Newington Sand Filter Monitoring
Project Development
2
• Site Selection
• Design
• Construction
• Monitoring
• Initial Findings
• Lessons Learned
Newington Sand Filter Monitoring
Site Selection
• Project Considerations
• County-wide evaluation – draft permit
• Potential retrofit opportunity
• 2+ impervious acres
• High potential to discharge pollutants
• Partnership with Solid Waste
3
Newington Sand Filter Monitoring
Project Design – Sand Filter Specifications
• Treats 2.30 Acres
4
• Treatment Volume: 7,728 CF• 60’ L x 18‘ W x 11’ H
Newington Sand Filter Monitoring
Project Construction
5
Newington Sand Filter Monitoring
Project Construction
6
Newington Sand Filter Monitoring
Timeline
• Construction Schedule
– April 2015 – September 2015
• Filter Cleanout
– Feb 2017
– Used coarser stones than initial installation
7
Newington Sand Filter Monitoring
Monitoring Program Development
• Monitoring Components
• Establish objectives
• Site-specific
Considerations
• Associated Partners
• Parameter Suite
• Sampling Design
8
Newington Sand Filter Monitoring
Monitoring Program Development
• Establish Objectives
• Evaluate filter effectiveness
at an industrialized site
• Determine maintenance
needs associated with a
facility of this type and size
• Site-Specific
• Sample at inflow and
outflow locations within
sand filter
• Identify Constraints
• Location
• Accessibility
9
Newington Sand Filter Monitoring
Monitoring Program Development
• Associated Partners
• Facility Managers
• Ingress/Egress, Safety
Considerations
• Maintenance Division
• Responsible for design and upkeep
• Design Consultants
• Insight on monitoring locations
• Monitoring Consultants
• Responsible for data collection
• Laboratory
• Sample Analysis
• Stormwater Planning
• Oversight of sampling protocols and
data analysis
10
Newington Sand Filter Monitoring
Monitoring Program Development
• Parameter Suite
• Runoff from industrial site –
parking area for waste disposal
vehicles at end of shift
• Characterize and quantify
pollutant generation onsite
• Comprehensive suite of analysis
• Rainfall and Flow
• Water Chemistry
• Visual Indicators
• Metals
• Nutrients
• Hydrocarbons
11
Parameter
Total Rainfall
Total Flow, cubic feet
Composite cf ISCO 750 Area
Peak Flow, cubic feet/second
pH
Conductivity
Temperature
Color
Transparency
Floating Matter
Odor
Sheen
Biochemical Oxygen Demand (BOD5)
Chemical Oxygen Demand (COD)
Copper, Total Recoverable (Cu)
Iron, Total Recoverable (Fe)
Lead, Total Recoverable (Pb)
Zinc, Total Recoverable (Zn)
Total Kjeldahl Nitrogen (TKN)
Nitrite - Nitrate (NO2-NO3)
Total Nitrogen (N)
Total Phosphorus (P)
Total Suspended Solids (TSS)
Total Petroleum Hydrocarbon - Diesel Range (TPH-DRO)
Total Petroleum Hydrocarbon - Gasoline Range (TPH-TGO)
Oil and Grease (O&G)
Newington Sand Filter Monitoring
Monitoring Program Development
• Sampling Design
– Once per quarter over two years
– Inflow (MS-1) and Outflow (MS-2) Autosampler Locations
– Incorporate non-qualifying events in scope
12
Newington Sand Filter Monitoring
Monitoring Program Development
• Qualifying Storms
• > 0.1 inches rain
• Dry period of 72 hours
• Composite Samples
• Inflow and Outflow
• Flow-weighted
• Triggered by rain gauge
and level
• First flush Grab Samples
• Hydrocarbons
• Water chemistry
13
Newington Sand Filter Monitoring
Initial Findings – Flow and Grab Samples
• June 19, 2017: 0.15 inch rain event
14
Newington Sand Filter Monitoring
Initial Findings – Event Mean Concentration (EMC)
15
• EMCs for Pre-Treatment (MS-1) and Post-Treatment (MS-2)
• EMC – flow-weighted composite of a pollutant
• NO2-NO3 increased, but total nitrogen decreased
• Media Filters tend to remove organic nitrogen particulates and export nitrate
Newington Sand Filter Monitoring
Initial Findings – Pollutant Loads
• Pre-Treatment (MS-1) and Post-Treatment (MS-2) Pollutant Loads
• Calculated by converting EMCs from mg/L to lb/cf and multiplying by total flow
16
Newington Sand Filter
Initial Findings – Storm Event Summary
• Total Flow reduced by 52%
• Visual Indicators reduced
• Temperature decreased
• Effective at removing heavy
organic materials
• Significant reduction in most
parameters
• EMCs and Pollutant Loads
• Attentuation and Lag Time
• Grab sample complications
• 1 hour and 40 minutes
17
Newington Sand Filter
Lessons Learned - Sampling
• Project Limitations
• Limited Dataset
• One successful storm event
• Small storm
• Potential impact on loading data
• Two failed events
• Not enough rain
• Equipment malfunction
• Collection Restraints
• 72 hour dry period
• Laboratory Hours
• Facility Access
• Safety Considerations
18
Newington Sand Filter Monitoring
Lessons Learned - Maintenance
• Maintenance Concerns
19
 Size and use of the drainage area has an impact on
loading time for the sand filter substrate.
 Filter clogged within a year
 Cleanout costs are high
 Increases significantly if clogging occurs deep into
the sand layer.
 Maintenance is specialized
 Confined space entry
 Pump truck
 Experienced crew
Additional Information
For additional information, please contact
www.fairfaxcounty.gov/publicworks
20
Joseph Sanchirico
703-324-2548
joseph.sanchirico@fairfaxcounty.gov

