CURRICULUM VITAE 
Name : MUHAMMAD FARRUKH ZAKI, 
Nationality Pakistani 
Date of Birth : 7th February 1956 
Marital Status : Married 
Profession : Civil Engineer 
Present Position : TEAM LEADER & ENGINEER’S REPRESENTATIVE 
(BRIDGE PROJECT), BANGLADESH 
Specialization : Project Management & Construction Supervision 
of Roads/Highways related Projects 
Countries of Work Experience : Saudi Arabia, Oman, Pakistan & Bangladesh 
Total Professional Experience : 30 Years 
Affiliation with Professional : - Member, Pakistan Engineering Council 
Institutions (Regd. # Civil/6732) 
- Saudi Council of Engineers (Regd. # 100095) 
Driving License: : Oman , Saudi Arabia, Pakistan 
KEY QUALIFICATIONS 
Practicing professional Engineer since 1981. 
- Construction Supervision of Roads / Highways / Buildings and Infrastructure. 
EDUCATION 
Name of Institution Year Degree/Diploma 
Sara Marwari high school, 
Ishurdi- Distt Pabna, BD 1970 High school-Bengali medium 
N.E.D. University of Engineering 1981 B.E. (Civil) Degree - First Division 
& Technology Karachi, Pakistan 
EXPERIENCE (FROM PRESENT TO PAST) 
1. Date: Feb 2014-till date (17.9. 2014) 
Company: Umer consulting engineers 
1
Role: Team Leader 
Project Name : 3rd Shitalakhya bridge, Narayangonj, Bangladesh 
Scope: Construction Supervision 
Duties: QUALITY ASSURANCE OF THE WORK DONE BY THE CONTRACTORS, CHECKING & 
PROCESSING CONTRACTORS’ IPCs, PREPARATION OF MONTHLY PROGRESS REPORTS, KEEPING 
AN EYE ON THE PROGRESS OF EACH CONTRACTOR,ADVISING THE CONTRACTOR IF FOUND 
BEHING SCHEDULE,IN CASE ANY OF THE CONTRACTOR DID NOT COMPLETE THE PROJECT IN 
TIME,I WAS SUPPOSED TO RECOMMENT TO THE CLIENT ABOUT TIME EXTENSION AS PER ARTICLE 
44 OF FIDIC CONDITIONS OF CONTRACT. 
Cost: 55.6 million $ 
2. Date: July 2010 –FEB 2014 
Company: NESPAK (CONSULTANCY FIRM) 
Role held: RESIDENT ENGINEER/PROJECT MANAGER--- 
Project Name: BALADIA ROADS PROJECT, (IN RIYADH REGION SAUDI ARABIA) 
Project Scope of Work: CONSTRUCTION OF NEW ROADS AND STRUCTURES IN 
JALAJIL, MAJMAA,TAVIA,ROWDA,HOWTA AND TUMAIR 
Value: 202 MILLION SAUDI RIYAL (54M USD) 
Duties: I AM RESPOSIBLE FOR QUALITY ASSURANCE OF THE WORK DONE BY THE CONTRACTORS, 
CHECKING & PROCESSING CONTRACTORS’ IPCs, PREPARATION OF MONTHLY PROGRESS 
REPORTS, KEEPING AN EYE ON THE PROGRESS OF EACH CONTRACTOR,ADVISING THE 
CONTRACTOR IF FOUND BEHING SCHEDULE,IN CASE ANY OF THE CONTRACTOR DID NOT 
COMPLETE THE PROJECT IN TIME,I WAS SUPPOSED TO RECOMMENT TO THE CLIENT ABOUT TIME 
EXTENSION AS PER ARTICLE 44 OF FIDIC CONDITIONS OF CONTRACT. 
THERE WER 3 CONTRAACTORS WORKING IN THE 6 CITIES MENTIONED ABOVE.FOR SIX CITIES I 
HAD 6 SITE INSPECTORS, 6 SURVEYORS,2 QS, 2 MIS (MATERILAS INSPECTORS) 3 C.Es (CIVIL 
ENGRS OF MIN 8 YRS EXPERIENCE) 
3. 
Date: October 2009 - July 2010 
Company: ITALCONSULT (AN ITALIAN CONSULTANCY FIRM) 
Role held: RESIDENT ENGINEER (FIDIC contract) / Engineer’s Representative 
Project Name: Altawal-Jazan-Shuqqaq Expressway, 130 Km long with 29 Bridges and 6 
interchanges, SAUDI ARABIA 
Project Scope of Work: CONSTRUCTION OF NEW EXPRESSWAY (DUAL CARRIAGEWAY 6 LANE 
HAVING 29 BRIDGES, 6 INTERCHNAGES,84 PIPE CULVERS (1000 MM DIA), 46 BOX CULVERTS (FROM 
SINGLE BARREL TO 12 BARRELS) 
Value: 600 MILLION SAUDI RIYAL (160M USD) 
Duties: I WAS RESPOSIBLE FOR QUALITY ASSURANCE OF THE WORK DONE BY THE 
CONTRACTORS, CHECKING & PROCESSING CONTRACTORS’ IPCs, PREPARATION OF MONTHLY 
PROGRESS REPORTS, KEEPING AN EYE ON THE PROGRESS OF WORK, ADVISING THE 
CONTRACTOR IF FOUND BEHING SCHEDULE,IN CASE THE CONTRACTOR DID NOT COMPLETE THE 
PROJECT IN TIME,I WAS SUPPOSED TO RECOMMEND TO THE CLIENT ABOUT TIME EXTENSION AS 
PER ARTICLE 44 OF FIDIC CONDITIONS OF CONTRACT. 
IN THIS PROJECT A MAJOR PROBLEM WAS OBSTRUCTIONS LIKE ELECTRIC POLES, HOUSES, 
CULTIVATED LANDS, GRAVEYARDS ETC.I WAS ALSO RESPONSIBLE TO RECEIVE FROM THE 
CONTRACTOR GENERAL PLAN SHOWING SIZE (AREA) THE OBSTRUCTIONS, CHECK ITS 
CORRECTNESS AND THEN FOR WARD TO THE MINISTRY OF TRANSPORT FOR REMOVAL OF THE 
OBSTRUCTIONS THRU THE CONCERNED AGENCIES. 
THE PROJECT PASSED THRU DESERTS, HILLS AND SABKHA AREAS ( SABKHA AREA IS A SANDY 
DESERT WITH VERY HIGH WATER TABLE (SALTY) WHICH MAKES CONSTRUCTION MORE 
DIFFICULT AS COMPARED TO NORMAL DESERTS. 
AL THE BRIDGES HAD PRE-STRESSED CONCRETE GIRDERS OF 19.80 M LENGTH.THE 
LARGEST BRIDGE WAS OF 200M LONG.ALL THE BRIDGES WERE ON PILE FOUNDATIONS. 
2
4 
Date: June 2008 – October 2009 
Company: ITALCONSULT (AN ITALIAN CONSULTANCY FIRM) 
Role held: RESIDENT ENGINEER/Engineer’s Representative 
Project Name: Majmaa-Shaqra expressway 96 km long, Riyadh region, Saudi Arabia 
Project Scope of Work: CONSTRUCTION OF NEW EXPRESSWAY (DUAL CARRIAGEWAY 12 PIPE 
CULVERS (1000 MM DIA), 6 BOX CULVERTS (FROM SINGLE BARREL TO 10 BARRELS) 
Value: 165 MILLION SAUDI RIYAL (44M USD) 
Duties: I WAS RESPOSIBLE FOR QUALITY ASSURANCE OF THE WORK DONE BY THE 
CONTRACTORS, CHECKING & PROCESSING CONTRACTORS’ IPCs, PREPARATION OF MONTHLY 
PROGRESS REPORTS, KEEPING AN EYE ON THE PROGRESS OF WORK, ADVISING THE 
CONTRACTOR IF FOUND BEHING SCHEDULE,IN CASE THE CONTRACTOR DID NOT COMPLETE THE 
5 
Date: MAY 2006 - MAY 2008 
Company: NESPAK (CONSULTANTS) 
Role held: senior expat contract specialist 
Project Name: 4 laning of Dhaka-Chittagong highway 
VALUE:75M USD 
Scope of work: construction of 2 additional lanes 189 km long for the existing road from 
Dhaka to Chittagong including 36 bridges and 84 culverts 
DUTIES: During this phase my duty was to call pre-bid meeting, Tendering, Tender 
evaluation and recommendation to the client for selection of contractor. 
9 
Date: JANUARY 2006 TO APRIL 2006 
Company: NESPAK (CONSULTANTS) 
Role held: RESIDENT ENGINEER/ENGINEER’S REPRESENTATIVE, OMAN-PROJECT 
