Project Aim:
To gain Planning Approval for revising the
original Planning Approved drawings, to
capture the changes made during the
construction phase.
Freelance Project Manager Services
included:
∗ Defining the Clients brief
∗ Undertaking a measured survey
∗ Producing existing drawings
∗ Producing proposed drawings
∗ Liaisons with the Planning Department
PROPOSED SECTION B-B
Scale: 1:50
DETAIL F
PROPOSED KITCHEN APERTURE SUPPORT
Scale: 1:5
DETAIL G
PROPOSED EAVES
Scale: 1:5
DETAIL E
PROPOSED SUBSTRUCTURE
Scale: 1:5
BUILDING
CONTROL
Client
SPW/BC/06
Rev ision
Drawing Number
Proposed Section and
Details
Drawing Title
Site Address
ScaleDate
A1 Drawing. Scale as stated.28th February 2010
222 Park Way
West London
Rev. 00
MR. Foster
Agent
MR. G Landers
63C Hemel Hempstead
Herts. HP 1 3AF
110mm
Note: the materials specified for the external walls have
been selected to achieve the 'U' Value of 0.30W/m2K.
This complies with the required 'U' Value stated in Part
L1 and L2: 2006 of the Building Regulations which is
0.30W/m2K for extensions. The 'U' Value calculation is
based on BS EN ISO 6946. Please refer to the email
message sent by Vencel Resil Limited on 02.02.10.
Note: The brickwork above the external window and
external door apertures are to be supported by Catnic
Cougar CG 90 / 100 lintels. Each lintel is to be a standard
size and fit the length of the aperture. A brickwork soldier
course above the window and door apertures is to be
included on all ground floor apertures.
See Detail G (Drawing 06)
See Detail E (Drawing 06)
See Detail F (Drawing 06)
Beams: 2Nr. 178 x 102 UB's side by
side and bolted together with M12 bolts
at 750mm centres. The UB's is to rest
upon Class B Engineering brick
(Staffordshire Blue or similar standard)
padstone.
Ventilation Duct: Duct from ground
floor toilet. Duct to run from the ceiling
attached mechanical extractor fab to
rear external wall. The duct is to laid
above the kitchen ceiling.
Drainage Pipe: from en-suite sink
Graded Floor Joists: 50mm x
200mm C16 grade timber floor joist to
BS 4978 or BS EN 519 or other
national equalivent and so marked.
Strength to be C grade and to BS EN
338. Treatment to be fire retardant
impregnation and British Wood
Preserving and Damp Proofing
Association Commodity Specification
FR2, Type A. Moisture content at time
of erection to be 13 - 19%.
Drainage Pipe: from shower
Existing Timber Joist: The existing
185mm high x 50mm thick built in joist
to be cut within a 6mm tolerance from
the back of joist hanger. The redesign
of the joist will allow the two steel
beams to be recessed above the
plastered ceiling. Teat cut ends.
Joist Hanger: Special restraint propierty
joist hanger to BS 5628 Part 1 to provide
laterial restraint to the external walls. Joist
hangers to be explanet or similar
approved standard. Strength of the joist
hanger to be confirmed by the Structural
Engineer to ensure a match with the
blockwork strength.Timber joists must be
accurately cut to length with an overall
tolerance at the back plate of 6mm.
Pack to beam: Pack to outer side of steel
beam. The pack is to be notched to allow
for the bolt connection.
Plaster Ceiling: 13mm thick plasterboard
with 2mm skim. The existing kitchen
ceiling is to levelled with the new kitchen
extension ceiling to allow for a flush finish.
Floor Boards: 16 - 25mm thick
softwood T&G flooring. New extension
floor is to be laid level with the existing
first floor.
Plaster: Manufacturer to be British
Gypsum Ltd. Product to be multicoat
propriety plaster - Thistle Hardwall for
undercoats. Application: Undercoat
thickness to be 11mm thick and a finishing
coat of 2mm thick. Preparation: prepare
background and conduits and the like and
apply bonding agents and provide a key for
the finishing coat. Stainless steel beads to
be compliant with BS EN 10088 - 1.
External Wall: New 315.5mm thick
external cavity wall construction. The
outer leaf is to be 65mm high x 215mm
long x 102.5mm wide fletton common
brick. The 100mm cavity is to be partially
filled with 75mm thick Jabfill Premium
supplied by Vencel Resil Limited (tel:
02083209175). The inner leaf is to be
215mm high x 620mm long x 100mm wide
Durox Supa Aircrete Block supplied by
Tarmac (tel:08456062468). The
compressive strength of the Aircrete Block
is to be 3.6M/mm2. . The horizontal and
vertical joints to be standard 10mm thick
mortar mix.
Wall Ties: Stainless steel ties with
insulation retainers. Manufacturer to be
Catnic or similar approved standard.
Structural Engineer to specify tie. Fix ties
at 400mm centres.
Windows and Doors: Windows and doors
to be REHAU. Windows to be 70mm and
chamfered. All new windows and doors to
