IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 05 Issue: 03 | Mar-2016, Available @ http://www.ijret.org 106
CONSTRUCTION INDUSTRY SURVEY AND STUDY THE
SUSTAINABLE PUBLIC PROCUREMENT
Deepali D Kadam1
, R.V.Devalkar2
1
M.E Construction Mgt. Student, Civil Engineering, N.D.M.V.P.S’S.K.B.T.C.O.E Nasik, Maharashtra, India
2
Assistant Professor, Civil Engineering, N.D.M.V.P.S’S.K.B.T.C.O.E Nasik, Maharashtra, India
Abstract
In India construction industry is improving the social, economic and environmental indicators of sustainability. We aware about
that the endangering the future of forth coming generations due to leaving depleted resources or no resources. As far as concerns
with growing sustainability have led the construction industry to adopt various policies for reducing the impacts caused by
construction activities. The aim of this study are to find out the awareness and extent to which sustainable procurement practices
in Nasik city is carried in construction industry. To find out what construction industry thinks on sustainable procurement. In this
qualitative methods is used which are based on descriptive scales. The entire analysis is carried out by statistical analysis method
and relative important index, and then by the score computed ranking is be done. There are many barriers that came forward
through the survey which needs to be worked out by the industry so that such an important issue can be solved. Lack of
sustainable performance in the project is because of issue is not being brought into the focus and even the industry is not well
known about the benefits of the green products. From the overall survey carried it can be concluded that the entire topic needs to
be focused and for the same experts opinion and views for the same should be taken into consideration, and also use of
sustainable materials should be increased and social awareness should be created.
Keywords: Sustainable Public Procurement, Relative Important Index, Sustainable Development
--------------------------------------------------------------------***----------------------------------------------------------------------
1. INTRODUCTION
Now a day’s industries are more concentrating and involved
in designing and implementing sustainable procurement
policies and keep attention on how environmental issues and
issues relating to other aspects of the sustainable
development pillars can be integrated in the procurement
process activities. In India construction industry is
improving the social, economic and environmental
indicators of sustainability. We are aware about that the
endangering the future of forth coming generations due to
leaving depleted resources or no resources. Therefore
construction industry in India an active effort is extremely
essential for sustainable development and leave resources
for the future generation to satisfy their needs. In recent
years, the construction industry has also adopted green
public procurement in which a process whereby contracting
authorities aim is to procure services and products that meet
environmental requirements. In some cases the green public
procurement has stretched to sustainable public procurement
in which involves the incorporation of both environmental
and social aspects in the procurement of services and
products. Sustainability in the construction industry is a
significant challenge. This challenge is due to the
requirement of high levels of support among project
stakeholders on the one hand and coordination between
project planning and implementation on the other hand.
Traditional procurement has play complete attention upon
value for money considerations. Sustainable procurement
the aim and challenge is to integrate environmental and
social considerations into the procurement process with the
reducing adverse impacts upon health, social conditions and
the environment by saving valuable costs for public sector
organizations and the community at large extent.
Sustainable procurement is a key part of an overall push for
sustainable development by governments.
2. METHODOLOGY
2.1 Analysis Method
In this Qualitative methods will be used which are based on
descriptive scales, and are used for describing the likelihood
and impact. The aim of this present work is to find out the
important factors affecting on performance of procurement
based on Principle of Sustainability i.e technical, social,
economic and environmental aspect. The questionnaire
interview was carried out among 53 construction companies
which are located in the Nasik region of Maharashtra
(India). The 53 interviews took place over a 3 month period
between August to October 2015 and each lasted
approximately half hours. The questionnaire was carried
through face-to-face interviews and it consisted of 56 closed
ended questions. The interviews reflects the opinion of
experts from 53 firms, it is believed that they can give an
idea about the important factors affecting on performance of
procurement based on Principle of Sustainability in the
Nasik region, Maharashtra (India) construction industry.
Descriptive survey is preferred because it gives quick
answers to the questions and does not consume much time
of the respondents. The entire analysis will be carried out by
Relative Important Index, and then by the score computed
ranking will be done.
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 05 Issue: 03 | Mar-2016, Available @ http://www.ijret.org 107
2.2 Relative Important Index
Relative important index is a regression-based index which
summarizes the magnitude of socio-economic status.RII is
useful because it takes into account the size of the
population and the relative disadvantage experienced by
different groups. By using this method we can rank a
particular aspect by means of the score computed which
depends upon the total responses received in terms of scale
by the highest scale value multiplied by number of
responses.
RII = ∑W/A×N
Where,
W= Weighting given to each factor by the respondents and
ranges from 1 to 5
Where ‘1’ is no significant,
‘5’ extremely significant
A= Highest weight
N= Total no. of respondents
3. RESULT
Overall 53 questionnaires was prepared and sent to various
companies through mails, and personal meetings.
Table 1. Show the questionnaire response rate
Question-
naire
Sent
Response
Received
Rejected Incomplete Total
53 27 10 16 53
Questionnaire Response Rate = 51%
Table 2. Showing technical aspects importance as per the
respondent
Sr.No Technical Aspects RII Rank
1 Building Byelaws,
&regulations 0.874074
1
2 Project Type 0.755556 5
3 Project Team Size 0.681481 7
4 Procurement Methods 0.785185 3
5 Project Completion Time 0.696296 6
6 Early Completion of
Project 0.585185
9
7 Project work flexibility 0.474074 10
8 Construction Risk 0.837037 2
9 Pre Contract Planning 0.777778 4
10 Cost overrun 0.688889 8
Table 3. Showing economic aspects as per the respondents
Sr.No Economic Aspect RII Rank
1 Local available material 0.822222 3
2 Procured material cost 0.8 4
3 Reuse of materials 0.733333 7
4 Material cost and its
reduction 0.733333
7
5 Quality of material 0.859259 1
6 Budget problems 0.703704 8
7 Shortage of suppliers 0.622222 9
8 Operational cost 0.748148 6
9 Greater efficiency 0.844444 2
10 New market opportunities 0.777778 5
Table 4. Showing environmental aspects as per the
respondents
Sr.No Environmental aspects RII Rank
1 Ecofriendly materials 0.725926 6
2 Protect the natural
environment
0.814815 3
3 Minimum resource
consumption
0.785185 4
4 Use of Lower hazardous
material
0.881481 1
5 Use of Green Products 0.6 9
6 Optimum use of
resources
0.659259 8
7 Effective disposal of
construction waste
0.844444 2
8 Climate change 0.518519 10
9 Emissions, effluents and
waste
0.777778 5
10 Use of water 0.696296 7
Table 5. Showing social aspects as per the respondents
Sr.No Social Aspects RII Rank
1
Management internal
issues
0.614815 9
2 Labor management issues 0.674074 7
3 Past experience 0.755556 4
4 Past performance 0.755556 4
5
Customer health and
safety
0.725926 5
6
Client’s needs and its
satisfaction
0.874074 2
7
Social awareness about
sustainable procurement
of construction materials
0.659259 8
8
ethical and responsible
treatment of labor
0.77037 3
9
Maximum use of local
suppliers
0.681481 6
10
Maintaining good
relations
0.903704 1
Table 6. Showing probable reasons due to which sustainable
procurement is not being practiced at high rate
Sr.No Probable reasons RII Rank
1 The lack of Building
Codes and Regulation