NAME: CONSTRUCTION SUPERVISION OF MAHOUT TO NIZWA - 
THUMRAIAT ROAD (SECTION – II). 
PROJECT SCOPE: 
o 30 km new Asphalt Road 
o 28 Nos. Box and Pipe Culverts (of variable cells) 
The construction period was 12 months ended in April 2006. 
VALUE: 25M USD 
Duties: I WAS RESPOSIBLE FOR QUALITY ASSURANCE OF THE WORK DONE BY THE 
CONTRACTORS, CHECKING & PROCESSING CONTRACTORS’ IPCs, PREPARATION OF MONTHLY 
PROGRESS REPORTS, KEEPING AN EYE ON THE PROGRESS OF WORK, ADVISING THE 
CONTRACTOR IF FOUND BEHING SCHEDULE,IN CASE THE CONTRACTOR DID NOT COMPLETE THE 
PROJECT IN TIME,I WAS SUPPOSED TO RECOMMEND TO THE CLIENT ABOUT TIME EXTENSION AS 
PER ARTICLE 44 OF FIDIC CONDITIONS OF CONTRACT. 
10 
Date: Sept 2003 - DECEMBER 2005 
Company: NESPAK (CONSULTANTS) In OMAN 
Role held: RESIDENT ENGINEER/ENGINEER’S REPRESENTATIVE 
PROJECT NAME: CONSTRUCTION SUPERVISION OF MAHOUT TO NIZWA - THUMRAIAT ROAD 
(SECTION – III). 
3
VALUE: 35M USD 
PROJECT SCOPE: 
o 41 km new Asphalt Road 
o 23 km long Track Road to divert the traffic in case the road has to be closed for traffic during routine 
practice session of Military. 
o Construction of 2 km long Runway (where C-130 Aircraft would land with 2 Tanks on board) 
o Tank Crossings: 4 tank crossings on the road. 
Duties: I WAS RESPOSIBLE FOR QUALITY ASSURANCE OF THE WORK DONE BY THE 
CONTRACTORS, CHECKING & PROCESSING CONTRACTORS’ IPCs, PREPARATION OF MONTHLY 
PROGRESS REPORTS, KEEPING AN EYE ON THE PROGRESS OF WORK, ADVISING THE 
CONTRACTOR IF FOUND BEHING SCHEDULE,IN CASE THE CONTRACTOR DID NOT COMPLETE THE 
PROJECT IN TIME,I WAS SUPPOSED TO RECOMMEND TO THE CLIENT ABOUT TIME EXTENSION AS 
PER ARTICLE 44 OF FIDIC CONDITIONS OF CONTRACT. 
11 
Date: July 2003 - September 2003 
Company: NESPAK (CONSULTANTS) 
Role held: PRINCIPAL ENGINEER 
PROJECT NAME: QUAILY ASSURANCE AND PROPOSALS 
PROJECT SCOPE: PREPARATION OF TECHNICAL AND FINANCILA PROPOSALS FOR 
HIGHWAY PROJECT.PREP OF PRE-QUALIFICATION DOCUMENTS.QUALITY 
ASSURANCE OF ALL DOCUEMTNS PREPARED BY CONTRAC SECTION (TECHNICAL 
SPECIFICATIONS, TENDER DRAWINGS AND VILUNE-1 (GENERAL CONDITIONS OF 
CONTRACT) 
DUTIES: As Principal Engineer Quality Assurance & Proposals (QA&P) responsible 
for the preparation of proposals, quality assurance of documents like Technical 
specifications of the Contract, TENDER Drawings, Engineer’s Estimate etc. 
Preparation of Expression of Interest, writing Letters of Interest for projects in Pakistan 
and abroad. Meetings with various Consulting Firms to form Joint Ventures for projects 
etc. 
12 
Date: October 2000- July 2003 
Company: NESPAK (CONSULTANTS) 
Role held: RESIDENT ENGINEER CONSTRUCTION/ENGINEER’S REPRESENTATIVE 
PROJECT NAME: CONSTRUCTION SUPERVISION OF PUNJAB HIGHWAY PROJECT 
SCOPE: GENERAL SUPERVISION OF ROAD, BRIDGES AND CULVERTS IN THE 
CENTRAL PART OF THE PROVINCE OF PUNJAB IN PAKISTAN.THERE WERE 3 
BRIDGES (2 OF CONVENTIONAL CONCRETE GIRDERS AND ONE PRE-STRESSED) 
VALUE:3 6M USD 
DUTIES: I WAS RESPOSIBLE FOR OVERALL QUALITY OF WORKS OF THE PROJECT 
AND PROCESSING OF IPCs OF THE CONTRACTOR. 
13 
Date: Nov. 1998 to Sept. 2000 
Company: NESPAK (CONSULTANTS) 
4
Role held: Assistant Resident Engineer, 
PROJECT NAME: FARM TO MARKET ROADS, PAKISTAN 
PROJECT SCOPE: Construction Supervision of ADB assisted Rural Access Roads 
Projects over 100 Km long having over 125 No. Culverts in Pakpattan & Sahiwal 
Districts. This residency was spread over two districts of South Punjab; Sahiwal and 
Pakpattan Sharif. Two roads were in Sahiwal and the rest in Pakpattan Sharif. 
VALUE:27M USD 
DUTIES: I WAS RESPONSIBLE TO ASSIST THE RE IN QUALITY ASSURANCE OF 
PROJECTS, IN PROCESSING THE IPCs OF THE CONTRACTORS,MAKING 
WEEKLY AND MONTHLY PROGRESS REPORTS,COMPARING WORK DONE 
AGAINST THE CONSTRUCTION SCHEDULE,LETTER DRAFT LETTERS ABOUT 
QUALITY OF WORKS TO THE CONTRACTOR.CHECKING BAR BENDING 
SCHDULES FOR THE STRUCTURES. 
14 
Date: MAY1998 to NOV1998 
Company: NESPAK (CONSULTANTS) 
Role held: Resident Engineer 
PROJECT NAME: Bridge over main Railway Track at Garhi Shahu, Lahore 
PROJECT SCOPE: bridge 250m long with 500mm diameter piles, pre-stressed girders 
22m long, deck slab, approach slabs and 100 m road with embankment on each side of 
the bridge. 
VALUE: 15M USD 
DUTIES: I WAS RESPONSIBLE FOR QUALITY ASSURANCE OF PROJECTS, 
PROCESSING THE IPCs OF THE CONTRACTORS,MAKING WEEKLY AND 
MONTHLY PROGRESS REPORTS,COMPARING WORK DONE AGAINST THE 
CONSTRUCTION SCHEDULE,WRITING LETTERS ABOUT QUALITY OF WORKS 
TO THE CONTRACTOR.MAKING SURE THAT THE STAFF IS WORKING 
PROPERLY. 
15 
Date: Jan1995 to April1998 
Company: NESPAK (CONSULTANTS) 
Role held: Resident Engineer / Engineer’s Representative 
PROJECT NAME: Fyzee Rahamin Art Gallery in Karachi 
SCOPE: 3 STOREY BUILDING OF ART GALLERY & AUDITORIUM WITH SEATING 
CAPACITY OF 1800 PEOPLE. IT WAS A CENTRALLY AIR CONDITIONED BUILDING. 
VALUE: 5M USD 
DUTIES:I WAS RESPONSIBLE FOR QUALITY ASSURANCE OF PROJECTS, 
PROCESSING THE IPCs OF THE CONTRACTORS,MAKING WEEKLY AND 
MONTHLY PROGRESS REPORTS,COMPARING WORK DONE AGAINST THE 
CONSTRUCTION SCHEDULE,WRITING LETTERS ABOUT QUALITY OF WORKS 
TO THE CONTRACTOR.MAKING SURE THAT THE STAFF IS WORKING 
PROPERLY. 
5
16 
Date: Aug 1994 to Dec1994 
Company: NESPAK (CONSULTANTS) 
Role held: SENIOR Engineer (claim analyst) 
PROJECT NAME: Evaluation of claims for Korangi Fisheries and Harbor Authority 
SCOPE: Evaluation of claims for Korangi Fisheries and Harbor Authority, Karachi 380 
million Pakistan rupees claim. There was disagreement between the Contractor and the 
Consultant about the recommendations of the Consultants. So NESPAK (the biggest 
Pakistani consultant were hired to give final recommendations. I was assigned this task. 
