SlideShare a Scribd company logo
1 of 2
Download to read offline
FAZALULLHAQ
Warehouse / Inventory
Management
Warehousing
Procurement
Material Management
Team Management
Communication
Planning
Problem Solving
SAP (MM)
Oracle ERP
MS Office
Advance Excel
Database
Adobe Photoshop
Corel Draw
Internet
Troubleshooting






via OSP to a Project in K
WH
Reason for leaving







Dawlance Group of Companies
AM
Reason for leaving












K-Electric Limited
STORE
Reason for leaving



+923 1534 888 38
alijan_fs@hotmail.com
PROFESSIONAL SKILLS
TECHNICAL/IT SKILLS
 More than 08 years warehouse and material management experience.
 Proven ability to manage warehouse/inventory operations such as planning,
procuring, receiving, issuance, tagging, handling, locating, caring, etc.
 Having expertise in SAP (MM), Oracle ERP, and MS Office (with advance Excel).
 Vast experience for storage and inventory management in
(technical/non-technical/general items), lube, chemical, returnable and scrap
stores.
 Hard working and detail oriented, with the ability to multi task effectively.
 Outstanding leadership, motivation and coordination skills.
via OSP to a Project in K-Electric Limited
WH SUPERVISOR (PROJECT) 15
th
Jan, 2016 to Jun, 2016 (projected date)
Reason for leaving This is project base job and project will be completed within 2 months.
 Working in a K-Electric power plant and manage the inventory of 26 MW steam
turbine parts/equipments and general items, etc.
 Follow up with supplier for deliveries/rejections/shortages.
 To maintain the inventory within the budget as per the norms.
 Analysis to curtail & reduce inventory & keep it to optimum level.
 Attending breakdown on priority basis and arranging all requi
local/import.
 Experience managing inventory and coordination of orders and deliveries, with
ability to priorities conflicting demands.
 Monitoring and recording inventory in SAP MM.
Dawlance Group of Companies
AM STORES – PROCUREMENT 22
nd
Reason for leaving
 Design AOP (Annual Operating Plan) with the coordination of supply chain &
production departments.
 To procure the material in time to meet production demand.
 Analyze demand and supply situation for Key Materials in local market and take
appropriate decisions.
 Develop and established new storage system that improved productivity and
accuracy.
 MIS reporting and reconciling as per planned and on management requir
 To maintain the inventory within the budget as per the norms.
 Ensure housekeeping and safety of storage areas and team.
 Manage/supervise a team of 67 members as per SOP’s for smooth store
operations.
 Coordinate with procurement & supply chain
purchasing, vendor selection, material’s quality, material costing, budgeting.
 Coordinate with logistic department to timely dispatch finish good to their
stations.
 Supervise audit activities and ensure 0% differences.
 Monitoring and recording inventory movements in Oracle ERP.
Electric Limited
TORE OFFICER 8
Reason for leaving
 Receive, Issue & transfer spares/materials as per standards procedures
 Ensure quality and quantity, and maintain records of all
(Left over material, returnable material, material replaced under warranty,
material taken from other stores/plants, etc).
 Ensure safety and housekeeping at workplaces.
years warehouse and material management experience.
Proven ability to manage warehouse/inventory operations such as planning,
receiving, issuance, tagging, handling, locating, caring, etc.
acle ERP, and MS Office (with advance Excel).
for storage and inventory management in material
technical/general items), lube, chemical, returnable and scrap
Hard working and detail oriented, with the ability to multi task effectively.
Outstanding leadership, motivation and coordination skills.
Jan, 2016 to Jun, 2016 (projected date)
job and project will be completed within 2 months.
Electric power plant and manage the inventory of 26 MW steam
Follow up with supplier for deliveries/rejections/shortages.
To maintain the inventory within the budget as per the norms.
Analysis to curtail & reduce inventory & keep it to optimum level.
Attending breakdown on priority basis and arranging all required parts
Experience managing inventory and coordination of orders and deliveries, with
nd
Dec, 2014 – 08
th
Dec, 2015
Company force me to transfer
Design AOP (Annual Operating Plan) with the coordination of supply chain &
To procure the material in time to meet production demand.
Analyze demand and supply situation for Key Materials in local market and take
Develop and established new storage system that improved productivity and
MIS reporting and reconciling as per planned and on management requirement.
within the budget as per the norms.
Ensure housekeeping and safety of storage areas and team.
Manage/supervise a team of 67 members as per SOP’s for smooth store
Coordinate with procurement & supply chain departments for material
purchasing, vendor selection, material’s quality, material costing, budgeting.
Coordinate with logistic department to timely dispatch finish good to their
Supervise audit activities and ensure 0% differences.
Monitoring and recording inventory movements in Oracle ERP.
8
th
Aug 2009 - 22
nd
Dec 2014
Career growth
materials as per standards procedures
maintain records of all material/inventory i.e.
(Left over material, returnable material, material replaced under warranty,
PROFILE SUMMARY:
WORK EXPERIENCE
Advance Excel
ICIL Karachi, 2007
Certificate of Achievement
OHSAS 18001; 2007
K-Electric 2010
Certificate of Achievement
QMS (ISO-9001:2008)
K-Electric 2011
Certificate of Appreciation
K-Electric 2014
Father’s Name Manzoorullhaq
Date of Birth 05
th
Feb, 1983
CNIC # 41303-3009307-5
Marital Status Married
Postal Add H. No. 8/210-A
Liaquatabad Khi.
Permanent Add H. No. 396-C/16
Chittal Chari, Hyd.















