By Tamara Shaqoura Darwish
Master of Integrated Building Delivery
Professor Tom Brock
Comprehensive Opportunity Assessment and Entrepreneurship Development Project
Arch. 564
Illinois Institute of Technology
Comprehensive Opportunity Assessment And Entrepreneurship Development
Condominiums
High Rise Development Building
11/6/2013
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
1
Abstract
This is a comprehensive study of developing an integrated complex high-rise building that
has its own challenges. The site falls in the heart of downtown Chicago, where the parcel
surrounding buildings have different heights, elevations and functions, also the parcel
location, and size ruled the building design, orientation and shape.
Thinking as an architect, contractor and developer in the same time was my biggest
challenge, which required going through the building construction and finance process.
By developing market analysis and site studies, I came out with a profitable project which
meets the clients requirements and needs in this particular market; still the building has a
curb appeal, where we can compete with the competition in the area.
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
2
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
3
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
4
Content:- Pages
EXECUTIVE SUMMARY
Project cost summery 8
Summery 9
PROJECT PROGRAM 10
Zoning 10-12
Zoning and Area Analysis 13
Condominiums Proposal 14
PROJECT PROPOSAL DRAWINGS 15
Perspective 16
Section 17
Plans 18-29
Furnished Plans Proposal 30-32
Elevations 33-34
Perspective 35
MARKET COMPARABLE ANALYSIS 36
Market study 36-39
Competitions 40-42
CONDOMINIUMS BUILDING BUDGET 43
Project Budget 43-44
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
5
CASH FLOW 45
Capitalization 45
Parking retail and offices income 45
Condominiums units’ income 46-47
Uses and resources 48
COST PERFORMA WITH SCHEDULE 49
CONSTRUCTION CASH FLOW SCHEDULE 50-53
PROJECT SUMMARY 54
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
6
EXECUTIVE SUMMARY
Project cost summery
Hard costs: -$ 26,927,874.14
Soft cost: - $13,184,206.77
Land cost:-$16,403,057.39
Project cost: - $56,515,138.30
Project sales summery
Condominiums sales;-$ 66,122,515
Offices, retails and parking sales:-$ 4,098,424
Total sales: - $70,220,938.55
5% vacancy=$3,511,046.928
Gross operating income: - NOI: -$ 66,709,891.62
Cash flow: -$ 10,194,753.32
Return on investment: - 18%
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
7
Summary
The new condominiums building will entail demolition of an existing abandoned two floor
residential building to create 9,204 square feet site. An 89-residace 23- story condominium
development with homes ranging from 800 square feet to 1800 square feet will be built on the site.
The asset condominium building will be ideally located downtown Chicago the location has a great
potentials of a high rise mixed used building with a small affordable units. The proposed project
will have a high return on income, due to its strategic location and the high demand in the market
for this type of projects.
The property located on 615 n Wabash Ave., Chicago, IL, 60611, is well positioned downtown
Chicago, within the same area residents will find many shops, such as Bloomingdales (an upscale
chain of department stores), restaurants, night clubs, parks, theater, cinema, different amenities
and live entertainment commuting
Figure 1
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
8
Project program:
A 23 story loft condominiums building will constructed in one phase on the site, with excellent
design and unique amenities
The development will provide:-
 Slender architectural tower
 23 floors, 89 homes
 Steel-reinforced concrete shear core for superior seismic stability
 Floor plate modulated at perimeter to maximize city and lake view
 Floor-to-ceiling window wall in each home
 Double-glazed, glass curtain-wall system for exceptional weather protection
 Applied acoustic technology to virtually eliminate home-to-home sound transfer
 Heated indoor garage space with each residence.
 Private balconies and terraces on different floors
 Hardware floors in foyer, kitchen, living and dining room.
 Plush carpet in bedrooms and dressing rooms.
 Fire resistant structure protected with sprinkler system in every room
 HVAC will be a central 4-pipe system to each condominium.
 The building will have a LEED Silver environmental rating.
Zoning:
This site is in compliances with the city of Chicago zoning ordinance, zoned DX-12
(DX - Downtown Mixed-Use District) Downtown high-rises - offices or apartments with ground-floor
stores. The suggested development project will fill with the master plan vision of the city. Since the lot is
surrounded with 11 floors parking building from the east, and 13 floors hotel building on the north,
creating a functional units will require going higher with the units, and by increasing the parking’s floors
to meet the requirements for DX-20. We can achieve a successful development project.
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
9
Figure 2 Zoning Map
SITE
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
10
Figure 3 Site Image
Figure 4 across the Street
Site
Site
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
11
Zoning And Area Analysis
Address 615 N Wabash Ave., Chicago, IL, 60611
Zoning District DX-12 to be rezoned to DX-20
Lot Size(SF) 9,204
Acres 0.21
Permitted Use Mixed Used Building Permitted
Allowable Far 12
Allowable FAR SF 110,448
Actual Far 179,543.1 + 3121.35 (balconies) more than allowable FAR (69,095.1)
Condo Saleable 89
Retail Saleable 3
Front Set Back None
Rear Setback None
Side Setback None
Building Height Max
Allowable
None, But Buildings Taller Than City's "Building Height Thresholds"
Require Planned Development Review
Actual Height 246 Feet
Site
Figure 5 Intersection
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
12
Stories 23
Number Of Parking Spaces 71 (required is 55.5)
15.5 extra added for rezoning
Construction Duration
(Month)
24
Project Duration (Month) 32
Table 1
Condo Proposal
Total
Floors
Total
Square/Feet
Condos Per Floor Area
2007.18 SF Ea. 5th
,6th
& 7th
Floor 3 6021.54
6565.49 SF Ea. 9th
- 12th
Floor 4 26261.96
7398.22 SF Ea. 13th
And 14th
Floor 2 14796.44
7677.89 SF Ea. 15 - 18th
Floor 4 30711.56
8010.48 SF Ea. 19th
And 20th
Floor 2 16020.96
5850.63 SF Ea. 21ST
And 22th,
Floor 1 11701.26
5671.61 SF 23Rd
Floor 2 5671.61
Totals Condos Floor Area 18 111185 58.5%
Circulation Per Floor Area
1583 SF 1st
Floor 1 1583
1238.89 SF Ea. 2nd
And 3rd
Floor 2 2477.78
1073.82 SF 4th
Floor 1 1073.83
1032.75 SF Ea. 5th
, 6th
And 7th
Floor 3 3098.25
1066.88 SF Ea. 8th
Floor 1 1066.88
1772.59 SF Ea. 9th
-12th
Floor 4 7090.36
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
13
1403.15 SF Ea. 13th
-23rd
Floor 11 15433
Totals Circulation Floor Area 23 36247 18%
Retail Per Floor Area 410 SF Ea. 1st Floor 3 1230
Totals Retail Stores Floor Area 3 1230 .7%
Office Space Area 1452.73 Sf 2nd And 3rd Floor 2
2945.36
Totals Offices Floor Area 2 2915.46 1.6%
Amenities
1257.12 SF Fitness (4thfloor) 1 1257.12
751 SF
Screening Room(4th
Floor)
1 751
1971.65 SF
Terrace (8th
Floor)
1971.65 SF
1909 SF Terrace (21ST
Floor) 1 1909
Totals Amenities Floor Area 3 3979.8 1%
Average Condo Unit 1349.733
Number Condo Units Per
Floor
2 5th
, 6th
And 7th
Floor
7 9th
- 12th
Floor
6 13th
- 18th
Floor
5 19th
- 20th
Floor
3 21-23rd
Floor
Total Condo Units 89
Parking Lot Area Per
Floor
4348 SF 1st
Floor 1 4348
4557 SF Ea. 2nd
-8th
Floor 7 31899
Total Floor Of Parking 8 36247 20%
Service Per Floor 182 SF 1st
Floor 1 182
108 SF Ea. 2nd
And 3rd
Floor 2 216
Total Services Area 3 398 0.2%
Table 2 condo units proposal
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
14
PROJECT PROPOSAL DRAWINGS:-
Condos Units Per Floors
Average Size Square
Feet
Total Units With Balcony
Without
Balcony
Units From 5th To 7th 1003.59 6
1 On The 7th
Floor
5
Unit From 9th To 12th 938 28 16 12
Units From 13th To 18th 1233.04 36 20 16
Units From 19th To 20th 1602.12 10 8 2
Pent House 1950 9 9 0
Table 3
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
15
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
16
Section 1
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
17
Drawing- Floor 1
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
18
Drawing- Floor 2
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
19
Drawing- Floor 3
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
20
Drawing- Floor 4
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
21
Drawing- Floor 5, 6, 7
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
22
Drawing- Floor 8
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
23
Drawing- Floor 9,10,11,12
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
24
Drawing- Floor 13, 14
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
25
Drawing- Floor 15, 16, 17
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
26
Drawing- Floor 18
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
27
Drawing- Floor 19, 20,21,22,23
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
28
Drawing- Studio furnishing Proposal
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
29
Drawing- Two Bedrooms Furnishing Proposal
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
30
Drawing- penthouse Furnishing Proposal
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
31
West Elevation
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
32
East Elevation
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
33
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
34
MARKET COMPARABLE ANALYSIS
Market study:-
The building will be designed and marketed as luxury lofts appealing to the middle, upper class, and
upper income segments of the young professional and empty nesters market. Extensive research indicates
strong demand for the product, and to quickly absorb by the market. The proposed building will blend with
the surrounding very easy (see figure 3). The building residence will range from 900-1600 square feet and
range in price from mid $350,000 to mid-700,000.
Figure 6
a) Market analysis : it suggests that market demand for proposed building is principally from buyers
who come from the following groups:
1. Young professionals and couples seeking an urban lifestyle.
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
35
Figure 7
2. Young professionals and couples with connection to downtown Chicago.
Figure 8
3. Empty nesters within the age-range of 30 to 50 years.
Figure 9
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
36
4. Owners of middle-high income $140,000-$200,000.
Figure 10
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
37
5. Current or past residents of the same area, or people who grown children living downtown.
Figure 11
This downtown location will attract buyers who value services within walking distance. All
perspective buyers value and appreciate a maintenance free living environment. While the young
professionals desire the urban experience, still demand moderately high level of luxury is desired