0.851852
2
2 Higher investment cost 0.807407 4
3 The lack of strategy that
promote sustainable
construction
0.688889
8
4 Lack of professional
knowledge
0.77037
5
5 Lack of Technology 0.696296 7
6 Lack of Government
support
0.62963
9
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 05 Issue: 03 | Mar-2016, Available @ http://www.ijret.org 108
7 Increased Documentation 0.474074 10
8 Lack of Demand 0.837037 3
9 Risk of investment 0.859259 1
10 Lack of Expertise 0.733333 6
4. CONCLUSION
From the overall survey carried it can be concluded that the
entire topic needs to be focused and for the same experts
opinion and views for the same should be taken into
consideration, and also use of sustainable materials should
be increased and social awareness should be created. As per
the technical aspect building byelaws and regulations are
considered there should be more precise information
compiling use of sustainable materials and procurement
methods and also there should be good awareness among the
top level to the bottom level personnel’s along with the
labors indulged in the project so as to reduce the
construction risk which will help increase use of sustainable
public procurement ways and methods thus helping the
nature and the environment. As per the economic aspect in
case of sustainable public procurement all the points can
only be achieved when the customer is ready to pay high
cost since sustainable materials are costlier than the
traditional ones which are easily available locally and with
which the workers work with greater efficiency. As per the
environmental aspect use of lower hazardous material,
Effective disposal of construction waste, protecting the
natural environment are some of the points which are
considered at the top most level. As per the social aspect
social dignity can only be maintained if the company
maintains and looks towards the interest of the people for
whom they are doing the business. As per the probable
reasons due to which sustainable procurement is not being
practiced at high rate because of the risk of investment, the
lack of building codes and regulation, lack of demand, the
higher investment cost, and the lack of professional
knowledge are the very important points which should be
worked out very seriously by the industry increase use of
sustainable public procurement. Now this can be achieved
only if good awareness is created and there are strict rules
and byelaws enforcing the use of such sustainable public
procurement methods and materials, thus by helping to
achieve the principle of sustainability in favor of the entire
earth and human beings.
REFERENCES
[1]. Enock Gideon Musau; “Effects of Government
Procurement on Prompt Tendering and Supply of
Goods: A Case Study of Kenya Pipeline Company”;
International Journal of Business and Management
Invention, vol.4, No.1, January 2015, pp71-84.
[2]. Sylvia Chilikona Wanyonyi; “Factors Affecting
Performance of Procurement Function among Public
Technical Training Institutions in Kisumu County,
Kenya”; International Journal of Economics,
Commerce and Management, vol.3, No.5, May 2015,
pp325-337.
[3]. Bo Xia, Qing Chen, Yelin Xu, Mei Li, Xiaohua Jin;
“Design-Build Contractor Selection for Public
Sustainable Buildings”; Journal of Management in
Engineering, March 2014, pp1-7.
[4]. Rajeev Ruparathna, S.M.ASCE, Kasun Hewage;
“Review of Contemporary Construction Procurement
Practices”; Journal of Management in Engineering,
September 2014, pp1-11.
[5]. J. K. Yates, M.ASCE; “Design and Construction for
Sustainable Industrial Construction”; Journal of
Management in Engineering, June 2014, pp1-14.
[6]. Silas E. Njeru, Dr. Patrick Ngugi, Dr. Robert Arasa,
Dr. James. Kahiri; “Procurement Policies and
Implementation of Effective Procurement Practices
in Tertiary Public Training Institutions in Kenya”;
Global Advanced Research Journal of Management
and Business Studies, Vol. 3, April 2014, pp166-170.
[7]. Brussels; “Communication from the Commission to
the European Parliament, the council, the European
Economic and Social committee and the committee
of the regions on Resource Efficiency Opportunities
in the Building Sector”; Study on Management of
CDW in the EU, July 2014,pp1-10.
[8]. Duncan Brack; “Promoting Legal and Sustainable
Timber: Using Public Procurement Policy”;
[9]. Energy Environment and Resources, September
2014, pp1-23.
[10]. Gbadamosi Olaniyi Mufutau; “Practical Procurement
Skill, Theory and Techniques”; Industrial
Engineering Letters, vol.3, No.9, 2013, pp27-38.
[11]. Japheth Ocharo Kiage; “Factors Affecting
Procurement Performance: A Case of Ministry of
Energy”; International Journal of Business and
Commerce, Vol. 3, No.1, Sept 2013, pp54-70.
[12]. Matthew Kalubanga; “SUSTAINABLE
PROCUREMENT: Concept, and Practical
Implications for the Procurement Process”;
International Journal of Economics and Management
Sciences, Vol.1, No.7, 2012, pp01-07.
[13]. Konstantinos I. Vatalis, Odysseus G. Manoliadis,
Dimitrios G. Mavridis; “Project performance
indicators as an innovative tool for identifying
sustainability perspectives in green public
procurement”; Procedia Economics and Finance,
2012, pp401 – 410.
[14]. Peter E. D. Love, David J. Edwards, Zahir Irani,
Amir Sharif; “Participatory Action Research
Approach to Public Sector Procurement Selection”;
Journal of Construction Engineering and
Management, Vol. 138, No. 3, March 2012, pp311-
322.
[15]. Crina Oltean-Dumbrava, Greg Watts, Abdul Miah;
“Procurement of Sustainable Noise-Reducing
Devices: State-of-the-Art Review from EU Project
QUIESST”; Journal of Management in Engineering,
Vol. 28, No. 3, July 2012, pp324-329.
[16]. Dr. Anil Sharma, Dr. Anupama Sharma, N. K.
Gupta; “Adoption of Green Building practices in
Mass Housing Construction Projects LEED Rating”;
International Journal of Advanced Engineering
Technology, Vol.3,No.4,Oct.-Dec 2012,pp64-66.
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 05 Issue: 03 | Mar-2016, Available @ http://www.ijret.org 109
[17]. Lauren Bradley Robichaud, Vittal S. Anantatmula;
“Greening Project Management Practices
[18]. for Sustainable Construction”Journal of Management
in Engineering, Vol. 27, No. 1, January 2011,pp48-
57.
[19]. Dr. Robert Eadie,Ms. Clare McKeown,Mr. Ken
Anderson; “The Social Element of Sustainable Civil
Engineering Public Procurement in Northern
Ireland”; International Journal of Business and Social
Science, Vol. 2, No. 12, July 2011,pp36-42.
[20]. Cathy Berry, Shaun McCarthy; “Guide to sustainable
procurement in construction”; CIRIA, 2011, pp1-25.
[21]. Kedar Uttam, Charlotta Faith-Ell, Berit Balfors;
“Increasing IA effectiveness by green procurement”;
International Conference Centre Geneva, April 2010,
pp1-5.
[22]. Md Mahbubur Rahim; “Identifying Factors Affecting
Acceptance of E-procurement Systems: An Initial
Qualitative Study at an Australian City Council”;
Communications of the IBIMA, vol 3, 2008, pp7-17.
[23]. Stephen Brammer, Helen Walker; “Sustainable
procurement practice in the public sector: An
international comparative study”; University of Bath
School of Management Working Paper Series, 2007,
pp1-36.
[24]. Delon Hampton, Fellow; “Procurement Issues”;
Journal of Construction Engineering and
Management, vol.10,No.6, Nov/Dec 1994,pp45-49.
[25]. Peter Boswell, Lorna Walker; “Procurement and
process design”; FIDIC and Lorna Walker
Consulting Ltd, pp1-18.
[26]. G OFORI; “Challenges of Construction Industries in
Developing Countries: Lessons from Various
Countries”; pp1-13.
[27]. John Karanja Ngugi, Hildah W. Mugo; “Internal
Factors Affecting Procurement Process of Supplies in
the Public Sector; A Survey of Kenya Government
Ministries”; pp2314-2343.
[28]. Preparatory study Public Procurement needs and
existing initiatives in Denmark, Jan 2011.
[29]. Green Tenders An Action Plan on Green Public
Procurement.
[30]. Greening the building supply chain, 2014.
[31]. Final Business and Regulatory Impact Assessment;
Public Contracts Scotland Progress Report, 2012.
[32]. André Martinuzzi, Robert Kudlak, Claus Faber,
Adele Wiman; “CSR Activities and impacts of the
construction sector”; pp1-28.
[33]. Public Procurement for Sustainable and Inclusive
Growth
[34]. Sustainable Public Procurement Main streaming
sustainability criteria in public procurement in
developing countries, June 2012.
[35]. Capacity building for Sustainable public
procurement, Jan 2009. Public Procurement as a tool
for promoting more Sustainable Consumption and
Production patterns, August 2008.

