The Islamic University of Gaza
Faculty of Engineering
Civil Engineering Department
Hydraulics - ECIV 3322
Water Distribution Systems
Chapter 4
2
Introduction
To deliver water to individual consumers with appropriate
quality, quantity, and pressure in a community setting requires
an extensive system of:
Pipes.
Storage reservoirs.
Pumps.
Other related accessories.
Distribution system: is used to describe collectively the
facilities used to supply water from its source to the point of
usage .
3
Methods of Supplying Water
• Depending on the topography relationship
between the source of supply and the consumer,
water can be transported by:
• Canals.
• Tunnels.
• Pipelines.
• The most common methods are:
• Gravity supply
• Pumped supply
• Combined supply
4
Gravity Supply
• The source of supply is at a sufficient elevation
above the distribution area (consumers).
so that the desired pressure can be maintained
Source
(Reservoir)
(Consumers)
Gravity-Supply System
HGL or EGL
5
Advantages of Gravity supply
• No energy costs.
• Simple operation (fewer mechanical parts,
independence of power supply, ….)
• Low maintenance costs.
• No sudden pressure changes
Source
HGL or EGL
6
Pumped Supply
 Used whenever:
• The source of water is lower than the area to which we need to
distribute water to (consumers)
• The source cannot maintain minimum pressure required.
 pumps are used to develop the necessary head (pressure) to
distribute water to the consumer and storage reservoirs.
Source
(River/Reservoir)
(Consumers)
Pumped-Supply System
HGL or EGL
7
Source
(River/Reservoir)
(Consumers)
HGL or EGL
Disadvantages of pumped supply
 Complicated operation and maintenance.
 Dependent on reliable power supply.
 Precautions have to be taken in order to enable permanent supply:
• Stock with spare parts
• Alternative source of power supply ….
8
Combined Supply
(pumped-storage supply)
• Both pumps and storage reservoirs are used.
• This system is usually used in the following cases:
1) When two sources of water are used to supply water:
Source (1)
Source (2)
City
Gravity
Pumping
HGL
HGL
Pumping station
9
Combined Supply (Continue)
2) In the pumped system sometimes a storage (elevated)
tank is connected to the system.
Elevated
tank
Source
Pipeline
High
consumption
Pumping station
• When the water consumption is low, the residual water is
pumped to the tank.
• When the consumption is high the water flows back to
the consumer area by gravity.
Low consumption
City
10
Combined Supply (Continue)
3) When the source is lower than the consumer area
Reservoir
Source
Pumping
Pumping Station
• A tank is constructed above the highest point in the area,
• Then the water is pumped from the source to the storage
tank (reservoir).
• And the hence the water is distributed from the reservoir
by gravity.
Gravity
City
HGL
HGL
11
Distribution Systems
(Network Configurations )
• In laying the pipes through the distribution
area, the following configuration can be
distinguished:
1. Branching system (Tree)
2. Grid system (Looped)
3. Combined system
12
Branching System (tree system)
Branching System
Source
Submain
Main
pipe
Dead End
Advantages:
• Simple to design and build.
• Less expensive than other systems.
13
• The large number of dead ends which results in sedimentation
and bacterial growths.
• When repairs must be made to an individual line, service
connections beyond the point of repair will be without water
until the repairs are made.
• The pressure at the end of the line may become undesirably
low as additional extensions are made.
Source
Dead End
Disadvantages:
14
Grid System (Looped system)
Grid System
Advantages:
• The grid system overcomes all of the difficulties of
the branching system discussed before.
• No dead ends. (All of the pipes are interconnected).
• Water can reach a given point of withdrawal from
several directions.
15
Disadvantages:
• Hydraulically far more complicated than branching
system (Determination of the pipe sizes is somewhat
more complicated) .
• Expensive (consists of a large number of loops).
But, it is the most reliable and used system.
16
Combined System
• It is a combination of both Grid and Branching
systems
• This type is widely used all over the world.
Combined System
17
Design of Water Distribution
Systems
Main requirements :
• Satisfied quality and quantity standards
Additional requirements :
• To enable reliable operation during irregular situations (power
failure, fires..)
• To be economically and financially viable, ensuring income
for operation, maintenance and extension.
• To be flexible with respect to the future extensions.
A properly designed water distribution system should
fulfill the following requirements:
18
The design of water distribution systems must
undergo through different studies and steps:
Design Phases
Hydraulic Analysis
Preliminary Studies
Network Layout
19
Preliminary Studies:
4.3.A.1 Topographical Studies:
Must be performed before starting the actual design:
1. Contour lines (or controlling elevations).
2. Digital maps showing present (and future) houses,
streets, lots, and so on..
3. Location of water sources so to help locating
distribution reservoirs.
20
Water Demand Studies:
Water consumption is ordinarily divided into the
following categories:
 Domestic demand.
 Industrial and Commercial demand.
 Agricultural demand.
 Fire demand.
 Leakage and Losses.
21
Domestic demand
• It is the amount of water used for Drinking, Cocking,
Gardening, Car Washing, Bathing, Laundry, Dish Washing,
and Toilet Flushing.
• The average water consumption is different from one
population to another. In Gaza strip the average
consumption is 70 L/capita/day which is very low compared
with other countries. For example, it is 250 L/c/day in
United States, and it is 180 L/c/day for population live in
Cairo (Egypt).
• The average consumption may increase with the increase in
standard of living.
• The water consumption varies hourly, daily, and monthly
22
How to predict the increase of population?
The total amount of water for domestic use is a function of:
Population increase
Geometric-increase model
Use
P P r n
 
0 1
( ) P0 = recent population
r = rate of population growth
n = design period in years
P = population at the end of the design period.
The total domestic demand can be estimated using:
Qdomestic = Qavg * P
23
Industrial and Commercial demand
• It is the amount of water needed for factories, offices,
and stores….
• Varies from one city to another and from one country
to another
• Hence should be studied for each case separately.
• However, it is sometimes taken as a percentage of the
domestic demand.
24
Agricultural demand
• It depends on the type of crops, soil, climate…
Fire demand
• To resist fire, the network should save a certain
amount of water.
• Many formulas can be used to estimate the amount of
water needed for fire.
25
Fire demand Formulas
)
01
.
0
1
(
65 P
P
QF 