More Related Content

What's hot

Zebra/CDM/NJDEP HAL Triad Presentation
Zebra/CDM/NJDEP HAL Triad PresentationZebra/CDM/NJDEP HAL Triad Presentation
Zebra/CDM/NJDEP HAL Triad Presentation
ZEBRA Environmental
 
Decommissioning Fukushima 20130306
Decommissioning Fukushima 20130306Decommissioning Fukushima 20130306
Decommissioning Fukushima 20130306
dinomasch
 

What's hot (20)

RAB Vapor Intrusion Mitigation
RAB Vapor Intrusion MitigationRAB Vapor Intrusion Mitigation
RAB Vapor Intrusion Mitigation
 
Focusing a Mineral Spirit LNAPL Investigation Towards Remedial Design Using U...
Focusing a Mineral Spirit LNAPL Investigation Towards Remedial Design Using U...Focusing a Mineral Spirit LNAPL Investigation Towards Remedial Design Using U...
Focusing a Mineral Spirit LNAPL Investigation Towards Remedial Design Using U...
 
CCS risk analysis
CCS risk analysisCCS risk analysis
CCS risk analysis
 
Epa vi and source investigation rab mtg update august 7 2014rv1
Epa vi  and source investigation rab mtg update    august 7 2014rv1Epa vi  and source investigation rab mtg update    august 7 2014rv1
Epa vi and source investigation rab mtg update august 7 2014rv1
 
Equivalent Grain Size Method for Sealing Capacity Assessment in CCS
Equivalent Grain Size Method for Sealing Capacity Assessment in CCSEquivalent Grain Size Method for Sealing Capacity Assessment in CCS
Equivalent Grain Size Method for Sealing Capacity Assessment in CCS
 
Data Analytics in Carbon Capture and Storage
Data Analytics in Carbon Capture and StorageData Analytics in Carbon Capture and Storage
Data Analytics in Carbon Capture and Storage
 
Modelling the Deposition of Pollutants on Habitats
Modelling the Deposition of Pollutants on HabitatsModelling the Deposition of Pollutants on Habitats
Modelling the Deposition of Pollutants on Habitats
 
Zebra/CDM/NJDEP HAL Triad Presentation
Zebra/CDM/NJDEP HAL Triad PresentationZebra/CDM/NJDEP HAL Triad Presentation
Zebra/CDM/NJDEP HAL Triad Presentation
 
Coupling groundwater and ecological models (MIKE-SHE & ECO Lab) - Roberta-Ser...
Coupling groundwater and ecological models (MIKE-SHE & ECO Lab) - Roberta-Ser...Coupling groundwater and ecological models (MIKE-SHE & ECO Lab) - Roberta-Ser...
Coupling groundwater and ecological models (MIKE-SHE & ECO Lab) - Roberta-Ser...
 