Duties: My duty was to do the job single handedly, 
I completed the job and was accepted by the concerned parties. 
17 
Date: June 1992 to July 1994 
Company: NESPAK (CONSULTANTS) 
Role held: SENIOR Engineer /PM 
PROJECT NAME: Development of 2 new towns near Karachi (NORTH KARACHI AND 
SURJANI TOWN) OF KARACHI DELEVOPMENT AUTHORITY 
SCOPE: CONSTRUCTION OF MORE THA 100 KM LONG ROADS & 21 CULVERTS, 
WATER SUPPLY, SEWERAGE AND 1000 FLATS*APPARTMENT (4 STOREY) 
VALUE:3.5M USD 
DUTIES: MY DUTY WAS TO SUPERVISE THE CONSTRUCTION FROM QUALITY 
POINT OF VIEW AND PROCESSING OF CONTRACTOR IPCs, 
18 
Date: Jan1991 to May1992 
Company: NESPAK (CONSULTANTS) 
Role held: Resident Engineer / Engineer’s Representative –Fidic contract 
PROJECT NAME: Headquarters Building Pakistan Medical & Dental Council at G-10/4 
Islamabad, and Ware House of duty Free shops in I-11/4 Islamabad. 
SCOPE: 3 STOREY BUILDING WITH CENTRAL AIRCONDITIONING SYSTEM. 
VALUE:3.0M USD 
DUTIES: I WAS RESPONSIBLE FOR QUALITY ASSURANCE OF PROJECTS, 
PROCESSING THE IPCs OF THE CONTRACTORS,MAKING WEEKLY AND MONTHLY 
PROGRESS REPORTS,COMPARING WORK DONE AGAINST THE CONSTRUCTION 
SCHEDULE,WRITING LETTERS ABOUT QUALITY OF WORKS TO THE 
CONTRACTOR.MAKING SURE THAT THE STAFF IS WORKING PROPERLY. 
19 
Date: Jan 1989 to Dec1990 
Company: NESPAK (CONSULTANTS) 
Role held: SENIOR Engineer- 
PROJECT NAME: Construction Supervision of Pak – Suzuki Plant near Karachi 
SCOPE: PAK SUZUKI MOTOR’S PLANT COMPRISING THE PLANT, WATER TANKS, 
MOSQUE, 
6
THE MAIN PLANT HAD ROOFING OF PRE-CAST PLANKS RESTING ON STRUCTURAL 
STEEL TRUSSESS RESTING ON RCC COLUMNS. 
DUTIES: I WAS RESPONSIBLE FOR QUALITY ASSURANCE OF PROJECTS, 
PROCESSING THE IPCs OF THE CONTRACTORS,MAKING WEEKLY AND MONTHLY 
PROGRESS REPORTS ON BEHALF OF THE RE,COMPARING WORK DONE AGAINST 
THE CONSTRUCTION SCHEDULE,WRITING LETTERS ABOUT QUALITY OF WORKS 
TO THE CONTRACTOR.MAKING SURE THAT THE STAFF IS WORKING PROPERLY. 
20 
Date: Jan1988 to Nov1988 
Company: NESPAK (CONSULTANTS) 
Role held: SENIOR Engineer 
PROJECT NAME: CONTRACT PREPARATION CELL 
SCOPE: PREPARATION OF CONTRACT DOCUMENTS (TECHNICAL 
SPECIFICATIONAS AND THE GENERAL CONDITIONS OF CONTRACT) FOR ROADS 
AND BUILDING PROJECT. 
DUTIES: I WAS RESPOSIBLE FOR PREPARATION OF CONTRACT DOCUMENTS AND 
SUBMIT TO THE PRINCIPAL ENGINEER 
21 
Date: Feb1987 to Dec1987 
Company: NESPAK (CONSULTANTS) 
Role held: SENIOR Engineer 
PROJECT NAME: CONSTRCUTION OF NATIONAL STADIUM KARACHI FOR WORLD 
CUP CRICKET 1987 
SCOPE: CONSTRUCTION OF NEW GENERAL ENCLOSURE, CLUB ENCLOSURE AND 
STUDENTS’ ENCLOSURE WITH ROOF.ROOF WAS OF PRE-CAST PLANTS PLACED 
ON STRUCTURAL STEEL TRUSSES PLACED ON STELL COLUMNS ON FIELD SIDE 
AND RCC COLUMNS ON THE OUTER SIDE. 
VALUE:5M USD 
DUTIES: I WAS RESPONSIBLE FOR QUALITY ASSURANCE OF PROJECTS, PROCESSING THE IPCs OF THE 
CONTRACTORS,MAKING WEEKLY AND MONTHLY PROGRESS REPORTS ON BEHALF OF THE 
RE,COMPARING WORK DONE AGAINST THE CONSTRUCTION SCHEDULE,WRITING LETTERS ABOUT 
QUALITY OF WORKS TO THE CONTRACTOR.MAKING SURE THAT THE STAFF IS WORKING PROPERLY 
22 
Date: 1985 to jan1987 
Company: NESPAK (CONSULTANTS) 
Role held: SENIOR Engineer, 
PROJECT NAME: Construction Supervision of Road from Star Gate to Karachi Airport 
SCOPE: CONSTRCUTION SUPERVISION OF ROAD AND CULVERTS FROM STAR 
GATE ON MAIN NATIONAL HIGHWAY TO THE TERMINAL 3 OF KARACHI AIRPORT. 
IT WAS WATER BOUND MACADAM ROAD WITH BINDER COURSE AND WEARING 
COURSE. 
VALUE:0.55M USD 
DUTIES: I WAS RESPONSIBLE FOR QUALITY ASSURANCE OF PROJECTS, 
PROCESSING THE IPCs OF THE CONTRACTORS,MAKING WEEKLY AND MONTHLY 
PROGRESS REPORTS ON BEHALF OF THE RE,COMPARING WORK DONE AGAINST 
7
THE CONSTRUCTION SCHEDULE,WRITING LETTERS ABOUT QUALITY OF WORKS 
TO THE CONTRACTOR.MAKING SURE THAT THE STAFF IS WORKING PROPERLY 
23 
Date: 1981 to 1985 
Company: NESPAK (CONSULTANTS) 
Role held: JUNIOR Engineer, 
PROJECT NAME: Main Access Roads (asphalt concrete) from National Highway to Port Bin Qasim 
including Bridges and Culverts. Thickness of binder course was 40 mm and that of wearing course 
40 mm.THERE WERE 2 BRIDGES OVER MAIN RAILWAY TRACK.BOTH WITH PRE-STRESSED 
GIRDERS.ONE WAS SKEW AND OTHER STRAIGHT.ONE WAS 80M LONG AND THE OTHER WAS 91M 
LONG. 
CULVERTS WERE OF 2 BARRELS TO 14 BARRELS.COST: 0.75M USD 
DUTIES: AS JUNIOR ENGINEER MY DUTIES WERE TO ASSIST THE SENIOR ENGINEER IN CHECKING 
THE REINFORCEMENT STEEL OF BRIDGES AND GIRDERS AND THOSE OF CULVERTS,ALSO 
COMPACTION OF SUB-BASE AND BASE CORSE LAYERS. 
CONTACT: Cell :00880-1793315579 
E-mail : mfzaki57@yahoo.com 
LANGUAGE CAPABILITY 
English - Excellent in speaking, reading and writing 
Arabic - Fair in speaking, 
Urdu - mother language 
Bengali - Excellent in reading, writing and speaking (I was born in Bangladesh and 
brought up there till the age of 14) 
REFERENCES: 
1. MR. NAUMAN UL HUQ 
REGIONAL MANAGER/ CHIEF ENGINEER, NESPAK 
MUSCAT, OMAN 
Email: <nauman_ul_haq@hotmail.com><nauman.ul.haq66@gmail.com>; 
Phone: 00968-92207707 
2. MR.NAJEEB ULLAH KHAN 
R.E, KHATEEB AL ALAMI, 
SAUDI ARABIA 
Email:najeebullahkhan99@hotmail.com<najeebullahkhan99@gmail.com> 
<najeebullahkhan99@gmail.com>; 
Phone: 00966-535660124 
3. MR.QAMAR HAYAT KHAN 
R.E, ITALCONSULT 
SAUDI ARABIA 
Email: <qhayatbn@gmail.com> 
Phone: 00966-546956590 
4. MR. ATHER KANDHIR 
R.E AECOM 
SAUDI ARABIA 
Email: <athar_kandhir@yahoo.com> 
Phone: 00966-551310710 
8
5. MR.MUZAFFAR A KHAN 
SENIOR ELECTRICAL ENGINEER 
WORLEY PARSONS, CANADA 
Email: <muzaffarkhan@hotmail.com>; 
Phone: 001-780-4639499 
Dated: 17 SEPT, 2014 
9
5. MR.MUZAFFAR A KHAN 
SENIOR ELECTRICAL ENGINEER 
WORLEY PARSONS, CANADA 
Email: <muzaffarkhan@hotmail.com>; 
Phone: 001-780-4639499 
Dated: 17 SEPT, 2014 
9