as well. Amanitas, transpiration, services and retails are very important for the targeted
population. Convenience of interaction with neighborhood is also highly demanded. Buyers are
most likely relying on public transportation, which is very convenient for the location.
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
38
b) Competitions:
 Address: 55 E Erie St Chicago, IL 60611
Figure 12 Building Location
units Sample SF PRICE
unit 1 SF For sale 1,407 sq ft $690,000
unit 2 SF For sale 4,350 sq ft $4,374,000
unit 3 SF For sale 3,375 sq ft $2,495,000
unit 4 SF For sale 1,588 sq ft $675,000
unit 5 SF SOLD 2,300 sq ft $1,360,000
unit 6 SF SOLD 1,800 sq ft $878,000
unit 7 SF SOLD 2,028 sq ft $890,000
95% SOLD
Table 4
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
39
 Address: 118 E Erie, Chicago, IL 60611, built 2012.
Figure 13
units Sample SF PRICE
unit 1 SF For sale 2,440 sq ft $1,000,369
unit 2 SF For sale 1,937 sq ft $2,235,559
unit 3 SF For sale 1,423 sq ft $1,000,369
unit 4 SF For sale 2,440 sq ft $2,901,929
unit 5 SF pending 2,440 sq ft $2,874,386
80% SOLD
Table 5
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
40
 Address : 535 N Michigan Ave Chicago, IL 60611,built 19652
Figure 14
units Sample SF PRICE
unit 1 SF For sale 940 sq ft $249,900
unit 2 SF For sale 800 sq ft $242,500
unit 3 SF For sale 840 sq ft $200,000
unit 4 SF SOLD 950 sq ft $248,500
unit 5 SF SOLD 1,000 sq ft $285,000
90% SOLD
Table 6
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
41
Condominiums Building BUDGET:-
Hard Construction Cost Total Per condo unit Per SF % of cost
Div. 1- General Conditions 599,673.95 6,737.91 3.34 2.23%
Water+ Sewer 420,130.85 4,720.57 2.34 1.56%
Excavations 658,923.18 7,403.63 3.67 2.45%
Paving 120,293.88 1,351.62 0.67 0.45%
Landscaping 233,406.03 2,622.54 1.3 0.87%
Structure Concrete Foundations 2,335,855.73 26,245.57 13.01 8.67%
Poured Concrete Structure 1,797,226.43 20,193.56 10.01 6.67%
Div.4- Masonry
CMU Bearing Walls 2335855.731 26,245.57 13.01 8.67%
Masonry Veneer 1197552.477 13,455.65 6.67 4.45%
Div.5- Steel
Misc. Ornamentals Iron 420130.854 4,720.57 2.34 1.56%
Div.6- Wood And Carpentry
Misc. Carpentry 1197552.477 13,455.65 6.67 4.45%
Cabinetry 430903.44 4,841.61 2.4 1.60%
Millwork 172361.376 1,936.64 0.96 0.64%
Div.7- Roofing And Moisture Control
Roofing 779217.054 8,755.25 4.34 2.89%
Caulking 120293.877 1,351.62 0.67 0.45%
Water Proofing 287268.96 3,227.74 1.6 1.07%
Div.8 – Doors And Windows
Window System 2396900.385 26,931.47 13.35 8.90%
Doors And Frames 143634.48 1,613.87 0.8 0.53%
Store Front 179543.1 2,017.34 1 0.67%
Finish Hardware 71817.24 806.94 0.4 0.27%
Div.9- Finishes
Drywall 1725409.191 19,386.62 9.61 6.41%
Tile 1079054.031 12,124.20 6.01 4.01%
Painting 718172.4 8,069.35 4 2.67%
Carpeting 287268.96 3,227.74 1.6 1.07%
Div. 10- Accessories
Bath Accessories 143634.48 1,613.87 0.8 0.53%
Div.11- Appliances 387813.096 4,357.45 2.16 1.44%
Div.12- Furniture 0 0.00 0 0.00%
Div. 13- Pool 0 0.00 0 0.00%
Div.14- Elevator 2396900.385 26,931.47 13.35 8.90%
Div.15- Mechanical System
HVAC 1150871.271 12,931.14 6.41 4.27%
Fire Protection 646355.16 7,262.42 3.6 2.40%
Plumbing 1150871.271 12,931.14 6.41 4.27%
Div.16- Electrical
Electrical 1150871.271 12,931.14 6.41 4.27%
Security 120293.877 1,351.62 0.67 0.45%
telephone 71817.24 806.94 0.4 0.27%
26,927,874.14 302,560.38 149.98 100.00%
Project Budget
Div. 2- Site Work
Div.3 -Concrete
Table 7
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
42
Div. 18- land cost 15,999,086 179,765.01 89.11
Site cleaning and demolition 403,971.75 4,539.01 2.25
Total Land Cost 16,403,057.39 184,304
Div. 19- Architect And Engineer
Architect 1,457,889.97 16,380.79 8.12 11.06%
Structure Engineer 728,944.99 8,190.39 4.06 5.53%
MEP Engineer 310,609.56 3,490.00 1.73 2.36%
Civil Engineer 104,135.00 1,170.06 0.58 0.79%
Consults 193,906.55 2,178.73 1.08 1.47%
Div. 20 – Legal And Accounting 714,582 8,029.01 3.98 5.42%
Div.21 – Financing 389,609 4,377.62 2.17 2.96%
Div. 22 - Title Insurance 193,907 2,178.73 1.08 1.47%
Div. 23 - Insurance 0.00%
General Liability 301,632.41 3,389.13 1.68 2.29%
Workers Comp. 170,565.95 1,916.47 0.95 1.29%
Builders Risk 44,885.78 504.33 0.25 0.34%
Div.24 Municipal Fees 0.00%
Permits 283,678.10 3,187.39 1.58 2.15%
Zoning Fees 19,749.74 221.91 0.11 0.15%
Other Taxes, Transfers + Fees 502,720.68 5,648.55 2.8 3.81%
Re Taxes 114,907.58 1,291.10 0.64 0.87%
Div. 25- Marketing 0.00%
Marketing Research Report 14,363.45 161.39 0.08 0.11%
Div. 26- Survey And Testing 0.00%
Plat of survey 1,795.43 20.17 0.01 0.01%
Concrete Testing 23,340.60 262.25 0.13 0.18%
Footing Testing 57,453.79 645.55 0.32 0.44%
Environmental Testing 5,386.29 60.52 0.03 536.70%
Construction Layout 7,181.72 80.69 0.04 0.05%
Div. 27 Utilities 44,886 504.33 0.25 0.34%
Div.28 A – Developer Fees 6% Of Hard Cost 1,615,672 18,176.22 9.01 12.25%
Div.28 B – Developer Overhead 9% 2,624,920 29,493.48 14.62 19.91%
Div. 31- Construction Interest 1,576,388 17,712.23 8.78 11.96%
Div. 32 A- Hard Cost Contingency 5% 1,346,393 17,712.23 8.78 10.21%
Div.32 B – Soft Cost Contingency 2.5% 334,703 8,190.39 4.06 2.54%
Total Soft Cost 13,184,206.77 155,173.65 76.92 100.00%
Total hard cost 26,927,874.14 302,560.38 149.98 47.65%
Total land cost 16,403,057.39 184,304.02 91.36 29.02%
Total soft cost 13,184,206.77 155,173.65 76.92 23.33%
Total project cost 56,515,138.30 642,038.06 318.26 100.00%
Land Cost
91.36
Project cost
Soft Cost
Table 8 Project Total Cost
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
43
Cash flow:-
PROJECT REVENUE:-
Space Total sf Average price
per sf
units Gross income
Retail 400.63 350 3 420,662
Offic1 422 350 2 295,400
Office2 640.1 350 2 448,070
Office 3 Second Floor 400.63 350 1 140,221
Office 3 third Floor 305.66 350 1 106,981
Office 4 324.44 350 1 113,554
parking 36247 30,000 71 2573537
Office 4
Total Gross Income 4,098,424
Table 10 Retails, Offices &Parking Gross Income
Capitalization
Equity
Construction loan $39,937,637.32 70% LTC
investors $17,116,130.28 30%LTC
Total construction capitalization $56,515,138.30 100%
Table 9
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
44
Floor 5th 6th 7th 9th thth 11th 12th 13th 14th
units/price
1003.59 2 2 1 1 1 1 1 1 1
price/so $420 $420 $440 $450 $460 $470 $480 $490 $500
total price $843,016 $843,016 $441,580 $451,616 $461,651 $471,687 $481,723 $491,759 $501,795
1003.59 1
(89)sf
price/sf $430
total price $431,544
914.59 1 1 1 1 1 1
price/sf $440 $450 $460 $470 $490 $500
total price $402,420 $411,566 $420,711 $429,857 $448,149 $457,295
842.41 1 1 1 1
price/sf $445 $445 $445 $470
total price $374,872 $374,872 $374,872 $395,933
910.02 1 1 1 1
85.29
price/sf $450 $460 $460 $470
total price $409,509 $418,609 $418,609 $427,709
812.79 1 1 1 1
65.57
price/sf $450 $460 $460 $470
total price $365,756 $373,883 $373,883 $382,011
997.09 1 1 1 1
35.99
price/sf $450 $460 $460 $470
total price $448,691 $458,661 $458,661 $468,632
1085 1 1 1 1
35.99
price/sf $450 $460 $460 $470
total price $488,250 $499,100 $499,100 $509,950
1548.25 1 1
129.67
price/sf $550 $550
total price $851,538 $851,538
1715.79 1 1
114.21
price/sf $550 $550
total price $943,685 $943,685
1093.62 1 1
36.65
price/sf $550 $550
total price $601,491 $601,491
1122.38 1 1
40.56
price/sf $520 $530
total price $583,638 $594,861
1995.46
price/sf
total price
2250.77
584.61
price/sf
total price
1419.71
274.71
price/sf
total price
1699.05
263.3
price/sf
total price
2727.93
432.06
price/sf
total price
2548.91
240.19
price/sf
total price
total units $843,016 $843,016 $873,123 $2,941,113 $2,998,343 $3,017,525 $3,095,816 $3,920,259 $3,950,664
Table 11 Condminuim Units Gross Income
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
45
Floor 15th 16th 17th 18th 19th 20th 21st 22ed 23rd
units/price
1003.59 1 1 1 1
price/so $510 $520 $530 $540
total price $511,831 $521,867 $531,903 $541,939
1003.59
(89)sf
price/sf
total price
914.59 1 1 1 1
price/sf $510 $520 $530 $540
total price $466,441 $475,587 $484,733 $493,879
842.41
price/sf
total price
910.02
85.29
price/sf
total price
812.79
65.57
price/sf
total price
997.09
35.99
price/sf
total price
1085
35.99
price/sf
total price
1548.25 1 1 1 1 1 1
129.67
price/sf $550 $550 $560 $570 $590 $600
total price $851,538 $851,538 $867,020 $882,503 $913,468 $928,950
1715.79
114.21
price/sf
total price
1093.62 1 1 1 1 1 1
36.65
price/sf $550 $560 $570 $580 $590 $600
total price $601,491 $612,427 $623,363 $634,300 $645,236 $656,172
1122.38 1 1 1 1 1 1
40.56
price/sf $540 $560 $570 $580 $590 $600
total price $606,085 $628,533 $639,757 $650,980 $662,204 $673,428
1995.46 1 1 1 1 1 1
price/sf $530 $540 $560 $570 $590 $600
total price $1,057,594 $1,077,548 $1,117,458 $1,137,412 $1,177,321 $1,197,276
2250.77 1 1
584.61
price/sf $650 $650
total price $1,463,001 $1,463,001
1419.71 1 1 1
274.71
price/sf $720 $720 $720
total price $1,114,740 $1,114,740 $1,114,740
1699.05 1 1 1
263.3
price/sf $800 $800 $800
total price $1,359,240 $1,359,240 $1,359,240
2727.93 1 1
432.06
price/sf $1,100 $1,100
total price $3,000,723 $3,000,723
2548.91 1
240.19
price/sf $1,400
total price $3,568,474
total units $4,094,979 $4,167,500 $4,264,233 $4,341,012 $4,861,229 $4,918,827 $5,474,703 $5,474,703 $6,042,454
$66,122,515
Table 12 Condminuim Units Gross Income
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
46
Total revenue = $4,098,424 + $66,122,515 =$70,220,938.55
Uses and resources:-
Total construction capitalization =$56,515,138.30
Vacancy 5%= $3,541,827.035
Total revenue = $66,122,515
Repayment of Construction loan 70% LTC = $39,560,596.81
Repayment Investors 30%LTC= $16,954,541.49
Distribute to investors 70%= $7,136,327.324
Distribute to developer 30% = $3,058,425.996
Investment analysis:-
Initial investment amount =$16,954,541.49
Total return amount = $10,194,753.32
Cash on cash return = 60%
IRR= 18%
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
47
COST PERFORMA WITH SCHEDULE:-
Site Analysis
Market Analysis
Concept DWG
Budget And Performa
Construction Analysis
Environmental Analysis
Land Acquisition
Zoning
Financing
Bank Finance
Investors Presentation
Close On Land Loan
Close On Construction Loan
A+E
Design Development
Drawings
Bid Documents
Issue For Permits Docs
Permitting
Issue For Const Docs
Construction
Construction Bidding
Construction
FF+E
Condo Management
MGT Bidding
Pre Opening
Closing
17
Ma
11
No
Conceptual Design/ Month
1
Jan
4
Ap
5
Ma
6
Jun
7
Jul
8
Au
9
Se
10
Oc
3
Ma
2
Fa
12
De
13
Jan
14
Fa
15
Ma
16
Ap
19
Jul
20
Au
21
Se
22
Oc
18
Jun
28
Ap
29
ma
30
Jun
23
No
24
De
25
Jan
26
Fa
27
Ma
36
De
31
Jul
32
Au
33
Se
34
Oc
35
No
Table 13 Construction Schedule
CONSTRUCTION CASH FLOW SCHDULE:-
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
48
Totals Pre- con Pre- con Pre- con Pre- con Pre- con Pre- con Pre- con Pre- con CONSTRUCTION
Month
Month
Project Budget
Hard Construction Cost
hard cost construction 26,927,874.14 961,709.79
land Cost
Div. 18- land cost 15,999,085.64 15,199,131 799,954
Site cleaning and demolition 403,971.75 403,971.75
Soft Construction Cost
Div. 19- Architect And Engineer
Architect 1,457,889.97 36,447.25 36,447.25 36,447.25 36,447.25 36,447.25 36,447.25 36,447.25 36,447.25 41,654.00