Decommissioning Fukushima 20130306
Decommissioning Fukushima 20130306Decommissioning Fukushima 20130306
Decommissioning Fukushima 20130306
 
Proficiency testing - implementing QA/QC standards in laboratory networks; Ex...
Proficiency testing - implementing QA/QC standards in laboratory networks; Ex...Proficiency testing - implementing QA/QC standards in laboratory networks; Ex...
Proficiency testing - implementing QA/QC standards in laboratory networks; Ex...
 
Pipeline Design Philosophy
Pipeline Design PhilosophyPipeline Design Philosophy
Pipeline Design Philosophy
 
21 WIPP recovery and Operational Safety
21 WIPP recovery and Operational Safety21 WIPP recovery and Operational Safety
21 WIPP recovery and Operational Safety
 
Ti02 ENM for wastewater odour control networks
Ti02 ENM for wastewater odour control networksTi02 ENM for wastewater odour control networks
Ti02 ENM for wastewater odour control networks
 
NextGen Gotland Sweden
NextGen Gotland SwedenNextGen Gotland Sweden
NextGen Gotland Sweden
 
Towards smarter agricultural systems: past, present and envisaged future soil...
Towards smarter agricultural systems: past, present and envisaged future soil...Towards smarter agricultural systems: past, present and envisaged future soil...
Towards smarter agricultural systems: past, present and envisaged future soil...
 
NextGen Braunschweig Germany
NextGen Braunschweig GermanyNextGen Braunschweig Germany
NextGen Braunschweig Germany
 
Moffett RAB: EPA Regional Groundwater and Vapor Intrusion Update
Moffett RAB: EPA Regional Groundwater and Vapor Intrusion UpdateMoffett RAB: EPA Regional Groundwater and Vapor Intrusion Update
Moffett RAB: EPA Regional Groundwater and Vapor Intrusion Update
 
ISO/TC 190 - Soil Quality
ISO/TC 190 - Soil QualityISO/TC 190 - Soil Quality
ISO/TC 190 - Soil Quality
 
NextGen Spernal United Kingdom
NextGen Spernal United KingdomNextGen Spernal United Kingdom
NextGen Spernal United Kingdom
 

Similar to Stormwater Monitoring - Newington Solid Waste Facility

Keeping radiation management at beverley uranium mine at best practice woods
Keeping radiation management at beverley uranium mine at best practice  woodsKeeping radiation management at beverley uranium mine at best practice  woods
Keeping radiation management at beverley uranium mine at best practice woods
Leishman Associates
 
Dutch CP L2012 190416
Dutch CP L2012 190416Dutch CP L2012 190416
Dutch CP L2012 190416
Mervyn Jones
 
CREATING A STANDARDISED APPROACH TO REGIONAL ENVIRONMENTAL MANAGEMENT
CREATING A STANDARDISED APPROACH TO REGIONAL ENVIRONMENTAL MANAGEMENTCREATING A STANDARDISED APPROACH TO REGIONAL ENVIRONMENTAL MANAGEMENT
CREATING A STANDARDISED APPROACH TO REGIONAL ENVIRONMENTAL MANAGEMENT
iQHub
 
The Intersection of Environment and EOR: How Carbon Capture is Changing Terti...
The Intersection of Environment and EOR: How Carbon Capture is Changing Terti...The Intersection of Environment and EOR: How Carbon Capture is Changing Terti...
The Intersection of Environment and EOR: How Carbon Capture is Changing Terti...
Society of Petroleum Engineers
 

Similar to Stormwater Monitoring - Newington Solid Waste Facility (20)

November 14, 2017 - Holyoke EHS Breakfast Seminar
November 14, 2017 - Holyoke EHS Breakfast SeminarNovember 14, 2017 - Holyoke EHS Breakfast Seminar
November 14, 2017 - Holyoke EHS Breakfast Seminar
 
Juliet long, Environment Agency
Juliet long, Environment Agency   Juliet long, Environment Agency
Juliet long, Environment Agency
 
Monitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Monitoring measuring and verification, Gonzalo Zambrano, University of AlbertaMonitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Monitoring measuring and verification, Gonzalo Zambrano, University of Alberta
 
SECARB Plant Barry CCS Project: Sharing Knowledge & Learning - Presentation b...
SECARB Plant Barry CCS Project: Sharing Knowledge & Learning - Presentation b...SECARB Plant Barry CCS Project: Sharing Knowledge & Learning - Presentation b...
SECARB Plant Barry CCS Project: Sharing Knowledge & Learning - Presentation b...
 
