1. Site Name Lincoln & De Aston School & Kim’s house Risk-Assessment 1
number
Project Drake - Headlines Names Tom and Hayley
Location School hall & Lincoln Assistants Gideon Seglah
Date Assessed 14th September 2012
What hazards have What are the What measures have Number What additional measures or Who is
been identified? potential injuries been taken to prevent of actions are required? responsible for
or damage? injury or damage? people action?
at risk
Severity (1, 2 or 3)
Wires and cables Could trip over Make sure cables are 2 Tell everyone to be aware of Hayley and Tom
wires and taped down so nobody loose cables. Waterproof
cables/ can trip on them. Check coating.
electrocution for nicks or cuts in wires.
Traffic in streets Accidents Watch out for traffic 3 Use pedestrian crossings. Be Hayley and Tom
involving before deciding to cross aware of moving traffic
moving vehicles roads.
Pole dancing Could cause Be careful 1 Warn the dancer to be careful
friction burns for burns and bruises Kimberley
and bruises
Champagne bottle Bottle and glass Pick up and move only if 3 Use plastic imitational glasses Tom, Hayley &
and glass could smash necessary Gideon
Lighting Electrical hazard One person only on high 2 Harness Tom and Hayley
preparation Height hazard. areas.