Structure Engineer 728,944.99 30,372.71 30,372.71 30,372.71 30,372.71 30,372.71 30,372.71 30,372.71
MEP Engineer 310,609.56 13,504.76 13,504.76 13,504.76 13,504.76 13,504.76 13,504.76
Civil Engineer 104,135.00 4,527.61 4,527.61 4,527.61 4,527.61 4,527.61 4,527.61
Consults 193,906.55 8,430.72 8,430.72 8,430.72 8,430.72 8,430.72 8,430.72
Div. 20 – Legal And Accounting 714,581.54 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49
Div.21 – Financing 389,608.53 13,914.59
Div. 22 - Title Insurance 193,906.55 96,953.27
Div. 23 - Insurance
General Liability 301,632.41 10,772.59
Workers Comp. 170,565.95 6,091.64
Builders Risk 44,885.78 1,603.06
Div.24 Municipal Fees
Permits 283,678.10 283,678.10
Zoning Fees 19,749.74 9,874.87 9,874.87
Other Taxes, Transfers + Fees 502,720.68 251,360.34 251,360.34
Re Taxes 114,907.58 57,453.79
Div. 25- Marketing
Marketing Research Report 14,363.45 7,181.72
Div. 26- Survey And Testing
Plat of survey 1,795.43 897.72 897.72
Concrete Testing 23,340.60 3890.1005
Footing Testing 57,453.79 14363.448
Environmental Testing 5,386.29 5,386.29
Construction Layout 7,181.72 7181.724
Div. 27 Utilities 44,885.78
Div.28 A – Developer Fees 6% Of Hard
Cost
1,615,672.00
Div.28 B – Developer Overhead 9% 2,624,920.12 93,747.15
Div. 31- Construction Interest 1,576,388.42 56,299.59
Div. 32 A- Hard Cost Contingency 5% 1,346,393.00 48,085.46
Div.32 B – Soft Cost Contingency 2.5% 334,703.25 11,953.69
56,515,138.30
uses 15,255,428.10 350,597.80 67,069.32 123,905.12 113,132.54 113,132.54 113,132.54 1,317,058.57 2,037,397.62
total uses 15,255,428.10 15,606,025.90 15,673,095.22 15,797,000.34 15,910,132.88 16,023,265.41 16,136,397.95 17,453,456.52 19,490,854.14
1 Jan. 2 Fab. 3 Mar. 4 Apr. 5 May. 6 Jun. 7 Jul. 8 Aug. 9 Sep.
Table 14construction Cash Flow
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
49
Totals CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION
Month
Month
Hard Construction Cost
hard cost construction 26,927,874.14 961,709.79 961,709.79 961,709.79 961,709.79 961,709.79 961,709.79 961,709.79 961,709.79
land Cost
Div. 18- land cost 15,999,085.64
Site cleaning and demolition 403,971.75
Soft Construction Cost
Div. 19- Architect And Engineer
Architect 1,457,889.97 41,654.00 41,654.00 41,654.00 41,654.00 41,654.00 41,654.00 41,654.00 41,654.00
Structure Engineer 728,944.99 30,372.71 30,372.71 30,372.71 30,372.71 30,372.71 30,372.71 30,372.71 30,372.71
MEP Engineer 310,609.56 13,504.76 13,504.76 13,504.76 13,504.76 13,504.76 13,504.76 13,504.76 13,504.76
Civil Engineer 104,135.00 4,527.61 4,527.61 4,527.61 4,527.61 4,527.61 4,527.61 4,527.61 4,527.61
Consults 193,906.55 8,430.72 8,430.72 8,430.72 8,430.72 8,430.72 8,430.72 8,430.72 8,430.72
Div. 20 – Legal And Accounting 714,581.54 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49
Div.21 – Financing 389,608.53 13,914.59 13,914.59 13,914.59 13,914.59 13,914.59 13,914.59 13,914.59 13,914.59
Div. 22 - Title Insurance 193,906.55
Div. 23 - Insurance 0.00
General Liability 301,632.41 10,772.59 10,772.59 10,772.59 10,772.59 10,772.59 10,772.59 10,772.59 10,772.59
Workers Comp. 170,565.95 6,091.64 6,091.64 6,091.64 6,091.64 6,091.64 6,091.64 6,091.64 6,091.64
Builders Risk 44,885.78 1,603.06 1,603.06 1,603.06 1,603.06 1,603.06 1,603.06 1,603.06 1,603.06
Div.24 Municipal Fees 0.00
Permits 283,678.10
Zoning Fees 19,749.74
Other Taxes, Transfers + Fees 502,720.68
Re Taxes 114,907.58
Div. 25- Marketing
Marketing Research Report 14,363.45 7,181.72
Div. 26- Survey And Testing
Plat of survey 1,795.43
Concrete Testing 23,340.60 3890.1005 3890.1005 3890.1005 3890.1005 3890.1005
Footing Testing 57,453.79 14363.448 14363.448 14363.448
Environmental Testing 5,386.29
Construction Layout 7,181.72
Div. 27 Utilities 44,885.78
Div.28 A – Developer Fees 6% Of
Hard Cost
1,615,672.00
Div.28 B – Developer Overhead 9% 2,624,920.12 632,793.24
Div. 31- Construction Interest 1,576,388.42 56,299.59 56,299.59 56,299.59 56,299.59 56,299.59 56,299.59 56,299.59 56,299.59
Div. 32 A- Hard Cost Contingency
5%
1,346,393.00 48,085.46 48,085.46 48,085.46 48,085.46 48,085.46 48,085.46 48,085.46 48,085.46
Div.32 B – Soft Cost Contingency
2.5%
334,703.25 11,953.69 11,953.69 11,953.69 11,953.69 11,953.69 11,953.69 11,953.69 11,953.69
1,254,204.97 1,247,023.24 1,247,023.24 1,232,659.80 1,232,659.80 1,861,562.94 1,228,769.70 1,228,769.70
20,745,059.10 21,992,082.35 23,239,105.59 24,471,765.39 25,704,425.18 27,565,988.12 28,794,757.82 30,023,527.51
17 May.10 Oct. 11 Nov. 12 Dec. 13 Jan. 14 Fab. 15 Mar. 16 Apr.
Table 15- Construction Cash Flow
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
50
Totals CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION
Month
Month
hard cost construction 26,927,874.14 961,709.79 961,709.79 961,709.79 961,709.79 961,709.79 961,709.79 961,709.79 961,709.79 961,709.79
land Cost 0.00
Div. 18- land cost 15,999,085.64
Site cleaning and demolition 403,971.75
Soft Construction Cost 0.00
Div. 19- Architect And Engineer 0.00
Architect 1,457,889.97 41,654.00 41,654.00 41,654.00 41,654.00 41,654.00 41,654.00 41,654.00 41,654.00 41,654.00
Structure Engineer 728,944.99 30,372.71 30,372.71 30,372.71 30,372.71 30,372.71 30,372.71 30,372.71 30,372.71 30,372.71
MEP Engineer 310,609.56 13,504.76 13,504.76 13,504.76 13,504.76 13,504.76 13,504.76 13,504.76 13,504.76 13,504.76
Civil Engineer 104,135.00 4,527.61 4,527.61 4,527.61 4,527.61 4,527.61 4,527.61 4,527.61 4,527.61 4,527.61
Consults 193,906.55 8,430.72 8,430.72 8,430.72 8,430.72 8,430.72 8,430.72 8,430.72 8,430.72 8,430.72
Div. 20 – Legal And Accounting 714,581.54 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49
Div.21 – Financing 389,608.53 13,914.59 13,914.59 13,914.59 13,914.59 13,914.59 13,914.59 13,914.59 13,914.59 13,914.59
Div. 22 - Title Insurance 193,906.55
Div. 23 - Insurance 0.00
General Liability 301,632.41 10,772.59 10,772.59 10,772.59 10,772.59 10,772.59 10,772.59 10,772.59 10,772.59 10,772.59
Workers Comp. 170,565.95 6,091.64 6,091.64 6,091.64 6,091.64 6,091.64 6,091.64 6,091.64 6,091.64 6,091.64
Builders Risk 44,885.78 1,603.06 1,603.06 1,603.06 1,603.06 1,603.06 1,603.06 1,603.06 1,603.06 1,603.06
Div.24 Municipal Fees 0.00
Permits 283,678.10
Zoning Fees 19,749.74
Other Taxes, Transfers + Fees 502,720.68
Re Taxes 114,907.58
Div. 25- Marketing 0.00
Marketing Research Report 14,363.45
Div. 26- Survey And Testing 0.00
Plat of survey 1,795.43
Concrete Testing 23,340.60
Footing Testing 57,453.79
Environmental Testing 5,386.29
Construction Layout 7,181.72
Div. 27 Utilities 44,885.78
Div.28 A – Developer Fees 6% Of
Hard Cost
1,615,672.00
Div.28 B – Developer Overhead 9% 2,624,920.12 632,793.24
Div. 31- Construction Interest 1,576,388.42 56,299.59 56,299.59 56,299.59 56,299.59 56,299.59 56,299.59 56,299.59 56,299.59 56,299.59
Div. 32 A- Hard Cost Contingency
5%
1,346,393.00 48,085.46 48,085.46 48,085.46 48,085.46 48,085.46 48,085.46 48,085.46 48,085.46 48,085.46
Div.32 B – Soft Cost Contingency
2.5%
334,703.25 11,953.69 11,953.69 11,953.69 11,953.69 11,953.69 11,953.69 11,953.69 11,953.69 11,953.69
1,228,769.70 1,228,769.70 1,228,769.70 1,861,562.94 1,228,769.70 1,228,769.70 1,228,769.70 1,228,769.70 1,228,769.70
31,252,297.21 32,481,066.90 33,709,836.60 35,571,399.54 36,800,169.23 38,028,938.93 39,257,708.62 40,486,478.32 41,715,248.01
19 Jul. 20 Aug. 21 Sep. 22 Oct. 23 Nov. 24 Dec. 25 Jan. 26 Fab.18 Jun.
Table 16-Construction Cash Flow
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
51
Totals CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION
Month
Month
hard cost construction 961,709.79 961,709.79 961,709.79 961,709.79 961,709.79 961,709.79 961,709.79 961,709.79 961,709.79 961,709.79 961,709.79
land Cost 0.00
Div. 18- land cost 0.00
Site cleaning and demolition 0.00
Soft Construction Cost 0.00
Div. 19- Architect And Engineer 0.00
Architect 41,654.00 41,654.00 41,654.00 41,654.00 41,654.00 41,654.00 41,654.00 41,654.00 41,654.00 41,654.00 41,654.00
Structure Engineer 30,372.71
MEP Engineer 13,504.76
Civil Engineer 4,527.61
Consults 8,430.72
Div. 20 – Legal And Accounting 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49
Div.21 – Financing 13,914.59 13,914.59 13,914.59 13,914.59 13,914.59 13,914.59 13,914.59 13,914.59 13,914.59 13,914.59 13,914.59
Div. 22 - Title Insurance 0.00 96,953.27
Div. 23 - Insurance 0.00
General Liability 10,772.59 10,772.59 10,772.59 10,772.59 10,772.59 10,772.59 10,772.59 10,772.59 10,772.59 10,772.59 10,772.59
Workers Comp. 6,091.64 6,091.64 6,091.64 6,091.64 6,091.64 6,091.64 6,091.64 6,091.64 6,091.64 6,091.64 6,091.64
Builders Risk 1,603.06 1,603.06 1,603.06 1,603.06 1,603.06 1,603.06 1,603.06 1,603.06 1,603.06 1,603.06 1,603.06
Div.24 Municipal Fees 0.00
Permits 0.00
Zoning Fees 0.00
Other Taxes, Transfers + Fees 0.00
Re Taxes 0.00 57,453.79
Div. 25- Marketing 0.00
Marketing Research Report 0.00
Div. 26- Survey And Testing 0.00
Plat of survey 0.00
Concrete Testing 0.00
Footing Testing 0.00
Environmental Testing 0.00
Construction Layout 0.00
Div. 27 Utilities 0.00 44,885.78
Div.28 A – Developer Fees 6% Of
Hard Cost
0.00 1,615,672.00
Div.28 B – Developer Overhead 9% 0.00 632,793.24 632,793.24
Div. 31- Construction Interest 56,299.59 56,299.59 56,299.59 56,299.59 56,299.59 56,299.59 56,299.59 56,299.59 56,299.59 56,299.59 56,299.59
Div. 32 A- Hard Cost Contingency
5%
48,085.46 48,085.46 48,085.46 48,085.46 48,085.46 48,085.46 48,085.46 48,085.46 48,085.46 48,085.46 48,085.46
Div.32 B – Soft Cost Contingency
2.5%
11,953.69 11,953.69 11,953.69 11,953.69 11,953.69 11,953.69 11,953.69 11,953.69 11,953.69 11,953.69 11,953.69
1,171,933.90 1,171,933.90 1,171,933.90 1,171,933.90 1,862,180.93 1,171,933.90 1,171,933.90 1,171,933.90 1,171,933.90 3,562,238.19
42,887,181.91 44,059,115.80 45,231,049.70 46,402,983.59 48,265,164.52 49,437,098.42 50,609,032.32 51,780,966.21 52,952,900.11 56,515,138.30
36 Dec.30 Jun. 31 Jul. 32 Aug. 33 Sep. 34 Oct. 35 Nov..27 Mar. 28 Apr. 29 may.
Table 17-Construction Cash Flow
Comprehensive Opportunity Assessment And Entrepreneurship
Development Condominiums
2013
52
PROJECT SUMMARY:-
The high-rise building is a best in class luxury residence offering spectacular views. These downtown
condominiums have it all an ideal location steps away from the lakefront, exceptional quality craftsmanship
and excellent building amenities.
The high rise building will be constructed on the intersection of Wabash Ave and Ontario Ave in downtown
Chicago. The lot is 9,204 SF. The building has 3 retail spaces and 7 offices space.
The proposed building is a 23 story building offering 89 units and 71 indoor parking spaces, the units vary
from studio units, one bedroom, two bedrooms and penthouse units, which can be customized to meet each
client’s needs.
The total project duration will be 36 months; it will offer unit prices ranging from $450 to $850 per
square foot. The total cost of the project is $56,515,138.30; consist of 47.65% of hard cost, 23.33% soft cost
and 29.02% land cost. In this development package we are requesting a construction loan of $39,937,637.32
and an equity source of$17,116,130.28. Considering project sales revenue of $70,220,938.55, the project will
have $10,194,753.32 of return.

