed by the central government, 15,530 MW that is backed by the various state governments and 46,825 MW that is expected from the private sector. However, no previous plan period in India has seen a capacity addition equal to or greater than what was planned. Most experts therefore expect less to be actually achieved. The easiest way for SEBs to improve their financial health is to raise tariffs to a level that truly reflects their generation, transmission and distribution costs. States like Tamil Nadu, Odisha, Jharkhand, Kerala and Delhi have already raised tariffs by as much as 15-30% in the past year. With costs rising and the financial health of distribution companies deteriorating, further increases of tariffs across the country are expected. The aim can be achieved in year 2014 or in the worst case 2015 when solar rate would be cheaper and with grid parity, it will continue to provide electricity with no fuel cost and with minimal maintenance for 25 years or more. Grid prices typically increase, however, making the value of solar greater over time. The chart illustrates the Grid electricity is cheaper after few years. Over 25 years, the savings from solar grow significantly and will be free forever and forever. Solar power can be considered to be a safe investment and is recognized as such in most mature markets such as Germany where the lenders are willing to provide 100% non-recourse debt. Solar power is already cheaper than grid power for commercial consumers in Maharashtra, Delhi and Kerala even without any subsidy. Unsubsidized solar power is already feasible in some parts of the country. As prices for grid power are expected to increase and cost for solar power is expected to fall, more and more states and customer segments will find investing in solar a lucrative option. REFERENCES [1] Bettina Weiss, P. S. I., 2013. JNNSM pathway, September, 9 2013. [2] deo, s. j. s. v., 2013. Central Electricity Regulatory Commission Indian Government. [Online] Available at: http://www.cercind.gov.in/2013/orders/SO243.pdf. [3] EIA, 2013. US. energy information admministration India Overview. [Online] Available at: http://www.eia.gov/countries/cab.cfm?fips=IN. [4] WATO-India, 2012. Renewable Energy in India, Mumbai: Government of western australia. woods, l., 2013. PVTECH. [Online] Available at: http://www.pv-tech.org/news/china_introduces_tariff_zones_6478. [5] Ramachandra, T. V. J. R. &. K. G., 2011. Hotspots of solar potential in India.. Renewable and Sustainable Energy Reviews, 15(6), pp. 3178-3186.
  • 9. International Journal of Mechanical Engineering and Technology (IJMET), ISSN 0976 – 6340(Print), ISSN 0976 – 6359(Online) Volume 5, Issue 1, January (2014), © IAEME 9 [6] MNRE, 2010. Guidelines for Selection of New Grid connected Solar Power Projects. [Online] Available at: http://www.mnre.gov.in/file-manager/UserFiles/jnnsm_gridconnected_25072010.pdf. [7] MNRE, 2013. Further Revised Draft of Guidelines for setting up of 750 MW Grid Solar PV power projects with Viability Gap Funding (VGF) under JNNSM Phase II, Batch I. Available at: http://mnre.gov.in/file-manager/UserFiles/further-revised-VGF_750MW_Guidelines_for- grid-solar-power-projects.pdf . [8] Eshan et al, “India’s Reliance on Energy Sources: An Overview Study towards Sustainability by 2022”, International Journal of Engineering Innovation & Research, Nov-Dec 2013, Volume 2, Issue 6, ISSN: 2277 – 5668. [9] K. Balachander and Dr. P. Vijayakumar, “Economic Analysis, Modeling and Simulation of Photovoltaic Fuel Cell Hybrid Renewable Electric System for Smart Grid Distributed Generation System”, International Journal of Mechanical Engineering & Technology (IJMET), Volume 3, Issue 1, 2012, pp. 179 - 186, ISSN Print: 0976 – 6340, ISSN Online: 0976 – 6359. [10] Eshan Ahuja and Dr. Navin Kumar Kohli, “Emission Reductions using Application of Conservation & Energy Efficiency Strategies in Energy Inefficient Australian’s Households”, International Journal of Advanced Research in Engineering & Technology (IJARET), Volume 4, Issue 6, 2013, pp. 110 - 117, ISSN Print: 0976-6480, ISSN Online: 0976-6499. [11] Navin Kumar Kohli and Eshan Ahuja, “Performance Prediction in Hawt Wind Power Turbine”, International Journal of Mechanical Engineering & Technology (IJMET), Volume 2, Issue 2, 2011, pp. 14 - 24, ISSN Print: 0976 – 6340, ISSN Online: 0976 – 6359.