MM Pakistan Pvt. Ltd. Karachi
COMPUTER






Colgate Palmolive (Hyderabad)
WAREHOUSE



English
Urdu
Sindh
Punjabi
CERTIFICATES/AWARDS
LANGUAGES
PERSONAL INFO
PRO: BACKGROUND
Admin
IT
Procurement
Graphics
Warehousing
 Coordinate with suppliers and review their operations to determine factors that
affect prices and determine lowest cost consistent with quality, reliability, and
ability to meet required schedules.
 Leading a team of workers, delegating work, and supervising work
day to day operations and special objectives and targets.
 All standard operating procedures SOP’s and systems are properly maintained
and being followed in the store/warehouse.
 Assess the availability of space and prepare handling/stacking/storage plans prior
to commodities arrivals.
 Issue Inventory report, in/out status report, dead stock report; goods age report,
consumption report, daily status report, etc.
 SAP R3/MM Experience
 Creates Purchase Requisitions and Purchase Orders in SAP
 Positing/updating receiving, issuance, transfer.
 Maintains Suppliers Master Data and creation of new Suppliers
 Maintains Material Master Data and creation of new Materials
 Stock posting into quarantine for inspections.
 Generate different types of reports from SAP as per management requirements.
 Posting of debit notes into stock, for availability of issuance
 ADHOC reporting based on requirement from management.
 Design a visual basic software for one click tracking solution of tools, PPE’s, stock
location, documents tracker, generate reports as inward, outward, overview,
tools & PPE’s with employee name etc. This program main function is to fulfilled
the all our requirements of store in few seconds.
MM Pakistan Pvt. Ltd. Karachi
OMPUTER OPERATOR 16
 Record keeping for office letters, reports and documents.
 Responsibilities include analysis, installation, maintenance and modification of
storage area networks and computing system.
 Ensure the compatibility of the hardware and software of the
determining it.
 Responsible for the evaluation and recommendation of the new hardware and
software.
 Assist team in resolution of hardware, software and system issues.
 Analyze performance of the system and ensure the performance objective and
availability of the requirements
Colgate Palmolive (Hyderabad)
AREHOUSE ASSISTANT 10
 Perform physical count activities randomly.
 Locate and place material to their appropriate bins.
 Worked with Inventory Control Analyst to compile data from
such as bills of materials, purchase orders, invoices, requisitions, costing,
accounting reports.
Bachelor of Commerce (B.Com)
University of Sindh Jamshoro
Intermediate (Pre-Engineering)
BISE Hyderabad
20082003
s and review their operations to determine factors that
affect prices and determine lowest cost consistent with quality, reliability, and
Leading a team of workers, delegating work, and supervising work-in-line with
to day operations and special objectives and targets.
and systems are properly maintained
Assess the availability of space and prepare handling/stacking/storage plans prior
Issue Inventory report, in/out status report, dead stock report; goods age report,
Creates Purchase Requisitions and Purchase Orders in SAP.
Maintains Suppliers Master Data and creation of new Suppliers.
Maintains Material Master Data and creation of new Materials.
management requirements.
Posting of debit notes into stock, for availability of issuance.
ADHOC reporting based on requirement from management.
Design a visual basic software for one click tracking solution of tools, PPE’s, stock
, generate reports as inward, outward, overview,
tools & PPE’s with employee name etc. This program main function is to fulfilled
16
th
Sep 2008 - 06
th
Aug 2009
Record keeping for office letters, reports and documents.
Responsibilities include analysis, installation, maintenance and modification of
Ensure the compatibility of the hardware and software of the system by
Responsible for the evaluation and recommendation of the new hardware and
Assist team in resolution of hardware, software and system issues.
Analyze performance of the system and ensure the performance objective and
10
th
Mar 2006 - 20
th
Aug 2008
Worked with Inventory Control Analyst to compile data from difference sources
such as bills of materials, purchase orders, invoices, requisitions, costing,
DAE (Mechanical)
University of Sindh Jamshoro SBTE Hyderabad
Matericulation (Science)
E Hyderabad BISE Hyderabad
EDUCATION
20001998

