New Government House
Complex, Uyo, Akwa Ibom
Client:
Akwa Ibom State 	
Government
Construction Period:
Phase II:
03/2010-09/2011
Services:
Construction of 	banquet
hall, three guest 	houses,
technical area and 	
infrastructure facilities
Two years after the first contract JBN PLC
was awarded to build several new buildings
and infrastructure facilities on the extended
area of 250,000m² at the Government House
Complex.
The projects in second phase consisted the
construction of one duplex, two single and
one VIP guest house with a total of approx.
2,000m² GFA, as well as the erection of
one gate house and a banquet hall for
500 guests with approx. 2,500m² GFA. To
support all these buildings, a technical area
including generator house with three 11kV
generators with a continuous power rating
of approx. 1500 kVA, water treatment plant
with daily water consumption of 250 m3/h
and hourly peak water consumption of 10.5
m3/h as well as a sewage treatment plant
as a Sequencing batch reactor (SBR) type
designed for more than 714 persons were
included in the scope of works.
The infrastructure and landscaping works
for the whole area were part of the contract,
providing access roads, different parking
areas, and walkways. Pipe connections
were created between the facilties and the
technical area.
To enable access to the banquet hall a
boulevard of 2x 6m broad lanes was built.
In addition, infrastructure works also
include the construction of pavements, the
utility system that comprises water supply,
sewage, storm water, an ekectrical duct
system and other relevant services to the
building. Finally, a parking area was build for
around 600 cars, a wall of 2,400m length
surround. the complete Government House
Complex was put in place.
The command center of the CCTV camera
system is located in the Banquet Hall. From
here is it possible to navigate the movable
cameras to the desirable places.
The construction works started in March
2010 and were completed within 19 months
in September 2011
JBNProjectBookNo.2009-006-00

More Related Content

Viewers also liked

Batman Opening Analysis
Batman Opening AnalysisBatman Opening Analysis
Batman Opening Analysissashiru
 
Oracle ADF Mobile Expense Report Approval
Oracle ADF Mobile Expense Report ApprovalOracle ADF Mobile Expense Report Approval
Oracle ADF Mobile Expense Report ApprovalVijay Reddy
 
CORPORATE TIJUCA - SALAS COMERCIAIS - JOÃO FORTES - Lançamento comecial na Ti...
CORPORATE TIJUCA - SALAS COMERCIAIS - JOÃO FORTES - Lançamento comecial na Ti...CORPORATE TIJUCA - SALAS COMERCIAIS - JOÃO FORTES - Lançamento comecial na Ti...
CORPORATE TIJUCA - SALAS COMERCIAIS - JOÃO FORTES - Lançamento comecial na Ti...MEU SONHO MINHA CASA
 
Language certification
Language certificationLanguage certification
Language certificationAlexandre Vion
 
Voorfilmen van noodzaak HR transformatie
Voorfilmen van noodzaak HR transformatieVoorfilmen van noodzaak HR transformatie
Voorfilmen van noodzaak HR transformatieDaïm Willemse
 
Venäjän talouden näkymät
Venäjän talouden näkymätVenäjän talouden näkymät
Venäjän talouden näkymätSuomen Pankki
 
Convocatoria evento 2013
Convocatoria evento 2013Convocatoria evento 2013
Convocatoria evento 2013María Rubio
 
Annual state of_global_mobile_industry_2012_chetan_sharma_consulting
Annual state of_global_mobile_industry_2012_chetan_sharma_consultingAnnual state of_global_mobile_industry_2012_chetan_sharma_consulting
Annual state of_global_mobile_industry_2012_chetan_sharma_consultingChetan Sharma
 

Viewers also liked (16)

Suite de danzas
Suite de danzas Suite de danzas
Suite de danzas
 
Batman Opening Analysis
Batman Opening AnalysisBatman Opening Analysis
Batman Opening Analysis
 
Acampada
AcampadaAcampada
Acampada
 
Oracle ADF Mobile Expense Report Approval
Oracle ADF Mobile Expense Report ApprovalOracle ADF Mobile Expense Report Approval
Oracle ADF Mobile Expense Report Approval
 
Novittá Residenze
Novittá ResidenzeNovittá Residenze
Novittá Residenze
 
Plymouth
PlymouthPlymouth
Plymouth
 
CORPORATE TIJUCA - SALAS COMERCIAIS - JOÃO FORTES - Lançamento comecial na Ti...
CORPORATE TIJUCA - SALAS COMERCIAIS - JOÃO FORTES - Lançamento comecial na Ti...CORPORATE TIJUCA - SALAS COMERCIAIS - JOÃO FORTES - Lançamento comecial na Ti...
CORPORATE TIJUCA - SALAS COMERCIAIS - JOÃO FORTES - Lançamento comecial na Ti...
 