be pitch polymer under cill damp proof
course. Manufacturer to be ruberiod or
similar standard. Product reference: Original
High Performance DPC.
Note: For the roof and floor structures please refer to
drawing 07.
Foul Drainage: 100mm dia pipe run is to
be vitrified clay to BS EN 295. The pipe is
to have a minimum depth of 1:40 gradient.
The pipe is to have a flow rate of 9.2 litres /
second. he pipe is to be encased in at least
100mm thick pea shingle or a similar
granular fill surround. The top of the
granular fill to be protected with a concrete
slab with a minimum overhang of 300mm.
Screed: At least 65mm thick fast
drying screed. Product to be Tarmac
Truscreed. To be laid level with exist
floor. Mix to be 1:3 (rapid harding
cement:sand) to BS 8204. Screed to
be tapped down to even horizontal
level and to ensure no gaps at
perimeters. Float finish.
Floor insulation: 100mm thick floor
insulation. Manufacturer to be Jablite.
Product to be Jabfloor Premium 70.
Supplied in sheet form. Install to
manufacturers instructions.
Membrane: membrane to BS EN
13967:2004. Manufactures to be
visqueen. Product to be black coloured
Visqueen EcoMembrane
(polythethylene and high tear
resistance). Jointing of membrane is to
overlap by at least 150mm and sealed
using Visqueen Double Sided Joining
Tape, then secured using 100mm wide
Visqueen girth joining tape. Fixed in
wall at least 100mm.
Vertical floor edge insulation: 30mm
thick edge strip. Manufacturer to be
Jablite. Product to be Jabfloor
Premium 70. Supplied in sheet form.
Install to manufacturers instructions.
Concrete floor slab: 150mm
concrete floor slab to be laid again the
compacted hardcore. Mix to be
sand:cement with aggregate.
Structural Engineer to confirm the
strength of the mix and final thickness.
Concrete to be tapped down to even
horizontal level and to ensure no gaps
at perimeters.
Hardcore 200mm hardcore laid
against the earth and compacted.
Structural Engineer to confirm the final
thickness.
Note: the materials specified for the concrete floor slab
have been selected to achieve the 'U' Value of 0.22W/m2K.
This complies with the required 'U' Value stated in Part L1
and L2: 2006 of the Building Regulations which is
0.22W/m2K for extensions. The 'U' Value calculation is
based on BS EN ISO 6946. Please refer to the email
message sent by Vencel Resil Limited on 01.02.10.
Concrete Foundations Excavate
trenches to 1.355m from ground floor
level and lay concrete foundations up
to 1.000m high from base of trench.
Concrete to BS EM 206-1 and BS
8500-2. Final depth of foundations,mix
and strength to be determined by the
LA Building Control Officer and
Structural Engineer. Mix to achieve
50mm slump when tested.
DPC: pitch polymer damp proof course
. Manufacturer to be ruberiod or similar
standard. Product reference: Original
High Performance DPC.
External plinth: plinth to be 150mm
high or two brick high and to match the
size and mix as the existing.
600mm
1000m355mm
1.355m
Concrete cavity fill to base of cavity:
Concrete to BS EN 206-1 and BS
8500-2.Maintain a 75mm between top
pf fill and external ground level and
minimum of 225mm between top of fill
and ground level DPC. When placing
the concrete is to be compacted.
Soffit and face: Eaves size to match
existing. The existing Soffit and fiacia to be
removed. The Soffit and fascia is to be
PVC-u. The soffit is to have 10mm
continuous natural air ventilation strip with fly
screen.
Rainwater Goods: Rainwater goods to be
100mm PVC-u and attached to the existing
Underlay: To BS 747 and to be felt type 1F.
Product to be Marley Waterproofing Undertile
Felt or similar standard. The felt is to be
waterproof, breathable and durable.
Install to manufacturers instructions.
Battens: 38mm x 25mm timber battens. Treatment
to be fire retarding impregnation and British Wood
Preserving and Damp Proofing Association
Commodity Specification FR., Type A. Moisture
content at time of erection to be 13 - 19%
Roof and ridge tiles: Roof and ridge tiles to
match existing size, colour. Roof tiles to be laid to
existing lap and lap. Double tile at eaves. Ridge
tiles are to be vented with 5mm continuous air
gap.
Close Cavity: Close cavity with a duress
supper lightweight block.
Wall Plate: Final size of the wall plate is to
match the existing to ensure the new roof
structure matches the existing height and
pitch. Treatment to be fire retarding
impregnation and British Wood Preserving
and Damp Proofing Association Commodity
Specification FR., Type A. Moisture content
at time of erection to be 13 - 19%
Straps: Mild Steel Straps vertical restraint
straps. Straps to be heavy duty 30mm wide x
800 long x 5mm thick pre galvanised edge