More Related Content

What's hot

Resume Thomas Lajoie - Operations
Resume Thomas Lajoie - OperationsResume Thomas Lajoie - Operations
Resume Thomas Lajoie - OperationsThomas Lajoie
 
Alok industries
Alok industriesAlok industries
Alok industrieskbraooct17
 
Resume - Harish Patel R2
Resume - Harish Patel R2Resume - Harish Patel R2
Resume - Harish Patel R2Harish Patel
 
10.15.16 Resume of Rita Bartl
10.15.16 Resume of Rita Bartl10.15.16 Resume of Rita Bartl
10.15.16 Resume of Rita BartlRita Bartl
 
Michael_Kelley_Resume_0215
Michael_Kelley_Resume_0215Michael_Kelley_Resume_0215
Michael_Kelley_Resume_0215Michael Kelley
 
Seetharaman-Resume-Consultant
Seetharaman-Resume-ConsultantSeetharaman-Resume-Consultant
Seetharaman-Resume-ConsultantSeetharaman V
 
Cesar Espada - resume 11-2016
Cesar Espada - resume 11-2016Cesar Espada - resume 11-2016
Cesar Espada - resume 11-2016cesar espada
 
Material requirements planning in a demand driven world 2
Material requirements planning in a demand driven world 2Material requirements planning in a demand driven world 2
Material requirements planning in a demand driven world 2jackson_bowie
 
BatchMaster ERP - Nutraceuticals
BatchMaster ERP - NutraceuticalsBatchMaster ERP - Nutraceuticals
BatchMaster ERP - NutraceuticalsMichell8240
 
Carlos A. Gonzalez - Continuous Improvement Agent 8-16
Carlos A. Gonzalez - Continuous Improvement Agent 8-16Carlos A. Gonzalez - Continuous Improvement Agent 8-16
Carlos A. Gonzalez - Continuous Improvement Agent 8-16Carlos A. Gonzalez
 

What's hot (19)

Resume Thomas Lajoie - Operations
Resume Thomas Lajoie - OperationsResume Thomas Lajoie - Operations
Resume Thomas Lajoie - Operations
 