QF = fire demand l/s
P = population in thousands
Q P
F  53
QF = fire demand l/s
P = population in thousands
Q C A
F  320*
QF = fire demand flow m3/d
A = areas of all stories of the building
under consideration (m2 )
C = constant depending on the type of
construction;
The above formulas can be replaced with local ones
(Amounts of water needed for fire in these formulas are high).
26
Leakage and Losses
• This is “unaccounted for water” (UFW)
• It is attributable to:
Errors in meter readings
Unauthorized connections
Leaks in the distribution system
27
Design Criteria
Are the design limitations required to get the most
efficient and economical water-distribution network
Velocity
Pressure
Average Water Consumption
28
Velocity
• Not be lower than 0.6 m/s to prevent
sedimentation
• Not be more than 3 m/s to prevent erosion and
high head losses.
• Commonly used values are 1 - 1.5 m/sec.
29
Pressure
• Pressure in municipal distribution systems ranges from 150-
300 kPa in residential districts with structures of four stories
or less and 400-500 kPa in commercial districts.
• Also, for fire hydrants the pressure should not be less than
150 kPa (15 m of water).
• In general for any node in the network the pressure should
not be less than 25 m of water.
• Moreover, the maximum pressure should be limited to 70 m
of water
30
Pipe sizes
• Lines which provide only domestic flow may be as small as 100 mm
(4 in) but should not exceed 400 m in length (if dead-ended) or 600 m
if connected to the system at both ends.
• Lines as small as 50-75 mm (2-3 in) are sometimes used in small
communities with length not to exceed 100 m (if dead-ended) or 200
m if connected at both ends.
• The size of the small distribution mains is seldom less than 150 mm (6
in) with cross mains located at intervals not more than 180 m.
• In high-value districts the minimum size is 200 mm (8 in) with cross-
mains at the same maximum spacing. Major streets are provided with
lines not less than 305 mm (12 in) in diameter.
31
Head Losses
• Optimum range is 1-4 m/km.
• Maximum head loss should not exceed 10
m/km.
32
Design Period for Water supply Components
• The economic design period of the components of a
distribution system depends on
• Their life.
• First cost.
• And the ease of expandability.
33
Average Water Consumption
• From the water demand (preliminary) studies,
estimate the average and peak water
consumption for the area.
34
Network Layout
• Next step is to estimate pipe sizes on the basis
of water demand and local code requirements.
• The pipes are then drawn on a digital map
(using AutoCAD, for example) starting from
the water source.
• All the components (pipes, valves, fire
hydrants) of the water network should be
shown on the lines.
35
Pipe Networks
• A hydraulic model is useful for examining the impact
of design and operation decisions.
• Simple systems, such as those discussed in last
chapters can be solved using a hand calculator.
• However, more complex systems require more effort
even for steady state conditions, but, as in simple
systems, the flow and pressure-head distribution
through a water distribution system must satisfy the
laws of conservation of mass and energy.
36
• The equations to solve Pipe network must
satisfy the following condition:
• The net flow into any junction must be zero
• The net head loss a round any closed loop must
be zero. The HGL at each junction must have one
and only one elevation
• All head losses must satisfy the Moody and
minor-loss friction correlation
Pipe Networks
0

Q
37
Node, Loop, and Pipes Node
Pipe
Loop
38
After completing all preliminary studies and
layout drawing of the network, one of the
methods of hydraulic analysis is used to
• Size the pipes and
• Assign the pressures and velocities
required.
Hydraulic Analysis
39
Hydraulic Analysis of Water Networks
• The solution to the problem is based on the same
basic hydraulic principles that govern simple and
compound pipes that were discussed previously.
• The following are the most common methods used to
analyze the Grid-system networks:
1. Hardy Cross method.
2. Sections method.
3. Circle method.
4. Computer programs (WaterCAD,Epanet, Loop, Alied...)
40
Hardy Cross Method
• This method is applicable to closed-loop pipe
networks (a complex set of pipes in parallel).
• It depends on the idea of head balance method
• Was originally devised by professor Hardy Cross.
41
Assumptions / Steps of this method:
1. Assume that the water is withdrawn from nodes only; not
directly from pipes.
2. The discharge, Q , entering the system will have (+) value,
and the discharge, Q , leaving the system will have (-) value.
3. Usually neglect minor losses since these will be small with
respect to those in long pipes, i.e.; Or could be included as
equivalent lengths in each pipe.
4. Assume flows for each individual pipe in the network.
5. At any junction (node), as done for pipes in parallel,
 
 out
in Q
Q Q 
 0
or
42
6. Around any loop in the grid, the sum of head losses must
equal to zero:
– Conventionally, clockwise flows in a loop are considered (+) and
produce positive head losses; counterclockwise flows are then (-) and
produce negative head losses.
– This fact is called the head balance of each loop, and this can be valid
only if the assumed Q for each pipe, within the loop, is correct.
• The probability of initially guessing all flow rates correctly is
virtually null.
• Therefore, to balance the head around each loop, a flow rate
correction ( ) for each loop in the network should be
computed, and hence some iteration scheme is needed.
hf
loop

 0

43
7. After finding the discharge correction, (one for each
loop) , the assumed discharges Q0 are adjusted and another
iteration is carried out until all corrections (values of )
become zero or negligible. At this point the condition of :
is satisfied.
Notes:
• The flows in pipes common to two loops are positive in
one loop and negative in the other.
• When calculated corrections are applied, with careful
attention to sign, pipes common to two loops receive both
corrections.


hf
loop

 00
.
44
How to find the correction value ( )

William
Hazen
n
Manning
Darcy
n
kQ
h n
F
85
.
1
,
2
)
1
(







)
2
(




 o
Q
Q
   
















 

....
2
1
2
&
1
2
2
1
f
n
o
n
o
n
o
n
o
n
Q
n
n
nQ
Q
k
Q
k
kQ
h
from
 



 1
f
n
o
n
o
n
nQ
Q
k
kQ
h
 
0
0
1













n
n
o
n
loop
n
loop
F
nkQ
kQ
kQ
kQ
h
Neglect terms contains 2

For each loop
45
• Note that if Hazen Williams (which is generally used in this method) is
used to find the head losses, then
h k Q
f  185
.
(n = 1.85) , then
 
 

h
h
Q
f
f
185
.
• If Darcy-Wiesbach is used to find the head losses, then
h k Q
f  2
 


h
h
Q
f
f
2
(n = 2) , then
 



 



 
o
F
F
n
o
n
o
Q
h
n
h
nkQ
kQ
1
46
Example
D
L
pipe
150mm
305m
1
150mm
305m
2
200mm
610m
3
150mm
457m
4
200mm
153m
5
1
2
3
4
5
37.8 L/s
25.2 L/s
63 L/s
24
11.4
Solve the following pipe network using Hazen William Method CHW =100
47
 
24
.
0
64
.
0
85
.
1
28
.
0
1 








o
F
F
Q
h
n
h
 
10
02
.
6
1000
0.7
1
L/s
,
100
0.7
1
852
.
1
852
.
1
87
.
4
9
852
.
1
87
.
4
852
.
1
852
.
1
87
.
4
852
.
1
Q
K
h
Q
D
L
h
Q
D
C
L
h
in
Q
C
Q
D
C
L
h
f
f
HW
f
HW
HW
f





















 
57
.
0
43
.
0
85
.
1
45
.
0
2 








o
F
F
Q
h
n
h
1
2
3 4
5
1
2
2
1
2
loop
in
2
pipe
for
1
loop
in
2
pipe
for










48
 
15
.
0
64
.
0
85
.
1
18
.
0
1 








o
F
F
Q
h
n
h  
 
09
.
0
42
.
0
85
.
1
07
.
0
1 








o
F
F
Q
h
n
h
1
2
3 4
5
1
2
2
1
2
loop
in
2
pipe
for
1
loop
in
2
pipe
for










49
Solve the following pipe
network using Hazen William
Method CHW =120
Example
50
Iteration 1
51
 
 
 
 
 
 
 
 
005
0
75
154
85
1
53
1
022
0
71
101
85
1
1
4
006
0
41
79
85
1
84
0
014
0
86
38
85
1
01
1
4
3
2
1
.
.
.
.
Δ
.
.
.
.
Δ
.
.
.
.
Δ
.
.
.
.
Δ




















 



