SlideShare a Scribd company logo
1 of 4
Download to read offline
Eng.hany amer Page 1 of 4
ahmoud AmerHany Mohammed M
00966-552366250Cellular
(Current))Address 1: Riyadh, Saudi Arabia
Address 2: Gardens Maadi City, Cairo, Egypt
Email: hany_7772001@yahoo.com
Objective:
Obtain a well position in the field of Quality & Process Improvement in a well- established firm.
Education :
Courses Quality Management:
•Quality Assurance - Contemporary Management.
•Statistics for Decision Making - Statistical Quality Control.
•Quality Management - Customer Relationship Management.
•Advanced topics in Quality management - Business process reengineering .
•Research Methodology - Group dynamics.
Bachelor's Degree
Helwan University
BSc: Engineering, September 2001
Major: Mechanical Power Engineering
Grade: Passable
Project Grade: Excellent
Graduation Project:. Experiments on vapor compression Refrigeration system for Air
conditioning Application
:Professional Certificates
- Internal Auditor ISO 9001:2000&ISO14001:2004 (SGS)-2006
- Lean Manufacturing Green Belt, TDS Toyota development system )Team America(
Work Experience:
Quality Engineer and operations engineer
ROLLC LTD, (Saudi Arabia)
3/2015-Present
The Company is a market leader in the delivery of industrial Manufacture, installation
and maintenance of industrial security automatic doors.The company characterized by
the following product:Industrial isolated and non-isolated doors, wind resistant roll up
shutter doors, fire rated doors from 2-3 hours which achieve (UL) certificate,
hydraulic road blocker, gate barrier, tire killer
 Planning, conducting and reporting Internal Quality Audits: presenting
reviews, written and oral reports that describe discrepancies along with the
recommendations of any actions required as an outcome.
 Developing robust audit plans, quality assurance plans, risk assessment and
procedures within the budgeted timeframe
 Overseeing the management of non-conformities related to quality and
customer requirements, corrective and preventive actions.
Eng.hany amer Page 2 of 4
 Directing and managing the quality system and resources to meet ISO 9001
and customer requirements. Planning and conducting project-trainings and
awareness workshops to achieve ISO 9001.
 Addressing customer complaints/warranty issues and following-up internal,
external corrective and preventive actions
 Compiling critical quality data for non-conformity trends, cause and effects
analysis, audit findings, customer issues, trainings, etc. as a means of
identifying areas for further improvement.
 Promoting a creative and positive environment for company-wide quality
improvement focused on meeting and exceeding customer expectations.
 Maintaining credibility of the Quality Department through professionalism,
independence and objectivity
 The work of the review of material determines the classification of defect and
how to dispose of it)M.R.B)
 follow up the process of industrialization special requests (concession ISO
9001)
Head Quality assurance
Power House Company
2013-2014
Company works in the field of petroleum services
 Senior management involved in the policies and objectives relating to quality
and the environment mode.
 plans to work for the internal audit system of quality and environmental
management company in coordination with the General Coordinator of the
production and quality (management representative(
 Follow-up to the implementation of internal audit in accordance with the
procedures and specific plan for it and reporting on the results of the general
coordinator of the production and quality (management representative)
 Follow-up implementation of corrective and preventive actions, which are
about the company's lack of matches and customer complaints and reporting
for senior management.
 Preparations for meetings of the management review and follow up the
implementation of all the resolutions and recommendations and assignments
implications.
 Follow the performance for all employees quality and environmental
management plans for the development of their capabilities in line with the
business requirements and the results of performance measurement for them.
 Follow the measurement and analysis of the results of the performance of the
activities and operations of different departments work and submit reports by
the General Coordinator of production and quality (management
representative) application and follow up of all acts of improvement and
development in the performance of the activities and operations of the
company.
 Obtain environmental laws and follow updated on a continuous basis.
 Identify environmental issues and constantly updated when you change the
operations or change the materials used.
 Participating in the development of environmental management programs for
the implementation of the environmental objectives of the company.
 Work time plan for conducting the required measurements of the elements of
the environment.
Eng.hany amer Page 1 of 4
Quality Control processes Engineer
Asfour Crystal International
6/2011-7/2013
The Company is a globally recognized name that is synonymous with unique quality
and decades of dedication
 Interim control of production processes
 Ensure the product specifications required by matching each stage of
conformity with the instructions of quality control
 Turn off any defective product from continuing the production line and
distinguish it as flawed
 The discovery of cases of non-conformity and deal with them according to the
corrective action followed
 Report of the recommendation of the director of quality control to raise the
necessary preventive measures
 quality of the processes responsible for keeping all records Quality models
perform quality management and all his works are subject to internal audit
 All of the above must be done according to the procedure adopted for the
formal quality management
 work of return on all production stages
 work of analysis of the data between productivity levels and identify defects
ratios
 Customer complaints internally and externally analysis and corrective actions
put them
 Quality Testing to determine the costs and the costs of quality internal and
external
Production and Quality engineer
Goldi group
2008-2011
The company specializes in manufacturing of home appliances
 Production engineer for manufacturing relay( GASCOOKER)
 Deputy Director of Production
 Prime quality sections of the stages of productivity
 Head of Department RECEIVING INSPECTION
 Achieving productivity plan in cooperation with the planning and management
of procurement
 Load machines and calculating time study for each machine
Quality Control Engineer
universal company
2007-2008
A global company specializing in the manufacture of all home appliances
Key Responsibilities:
•The application of quality requirements on the assembly lines home appliances,
complying with Egyptian and European manufacturer of gas furnaces
Eng.hany amer Page 2 of 4
Production Engineer
Electrostar Company
2003-2007
A global company specializing in the manufacture of all home appliances
 Head of maintenance service after sales center
 Production engineer sheet section
 Head of the assembly refrigerators
 Head of injection Doors
 Edovriv technical support for the analysis of specific problems Relay
registration - suppliers defects
 The Operating Push System) MRP) depends on the existence of stocks and
sometimes rely on planning Pull System just-in-time
Technical skills:
 Statistical Quality control methods
 TOTAL QUALITY management
 6S techniques: apply 6S and adjust its performance results.
 The principles of total quality management
 Pore quality Cost
 7 Quality Tools
 Stock Control and Inventory Stocktaking
 Used 5 Whys is a technique Analyze phase of the Six Sigma DMAIC 5 why
 Use the Fishbone Tool for Root Cause Analysis
Computer Skills:
 Excellent in using Microsoft Office Package (Word, Excel, PowerPoint).
Professional in using Internet
 using (MINITAB 16) statistical analysis
 Using (VISIO 2007- MICROSOFT PROJECT 2007)
 Outstanding internet search skills
Personal Skills:
 Communication skills, presentation and negotiation skills
 Leadership, Hard Working
 Detail oriented.
 Enthused, Teamwork
 Flexible and dynamic
Languages:
 English fluent.
 Arabic native language
Personal Data
 Date of Birth… Setmp21th
1976.
 Nationality…....Egyptian.
 Marital Status…Married
 Military Status...Completed