More Related Content

Similar to Construction industry survey and study the sustainable public procurement

Vibgyor a sustainability assessment tool for residential building
Vibgyor a sustainability assessment tool for residential buildingVibgyor a sustainability assessment tool for residential building
Vibgyor a sustainability assessment tool for residential buildingeSAT Publishing House
 
Construction Equipment Monitoring By using Relative Important Indices RII Ana...
Construction Equipment Monitoring By using Relative Important Indices RII Ana...Construction Equipment Monitoring By using Relative Important Indices RII Ana...
Construction Equipment Monitoring By using Relative Important Indices RII Ana...ijtsrd
 
Barriers to Implement Lean Principles in the Indian Construction Industry
Barriers to Implement Lean Principles in the Indian Construction IndustryBarriers to Implement Lean Principles in the Indian Construction Industry
Barriers to Implement Lean Principles in the Indian Construction IndustryAM Publications
 
Green Ratings of Residential Buildings: Survey, Analysis and Suggestions
Green Ratings of Residential Buildings: Survey, Analysis and SuggestionsGreen Ratings of Residential Buildings: Survey, Analysis and Suggestions
Green Ratings of Residential Buildings: Survey, Analysis and SuggestionsIRJET Journal
 
Impact of Sustainable Construction on Business Decisions
Impact of Sustainable Construction on Business DecisionsImpact of Sustainable Construction on Business Decisions
Impact of Sustainable Construction on Business DecisionsIRJET Journal
 
IRJET- Assessment of Role of Material Management in Construction Projects
IRJET- 	  Assessment of Role of Material Management in Construction ProjectsIRJET- 	  Assessment of Role of Material Management in Construction Projects
IRJET- Assessment of Role of Material Management in Construction ProjectsIRJET Journal
 
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...IRJET Journal
 
A STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTS
A STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTSA STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTS
A STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTSAmy Roman
 
A study on the applicability of quality circles to construction projects
A study on the applicability of quality circles to construction projectsA study on the applicability of quality circles to construction projects
A study on the applicability of quality circles to construction projectseSAT Journals
 
IRJET- Improving Labour Productivity in Construction Industries
IRJET- Improving Labour Productivity in Construction IndustriesIRJET- Improving Labour Productivity in Construction Industries
IRJET- Improving Labour Productivity in Construction IndustriesIRJET Journal
 
Causes of delay in indian transportation infrastructure projects
Causes of delay in indian transportation infrastructure projectsCauses of delay in indian transportation infrastructure projects
Causes of delay in indian transportation infrastructure projectseSAT Journals
 