Sardinia 2015: Impact of municipal solid waste landfill leachate loading on t...
Sardinia 2015: Impact of municipal solid waste landfill leachate loading on t...Sardinia 2015: Impact of municipal solid waste landfill leachate loading on t...
Sardinia 2015: Impact of municipal solid waste landfill leachate loading on t...
 
CCS Risk analysis, Neil Wildgust, Global CCS Institute
CCS Risk analysis, Neil Wildgust, Global CCS InstituteCCS Risk analysis, Neil Wildgust, Global CCS Institute
CCS Risk analysis, Neil Wildgust, Global CCS Institute
 
Leachate project presentation Engineers Ireland Talk
Leachate project presentation Engineers Ireland TalkLeachate project presentation Engineers Ireland Talk
Leachate project presentation Engineers Ireland Talk
 
Keeping radiation management at beverley uranium mine at best practice woods
Keeping radiation management at beverley uranium mine at best practice  woodsKeeping radiation management at beverley uranium mine at best practice  woods
Keeping radiation management at beverley uranium mine at best practice woods
 
Heather Dylla - Measuring Sustainability
Heather Dylla - Measuring SustainabilityHeather Dylla - Measuring Sustainability
Heather Dylla - Measuring Sustainability
 
Dutch CP L2012 190416
Dutch CP L2012 190416Dutch CP L2012 190416
Dutch CP L2012 190416
 
Management of landfill leachate: The legacy of European Union Directives
Management of landfill leachate: The legacy of European Union DirectivesManagement of landfill leachate: The legacy of European Union Directives
Management of landfill leachate: The legacy of European Union Directives
 
[Final] Environmental Engineering Project.pptx
[Final] Environmental Engineering Project.pptx[Final] Environmental Engineering Project.pptx
[Final] Environmental Engineering Project.pptx
 
2010 2012-groundwater-plume
2010 2012-groundwater-plume2010 2012-groundwater-plume
2010 2012-groundwater-plume
 
Collaborative Sensor Rotation Programme Jacqueline Barr (IBI Group)
Collaborative Sensor Rotation Programme Jacqueline Barr (IBI Group)Collaborative Sensor Rotation Programme Jacqueline Barr (IBI Group)
Collaborative Sensor Rotation Programme Jacqueline Barr (IBI Group)
 
Iwcm green_expo
Iwcm  green_expoIwcm  green_expo
Iwcm green_expo
 
ENVIRONMENTAL IMPACT ASSESSMENT OF CEMENT PLANT___ A.pptx
 ENVIRONMENTAL IMPACT ASSESSMENT OF CEMENT PLANT___ A.pptx ENVIRONMENTAL IMPACT ASSESSMENT OF CEMENT PLANT___ A.pptx
ENVIRONMENTAL IMPACT ASSESSMENT OF CEMENT PLANT___ A.pptx
 
James Woodcock 17.5.2013: Case Study Examples
James Woodcock 17.5.2013: Case Study ExamplesJames Woodcock 17.5.2013: Case Study Examples
James Woodcock 17.5.2013: Case Study Examples
 
CREATING A STANDARDISED APPROACH TO REGIONAL ENVIRONMENTAL MANAGEMENT
CREATING A STANDARDISED APPROACH TO REGIONAL ENVIRONMENTAL MANAGEMENTCREATING A STANDARDISED APPROACH TO REGIONAL ENVIRONMENTAL MANAGEMENT
CREATING A STANDARDISED APPROACH TO REGIONAL ENVIRONMENTAL MANAGEMENT
 
The Intersection of Environment and EOR: How Carbon Capture is Changing Terti...
The Intersection of Environment and EOR: How Carbon Capture is Changing Terti...The Intersection of Environment and EOR: How Carbon Capture is Changing Terti...
The Intersection of Environment and EOR: How Carbon Capture is Changing Terti...
 