coated mild steel bent traps at 1.2mm
centres to tie down the wall plate to the inner
blockwork. Length to be 1200mm..
Manufacturer to be explanet or similar
approved standard.
Note: the roof is to achieve a 'U' Value of 0.16W/m2K. to
comply with the required 'U' Value stated in Part L1 and
L2: 2006 of the Building Regulations.
Rafter tray: trays to be laid between rafters
to ensure a clear air path of 10mm - 25mm
continuous air path between the roof
underlay and insulation. Explamnet or similar
approved standard. Install to manufacturers
recommendations
Roof insulation: 3 layers of 100mm thick
isowool insulation. Two layers to be between
joists and one layer laid at 90 degrees across
the joists. At eaves level the insulation is to
laid in to prevent voids and air gaps.
Project Aim:
New two storey extension to an existing dwelling.
Freelance Project Manager Services included:
∗ Producing a set of building control drawings
incorporating:
∗ Sections, Plans and Construction details
∗ Bridging over existing below ground drainage
∗ Full compliance with UK Building Regs
∗ Specification on drawings
∗ Close liaisons with the Structural Engineer on
structural matters
∗ Site inspections
Key Aspects:
No existing below ground drawings were available
and when excavating storm water drainage were
discussed and therefore quick solutions were required
to prevent delays.
Freelance Project Management Case Study
New Two-Storey Residential Extension,
London.
gl
Freelance DesignerFreelance Designer
& Consultant& Consultant
ServicesServices
PROPOSED SOUTH EAST ELEVATION
Scale: 1:100
NEW DWELLINGEXISTING TERRACE DWELLINGS EXISTING GARDEN & DWELLING
NOTE:
Hard Wood Front Clear Double Glazed Sash Windows.
To be Painted White. Appearance to Match Existing Terrace
Hard Wood Front Door to Match Existing Terrace Style and Design.
Sloping Path to Front Door (no Steps), to allow for Ambulant Disabled
Use. Path to be Tiled with Design and Appearance to Match Existing.
Front Boundary Wall to Match Existing Traditional Terrace.
New Garage to be Precast Reinforced Concrete with Bitumen
Corrugated Roof, to Match Existing.
Hardwood Eaves and Hardwood Dental Course, to Match Existing.
To be Painted White.
Red Face Brickwork to Match Existing Terrace. Traditional Brickwork
Bond to Match Existing Terrace
Roof to be natural slate (Welsh or Spanish). Size and Appearance
to Match Existing Terrace.
Rainwater Goods and External Soil Vent Pipe to be Black Painted
Cast Iron. Appearance to Match Existing Terrace.
Front Boundary Wall Inside Face (Patio Side), to have a
Bicycle Locking Provision. To Encourage Occupiers to Use Bicycles.
NEW GARAGE &
ALTERED DRIVE
PROPOSED NORTH WEST ELEVATION
NEW DWELLING EXISTING TERRACE DWELLINGSEXISTING GARDEN & DWELLING ALTERED DRIVE
Fence Removed
For Clarity
NOTE:
Hard Wood First Floor Frosted Double Glazed Sash
Window to Bathroom. To be Painted White. Appearance
to Match Existing Terrace
Hard Wood Fixed First Floor Frosted Double Glazed
Staircase Window. To be Painted White. Appearance
to Match Existing Terrace.
Rear Brickwork to Match Existing Terrace. Traditional
Brickwork Bond to Match Existing Terrace
Roof to be natural slate (Welsh or Spanish). Size and
Ground Floor Powder Coated Aluminium Clear
Double Glazed Sliding Patio Window. Colour to be White.
Hardwood Eaves and Hardwood Dental Course,
to Match Existing Terrace. To be Painted White.
Rainwater Goods and External Soil Vent Pipe to be Black
appearance to Match Existing Terrace.
Painted Cast Iron. Appearance to Match Existing Terrace.
Scale: 1:100
PROPOSED NORTH EAST ELEVATION
Scale: 1:100
NEW DWELLING (Inc. Front and Rear Patios)
NOTE:
Brickwork to Match Existing Terrace. Traditional
Brickwork Bond to Match Existing Terrace
Front Boundary Wall to Match Existing Traditional
Terrace.
N
S
W
C Areys & N Kavanaugh
Client
Grahame Landers
63C High Street,
Old Town,
Hemel Hempstead,
Hertfordshire. HP1 3AF.
Proposed Dwelling on Land
Adjacent to Nr. 1 Park Hill,
Harpenden, Hertfordshire.
7th January 2008 As Shown on Drawing
Date Scale
Address
Drawing Title
PROPOSED ELEVATIONS
Drawing Number Revision
HARPENDEN/2007/P03
Agent
PLANNING
ISSUE
Project Aim:
New two storey dwelling
to the end of an existing
row of traditional terrace .
Freelance Project
Manager Services
included:
∗Produced a set of
drawings (existing and
proposed: Sections, Plans,
levels, party wall detail)
∗ Acted as Planning Agent
Key Aspects:
The proposed dwelling
needed to be in-keeping
with the 1880’s street
scene.
Freelance Project Management Case Study
New Two-Storey Dwelling,
Hertfordshire, UK.
gl
Freelance DesignerFreelance Designer
& Consultant& Consultant
ServicesServices