Causes of delay in indian transportation
Causes of delay in indian transportationCauses of delay in indian transportation
Causes of delay in indian transportationeSAT Publishing House
 
IRJET- Influence of Stakeholder Management on the Success Construction Pr...
IRJET-  	  Influence of Stakeholder Management on the Success Construction Pr...IRJET-  	  Influence of Stakeholder Management on the Success Construction Pr...
IRJET- Influence of Stakeholder Management on the Success Construction Pr...IRJET Journal
 
IRJET- Study on Economic Sustainability of Industrial Buildings
IRJET-  	  Study on Economic Sustainability of Industrial BuildingsIRJET-  	  Study on Economic Sustainability of Industrial Buildings
IRJET- Study on Economic Sustainability of Industrial BuildingsIRJET Journal
 
IRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction ProjectsIRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction ProjectsIRJET Journal
 
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...
IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...IRJET Journal
 
Impact assessment of factors affecting information technology projects in riv...
Impact assessment of factors affecting information technology projects in riv...Impact assessment of factors affecting information technology projects in riv...
Impact assessment of factors affecting information technology projects in riv...eSAT Publishing House
 
Construction Standards of Residential Buildings Post Handover
Construction Standards of Residential Buildings Post HandoverConstruction Standards of Residential Buildings Post Handover
Construction Standards of Residential Buildings Post HandoverIRJET Journal
 
Investigating the Factors Affecting Delays in Infrastructure Projects
Investigating the Factors Affecting Delays in Infrastructure ProjectsInvestigating the Factors Affecting Delays in Infrastructure Projects
Investigating the Factors Affecting Delays in Infrastructure ProjectsDr. Amarjeet Singh
 

Similar to Construction industry survey and study the sustainable public procurement (20)

Vibgyor a sustainability assessment tool for residential building
Vibgyor a sustainability assessment tool for residential buildingVibgyor a sustainability assessment tool for residential building
Vibgyor a sustainability assessment tool for residential building
 
Construction Equipment Monitoring By using Relative Important Indices RII Ana...
Construction Equipment Monitoring By using Relative Important Indices RII Ana...Construction Equipment Monitoring By using Relative Important Indices RII Ana...
Construction Equipment Monitoring By using Relative Important Indices RII Ana...
 
Barriers to Implement Lean Principles in the Indian Construction Industry
Barriers to Implement Lean Principles in the Indian Construction IndustryBarriers to Implement Lean Principles in the Indian Construction Industry
Barriers to Implement Lean Principles in the Indian Construction Industry
 
Green Ratings of Residential Buildings: Survey, Analysis and Suggestions
Green Ratings of Residential Buildings: Survey, Analysis and SuggestionsGreen Ratings of Residential Buildings: Survey, Analysis and Suggestions
Green Ratings of Residential Buildings: Survey, Analysis and Suggestions
 
Impact of Sustainable Construction on Business Decisions
Impact of Sustainable Construction on Business DecisionsImpact of Sustainable Construction on Business Decisions
Impact of Sustainable Construction on Business Decisions
 
IRJET- Assessment of Role of Material Management in Construction Projects
IRJET- 	  Assessment of Role of Material Management in Construction ProjectsIRJET- 	  Assessment of Role of Material Management in Construction Projects
IRJET- Assessment of Role of Material Management in Construction Projects
 
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
USING LEAN TECHNIQUES TO REDUCE WASTE AND IMPROVE PERFORMANCE IN MUNICIPAL CO...
 
A STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTS
A STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTSA STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTS
A STUDY ON THE APPLICABILITY OF QUALITY CIRCLES TO CONSTRUCTION PROJECTS
 
A study on the applicability of quality circles to construction projects
A study on the applicability of quality circles to construction projectsA study on the applicability of quality circles to construction projects
A study on the applicability of quality circles to construction projects
 
IRJET- Improving Labour Productivity in Construction Industries
IRJET- Improving Labour Productivity in Construction IndustriesIRJET- Improving Labour Productivity in Construction Industries
IRJET- Improving Labour Productivity in Construction Industries
 
Causes of delay in indian transportation infrastructure projects
Causes of delay in indian transportation infrastructure projectsCauses of delay in indian transportation infrastructure projects
Causes of delay in indian transportation infrastructure projects
 
Causes of delay in indian transportation
Causes of delay in indian transportationCauses of delay in indian transportation
Causes of delay in indian transportation
 
IRJET- Influence of Stakeholder Management on the Success Construction Pr...
IRJET-  	  Influence of Stakeholder Management on the Success Construction Pr...IRJET-  	  Influence of Stakeholder Management on the Success Construction Pr...
IRJET- Influence of Stakeholder Management on the Success Construction Pr...
 
IRJET- Study on Economic Sustainability of Industrial Buildings
IRJET-  	  Study on Economic Sustainability of Industrial BuildingsIRJET-  	  Study on Economic Sustainability of Industrial Buildings
IRJET- Study on Economic Sustainability of Industrial Buildings
 
IRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction ProjectsIRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction Projects
 
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...
IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...IRJET-  	  Identification of Critical Factors Affecting Infrastructure Projec...
IRJET- Identification of Critical Factors Affecting Infrastructure Projec...
 
Impact assessment of factors affecting information technology projects in riv...
Impact assessment of factors affecting information technology projects in riv...Impact assessment of factors affecting information technology projects in riv...
Impact assessment of factors affecting information technology projects in riv...
 