Village dos Coqueirais
Village dos CoqueiraisVillage dos Coqueirais
Village dos Coqueirais
 
Language certification
Language certificationLanguage certification
Language certification
 
Georges
GeorgesGeorges
Georges
 
Jesus6b
Jesus6bJesus6b
Jesus6b
 
Voorfilmen van noodzaak HR transformatie
Voorfilmen van noodzaak HR transformatieVoorfilmen van noodzaak HR transformatie
Voorfilmen van noodzaak HR transformatie
 
Venäjän talouden näkymät
Venäjän talouden näkymätVenäjän talouden näkymät
Venäjän talouden näkymät
 
1445259389545
14452593895451445259389545
1445259389545
 
Convocatoria evento 2013
Convocatoria evento 2013Convocatoria evento 2013
Convocatoria evento 2013
 
Annual state of_global_mobile_industry_2012_chetan_sharma_consulting
Annual state of_global_mobile_industry_2012_chetan_sharma_consultingAnnual state of_global_mobile_industry_2012_chetan_sharma_consulting
Annual state of_global_mobile_industry_2012_chetan_sharma_consulting
 

Similar to PIS Uyo - Government House Phase II

PIS Infrastructure Abuja
PIS Infrastructure AbujaPIS Infrastructure Abuja
PIS Infrastructure AbujaSven Maedler
 
ICR_August06_Song_Gianh
ICR_August06_Song_GianhICR_August06_Song_Gianh
ICR_August06_Song_GianhAnh Nguyen
 
PIS Obajana - Cement Factory
PIS Obajana - Cement FactoryPIS Obajana - Cement Factory
PIS Obajana - Cement FactorySven Maedler
 
RHDHV Buildings Architecture 2008-18
RHDHV Buildings Architecture 2008-18RHDHV Buildings Architecture 2008-18
RHDHV Buildings Architecture 2008-18Mauritz Kruger
 
Christian akl cv typ
Christian akl cv typChristian akl cv typ
Christian akl cv typChristian Akl
 
Christian akl cv typ
Christian akl cv typChristian akl cv typ
Christian akl cv typChristian Akl
 
Christian AKL CV-typ.DOC
Christian AKL CV-typ.DOCChristian AKL CV-typ.DOC
Christian AKL CV-typ.DOCChristian Akl
 
Ici final project
Ici final projectIci final project
Ici final projectkongzc
 
Life cycle of tarbella dam
Life cycle of tarbella dam Life cycle of tarbella dam
Life cycle of tarbella dam JunaidAshraf31
 
Seminar on capital gate building
Seminar on capital gate buildingSeminar on capital gate building
Seminar on capital gate buildingNayan Rao
 
Preliminary plans for pumped storage at Columbia Gorge
Preliminary plans for pumped storage at Columbia GorgePreliminary plans for pumped storage at Columbia Gorge
Preliminary plans for pumped storage at Columbia GorgeNate Sandvig
 

Similar to PIS Uyo - Government House Phase II (20)

PIS Infrastructure Abuja
PIS Infrastructure AbujaPIS Infrastructure Abuja
PIS Infrastructure Abuja
 
ICR_August06_Song_Gianh
ICR_August06_Song_GianhICR_August06_Song_Gianh
ICR_August06_Song_Gianh
 
Eagles Nest
Eagles NestEagles Nest
Eagles Nest
 
PIS Obajana - Cement Factory
PIS Obajana - Cement FactoryPIS Obajana - Cement Factory
PIS Obajana - Cement Factory
 
RHDHV Buildings Architecture 2008-18
RHDHV Buildings Architecture 2008-18RHDHV Buildings Architecture 2008-18
RHDHV Buildings Architecture 2008-18
 
Ici final project
Ici final projectIci final project
Ici final project
 
Christian akl cv typ
Christian akl cv typChristian akl cv typ
Christian akl cv typ
 
Christian akl cv typ
Christian akl cv typChristian akl cv typ
Christian akl cv typ
 
Christian AKL CV-typ.DOC
Christian AKL CV-typ.DOCChristian AKL CV-typ.DOC
Christian AKL CV-typ.DOC
 
Sajeevresume_June-28-2015
Sajeevresume_June-28-2015Sajeevresume_June-28-2015
Sajeevresume_June-28-2015
 
CV
CVCV
CV
 
Ici final project
Ici final projectIci final project
Ici final project
 
Life cycle of tarbella dam
Life cycle of tarbella dam Life cycle of tarbella dam
Life cycle of tarbella dam
 
Babel company profile
Babel company profileBabel company profile
Babel company profile
 
william-first-revision
william-first-revisionwilliam-first-revision
william-first-revision
 
