Project Aims and Objectives:
To provide the in-house Car Manufacture Division with two detailed Pre –
Acquisition and fully costed Reports on two industrial premises. Total foot print
of both premises was 125,000 square feet.
Consultant Services Included:
• Defined the Clients brief and agreed Consultancy fees
• Managed Health & Safety
• Undertook internal and external condition survey
• Production of a Pre – acquisition report which formed part of the Lease
• Estimated landlord remedial costs and in-house strip out & fit out costs
• Identified and defined local law on business acquisitions, including costs
Accomplishments:
Successfully undertook two surveys and produced pre - acquisition reports of two
car manufacturing facilities, outside the UK. This was achieved by researching the
local market, applying European standards and working with diverse teams.
Building A1 Facility in Valencia
Building A2 Facility in Valencia
Consultancy Case Study
Pre - Acquisition Reports,
Two Car Manufacturing Facilities,
Valencia, Spain.
Project Aims and Objectives:
To provide the in-house Car Manufacture Division with a detailed Pre –
Acquisition and fully costed Report on 130,000 square feet of vandalised
and medium term vacant industrial premises.
Consultant Services Included:
• Defined the Clients brief and agreed Consultancy fees
• Procured and managed a M&E Consultant
• Managed Health & Safety
• Undertook internal and external condition survey
• Production of a Pre - acquisition report which formed part of the Lease
• Estimated landlord remedial costs and in-house strip out & fit out costs
Project Management to Gain Landlord Approval to Alter:
Due to poor D&B Contractor Management during the construction works,
an additional remit was granted by our in-house Client, to undertake the
following: -
1. Award Practical Completion to the Contractor
2. Establish the defects liability period
3. Leading the Contractor to gaining Building Control Approval, from the Council
4. Ensuring the H&S File was produced
5. Gaining Landlords Consent to alter the premises
6. Providing additional information for the Lease
• Producing drawings of the Clients demise and operations.
• Scheduling alterations
• Negotiations and agreeing with the Owners Agents the reinstatement of
the premises at Lease End, including costs.
Johnson Controls Automotive - Cheshire
Roof Condition Internals Condition Loading Bay Condition
Consultancy & Management Case Study
Pre - Acquisition Report & Landlords Approval to Alter,
Car Manufacturing Facility,
Cheshire, UK.
Consultancy Case Study
Commercial Fire Insurance Valuations,
London, UK.
Project Aim and Objectives:
To provide fully costed fire insurance valuations to a security
company
Consultant Services:
• Defined the Clients brief and agreed Consultancy fees
• Managed Health & Safety
• Undertook internal and external condition survey
• Production of valuation reports
• Estimated the cost to rebuild each premises based on their
construction and internal fit out
Accomplishments:
Accurately determining the costs of replacement of commercial
premises, should the existing premises burn down.

More Related Content

What's hot

Installation of lpg terminal
Installation of lpg terminalInstallation of lpg terminal
Installation of lpg terminallpgbnhgastank
 
FHA Streamline 203[k] Residential
FHA Streamline 203[k] ResidentialFHA Streamline 203[k] Residential
FHA Streamline 203[k] Residentialafrmarketing
 
Marco DEVETTA - SOGESCA, Daniela LUISE and Michele ZUIN - Municipality of Pad...
Marco DEVETTA - SOGESCA, Daniela LUISE and Michele ZUIN - Municipality of Pad...Marco DEVETTA - SOGESCA, Daniela LUISE and Michele ZUIN - Municipality of Pad...
Marco DEVETTA - SOGESCA, Daniela LUISE and Michele ZUIN - Municipality of Pad...covcap1
 
Paul Cuconato Resume
Paul Cuconato ResumePaul Cuconato Resume
Paul Cuconato Resumepaul cuconato
 
Cost effective construction and green building
Cost effective construction and green buildingCost effective construction and green building
Cost effective construction and green buildingManjunath N V
 
Dealing with construction permits in malaysia doing business - world bank g...
Dealing with construction permits in malaysia   doing business - world bank g...Dealing with construction permits in malaysia   doing business - world bank g...
Dealing with construction permits in malaysia doing business - world bank g...Jaclyn Hwang
 
Facilities Teams - Are You Telling Your Whole Story? - Ray Mirizzi
Facilities Teams - Are You Telling Your Whole Story? - Ray MirizziFacilities Teams - Are You Telling Your Whole Story? - Ray Mirizzi
Facilities Teams - Are You Telling Your Whole Story? - Ray MirizziSchoolDude Editors
 
Project_Cycle_&_Flow_New[1]
Project_Cycle_&_Flow_New[1]Project_Cycle_&_Flow_New[1]
Project_Cycle_&_Flow_New[1]jaime rowe
 
Pas2030 presentation april 2013 3
Pas2030 presentation april 2013 3Pas2030 presentation april 2013 3
Pas2030 presentation april 2013 3Scott Buckler
 
Sanjeewa_CV updated on 16.05.2014
Sanjeewa_CV  updated on 16.05.2014Sanjeewa_CV  updated on 16.05.2014
Sanjeewa_CV updated on 16.05.2014Sanjeewa Mahawedage
 
