- Maintenance of electrical and mechanical equipment
- Installation and repair of electrical panels
- Calibration of instrumentation
- PLC programming
- Hydraulics and pneumatics
- Welding and cutting
- AutoCAD drawings
- Preventive maintenance plans
- HACCP and ISO 9001 implementation
- Project management
- Commissioning and start up support
- Troubleshooting
- Training
- Safety procedures implementation
- Documentation management
- Quality control
- Process optimization
- Continuous improvement plans
- Lean manufacturing techniques
- Automation and system integration
- Piping and instrumentation diagrams (P&
1. David Correia
Name: David A. S. Correia
Place of birth:Lisbon
Date of birth: October 6th 1975
Gender: Male
Street: Jacques Perkstraat 25
Post Code: 3351CP
Country: Netherland
Telephone:
Mob: 0031 (0) 624312396
Email:Info@advanced-automatisation.nl
PSL Nr:M250367
VVA I/II Cert. Nr: HE.02.05.8114
School: 1992-1994 secondary school Reynaldo dos Santos
Equivalences 1: 9grade basic
Equivalences 2: High degree power distribution
Spoken languages: Dutch, English, French, Spanish, and Portuguese
2. Work experience with the following software:
Office XP
Office 2003
Office 2007
Microsoft Visio
AutoCad
MySql
MSQL2008
WebServer
PHPMyadmin
Dreamweaver CS4
VmWare
RealVnc
Symantec
Network monitoring packages.
System administrator work experience with the following operating systems:
MS-DOS
PC-DOS
UNIX
LINUX
Apple
Windows NT, 95, 2000, 2000 Server, Server2003, server2008, XP, Vista, Win7. (Both 32/64Bit).
Programming, troubleshooting and testing experience with the following system control
software:
MetsoDNA
Metso FA (field Assessor)
Hima ELOPII
Honeywell TDC3000
Honeywell Experion PKS
Honeywell FSC
Yokogawa: Micro XL, Centum XL, Centum CS, CentumCS3000 and PRM.
SCADA HMI Factory Link (Builder)
3. MES
WIS
Siemens builder software 300/400 PLC’s
Builder and control software for OMRON PLC’S
And various real time data acquisition software packages.
Hobby Projects:
Design, implementation, troubleshooting of 32Ha wireless network up to 60 Clients for a friends
business
Web site building and hosting
Configuration experience following ICT hardware:
Dell servers
Hp Servers
Cisco switches
Jupiner firewall
Netgear
Moxa switches
3Com
Linksys by Cisco
Training & certifications
Rosemount MicroMotion
Vega transmitters (micro guided wave, Ultrasonic & Radar)
ABB Drive training &ABB Drive window
Dresser Masonelian SVIIPositioner and valves
Dresser Masonelian level displacers
MetsoDNA Field assessor
MetsoDNA operator training
Intel technology Expert (Certified by Intel)
Thechnicom Permit to work/ Risk Analysis (TRA)
Thechnicom (TEB)
4. NEN1010/3140
Projects:
Date: Function: Company:
2012-2012 commissioning engineerAttero
Job description:
Lead commissioning engineer
Instrument commissioning
Date: Function: Company:
2011-2012 lead commissioning engineerShell
Pre-commissioning, commissioning and start-up
Job description:
Start-up support
Date: Function: Company:
2011-2012 lead commissioning engineerAVC
Pre-commissioning, commissioning and start-up
Job description:
Start-up support /Troubleshooting
5. Date: Function: Company:
2010-2011 Application engineer / lead commissioning engineerNeste Oil
Pre-commissioning, commissioning and start-up
Job description:
Application engineer / lead commissioning engineer
Instrument Pre-commissioning
Instrument commissioning
Instrumentation engineer
Start-up support team manager
Loop test team manager
Installation handover acceptance
Loop test
HSE walk downs
Technical support to 3 party hardware vendors
Date: Function: Company:
2010-2010 Commissioning engineer BP (Rig Valhall)
Job description:
Instrument commissioning
Instrument pre-calibrations
Loop test
HSE walk downs
Technical support to 3 party hardware vendors
Date: Function: Company:
2009-2009 Field service engineer Alewijnse
Job description:
E&I Field service engineerplus technical support
6. Commissioning function test tanker (Staat Essen)
Commissioning function test tanker (Milagro)
Date: Function: Company:
2008-2009 Lead engineer E&I Ovako Wire B.V.