Seminar on capital gate building
Seminar on capital gate buildingSeminar on capital gate building
Seminar on capital gate building
 
c.v(abozamel)
c.v(abozamel)c.v(abozamel)
c.v(abozamel)
 
CV William 2016
CV William 2016CV William 2016
CV William 2016
 
muok cv
muok cvmuok cv
muok cv
 
Preliminary plans for pumped storage at Columbia Gorge
Preliminary plans for pumped storage at Columbia GorgePreliminary plans for pumped storage at Columbia Gorge
Preliminary plans for pumped storage at Columbia Gorge
 

More from Sven Maedler

PIS Uyo - Government House Phase III
PIS Uyo - Government House Phase IIIPIS Uyo - Government House Phase III
PIS Uyo - Government House Phase IIISven Maedler
 
PIS Uyo - Stadium Complex
PIS Uyo - Stadium ComplexPIS Uyo - Stadium Complex
PIS Uyo - Stadium ComplexSven Maedler
 
PIS Uyo - Ikot Ekpene Road Phase I
PIS Uyo - Ikot Ekpene Road Phase IPIS Uyo - Ikot Ekpene Road Phase I
PIS Uyo - Ikot Ekpene Road Phase ISven Maedler
 
PIS Uyo - Abak Road
PIS Uyo - Abak RoadPIS Uyo - Abak Road
PIS Uyo - Abak RoadSven Maedler
 
PIS Uyo - Abak River Bridge
PIS Uyo - Abak River BridgePIS Uyo - Abak River Bridge
PIS Uyo - Abak River BridgeSven Maedler
 
PIS Uyo - Ring Road Phases I
PIS Uyo - Ring Road Phases IPIS Uyo - Ring Road Phases I
PIS Uyo - Ring Road Phases ISven Maedler
 

More from Sven Maedler (7)

PIS AAR
PIS AARPIS AAR
PIS AAR
 
PIS Uyo - Government House Phase III
PIS Uyo - Government House Phase IIIPIS Uyo - Government House Phase III
PIS Uyo - Government House Phase III
 
PIS Uyo - Stadium Complex
PIS Uyo - Stadium ComplexPIS Uyo - Stadium Complex
PIS Uyo - Stadium Complex
 
PIS Uyo - Ikot Ekpene Road Phase I
PIS Uyo - Ikot Ekpene Road Phase IPIS Uyo - Ikot Ekpene Road Phase I
PIS Uyo - Ikot Ekpene Road Phase I
 
PIS Uyo - Abak Road
PIS Uyo - Abak RoadPIS Uyo - Abak Road
PIS Uyo - Abak Road
 
PIS Uyo - Abak River Bridge
PIS Uyo - Abak River BridgePIS Uyo - Abak River Bridge
PIS Uyo - Abak River Bridge
 
PIS Uyo - Ring Road Phases I
PIS Uyo - Ring Road Phases IPIS Uyo - Ring Road Phases I
PIS Uyo - Ring Road Phases I
 

PIS Uyo - Government House Phase II

  • 1. New Government House Complex, Uyo, Akwa Ibom Client: Akwa Ibom State Government Construction Period: Phase II: 03/2010-09/2011 Services: Construction of banquet hall, three guest houses, technical area and infrastructure facilities Two years after the first contract JBN PLC was awarded to build several new buildings and infrastructure facilities on the extended area of 250,000m² at the Government House Complex. The projects in second phase consisted the construction of one duplex, two single and one VIP guest house with a total of approx. 2,000m² GFA, as well as the erection of one gate house and a banquet hall for 500 guests with approx. 2,500m² GFA. To support all these buildings, a technical area including generator house with three 11kV generators with a continuous power rating of approx. 1500 kVA, water treatment plant with daily water consumption of 250 m3/h and hourly peak water consumption of 10.5 m3/h as well as a sewage treatment plant as a Sequencing batch reactor (SBR) type designed for more than 714 persons were included in the scope of works. The infrastructure and landscaping works for the whole area were part of the contract, providing access roads, different parking areas, and walkways. Pipe connections were created between the facilties and the technical area. To enable access to the banquet hall a boulevard of 2x 6m broad lanes was built. In addition, infrastructure works also include the construction of pavements, the utility system that comprises water supply, sewage, storm water, an ekectrical duct system and other relevant services to the building. Finally, a parking area was build for around 600 cars, a wall of 2,400m length surround. the complete Government House Complex was put in place. The command center of the CCTV camera system is located in the Banquet Hall. From here is it possible to navigate the movable cameras to the desirable places. The construction works started in March 2010 and were completed within 19 months in September 2011 JBNProjectBookNo.2009-006-00