More Related Content

What's hot

Leisure Centre
Leisure CentreLeisure Centre
Leisure CentreEdel Fox
 
Restoration, extension and upgradation of protected structures
Restoration, extension and upgradation of protected structuresRestoration, extension and upgradation of protected structures
Restoration, extension and upgradation of protected structuresEdel Fox
 
Measurement II BQ
Measurement II BQMeasurement II BQ
Measurement II BQashleyyeap
 
12724469 wtp-cost-estimate
12724469 wtp-cost-estimate12724469 wtp-cost-estimate
12724469 wtp-cost-estimateimaduddin91
 
011 - Proposed Ground Floor plan
011 - Proposed Ground Floor plan011 - Proposed Ground Floor plan
011 - Proposed Ground Floor planDanny Chiverton
 
coba_flooring Brochure
coba_flooring Brochurecoba_flooring Brochure
coba_flooring BrochureMatthew Davies
 
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILS
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILSMill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILS
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILSSin Byrne
 
Experiences Olaya- Frasers-ID Package- Public Spaces
Experiences Olaya- Frasers-ID Package- Public SpacesExperiences Olaya- Frasers-ID Package- Public Spaces
Experiences Olaya- Frasers-ID Package- Public SpacesAmer El Malki
 
5) int walls finishes bq
5) int walls finishes bq5) int walls finishes bq
5) int walls finishes bqJeanne Hoo
 
chi-commercial-garage-door-buyers-guide
chi-commercial-garage-door-buyers-guidechi-commercial-garage-door-buyers-guide
chi-commercial-garage-door-buyers-guideSean Rogers
 
chi-residential-garage-door-buyers-guide
chi-residential-garage-door-buyers-guidechi-residential-garage-door-buyers-guide
chi-residential-garage-door-buyers-guideSean Rogers
 
House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1David Dinsdale
 
M3 EG BQ metal frame door
M3 EG BQ metal frame doorM3 EG BQ metal frame door
M3 EG BQ metal frame doorEst
 
Jack_Lambourne - Portfolio
Jack_Lambourne - PortfolioJack_Lambourne - Portfolio
Jack_Lambourne - PortfolioJack Lambourne
 
False ceiling materials
False ceiling materialsFalse ceiling materials
False ceiling materialsMudra Redkar
 
Presentation Design Drawing for Architectural Drawing
Presentation Design Drawing for Architectural DrawingPresentation Design Drawing for Architectural Drawing
Presentation Design Drawing for Architectural DrawingShane Madden
 

What's hot (20)

Leisure Centre
Leisure CentreLeisure Centre
Leisure Centre
 
Restoration, extension and upgradation of protected structures
Restoration, extension and upgradation of protected structuresRestoration, extension and upgradation of protected structures
Restoration, extension and upgradation of protected structures
 
Measurement II BQ
Measurement II BQMeasurement II BQ
Measurement II BQ
 
12724469 wtp-cost-estimate
12724469 wtp-cost-estimate12724469 wtp-cost-estimate
12724469 wtp-cost-estimate
 
Car park bq
Car park bqCar park bq
Car park bq
 
011 - Proposed Ground Floor plan
011 - Proposed Ground Floor plan011 - Proposed Ground Floor plan
011 - Proposed Ground Floor plan
 
coba_flooring Brochure
coba_flooring Brochurecoba_flooring Brochure
coba_flooring Brochure
 
Boq sample
Boq sampleBoq sample
Boq sample
 
Bill Of Quantities
Bill Of QuantitiesBill Of Quantities
Bill Of Quantities
 
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILS
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILSMill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILS
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILS
 
Experiences Olaya- Frasers-ID Package- Public Spaces
Experiences Olaya- Frasers-ID Package- Public SpacesExperiences Olaya- Frasers-ID Package- Public Spaces
Experiences Olaya- Frasers-ID Package- Public Spaces
 
5) int walls finishes bq
5) int walls finishes bq5) int walls finishes bq
5) int walls finishes bq
 
Bq floor
Bq floorBq floor
Bq floor
 
chi-commercial-garage-door-buyers-guide
chi-commercial-garage-door-buyers-guidechi-commercial-garage-door-buyers-guide
chi-commercial-garage-door-buyers-guide
 
chi-residential-garage-door-buyers-guide
chi-residential-garage-door-buyers-guidechi-residential-garage-door-buyers-guide
chi-residential-garage-door-buyers-guide
 
House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1
 
M3 EG BQ metal frame door
M3 EG BQ metal frame doorM3 EG BQ metal frame door
M3 EG BQ metal frame door
 
Jack_Lambourne - Portfolio
Jack_Lambourne - PortfolioJack_Lambourne - Portfolio
Jack_Lambourne - Portfolio
 
False ceiling materials
False ceiling materialsFalse ceiling materials
False ceiling materials
 
Presentation Design Drawing for Architectural Drawing
Presentation Design Drawing for Architectural DrawingPresentation Design Drawing for Architectural Drawing
Presentation Design Drawing for Architectural Drawing
 

Viewers also liked

Ovarian Cancer Research Fund Enables Breakthroughs in Saving Lives
Ovarian Cancer Research Fund Enables Breakthroughs in Saving LivesOvarian Cancer Research Fund Enables Breakthroughs in Saving Lives
Ovarian Cancer Research Fund Enables Breakthroughs in Saving LivesHaberman Management Corp
 
Les cahiers-de-la-finance-islamique-n°5
Les cahiers-de-la-finance-islamique-n°5Les cahiers-de-la-finance-islamique-n°5
Les cahiers-de-la-finance-islamique-n°5Hicham Marzouk
 
Jagocoding.com mengirimkan email-massal_dengan_php_dan_my_sq_li
Jagocoding.com   mengirimkan email-massal_dengan_php_dan_my_sq_liJagocoding.com   mengirimkan email-massal_dengan_php_dan_my_sq_li
Jagocoding.com mengirimkan email-massal_dengan_php_dan_my_sq_liKang Mas Tutu
 
Martini de fresa
Martini de fresaMartini de fresa
Martini de fresaKaren Luna
 
Dawid gruszczynski VSDC Free Video Editor
Dawid gruszczynski VSDC Free Video EditorDawid gruszczynski VSDC Free Video Editor
Dawid gruszczynski VSDC Free Video EditorPolaco991
 
Brigitte contreras programas educativos
Brigitte contreras programas educativosBrigitte contreras programas educativos
Brigitte contreras programas educativosChristian Reuss
 

Viewers also liked (10)

Ovarian Cancer Research Fund Enables Breakthroughs in Saving Lives
Ovarian Cancer Research Fund Enables Breakthroughs in Saving LivesOvarian Cancer Research Fund Enables Breakthroughs in Saving Lives
Ovarian Cancer Research Fund Enables Breakthroughs in Saving Lives
 