More Related Content

What's hot

What's hot (9)

Item #6 ppt 301 ogden
Item #6   ppt 301 ogdenItem #6   ppt 301 ogden
Item #6 ppt 301 ogden
 
Item 7.1 art center study session
Item 7.1   art center study sessionItem 7.1   art center study session
Item 7.1 art center study session
 
Lpas rcs-3600-san-pablo
Lpas rcs-3600-san-pabloLpas rcs-3600-san-pablo
Lpas rcs-3600-san-pablo
 
Biomed realty-emeryville-center-innovation
Biomed realty-emeryville-center-innovationBiomed realty-emeryville-center-innovation
Biomed realty-emeryville-center-innovation
 
BE Cost Plan
BE Cost Plan BE Cost Plan
BE Cost Plan
 
Bryant Residence
Bryant ResidenceBryant Residence
Bryant Residence
 
Ignazio deiana portfolio 2016
Ignazio deiana portfolio 2016Ignazio deiana portfolio 2016
Ignazio deiana portfolio 2016
 
KDDWG2016
KDDWG2016KDDWG2016
KDDWG2016
 
Lowe's Carmel, IN
Lowe's   Carmel, INLowe's   Carmel, IN
Lowe's Carmel, IN
 

Viewers also liked

22 Quotes About Leadership
22 Quotes About Leadership22 Quotes About Leadership
22 Quotes About LeadershipShane Kluiter
 
Resume - Vivek V. Rajput
Resume - Vivek V. RajputResume - Vivek V. Rajput
Resume - Vivek V. RajputVivek Rajput
 
Pretzelmaker Franchise Opportunity Available in Columbia, South Carolina!
Pretzelmaker Franchise Opportunity Available in Columbia, South Carolina!Pretzelmaker Franchise Opportunity Available in Columbia, South Carolina!
Pretzelmaker Franchise Opportunity Available in Columbia, South Carolina!Pretzelmaker
 
Sky Eye Trading System Edge Abyss
Sky Eye Trading System Edge AbyssSky Eye Trading System Edge Abyss
Sky Eye Trading System Edge AbyssMohammed Al-Ghenaim
 
The Role of Domestic Resource Mobilization for Sustainable Financing of Devel...
The Role of Domestic Resource Mobilization for Sustainable Financing of Devel...The Role of Domestic Resource Mobilization for Sustainable Financing of Devel...
The Role of Domestic Resource Mobilization for Sustainable Financing of Devel...Yuwana Zemoh-Adeyemi
 
合同ゼミ2015 最終スライド
合同ゼミ2015 最終スライド合同ゼミ2015 最終スライド
合同ゼミ2015 最終スライド晃太朗 春谷
 
Grown Downtown,VHG interieurbeplanters ledenvergadering, Grown Downtown, pres...
Grown Downtown,VHG interieurbeplanters ledenvergadering, Grown Downtown, pres...Grown Downtown,VHG interieurbeplanters ledenvergadering, Grown Downtown, pres...
Grown Downtown,VHG interieurbeplanters ledenvergadering, Grown Downtown, pres...Redactie Intogreen
 
Financing for Development
Financing for DevelopmentFinancing for Development
Financing for Developmentcloverrenchen
 
Top 10 Game yang Sequelnya Tenggelam
Top 10 Game yang Sequelnya TenggelamTop 10 Game yang Sequelnya Tenggelam
Top 10 Game yang Sequelnya TenggelamCaroline Winata
 
Pretzelmaker Franchise Opportunity Available in Grand Rapids, Michigan!
Pretzelmaker Franchise Opportunity Available in Grand Rapids, Michigan!Pretzelmaker Franchise Opportunity Available in Grand Rapids, Michigan!
Pretzelmaker Franchise Opportunity Available in Grand Rapids, Michigan!Pretzelmaker
 
New Microsoft Word Document (2)
New Microsoft Word Document (2)New Microsoft Word Document (2)
New Microsoft Word Document (2)Muhammad Saleem
 
FCI Currency Brochure
FCI Currency BrochureFCI Currency Brochure
FCI Currency BrochureDavid Murray
 

Viewers also liked (14)

22 Quotes About Leadership
22 Quotes About Leadership22 Quotes About Leadership
22 Quotes About Leadership
 
Reported speech
Reported speechReported speech
Reported speech
 
Resume - Vivek V. Rajput
Resume - Vivek V. RajputResume - Vivek V. Rajput
Resume - Vivek V. Rajput
 
Pretzelmaker Franchise Opportunity Available in Columbia, South Carolina!
Pretzelmaker Franchise Opportunity Available in Columbia, South Carolina!Pretzelmaker Franchise Opportunity Available in Columbia, South Carolina!
Pretzelmaker Franchise Opportunity Available in Columbia, South Carolina!
 
Sky Eye Trading System Edge Abyss
Sky Eye Trading System Edge AbyssSky Eye Trading System Edge Abyss
Sky Eye Trading System Edge Abyss
 
The Role of Domestic Resource Mobilization for Sustainable Financing of Devel...
The Role of Domestic Resource Mobilization for Sustainable Financing of Devel...The Role of Domestic Resource Mobilization for Sustainable Financing of Devel...
The Role of Domestic Resource Mobilization for Sustainable Financing of Devel...
 
合同ゼミ2015 最終スライド
合同ゼミ2015 最終スライド合同ゼミ2015 最終スライド
合同ゼミ2015 最終スライド
 
Grown Downtown,VHG interieurbeplanters ledenvergadering, Grown Downtown, pres...
Grown Downtown,VHG interieurbeplanters ledenvergadering, Grown Downtown, pres...Grown Downtown,VHG interieurbeplanters ledenvergadering, Grown Downtown, pres...
Grown Downtown,VHG interieurbeplanters ledenvergadering, Grown Downtown, pres...
 
Brochure 2016
Brochure 2016Brochure 2016
Brochure 2016
 
Financing for Development
Financing for DevelopmentFinancing for Development
Financing for Development
 
Top 10 Game yang Sequelnya Tenggelam
Top 10 Game yang Sequelnya TenggelamTop 10 Game yang Sequelnya Tenggelam
Top 10 Game yang Sequelnya Tenggelam
 
Pretzelmaker Franchise Opportunity Available in Grand Rapids, Michigan!
Pretzelmaker Franchise Opportunity Available in Grand Rapids, Michigan!Pretzelmaker Franchise Opportunity Available in Grand Rapids, Michigan!
Pretzelmaker Franchise Opportunity Available in Grand Rapids, Michigan!
 