Resume - Alamsha faiz Updated, feb'16
Resume - Alamsha faiz Updated, feb'16Resume - Alamsha faiz Updated, feb'16
Resume - Alamsha faiz Updated, feb'16Alamsha Faiz
 
Roof replacement and internal remedial works
Roof replacement and internal remedial worksRoof replacement and internal remedial works
Roof replacement and internal remedial worksgrahamelanders
 

What's hot (16)

Installation of lpg terminal
Installation of lpg terminalInstallation of lpg terminal
Installation of lpg terminal
 
FHA Streamline 203[k] Residential
FHA Streamline 203[k] ResidentialFHA Streamline 203[k] Residential
FHA Streamline 203[k] Residential
 
Marco DEVETTA - SOGESCA, Daniela LUISE and Michele ZUIN - Municipality of Pad...
Marco DEVETTA - SOGESCA, Daniela LUISE and Michele ZUIN - Municipality of Pad...Marco DEVETTA - SOGESCA, Daniela LUISE and Michele ZUIN - Municipality of Pad...
Marco DEVETTA - SOGESCA, Daniela LUISE and Michele ZUIN - Municipality of Pad...
 
Paul Cuconato Resume
Paul Cuconato ResumePaul Cuconato Resume
Paul Cuconato Resume
 
Cost effective construction and green building
Cost effective construction and green buildingCost effective construction and green building
Cost effective construction and green building
 
Dealing with construction permits in malaysia doing business - world bank g...
Dealing with construction permits in malaysia   doing business - world bank g...Dealing with construction permits in malaysia   doing business - world bank g...
Dealing with construction permits in malaysia doing business - world bank g...
 
PFurfaro resume
PFurfaro resumePFurfaro resume
PFurfaro resume
 
Facilities Teams - Are You Telling Your Whole Story? - Ray Mirizzi
Facilities Teams - Are You Telling Your Whole Story? - Ray MirizziFacilities Teams - Are You Telling Your Whole Story? - Ray Mirizzi
Facilities Teams - Are You Telling Your Whole Story? - Ray Mirizzi
 
Project_Cycle_&_Flow_New[1]
Project_Cycle_&_Flow_New[1]Project_Cycle_&_Flow_New[1]
Project_Cycle_&_Flow_New[1]
 
Pas2030 presentation april 2013 3
Pas2030 presentation april 2013 3Pas2030 presentation april 2013 3
Pas2030 presentation april 2013 3
 
Sanjeewa_CV updated on 16.05.2014
Sanjeewa_CV  updated on 16.05.2014Sanjeewa_CV  updated on 16.05.2014
Sanjeewa_CV updated on 16.05.2014
 
15-10-15 Keith CV
15-10-15 Keith CV15-10-15 Keith CV
15-10-15 Keith CV
 
DLF The Crest
DLF The Crest DLF The Crest
DLF The Crest
 
Resume - Alamsha faiz Updated, feb'16
Resume - Alamsha faiz Updated, feb'16Resume - Alamsha faiz Updated, feb'16
Resume - Alamsha faiz Updated, feb'16
 
Roof replacement and internal remedial works
Roof replacement and internal remedial worksRoof replacement and internal remedial works
Roof replacement and internal remedial works
 
Lrr new alignment
Lrr new alignmentLrr new alignment
Lrr new alignment
 

Similar to Providing fire insurance valuations for commercial properties

Similar to Providing fire insurance valuations for commercial properties (20)

Property Development Finance Case Study-Blueray Capital.pdf
Property Development Finance Case Study-Blueray Capital.pdfProperty Development Finance Case Study-Blueray Capital.pdf
Property Development Finance Case Study-Blueray Capital.pdf
 
Sanjeewa_CV updated on 23.02.2016
Sanjeewa_CV  updated on 23.02.2016Sanjeewa_CV  updated on 23.02.2016
Sanjeewa_CV updated on 23.02.2016
 
Surrey education case study
Surrey education case studySurrey education case study
Surrey education case study
 
Martin Lawton CV June 2014
Martin Lawton CV June 2014Martin Lawton CV June 2014
Martin Lawton CV June 2014
 
Jacobs Curriculum Vitae
Jacobs Curriculum VitaeJacobs Curriculum Vitae
Jacobs Curriculum Vitae
 
Pp1 seminar
Pp1 seminarPp1 seminar
Pp1 seminar
 
MOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_EngrMOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_Engr
 
New brochure 240311
New brochure 240311New brochure 240311
New brochure 240311
 
Kandil_Sameh_CPMPart 4 _b
Kandil_Sameh_CPMPart 4 _bKandil_Sameh_CPMPart 4 _b
Kandil_Sameh_CPMPart 4 _b
 
Owner's engineer services - statement of capabilities
Owner's engineer services - statement of capabilitiesOwner's engineer services - statement of capabilities
Owner's engineer services - statement of capabilities
 
