Providing fire insurance valuations for commercial properties
1. Project Aims and Objectives:
To provide the in-house Car Manufacture Division with two detailed Pre –
Acquisition and fully costed Reports on two industrial premises. Total foot print
of both premises was 125,000 square feet.
Consultant Services Included:
• Defined the Clients brief and agreed Consultancy fees
• Managed Health & Safety
• Undertook internal and external condition survey
• Production of a Pre – acquisition report which formed part of the Lease
• Estimated landlord remedial costs and in-house strip out & fit out costs
• Identified and defined local law on business acquisitions, including costs
Accomplishments:
Successfully undertook two surveys and produced pre - acquisition reports of two
car manufacturing facilities, outside the UK. This was achieved by researching the
local market, applying European standards and working with diverse teams.
Building A1 Facility in Valencia
Building A2 Facility in Valencia
Consultancy Case Study
Pre - Acquisition Reports,
Two Car Manufacturing Facilities,
Valencia, Spain.
2. Project Aims and Objectives:
To provide the in-house Car Manufacture Division with a detailed Pre –
Acquisition and fully costed Report on 130,000 square feet of vandalised
and medium term vacant industrial premises.
Consultant Services Included:
• Defined the Clients brief and agreed Consultancy fees
• Procured and managed a M&E Consultant
• Managed Health & Safety
• Undertook internal and external condition survey
• Production of a Pre - acquisition report which formed part of the Lease
• Estimated landlord remedial costs and in-house strip out & fit out costs
Project Management to Gain Landlord Approval to Alter:
Due to poor D&B Contractor Management during the construction works,
an additional remit was granted by our in-house Client, to undertake the
following: -
1. Award Practical Completion to the Contractor
2. Establish the defects liability period
3. Leading the Contractor to gaining Building Control Approval, from the Council
4. Ensuring the H&S File was produced
5. Gaining Landlords Consent to alter the premises
6. Providing additional information for the Lease
• Producing drawings of the Clients demise and operations.
• Scheduling alterations
• Negotiations and agreeing with the Owners Agents the reinstatement of
the premises at Lease End, including costs.
Johnson Controls Automotive - Cheshire
Roof Condition Internals Condition Loading Bay Condition
Consultancy & Management Case Study
Pre - Acquisition Report & Landlords Approval to Alter,
Car Manufacturing Facility,
Cheshire, UK.
3. Consultancy Case Study
Commercial Fire Insurance Valuations,
London, UK.
Project Aim and Objectives:
To provide fully costed fire insurance valuations to a security
company
Consultant Services:
• Defined the Clients brief and agreed Consultancy fees
• Managed Health & Safety
• Undertook internal and external condition survey
• Production of valuation reports
• Estimated the cost to rebuild each premises based on their
construction and internal fit out
Accomplishments:
Accurately determining the costs of replacement of commercial
premises, should the existing premises burn down.