Construction Standards of Residential Buildings Post Handover
Construction Standards of Residential Buildings Post HandoverConstruction Standards of Residential Buildings Post Handover
Construction Standards of Residential Buildings Post Handover
 
D012251726
D012251726D012251726
D012251726
 
Investigating the Factors Affecting Delays in Infrastructure Projects
Investigating the Factors Affecting Delays in Infrastructure ProjectsInvestigating the Factors Affecting Delays in Infrastructure Projects
Investigating the Factors Affecting Delays in Infrastructure Projects
 

More from eSAT Journals

Mechanical properties of hybrid fiber reinforced concrete for pavements
Mechanical properties of hybrid fiber reinforced concrete for pavementsMechanical properties of hybrid fiber reinforced concrete for pavements
Mechanical properties of hybrid fiber reinforced concrete for pavementseSAT Journals
 
Material management in construction – a case study
Material management in construction – a case studyMaterial management in construction – a case study
Material management in construction – a case studyeSAT Journals
 
Managing drought short term strategies in semi arid regions a case study
Managing drought    short term strategies in semi arid regions  a case studyManaging drought    short term strategies in semi arid regions  a case study
Managing drought short term strategies in semi arid regions a case studyeSAT Journals
 
Life cycle cost analysis of overlay for an urban road in bangalore
Life cycle cost analysis of overlay for an urban road in bangaloreLife cycle cost analysis of overlay for an urban road in bangalore
Life cycle cost analysis of overlay for an urban road in bangaloreeSAT Journals
 
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materialsLaboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materialseSAT Journals
 
Laboratory investigation of expansive soil stabilized with natural inorganic ...
Laboratory investigation of expansive soil stabilized with natural inorganic ...Laboratory investigation of expansive soil stabilized with natural inorganic ...
Laboratory investigation of expansive soil stabilized with natural inorganic ...eSAT Journals
 
Influence of reinforcement on the behavior of hollow concrete block masonry p...
Influence of reinforcement on the behavior of hollow concrete block masonry p...Influence of reinforcement on the behavior of hollow concrete block masonry p...
Influence of reinforcement on the behavior of hollow concrete block masonry p...eSAT Journals
 
Influence of compaction energy on soil stabilized with chemical stabilizer
Influence of compaction energy on soil stabilized with chemical stabilizerInfluence of compaction energy on soil stabilized with chemical stabilizer
Influence of compaction energy on soil stabilized with chemical stabilizereSAT Journals
 
Geographical information system (gis) for water resources management
Geographical information system (gis) for water resources managementGeographical information system (gis) for water resources management
Geographical information system (gis) for water resources managementeSAT Journals
 
Forest type mapping of bidar forest division, karnataka using geoinformatics ...
Forest type mapping of bidar forest division, karnataka using geoinformatics ...Forest type mapping of bidar forest division, karnataka using geoinformatics ...
Forest type mapping of bidar forest division, karnataka using geoinformatics ...eSAT Journals
 
Factors influencing compressive strength of geopolymer concrete
Factors influencing compressive strength of geopolymer concreteFactors influencing compressive strength of geopolymer concrete
Factors influencing compressive strength of geopolymer concreteeSAT Journals
 
Experimental investigation on circular hollow steel columns in filled with li...
Experimental investigation on circular hollow steel columns in filled with li...Experimental investigation on circular hollow steel columns in filled with li...
Experimental investigation on circular hollow steel columns in filled with li...eSAT Journals
 
Experimental behavior of circular hsscfrc filled steel tubular columns under ...
Experimental behavior of circular hsscfrc filled steel tubular columns under ...Experimental behavior of circular hsscfrc filled steel tubular columns under ...
Experimental behavior of circular hsscfrc filled steel tubular columns under ...eSAT Journals
 
Evaluation of punching shear in flat slabs
Evaluation of punching shear in flat slabsEvaluation of punching shear in flat slabs
Evaluation of punching shear in flat slabseSAT Journals
 
Evaluation of performance of intake tower dam for recent earthquake in india
Evaluation of performance of intake tower dam for recent earthquake in indiaEvaluation of performance of intake tower dam for recent earthquake in india
Evaluation of performance of intake tower dam for recent earthquake in indiaeSAT Journals
 
Evaluation of operational efficiency of urban road network using travel time ...
Evaluation of operational efficiency of urban road network using travel time ...Evaluation of operational efficiency of urban road network using travel time ...
Evaluation of operational efficiency of urban road network using travel time ...eSAT Journals
 
Estimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn methodEstimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn methodeSAT Journals
 
Estimation of morphometric parameters and runoff using rs & gis techniques
Estimation of morphometric parameters and runoff using rs & gis techniquesEstimation of morphometric parameters and runoff using rs & gis techniques
Estimation of morphometric parameters and runoff using rs & gis techniqueseSAT Journals
 
Effect of variation of plastic hinge length on the results of non linear anal...
Effect of variation of plastic hinge length on the results of non linear anal...Effect of variation of plastic hinge length on the results of non linear anal...
Effect of variation of plastic hinge length on the results of non linear anal...eSAT Journals
 
Effect of use of recycled materials on indirect tensile strength of asphalt c...
Effect of use of recycled materials on indirect tensile strength of asphalt c...Effect of use of recycled materials on indirect tensile strength of asphalt c...
Effect of use of recycled materials on indirect tensile strength of asphalt c...eSAT Journals
 

More from eSAT Journals (20)

Mechanical properties of hybrid fiber reinforced concrete for pavements
Mechanical properties of hybrid fiber reinforced concrete for pavementsMechanical properties of hybrid fiber reinforced concrete for pavements
Mechanical properties of hybrid fiber reinforced concrete for pavements
 
Material management in construction – a case study
Material management in construction – a case studyMaterial management in construction – a case study
Material management in construction – a case study
 
Managing drought short term strategies in semi arid regions a case study
Managing drought    short term strategies in semi arid regions  a case studyManaging drought    short term strategies in semi arid regions  a case study
Managing drought short term strategies in semi arid regions a case study
 
Life cycle cost analysis of overlay for an urban road in bangalore
Life cycle cost analysis of overlay for an urban road in bangaloreLife cycle cost analysis of overlay for an urban road in bangalore
Life cycle cost analysis of overlay for an urban road in bangalore
 
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materialsLaboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
 
Laboratory investigation of expansive soil stabilized with natural inorganic ...
Laboratory investigation of expansive soil stabilized with natural inorganic ...Laboratory investigation of expansive soil stabilized with natural inorganic ...
Laboratory investigation of expansive soil stabilized with natural inorganic ...
 
Influence of reinforcement on the behavior of hollow concrete block masonry p...
Influence of reinforcement on the behavior of hollow concrete block masonry p...Influence of reinforcement on the behavior of hollow concrete block masonry p...
Influence of reinforcement on the behavior of hollow concrete block masonry p...
 