 


 
o
f
f
n
o
n
o
Q
h
n
h
nkQ
kQ
Δ 1
1
Iteration
for
52
Iteration 2
53
Iteration 3
54
Example
• The figure below represents a simplified pipe network.
• Flows for the area have been disaggregated to the nodes,
and a major fire flow has been added at node G.
• The water enters the system at node A.
• Pipe diameters and lengths are shown on the figure.
• Find the flow rate of water in each pipe using the Hazen-
Williams equation with CHW = 100.
• Carry out calculations until the corrections are less then
0.2 m3/min.
55
56
57
58
59
60
61
62
63
64
General Notes
• Occasionally the assumed direction of flow will be incorrect. In such
cases the method will produce corrections larger than the original
flow and in subsequent calculations the direction will be reversed.
• Even when the initial flow assumptions are poor, the convergence
will usually be rapid. Only in unusual cases will more than three
iterations be necessary.
• The method is applicable to the design of new system or to evaluate
the proposed changes in an existing system.
• The pressure calculation in the above example assumes points are at
equal elevations. If they are not, the elevation difference must be
includes in the calculation.
• The balanced network must then be reviewed to assure that the
velocity and pressure criteria are satisfied. If some lines do not meet
the suggested criteria, it would be necessary to increase the
diameters of these pipes and repeat the calculations.
65
• Assigning clockwise flows and their associated head
losses are positive, the procedure is as follows:
 Assume values of Q to satisfy Q = 0.
 Calculate HL from Q using hf = K1Q2 .
 If hf = 0, then the solution is correct.
 If hf  0, then apply a correction factor, Q, to all
Q and repeat from step (2).
 For practical purposes, the calculation is usually
terminated when hf < 0.01 m or Q < 1 L/s.
 A reasonably efficient value of Q for rapid
convergence is given by;





Q
H
2
H
Q
L
L
Summary





Q
H
2
H
Q
L
L
66
Example
• The following example contains nodes with different
elevations and pressure heads.
• Neglecting minor loses in the pipes, determine:
• The flows in the pipes.
• The pressure heads at the nodes.
67
Assume T= 150C
68
Assume flows magnitude and direction
69
First Iteration
• Loop (1)
Pipe
L
(m)
D
(m)
Q
(m3/s)
f
hf
(m)
hf/Q
(m/m3/s)
AB 600 0.25 0.12 0.0157 11.48 95.64
BE 200 0.10 0.01 0.0205 3.38 338.06
EF 600 0.15 -0.06 0.0171 -40.25 670.77
FA 200 0.20 -0.10 0.0162 -8.34 83.42
S -33.73 1187.89
L/s
20
.
14
/s
m
01419
.
0
)
89
.
1187
(
2
73
.
33 3






70
First Iteration
• Loop (2)
Pipe
L
(m)
D
(m)
Q
(m3/s)
f
hf
(m)
hf/Q
(m/m3/s)
BC 600 0.15 0.05 0.0173 28.29 565.81
CD 200 0.10 0.01 0.0205 3.38 338.05
DE 600 0.15 -0.02 0.0189 -4.94 246.78
EB 200 0.10 -0.01 0.0205 -3.38 338.05
S 23.35 1488.7
L/s
842
.
7
/s
m
00784
.
0
)
7
.
1488
(
2
35
.
23 3







71
Second Iteration
• Loop (1)
Pipe
L
(m)
D
(m)
Q
(m3/s)
f
hf
(m)
hf/Q
(m/m3/s)
AB 600 0.25 0.1342 0.0156 14.27 106.08
BE 200 0.10 0.03204 0.0186 31.48 982.60
EF 600 0.15 -0.0458 0.0174 -23.89 521.61
FA 200 0.20 -0.0858 0.0163 -6.21 72.33
S 15.65 1682.62
L/s
65
.
4
/s
m
00465
.
0
)
62
.
1682
(
2
65
.
15 3







14.20
14.20
14.20 7.84
14.20
72
Second Iteration
• Loop (2)
Pipe
L
(m)
D
(m)
Q
(m3/s)
f
hf
(m)
hf/Q
(m/m3/s)
BC 600 0.15 0.04216 0.0176 20.37 483.24
CD 200 0.10 0.00216 0.0261 0.20 93.23
DE 600 0.15 -0.02784 0.0182 -9.22 331.23
EB 200 0.10 -0.03204 0.0186 -31.48 982.60
S -20.13 1890.60
L/s
32
.
5
/s
m
00532
.
0
)
3
.
1890
(
2
13
.
20 3






14.20 7.84
7.84
7.84
7.84
73
Third Iteration
• Loop (1)
Pipe
L
(m)
D
(m)
Q
(m3/s)
f
hf
(m)
hf/Q
(m/m3/s)
AB 600 0.25 0.1296 0.0156 13.30 102.67
BE 200 0.10 0.02207 0.0190 15.30 693.08
EF 600 0.15 -0.05045 0.0173 -28.78 570.54
FA 200 0.20 -0.09045 0.0163 -6.87 75.97
S -7.05 1442.26
L/s
44
.
2
/s
m
00244
.
0
)
26
.
1442
(
2
05
.
7 3






74
Third Iteration
• Loop (2)
Pipe
L
(m)
D
(m)
Q
(m3/s)
f
hf
(m)
hf/Q
(m/m3/s)
BC 600 0.15 0.04748 0.0174 25.61 539.30
CD 200 0.10 0.00748 0.0212 1.96 262.11
DE 600 0.15 -0.02252 0.0186 -6.17 274.07
EB 200 0.10 -0.02207 0.0190 -15.30 693.08
S 6.1 1768.56
L/s
72
.
1
/s
m
00172
.
0
)
56
.
1768
(
2
1
.
6 3







75
After applying Third correction
76
Velocity and Pressure Heads:
pipe
Q
(l/s)
V
(m/s)
hf
(m)
AB 131.99 2.689 13.79
BE 26.23 3.340 21.35
FE 48.01 2.717 26.16
AF 88.01 2.801 6.52
BC 45.76 2.589 23.85
CD 5.76 0.733 1.21
ED 24.24 1.372 7.09
1.21
21.35
13.79 23.85
6.52
26.16 7.09
77
Velocity and Pressure Heads:
Node
p/g+Z
(m)
Z
(m)
P/g
(m)
A 70 30 40
B 56.21 25 31.21
C 32.36 20 12.36
D 31.15 20 11.15
E 37.32 22 15.32
F 63.48 25 38.48
1.21
21.35
13.79 23.85
6.52
26.16 7.09
78
Example
For the square loop shown, find the discharge in all the pipes.
All pipes are 1 km long and 300 mm in diameter, with a friction
factor of 0.0163. Assume that minor losses can be neglected.
79
•Solution:
 Assume values of Q to satisfy continuity equations all
at nodes.
 The head loss is calculated using; HL = K1Q2
 HL = hf + hLm
 But minor losses can be neglected:  hLm = 0
 Thus HL = hf
 Head loss can be calculated using the Darcy-Weisbach
equation
g
2
V
D
L
h
2
f 

80
First trial
Since HL > 0.01 m, then correction has to be applied.
554
'
K
Q
'
K
H
Q
554
H
3
.
0
x
4
Q
x
77
.
2
A
Q
77
.
2
H
81
.
9
x
2
V
x
3
.
0
1000
x
0163
.
0
H
g
2
V
D
L
h
H
2
L
2
L
2
2
2
2
2
L
2
L
2
f
L









 






Pipe Q (L/s) HL (m) HL/Q
AB 60 2.0 0.033
BC 40 0.886 0.0222
CD 0 0 0
AD -40 -0.886 0.0222
S 2.00 0.0774
81
Second trial
Since HL ≈ 0.01 m, then it is OK.
Thus, the discharge in each pipe is as follows (to the nearest integer).
s
/
L
92
.
12
0774
.
0
x
2
2
Q
H
2
H
Q
L
L 