Be a Better Writer
Be a Better WriterBe a Better Writer
Be a Better Writer
 
Les cahiers-de-la-finance-islamique-n°5
Les cahiers-de-la-finance-islamique-n°5Les cahiers-de-la-finance-islamique-n°5
Les cahiers-de-la-finance-islamique-n°5
 
Jagocoding.com mengirimkan email-massal_dengan_php_dan_my_sq_li
Jagocoding.com   mengirimkan email-massal_dengan_php_dan_my_sq_liJagocoding.com   mengirimkan email-massal_dengan_php_dan_my_sq_li
Jagocoding.com mengirimkan email-massal_dengan_php_dan_my_sq_li
 
Power Point2
Power Point2Power Point2
Power Point2
 
Martini de fresa
Martini de fresaMartini de fresa
Martini de fresa
 
Hypnotism
HypnotismHypnotism
Hypnotism
 
Dawid gruszczynski VSDC Free Video Editor
Dawid gruszczynski VSDC Free Video EditorDawid gruszczynski VSDC Free Video Editor
Dawid gruszczynski VSDC Free Video Editor
 
Brigitte contreras programas educativos
Brigitte contreras programas educativosBrigitte contreras programas educativos
Brigitte contreras programas educativos
 
Judul tesis
Judul tesisJudul tesis
Judul tesis
 

Similar to Freelance project management residential

Mill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONSMill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONSSin Byrne
 
House Plan For Robert Ledwaba
House Plan For Robert LedwabaHouse Plan For Robert Ledwaba
House Plan For Robert LedwabaJan Malesela
 
Supplier's rates updated
Supplier's rates updatedSupplier's rates updated
Supplier's rates updatedArthur Wilson
 
Bolderstone brochure
Bolderstone brochureBolderstone brochure
Bolderstone brochurekristenjames
 
Greenbuild 2013
Greenbuild 2013Greenbuild 2013
Greenbuild 2013nuform
 
Ceramic Liners brochure
Ceramic Liners brochureCeramic Liners brochure
Ceramic Liners brochureSchiedel UK
 
Bolderstone brochure
Bolderstone brochureBolderstone brochure
Bolderstone brochurekristenjames
 
Revit project No. 3 Thesis - Exhibition posters
 Revit project No. 3 Thesis - Exhibition posters Revit project No. 3 Thesis - Exhibition posters
Revit project No. 3 Thesis - Exhibition postersTej Raj Upreti
 
section and detail sheet1
section and detail sheet1section and detail sheet1
section and detail sheet1Jacob Dobson
 
1515-T_Drawings
1515-T_Drawings1515-T_Drawings
1515-T_DrawingsMark Daly
 
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONSMill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONSSin Byrne
 
Polyform's new products in provisional patent
Polyform's new products in provisional patentPolyform's new products in provisional patent
Polyform's new products in provisional patentpolyformbinder
 
FBP_1200 Series details-1213
FBP_1200 Series details-1213FBP_1200 Series details-1213
FBP_1200 Series details-1213Adam Barnett
 

Similar to Freelance project management residential (20)

Mill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONSMill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONS
 
final dcc
final dccfinal dcc
final dcc
 
A2768 103 - floor plans - building regs
A2768 103 - floor plans - building regsA2768 103 - floor plans - building regs
A2768 103 - floor plans - building regs
 
House Plan For Robert Ledwaba
House Plan For Robert LedwabaHouse Plan For Robert Ledwaba
House Plan For Robert Ledwaba
 
3D
3D3D
3D
 
Supplier's rates updated
Supplier's rates updatedSupplier's rates updated
Supplier's rates updated
 
Bolderstone brochure
Bolderstone brochureBolderstone brochure
Bolderstone brochure
 
SPECIFICATION
SPECIFICATIONSPECIFICATION
SPECIFICATION
 
Project1
Project1Project1
Project1
 
PROJECT 3-Layout1 (2)
PROJECT 3-Layout1 (2)PROJECT 3-Layout1 (2)
PROJECT 3-Layout1 (2)
 
Greenbuild 2013
Greenbuild 2013Greenbuild 2013
Greenbuild 2013
 
Ceramic Liners brochure
Ceramic Liners brochureCeramic Liners brochure
Ceramic Liners brochure
 
Bolderstone brochure
Bolderstone brochureBolderstone brochure
Bolderstone brochure
 
7906_20_l2_202_ppt_1.pptx
7906_20_l2_202_ppt_1.pptx7906_20_l2_202_ppt_1.pptx
7906_20_l2_202_ppt_1.pptx
 
Revit project No. 3 Thesis - Exhibition posters
 Revit project No. 3 Thesis - Exhibition posters Revit project No. 3 Thesis - Exhibition posters
Revit project No. 3 Thesis - Exhibition posters
 
section and detail sheet1
section and detail sheet1section and detail sheet1
section and detail sheet1
 
1515-T_Drawings
1515-T_Drawings1515-T_Drawings
1515-T_Drawings
 
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONSMill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
 
Polyform's new products in provisional patent
Polyform's new products in provisional patentPolyform's new products in provisional patent
Polyform's new products in provisional patent
 
FBP_1200 Series details-1213
FBP_1200 Series details-1213FBP_1200 Series details-1213
FBP_1200 Series details-1213
 

More from grahamelanders

Roof replacement and internal remedial works
Roof replacement and internal remedial worksRoof replacement and internal remedial works
Roof replacement and internal remedial worksgrahamelanders
 