Disco Road Biogas Utilization Project
Disco Road Biogas Utilization ProjectDisco Road Biogas Utilization Project
Disco Road Biogas Utilization Project
 

More from Fairfax County

More from Fairfax County (20)

Merrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer ReplacementMerrifield Nursery Emergency Gravity Sewer Replacement
Merrifield Nursery Emergency Gravity Sewer Replacement
 
SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS SULLY BASINS STORMWATER POND RETROFITS
SULLY BASINS STORMWATER POND RETROFITS
 
Clarks Crossing Road Improvements 05-13-22
 Clarks Crossing Road Improvements 05-13-22 Clarks Crossing Road Improvements 05-13-22
Clarks Crossing Road Improvements 05-13-22
 
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxTysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptx
 
Lorton Volunteer Fire Station #19
Lorton Volunteer Fire Station  #19 Lorton Volunteer Fire Station  #19
Lorton Volunteer Fire Station #19
 
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream RestorationScotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
Scotts Run at Old Meadow Road Park Phase I and Phase II Stream Restoration
 
Sully Community Center Construction Progress
Sully Community Center Construction ProgressSully Community Center Construction Progress
Sully Community Center Construction Progress
 
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptxRiverwood Community Meeting - 04-14-2022- Presentation.pptx
Riverwood Community Meeting - 04-14-2022- Presentation.pptx
 
Burke VRE Connector Phase IV
Burke VRE Connector Phase IVBurke VRE Connector Phase IV
Burke VRE Connector Phase IV
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
Workhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick OffpptxWorkhouse Arts Stakeholder Kick Offpptx
Workhouse Arts Stakeholder Kick Offpptx
 
Workhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing CouncilWorkhouse Arts Affordable Housing Council
Workhouse Arts Affordable Housing Council
 
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
Rabbit Branch at Collingham Drive Stream Restoration - March 28, 2022.pptx
 
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
LAKE BARTON DREDGING, RESTORATION AND RISER MODIFICATION PROJECT
 
Reston Arts Community Center Feasibility - Wrap Up
 Reston Arts Community Center Feasibility - Wrap Up Reston Arts Community Center Feasibility - Wrap Up
Reston Arts Community Center Feasibility - Wrap Up
 
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
Stormwater Wastewater Facility Virtual Community Meeting, March 29, 2022
 
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022Reston Arts Center Feasibility Study Focus Group - March 28, 2022
Reston Arts Center Feasibility Study Focus Group - March 28, 2022
 
Oak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction ProjectOak Marr Pump Station Rehabilitation – Construction Project
Oak Marr Pump Station Rehabilitation – Construction Project
 
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Tucker Avenue Neighborhood Community Meeting, 03-15-2022
Tucker Avenue Neighborhood Community Meeting, 03-15-2022
 
Reston Arts Center Feasibility - Focus Group Visual Arts
Reston Arts Center Feasibility -  Focus Group Visual ArtsReston Arts Center Feasibility -  Focus Group Visual Arts
Reston Arts Center Feasibility - Focus Group Visual Arts
 

Recently uploaded

case-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdfcase-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdf
garthraymundo123
 
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi EscortsHigh Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
Monica Sydney
 
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
BrixsonLajara
 

Recently uploaded (20)

Book Call Girls in Kathua { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Book Call Girls in Kathua { 9332606886 } VVIP NISHA Call Girls Near 5 Star HotelBook Call Girls in Kathua { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Book Call Girls in Kathua { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
 
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
 
Environmental Topic : Soil Pollution by Afzalul Hoda.pptx
Environmental Topic : Soil Pollution by Afzalul Hoda.pptxEnvironmental Topic : Soil Pollution by Afzalul Hoda.pptx
Environmental Topic : Soil Pollution by Afzalul Hoda.pptx
 
A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...A Review on Integrated River Basin Management and Development Master Plan of ...
A Review on Integrated River Basin Management and Development Master Plan of ...
 
Russian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai EscortsRussian Escort Dubai 0503464457 Dubai Escorts
Russian Escort Dubai 0503464457 Dubai Escorts
 
Russian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girlsRussian Call girls in Dubai 0508644382 Dubai Call girls
Russian Call girls in Dubai 0508644382 Dubai Call girls
 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
 
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star HotelTop Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
 
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery NewsletterYil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
 
Role of Copper and Zinc Nanoparticles in Plant Disease Management
Role of Copper and Zinc Nanoparticles in Plant Disease ManagementRole of Copper and Zinc Nanoparticles in Plant Disease Management
Role of Copper and Zinc Nanoparticles in Plant Disease Management
 
case-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdfcase-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdf
 
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi EscortsHigh Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
 
Climate Change
Climate ChangeClimate Change
Climate Change
 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.
 