Influence of compaction energy on soil stabilized with chemical stabilizer
Influence of compaction energy on soil stabilized with chemical stabilizerInfluence of compaction energy on soil stabilized with chemical stabilizer
Influence of compaction energy on soil stabilized with chemical stabilizer
 
Geographical information system (gis) for water resources management
Geographical information system (gis) for water resources managementGeographical information system (gis) for water resources management
Geographical information system (gis) for water resources management
 
Forest type mapping of bidar forest division, karnataka using geoinformatics ...
Forest type mapping of bidar forest division, karnataka using geoinformatics ...Forest type mapping of bidar forest division, karnataka using geoinformatics ...
Forest type mapping of bidar forest division, karnataka using geoinformatics ...
 
Factors influencing compressive strength of geopolymer concrete
Factors influencing compressive strength of geopolymer concreteFactors influencing compressive strength of geopolymer concrete
Factors influencing compressive strength of geopolymer concrete
 
Experimental investigation on circular hollow steel columns in filled with li...
Experimental investigation on circular hollow steel columns in filled with li...Experimental investigation on circular hollow steel columns in filled with li...
Experimental investigation on circular hollow steel columns in filled with li...
 
Experimental behavior of circular hsscfrc filled steel tubular columns under ...
Experimental behavior of circular hsscfrc filled steel tubular columns under ...Experimental behavior of circular hsscfrc filled steel tubular columns under ...
Experimental behavior of circular hsscfrc filled steel tubular columns under ...
 
Evaluation of punching shear in flat slabs
Evaluation of punching shear in flat slabsEvaluation of punching shear in flat slabs
Evaluation of punching shear in flat slabs
 
Evaluation of performance of intake tower dam for recent earthquake in india
Evaluation of performance of intake tower dam for recent earthquake in indiaEvaluation of performance of intake tower dam for recent earthquake in india
Evaluation of performance of intake tower dam for recent earthquake in india
 
Evaluation of operational efficiency of urban road network using travel time ...
Evaluation of operational efficiency of urban road network using travel time ...Evaluation of operational efficiency of urban road network using travel time ...
Evaluation of operational efficiency of urban road network using travel time ...
 
Estimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn methodEstimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn method
 
Estimation of morphometric parameters and runoff using rs & gis techniques
Estimation of morphometric parameters and runoff using rs & gis techniquesEstimation of morphometric parameters and runoff using rs & gis techniques
Estimation of morphometric parameters and runoff using rs & gis techniques
 
Effect of variation of plastic hinge length on the results of non linear anal...
Effect of variation of plastic hinge length on the results of non linear anal...Effect of variation of plastic hinge length on the results of non linear anal...
Effect of variation of plastic hinge length on the results of non linear anal...
 
Effect of use of recycled materials on indirect tensile strength of asphalt c...
Effect of use of recycled materials on indirect tensile strength of asphalt c...Effect of use of recycled materials on indirect tensile strength of asphalt c...
Effect of use of recycled materials on indirect tensile strength of asphalt c...
 

Recently uploaded

ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf203318pmpc
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoordharasingh5698
 

Recently uploaded (20)

ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 

Construction industry survey and study the sustainable public procurement

  • 1. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 05 Issue: 03 | Mar-2016, Available @ http://www.ijret.org 106 CONSTRUCTION INDUSTRY SURVEY AND STUDY THE SUSTAINABLE PUBLIC PROCUREMENT Deepali D Kadam1 , R.V.Devalkar2 1 M.E Construction Mgt. Student, Civil Engineering, N.D.M.V.P.S’S.K.B.T.C.O.E Nasik, Maharashtra, India 2 Assistant Professor, Civil Engineering, N.D.M.V.P.S’S.K.B.T.C.O.E Nasik, Maharashtra, India Abstract In India construction industry is improving the social, economic and environmental indicators of sustainability. We aware about that the endangering the future of forth coming generations due to leaving depleted resources or no resources. As far as concerns with growing sustainability have led the construction industry to adopt various policies for reducing the impacts caused by construction activities. The aim of this study are to find out the awareness and extent to which sustainable procurement practices in Nasik city is carried in construction industry. To find out what construction industry thinks on sustainable procurement. In this qualitative methods is used which are based on descriptive scales. The entire analysis is carried out by statistical analysis method and relative important index, and then by the score computed ranking is be done. There are many barriers that came forward through the survey which needs to be worked out by the industry so that such an important issue can be solved. Lack of sustainable performance in the project is because of issue is not being brought into the focus and even the industry is not well known about the benefits of the green products. From the overall survey carried it can be concluded that the entire topic needs to be focused and for the same experts opinion and views for the same should be taken into consideration, and also use of sustainable materials should be increased and social awareness should be created. Keywords: Sustainable Public Procurement, Relative Important Index, Sustainable Development --------------------------------------------------------------------***---------------------------------------------------------------------- 1. INTRODUCTION Now a day’s industries are more concentrating and involved in designing and implementing sustainable procurement policies and keep attention on how environmental issues and issues relating to other aspects of the sustainable development pillars can be integrated in the procurement process activities. In India construction industry is improving the social, economic and environmental indicators of sustainability. We are aware about that the endangering the future of forth coming generations due to leaving depleted resources or no resources. Therefore construction industry in India an active effort is extremely essential for sustainable development and leave resources for the future generation to satisfy their needs. In recent years, the construction industry has also adopted green public procurement in which a process whereby contracting authorities aim is to procure services and products that meet environmental requirements. In some cases the green public procurement has stretched to sustainable public procurement in which involves the incorporation of both environmental and social aspects in the procurement of services and products. Sustainability in the construction industry is a significant challenge. This challenge is due to the requirement of high levels of support among project stakeholders on the one hand and coordination between project planning and implementation on the other hand. Traditional procurement has play complete attention upon value for money considerations. Sustainable procurement the aim and challenge is to integrate environmental and social considerations into the procurement process with the reducing adverse impacts upon health, social conditions and the environment by saving valuable costs for public sector organizations and the community at large extent. Sustainable procurement is a key part of an overall push for sustainable development by governments. 2. METHODOLOGY 2.1 Analysis Method In this Qualitative methods will be used which are based on descriptive scales, and are used for describing the likelihood and impact. The aim of this present work is to find out the important factors affecting on performance of procurement based on Principle of Sustainability i.e technical, social, economic and environmental aspect. The questionnaire interview was carried out among 53 construction companies which are located in the Nasik region of Maharashtra (India). The 53 interviews took place over a 3 month period between August to October 2015 and each lasted approximately half hours. The questionnaire was carried through face-to-face interviews and it consisted of 56 closed ended questions. The interviews reflects the opinion of experts from 53 firms, it is believed that they can give an idea about the important factors affecting on performance of procurement based on Principle of Sustainability in the Nasik region, Maharashtra (India) construction industry. Descriptive survey is preferred because it gives quick answers to the questions and does not consume much time of the respondents. The entire analysis will be carried out by Relative Important Index, and then by the score computed ranking will be done.
  • 2. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 05 Issue: 03 | Mar-2016, Available @ http://www.ijret.org 107 2.2 Relative Important Index Relative important index is a regression-based index which summarizes the magnitude of socio-economic status.RII is useful because it takes into account the size of the population and the relative disadvantage experienced by different groups. By using this method we can rank a particular aspect by means of the score computed which depends upon the total responses received in terms of scale by the highest scale value multiplied by number of responses. RII = ∑W/A×N Where, W= Weighting given to each factor by the respondents and ranges from 1 to 5 Where ‘1’ is no significant, ‘5’ extremely significant A= Highest weight N= Total no. of respondents 3. RESULT Overall 53 questionnaires was prepared and sent to various companies through mails, and personal meetings. Table 1. Show the questionnaire response rate Question- naire Sent Response Received Rejected Incomplete Total 53 27 10 16 53 Questionnaire Response Rate = 51% Table 2. Showing technical aspects importance as per the respondent Sr.No Technical Aspects RII Rank 1 Building Byelaws, &regulations 0.874074 1 2 Project Type 0.755556 5 3 Project Team Size 0.681481 7 4 Procurement Methods 0.785185 3 5 Project Completion Time 0.696296 6 6 Early Completion of Project 0.585185 9 7 Project work flexibility 0.474074 10 8 Construction Risk 0.837037 2 9 Pre Contract Planning 0.777778 4 10 Cost overrun 0.688889 8 Table 3. Showing economic aspects as per the respondents Sr.No Economic Aspect RII Rank 1 Local available material 0.822222 3 2 Procured material cost 0.8 4 3 Reuse of materials 0.733333 7 4 Material cost and its reduction 0.733333 7 5 Quality of material 0.859259 1 6 Budget problems 0.703704 8 7 Shortage of suppliers 0.622222 9 8 Operational cost 0.748148 6 9 Greater efficiency 0.844444 2 10 New market opportunities 0.777778 5 Table 4. Showing environmental aspects as per the respondents Sr.No Environmental aspects RII Rank 1 Ecofriendly materials 0.725926 6 2 Protect the natural environment 0.814815 3 3 Minimum resource consumption 0.785185 4 4 Use of Lower hazardous material 0.881481 1 5 Use of Green Products 0.6 9 6 Optimum use of resources 0.659259 8 7 Effective disposal of construction waste 0.844444 2 8 Climate change 0.518519 10 9 Emissions, effluents and waste 0.777778 5 10 Use of water 0.696296 7 Table 5. Showing social aspects as per the respondents Sr.No Social Aspects RII Rank 1 Management internal issues 0.614815 9 2 Labor management issues 0.674074 7 3 Past experience 0.755556 4 4 Past performance 0.755556 4 5 Customer health and safety 0.725926 5 6 Client’s needs and its satisfaction 0.874074 2 7 Social awareness about sustainable procurement of construction materials 0.659259 8 8 ethical and responsible treatment of labor 0.77037 3 9 Maximum use of local suppliers 0.681481 6 10 Maintaining good relations 0.903704 1 Table 6. Showing probable reasons due to which sustainable procurement is not being practiced at high rate Sr.No Probable reasons RII Rank 1 The lack of Building Codes and Regulation 0.851852 2 2 Higher investment cost 0.807407 4 3 The lack of strategy that promote sustainable construction 0.688889 8 4 Lack of professional knowledge 0.77037 5 5 Lack of Technology 0.696296 7 6 Lack of Government support 0.62963 9