Consultancy case studies
Consultancy case studiesConsultancy case studies
Consultancy case studiesgrahamelanders
 
Johnson Controls case studies - Commercial Project Management
Johnson Controls case studies - Commercial Project ManagementJohnson Controls case studies - Commercial Project Management
Johnson Controls case studies - Commercial Project Managementgrahamelanders
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residentialgrahamelanders
 
Freelance project management commercial - Case Study
Freelance project management commercial - Case StudyFreelance project management commercial - Case Study
Freelance project management commercial - Case Studygrahamelanders
 
Johnson controls case study consultancy
Johnson controls case study   consultancyJohnson controls case study   consultancy
Johnson controls case study consultancygrahamelanders
 

More from grahamelanders (13)

Roof replacement and internal remedial works
Roof replacement and internal remedial worksRoof replacement and internal remedial works
Roof replacement and internal remedial works
 
program
programprogram
program
 
Surrey education
Surrey educationSurrey education
Surrey education
 
Perth metro
Perth metroPerth metro
Perth metro
 
Consultancy case studies
Consultancy case studiesConsultancy case studies
Consultancy case studies
 
Johnson Controls case studies - Commercial Project Management
Johnson Controls case studies - Commercial Project ManagementJohnson Controls case studies - Commercial Project Management
Johnson Controls case studies - Commercial Project Management
 
Upload
UploadUpload
Upload
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
 
Freelance project management commercial - Case Study
Freelance project management commercial - Case StudyFreelance project management commercial - Case Study
Freelance project management commercial - Case Study
 
Johnson controls case study consultancy
Johnson controls case study   consultancyJohnson controls case study   consultancy
Johnson controls case study consultancy
 
Upload
UploadUpload
Upload
 
PerthMetro Case Study
PerthMetro Case StudyPerthMetro Case Study
PerthMetro Case Study
 
PerthMetro case study
PerthMetro case studyPerthMetro case study
PerthMetro case study
 