Green Marketing
Green MarketingGreen Marketing
Green Marketing
 
Call girl in Sharjah 0503464457 Sharjah Call girl
Call girl in Sharjah 0503464457 Sharjah Call girlCall girl in Sharjah 0503464457 Sharjah Call girl
Call girl in Sharjah 0503464457 Sharjah Call girl
 
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
Test bank for beckmann and ling s obstetrics and gynecology 8th edition by ro...
 
Low Rate Call Girls Boudh 9332606886 HOT & SEXY Models beautiful and charmin...
Low Rate Call Girls Boudh  9332606886 HOT & SEXY Models beautiful and charmin...Low Rate Call Girls Boudh  9332606886 HOT & SEXY Models beautiful and charmin...
Low Rate Call Girls Boudh 9332606886 HOT & SEXY Models beautiful and charmin...
 
Top Call Girls in Bishnupur 9332606886 High Profile Call Girls You Can Get...
Top Call Girls in Bishnupur   9332606886  High Profile Call Girls You Can Get...Top Call Girls in Bishnupur   9332606886  High Profile Call Girls You Can Get...
Top Call Girls in Bishnupur 9332606886 High Profile Call Girls You Can Get...
 
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
 

Stormwater Monitoring - Newington Solid Waste Facility

  • 1. A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Stormwater Monitoring – Newington Solid Waste Facility Development of an Innovative Monitoring Program March, 2018
  • 2. Newington Sand Filter Monitoring Project Development 2 • Site Selection • Design • Construction • Monitoring • Initial Findings • Lessons Learned
  • 3. Newington Sand Filter Monitoring Site Selection • Project Considerations • County-wide evaluation – draft permit • Potential retrofit opportunity • 2+ impervious acres • High potential to discharge pollutants • Partnership with Solid Waste 3
  • 4. Newington Sand Filter Monitoring Project Design – Sand Filter Specifications • Treats 2.30 Acres 4 • Treatment Volume: 7,728 CF• 60’ L x 18‘ W x 11’ H
  • 5. Newington Sand Filter Monitoring Project Construction 5
  • 6. Newington Sand Filter Monitoring Project Construction 6
  • 7. Newington Sand Filter Monitoring Timeline • Construction Schedule – April 2015 – September 2015 • Filter Cleanout – Feb 2017 – Used coarser stones than initial installation 7
  • 8. Newington Sand Filter Monitoring Monitoring Program Development • Monitoring Components • Establish objectives • Site-specific Considerations • Associated Partners • Parameter Suite • Sampling Design 8
  • 9. Newington Sand Filter Monitoring Monitoring Program Development • Establish Objectives • Evaluate filter effectiveness at an industrialized site • Determine maintenance needs associated with a facility of this type and size • Site-Specific • Sample at inflow and outflow locations within sand filter • Identify Constraints • Location • Accessibility 9
  • 10. Newington Sand Filter Monitoring Monitoring Program Development • Associated Partners • Facility Managers • Ingress/Egress, Safety Considerations • Maintenance Division • Responsible for design and upkeep • Design Consultants • Insight on monitoring locations • Monitoring Consultants • Responsible for data collection • Laboratory • Sample Analysis • Stormwater Planning • Oversight of sampling protocols and data analysis 10