More Related Content

What's hot

CV Engr. Sikandar Khan
CV Engr. Sikandar KhanCV Engr. Sikandar Khan
CV Engr. Sikandar Khansikandar Khan
 
Atef_Tayeb_CV-Jan 2015 (2)
Atef_Tayeb_CV-Jan 2015 (2)Atef_Tayeb_CV-Jan 2015 (2)
Atef_Tayeb_CV-Jan 2015 (2)?Atef Tayeb
 
AECOM BAH-Madhava.Kulal.P
AECOM BAH-Madhava.Kulal.PAECOM BAH-Madhava.Kulal.P
AECOM BAH-Madhava.Kulal.PMadhava Kulal
 
Navaneethakrishnan BE .Civil over 8 yrs of exp in Infrastructure projects
Navaneethakrishnan BE .Civil over 8 yrs of exp in Infrastructure projectsNavaneethakrishnan BE .Civil over 8 yrs of exp in Infrastructure projects
Navaneethakrishnan BE .Civil over 8 yrs of exp in Infrastructure projectsnavaneethakrishnan k
 
Aqeel Ahmed se (2)
Aqeel Ahmed se (2)Aqeel Ahmed se (2)
Aqeel Ahmed se (2)aqeel ahmed
 
CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016Subhash Dhiman
 
Muhammad Aslam Bhutto Cv 2015
Muhammad Aslam Bhutto Cv 2015Muhammad Aslam Bhutto Cv 2015
Muhammad Aslam Bhutto Cv 2015muhammad aslam
 
PORTFOLIO.compressed
PORTFOLIO.compressedPORTFOLIO.compressed
PORTFOLIO.compressedJoseph Ahmadi
 
Structural Engineer_Duong Quoc Huan_2015
Structural Engineer_Duong Quoc Huan_2015Structural Engineer_Duong Quoc Huan_2015
Structural Engineer_Duong Quoc Huan_2015Huan Duong Quoc
 
1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)Hassan Halhoul
 

What's hot (20)

MCV
MCVMCV
MCV
 
Sankar CV
Sankar CVSankar CV
Sankar CV
 
RAVINDER_RESUME
RAVINDER_RESUME RAVINDER_RESUME
RAVINDER_RESUME
 
CV Engr. Sikandar Khan
CV Engr. Sikandar KhanCV Engr. Sikandar Khan
CV Engr. Sikandar Khan
 
Atef_Tayeb_CV-Jan 2015 (2)
Atef_Tayeb_CV-Jan 2015 (2)Atef_Tayeb_CV-Jan 2015 (2)
Atef_Tayeb_CV-Jan 2015 (2)
 
AECOM BAH-Madhava.Kulal.P
AECOM BAH-Madhava.Kulal.PAECOM BAH-Madhava.Kulal.P
AECOM BAH-Madhava.Kulal.P
 
Navaneethakrishnan BE .Civil over 8 yrs of exp in Infrastructure projects
Navaneethakrishnan BE .Civil over 8 yrs of exp in Infrastructure projectsNavaneethakrishnan BE .Civil over 8 yrs of exp in Infrastructure projects
Navaneethakrishnan BE .Civil over 8 yrs of exp in Infrastructure projects
 
CV - Ahmed Mounir
CV - Ahmed MounirCV - Ahmed Mounir
CV - Ahmed Mounir
 
Aqeel Ahmed se (2)
Aqeel Ahmed se (2)Aqeel Ahmed se (2)
Aqeel Ahmed se (2)
 
Anil_CV_Recent
Anil_CV_RecentAnil_CV_Recent
Anil_CV_Recent
 
CV_Alfred_Coning2014
CV_Alfred_Coning2014CV_Alfred_Coning2014
CV_Alfred_Coning2014
 
CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016CV-_SDhiman_27-04-2016
CV-_SDhiman_27-04-2016
 
Muhammad Aslam Bhutto Cv 2015
Muhammad Aslam Bhutto Cv 2015Muhammad Aslam Bhutto Cv 2015
Muhammad Aslam Bhutto Cv 2015
 
PORTFOLIO.compressed
PORTFOLIO.compressedPORTFOLIO.compressed
PORTFOLIO.compressed
 
Structural Engineer_Duong Quoc Huan_2015
Structural Engineer_Duong Quoc Huan_2015Structural Engineer_Duong Quoc Huan_2015
Structural Engineer_Duong Quoc Huan_2015
 
Ghazawi-CV updat - April 2016
Ghazawi-CV updat - April 2016Ghazawi-CV updat - April 2016
Ghazawi-CV updat - April 2016
 
1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)
 
Vinoth2016 - CV
Vinoth2016 - CVVinoth2016 - CV
Vinoth2016 - CV
 
CV-SM-Akbari-Feb 2016
CV-SM-Akbari-Feb 2016CV-SM-Akbari-Feb 2016
CV-SM-Akbari-Feb 2016
 
Ronnie CV 2015
Ronnie CV  2015Ronnie CV  2015
Ronnie CV 2015
 

Similar to Cv zaki 17.11.2014 dhaka

Resume q.surveyor - amanat ali (updated)
Resume   q.surveyor - amanat ali (updated)Resume   q.surveyor - amanat ali (updated)
Resume q.surveyor - amanat ali (updated)Amanat ali
 
CV QS AKHTAR RASUL
CV QS AKHTAR RASULCV QS AKHTAR RASUL
CV QS AKHTAR RASULAkhtar Rasul
 
AjayasankarK M _ Engineer
AjayasankarK M _ EngineerAjayasankarK M _ Engineer
AjayasankarK M _ EngineerAjay Sankar
 
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CVELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CVjignesh kadam
 
TAHRER C.V on 30-07-2015 -link
TAHRER C.V  on 30-07-2015 -linkTAHRER C.V  on 30-07-2015 -link
TAHRER C.V on 30-07-2015 -linkTahrer Abu Yousef
 
QUANTITY SURVEYOR (MUHAMMAD AZEEM) UPDATED 1-22-2017
QUANTITY SURVEYOR  (MUHAMMAD AZEEM) UPDATED 1-22-2017QUANTITY SURVEYOR  (MUHAMMAD AZEEM) UPDATED 1-22-2017
QUANTITY SURVEYOR (MUHAMMAD AZEEM) UPDATED 1-22-2017muhammad azeem
 
CV Updated 8-10-16
CV Updated 8-10-16CV Updated 8-10-16
CV Updated 8-10-16SHYAM NIKESH
 
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and RoadsEngr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and RoadsNoor Wali Khan
 

Similar to Cv zaki 17.11.2014 dhaka (20)

Resume q.surveyor - amanat ali (updated)
Resume   q.surveyor - amanat ali (updated)Resume   q.surveyor - amanat ali (updated)
Resume q.surveyor - amanat ali (updated)
 
pdf C.V RAVIKANNIAPPAN
pdf C.V RAVIKANNIAPPANpdf C.V RAVIKANNIAPPAN
pdf C.V RAVIKANNIAPPAN
 
CV - Dsouza UPDATED 03-04-2016
CV - Dsouza UPDATED 03-04-2016CV - Dsouza UPDATED 03-04-2016
CV - Dsouza UPDATED 03-04-2016
 
CV QS AKHTAR RASUL
CV QS AKHTAR RASULCV QS AKHTAR RASUL
CV QS AKHTAR RASUL
 
CV - Fakruddin R01
CV - Fakruddin  R01CV - Fakruddin  R01
CV - Fakruddin R01
 
AjayasankarK M _ Engineer
AjayasankarK M _ EngineerAjayasankarK M _ Engineer
AjayasankarK M _ Engineer
 
Cv 01
Cv 01Cv 01
Cv 01
 
CV Abdul Saeed
CV Abdul SaeedCV Abdul Saeed
CV Abdul Saeed
 
CV
CVCV
CV
 
Updated cv (2)
Updated cv (2)Updated cv (2)
Updated cv (2)
 
WILSON SAPIEN CV
WILSON SAPIEN CVWILSON SAPIEN CV
WILSON SAPIEN CV
 
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CVELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
ELECTRICAL ENGR.WITH 20YRS.EXP.up-dated CV
 
Gaurav Kumar
Gaurav KumarGaurav Kumar
Gaurav Kumar
 
TAHRER C.V on 30-07-2015 -link
TAHRER C.V  on 30-07-2015 -linkTAHRER C.V  on 30-07-2015 -link
TAHRER C.V on 30-07-2015 -link
 
QUANTITY SURVEYOR (MUHAMMAD AZEEM) UPDATED 1-22-2017
QUANTITY SURVEYOR  (MUHAMMAD AZEEM) UPDATED 1-22-2017QUANTITY SURVEYOR  (MUHAMMAD AZEEM) UPDATED 1-22-2017
QUANTITY SURVEYOR (MUHAMMAD AZEEM) UPDATED 1-22-2017
 
CV Updated 8-10-16
CV Updated 8-10-16CV Updated 8-10-16
CV Updated 8-10-16
 
hidayath cv 2016
hidayath cv 2016hidayath cv 2016
hidayath cv 2016
 
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and RoadsEngr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
 