Alok industries
Alok industriesAlok industries
Alok industries
 
Resume - Harish Patel R2
Resume - Harish Patel R2Resume - Harish Patel R2
Resume - Harish Patel R2
 
10.15.16 Resume of Rita Bartl
10.15.16 Resume of Rita Bartl10.15.16 Resume of Rita Bartl
10.15.16 Resume of Rita Bartl
 
Cover Document
Cover DocumentCover Document
Cover Document
 
Kanwaljit.doc
Kanwaljit.docKanwaljit.doc
Kanwaljit.doc
 
Michael_Kelley_Resume_0215
Michael_Kelley_Resume_0215Michael_Kelley_Resume_0215
Michael_Kelley_Resume_0215
 
Resume (Urtiaga Larry)
Resume (Urtiaga Larry)Resume (Urtiaga Larry)
Resume (Urtiaga Larry)
 
Callaio_Resume
Callaio_ResumeCallaio_Resume
Callaio_Resume
 
Seetharaman-Resume-Consultant
Seetharaman-Resume-ConsultantSeetharaman-Resume-Consultant
Seetharaman-Resume-Consultant
 
Cesar Espada - resume 11-2016
Cesar Espada - resume 11-2016Cesar Espada - resume 11-2016
Cesar Espada - resume 11-2016
 
Shivaji S_Bikale
Shivaji S_BikaleShivaji S_Bikale
Shivaji S_Bikale
 
S.Muhammad Arif
S.Muhammad ArifS.Muhammad Arif
S.Muhammad Arif
 
Erp case study
Erp case studyErp case study
Erp case study
 
Material requirements planning in a demand driven world 2
Material requirements planning in a demand driven world 2Material requirements planning in a demand driven world 2
Material requirements planning in a demand driven world 2
 
BatchMaster ERP - Nutraceuticals
BatchMaster ERP - NutraceuticalsBatchMaster ERP - Nutraceuticals
BatchMaster ERP - Nutraceuticals
 
Does APO Really Work? - An APO Case Study
Does APO Really Work? - An APO Case StudyDoes APO Really Work? - An APO Case Study
Does APO Really Work? - An APO Case Study
 
Carlos A. Gonzalez - Continuous Improvement Agent 8-16
Carlos A. Gonzalez - Continuous Improvement Agent 8-16Carlos A. Gonzalez - Continuous Improvement Agent 8-16
Carlos A. Gonzalez - Continuous Improvement Agent 8-16
 
GVK- Resume
GVK- ResumeGVK- Resume
GVK- Resume
 

Viewers also liked

Report of intrinship at JPCL Jamshoro sindh
Report of intrinship at JPCL Jamshoro sindhReport of intrinship at JPCL Jamshoro sindh
Report of intrinship at JPCL Jamshoro sindhAftab Ahmed khuhro
 
Gas turbine Power Station Internship Report
Gas turbine Power Station Internship ReportGas turbine Power Station Internship Report
Gas turbine Power Station Internship ReportAsad Hussain
 
Dawlance internship report
Dawlance internship reportDawlance internship report
Dawlance internship reportMohammad Younus
 

Viewers also liked (7)

rajesh kumar
rajesh kumarrajesh kumar
rajesh kumar
 
Report of intrinship at JPCL Jamshoro sindh
Report of intrinship at JPCL Jamshoro sindhReport of intrinship at JPCL Jamshoro sindh
Report of intrinship at JPCL Jamshoro sindh
 
JPCL,Internship Report
JPCL,Internship ReportJPCL,Internship Report
JPCL,Internship Report
 
Gas turbine Power Station Internship Report
Gas turbine Power Station Internship ReportGas turbine Power Station Internship Report
Gas turbine Power Station Internship Report
 
Dalwance
DalwanceDalwance
Dalwance
 
Dawlance internship report
Dawlance internship reportDawlance internship report
Dawlance internship report
 