  • 11. Newington Sand Filter Monitoring Monitoring Program Development • Parameter Suite • Runoff from industrial site – parking area for waste disposal vehicles at end of shift • Characterize and quantify pollutant generation onsite • Comprehensive suite of analysis • Rainfall and Flow • Water Chemistry • Visual Indicators • Metals • Nutrients • Hydrocarbons 11 Parameter Total Rainfall Total Flow, cubic feet Composite cf ISCO 750 Area Peak Flow, cubic feet/second pH Conductivity Temperature Color Transparency Floating Matter Odor Sheen Biochemical Oxygen Demand (BOD5) Chemical Oxygen Demand (COD) Copper, Total Recoverable (Cu) Iron, Total Recoverable (Fe) Lead, Total Recoverable (Pb) Zinc, Total Recoverable (Zn) Total Kjeldahl Nitrogen (TKN) Nitrite - Nitrate (NO2-NO3) Total Nitrogen (N) Total Phosphorus (P) Total Suspended Solids (TSS) Total Petroleum Hydrocarbon - Diesel Range (TPH-DRO) Total Petroleum Hydrocarbon - Gasoline Range (TPH-TGO) Oil and Grease (O&G)
  • 12. Newington Sand Filter Monitoring Monitoring Program Development • Sampling Design – Once per quarter over two years – Inflow (MS-1) and Outflow (MS-2) Autosampler Locations – Incorporate non-qualifying events in scope 12
  • 13. Newington Sand Filter Monitoring Monitoring Program Development • Qualifying Storms • > 0.1 inches rain • Dry period of 72 hours • Composite Samples • Inflow and Outflow • Flow-weighted • Triggered by rain gauge and level • First flush Grab Samples • Hydrocarbons • Water chemistry 13
  • 14. Newington Sand Filter Monitoring Initial Findings – Flow and Grab Samples • June 19, 2017: 0.15 inch rain event 14
  • 15. Newington Sand Filter Monitoring Initial Findings – Event Mean Concentration (EMC) 15 • EMCs for Pre-Treatment (MS-1) and Post-Treatment (MS-2) • EMC – flow-weighted composite of a pollutant • NO2-NO3 increased, but total nitrogen decreased • Media Filters tend to remove organic nitrogen particulates and export nitrate
  • 16. Newington Sand Filter Monitoring Initial Findings – Pollutant Loads • Pre-Treatment (MS-1) and Post-Treatment (MS-2) Pollutant Loads • Calculated by converting EMCs from mg/L to lb/cf and multiplying by total flow 16
  • 17. Newington Sand Filter Initial Findings – Storm Event Summary • Total Flow reduced by 52% • Visual Indicators reduced • Temperature decreased • Effective at removing heavy organic materials • Significant reduction in most parameters • EMCs and Pollutant Loads • Attentuation and Lag Time • Grab sample complications • 1 hour and 40 minutes 17
  • 18. Newington Sand Filter Lessons Learned - Sampling • Project Limitations • Limited Dataset • One successful storm event • Small storm • Potential impact on loading data • Two failed events • Not enough rain • Equipment malfunction • Collection Restraints • 72 hour dry period • Laboratory Hours • Facility Access • Safety Considerations 18
  • 19. Newington Sand Filter Monitoring Lessons Learned - Maintenance • Maintenance Concerns 19  Size and use of the drainage area has an impact on loading time for the sand filter substrate.  Filter clogged within a year  Cleanout costs are high  Increases significantly if clogging occurs deep into the sand layer.  Maintenance is specialized  Confined space entry  Pump truck  Experienced crew
  • 20. Additional Information For additional information, please contact www.fairfaxcounty.gov/publicworks 20 Joseph Sanchirico 703-324-2548 joseph.sanchirico@fairfaxcounty.gov