CV
CVCV
CV
 
Asif QS CV
Asif QS CVAsif QS CV
Asif QS CV
 

Cv zaki 17.11.2014 dhaka

  • 1. CURRICULUM VITAE Name : MUHAMMAD FARRUKH ZAKI, Nationality Pakistani Date of Birth : 7th February 1956 Marital Status : Married Profession : Civil Engineer Present Position : TEAM LEADER & ENGINEER’S REPRESENTATIVE (BRIDGE PROJECT), BANGLADESH Specialization : Project Management & Construction Supervision of Roads/Highways related Projects Countries of Work Experience : Saudi Arabia, Oman, Pakistan & Bangladesh Total Professional Experience : 30 Years Affiliation with Professional : - Member, Pakistan Engineering Council Institutions (Regd. # Civil/6732) - Saudi Council of Engineers (Regd. # 100095) Driving License: : Oman , Saudi Arabia, Pakistan KEY QUALIFICATIONS Practicing professional Engineer since 1981. - Construction Supervision of Roads / Highways / Buildings and Infrastructure. EDUCATION Name of Institution Year Degree/Diploma Sara Marwari high school, Ishurdi- Distt Pabna, BD 1970 High school-Bengali medium N.E.D. University of Engineering 1981 B.E. (Civil) Degree - First Division & Technology Karachi, Pakistan EXPERIENCE (FROM PRESENT TO PAST) 1. Date: Feb 2014-till date (17.9. 2014) Company: Umer consulting engineers 1
  • 2. Role: Team Leader Project Name : 3rd Shitalakhya bridge, Narayangonj, Bangladesh Scope: Construction Supervision Duties: QUALITY ASSURANCE OF THE WORK DONE BY THE CONTRACTORS, CHECKING & PROCESSING CONTRACTORS’ IPCs, PREPARATION OF MONTHLY PROGRESS REPORTS, KEEPING AN EYE ON THE PROGRESS OF EACH CONTRACTOR,ADVISING THE CONTRACTOR IF FOUND BEHING SCHEDULE,IN CASE ANY OF THE CONTRACTOR DID NOT COMPLETE THE PROJECT IN TIME,I WAS SUPPOSED TO RECOMMENT TO THE CLIENT ABOUT TIME EXTENSION AS PER ARTICLE 44 OF FIDIC CONDITIONS OF CONTRACT. Cost: 55.6 million $ 2. Date: July 2010 –FEB 2014 Company: NESPAK (CONSULTANCY FIRM) Role held: RESIDENT ENGINEER/PROJECT MANAGER--- Project Name: BALADIA ROADS PROJECT, (IN RIYADH REGION SAUDI ARABIA) Project Scope of Work: CONSTRUCTION OF NEW ROADS AND STRUCTURES IN JALAJIL, MAJMAA,TAVIA,ROWDA,HOWTA AND TUMAIR Value: 202 MILLION SAUDI RIYAL (54M USD) Duties: I AM RESPOSIBLE FOR QUALITY ASSURANCE OF THE WORK DONE BY THE CONTRACTORS, CHECKING & PROCESSING CONTRACTORS’ IPCs, PREPARATION OF MONTHLY PROGRESS REPORTS, KEEPING AN EYE ON THE PROGRESS OF EACH CONTRACTOR,ADVISING THE CONTRACTOR IF FOUND BEHING SCHEDULE,IN CASE ANY OF THE CONTRACTOR DID NOT COMPLETE THE PROJECT IN TIME,I WAS SUPPOSED TO RECOMMENT TO THE CLIENT ABOUT TIME EXTENSION AS PER ARTICLE 44 OF FIDIC CONDITIONS OF CONTRACT. THERE WER 3 CONTRAACTORS WORKING IN THE 6 CITIES MENTIONED ABOVE.FOR SIX CITIES I HAD 6 SITE INSPECTORS, 6 SURVEYORS,2 QS, 2 MIS (MATERILAS INSPECTORS) 3 C.Es (CIVIL ENGRS OF MIN 8 YRS EXPERIENCE) 3. Date: October 2009 - July 2010 Company: ITALCONSULT (AN ITALIAN CONSULTANCY FIRM) Role held: RESIDENT ENGINEER (FIDIC contract) / Engineer’s Representative Project Name: Altawal-Jazan-Shuqqaq Expressway, 130 Km long with 29 Bridges and 6 interchanges, SAUDI ARABIA Project Scope of Work: CONSTRUCTION OF NEW EXPRESSWAY (DUAL CARRIAGEWAY 6 LANE HAVING 29 BRIDGES, 6 INTERCHNAGES,84 PIPE CULVERS (1000 MM DIA), 46 BOX CULVERTS (FROM SINGLE BARREL TO 12 BARRELS) Value: 600 MILLION SAUDI RIYAL (160M USD) Duties: I WAS RESPOSIBLE FOR QUALITY ASSURANCE OF THE WORK DONE BY THE CONTRACTORS, CHECKING & PROCESSING CONTRACTORS’ IPCs, PREPARATION OF MONTHLY PROGRESS REPORTS, KEEPING AN EYE ON THE PROGRESS OF WORK, ADVISING THE CONTRACTOR IF FOUND BEHING SCHEDULE,IN CASE THE CONTRACTOR DID NOT COMPLETE THE PROJECT IN TIME,I WAS SUPPOSED TO RECOMMEND TO THE CLIENT ABOUT TIME EXTENSION AS PER ARTICLE 44 OF FIDIC CONDITIONS OF CONTRACT. IN THIS PROJECT A MAJOR PROBLEM WAS OBSTRUCTIONS LIKE ELECTRIC POLES, HOUSES, CULTIVATED LANDS, GRAVEYARDS ETC.I WAS ALSO RESPONSIBLE TO RECEIVE FROM THE CONTRACTOR GENERAL PLAN SHOWING SIZE (AREA) THE OBSTRUCTIONS, CHECK ITS CORRECTNESS AND THEN FOR WARD TO THE MINISTRY OF TRANSPORT FOR REMOVAL OF THE OBSTRUCTIONS THRU THE CONCERNED AGENCIES. THE PROJECT PASSED THRU DESERTS, HILLS AND SABKHA AREAS ( SABKHA AREA IS A SANDY DESERT WITH VERY HIGH WATER TABLE (SALTY) WHICH MAKES CONSTRUCTION MORE DIFFICULT AS COMPARED TO NORMAL DESERTS. AL THE BRIDGES HAD PRE-STRESSED CONCRETE GIRDERS OF 19.80 M LENGTH.THE LARGEST BRIDGE WAS OF 200M LONG.ALL THE BRIDGES WERE ON PILE FOUNDATIONS. 2
  • 3. 4 Date: June 2008 – October 2009 Company: ITALCONSULT (AN ITALIAN CONSULTANCY FIRM) Role held: RESIDENT ENGINEER/Engineer’s Representative Project Name: Majmaa-Shaqra expressway 96 km long, Riyadh region, Saudi Arabia Project Scope of Work: CONSTRUCTION OF NEW EXPRESSWAY (DUAL CARRIAGEWAY 12 PIPE CULVERS (1000 MM DIA), 6 BOX CULVERTS (FROM SINGLE BARREL TO 10 BARRELS) Value: 165 MILLION SAUDI RIYAL (44M USD) Duties: I WAS RESPOSIBLE FOR QUALITY ASSURANCE OF THE WORK DONE BY THE CONTRACTORS, CHECKING & PROCESSING CONTRACTORS’ IPCs, PREPARATION OF MONTHLY PROGRESS REPORTS, KEEPING AN EYE ON THE PROGRESS OF WORK, ADVISING THE CONTRACTOR IF FOUND BEHING SCHEDULE,IN CASE THE CONTRACTOR DID NOT COMPLETE THE 5 Date: MAY 2006 - MAY 2008 Company: NESPAK (CONSULTANTS) Role held: senior expat contract specialist Project Name: 4 laning of Dhaka-Chittagong highway VALUE:75M USD Scope of work: construction of 2 additional lanes 189 km long for the existing road from Dhaka to Chittagong including 36 bridges and 84 culverts DUTIES: During this phase my duty was to call pre-bid meeting, Tendering, Tender evaluation and recommendation to the client for selection of contractor. 