New Microsoft Word Document (2)
New Microsoft Word Document (2)New Microsoft Word Document (2)
New Microsoft Word Document (2)
 
FCI Currency Brochure
FCI Currency BrochureFCI Currency Brochure
FCI Currency Brochure
 

Similar to f7

introduction to commercial real estate development
introduction to commercial real estate developmentintroduction to commercial real estate development
introduction to commercial real estate developmentPMILebanonChapter
 
Item # 6 - 820 Cambridge Oval
Item # 6 - 820 Cambridge OvalItem # 6 - 820 Cambridge Oval
Item # 6 - 820 Cambridge Ovalahcitycouncil
 
Building economics final assignment report
Building economics final assignment reportBuilding economics final assignment report
Building economics final assignment reportlucaschinsheng
 
Assignment Project Management.pdf
Assignment Project Management.pdfAssignment Project Management.pdf
Assignment Project Management.pdfWhitney Anderson
 
Glovapp Presentation140709
Glovapp Presentation140709Glovapp Presentation140709
Glovapp Presentation140709ehiosa
 
Building economic
Building economicBuilding economic
Building economictfkc1212
 
The Etobicoke Report_Spring 2016
The Etobicoke Report_Spring 2016The Etobicoke Report_Spring 2016
The Etobicoke Report_Spring 2016John LaFontaine
 
PLANNING ANALYSIS OF A COMMERCIAL BUILDING 4th review.pptx
PLANNING ANALYSIS OF A COMMERCIAL BUILDING  4th review.pptxPLANNING ANALYSIS OF A COMMERCIAL BUILDING  4th review.pptx
PLANNING ANALYSIS OF A COMMERCIAL BUILDING 4th review.pptxBaharAnjum
 
final report draft.pdf
final report draft.pdffinal report draft.pdf
final report draft.pdfEyuel24
 
Development Economics (Group Assignment) - Financial appraisal
Development Economics (Group Assignment) - Financial appraisalDevelopment Economics (Group Assignment) - Financial appraisal
Development Economics (Group Assignment) - Financial appraisalYee Len Wan
 
Bockwerr-Workspaces-Brochure-Guidelines-20225.pdf
Bockwerr-Workspaces-Brochure-Guidelines-20225.pdfBockwerr-Workspaces-Brochure-Guidelines-20225.pdf
Bockwerr-Workspaces-Brochure-Guidelines-20225.pdfkgn50118
 
NJ Future Forum 2012 Dealing With Reality Antonicello
NJ Future Forum 2012 Dealing With Reality AntonicelloNJ Future Forum 2012 Dealing With Reality Antonicello
NJ Future Forum 2012 Dealing With Reality AntonicelloNew Jersey Future
 
Item # 4 - 337 Ogden
Item # 4  - 337 OgdenItem # 4  - 337 Ogden
Item # 4 - 337 Ogdenahcitycouncil
 
Seemant Gupta- Architecture & Interior design
Seemant Gupta- Architecture & Interior designSeemant Gupta- Architecture & Interior design
Seemant Gupta- Architecture & Interior designUpendra Rana
 

Similar to f7 (20)

TowerAlDhafra - book3_24Sep2007
TowerAlDhafra - book3_24Sep2007TowerAlDhafra - book3_24Sep2007
TowerAlDhafra - book3_24Sep2007
 
introduction to commercial real estate development
introduction to commercial real estate developmentintroduction to commercial real estate development
introduction to commercial real estate development
 
Item # 6 - 820 Cambridge Oval
Item # 6 - 820 Cambridge OvalItem # 6 - 820 Cambridge Oval
Item # 6 - 820 Cambridge Oval
 
Building economics final assignment report
Building economics final assignment reportBuilding economics final assignment report
Building economics final assignment report
 
Dq1 assignment karl
Dq1 assignment  karlDq1 assignment  karl
Dq1 assignment karl
 
Assignment Project Management.pdf
Assignment Project Management.pdfAssignment Project Management.pdf
Assignment Project Management.pdf
 
Glovapp Presentation140709
Glovapp Presentation140709Glovapp Presentation140709
Glovapp Presentation140709
 
Eco city
Eco cityEco city
Eco city
 
Nagalakshmi sr. architect portfolio
Nagalakshmi sr. architect portfolioNagalakshmi sr. architect portfolio
Nagalakshmi sr. architect portfolio
 
Building economic
Building economicBuilding economic
Building economic
 
The Etobicoke Report_Spring 2016
The Etobicoke Report_Spring 2016The Etobicoke Report_Spring 2016
The Etobicoke Report_Spring 2016
 
PLANNING ANALYSIS OF A COMMERCIAL BUILDING 4th review.pptx
PLANNING ANALYSIS OF A COMMERCIAL BUILDING  4th review.pptxPLANNING ANALYSIS OF A COMMERCIAL BUILDING  4th review.pptx
PLANNING ANALYSIS OF A COMMERCIAL BUILDING 4th review.pptx
 
final report draft.pdf
final report draft.pdffinal report draft.pdf
final report draft.pdf
 
Development Economics (Group Assignment) - Financial appraisal
Development Economics (Group Assignment) - Financial appraisalDevelopment Economics (Group Assignment) - Financial appraisal
Development Economics (Group Assignment) - Financial appraisal
 
Bockwerr-Workspaces-Brochure-Guidelines-20225.pdf
Bockwerr-Workspaces-Brochure-Guidelines-20225.pdfBockwerr-Workspaces-Brochure-Guidelines-20225.pdf
Bockwerr-Workspaces-Brochure-Guidelines-20225.pdf
 
NJ Future Forum 2012 Dealing With Reality Antonicello
NJ Future Forum 2012 Dealing With Reality AntonicelloNJ Future Forum 2012 Dealing With Reality Antonicello
NJ Future Forum 2012 Dealing With Reality Antonicello
 
1 Essam CV
1 Essam CV1 Essam CV
1 Essam CV
 
Item # 4 - 337 Ogden
Item # 4  - 337 OgdenItem # 4  - 337 Ogden
Item # 4 - 337 Ogden
 
Seemant Gupta- Architecture & Interior design
Seemant Gupta- Architecture & Interior designSeemant Gupta- Architecture & Interior design
Seemant Gupta- Architecture & Interior design
 