Editor's Notes

  1. This discussion will focus on the development of a monitoring program for a large-scale sand filter at the Newington Solid Waste Facility. The program was designed to both determine the efficiency of this best management practice and provide insight on the maintenance needs of such a facility.
  2. I’ll go through the steps from concept to results, along with some lessons learned regarding both sampling and future maintenance of such a facility.
  3. This project was originally conceived in response to language in a draft MS4 permit. It stated that the County should identify facilities with greater than 2 acres of impervious surface with potential for stormwater retrofit opportunities. Based on a County-wide evaluation, the Newington Solid Waste facility had a high potential to discharge pollutants. In addition, the Director of Solid Waste was a very amenable partner and was willing to pilot new approached for managing stormwater.
  4. The primary focus of the retrofit was the development of a large-scale sand filter designed to treat runoff originating from a parking lot for approximately 60 waste disposal vehicles. The schematic give a sense of the dimenisons and the capacity of the filter. Designed to treat 1” of rainfall Drawdown time of 40 hours One quick, big rain activates overflow pipe
  5. Some photos to illustrate the scale of the project. ~$850,000 for construction of filter ~$85,00 for design costs
  6. Stormwater Planning was brought in to develop a monitoring plan. We’ll go through the steps that lead to actual sampling: Objectives Site Specific Considerations Partnerships Targeted Parameters Sampling Design
  7. An effective monitoring plan has to start with clearly defined objectives In this case, we wanted to: Evaluate BMP effectiveness at removing pollutants from stormwater runoff at an industrialized site Determine maintenance needs at such a facility – the County has experience with smaller-scale sand filters but this is the first we’ve installed at such an industrial facility at this size. We also need to take into account the location as we design the monitoring plan. - the filter has a defined input and output – targets for the autosamplers - safety considerations while sampling are important, as this is a high traffic facility with heavy equipment - BMP in a gated facility, so coordination is important
  8. Successful programs rely on coordination between invested parties. In this case, buy-in from the facility managers was critical to success, as disruption to regular activity while under construction is significant. Coordination with County maintenance staff was important as we learned more about the function of the sand filter Consultants who designed the facility could lend insight to the monitoring crew- in this case they were one and the same. A certified lab able to carry out the comprehensive sample analysis And the Planning team to ensure oversight and facilitation, in addition to long term data analysis
  9. To ensure we are capturing how efficient the BMP is, we developed a comprehensive parameter list for industrial sites. This includes flow, water chemistry, visiuals, metals, nutrients and hydrocarbons – the latter require a first flush grab sample, complicating sampling efforts.
  10. The intent of the sampling design is to collect one sample per quarter from both the inflow and the outflow of the sand filter. These photos show the two locations, and also illustrate the challenge in setting up monitoring locations.
  11. After setting up for a storm event, certain conditions need to be met to trigger a sample. Once the rain gauge measure > .1 inches of rain, the inflow autosampler will activate. As there is a lag for the water to travel through the filter, the outflow autosampler is triggered solely on level. As we are collecting hydrocarbons , they require a grab sample as well – this necessitates having staff on site during the event until both the infow and outflow samples are collected.
  12. At this point in time, we have only one successful event from last summer. I’d like to point out a few encouraging finds from this limited dataset: Total flow was reduced by 52 percent from inflow to outflow, which illustrates the ability of the sand filter to both slow down and attenuate the stormwater from the site. There was also a significant reduction in temperature after coming off the parking lot. For both the diesel-based hydrocarbons and the oil and grease parameters – almost 90% reductions were found . As we found during maintenance, the filter sludge smelled strongly of hydrocarbons, which is most likely byproduct from the trucks such as leaking hydraulic couplings and motor oil.
  13. EMCs decreased for all sampled parameters except for nitrate-nitrite. The literature shows that media filters tend to export this form of nitrogen, although the total N went down as a result of greater reduction of TKN.
  14. The decrease in total pollutant loads ranged from 53% for total nitrogen to greater than 87% for BOD5. It should be noted that the percent reduction of pollutant loads was greater than the percent reduction in EMCs. This can be attributed to the reduction in total flow measured at the outflow. A larger storm may not provide the same results as storage in the sand filter would be decreased, increasing the flow coming out.
  15. The influent flow was initially recorded at approximately 3:25 pm and measurable effluent flow began at approximately 5:05 pm resulting in a detention time of approximately 1 hour and 40 minutes. This variable increases the complexity for grab collection, necessitating staff remain on site during storm events for a long period of time.
  16. The results so far, while encouraging, are very limited. We have one successful storm, which was relatively low intensity. Two other events that we mobilized for were not successful – once for not enough rain and another for a clogged intake tube. As we move forward, we are considering revising the sampling protocol to increase chances for collection. Shortening the dry period to 48 hours and utilizing a lab with extended weekend hours would put more storms into play. Facility access and working in a busy facility are limiting factors that need to be taken into account as well.
  17. I also received some insight from maintenance staff – - an industrialized site such as this shortens the maintenance interval – scheduling for this type of facility will need to follow a different frequency than other sand filters in the County. It took about a year for the sand filter to fully clog after installation. Trash collection activities generate a higher than average amount of contaminated runoff. Maintenance could be cost prohibitive over the lifetime of the BMP Maintenance is specialized - The work must be conducted during a period or in such a manner where the extracted stone and sand will not be exposed to precipitation or runoff.