More Related Content

What's hot

QUALITY CONTROL AND SAFETY DURING CONSTRUCTIONIjmet 08 03_012
QUALITY CONTROL AND SAFETY DURING CONSTRUCTIONIjmet 08 03_012QUALITY CONTROL AND SAFETY DURING CONSTRUCTIONIjmet 08 03_012
QUALITY CONTROL AND SAFETY DURING CONSTRUCTIONIjmet 08 03_012IAEME Publication
 
Ipc india newsletter feb19_article_ms_seema sabikhi
Ipc india newsletter feb19_article_ms_seema sabikhiIpc india newsletter feb19_article_ms_seema sabikhi
Ipc india newsletter feb19_article_ms_seema sabikhiSuresh Kr. Rana
 
Tammy Flory 2017
Tammy Flory 2017Tammy Flory 2017
Tammy Flory 2017Tammy Flory
 
Quality Control Leader
Quality Control LeaderQuality Control Leader
Quality Control Leaderhotmagenta
 
The Implementation of QMS in construction industry
The Implementation of QMS in construction industryThe Implementation of QMS in construction industry
The Implementation of QMS in construction industryRaghavendra Rachamadugu
 
10. Project Quality Management
10. Project Quality Management 10. Project Quality Management
10. Project Quality Management BhuWan Khadka
 
Curriculum Vitae 2015
Curriculum Vitae 2015Curriculum Vitae 2015
Curriculum Vitae 2015James Ellams
 