NAIOP 2014 REC_UBC
NAIOP 2014 REC_UBCNAIOP 2014 REC_UBC
NAIOP 2014 REC_UBC
 

f7

  • 1. By Tamara Shaqoura Darwish Master of Integrated Building Delivery Professor Tom Brock Comprehensive Opportunity Assessment and Entrepreneurship Development Project Arch. 564 Illinois Institute of Technology Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums High Rise Development Building 11/6/2013
  • 2. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 1 Abstract This is a comprehensive study of developing an integrated complex high-rise building that has its own challenges. The site falls in the heart of downtown Chicago, where the parcel surrounding buildings have different heights, elevations and functions, also the parcel location, and size ruled the building design, orientation and shape. Thinking as an architect, contractor and developer in the same time was my biggest challenge, which required going through the building construction and finance process. By developing market analysis and site studies, I came out with a profitable project which meets the clients requirements and needs in this particular market; still the building has a curb appeal, where we can compete with the competition in the area.
  • 3. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 2
  • 4. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 3
  • 5. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 4 Content:- Pages EXECUTIVE SUMMARY Project cost summery 8 Summery 9 PROJECT PROGRAM 10 Zoning 10-12 Zoning and Area Analysis 13 Condominiums Proposal 14 PROJECT PROPOSAL DRAWINGS 15 Perspective 16 Section 17 Plans 18-29 Furnished Plans Proposal 30-32 Elevations 33-34 Perspective 35 MARKET COMPARABLE ANALYSIS 36 Market study 36-39 Competitions 40-42 CONDOMINIUMS BUILDING BUDGET 43 Project Budget 43-44
  • 6. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 5 CASH FLOW 45 Capitalization 45 Parking retail and offices income 45 Condominiums units’ income 46-47 Uses and resources 48 COST PERFORMA WITH SCHEDULE 49 CONSTRUCTION CASH FLOW SCHEDULE 50-53 PROJECT SUMMARY 54
  • 7. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 6 EXECUTIVE SUMMARY Project cost summery Hard costs: -$ 26,927,874.14 Soft cost: - $13,184,206.77 Land cost:-$16,403,057.39 Project cost: - $56,515,138.30 Project sales summery Condominiums sales;-$ 66,122,515 Offices, retails and parking sales:-$ 4,098,424 Total sales: - $70,220,938.55 5% vacancy=$3,511,046.928 Gross operating income: - NOI: -$ 66,709,891.62 Cash flow: -$ 10,194,753.32 Return on investment: - 18%
  • 8. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 7 Summary The new condominiums building will entail demolition of an existing abandoned two floor residential building to create 9,204 square feet site. An 89-residace 23- story condominium development with homes ranging from 800 square feet to 1800 square feet will be built on the site. The asset condominium building will be ideally located downtown Chicago the location has a great potentials of a high rise mixed used building with a small affordable units. The proposed project will have a high return on income, due to its strategic location and the high demand in the market for this type of projects. The property located on 615 n Wabash Ave., Chicago, IL, 60611, is well positioned downtown Chicago, within the same area residents will find many shops, such as Bloomingdales (an upscale chain of department stores), restaurants, night clubs, parks, theater, cinema, different amenities and live entertainment commuting Figure 1
  • 9. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 8 Project program: A 23 story loft condominiums building will constructed in one phase on the site, with excellent design and unique amenities The development will provide:-  Slender architectural tower  23 floors, 89 homes  Steel-reinforced concrete shear core for superior seismic stability  Floor plate modulated at perimeter to maximize city and lake view  Floor-to-ceiling window wall in each home  Double-glazed, glass curtain-wall system for exceptional weather protection  Applied acoustic technology to virtually eliminate home-to-home sound transfer  Heated indoor garage space with each residence.  Private balconies and terraces on different floors  Hardware floors in foyer, kitchen, living and dining room.  Plush carpet in bedrooms and dressing rooms.  Fire resistant structure protected with sprinkler system in every room  HVAC will be a central 4-pipe system to each condominium.  The building will have a LEED Silver environmental rating. Zoning: This site is in compliances with the city of Chicago zoning ordinance, zoned DX-12 (DX - Downtown Mixed-Use District) Downtown high-rises - offices or apartments with ground-floor stores. The suggested development project will fill with the master plan vision of the city. Since the lot is surrounded with 11 floors parking building from the east, and 13 floors hotel building on the north, creating a functional units will require going higher with the units, and by increasing the parking’s floors to meet the requirements for DX-20. We can achieve a successful development project.
  • 10. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 9 Figure 2 Zoning Map SITE
  • 11. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 10 Figure 3 Site Image Figure 4 across the Street Site Site
  • 12. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 11 Zoning And Area Analysis Address 615 N Wabash Ave., Chicago, IL, 60611 Zoning District DX-12 to be rezoned to DX-20 Lot Size(SF) 9,204 Acres 0.21 Permitted Use Mixed Used Building Permitted Allowable Far 12 Allowable FAR SF 110,448 Actual Far 179,543.1 + 3121.35 (balconies) more than allowable FAR (69,095.1) Condo Saleable 89 Retail Saleable 3 Front Set Back None Rear Setback None Side Setback None Building Height Max Allowable None, But Buildings Taller Than City's "Building Height Thresholds" Require Planned Development Review Actual Height 246 Feet Site Figure 5 Intersection
  • 13. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 12 Stories 23 Number Of Parking Spaces 71 (required is 55.5) 15.5 extra added for rezoning Construction Duration (Month) 24 Project Duration (Month) 32 Table 1 Condo Proposal Total Floors Total Square/Feet Condos Per Floor Area 2007.18 SF Ea. 5th ,6th & 7th Floor 3 6021.54 6565.49 SF Ea. 9th - 12th Floor 4 26261.96 7398.22 SF Ea. 13th And 14th Floor 2 14796.44 7677.89 SF Ea. 15 - 18th Floor 4 30711.56 8010.48 SF Ea. 19th And 20th Floor 2 16020.96 5850.63 SF Ea. 21ST And 22th, Floor 1 11701.26 5671.61 SF 23Rd Floor 2 5671.61 Totals Condos Floor Area 18 111185 58.5% Circulation Per Floor Area 1583 SF 1st Floor 1 1583 1238.89 SF Ea. 2nd And 3rd Floor 2 2477.78 1073.82 SF 4th Floor 1 1073.83 1032.75 SF Ea. 5th , 6th And 7th Floor 3 3098.25 1066.88 SF Ea. 8th Floor 1 1066.88 1772.59 SF Ea. 9th -12th Floor 4 7090.36
  • 14. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 13 1403.15 SF Ea. 13th -23rd Floor 11 15433 Totals Circulation Floor Area 23 36247 18% Retail Per Floor Area 410 SF Ea. 1st Floor 3 1230 Totals Retail Stores Floor Area 3 1230 .7% Office Space Area 1452.73 Sf 2nd And 3rd Floor 2 2945.36 Totals Offices Floor Area 2 2915.46 1.6% Amenities 1257.12 SF Fitness (4thfloor) 1 1257.12 751 SF Screening Room(4th Floor) 1 751 1971.65 SF Terrace (8th Floor) 1971.65 SF 1909 SF Terrace (21ST Floor) 1 1909 Totals Amenities Floor Area 3 3979.8 1% Average Condo Unit 1349.733 Number Condo Units Per Floor 2 5th , 6th And 7th Floor 7 9th - 12th Floor 6 13th - 18th Floor 5 19th - 20th Floor 3 21-23rd Floor Total Condo Units 89 Parking Lot Area Per Floor 4348 SF 1st Floor 1 4348 4557 SF Ea. 2nd -8th Floor 7 31899 Total Floor Of Parking 8 36247 20% Service Per Floor 182 SF 1st Floor 1 182 108 SF Ea. 2nd And 3rd Floor 2 216 Total Services Area 3 398 0.2% Table 2 condo units proposal
  • 15. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 14 PROJECT PROPOSAL DRAWINGS:- Condos Units Per Floors Average Size Square Feet Total Units With Balcony Without Balcony Units From 5th To 7th 1003.59 6 1 On The 7th Floor 5 Unit From 9th To 12th 938 28 16 12 Units From 13th To 18th 1233.04 36 20 16 Units From 19th To 20th 1602.12 10 8 2 Pent House 1950 9 9 0 Table 3
  • 16. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 15
  • 17. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 16 Section 1
  • 18. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 17 Drawing- Floor 1
  • 19. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 18 Drawing- Floor 2
  • 20. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 19 Drawing- Floor 3
  • 21. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 20 Drawing- Floor 4
  • 22. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 21 Drawing- Floor 5, 6, 7
  • 23. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 22 Drawing- Floor 8
  • 24. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 23 Drawing- Floor 9,10,11,12
  • 25. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 24 Drawing- Floor 13, 14
  • 26. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 25 Drawing- Floor 15, 16, 17
  • 27. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 26 Drawing- Floor 18
  • 28. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 27 Drawing- Floor 19, 20,21,22,23
  • 29. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 28 Drawing- Studio furnishing Proposal
  • 30. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 29 Drawing- Two Bedrooms Furnishing Proposal
  • 31. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 30 Drawing- penthouse Furnishing Proposal
  • 32. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 31 West Elevation
  • 33. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 32 East Elevation
  • 34. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 33
  • 35. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 34 MARKET COMPARABLE ANALYSIS Market study:- The building will be designed and marketed as luxury lofts appealing to the middle, upper class, and upper income segments of the young professional and empty nesters market. Extensive research indicates strong demand for the product, and to quickly absorb by the market. The proposed building will blend with the surrounding very easy (see figure 3). The building residence will range from 900-1600 square feet and range in price from mid $350,000 to mid-700,000. Figure 6 a) Market analysis : it suggests that market demand for proposed building is principally from buyers who come from the following groups: 1. Young professionals and couples seeking an urban lifestyle.
  • 36. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 35 Figure 7 2. Young professionals and couples with connection to downtown Chicago. Figure 8 3. Empty nesters within the age-range of 30 to 50 years. Figure 9
  • 37. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 36 4. Owners of middle-high income $140,000-$200,000. Figure 10