Dawlance
DawlanceDawlance
Dawlance
 

Similar to Final Resume FS (20)

GS-SCM-Resume
GS-SCM-ResumeGS-SCM-Resume
GS-SCM-Resume
 
NEW VERSION RESUME-1 .4L
NEW VERSION RESUME-1 .4LNEW VERSION RESUME-1 .4L
NEW VERSION RESUME-1 .4L
 
CV WH2016 Latest
CV WH2016 LatestCV WH2016 Latest
CV WH2016 Latest
 
Dilip Daphal
Dilip DaphalDilip Daphal
Dilip Daphal
 
Group_Manager_Demand_Planning
Group_Manager_Demand_PlanningGroup_Manager_Demand_Planning
Group_Manager_Demand_Planning
 
Group_Manager_Demand_Planning
Group_Manager_Demand_PlanningGroup_Manager_Demand_Planning
Group_Manager_Demand_Planning
 
CV FOR STORE
CV FOR STORECV FOR STORE
CV FOR STORE
 
Rajesh_CV_new
Rajesh_CV_newRajesh_CV_new
Rajesh_CV_new
 
Sridharan CV.
Sridharan CV.Sridharan CV.
Sridharan CV.
 
Resume -Sidney, Keith A.
Resume -Sidney, Keith A.Resume -Sidney, Keith A.
Resume -Sidney, Keith A.
 
Resume -Sidney, Keith A.
Resume -Sidney, Keith A.Resume -Sidney, Keith A.
Resume -Sidney, Keith A.
 
Cv
CvCv
Cv
 
Kim Timothy Resume _In
Kim Timothy Resume _InKim Timothy Resume _In
Kim Timothy Resume _In
 
Resume
Resume Resume
Resume
 
M.k sharma profile
M.k sharma profileM.k sharma profile
M.k sharma profile
 
Maria Bevan CPIM Resume
Maria Bevan CPIM ResumeMaria Bevan CPIM Resume
Maria Bevan CPIM Resume
 
JAGISH-5 YEARS-SENIOR MANUFACTURING & INDUSTRIAL MANAGEMENT
JAGISH-5 YEARS-SENIOR MANUFACTURING & INDUSTRIAL MANAGEMENTJAGISH-5 YEARS-SENIOR MANUFACTURING & INDUSTRIAL MANAGEMENT
JAGISH-5 YEARS-SENIOR MANUFACTURING & INDUSTRIAL MANAGEMENT
 