Pipe Q (L/s) HL (m) HL/Q
AB 47.08 1.23 0.0261
BC 27.08 0.407 0.015
CD -12.92 -0.092 0.007
AD -52.92 -1.555 0.0294
S -0.0107 0.07775
Pipe Discharge
(L/s)
AB 47
BC 27
CD -13
AD -53
82
‫تعالى‬ ‫اهلل‬ ‫قال‬
:
‫عن‬ ‫بيع‬ ‫وال‬ ‫تجارة‬ ‫تلهيهم‬ ‫ال‬ ‫رجال‬
‫ﺫ‬
‫كر‬
‫اهلل‬
83
‫الدنيا‬ ‫حب‬
ّ
‫أن‬ ‫اعمم‬
،‫القمب‬ ‫قسوة‬ ‫من‬ ‫العين‬ ‫جمود‬
،‫الذنوب‬ ‫ة‬
‫كثر‬ ‫من‬ ‫القمب‬ ‫وقسوة‬
،‫الموت‬ ‫نسيان‬ ‫من‬ ‫الذنوب‬ ‫ة‬
‫وكثر‬
،‫األمل‬ ‫طول‬ ‫من‬ ‫الموت‬ ‫ونسيان‬
،‫الحرص‬ ‫شدة‬ ‫من‬ ‫األمل‬ ‫وطول‬
،‫الدنيا‬ ‫حب‬ ‫من‬ ‫الحرص‬ ‫وشدة‬
‫كل‬ ‫أس‬
‫ر‬ ‫الدنيا‬ ‫وحب‬
‫خطيئة‬
.
84
‫تحابوا‬ ‫تهادوا‬
‫بالهذية‬ ‫تبخل‬ ‫ال‬
‫سعرها‬ ّ‫ل‬‫ق‬ ‫ولى‬
‫مادية‬ ‫من‬ ‫اكثر‬ ‫معنىية‬ ‫فقيمتها‬
85
‫نجاح‬ ‫كل‬ ‫مفتاح‬ ‫هللا‬ ‫تقوى‬
”
‫يحتسب‬ ‫ال‬ ‫حيث‬ ‫من‬ ‫ويرزقه‬ ً‫ا‬‫مخرج‬ ‫له‬ ‫يجعل‬ ‫هللا‬ ‫يتق‬ ‫ومن‬
“

More Related Content

What's hot

design and analysis of water distribution System
design and analysis of water distribution Systemdesign and analysis of water distribution System
design and analysis of water distribution SystemMian Umair Afzal
 
Introduction to Dams.pptx
Introduction to Dams.pptxIntroduction to Dams.pptx
Introduction to Dams.pptxPMAS-AAUR
 
Rainwater harvesting needs and uses
Rainwater harvesting  needs and usesRainwater harvesting  needs and uses
Rainwater harvesting needs and usesAtrayee Chatterjee
 
01 Sewage Generation, Collection and Conveyance
01 Sewage Generation, Collection and Conveyance01 Sewage Generation, Collection and Conveyance
01 Sewage Generation, Collection and Conveyanceakashpadole
 
Water Supply and Sewerage Design
Water Supply and Sewerage DesignWater Supply and Sewerage Design
Water Supply and Sewerage DesignJeremy Molayem
 
02 pipe networks
02 pipe networks02 pipe networks
02 pipe networksKriss Hung
 
hydro chapter_4_b_pipe_network_by louy Al hami
hydro  chapter_4_b_pipe_network_by louy Al hami hydro  chapter_4_b_pipe_network_by louy Al hami
hydro chapter_4_b_pipe_network_by louy Al hami Louy Alhamy
 
Introduction, water demand
Introduction, water demandIntroduction, water demand
Introduction, water demandGARRE RAVI KUMAR
 
rainwater harvesting, Nepal
rainwater harvesting, Nepalrainwater harvesting, Nepal
rainwater harvesting, NepalSaazan Shrestha
 
L5 - ESTIMATION OF SEWAGE.pptx
L5 - ESTIMATION OF SEWAGE.pptxL5 - ESTIMATION OF SEWAGE.pptx
L5 - ESTIMATION OF SEWAGE.pptxPRACHI DESSAI
 
L 5 pipe_network_analysis
L 5 pipe_network_analysisL 5 pipe_network_analysis
L 5 pipe_network_analysisMEHEDIMASUM2
 
The impact of hydropower projects on water availability in Tamor basin, Koshi...
The impact of hydropower projects on water availability in Tamor basin, Koshi...The impact of hydropower projects on water availability in Tamor basin, Koshi...
The impact of hydropower projects on water availability in Tamor basin, Koshi...Hari Krishna Shrestha
 
Rain water harvesting in homes
Rain water  harvesting in homesRain water  harvesting in homes
Rain water harvesting in homesArvind Srinivasan
 

What's hot (20)

design and analysis of water distribution System
design and analysis of water distribution Systemdesign and analysis of water distribution System
design and analysis of water distribution System
 
Rain water harvesting
Rain water harvestingRain water harvesting
Rain water harvesting
 
CE-235 EH Lec 1
CE-235 EH Lec 1CE-235 EH Lec 1
CE-235 EH Lec 1
 
Design of sewers
Design of sewersDesign of sewers
Design of sewers
 
Introduction to Dams.pptx
Introduction to Dams.pptxIntroduction to Dams.pptx
Introduction to Dams.pptx
 
Rainwater harvesting needs and uses
Rainwater harvesting  needs and usesRainwater harvesting  needs and uses
Rainwater harvesting needs and uses
 
01 Sewage Generation, Collection and Conveyance
01 Sewage Generation, Collection and Conveyance01 Sewage Generation, Collection and Conveyance
01 Sewage Generation, Collection and Conveyance
 
Water Supply and Sewerage Design
Water Supply and Sewerage DesignWater Supply and Sewerage Design
Water Supply and Sewerage Design
 
02 pipe networks
02 pipe networks02 pipe networks
02 pipe networks
 
rain water harvesting ppt slideshare
rain water harvesting ppt slidesharerain water harvesting ppt slideshare
rain water harvesting ppt slideshare
 
SEWER DESIGN:
SEWER DESIGN:SEWER DESIGN:
SEWER DESIGN:
 
hydro chapter_4_b_pipe_network_by louy Al hami
hydro  chapter_4_b_pipe_network_by louy Al hami hydro  chapter_4_b_pipe_network_by louy Al hami
hydro chapter_4_b_pipe_network_by louy Al hami
 
Introduction, water demand
Introduction, water demandIntroduction, water demand
Introduction, water demand
 
rainwater harvesting, Nepal
rainwater harvesting, Nepalrainwater harvesting, Nepal
rainwater harvesting, Nepal
 
L5 - ESTIMATION OF SEWAGE.pptx
L5 - ESTIMATION OF SEWAGE.pptxL5 - ESTIMATION OF SEWAGE.pptx
L5 - ESTIMATION OF SEWAGE.pptx
 
L 5 pipe_network_analysis
L 5 pipe_network_analysisL 5 pipe_network_analysis
L 5 pipe_network_analysis
 
The impact of hydropower projects on water availability in Tamor basin, Koshi...
The impact of hydropower projects on water availability in Tamor basin, Koshi...The impact of hydropower projects on water availability in Tamor basin, Koshi...
The impact of hydropower projects on water availability in Tamor basin, Koshi...
 