JoeResume2 (1) (2)
JoeResume2 (1) (2)JoeResume2 (1) (2)
JoeResume2 (1) (2)Joe Onofaro
 
PatrickHudginResume CV
PatrickHudginResume CVPatrickHudginResume CV
PatrickHudginResume CVPatrick Hudgin
 

What's hot (20)

resume G.Roul
resume G.Roulresume G.Roul
resume G.Roul
 
Resume 6-18-2016
Resume 6-18-2016Resume 6-18-2016
Resume 6-18-2016
 
EMEELIZA_HORNILLA_CAPONPON
EMEELIZA_HORNILLA_CAPONPONEMEELIZA_HORNILLA_CAPONPON
EMEELIZA_HORNILLA_CAPONPON
 
MacKeen, Robert
MacKeen, RobertMacKeen, Robert
MacKeen, Robert
 
Carmela 3-28-15
Carmela 3-28-15Carmela 3-28-15
Carmela 3-28-15
 
QUALITY CONTROL AND SAFETY DURING CONSTRUCTIONIjmet 08 03_012
QUALITY CONTROL AND SAFETY DURING CONSTRUCTIONIjmet 08 03_012QUALITY CONTROL AND SAFETY DURING CONSTRUCTIONIjmet 08 03_012
QUALITY CONTROL AND SAFETY DURING CONSTRUCTIONIjmet 08 03_012
 
CV Mohan
CV MohanCV Mohan
CV Mohan
 
vijay bharathi
vijay bharathivijay bharathi
vijay bharathi
 
Ipc india newsletter feb19_article_ms_seema sabikhi
Ipc india newsletter feb19_article_ms_seema sabikhiIpc india newsletter feb19_article_ms_seema sabikhi
Ipc india newsletter feb19_article_ms_seema sabikhi
 
Shajaruddin Baloch 30.06.2015
Shajaruddin Baloch 30.06.2015Shajaruddin Baloch 30.06.2015
Shajaruddin Baloch 30.06.2015
 
Quality assurance
Quality assuranceQuality assurance
Quality assurance
 
Tammy Flory 2017
Tammy Flory 2017Tammy Flory 2017
Tammy Flory 2017
 
CV - K. Raja Narender Reddy
CV - K. Raja Narender ReddyCV - K. Raja Narender Reddy
CV - K. Raja Narender Reddy
 
Quality Control Leader
Quality Control LeaderQuality Control Leader
Quality Control Leader
 
The Implementation of QMS in construction industry
The Implementation of QMS in construction industryThe Implementation of QMS in construction industry
The Implementation of QMS in construction industry
 
10. Project Quality Management
10. Project Quality Management 10. Project Quality Management
10. Project Quality Management
 
Curriculum Vitae 2015
Curriculum Vitae 2015Curriculum Vitae 2015
Curriculum Vitae 2015
 
JoeResume2 (1) (2)
JoeResume2 (1) (2)JoeResume2 (1) (2)
JoeResume2 (1) (2)
 
Dbresume28
Dbresume28Dbresume28
Dbresume28
 
PatrickHudginResume CV
PatrickHudginResume CVPatrickHudginResume CV
PatrickHudginResume CV
 

Viewers also liked

Detailed (C.V) 8814
Detailed (C.V) 8814 Detailed (C.V) 8814
Detailed (C.V) 8814 loai hany
 
Hani Nasif Resume 2014
Hani Nasif Resume 2014Hani Nasif Resume 2014
Hani Nasif Resume 2014Hani Nasif
 
Rami Hani Resume April 2016
Rami Hani Resume April 2016Rami Hani Resume April 2016
Rami Hani Resume April 2016rami qashta
 
C v surveyor( Mumtaz )
C v surveyor( Mumtaz )C v surveyor( Mumtaz )
C v surveyor( Mumtaz )Mumtaz Ahmad
 
CV For OSP Planning & Design-Kumaran
CV For OSP Planning & Design-KumaranCV For OSP Planning & Design-Kumaran
CV For OSP Planning & Design-Kumarankumaraguru paran
 
Hani Farraj CV Final
Hani Farraj CV FinalHani Farraj CV Final
Hani Farraj CV FinalHANI FARRAJ
 
mohamed AWAD SHERIF CV
mohamed AWAD SHERIF CVmohamed AWAD SHERIF CV
mohamed AWAD SHERIF CVmohamed awad
 