Resume-2
Resume-2Resume-2
Resume-2
 
Rajesh Resume
Rajesh  ResumeRajesh  Resume
Rajesh Resume
 
Naresh_Resume12
Naresh_Resume12Naresh_Resume12
Naresh_Resume12
 

Final Resume FS

  • 1. FAZALULLHAQ Warehouse / Inventory Management Warehousing Procurement Material Management Team Management Communication Planning Problem Solving SAP (MM) Oracle ERP MS Office Advance Excel Database Adobe Photoshop Corel Draw Internet Troubleshooting       via OSP to a Project in K WH Reason for leaving        Dawlance Group of Companies AM Reason for leaving             K-Electric Limited STORE Reason for leaving    +923 1534 888 38 alijan_fs@hotmail.com PROFESSIONAL SKILLS TECHNICAL/IT SKILLS  More than 08 years warehouse and material management experience.  Proven ability to manage warehouse/inventory operations such as planning, procuring, receiving, issuance, tagging, handling, locating, caring, etc.  Having expertise in SAP (MM), Oracle ERP, and MS Office (with advance Excel).  Vast experience for storage and inventory management in (technical/non-technical/general items), lube, chemical, returnable and scrap stores.  Hard working and detail oriented, with the ability to multi task effectively.  Outstanding leadership, motivation and coordination skills. via OSP to a Project in K-Electric Limited WH SUPERVISOR (PROJECT) 15 th Jan, 2016 to Jun, 2016 (projected date) Reason for leaving This is project base job and project will be completed within 2 months.  Working in a K-Electric power plant and manage the inventory of 26 MW steam turbine parts/equipments and general items, etc.  Follow up with supplier for deliveries/rejections/shortages.  To maintain the inventory within the budget as per the norms.  Analysis to curtail & reduce inventory & keep it to optimum level.  Attending breakdown on priority basis and arranging all requi local/import.  Experience managing inventory and coordination of orders and deliveries, with ability to priorities conflicting demands.  Monitoring and recording inventory in SAP MM. Dawlance Group of Companies AM STORES – PROCUREMENT 22 nd Reason for leaving  Design AOP (Annual Operating Plan) with the coordination of supply chain & production departments.  To procure the material in time to meet production demand.  Analyze demand and supply situation for Key Materials in local market and take appropriate decisions.  Develop and established new storage system that improved productivity and accuracy.  MIS reporting and reconciling as per planned and on management requir  To maintain the inventory within the budget as per the norms.  Ensure housekeeping and safety of storage areas and team.  Manage/supervise a team of 67 members as per SOP’s for smooth store operations.  Coordinate with procurement & supply chain purchasing, vendor selection, material’s quality, material costing, budgeting.  Coordinate with logistic department to timely dispatch finish good to their stations.  Supervise audit activities and ensure 0% differences.  Monitoring and recording inventory movements in Oracle ERP. Electric Limited TORE OFFICER 8 Reason for leaving  Receive, Issue & transfer spares/materials as per standards procedures  Ensure quality and quantity, and maintain records of all (Left over material, returnable material, material replaced under warranty, material taken from other stores/plants, etc).  Ensure safety and housekeeping at workplaces. years warehouse and material management experience. Proven ability to manage warehouse/inventory operations such as planning, receiving, issuance, tagging, handling, locating, caring, etc. acle ERP, and MS Office (with advance Excel). for storage and inventory management in material technical/general items), lube, chemical, returnable and scrap Hard working and detail oriented, with the ability to multi task effectively. Outstanding leadership, motivation and coordination skills. Jan, 2016 to Jun, 2016 (projected date) job and project will be completed within 2 months. Electric power plant and manage the inventory of 26 MW steam Follow up with supplier for deliveries/rejections/shortages. To maintain the inventory within the budget as per the norms. Analysis to curtail & reduce inventory & keep it to optimum level. Attending breakdown on priority basis and arranging all required parts Experience managing inventory and coordination of orders and deliveries, with nd Dec, 2014 – 08 th Dec, 2015 Company force me to transfer Design AOP (Annual Operating Plan) with the coordination of supply chain & To procure the material in time to meet production demand. Analyze demand and supply situation for Key Materials in local market and take Develop and established new storage system that improved productivity and MIS reporting and reconciling as per planned and on management requirement. within the budget as per the norms. Ensure housekeeping and safety of storage areas and team. Manage/supervise a team of 67 members as per SOP’s for smooth store Coordinate with procurement & supply chain departments for material purchasing, vendor selection, material’s quality, material costing, budgeting. Coordinate with logistic department to timely dispatch finish good to their Supervise audit activities and ensure 0% differences. Monitoring and recording inventory movements in Oracle ERP. 8 th Aug 2009 - 22 nd Dec 2014 Career growth materials as per standards procedures maintain records of all material/inventory i.e. (Left over material, returnable material, material replaced under warranty, PROFILE SUMMARY: WORK EXPERIENCE