energy dissipators
energy dissipatorsenergy dissipators
energy dissipators
 
Hardycross method
Hardycross methodHardycross method
Hardycross method
 
Rain water harvesting in homes
Rain water  harvesting in homesRain water  harvesting in homes
Rain water harvesting in homes
 

Similar to ch4-part-2.pdf

Water supply systems in Architecture By Minal Palve
Water supply systems in Architecture By Minal PalveWater supply systems in Architecture By Minal Palve
Water supply systems in Architecture By Minal PalveMinal Palve
 
Water distribution
Water distributionWater distribution
Water distributionRavi Bhadani
 
Plumbing "cold water supply" Workshop
Plumbing "cold water supply" WorkshopPlumbing "cold water supply" Workshop
Plumbing "cold water supply" WorkshopAhmed Kamal
 
BUILDING SERVICES- water supply, plumbing.ppt
BUILDING SERVICES- water supply, plumbing.pptBUILDING SERVICES- water supply, plumbing.ppt
BUILDING SERVICES- water supply, plumbing.pptDr. Akshay Wayal
 
Theory and Application of Hydraulic Ram Pumps (Hydrams) - S Hazarika
Theory and Application of Hydraulic Ram Pumps (Hydrams) - S HazarikaTheory and Application of Hydraulic Ram Pumps (Hydrams) - S Hazarika
Theory and Application of Hydraulic Ram Pumps (Hydrams) - S HazarikaFifi62z
 
P7-EN.pptx
P7-EN.pptxP7-EN.pptx
P7-EN.pptxDHYUTHIA
 
Water Supply System for Town and Building
Water Supply System for Town and Building Water Supply System for Town and Building
Water Supply System for Town and Building Aroh Thombre
 
Bright solar water pump irrigation
Bright solar water pump   irrigationBright solar water pump   irrigation
Bright solar water pump irrigationPiyushkumar Thumar
 
Bright Solar Water Pump - IRRIGATION
Bright Solar Water Pump - IRRIGATIONBright Solar Water Pump - IRRIGATION
Bright Solar Water Pump - IRRIGATIONPiyushkumar Thumar
 
Lectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptxLectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptxAsnelTiffa
 
Environment i lecs 18 to 23 wbb34
Environment i lecs 18 to 23 wbb34Environment i lecs 18 to 23 wbb34
Environment i lecs 18 to 23 wbb34WBB34
 
Closer Look At Infrastructure Sustainability - Engineering Perspective - Infr...
Closer Look At Infrastructure Sustainability - Engineering Perspective - Infr...Closer Look At Infrastructure Sustainability - Engineering Perspective - Infr...
Closer Look At Infrastructure Sustainability - Engineering Perspective - Infr...Loay Ghazaleh MBA, BSc Civil Eng.
 
Water distribution system design report
Water distribution system design reportWater distribution system design report
Water distribution system design reportMuhammad Magsi
 

Similar to ch4-part-2.pdf (20)

Water supply systems in Architecture By Minal Palve
Water supply systems in Architecture By Minal PalveWater supply systems in Architecture By Minal Palve
Water supply systems in Architecture By Minal Palve
 
unit 1.pptx
unit 1.pptxunit 1.pptx
unit 1.pptx
 
wheel
wheelwheel
wheel
 
Water distribution
Water distributionWater distribution
Water distribution
 
Plumbing "cold water supply" Workshop
Plumbing "cold water supply" WorkshopPlumbing "cold water supply" Workshop
Plumbing "cold water supply" Workshop
 
BUILDING SERVICES- water supply, plumbing.ppt
BUILDING SERVICES- water supply, plumbing.pptBUILDING SERVICES- water supply, plumbing.ppt
BUILDING SERVICES- water supply, plumbing.ppt
 
Water distribution
Water distributionWater distribution
Water distribution
 
unit ii.pptx
unit  ii.pptxunit  ii.pptx
unit ii.pptx
 
Theory and Application of Hydraulic Ram Pumps (Hydrams) - S Hazarika
Theory and Application of Hydraulic Ram Pumps (Hydrams) - S HazarikaTheory and Application of Hydraulic Ram Pumps (Hydrams) - S Hazarika
Theory and Application of Hydraulic Ram Pumps (Hydrams) - S Hazarika
 
P7-EN.pptx
P7-EN.pptxP7-EN.pptx
P7-EN.pptx
 
Water Supply System for Town and Building
Water Supply System for Town and Building Water Supply System for Town and Building
Water Supply System for Town and Building
 
UNIT 2.pptx
UNIT 2.pptxUNIT 2.pptx
UNIT 2.pptx
 
Bright solar water pump irrigation
Bright solar water pump   irrigationBright solar water pump   irrigation
Bright solar water pump irrigation
 
Bright Solar Water Pump - IRRIGATION
Bright Solar Water Pump - IRRIGATIONBright Solar Water Pump - IRRIGATION
Bright Solar Water Pump - IRRIGATION
 
Lectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptxLectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptx
 
HOUSING (SERVICES)
HOUSING (SERVICES)HOUSING (SERVICES)
HOUSING (SERVICES)
 
Environment i lecs 18 to 23 wbb34
Environment i lecs 18 to 23 wbb34Environment i lecs 18 to 23 wbb34
Environment i lecs 18 to 23 wbb34
 
Closer Look At Infrastructure Sustainability - Engineering Perspective - Infr...
Closer Look At Infrastructure Sustainability - Engineering Perspective - Infr...Closer Look At Infrastructure Sustainability - Engineering Perspective - Infr...
Closer Look At Infrastructure Sustainability - Engineering Perspective - Infr...
 
L 37
L 37L 37
L 37
 
Water distribution system design report
Water distribution system design reportWater distribution system design report
Water distribution system design report
 

Recently uploaded

INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 

Recently uploaded (20)

INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 

ch4-part-2.pdf

  • 1. 1 The Islamic University of Gaza Faculty of Engineering Civil Engineering Department Hydraulics - ECIV 3322 Water Distribution Systems Chapter 4
  • 2. 2 Introduction To deliver water to individual consumers with appropriate quality, quantity, and pressure in a community setting requires an extensive system of: Pipes. Storage reservoirs. Pumps. Other related accessories. Distribution system: is used to describe collectively the facilities used to supply water from its source to the point of usage .
  • 3. 3 Methods of Supplying Water • Depending on the topography relationship between the source of supply and the consumer, water can be transported by: • Canals. • Tunnels. • Pipelines. • The most common methods are: • Gravity supply • Pumped supply • Combined supply
  • 4. 4 Gravity Supply • The source of supply is at a sufficient elevation above the distribution area (consumers). so that the desired pressure can be maintained Source (Reservoir) (Consumers) Gravity-Supply System HGL or EGL
  • 5. 5 Advantages of Gravity supply • No energy costs. • Simple operation (fewer mechanical parts, independence of power supply, ….) • Low maintenance costs. • No sudden pressure changes Source HGL or EGL
  • 6. 6 Pumped Supply  Used whenever: • The source of water is lower than the area to which we need to distribute water to (consumers) • The source cannot maintain minimum pressure required.  pumps are used to develop the necessary head (pressure) to distribute water to the consumer and storage reservoirs. Source (River/Reservoir) (Consumers) Pumped-Supply System HGL or EGL
  • 7. 7 Source (River/Reservoir) (Consumers) HGL or EGL Disadvantages of pumped supply  Complicated operation and maintenance.  Dependent on reliable power supply.  Precautions have to be taken in order to enable permanent supply: • Stock with spare parts • Alternative source of power supply ….
  • 8. 8 Combined Supply (pumped-storage supply) • Both pumps and storage reservoirs are used. • This system is usually used in the following cases: 1) When two sources of water are used to supply water: Source (1) Source (2) City Gravity Pumping HGL HGL Pumping station
  • 9. 9 Combined Supply (Continue) 2) In the pumped system sometimes a storage (elevated) tank is connected to the system. Elevated tank Source Pipeline High consumption Pumping station • When the water consumption is low, the residual water is pumped to the tank. • When the consumption is high the water flows back to the consumer area by gravity. Low consumption City
  • 10. 10 Combined Supply (Continue) 3) When the source is lower than the consumer area Reservoir Source Pumping Pumping Station • A tank is constructed above the highest point in the area, • Then the water is pumped from the source to the storage tank (reservoir). • And the hence the water is distributed from the reservoir by gravity. Gravity City HGL HGL
  • 11. 11 Distribution Systems (Network Configurations ) • In laying the pipes through the distribution area, the following configuration can be distinguished: 1. Branching system (Tree) 2. Grid system (Looped) 3. Combined system
  • 12. 12 Branching System (tree system) Branching System Source Submain Main pipe Dead End Advantages: • Simple to design and build. • Less expensive than other systems.
  • 13. 13 • The large number of dead ends which results in sedimentation and bacterial growths. • When repairs must be made to an individual line, service connections beyond the point of repair will be without water until the repairs are made. • The pressure at the end of the line may become undesirably low as additional extensions are made. Source Dead End Disadvantages:
  • 14. 14 Grid System (Looped system) Grid System Advantages: • The grid system overcomes all of the difficulties of the branching system discussed before. • No dead ends. (All of the pipes are interconnected). • Water can reach a given point of withdrawal from several directions.
  • 15. 15 Disadvantages: • Hydraulically far more complicated than branching system (Determination of the pipe sizes is somewhat more complicated) . • Expensive (consists of a large number of loops). But, it is the most reliable and used system.
  • 16. 16 Combined System • It is a combination of both Grid and Branching systems • This type is widely used all over the world. Combined System
  • 17. 17 Design of Water Distribution Systems Main requirements : • Satisfied quality and quantity standards Additional requirements : • To enable reliable operation during irregular situations (power failure, fires..) • To be economically and financially viable, ensuring income for operation, maintenance and extension. • To be flexible with respect to the future extensions. A properly designed water distribution system should fulfill the following requirements:
  • 18. 18 The design of water distribution systems must undergo through different studies and steps: Design Phases Hydraulic Analysis Preliminary Studies Network Layout
  • 19. 19 Preliminary Studies: 4.3.A.1 Topographical Studies: Must be performed before starting the actual design: 1. Contour lines (or controlling elevations). 2. Digital maps showing present (and future) houses, streets, lots, and so on.. 3. Location of water sources so to help locating distribution reservoirs.
  • 20. 20 Water Demand Studies: Water consumption is ordinarily divided into the following categories:  Domestic demand.  Industrial and Commercial demand.  Agricultural demand.  Fire demand.  Leakage and Losses.
  • 21. 21 Domestic demand • It is the amount of water used for Drinking, Cocking, Gardening, Car Washing, Bathing, Laundry, Dish Washing, and Toilet Flushing. • The average water consumption is different from one population to another. In Gaza strip the average consumption is 70 L/capita/day which is very low compared with other countries. For example, it is 250 L/c/day in United States, and it is 180 L/c/day for population live in Cairo (Egypt). • The average consumption may increase with the increase in standard of living. • The water consumption varies hourly, daily, and monthly
  • 22. 22 How to predict the increase of population? The total amount of water for domestic use is a function of: Population increase Geometric-increase model Use P P r n   0 1 ( ) P0 = recent population r = rate of population growth n = design period in years P = population at the end of the design period. The total domestic demand can be estimated using: Qdomestic = Qavg * P
  • 23. 23 Industrial and Commercial demand • It is the amount of water needed for factories, offices, and stores…. • Varies from one city to another and from one country to another • Hence should be studied for each case separately. • However, it is sometimes taken as a percentage of the domestic demand.
  • 24. 24 Agricultural demand • It depends on the type of crops, soil, climate… Fire demand • To resist fire, the network should save a certain amount of water. • Many formulas can be used to estimate the amount of water needed for fire.