DR NOREEN JAWAD CV PDF
DR NOREEN JAWAD CV PDFDR NOREEN JAWAD CV PDF
DR NOREEN JAWAD CV PDFNoreen Jawad
 
Curriculum vitae CV date 13-1-2016
Curriculum vitae CV date 13-1-2016Curriculum vitae CV date 13-1-2016
Curriculum vitae CV date 13-1-2016Maitham Al Miskeen
 
C.V. Eng. Abdulqader 10-8-2015
C.V. Eng. Abdulqader 10-8-2015C.V. Eng. Abdulqader 10-8-2015
C.V. Eng. Abdulqader 10-8-2015Abdulqader Khaled
 
Hani El Jamal Jan 2015 resume
Hani El Jamal Jan 2015 resumeHani El Jamal Jan 2015 resume
Hani El Jamal Jan 2015 resumeHani Al Jamal
 

Viewers also liked (20)

CV hany
CV hanyCV hany
CV hany
 
Detailed (C.V) 8814
Detailed (C.V) 8814 Detailed (C.V) 8814
Detailed (C.V) 8814
 
Hani Nasif Resume 2014
Hani Nasif Resume 2014Hani Nasif Resume 2014
Hani Nasif Resume 2014
 
M. Darwish CV 30-11-2015
M. Darwish CV 30-11-2015M. Darwish CV 30-11-2015
M. Darwish CV 30-11-2015
 
Maya Assaf CV
Maya Assaf CVMaya Assaf CV
Maya Assaf CV
 
Rami Hani Resume April 2016
Rami Hani Resume April 2016Rami Hani Resume April 2016
Rami Hani Resume April 2016
 
C v surveyor( Mumtaz )
C v surveyor( Mumtaz )C v surveyor( Mumtaz )
C v surveyor( Mumtaz )
 
CV For OSP Planning & Design-Kumaran
CV For OSP Planning & Design-KumaranCV For OSP Planning & Design-Kumaran
CV For OSP Planning & Design-Kumaran
 
Hani Farraj CV Final
Hani Farraj CV FinalHani Farraj CV Final
Hani Farraj CV Final
 
mohamed AWAD SHERIF CV
mohamed AWAD SHERIF CVmohamed AWAD SHERIF CV
mohamed AWAD SHERIF CV
 
Kahlid Abdul Aziz CV
Kahlid Abdul Aziz CVKahlid Abdul Aziz CV
Kahlid Abdul Aziz CV
 
AJMAL CV,
AJMAL CV,AJMAL CV,
AJMAL CV,
 
ahmad CV
ahmad CVahmad CV
ahmad CV
 
hani C.V pdf
hani C.V pdfhani C.V pdf
hani C.V pdf
 
DR NOREEN JAWAD CV PDF
DR NOREEN JAWAD CV PDFDR NOREEN JAWAD CV PDF
DR NOREEN JAWAD CV PDF
 
Omar CV
Omar CVOmar CV
Omar CV
 
Curriculum vitae CV date 13-1-2016
Curriculum vitae CV date 13-1-2016Curriculum vitae CV date 13-1-2016
Curriculum vitae CV date 13-1-2016
 
C.V. Eng. Abdulqader 10-8-2015
C.V. Eng. Abdulqader 10-8-2015C.V. Eng. Abdulqader 10-8-2015
C.V. Eng. Abdulqader 10-8-2015
 
Hani El Jamal Jan 2015 resume
Hani El Jamal Jan 2015 resumeHani El Jamal Jan 2015 resume
Hani El Jamal Jan 2015 resume
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 

Similar to Hany Mohammed mahmoud Amer new1

Similar to Hany Mohammed mahmoud Amer new1 (20)

Mohamed salah cv
Mohamed  salah cvMohamed  salah cv
Mohamed salah cv
 
Rohit_Awasthi_Final 1
Rohit_Awasthi_Final 1Rohit_Awasthi_Final 1
Rohit_Awasthi_Final 1
 
Thiruchelvan K
Thiruchelvan KThiruchelvan K
Thiruchelvan K
 
Resume
ResumeResume
Resume
 
Marty Howard ASQ QM QE Resume 5.doc
Marty Howard ASQ QM QE Resume 5.docMarty Howard ASQ QM QE Resume 5.doc
Marty Howard ASQ QM QE Resume 5.doc
 