Freelance project management residential

  • 1. Freelance Project Management Case Study Residential Flats Drawing Alterations, Hertfordshire, UK. gl Freelance DesignerFreelance Designer & Consultant& Consultant ServicesServices Project Aim: To gain Planning Approval for revising the original Planning Approved drawings, to capture the changes made during the construction phase. Freelance Project Manager Services included: ∗ Defining the Clients brief ∗ Undertaking a measured survey ∗ Producing existing drawings ∗ Producing proposed drawings ∗ Liaisons with the Planning Department
  • 2. PROPOSED SECTION B-B Scale: 1:50 DETAIL F PROPOSED KITCHEN APERTURE SUPPORT Scale: 1:5 DETAIL G PROPOSED EAVES Scale: 1:5 DETAIL E PROPOSED SUBSTRUCTURE Scale: 1:5 BUILDING CONTROL Client SPW/BC/06 Rev ision Drawing Number Proposed Section and Details Drawing Title Site Address ScaleDate A1 Drawing. Scale as stated.28th February 2010 222 Park Way West London Rev. 00 MR. Foster Agent MR. G Landers 63C Hemel Hempstead Herts. HP 1 3AF 110mm Note: the materials specified for the external walls have been selected to achieve the 'U' Value of 0.30W/m2K. This complies with the required 'U' Value stated in Part L1 and L2: 2006 of the Building Regulations which is 0.30W/m2K for extensions. The 'U' Value calculation is based on BS EN ISO 6946. Please refer to the email message sent by Vencel Resil Limited on 02.02.10. Note: The brickwork above the external window and external door apertures are to be supported by Catnic Cougar CG 90 / 100 lintels. Each lintel is to be a standard size and fit the length of the aperture. A brickwork soldier course above the window and door apertures is to be included on all ground floor apertures. See Detail G (Drawing 06) See Detail E (Drawing 06) See Detail F (Drawing 06) Beams: 2Nr. 178 x 102 UB's side by side and bolted together with M12 bolts at 750mm centres. The UB's is to rest upon Class B Engineering brick (Staffordshire Blue or similar standard) padstone. Ventilation Duct: Duct from ground floor toilet. Duct to run from the ceiling attached mechanical extractor fab to rear external wall. The duct is to laid above the kitchen ceiling. Drainage Pipe: from en-suite sink Graded Floor Joists: 50mm x 200mm C16 grade timber floor joist to BS 4978 or BS EN 519 or other national equalivent and so marked. Strength to be C grade and to BS EN 338. Treatment to be fire retardant impregnation and British Wood Preserving and Damp Proofing Association Commodity Specification FR2, Type A. Moisture content at time of erection to be 13 - 19%. Drainage Pipe: from shower Existing Timber Joist: The existing 185mm high x 50mm thick built in joist to be cut within a 6mm tolerance from the back of joist hanger. The redesign of the joist will allow the two steel beams to be recessed above the plastered ceiling. Teat cut ends. Joist Hanger: Special restraint propierty joist hanger to BS 5628 Part 1 to provide laterial restraint to the external walls. Joist hangers to be explanet or similar approved standard. Strength of the joist hanger to be confirmed by the Structural Engineer to ensure a match with the blockwork strength.Timber joists must be accurately cut to length with an overall tolerance at the back plate of 6mm. Pack to beam: Pack to outer side of steel beam. The pack is to be notched to allow for the bolt connection. Plaster Ceiling: 13mm thick plasterboard with 2mm skim. The existing kitchen ceiling is to levelled with the new kitchen extension ceiling to allow for a flush finish. Floor Boards: 16 - 25mm thick softwood T&G flooring. New extension floor is to be laid level with the existing first floor. Plaster: Manufacturer to be British Gypsum Ltd. Product to be multicoat propriety plaster - Thistle Hardwall for undercoats. Application: Undercoat thickness to be 11mm thick and a finishing coat of 2mm thick. Preparation: prepare background and conduits and the like and apply bonding agents and provide a key for the finishing coat. Stainless steel beads to be compliant with BS EN 10088 - 1. External Wall: New 315.5mm thick external cavity wall construction. The outer leaf is to be 65mm high x 215mm long x 102.5mm wide fletton common brick. The 100mm cavity is to be partially filled with 75mm thick Jabfill Premium supplied by Vencel Resil Limited (tel: 02083209175). The inner leaf is to be 215mm high x 620mm long x 100mm wide Durox Supa Aircrete Block supplied by Tarmac (tel:08456062468). The compressive strength of the Aircrete Block is to be 3.6M/mm2. . The horizontal and vertical joints to be standard 10mm thick mortar mix. Wall Ties: Stainless steel ties with insulation retainers. Manufacturer to be Catnic or similar approved standard. Structural Engineer to specify tie. Fix ties at 400mm centres. Windows and Doors: Windows and doors to be REHAU. Windows to be 70mm and chamfered. All new windows and doors to be pitch polymer under cill damp proof course. Manufacturer to be ruberiod or similar standard. Product reference: Original High Performance DPC. Note: For the roof and floor structures please refer to drawing 07. Foul Drainage: 100mm dia pipe run is to be vitrified clay to BS EN 295. The pipe is to have a minimum depth of 1:40 gradient. The pipe is to have a flow rate of 9.2 litres / second. he pipe is to be encased in at least 100mm thick pea shingle or a similar granular fill surround. The top of the granular fill to be protected with a concrete slab with a minimum overhang of 300mm. Screed: At least 65mm thick fast drying screed. Product to be Tarmac Truscreed. To be laid level with exist floor. Mix to be 1:3 (rapid harding cement:sand) to BS 8204. Screed to be tapped down to even horizontal level and to ensure no gaps at perimeters. Float finish. Floor insulation: 100mm thick floor insulation. Manufacturer to be Jablite. Product to be Jabfloor Premium 70. Supplied in sheet form. Install to manufacturers instructions. Membrane: membrane to BS EN 13967:2004. Manufactures to be visqueen. Product to be black coloured Visqueen EcoMembrane (polythethylene and high tear resistance). Jointing of membrane is to overlap by at least 150mm and sealed using Visqueen Double Sided Joining Tape, then secured using 100mm wide Visqueen girth joining tape. Fixed in wall at least 100mm. Vertical floor edge insulation: 30mm thick edge strip. Manufacturer to be Jablite. Product to be Jabfloor Premium 70. Supplied in sheet form. Install to manufacturers instructions. Concrete floor slab: 150mm concrete floor slab to be laid again the compacted hardcore. Mix to be sand:cement with aggregate. Structural Engineer to confirm the strength of the mix and final thickness. Concrete to be tapped down to even horizontal level and to ensure no gaps at perimeters. Hardcore 200mm hardcore laid against the earth and compacted. Structural Engineer to confirm the final thickness. Note: the materials specified for the concrete floor slab have been selected to achieve the 'U' Value of 0.22W/m2K. This complies with the required 'U' Value stated in Part L1 and L2: 2006 of the Building Regulations which is 0.22W/m2K for extensions. The 'U' Value calculation is based on BS EN ISO 6946. Please refer to the email message sent by Vencel Resil Limited on 01.02.10. Concrete Foundations Excavate trenches to 1.355m from ground floor level and lay concrete foundations up to 1.000m high from base of trench. Concrete to BS EM 206-1 and BS 8500-2. Final depth of foundations,mix and strength to be determined by the LA Building Control Officer and Structural Engineer. Mix to achieve 50mm slump when tested. DPC: pitch polymer damp proof course . Manufacturer to be ruberiod or similar standard. Product reference: Original High Performance DPC. External plinth: plinth to be 150mm high or two brick high and to match the size and mix as the existing. 