  • 25. 25 Fire demand Formulas ) 01 . 0 1 ( 65 P P QF   QF = fire demand l/s P = population in thousands Q P F  53 QF = fire demand l/s P = population in thousands Q C A F  320* QF = fire demand flow m3/d A = areas of all stories of the building under consideration (m2 ) C = constant depending on the type of construction; The above formulas can be replaced with local ones (Amounts of water needed for fire in these formulas are high).
  • 26. 26 Leakage and Losses • This is “unaccounted for water” (UFW) • It is attributable to: Errors in meter readings Unauthorized connections Leaks in the distribution system
  • 27. 27 Design Criteria Are the design limitations required to get the most efficient and economical water-distribution network Velocity Pressure Average Water Consumption
  • 28. 28 Velocity • Not be lower than 0.6 m/s to prevent sedimentation • Not be more than 3 m/s to prevent erosion and high head losses. • Commonly used values are 1 - 1.5 m/sec.
  • 29. 29 Pressure • Pressure in municipal distribution systems ranges from 150- 300 kPa in residential districts with structures of four stories or less and 400-500 kPa in commercial districts. • Also, for fire hydrants the pressure should not be less than 150 kPa (15 m of water). • In general for any node in the network the pressure should not be less than 25 m of water. • Moreover, the maximum pressure should be limited to 70 m of water
  • 30. 30 Pipe sizes • Lines which provide only domestic flow may be as small as 100 mm (4 in) but should not exceed 400 m in length (if dead-ended) or 600 m if connected to the system at both ends. • Lines as small as 50-75 mm (2-3 in) are sometimes used in small communities with length not to exceed 100 m (if dead-ended) or 200 m if connected at both ends. • The size of the small distribution mains is seldom less than 150 mm (6 in) with cross mains located at intervals not more than 180 m. • In high-value districts the minimum size is 200 mm (8 in) with cross- mains at the same maximum spacing. Major streets are provided with lines not less than 305 mm (12 in) in diameter.
  • 31. 31 Head Losses • Optimum range is 1-4 m/km. • Maximum head loss should not exceed 10 m/km.
  • 32. 32 Design Period for Water supply Components • The economic design period of the components of a distribution system depends on • Their life. • First cost. • And the ease of expandability.
  • 33. 33 Average Water Consumption • From the water demand (preliminary) studies, estimate the average and peak water consumption for the area.
  • 34. 34 Network Layout • Next step is to estimate pipe sizes on the basis of water demand and local code requirements. • The pipes are then drawn on a digital map (using AutoCAD, for example) starting from the water source. • All the components (pipes, valves, fire hydrants) of the water network should be shown on the lines.
  • 35. 35 Pipe Networks • A hydraulic model is useful for examining the impact of design and operation decisions. • Simple systems, such as those discussed in last chapters can be solved using a hand calculator. • However, more complex systems require more effort even for steady state conditions, but, as in simple systems, the flow and pressure-head distribution through a water distribution system must satisfy the laws of conservation of mass and energy.
  • 36. 36 • The equations to solve Pipe network must satisfy the following condition: • The net flow into any junction must be zero • The net head loss a round any closed loop must be zero. The HGL at each junction must have one and only one elevation • All head losses must satisfy the Moody and minor-loss friction correlation Pipe Networks 0  Q
  • 37. 37 Node, Loop, and Pipes Node Pipe Loop
  • 38. 38 After completing all preliminary studies and layout drawing of the network, one of the methods of hydraulic analysis is used to • Size the pipes and • Assign the pressures and velocities required. Hydraulic Analysis
  • 39. 39 Hydraulic Analysis of Water Networks • The solution to the problem is based on the same basic hydraulic principles that govern simple and compound pipes that were discussed previously. • The following are the most common methods used to analyze the Grid-system networks: 1. Hardy Cross method. 2. Sections method. 3. Circle method. 4. Computer programs (WaterCAD,Epanet, Loop, Alied...)
  • 40. 40 Hardy Cross Method • This method is applicable to closed-loop pipe networks (a complex set of pipes in parallel). • It depends on the idea of head balance method • Was originally devised by professor Hardy Cross.
  • 41. 41 Assumptions / Steps of this method: 1. Assume that the water is withdrawn from nodes only; not directly from pipes. 2. The discharge, Q , entering the system will have (+) value, and the discharge, Q , leaving the system will have (-) value. 3. Usually neglect minor losses since these will be small with respect to those in long pipes, i.e.; Or could be included as equivalent lengths in each pipe. 4. Assume flows for each individual pipe in the network. 5. At any junction (node), as done for pipes in parallel,    out in Q Q Q   0 or
  • 42. 42 6. Around any loop in the grid, the sum of head losses must equal to zero: – Conventionally, clockwise flows in a loop are considered (+) and produce positive head losses; counterclockwise flows are then (-) and produce negative head losses. – This fact is called the head balance of each loop, and this can be valid only if the assumed Q for each pipe, within the loop, is correct. • The probability of initially guessing all flow rates correctly is virtually null. • Therefore, to balance the head around each loop, a flow rate correction ( ) for each loop in the network should be computed, and hence some iteration scheme is needed. hf loop   0 
  • 43. 43 7. After finding the discharge correction, (one for each loop) , the assumed discharges Q0 are adjusted and another iteration is carried out until all corrections (values of ) become zero or negligible. At this point the condition of : is satisfied. Notes: • The flows in pipes common to two loops are positive in one loop and negative in the other. • When calculated corrections are applied, with careful attention to sign, pipes common to two loops receive both corrections.   hf loop   00 .
  • 44. 44 How to find the correction value ( )  William Hazen n Manning Darcy n kQ h n F 85 . 1 , 2 ) 1 (        ) 2 (      o Q Q                        .... 2 1 2 & 1 2 2 1 f n o n o n o n o n Q n n nQ Q k Q k kQ h from       1 f n o n o n nQ Q k kQ h   0 0 1              n n o n loop n loop F nkQ kQ kQ kQ h Neglect terms contains 2  For each loop
  • 45. 45 • Note that if Hazen Williams (which is generally used in this method) is used to find the head losses, then h k Q f  185 . (n = 1.85) , then      h h Q f f 185 . • If Darcy-Wiesbach is used to find the head losses, then h k Q f  2     h h Q f f 2 (n = 2) , then             o F F n o n o Q h n h nkQ kQ 1
  • 46. 46 Example D L pipe 150mm 305m 1 150mm 305m 2 200mm 610m 3 150mm 457m 4 200mm 153m 5 1 2 3 4 5 37.8 L/s 25.2 L/s 63 L/s 24 11.4 Solve the following pipe network using Hazen William Method CHW =100