C v a.madrigal ingles
C v a.madrigal inglesC v a.madrigal ingles
C v a.madrigal ingles
 
Resume
ResumeResume
Resume
 
Panneer selvam quality
Panneer selvam quality Panneer selvam quality
Panneer selvam quality
 
Doug Cruz_Resume_2016
Doug Cruz_Resume_2016Doug Cruz_Resume_2016
Doug Cruz_Resume_2016
 
Murali_Resume_updated[1]
Murali_Resume_updated[1]Murali_Resume_updated[1]
Murali_Resume_updated[1]
 
kka 110316
kka 110316kka 110316
kka 110316
 
CV KDueñas Oct 2015_2
CV KDueñas Oct 2015_2CV KDueñas Oct 2015_2
CV KDueñas Oct 2015_2
 
April 2016 - Denita's Resume
April 2016 - Denita's ResumeApril 2016 - Denita's Resume
April 2016 - Denita's Resume
 
Isaac.Oladimejii.pdf
Isaac.Oladimejii.pdfIsaac.Oladimejii.pdf
Isaac.Oladimejii.pdf
 
YEIN RESUME
YEIN RESUMEYEIN RESUME
YEIN RESUME
 
maclean--scott---resume 1-19-2016
maclean--scott---resume 1-19-2016maclean--scott---resume 1-19-2016
maclean--scott---resume 1-19-2016
 
Mallappa Beleri Resume
Mallappa Beleri ResumeMallappa Beleri Resume
Mallappa Beleri Resume
 
Resume-Quality Director-Dominic 2016 1
Resume-Quality Director-Dominic 2016 1Resume-Quality Director-Dominic 2016 1
Resume-Quality Director-Dominic 2016 1
 