  • 38. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 37 5. Current or past residents of the same area, or people who grown children living downtown. Figure 11 This downtown location will attract buyers who value services within walking distance. All perspective buyers value and appreciate a maintenance free living environment. While the young professionals desire the urban experience, still demand moderately high level of luxury is desired as well. Amanitas, transpiration, services and retails are very important for the targeted population. Convenience of interaction with neighborhood is also highly demanded. Buyers are most likely relying on public transportation, which is very convenient for the location.
  • 39. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 38 b) Competitions:  Address: 55 E Erie St Chicago, IL 60611 Figure 12 Building Location units Sample SF PRICE unit 1 SF For sale 1,407 sq ft $690,000 unit 2 SF For sale 4,350 sq ft $4,374,000 unit 3 SF For sale 3,375 sq ft $2,495,000 unit 4 SF For sale 1,588 sq ft $675,000 unit 5 SF SOLD 2,300 sq ft $1,360,000 unit 6 SF SOLD 1,800 sq ft $878,000 unit 7 SF SOLD 2,028 sq ft $890,000 95% SOLD Table 4
  • 40. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 39  Address: 118 E Erie, Chicago, IL 60611, built 2012. Figure 13 units Sample SF PRICE unit 1 SF For sale 2,440 sq ft $1,000,369 unit 2 SF For sale 1,937 sq ft $2,235,559 unit 3 SF For sale 1,423 sq ft $1,000,369 unit 4 SF For sale 2,440 sq ft $2,901,929 unit 5 SF pending 2,440 sq ft $2,874,386 80% SOLD Table 5
  • 41. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 40  Address : 535 N Michigan Ave Chicago, IL 60611,built 19652 Figure 14 units Sample SF PRICE unit 1 SF For sale 940 sq ft $249,900 unit 2 SF For sale 800 sq ft $242,500 unit 3 SF For sale 840 sq ft $200,000 unit 4 SF SOLD 950 sq ft $248,500 unit 5 SF SOLD 1,000 sq ft $285,000 90% SOLD Table 6
  • 42. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 41 Condominiums Building BUDGET:- Hard Construction Cost Total Per condo unit Per SF % of cost Div. 1- General Conditions 599,673.95 6,737.91 3.34 2.23% Water+ Sewer 420,130.85 4,720.57 2.34 1.56% Excavations 658,923.18 7,403.63 3.67 2.45% Paving 120,293.88 1,351.62 0.67 0.45% Landscaping 233,406.03 2,622.54 1.3 0.87% Structure Concrete Foundations 2,335,855.73 26,245.57 13.01 8.67% Poured Concrete Structure 1,797,226.43 20,193.56 10.01 6.67% Div.4- Masonry CMU Bearing Walls 2335855.731 26,245.57 13.01 8.67% Masonry Veneer 1197552.477 13,455.65 6.67 4.45% Div.5- Steel Misc. Ornamentals Iron 420130.854 4,720.57 2.34 1.56% Div.6- Wood And Carpentry Misc. Carpentry 1197552.477 13,455.65 6.67 4.45% Cabinetry 430903.44 4,841.61 2.4 1.60% Millwork 172361.376 1,936.64 0.96 0.64% Div.7- Roofing And Moisture Control Roofing 779217.054 8,755.25 4.34 2.89% Caulking 120293.877 1,351.62 0.67 0.45% Water Proofing 287268.96 3,227.74 1.6 1.07% Div.8 – Doors And Windows Window System 2396900.385 26,931.47 13.35 8.90% Doors And Frames 143634.48 1,613.87 0.8 0.53% Store Front 179543.1 2,017.34 1 0.67% Finish Hardware 71817.24 806.94 0.4 0.27% Div.9- Finishes Drywall 1725409.191 19,386.62 9.61 6.41% Tile 1079054.031 12,124.20 6.01 4.01% Painting 718172.4 8,069.35 4 2.67% Carpeting 287268.96 3,227.74 1.6 1.07% Div. 10- Accessories Bath Accessories 143634.48 1,613.87 0.8 0.53% Div.11- Appliances 387813.096 4,357.45 2.16 1.44% Div.12- Furniture 0 0.00 0 0.00% Div. 13- Pool 0 0.00 0 0.00% Div.14- Elevator 2396900.385 26,931.47 13.35 8.90% Div.15- Mechanical System HVAC 1150871.271 12,931.14 6.41 4.27% Fire Protection 646355.16 7,262.42 3.6 2.40% Plumbing 1150871.271 12,931.14 6.41 4.27% Div.16- Electrical Electrical 1150871.271 12,931.14 6.41 4.27% Security 120293.877 1,351.62 0.67 0.45% telephone 71817.24 806.94 0.4 0.27% 26,927,874.14 302,560.38 149.98 100.00% Project Budget Div. 2- Site Work Div.3 -Concrete Table 7
  • 43. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 42 Div. 18- land cost 15,999,086 179,765.01 89.11 Site cleaning and demolition 403,971.75 4,539.01 2.25 Total Land Cost 16,403,057.39 184,304 Div. 19- Architect And Engineer Architect 1,457,889.97 16,380.79 8.12 11.06% Structure Engineer 728,944.99 8,190.39 4.06 5.53% MEP Engineer 310,609.56 3,490.00 1.73 2.36% Civil Engineer 104,135.00 1,170.06 0.58 0.79% Consults 193,906.55 2,178.73 1.08 1.47% Div. 20 – Legal And Accounting 714,582 8,029.01 3.98 5.42% Div.21 – Financing 389,609 4,377.62 2.17 2.96% Div. 22 - Title Insurance 193,907 2,178.73 1.08 1.47% Div. 23 - Insurance 0.00% General Liability 301,632.41 3,389.13 1.68 2.29% Workers Comp. 170,565.95 1,916.47 0.95 1.29% Builders Risk 44,885.78 504.33 0.25 0.34% Div.24 Municipal Fees 0.00% Permits 283,678.10 3,187.39 1.58 2.15% Zoning Fees 19,749.74 221.91 0.11 0.15% Other Taxes, Transfers + Fees 502,720.68 5,648.55 2.8 3.81% Re Taxes 114,907.58 1,291.10 0.64 0.87% Div. 25- Marketing 0.00% Marketing Research Report 14,363.45 161.39 0.08 0.11% Div. 26- Survey And Testing 0.00% Plat of survey 1,795.43 20.17 0.01 0.01% Concrete Testing 23,340.60 262.25 0.13 0.18% Footing Testing 57,453.79 645.55 0.32 0.44% Environmental Testing 5,386.29 60.52 0.03 536.70% Construction Layout 7,181.72 80.69 0.04 0.05% Div. 27 Utilities 44,886 504.33 0.25 0.34% Div.28 A – Developer Fees 6% Of Hard Cost 1,615,672 18,176.22 9.01 12.25% Div.28 B – Developer Overhead 9% 2,624,920 29,493.48 14.62 19.91% Div. 31- Construction Interest 1,576,388 17,712.23 8.78 11.96% Div. 32 A- Hard Cost Contingency 5% 1,346,393 17,712.23 8.78 10.21% Div.32 B – Soft Cost Contingency 2.5% 334,703 8,190.39 4.06 2.54% Total Soft Cost 13,184,206.77 155,173.65 76.92 100.00% Total hard cost 26,927,874.14 302,560.38 149.98 47.65% Total land cost 16,403,057.39 184,304.02 91.36 29.02% Total soft cost 13,184,206.77 155,173.65 76.92 23.33% Total project cost 56,515,138.30 642,038.06 318.26 100.00% Land Cost 91.36 Project cost Soft Cost Table 8 Project Total Cost
  • 44. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 43 Cash flow:- PROJECT REVENUE:- Space Total sf Average price per sf units Gross income Retail 400.63 350 3 420,662 Offic1 422 350 2 295,400 Office2 640.1 350 2 448,070 Office 3 Second Floor 400.63 350 1 140,221 Office 3 third Floor 305.66 350 1 106,981 Office 4 324.44 350 1 113,554 parking 36247 30,000 71 2573537 Office 4 Total Gross Income 4,098,424 Table 10 Retails, Offices &Parking Gross Income Capitalization Equity Construction loan $39,937,637.32 70% LTC investors $17,116,130.28 30%LTC Total construction capitalization $56,515,138.30 100% Table 9
  • 45. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 44 Floor 5th 6th 7th 9th thth 11th 12th 13th 14th units/price 1003.59 2 2 1 1 1 1 1 1 1 price/so $420 $420 $440 $450 $460 $470 $480 $490 $500 total price $843,016 $843,016 $441,580 $451,616 $461,651 $471,687 $481,723 $491,759 $501,795 1003.59 1 (89)sf price/sf $430 total price $431,544 914.59 1 1 1 1 1 1 price/sf $440 $450 $460 $470 $490 $500 total price $402,420 $411,566 $420,711 $429,857 $448,149 $457,295 842.41 1 1 1 1 price/sf $445 $445 $445 $470 total price $374,872 $374,872 $374,872 $395,933 910.02 1 1 1 1 85.29 price/sf $450 $460 $460 $470 total price $409,509 $418,609 $418,609 $427,709 812.79 1 1 1 1 65.57 price/sf $450 $460 $460 $470 total price $365,756 $373,883 $373,883 $382,011 997.09 1 1 1 1 35.99 price/sf $450 $460 $460 $470 total price $448,691 $458,661 $458,661 $468,632 1085 1 1 1 1 35.99 price/sf $450 $460 $460 $470 total price $488,250 $499,100 $499,100 $509,950 1548.25 1 1 129.67 price/sf $550 $550 total price $851,538 $851,538 1715.79 1 1 114.21 price/sf $550 $550 total price $943,685 $943,685 1093.62 1 1 36.65 price/sf $550 $550 total price $601,491 $601,491 1122.38 1 1 40.56 price/sf $520 $530 total price $583,638 $594,861 1995.46 price/sf total price 2250.77 584.61 price/sf total price 1419.71 274.71 price/sf total price 1699.05 263.3 price/sf total price 2727.93 432.06 price/sf total price 2548.91 240.19 price/sf total price total units $843,016 $843,016 $873,123 $2,941,113 $2,998,343 $3,017,525 $3,095,816 $3,920,259 $3,950,664 Table 11 Condminuim Units Gross Income
  • 46. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 45 Floor 15th 16th 17th 18th 19th 20th 21st 22ed 23rd units/price 1003.59 1 1 1 1 price/so $510 $520 $530 $540 total price $511,831 $521,867 $531,903 $541,939 1003.59 (89)sf price/sf total price 914.59 1 1 1 1 price/sf $510 $520 $530 $540 total price $466,441 $475,587 $484,733 $493,879 842.41 price/sf total price 910.02 85.29 price/sf total price 812.79 65.57 price/sf total price 997.09 35.99 price/sf total price 1085 35.99 price/sf total price 1548.25 1 1 1 1 1 1 129.67 price/sf $550 $550 $560 $570 $590 $600 total price $851,538 $851,538 $867,020 $882,503 $913,468 $928,950 1715.79 114.21 price/sf total price 1093.62 1 1 1 1 1 1 36.65 price/sf $550 $560 $570 $580 $590 $600 total price $601,491 $612,427 $623,363 $634,300 $645,236 $656,172 1122.38 1 1 1 1 1 1 40.56 price/sf $540 $560 $570 $580 $590 $600 total price $606,085 $628,533 $639,757 $650,980 $662,204 $673,428 1995.46 1 1 1 1 1 1 price/sf $530 $540 $560 $570 $590 $600 total price $1,057,594 $1,077,548 $1,117,458 $1,137,412 $1,177,321 $1,197,276 2250.77 1 1 584.61 price/sf $650 $650 total price $1,463,001 $1,463,001 1419.71 1 1 1 274.71 price/sf $720 $720 $720 total price $1,114,740 $1,114,740 $1,114,740 1699.05 1 1 1 263.3 price/sf $800 $800 $800 total price $1,359,240 $1,359,240 $1,359,240 2727.93 1 1 432.06 price/sf $1,100 $1,100 total price $3,000,723 $3,000,723 2548.91 1 240.19 price/sf $1,400 total price $3,568,474 total units $4,094,979 $4,167,500 $4,264,233 $4,341,012 $4,861,229 $4,918,827 $5,474,703 $5,474,703 $6,042,454 $66,122,515 Table 12 Condminuim Units Gross Income
  • 47. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 46 Total revenue = $4,098,424 + $66,122,515 =$70,220,938.55 Uses and resources:- Total construction capitalization =$56,515,138.30 Vacancy 5%= $3,541,827.035 Total revenue = $66,122,515 Repayment of Construction loan 70% LTC = $39,560,596.81 Repayment Investors 30%LTC= $16,954,541.49 Distribute to investors 70%= $7,136,327.324 Distribute to developer 30% = $3,058,425.996 Investment analysis:- Initial investment amount =$16,954,541.49 Total return amount = $10,194,753.32 Cash on cash return = 60% IRR= 18%
  • 48. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 47 COST PERFORMA WITH SCHEDULE:- Site Analysis Market Analysis Concept DWG Budget And Performa Construction Analysis Environmental Analysis Land Acquisition Zoning Financing Bank Finance Investors Presentation Close On Land Loan Close On Construction Loan A+E Design Development Drawings Bid Documents Issue For Permits Docs Permitting Issue For Const Docs Construction Construction Bidding Construction FF+E Condo Management MGT Bidding Pre Opening Closing 17 Ma 11 No Conceptual Design/ Month 1 Jan 4 Ap 5 Ma 6 Jun 7 Jul 8 Au 9 Se 10 Oc 3 Ma 2 Fa 12 De 13 Jan 14 Fa 15 Ma 16 Ap 19 Jul 20 Au 21 Se 22 Oc 18 Jun 28 Ap 29 ma 30 Jun 23 No 24 De 25 Jan 26 Fa 27 Ma 36 De 31 Jul 32 Au 33 Se 34 Oc 35 No Table 13 Construction Schedule CONSTRUCTION CASH FLOW SCHDULE:-