  • 2. Advance Excel ICIL Karachi, 2007 Certificate of Achievement OHSAS 18001; 2007 K-Electric 2010 Certificate of Achievement QMS (ISO-9001:2008) K-Electric 2011 Certificate of Appreciation K-Electric 2014 Father’s Name Manzoorullhaq Date of Birth 05 th Feb, 1983 CNIC # 41303-3009307-5 Marital Status Married Postal Add H. No. 8/210-A Liaquatabad Khi. Permanent Add H. No. 396-C/16 Chittal Chari, Hyd.                MM Pakistan Pvt. Ltd. Karachi COMPUTER       Colgate Palmolive (Hyderabad) WAREHOUSE    English Urdu Sindh Punjabi CERTIFICATES/AWARDS LANGUAGES PERSONAL INFO PRO: BACKGROUND Admin IT Procurement Graphics Warehousing  Coordinate with suppliers and review their operations to determine factors that affect prices and determine lowest cost consistent with quality, reliability, and ability to meet required schedules.  Leading a team of workers, delegating work, and supervising work day to day operations and special objectives and targets.  All standard operating procedures SOP’s and systems are properly maintained and being followed in the store/warehouse.  Assess the availability of space and prepare handling/stacking/storage plans prior to commodities arrivals.  Issue Inventory report, in/out status report, dead stock report; goods age report, consumption report, daily status report, etc.  SAP R3/MM Experience  Creates Purchase Requisitions and Purchase Orders in SAP  Positing/updating receiving, issuance, transfer.  Maintains Suppliers Master Data and creation of new Suppliers  Maintains Material Master Data and creation of new Materials  Stock posting into quarantine for inspections.  Generate different types of reports from SAP as per management requirements.  Posting of debit notes into stock, for availability of issuance  ADHOC reporting based on requirement from management.  Design a visual basic software for one click tracking solution of tools, PPE’s, stock location, documents tracker, generate reports as inward, outward, overview, tools & PPE’s with employee name etc. This program main function is to fulfilled the all our requirements of store in few seconds. MM Pakistan Pvt. Ltd. Karachi OMPUTER OPERATOR 16  Record keeping for office letters, reports and documents.  Responsibilities include analysis, installation, maintenance and modification of storage area networks and computing system.  Ensure the compatibility of the hardware and software of the determining it.  Responsible for the evaluation and recommendation of the new hardware and software.  Assist team in resolution of hardware, software and system issues.  Analyze performance of the system and ensure the performance objective and availability of the requirements Colgate Palmolive (Hyderabad) AREHOUSE ASSISTANT 10  Perform physical count activities randomly.  Locate and place material to their appropriate bins.  Worked with Inventory Control Analyst to compile data from such as bills of materials, purchase orders, invoices, requisitions, costing, accounting reports. Bachelor of Commerce (B.Com) University of Sindh Jamshoro Intermediate (Pre-Engineering) BISE Hyderabad 20082003 s and review their operations to determine factors that affect prices and determine lowest cost consistent with quality, reliability, and Leading a team of workers, delegating work, and supervising work-in-line with to day operations and special objectives and targets. and systems are properly maintained Assess the availability of space and prepare handling/stacking/storage plans prior Issue Inventory report, in/out status report, dead stock report; goods age report, Creates Purchase Requisitions and Purchase Orders in SAP. Maintains Suppliers Master Data and creation of new Suppliers. Maintains Material Master Data and creation of new Materials. management requirements. Posting of debit notes into stock, for availability of issuance. ADHOC reporting based on requirement from management. Design a visual basic software for one click tracking solution of tools, PPE’s, stock , generate reports as inward, outward, overview, tools & PPE’s with employee name etc. This program main function is to fulfilled 16 th Sep 2008 - 06 th Aug 2009 Record keeping for office letters, reports and documents. Responsibilities include analysis, installation, maintenance and modification of Ensure the compatibility of the hardware and software of the system by Responsible for the evaluation and recommendation of the new hardware and Assist team in resolution of hardware, software and system issues. Analyze performance of the system and ensure the performance objective and 10 th Mar 2006 - 20 th Aug 2008 Worked with Inventory Control Analyst to compile data from difference sources such as bills of materials, purchase orders, invoices, requisitions, costing, DAE (Mechanical) University of Sindh Jamshoro SBTE Hyderabad Matericulation (Science) E Hyderabad BISE Hyderabad EDUCATION 20001998