  • 3. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 05 Issue: 03 | Mar-2016, Available @ http://www.ijret.org 108 7 Increased Documentation 0.474074 10 8 Lack of Demand 0.837037 3 9 Risk of investment 0.859259 1 10 Lack of Expertise 0.733333 6 4. CONCLUSION From the overall survey carried it can be concluded that the entire topic needs to be focused and for the same experts opinion and views for the same should be taken into consideration, and also use of sustainable materials should be increased and social awareness should be created. As per the technical aspect building byelaws and regulations are considered there should be more precise information compiling use of sustainable materials and procurement methods and also there should be good awareness among the top level to the bottom level personnel’s along with the labors indulged in the project so as to reduce the construction risk which will help increase use of sustainable public procurement ways and methods thus helping the nature and the environment. As per the economic aspect in case of sustainable public procurement all the points can only be achieved when the customer is ready to pay high cost since sustainable materials are costlier than the traditional ones which are easily available locally and with which the workers work with greater efficiency. As per the environmental aspect use of lower hazardous material, Effective disposal of construction waste, protecting the natural environment are some of the points which are considered at the top most level. As per the social aspect social dignity can only be maintained if the company maintains and looks towards the interest of the people for whom they are doing the business. As per the probable reasons due to which sustainable procurement is not being practiced at high rate because of the risk of investment, the lack of building codes and regulation, lack of demand, the higher investment cost, and the lack of professional knowledge are the very important points which should be worked out very seriously by the industry increase use of sustainable public procurement. Now this can be achieved only if good awareness is created and there are strict rules and byelaws enforcing the use of such sustainable public procurement methods and materials, thus by helping to achieve the principle of sustainability in favor of the entire earth and human beings. REFERENCES [1]. Enock Gideon Musau; “Effects of Government Procurement on Prompt Tendering and Supply of Goods: A Case Study of Kenya Pipeline Company”; International Journal of Business and Management Invention, vol.4, No.1, January 2015, pp71-84. [2]. Sylvia Chilikona Wanyonyi; “Factors Affecting Performance of Procurement Function among Public Technical Training Institutions in Kisumu County, Kenya”; International Journal of Economics, Commerce and Management, vol.3, No.5, May 2015, pp325-337. [3]. Bo Xia, Qing Chen, Yelin Xu, Mei Li, Xiaohua Jin; “Design-Build Contractor Selection for Public Sustainable Buildings”; Journal of Management in Engineering, March 2014, pp1-7. [4]. Rajeev Ruparathna, S.M.ASCE, Kasun Hewage; “Review of Contemporary Construction Procurement Practices”; Journal of Management in Engineering, September 2014, pp1-11. [5]. J. K. Yates, M.ASCE; “Design and Construction for Sustainable Industrial Construction”; Journal of Management in Engineering, June 2014, pp1-14. [6]. Silas E. Njeru, Dr. Patrick Ngugi, Dr. Robert Arasa, Dr. James. Kahiri; “Procurement Policies and Implementation of Effective Procurement Practices in Tertiary Public Training Institutions in Kenya”; Global Advanced Research Journal of Management and Business Studies, Vol. 3, April 2014, pp166-170. [7]. Brussels; “Communication from the Commission to the European Parliament, the council, the European Economic and Social committee and the committee of the regions on Resource Efficiency Opportunities in the Building Sector”; Study on Management of CDW in the EU, July 2014,pp1-10. [8]. Duncan Brack; “Promoting Legal and Sustainable Timber: Using Public Procurement Policy”; [9]. Energy Environment and Resources, September 2014, pp1-23. [10]. Gbadamosi Olaniyi Mufutau; “Practical Procurement Skill, Theory and Techniques”; Industrial Engineering Letters, vol.3, No.9, 2013, pp27-38. [11]. Japheth Ocharo Kiage; “Factors Affecting Procurement Performance: A Case of Ministry of Energy”; International Journal of Business and Commerce, Vol. 3, No.1, Sept 2013, pp54-70. [12]. Matthew Kalubanga; “SUSTAINABLE PROCUREMENT: Concept, and Practical Implications for the Procurement Process”; International Journal of Economics and Management Sciences, Vol.1, No.7, 2012, pp01-07. [13]. Konstantinos I. Vatalis, Odysseus G. Manoliadis, Dimitrios G. Mavridis; “Project performance indicators as an innovative tool for identifying sustainability perspectives in green public procurement”; Procedia Economics and Finance, 2012, pp401 – 410. [14]. Peter E. D. Love, David J. Edwards, Zahir Irani, Amir Sharif; “Participatory Action Research Approach to Public Sector Procurement Selection”; Journal of Construction Engineering and Management, Vol. 138, No. 3, March 2012, pp311- 322. [15]. Crina Oltean-Dumbrava, Greg Watts, Abdul Miah; “Procurement of Sustainable Noise-Reducing Devices: State-of-the-Art Review from EU Project QUIESST”; Journal of Management in Engineering, Vol. 28, No. 3, July 2012, pp324-329. [16]. Dr. Anil Sharma, Dr. Anupama Sharma, N. K. Gupta; “Adoption of Green Building practices in Mass Housing Construction Projects LEED Rating”; International Journal of Advanced Engineering Technology, Vol.3,No.4,Oct.-Dec 2012,pp64-66.
  • 4. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 05 Issue: 03 | Mar-2016, Available @ http://www.ijret.org 109 [17]. Lauren Bradley Robichaud, Vittal S. Anantatmula; “Greening Project Management Practices [18]. for Sustainable Construction”Journal of Management in Engineering, Vol. 27, No. 1, January 2011,pp48- 57. [19]. Dr. Robert Eadie,Ms. Clare McKeown,Mr. Ken Anderson; “The Social Element of Sustainable Civil Engineering Public Procurement in Northern Ireland”; International Journal of Business and Social Science, Vol. 2, No. 12, July 2011,pp36-42. [20]. Cathy Berry, Shaun McCarthy; “Guide to sustainable procurement in construction”; CIRIA, 2011, pp1-25. [21]. Kedar Uttam, Charlotta Faith-Ell, Berit Balfors; “Increasing IA effectiveness by green procurement”; International Conference Centre Geneva, April 2010, pp1-5. [22]. Md Mahbubur Rahim; “Identifying Factors Affecting Acceptance of E-procurement Systems: An Initial Qualitative Study at an Australian City Council”; Communications of the IBIMA, vol 3, 2008, pp7-17. [23]. Stephen Brammer, Helen Walker; “Sustainable procurement practice in the public sector: An international comparative study”; University of Bath School of Management Working Paper Series, 2007, pp1-36. [24]. Delon Hampton, Fellow; “Procurement Issues”; Journal of Construction Engineering and Management, vol.10,No.6, Nov/Dec 1994,pp45-49. [25]. Peter Boswell, Lorna Walker; “Procurement and process design”; FIDIC and Lorna Walker Consulting Ltd, pp1-18. [26]. G OFORI; “Challenges of Construction Industries in Developing Countries: Lessons from Various Countries”; pp1-13. [27]. John Karanja Ngugi, Hildah W. Mugo; “Internal Factors Affecting Procurement Process of Supplies in the Public Sector; A Survey of Kenya Government Ministries”; pp2314-2343. [28]. Preparatory study Public Procurement needs and existing initiatives in Denmark, Jan 2011. [29]. Green Tenders An Action Plan on Green Public Procurement. [30]. Greening the building supply chain, 2014. [31]. Final Business and Regulatory Impact Assessment; Public Contracts Scotland Progress Report, 2012. [32]. André Martinuzzi, Robert Kudlak, Claus Faber, Adele Wiman; “CSR Activities and impacts of the construction sector”; pp1-28. [33]. Public Procurement for Sustainable and Inclusive Growth [34]. Sustainable Public Procurement Main streaming sustainability criteria in public procurement in developing countries, June 2012. [35]. Capacity building for Sustainable public procurement, Jan 2009. Public Procurement as a tool for promoting more Sustainable Consumption and Production patterns, August 2008.