  • 47. 47   24 . 0 64 . 0 85 . 1 28 . 0 1          o F F Q h n h   10 02 . 6 1000 0.7 1 L/s , 100 0.7 1 852 . 1 852 . 1 87 . 4 9 852 . 1 87 . 4 852 . 1 852 . 1 87 . 4 852 . 1 Q K h Q D L h Q D C L h in Q C Q D C L h f f HW f HW HW f                        57 . 0 43 . 0 85 . 1 45 . 0 2          o F F Q h n h 1 2 3 4 5 1 2 2 1 2 loop in 2 pipe for 1 loop in 2 pipe for          
  • 48. 48   15 . 0 64 . 0 85 . 1 18 . 0 1          o F F Q h n h     09 . 0 42 . 0 85 . 1 07 . 0 1          o F F Q h n h 1 2 3 4 5 1 2 2 1 2 loop in 2 pipe for 1 loop in 2 pipe for          
  • 49. 49 Solve the following pipe network using Hazen William Method CHW =120 Example
  • 51. 51                 005 0 75 154 85 1 53 1 022 0 71 101 85 1 1 4 006 0 41 79 85 1 84 0 014 0 86 38 85 1 01 1 4 3 2 1 . . . . Δ . . . . Δ . . . . Δ . . . . Δ                                o f f n o n o Q h n h nkQ kQ Δ 1 1 Iteration for
  • 54. 54 Example • The figure below represents a simplified pipe network. • Flows for the area have been disaggregated to the nodes, and a major fire flow has been added at node G. • The water enters the system at node A. • Pipe diameters and lengths are shown on the figure. • Find the flow rate of water in each pipe using the Hazen- Williams equation with CHW = 100. • Carry out calculations until the corrections are less then 0.2 m3/min.
  • 55. 55
  • 56. 56
  • 57. 57
  • 58. 58
  • 59. 59
  • 60. 60
  • 61. 61
  • 62. 62
  • 63. 63
  • 64. 64 General Notes • Occasionally the assumed direction of flow will be incorrect. In such cases the method will produce corrections larger than the original flow and in subsequent calculations the direction will be reversed. • Even when the initial flow assumptions are poor, the convergence will usually be rapid. Only in unusual cases will more than three iterations be necessary. • The method is applicable to the design of new system or to evaluate the proposed changes in an existing system. • The pressure calculation in the above example assumes points are at equal elevations. If they are not, the elevation difference must be includes in the calculation. • The balanced network must then be reviewed to assure that the velocity and pressure criteria are satisfied. If some lines do not meet the suggested criteria, it would be necessary to increase the diameters of these pipes and repeat the calculations.
  • 65. 65 • Assigning clockwise flows and their associated head losses are positive, the procedure is as follows:  Assume values of Q to satisfy Q = 0.  Calculate HL from Q using hf = K1Q2 .  If hf = 0, then the solution is correct.  If hf  0, then apply a correction factor, Q, to all Q and repeat from step (2).  For practical purposes, the calculation is usually terminated when hf < 0.01 m or Q < 1 L/s.  A reasonably efficient value of Q for rapid convergence is given by;      Q H 2 H Q L L Summary      Q H 2 H Q L L
  • 66. 66 Example • The following example contains nodes with different elevations and pressure heads. • Neglecting minor loses in the pipes, determine: • The flows in the pipes. • The pressure heads at the nodes.
  • 68. 68 Assume flows magnitude and direction
  • 69. 69 First Iteration • Loop (1) Pipe L (m) D (m) Q (m3/s) f hf (m) hf/Q (m/m3/s) AB 600 0.25 0.12 0.0157 11.48 95.64 BE 200 0.10 0.01 0.0205 3.38 338.06 EF 600 0.15 -0.06 0.0171 -40.25 670.77 FA 200 0.20 -0.10 0.0162 -8.34 83.42 S -33.73 1187.89 L/s 20 . 14 /s m 01419 . 0 ) 89 . 1187 ( 2 73 . 33 3      
  • 70. 70 First Iteration • Loop (2) Pipe L (m) D (m) Q (m3/s) f hf (m) hf/Q (m/m3/s) BC 600 0.15 0.05 0.0173 28.29 565.81 CD 200 0.10 0.01 0.0205 3.38 338.05 DE 600 0.15 -0.02 0.0189 -4.94 246.78 EB 200 0.10 -0.01 0.0205 -3.38 338.05 S 23.35 1488.7 L/s 842 . 7 /s m 00784 . 0 ) 7 . 1488 ( 2 35 . 23 3       
  • 71. 71 Second Iteration • Loop (1) Pipe L (m) D (m) Q (m3/s) f hf (m) hf/Q (m/m3/s) AB 600 0.25 0.1342 0.0156 14.27 106.08 BE 200 0.10 0.03204 0.0186 31.48 982.60 EF 600 0.15 -0.0458 0.0174 -23.89 521.61 FA 200 0.20 -0.0858 0.0163 -6.21 72.33 S 15.65 1682.62 L/s 65 . 4 /s m 00465 . 0 ) 62 . 1682 ( 2 65 . 15 3        14.20 14.20 14.20 7.84 14.20
  • 72. 72 Second Iteration • Loop (2) Pipe L (m) D (m) Q (m3/s) f hf (m) hf/Q (m/m3/s) BC 600 0.15 0.04216 0.0176 20.37 483.24 CD 200 0.10 0.00216 0.0261 0.20 93.23 DE 600 0.15 -0.02784 0.0182 -9.22 331.23 EB 200 0.10 -0.03204 0.0186 -31.48 982.60 S -20.13 1890.60 L/s 32 . 5 /s m 00532 . 0 ) 3 . 1890 ( 2 13 . 20 3       14.20 7.84 7.84 7.84 7.84
  • 73. 73 Third Iteration • Loop (1) Pipe L (m) D (m) Q (m3/s) f hf (m) hf/Q (m/m3/s) AB 600 0.25 0.1296 0.0156 13.30 102.67 BE 200 0.10 0.02207 0.0190 15.30 693.08 EF 600 0.15 -0.05045 0.0173 -28.78 570.54 FA 200 0.20 -0.09045 0.0163 -6.87 75.97 S -7.05 1442.26 L/s 44 . 2 /s m 00244 . 0 ) 26 . 1442 ( 2 05 . 7 3      
  • 74. 74 Third Iteration • Loop (2) Pipe L (m) D (m) Q (m3/s) f hf (m) hf/Q (m/m3/s) BC 600 0.15 0.04748 0.0174 25.61 539.30 CD 200 0.10 0.00748 0.0212 1.96 262.11 DE 600 0.15 -0.02252 0.0186 -6.17 274.07 EB 200 0.10 -0.02207 0.0190 -15.30 693.08 S 6.1 1768.56 L/s 72 . 1 /s m 00172 . 0 ) 56 . 1768 ( 2 1 . 6 3       
  • 76. 76 Velocity and Pressure Heads: pipe Q (l/s) V (m/s) hf (m) AB 131.99 2.689 13.79 BE 26.23 3.340 21.35 FE 48.01 2.717 26.16 AF 88.01 2.801 6.52 BC 45.76 2.589 23.85 CD 5.76 0.733 1.21 ED 24.24 1.372 7.09 1.21 21.35 13.79 23.85 6.52 26.16 7.09
  • 77. 77 Velocity and Pressure Heads: Node p/g+Z (m) Z (m) P/g (m) A 70 30 40 B 56.21 25 31.21 C 32.36 20 12.36 D 31.15 20 11.15 E 37.32 22 15.32 F 63.48 25 38.48 1.21 21.35 13.79 23.85 6.52 26.16 7.09
  • 78. 78 Example For the square loop shown, find the discharge in all the pipes. All pipes are 1 km long and 300 mm in diameter, with a friction factor of 0.0163. Assume that minor losses can be neglected.
  • 79. 79 •Solution:  Assume values of Q to satisfy continuity equations all at nodes.  The head loss is calculated using; HL = K1Q2  HL = hf + hLm  But minor losses can be neglected:  hLm = 0  Thus HL = hf  Head loss can be calculated using the Darcy-Weisbach equation g 2 V D L h 2 f  
  • 80. 80 First trial Since HL > 0.01 m, then correction has to be applied. 554 ' K Q ' K H Q 554 H 3 . 0 x 4 Q x 77 . 2 A Q 77 . 2 H 81 . 9 x 2 V x 3 . 0 1000 x 0163 . 0 H g 2 V D L h H 2 L 2 L 2 2 2 2 2 L 2 L 2 f L                  Pipe Q (L/s) HL (m) HL/Q AB 60 2.0 0.033 BC 40 0.886 0.0222 CD 0 0 0 AD -40 -0.886 0.0222 S 2.00 0.0774
  • 81. 81 Second trial Since HL ≈ 0.01 m, then it is OK. Thus, the discharge in each pipe is as follows (to the nearest integer). s / L 92 . 12 0774 . 0 x 2 2 Q H 2 H Q L L          Pipe Q (L/s) HL (m) HL/Q AB 47.08 1.23 0.0261 BC 27.08 0.407 0.015 CD -12.92 -0.092 0.007 AD -52.92 -1.555 0.0294 S -0.0107 0.07775 Pipe Discharge (L/s) AB 47 BC 27 CD -13 AD -53
  • 82. 82 ‫تعالى‬ ‫اهلل‬ ‫قال‬ : ‫عن‬ ‫بيع‬ ‫وال‬ ‫تجارة‬ ‫تلهيهم‬ ‫ال‬ ‫رجال‬ ‫ﺫ‬ ‫كر‬ ‫اهلل‬
  • 83. 83 ‫الدنيا‬ ‫حب‬ ّ ‫أن‬ ‫اعمم‬ ،‫القمب‬ ‫قسوة‬ ‫من‬ ‫العين‬ ‫جمود‬ ،‫الذنوب‬ ‫ة‬ ‫كثر‬ ‫من‬ ‫القمب‬ ‫وقسوة‬ ،‫الموت‬ ‫نسيان‬ ‫من‬ ‫الذنوب‬ ‫ة‬ ‫وكثر‬ ،‫األمل‬ ‫طول‬ ‫من‬ ‫الموت‬ ‫ونسيان‬ ،‫الحرص‬ ‫شدة‬ ‫من‬ ‫األمل‬ ‫وطول‬ ،‫الدنيا‬ ‫حب‬ ‫من‬ ‫الحرص‬ ‫وشدة‬ ‫كل‬ ‫أس‬ ‫ر‬ ‫الدنيا‬ ‫وحب‬ ‫خطيئة‬ .
  • 84. 84 ‫تحابوا‬ ‫تهادوا‬ ‫بالهذية‬ ‫تبخل‬ ‫ال‬ ‫سعرها‬ ّ‫ل‬‫ق‬ ‫ولى‬ ‫مادية‬ ‫من‬ ‫اكثر‬ ‫معنىية‬ ‫فقيمتها‬
  • 85. 85 ‫نجاح‬ ‫كل‬ ‫مفتاح‬ ‫هللا‬ ‫تقوى‬ ” ‫يحتسب‬ ‫ال‬ ‫حيث‬ ‫من‬ ‫ويرزقه‬ ً‫ا‬‫مخرج‬ ‫له‬ ‫يجعل‬ ‫هللا‬ ‫يتق‬ ‫ومن‬ “