600mm 1000m355mm 1.355m Concrete cavity fill to base of cavity: Concrete to BS EN 206-1 and BS 8500-2.Maintain a 75mm between top pf fill and external ground level and minimum of 225mm between top of fill and ground level DPC. When placing the concrete is to be compacted. Soffit and face: Eaves size to match existing. The existing Soffit and fiacia to be removed. The Soffit and fascia is to be PVC-u. The soffit is to have 10mm continuous natural air ventilation strip with fly screen. Rainwater Goods: Rainwater goods to be 100mm PVC-u and attached to the existing Underlay: To BS 747 and to be felt type 1F. Product to be Marley Waterproofing Undertile Felt or similar standard. The felt is to be waterproof, breathable and durable. Install to manufacturers instructions. Battens: 38mm x 25mm timber battens. Treatment to be fire retarding impregnation and British Wood Preserving and Damp Proofing Association Commodity Specification FR., Type A. Moisture content at time of erection to be 13 - 19% Roof and ridge tiles: Roof and ridge tiles to match existing size, colour. Roof tiles to be laid to existing lap and lap. Double tile at eaves. Ridge tiles are to be vented with 5mm continuous air gap. Close Cavity: Close cavity with a duress supper lightweight block. Wall Plate: Final size of the wall plate is to match the existing to ensure the new roof structure matches the existing height and pitch. Treatment to be fire retarding impregnation and British Wood Preserving and Damp Proofing Association Commodity Specification FR., Type A. Moisture content at time of erection to be 13 - 19% Straps: Mild Steel Straps vertical restraint straps. Straps to be heavy duty 30mm wide x 800 long x 5mm thick pre galvanised edge coated mild steel bent traps at 1.2mm centres to tie down the wall plate to the inner blockwork. Length to be 1200mm.. Manufacturer to be explanet or similar approved standard. Note: the roof is to achieve a 'U' Value of 0.16W/m2K. to comply with the required 'U' Value stated in Part L1 and L2: 2006 of the Building Regulations. Rafter tray: trays to be laid between rafters to ensure a clear air path of 10mm - 25mm continuous air path between the roof underlay and insulation. Explamnet or similar approved standard. Install to manufacturers recommendations Roof insulation: 3 layers of 100mm thick isowool insulation. Two layers to be between joists and one layer laid at 90 degrees across the joists. At eaves level the insulation is to laid in to prevent voids and air gaps. Project Aim: New two storey extension to an existing dwelling. Freelance Project Manager Services included: ∗ Producing a set of building control drawings incorporating: ∗ Sections, Plans and Construction details ∗ Bridging over existing below ground drainage ∗ Full compliance with UK Building Regs ∗ Specification on drawings ∗ Close liaisons with the Structural Engineer on structural matters ∗ Site inspections Key Aspects: No existing below ground drawings were available and when excavating storm water drainage were discussed and therefore quick solutions were required to prevent delays. Freelance Project Management Case Study New Two-Storey Residential Extension, London. gl Freelance DesignerFreelance Designer & Consultant& Consultant ServicesServices
  • 3. PROPOSED SOUTH EAST ELEVATION Scale: 1:100 NEW DWELLINGEXISTING TERRACE DWELLINGS EXISTING GARDEN & DWELLING NOTE: Hard Wood Front Clear Double Glazed Sash Windows. To be Painted White. Appearance to Match Existing Terrace Hard Wood Front Door to Match Existing Terrace Style and Design. Sloping Path to Front Door (no Steps), to allow for Ambulant Disabled Use. Path to be Tiled with Design and Appearance to Match Existing. Front Boundary Wall to Match Existing Traditional Terrace. New Garage to be Precast Reinforced Concrete with Bitumen Corrugated Roof, to Match Existing. Hardwood Eaves and Hardwood Dental Course, to Match Existing. To be Painted White. Red Face Brickwork to Match Existing Terrace. Traditional Brickwork Bond to Match Existing Terrace Roof to be natural slate (Welsh or Spanish). Size and Appearance to Match Existing Terrace. Rainwater Goods and External Soil Vent Pipe to be Black Painted Cast Iron. Appearance to Match Existing Terrace. Front Boundary Wall Inside Face (Patio Side), to have a Bicycle Locking Provision. To Encourage Occupiers to Use Bicycles. NEW GARAGE & ALTERED DRIVE PROPOSED NORTH WEST ELEVATION NEW DWELLING EXISTING TERRACE DWELLINGSEXISTING GARDEN & DWELLING ALTERED DRIVE Fence Removed For Clarity NOTE: Hard Wood First Floor Frosted Double Glazed Sash Window to Bathroom. To be Painted White. Appearance to Match Existing Terrace Hard Wood Fixed First Floor Frosted Double Glazed Staircase Window. To be Painted White. Appearance to Match Existing Terrace. Rear Brickwork to Match Existing Terrace. Traditional Brickwork Bond to Match Existing Terrace Roof to be natural slate (Welsh or Spanish). Size and Ground Floor Powder Coated Aluminium Clear Double Glazed Sliding Patio Window. Colour to be White. Hardwood Eaves and Hardwood Dental Course, to Match Existing Terrace. To be Painted White. Rainwater Goods and External Soil Vent Pipe to be Black appearance to Match Existing Terrace. Painted Cast Iron. Appearance to Match Existing Terrace. Scale: 1:100 PROPOSED NORTH EAST ELEVATION Scale: 1:100 NEW DWELLING (Inc. Front and Rear Patios) NOTE: Brickwork to Match Existing Terrace. Traditional Brickwork Bond to Match Existing Terrace Front Boundary Wall to Match Existing Traditional Terrace. N S W C Areys & N Kavanaugh Client Grahame Landers 63C High Street, Old Town, Hemel Hempstead, Hertfordshire. HP1 3AF. Proposed Dwelling on Land Adjacent to Nr. 1 Park Hill, Harpenden, Hertfordshire. 7th January 2008 As Shown on Drawing Date Scale Address Drawing Title PROPOSED ELEVATIONS Drawing Number Revision HARPENDEN/2007/P03 Agent PLANNING ISSUE Project Aim: New two storey dwelling to the end of an existing row of traditional terrace . Freelance Project Manager Services included: ∗Produced a set of drawings (existing and proposed: Sections, Plans, levels, party wall detail) ∗ Acted as Planning Agent Key Aspects: The proposed dwelling needed to be in-keeping with the 1880’s street scene. Freelance Project Management Case Study New Two-Storey Dwelling, Hertfordshire, UK. gl Freelance DesignerFreelance Designer & Consultant& Consultant ServicesServices