9 Date: JANUARY 2006 TO APRIL 2006 Company: NESPAK (CONSULTANTS) Role held: RESIDENT ENGINEER/ENGINEER’S REPRESENTATIVE, OMAN-PROJECT NAME: CONSTRUCTION SUPERVISION OF MAHOUT TO NIZWA - THUMRAIAT ROAD (SECTION – II). PROJECT SCOPE: o 30 km new Asphalt Road o 28 Nos. Box and Pipe Culverts (of variable cells) The construction period was 12 months ended in April 2006. VALUE: 25M USD Duties: I WAS RESPOSIBLE FOR QUALITY ASSURANCE OF THE WORK DONE BY THE CONTRACTORS, CHECKING & PROCESSING CONTRACTORS’ IPCs, PREPARATION OF MONTHLY PROGRESS REPORTS, KEEPING AN EYE ON THE PROGRESS OF WORK, ADVISING THE CONTRACTOR IF FOUND BEHING SCHEDULE,IN CASE THE CONTRACTOR DID NOT COMPLETE THE PROJECT IN TIME,I WAS SUPPOSED TO RECOMMEND TO THE CLIENT ABOUT TIME EXTENSION AS PER ARTICLE 44 OF FIDIC CONDITIONS OF CONTRACT. 10 Date: Sept 2003 - DECEMBER 2005 Company: NESPAK (CONSULTANTS) In OMAN Role held: RESIDENT ENGINEER/ENGINEER’S REPRESENTATIVE PROJECT NAME: CONSTRUCTION SUPERVISION OF MAHOUT TO NIZWA - THUMRAIAT ROAD (SECTION – III). 3
  • 4. VALUE: 35M USD PROJECT SCOPE: o 41 km new Asphalt Road o 23 km long Track Road to divert the traffic in case the road has to be closed for traffic during routine practice session of Military. o Construction of 2 km long Runway (where C-130 Aircraft would land with 2 Tanks on board) o Tank Crossings: 4 tank crossings on the road. Duties: I WAS RESPOSIBLE FOR QUALITY ASSURANCE OF THE WORK DONE BY THE CONTRACTORS, CHECKING & PROCESSING CONTRACTORS’ IPCs, PREPARATION OF MONTHLY PROGRESS REPORTS, KEEPING AN EYE ON THE PROGRESS OF WORK, ADVISING THE CONTRACTOR IF FOUND BEHING SCHEDULE,IN CASE THE CONTRACTOR DID NOT COMPLETE THE PROJECT IN TIME,I WAS SUPPOSED TO RECOMMEND TO THE CLIENT ABOUT TIME EXTENSION AS PER ARTICLE 44 OF FIDIC CONDITIONS OF CONTRACT. 11 Date: July 2003 - September 2003 Company: NESPAK (CONSULTANTS) Role held: PRINCIPAL ENGINEER PROJECT NAME: QUAILY ASSURANCE AND PROPOSALS PROJECT SCOPE: PREPARATION OF TECHNICAL AND FINANCILA PROPOSALS FOR HIGHWAY PROJECT.PREP OF PRE-QUALIFICATION DOCUMENTS.QUALITY ASSURANCE OF ALL DOCUEMTNS PREPARED BY CONTRAC SECTION (TECHNICAL SPECIFICATIONS, TENDER DRAWINGS AND VILUNE-1 (GENERAL CONDITIONS OF CONTRACT) DUTIES: As Principal Engineer Quality Assurance & Proposals (QA&P) responsible for the preparation of proposals, quality assurance of documents like Technical specifications of the Contract, TENDER Drawings, Engineer’s Estimate etc. Preparation of Expression of Interest, writing Letters of Interest for projects in Pakistan and abroad. Meetings with various Consulting Firms to form Joint Ventures for projects etc. 12 Date: October 2000- July 2003 Company: NESPAK (CONSULTANTS) Role held: RESIDENT ENGINEER CONSTRUCTION/ENGINEER’S REPRESENTATIVE PROJECT NAME: CONSTRUCTION SUPERVISION OF PUNJAB HIGHWAY PROJECT SCOPE: GENERAL SUPERVISION OF ROAD, BRIDGES AND CULVERTS IN THE CENTRAL PART OF THE PROVINCE OF PUNJAB IN PAKISTAN.THERE WERE 3 BRIDGES (2 OF CONVENTIONAL CONCRETE GIRDERS AND ONE PRE-STRESSED) VALUE:3 6M USD DUTIES: I WAS RESPOSIBLE FOR OVERALL QUALITY OF WORKS OF THE PROJECT AND PROCESSING OF IPCs OF THE CONTRACTOR. 13 Date: Nov. 1998 to Sept. 2000 Company: NESPAK (CONSULTANTS) 4
  • 5. Role held: Assistant Resident Engineer, PROJECT NAME: FARM TO MARKET ROADS, PAKISTAN PROJECT SCOPE: Construction Supervision of ADB assisted Rural Access Roads Projects over 100 Km long having over 125 No. Culverts in Pakpattan & Sahiwal Districts. This residency was spread over two districts of South Punjab; Sahiwal and Pakpattan Sharif. Two roads were in Sahiwal and the rest in Pakpattan Sharif. VALUE:27M USD DUTIES: I WAS RESPONSIBLE TO ASSIST THE RE IN QUALITY ASSURANCE OF PROJECTS, IN PROCESSING THE IPCs OF THE CONTRACTORS,MAKING WEEKLY AND MONTHLY PROGRESS REPORTS,COMPARING WORK DONE AGAINST THE CONSTRUCTION SCHEDULE,LETTER DRAFT LETTERS ABOUT QUALITY OF WORKS TO THE CONTRACTOR.CHECKING BAR BENDING SCHDULES FOR THE STRUCTURES. 14 Date: MAY1998 to NOV1998 Company: NESPAK (CONSULTANTS) Role held: Resident Engineer PROJECT NAME: Bridge over main Railway Track at Garhi Shahu, Lahore PROJECT SCOPE: bridge 250m long with 500mm diameter piles, pre-stressed girders 22m long, deck slab, approach slabs and 100 m road with embankment on each side of the bridge. VALUE: 15M USD DUTIES: I WAS RESPONSIBLE FOR QUALITY ASSURANCE OF PROJECTS, PROCESSING THE IPCs OF THE CONTRACTORS,MAKING WEEKLY AND MONTHLY PROGRESS REPORTS,COMPARING WORK DONE AGAINST THE CONSTRUCTION SCHEDULE,WRITING LETTERS ABOUT QUALITY OF WORKS TO THE CONTRACTOR.MAKING SURE THAT THE STAFF IS WORKING PROPERLY. 15 Date: Jan1995 to April1998 Company: NESPAK (CONSULTANTS) Role held: Resident Engineer / Engineer’s Representative PROJECT NAME: Fyzee Rahamin Art Gallery in Karachi SCOPE: 3 STOREY BUILDING OF ART GALLERY & AUDITORIUM WITH SEATING CAPACITY OF 1800 PEOPLE. IT WAS A CENTRALLY AIR CONDITIONED BUILDING. VALUE: 5M USD DUTIES:I WAS RESPONSIBLE FOR QUALITY ASSURANCE OF PROJECTS, PROCESSING THE IPCs OF THE CONTRACTORS,MAKING WEEKLY AND MONTHLY PROGRESS REPORTS,COMPARING WORK DONE AGAINST THE CONSTRUCTION SCHEDULE,WRITING LETTERS ABOUT QUALITY OF WORKS TO THE CONTRACTOR.MAKING SURE THAT THE STAFF IS WORKING PROPERLY. 5