Sample wind apartment ins val rep
Sample wind apartment ins val repSample wind apartment ins val rep
Sample wind apartment ins val rep
 
CV-Sounder
CV-SounderCV-Sounder
CV-Sounder
 
sounder
soundersounder
sounder
 
CURRICULUM_VITAE 2
CURRICULUM_VITAE 2CURRICULUM_VITAE 2
CURRICULUM_VITAE 2
 
Gensolownersengineerservices 140323094758-phpapp02
Gensolownersengineerservices 140323094758-phpapp02Gensolownersengineerservices 140323094758-phpapp02
Gensolownersengineerservices 140323094758-phpapp02
 
Working with an Architect
Working with an Architect Working with an Architect
Working with an Architect
 
C.V_Suhail_Ahmad_ Mechanical Engr.
C.V_Suhail_Ahmad_ Mechanical Engr.C.V_Suhail_Ahmad_ Mechanical Engr.
C.V_Suhail_Ahmad_ Mechanical Engr.
 
Kandil_Sameh_AR50360
Kandil_Sameh_AR50360Kandil_Sameh_AR50360
Kandil_Sameh_AR50360
 
CV
CVCV
CV
 
Credicon Introduction
Credicon  IntroductionCredicon  Introduction
Credicon Introduction
 

More from grahamelanders

Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residentialgrahamelanders
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residentialgrahamelanders
 
Freelance project management case studies - residential
Freelance project management case studies - residentialFreelance project management case studies - residential
Freelance project management case studies - residentialgrahamelanders
 
Freelance project management commercial - Case Study
Freelance project management commercial - Case StudyFreelance project management commercial - Case Study
Freelance project management commercial - Case Studygrahamelanders
 

More from grahamelanders (9)

program
programprogram
program
 
Surrey education
Surrey educationSurrey education
Surrey education
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
 
Freelance project management case studies - residential
Freelance project management case studies - residentialFreelance project management case studies - residential
Freelance project management case studies - residential
 
Freelance project management commercial - Case Study
Freelance project management commercial - Case StudyFreelance project management commercial - Case Study
Freelance project management commercial - Case Study
 
Upload
UploadUpload
Upload
 
PerthMetro Case Study
PerthMetro Case StudyPerthMetro Case Study
PerthMetro Case Study
 
PerthMetro case study
PerthMetro case studyPerthMetro case study
PerthMetro case study
 

Providing fire insurance valuations for commercial properties

  • 1. Project Aims and Objectives: To provide the in-house Car Manufacture Division with two detailed Pre – Acquisition and fully costed Reports on two industrial premises. Total foot print of both premises was 125,000 square feet. Consultant Services Included: • Defined the Clients brief and agreed Consultancy fees • Managed Health & Safety • Undertook internal and external condition survey • Production of a Pre – acquisition report which formed part of the Lease • Estimated landlord remedial costs and in-house strip out & fit out costs • Identified and defined local law on business acquisitions, including costs Accomplishments: Successfully undertook two surveys and produced pre - acquisition reports of two car manufacturing facilities, outside the UK. This was achieved by researching the local market, applying European standards and working with diverse teams. Building A1 Facility in Valencia Building A2 Facility in Valencia Consultancy Case Study Pre - Acquisition Reports, Two Car Manufacturing Facilities, Valencia, Spain.
  • 2. Project Aims and Objectives: To provide the in-house Car Manufacture Division with a detailed Pre – Acquisition and fully costed Report on 130,000 square feet of vandalised and medium term vacant industrial premises. Consultant Services Included: • Defined the Clients brief and agreed Consultancy fees • Procured and managed a M&E Consultant • Managed Health & Safety • Undertook internal and external condition survey • Production of a Pre - acquisition report which formed part of the Lease • Estimated landlord remedial costs and in-house strip out & fit out costs Project Management to Gain Landlord Approval to Alter: Due to poor D&B Contractor Management during the construction works, an additional remit was granted by our in-house Client, to undertake the following: - 1. Award Practical Completion to the Contractor 2. Establish the defects liability period 3. Leading the Contractor to gaining Building Control Approval, from the Council 4. Ensuring the H&S File was produced 5. Gaining Landlords Consent to alter the premises 6. Providing additional information for the Lease • Producing drawings of the Clients demise and operations. • Scheduling alterations • Negotiations and agreeing with the Owners Agents the reinstatement of the premises at Lease End, including costs. Johnson Controls Automotive - Cheshire Roof Condition Internals Condition Loading Bay Condition Consultancy & Management Case Study Pre - Acquisition Report & Landlords Approval to Alter, Car Manufacturing Facility, Cheshire, UK.
  • 3. Consultancy Case Study Commercial Fire Insurance Valuations, London, UK. Project Aim and Objectives: To provide fully costed fire insurance valuations to a security company Consultant Services: • Defined the Clients brief and agreed Consultancy fees • Managed Health & Safety • Undertook internal and external condition survey • Production of valuation reports • Estimated the cost to rebuild each premises based on their construction and internal fit out Accomplishments: Accurately determining the costs of replacement of commercial premises, should the existing premises burn down.