Glen's Resume
Glen's ResumeGlen's Resume
Glen's Resume
 
NM CV 041114
NM CV 041114NM CV 041114
NM CV 041114
 

Hany Mohammed mahmoud Amer new1

  • 1. Eng.hany amer Page 1 of 4 ahmoud AmerHany Mohammed M 00966-552366250Cellular (Current))Address 1: Riyadh, Saudi Arabia Address 2: Gardens Maadi City, Cairo, Egypt Email: hany_7772001@yahoo.com Objective: Obtain a well position in the field of Quality & Process Improvement in a well- established firm. Education : Courses Quality Management: •Quality Assurance - Contemporary Management. •Statistics for Decision Making - Statistical Quality Control. •Quality Management - Customer Relationship Management. •Advanced topics in Quality management - Business process reengineering . •Research Methodology - Group dynamics. Bachelor's Degree Helwan University BSc: Engineering, September 2001 Major: Mechanical Power Engineering Grade: Passable Project Grade: Excellent Graduation Project:. Experiments on vapor compression Refrigeration system for Air conditioning Application :Professional Certificates - Internal Auditor ISO 9001:2000&ISO14001:2004 (SGS)-2006 - Lean Manufacturing Green Belt, TDS Toyota development system )Team America( Work Experience: Quality Engineer and operations engineer ROLLC LTD, (Saudi Arabia) 3/2015-Present The Company is a market leader in the delivery of industrial Manufacture, installation and maintenance of industrial security automatic doors.The company characterized by the following product:Industrial isolated and non-isolated doors, wind resistant roll up shutter doors, fire rated doors from 2-3 hours which achieve (UL) certificate, hydraulic road blocker, gate barrier, tire killer  Planning, conducting and reporting Internal Quality Audits: presenting reviews, written and oral reports that describe discrepancies along with the recommendations of any actions required as an outcome.  Developing robust audit plans, quality assurance plans, risk assessment and procedures within the budgeted timeframe  Overseeing the management of non-conformities related to quality and customer requirements, corrective and preventive actions.
  • 2. Eng.hany amer Page 2 of 4  Directing and managing the quality system and resources to meet ISO 9001 and customer requirements. Planning and conducting project-trainings and awareness workshops to achieve ISO 9001.  Addressing customer complaints/warranty issues and following-up internal, external corrective and preventive actions  Compiling critical quality data for non-conformity trends, cause and effects analysis, audit findings, customer issues, trainings, etc. as a means of identifying areas for further improvement.  Promoting a creative and positive environment for company-wide quality improvement focused on meeting and exceeding customer expectations.  Maintaining credibility of the Quality Department through professionalism, independence and objectivity  The work of the review of material determines the classification of defect and how to dispose of it)M.R.B)  follow up the process of industrialization special requests (concession ISO 9001) Head Quality assurance Power House Company 2013-2014 Company works in the field of petroleum services  Senior management involved in the policies and objectives relating to quality and the environment mode.  plans to work for the internal audit system of quality and environmental management company in coordination with the General Coordinator of the production and quality (management representative(  Follow-up to the implementation of internal audit in accordance with the procedures and specific plan for it and reporting on the results of the general coordinator of the production and quality (management representative)  Follow-up implementation of corrective and preventive actions, which are about the company's lack of matches and customer complaints and reporting for senior management.  Preparations for meetings of the management review and follow up the implementation of all the resolutions and recommendations and assignments implications.  Follow the performance for all employees quality and environmental management plans for the development of their capabilities in line with the business requirements and the results of performance measurement for them.  Follow the measurement and analysis of the results of the performance of the activities and operations of different departments work and submit reports by the General Coordinator of production and quality (management representative) application and follow up of all acts of improvement and development in the performance of the activities and operations of the company.  Obtain environmental laws and follow updated on a continuous basis.  Identify environmental issues and constantly updated when you change the operations or change the materials used.  Participating in the development of environmental management programs for the implementation of the environmental objectives of the company.  Work time plan for conducting the required measurements of the elements of the environment.
  • 3. Eng.hany amer Page 1 of 4 Quality Control processes Engineer Asfour Crystal International 6/2011-7/2013 The Company is a globally recognized name that is synonymous with unique quality and decades of dedication  Interim control of production processes  Ensure the product specifications required by matching each stage of conformity with the instructions of quality control  Turn off any defective product from continuing the production line and distinguish it as flawed  The discovery of cases of non-conformity and deal with them according to the corrective action followed  Report of the recommendation of the director of quality control to raise the necessary preventive measures  quality of the processes responsible for keeping all records Quality models perform quality management and all his works are subject to internal audit  All of the above must be done according to the procedure adopted for the formal quality management  work of return on all production stages  work of analysis of the data between productivity levels and identify defects ratios  Customer complaints internally and externally analysis and corrective actions put them  Quality Testing to determine the costs and the costs of quality internal and external Production and Quality engineer Goldi group 2008-2011 The company specializes in manufacturing of home appliances  Production engineer for manufacturing relay( GASCOOKER)  Deputy Director of Production  Prime quality sections of the stages of productivity  Head of Department RECEIVING INSPECTION  Achieving productivity plan in cooperation with the planning and management of procurement  Load machines and calculating time study for each machine Quality Control Engineer universal company 2007-2008 A global company specializing in the manufacture of all home appliances Key Responsibilities: •The application of quality requirements on the assembly lines home appliances, complying with Egyptian and European manufacturer of gas furnaces
  • 4. Eng.hany amer Page 2 of 4 Production Engineer Electrostar Company 2003-2007 A global company specializing in the manufacture of all home appliances  Head of maintenance service after sales center  Production engineer sheet section  Head of the assembly refrigerators  Head of injection Doors  Edovriv technical support for the analysis of specific problems Relay registration - suppliers defects  The Operating Push System) MRP) depends on the existence of stocks and sometimes rely on planning Pull System just-in-time Technical skills:  Statistical Quality control methods  TOTAL QUALITY management  6S techniques: apply 6S and adjust its performance results.  The principles of total quality management  Pore quality Cost  7 Quality Tools  Stock Control and Inventory Stocktaking  Used 5 Whys is a technique Analyze phase of the Six Sigma DMAIC 5 why  Use the Fishbone Tool for Root Cause Analysis Computer Skills:  Excellent in using Microsoft Office Package (Word, Excel, PowerPoint). Professional in using Internet  using (MINITAB 16) statistical analysis  Using (VISIO 2007- MICROSOFT PROJECT 2007)  Outstanding internet search skills Personal Skills:  Communication skills, presentation and negotiation skills  Leadership, Hard Working  Detail oriented.  Enthused, Teamwork  Flexible and dynamic Languages:  English fluent.  Arabic native language Personal Data  Date of Birth… Setmp21th 1976.  Nationality…....Egyptian.  Marital Status…Married  Military Status...Completed