  • 6. 16 Date: Aug 1994 to Dec1994 Company: NESPAK (CONSULTANTS) Role held: SENIOR Engineer (claim analyst) PROJECT NAME: Evaluation of claims for Korangi Fisheries and Harbor Authority SCOPE: Evaluation of claims for Korangi Fisheries and Harbor Authority, Karachi 380 million Pakistan rupees claim. There was disagreement between the Contractor and the Consultant about the recommendations of the Consultants. So NESPAK (the biggest Pakistani consultant were hired to give final recommendations. I was assigned this task. Duties: My duty was to do the job single handedly, I completed the job and was accepted by the concerned parties. 17 Date: June 1992 to July 1994 Company: NESPAK (CONSULTANTS) Role held: SENIOR Engineer /PM PROJECT NAME: Development of 2 new towns near Karachi (NORTH KARACHI AND SURJANI TOWN) OF KARACHI DELEVOPMENT AUTHORITY SCOPE: CONSTRUCTION OF MORE THA 100 KM LONG ROADS & 21 CULVERTS, WATER SUPPLY, SEWERAGE AND 1000 FLATS*APPARTMENT (4 STOREY) VALUE:3.5M USD DUTIES: MY DUTY WAS TO SUPERVISE THE CONSTRUCTION FROM QUALITY POINT OF VIEW AND PROCESSING OF CONTRACTOR IPCs, 18 Date: Jan1991 to May1992 Company: NESPAK (CONSULTANTS) Role held: Resident Engineer / Engineer’s Representative –Fidic contract PROJECT NAME: Headquarters Building Pakistan Medical & Dental Council at G-10/4 Islamabad, and Ware House of duty Free shops in I-11/4 Islamabad. SCOPE: 3 STOREY BUILDING WITH CENTRAL AIRCONDITIONING SYSTEM. VALUE:3.0M USD DUTIES: I WAS RESPONSIBLE FOR QUALITY ASSURANCE OF PROJECTS, PROCESSING THE IPCs OF THE CONTRACTORS,MAKING WEEKLY AND MONTHLY PROGRESS REPORTS,COMPARING WORK DONE AGAINST THE CONSTRUCTION SCHEDULE,WRITING LETTERS ABOUT QUALITY OF WORKS TO THE CONTRACTOR.MAKING SURE THAT THE STAFF IS WORKING PROPERLY. 19 Date: Jan 1989 to Dec1990 Company: NESPAK (CONSULTANTS) Role held: SENIOR Engineer- PROJECT NAME: Construction Supervision of Pak – Suzuki Plant near Karachi SCOPE: PAK SUZUKI MOTOR’S PLANT COMPRISING THE PLANT, WATER TANKS, MOSQUE, 6
  • 7. THE MAIN PLANT HAD ROOFING OF PRE-CAST PLANKS RESTING ON STRUCTURAL STEEL TRUSSESS RESTING ON RCC COLUMNS. DUTIES: I WAS RESPONSIBLE FOR QUALITY ASSURANCE OF PROJECTS, PROCESSING THE IPCs OF THE CONTRACTORS,MAKING WEEKLY AND MONTHLY PROGRESS REPORTS ON BEHALF OF THE RE,COMPARING WORK DONE AGAINST THE CONSTRUCTION SCHEDULE,WRITING LETTERS ABOUT QUALITY OF WORKS TO THE CONTRACTOR.MAKING SURE THAT THE STAFF IS WORKING PROPERLY. 20 Date: Jan1988 to Nov1988 Company: NESPAK (CONSULTANTS) Role held: SENIOR Engineer PROJECT NAME: CONTRACT PREPARATION CELL SCOPE: PREPARATION OF CONTRACT DOCUMENTS (TECHNICAL SPECIFICATIONAS AND THE GENERAL CONDITIONS OF CONTRACT) FOR ROADS AND BUILDING PROJECT. DUTIES: I WAS RESPOSIBLE FOR PREPARATION OF CONTRACT DOCUMENTS AND SUBMIT TO THE PRINCIPAL ENGINEER 21 Date: Feb1987 to Dec1987 Company: NESPAK (CONSULTANTS) Role held: SENIOR Engineer PROJECT NAME: CONSTRCUTION OF NATIONAL STADIUM KARACHI FOR WORLD CUP CRICKET 1987 SCOPE: CONSTRUCTION OF NEW GENERAL ENCLOSURE, CLUB ENCLOSURE AND STUDENTS’ ENCLOSURE WITH ROOF.ROOF WAS OF PRE-CAST PLANTS PLACED ON STRUCTURAL STEEL TRUSSES PLACED ON STELL COLUMNS ON FIELD SIDE AND RCC COLUMNS ON THE OUTER SIDE. VALUE:5M USD DUTIES: I WAS RESPONSIBLE FOR QUALITY ASSURANCE OF PROJECTS, PROCESSING THE IPCs OF THE CONTRACTORS,MAKING WEEKLY AND MONTHLY PROGRESS REPORTS ON BEHALF OF THE RE,COMPARING WORK DONE AGAINST THE CONSTRUCTION SCHEDULE,WRITING LETTERS ABOUT QUALITY OF WORKS TO THE CONTRACTOR.MAKING SURE THAT THE STAFF IS WORKING PROPERLY 22 Date: 1985 to jan1987 Company: NESPAK (CONSULTANTS) Role held: SENIOR Engineer, PROJECT NAME: Construction Supervision of Road from Star Gate to Karachi Airport SCOPE: CONSTRCUTION SUPERVISION OF ROAD AND CULVERTS FROM STAR GATE ON MAIN NATIONAL HIGHWAY TO THE TERMINAL 3 OF KARACHI AIRPORT. IT WAS WATER BOUND MACADAM ROAD WITH BINDER COURSE AND WEARING COURSE. VALUE:0.55M USD DUTIES: I WAS RESPONSIBLE FOR QUALITY ASSURANCE OF PROJECTS, PROCESSING THE IPCs OF THE CONTRACTORS,MAKING WEEKLY AND MONTHLY PROGRESS REPORTS ON BEHALF OF THE RE,COMPARING WORK DONE AGAINST 7
  • 8. THE CONSTRUCTION SCHEDULE,WRITING LETTERS ABOUT QUALITY OF WORKS TO THE CONTRACTOR.MAKING SURE THAT THE STAFF IS WORKING PROPERLY 23 Date: 1981 to 1985 Company: NESPAK (CONSULTANTS) Role held: JUNIOR Engineer, PROJECT NAME: Main Access Roads (asphalt concrete) from National Highway to Port Bin Qasim including Bridges and Culverts. Thickness of binder course was 40 mm and that of wearing course 40 mm.THERE WERE 2 BRIDGES OVER MAIN RAILWAY TRACK.BOTH WITH PRE-STRESSED GIRDERS.ONE WAS SKEW AND OTHER STRAIGHT.ONE WAS 80M LONG AND THE OTHER WAS 91M LONG. CULVERTS WERE OF 2 BARRELS TO 14 BARRELS.COST: 0.75M USD DUTIES: AS JUNIOR ENGINEER MY DUTIES WERE TO ASSIST THE SENIOR ENGINEER IN CHECKING THE REINFORCEMENT STEEL OF BRIDGES AND GIRDERS AND THOSE OF CULVERTS,ALSO COMPACTION OF SUB-BASE AND BASE CORSE LAYERS. CONTACT: Cell :00880-1793315579 E-mail : mfzaki57@yahoo.com LANGUAGE CAPABILITY English - Excellent in speaking, reading and writing Arabic - Fair in speaking, Urdu - mother language Bengali - Excellent in reading, writing and speaking (I was born in Bangladesh and brought up there till the age of 14) REFERENCES: 1. MR. NAUMAN UL HUQ REGIONAL MANAGER/ CHIEF ENGINEER, NESPAK MUSCAT, OMAN Email: <nauman_ul_haq@hotmail.com><nauman.ul.haq66@gmail.com>; Phone: 00968-92207707 2. MR.NAJEEB ULLAH KHAN R.E, KHATEEB AL ALAMI, SAUDI ARABIA Email:najeebullahkhan99@hotmail.com<najeebullahkhan99@gmail.com> <najeebullahkhan99@gmail.com>; Phone: 00966-535660124 3. MR.QAMAR HAYAT KHAN R.E, ITALCONSULT SAUDI ARABIA Email: <qhayatbn@gmail.com> Phone: 00966-546956590 4. MR. ATHER KANDHIR R.E AECOM SAUDI ARABIA Email: <athar_kandhir@yahoo.com> Phone: 00966-551310710 8