  • 49. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 48 Totals Pre- con Pre- con Pre- con Pre- con Pre- con Pre- con Pre- con Pre- con CONSTRUCTION Month Month Project Budget Hard Construction Cost hard cost construction 26,927,874.14 961,709.79 land Cost Div. 18- land cost 15,999,085.64 15,199,131 799,954 Site cleaning and demolition 403,971.75 403,971.75 Soft Construction Cost Div. 19- Architect And Engineer Architect 1,457,889.97 36,447.25 36,447.25 36,447.25 36,447.25 36,447.25 36,447.25 36,447.25 36,447.25 41,654.00 Structure Engineer 728,944.99 30,372.71 30,372.71 30,372.71 30,372.71 30,372.71 30,372.71 30,372.71 MEP Engineer 310,609.56 13,504.76 13,504.76 13,504.76 13,504.76 13,504.76 13,504.76 Civil Engineer 104,135.00 4,527.61 4,527.61 4,527.61 4,527.61 4,527.61 4,527.61 Consults 193,906.55 8,430.72 8,430.72 8,430.72 8,430.72 8,430.72 8,430.72 Div. 20 – Legal And Accounting 714,581.54 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 Div.21 – Financing 389,608.53 13,914.59 Div. 22 - Title Insurance 193,906.55 96,953.27 Div. 23 - Insurance General Liability 301,632.41 10,772.59 Workers Comp. 170,565.95 6,091.64 Builders Risk 44,885.78 1,603.06 Div.24 Municipal Fees Permits 283,678.10 283,678.10 Zoning Fees 19,749.74 9,874.87 9,874.87 Other Taxes, Transfers + Fees 502,720.68 251,360.34 251,360.34 Re Taxes 114,907.58 57,453.79 Div. 25- Marketing Marketing Research Report 14,363.45 7,181.72 Div. 26- Survey And Testing Plat of survey 1,795.43 897.72 897.72 Concrete Testing 23,340.60 3890.1005 Footing Testing 57,453.79 14363.448 Environmental Testing 5,386.29 5,386.29 Construction Layout 7,181.72 7181.724 Div. 27 Utilities 44,885.78 Div.28 A – Developer Fees 6% Of Hard Cost 1,615,672.00 Div.28 B – Developer Overhead 9% 2,624,920.12 93,747.15 Div. 31- Construction Interest 1,576,388.42 56,299.59 Div. 32 A- Hard Cost Contingency 5% 1,346,393.00 48,085.46 Div.32 B – Soft Cost Contingency 2.5% 334,703.25 11,953.69 56,515,138.30 uses 15,255,428.10 350,597.80 67,069.32 123,905.12 113,132.54 113,132.54 113,132.54 1,317,058.57 2,037,397.62 total uses 15,255,428.10 15,606,025.90 15,673,095.22 15,797,000.34 15,910,132.88 16,023,265.41 16,136,397.95 17,453,456.52 19,490,854.14 1 Jan. 2 Fab. 3 Mar. 4 Apr. 5 May. 6 Jun. 7 Jul. 8 Aug. 9 Sep. Table 14construction Cash Flow
  • 50. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 49 Totals CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION Month Month Hard Construction Cost hard cost construction 26,927,874.14 961,709.79 961,709.79 961,709.79 961,709.79 961,709.79 961,709.79 961,709.79 961,709.79 land Cost Div. 18- land cost 15,999,085.64 Site cleaning and demolition 403,971.75 Soft Construction Cost Div. 19- Architect And Engineer Architect 1,457,889.97 41,654.00 41,654.00 41,654.00 41,654.00 41,654.00 41,654.00 41,654.00 41,654.00 Structure Engineer 728,944.99 30,372.71 30,372.71 30,372.71 30,372.71 30,372.71 30,372.71 30,372.71 30,372.71 MEP Engineer 310,609.56 13,504.76 13,504.76 13,504.76 13,504.76 13,504.76 13,504.76 13,504.76 13,504.76 Civil Engineer 104,135.00 4,527.61 4,527.61 4,527.61 4,527.61 4,527.61 4,527.61 4,527.61 4,527.61 Consults 193,906.55 8,430.72 8,430.72 8,430.72 8,430.72 8,430.72 8,430.72 8,430.72 8,430.72 Div. 20 – Legal And Accounting 714,581.54 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 Div.21 – Financing 389,608.53 13,914.59 13,914.59 13,914.59 13,914.59 13,914.59 13,914.59 13,914.59 13,914.59 Div. 22 - Title Insurance 193,906.55 Div. 23 - Insurance 0.00 General Liability 301,632.41 10,772.59 10,772.59 10,772.59 10,772.59 10,772.59 10,772.59 10,772.59 10,772.59 Workers Comp. 170,565.95 6,091.64 6,091.64 6,091.64 6,091.64 6,091.64 6,091.64 6,091.64 6,091.64 Builders Risk 44,885.78 1,603.06 1,603.06 1,603.06 1,603.06 1,603.06 1,603.06 1,603.06 1,603.06 Div.24 Municipal Fees 0.00 Permits 283,678.10 Zoning Fees 19,749.74 Other Taxes, Transfers + Fees 502,720.68 Re Taxes 114,907.58 Div. 25- Marketing Marketing Research Report 14,363.45 7,181.72 Div. 26- Survey And Testing Plat of survey 1,795.43 Concrete Testing 23,340.60 3890.1005 3890.1005 3890.1005 3890.1005 3890.1005 Footing Testing 57,453.79 14363.448 14363.448 14363.448 Environmental Testing 5,386.29 Construction Layout 7,181.72 Div. 27 Utilities 44,885.78 Div.28 A – Developer Fees 6% Of Hard Cost 1,615,672.00 Div.28 B – Developer Overhead 9% 2,624,920.12 632,793.24 Div. 31- Construction Interest 1,576,388.42 56,299.59 56,299.59 56,299.59 56,299.59 56,299.59 56,299.59 56,299.59 56,299.59 Div. 32 A- Hard Cost Contingency 5% 1,346,393.00 48,085.46 48,085.46 48,085.46 48,085.46 48,085.46 48,085.46 48,085.46 48,085.46 Div.32 B – Soft Cost Contingency 2.5% 334,703.25 11,953.69 11,953.69 11,953.69 11,953.69 11,953.69 11,953.69 11,953.69 11,953.69 1,254,204.97 1,247,023.24 1,247,023.24 1,232,659.80 1,232,659.80 1,861,562.94 1,228,769.70 1,228,769.70 20,745,059.10 21,992,082.35 23,239,105.59 24,471,765.39 25,704,425.18 27,565,988.12 28,794,757.82 30,023,527.51 17 May.10 Oct. 11 Nov. 12 Dec. 13 Jan. 14 Fab. 15 Mar. 16 Apr. Table 15- Construction Cash Flow
  • 51. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 50 Totals CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION Month Month hard cost construction 26,927,874.14 961,709.79 961,709.79 961,709.79 961,709.79 961,709.79 961,709.79 961,709.79 961,709.79 961,709.79 land Cost 0.00 Div. 18- land cost 15,999,085.64 Site cleaning and demolition 403,971.75 Soft Construction Cost 0.00 Div. 19- Architect And Engineer 0.00 Architect 1,457,889.97 41,654.00 41,654.00 41,654.00 41,654.00 41,654.00 41,654.00 41,654.00 41,654.00 41,654.00 Structure Engineer 728,944.99 30,372.71 30,372.71 30,372.71 30,372.71 30,372.71 30,372.71 30,372.71 30,372.71 30,372.71 MEP Engineer 310,609.56 13,504.76 13,504.76 13,504.76 13,504.76 13,504.76 13,504.76 13,504.76 13,504.76 13,504.76 Civil Engineer 104,135.00 4,527.61 4,527.61 4,527.61 4,527.61 4,527.61 4,527.61 4,527.61 4,527.61 4,527.61 Consults 193,906.55 8,430.72 8,430.72 8,430.72 8,430.72 8,430.72 8,430.72 8,430.72 8,430.72 8,430.72 Div. 20 – Legal And Accounting 714,581.54 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 Div.21 – Financing 389,608.53 13,914.59 13,914.59 13,914.59 13,914.59 13,914.59 13,914.59 13,914.59 13,914.59 13,914.59 Div. 22 - Title Insurance 193,906.55 Div. 23 - Insurance 0.00 General Liability 301,632.41 10,772.59 10,772.59 10,772.59 10,772.59 10,772.59 10,772.59 10,772.59 10,772.59 10,772.59 Workers Comp. 170,565.95 6,091.64 6,091.64 6,091.64 6,091.64 6,091.64 6,091.64 6,091.64 6,091.64 6,091.64 Builders Risk 44,885.78 1,603.06 1,603.06 1,603.06 1,603.06 1,603.06 1,603.06 1,603.06 1,603.06 1,603.06 Div.24 Municipal Fees 0.00 Permits 283,678.10 Zoning Fees 19,749.74 Other Taxes, Transfers + Fees 502,720.68 Re Taxes 114,907.58 Div. 25- Marketing 0.00 Marketing Research Report 14,363.45 Div. 26- Survey And Testing 0.00 Plat of survey 1,795.43 Concrete Testing 23,340.60 Footing Testing 57,453.79 Environmental Testing 5,386.29 Construction Layout 7,181.72 Div. 27 Utilities 44,885.78 Div.28 A – Developer Fees 6% Of Hard Cost 1,615,672.00 Div.28 B – Developer Overhead 9% 2,624,920.12 632,793.24 Div. 31- Construction Interest 1,576,388.42 56,299.59 56,299.59 56,299.59 56,299.59 56,299.59 56,299.59 56,299.59 56,299.59 56,299.59 Div. 32 A- Hard Cost Contingency 5% 1,346,393.00 48,085.46 48,085.46 48,085.46 48,085.46 48,085.46 48,085.46 48,085.46 48,085.46 48,085.46 Div.32 B – Soft Cost Contingency 2.5% 334,703.25 11,953.69 11,953.69 11,953.69 11,953.69 11,953.69 11,953.69 11,953.69 11,953.69 11,953.69 1,228,769.70 1,228,769.70 1,228,769.70 1,861,562.94 1,228,769.70 1,228,769.70 1,228,769.70 1,228,769.70 1,228,769.70 31,252,297.21 32,481,066.90 33,709,836.60 35,571,399.54 36,800,169.23 38,028,938.93 39,257,708.62 40,486,478.32 41,715,248.01 19 Jul. 20 Aug. 21 Sep. 22 Oct. 23 Nov. 24 Dec. 25 Jan. 26 Fab.18 Jun. Table 16-Construction Cash Flow
  • 52. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 51 Totals CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION CONSTRUCTION Month Month hard cost construction 961,709.79 961,709.79 961,709.79 961,709.79 961,709.79 961,709.79 961,709.79 961,709.79 961,709.79 961,709.79 961,709.79 land Cost 0.00 Div. 18- land cost 0.00 Site cleaning and demolition 0.00 Soft Construction Cost 0.00 Div. 19- Architect And Engineer 0.00 Architect 41,654.00 41,654.00 41,654.00 41,654.00 41,654.00 41,654.00 41,654.00 41,654.00 41,654.00 41,654.00 41,654.00 Structure Engineer 30,372.71 MEP Engineer 13,504.76 Civil Engineer 4,527.61 Consults 8,430.72 Div. 20 – Legal And Accounting 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 19,849.49 Div.21 – Financing 13,914.59 13,914.59 13,914.59 13,914.59 13,914.59 13,914.59 13,914.59 13,914.59 13,914.59 13,914.59 13,914.59 Div. 22 - Title Insurance 0.00 96,953.27 Div. 23 - Insurance 0.00 General Liability 10,772.59 10,772.59 10,772.59 10,772.59 10,772.59 10,772.59 10,772.59 10,772.59 10,772.59 10,772.59 10,772.59 Workers Comp. 6,091.64 6,091.64 6,091.64 6,091.64 6,091.64 6,091.64 6,091.64 6,091.64 6,091.64 6,091.64 6,091.64 Builders Risk 1,603.06 1,603.06 1,603.06 1,603.06 1,603.06 1,603.06 1,603.06 1,603.06 1,603.06 1,603.06 1,603.06 Div.24 Municipal Fees 0.00 Permits 0.00 Zoning Fees 0.00 Other Taxes, Transfers + Fees 0.00 Re Taxes 0.00 57,453.79 Div. 25- Marketing 0.00 Marketing Research Report 0.00 Div. 26- Survey And Testing 0.00 Plat of survey 0.00 Concrete Testing 0.00 Footing Testing 0.00 Environmental Testing 0.00 Construction Layout 0.00 Div. 27 Utilities 0.00 44,885.78 Div.28 A – Developer Fees 6% Of Hard Cost 0.00 1,615,672.00 Div.28 B – Developer Overhead 9% 0.00 632,793.24 632,793.24 Div. 31- Construction Interest 56,299.59 56,299.59 56,299.59 56,299.59 56,299.59 56,299.59 56,299.59 56,299.59 56,299.59 56,299.59 56,299.59 Div. 32 A- Hard Cost Contingency 5% 48,085.46 48,085.46 48,085.46 48,085.46 48,085.46 48,085.46 48,085.46 48,085.46 48,085.46 48,085.46 48,085.46 Div.32 B – Soft Cost Contingency 2.5% 11,953.69 11,953.69 11,953.69 11,953.69 11,953.69 11,953.69 11,953.69 11,953.69 11,953.69 11,953.69 11,953.69 1,171,933.90 1,171,933.90 1,171,933.90 1,171,933.90 1,862,180.93 1,171,933.90 1,171,933.90 1,171,933.90 1,171,933.90 3,562,238.19 42,887,181.91 44,059,115.80 45,231,049.70 46,402,983.59 48,265,164.52 49,437,098.42 50,609,032.32 51,780,966.21 52,952,900.11 56,515,138.30 36 Dec.30 Jun. 31 Jul. 32 Aug. 33 Sep. 34 Oct. 35 Nov..27 Mar. 28 Apr. 29 may. Table 17-Construction Cash Flow
  • 53. Comprehensive Opportunity Assessment And Entrepreneurship Development Condominiums 2013 52 PROJECT SUMMARY:- The high-rise building is a best in class luxury residence offering spectacular views. These downtown condominiums have it all an ideal location steps away from the lakefront, exceptional quality craftsmanship and excellent building amenities. The high rise building will be constructed on the intersection of Wabash Ave and Ontario Ave in downtown Chicago. The lot is 9,204 SF. The building has 3 retail spaces and 7 offices space. The proposed building is a 23 story building offering 89 units and 71 indoor parking spaces, the units vary from studio units, one bedroom, two bedrooms and penthouse units, which can be customized to meet each client’s needs. The total project duration will be 36 months; it will offer unit prices ranging from $450 to $850 per square foot. The total cost of the project is $56,515,138.30; consist of 47.65% of hard cost, 23.33% soft cost and 29.02% land cost. In this development package we are requesting a construction loan of $39,937,637.32 and an equity source of$17,116,130.28. Considering project sales revenue of $70,220,938.55, the project will have $10,194,753.32 of return.