Job description:
Lead Electro technical Dept. /Planner/ Hardware Technical Advisor
1st line call out support for instrumentation related problems
Control maintenance and design from field equipment
Instrumentation Field devices hardware engineering commissioning and function test
Implementation from network monitoring (hardware & software)
Upgrade control network to turbo-ring v2
Performing analysis, of plant failures
Implementation reliable hardware in order to reduce production downtime, as well as
maintenance activities
Hardware engineering and software modification (water treatment station, lube-oil. and
furnace) on order to increase reliability and meet process demands
Support to field teams delivering specific wiring diagrams for field instrumentation.
Support to both electrical and to mechanical dept
Planning from preventive maintenance and shutdown maintenance to be preformed
internally (maintenance technical dept) or by subcontractors
2 line call out
Factory start up support
Test and commissioning new installations
Date: Function: Company:
2007-2008 Lead Engineer SPIE Controlec
Job description:
Lead Engineer (Vopak Botlek ATEX certification)
7. Control from field equipment vs PID's
Control filed equipment specifications
Technical support and close team work piping engineers in order to achieve maximum
accuracy and technicalinformation on PID's, and therefore meet client demands
Maintenance of local network wired and wireless to guarantee permanent head office
link and minimize engineering downtime
Date: Function: Company:
2007-2007 Technical engineer SPIE Controlec
Job description: (For shell Chemicals Moerdijk II Faze MLO turnaround)
Wiring function test DCS system
Loop wiring plus loop test
Software & hardware support Yokogawa CS3000 R3.03 hardware
Engineering cabinet drawings for as-built
Modification from I/O cabinets
Modification from PC cabinets plus mechanical design modification
Modification from wiring diagrams
Ensure extra system reliability
Engineering test and installation from hardware to allow remote PC access (single end
user plus multiple end users)
Concept and or modification from structured network
Test from new patch panels.
Assembly from new operation console desks fine tuning from monitors
Disassembly from old TDC system Honeywell
Date: Function: Company:
2007-2007 Commissioning engineer Croon
Job description:
(DuPont Nederland Stop 2007)
8. Preparation for commissioning new power supply distribution panels
Preparation from field equipment to be removed for inspection, maintenance or
replacement
Support to field teams delivering specific wiring diagrams for field instrumentation
Test field instrumentation
Control from preformed job packages by several subcontractors
Factory start up support
Date: Function: Company:
2006-2007 Lead Engineer Spie Controlec
Job description: (Stop OXY3 2007)
ESD Honeywell function test plus control modification from ESD test protocol
TDC loop test
Preparation from field equipment to be removed for inspection, maintenance or replacement
Rewiring from removed field equipment
Replacement from damaged field equipment
Calibration from field equipment
Factory start up support
Date: Function: Company:
2006-2007 Technical Engineer Spie Control
Job description: (For shell Chemicals MoerdijkI Fase MLO turnaround)
9. Wiring function test DCS system
Loop wiring plus loop test
Software & hardware support Yokogawa CS3000 R3.03 hardware
Modification from cabinet drawings for as-built
Modification from I/O cabinets
Modification from PC cabinets plus mechanical design modification
Modification from electrical
Ensuresystem reliability
Design ordering test and installation from hardware to allow remote PC access (single
end user plus multiple end users)
Concept and modification from structured network
Test from new patch panels
Assembly from new operation console desks fine tuning from monitors
Disassembly from old TDC system Honeywell
Programming from switches and routers
Destructive and non destructive hardware analysis after system failures
Date: Function: Company:
2005-2006 Maintenance engineer StorkWorkSphere
Job description:
Technical maintenance engineer
Implementation of industrial maintenance on HilversumMediaPark
Registration from existing equipment
Instrument inspection repair and calibration
E&I inspections
Mechanical adjustment from actuators electrical and pneumatic
Modification from existing equipment for better performance
Date: Function: Company:
2003-2005 Service engineer Yokogawa Nederland
10. Job description:
And stability in order to improve quality and speed from delivered equipment and reduce
down time at Yokogawa clients Yokogawa system maintenance engineer (Service
maintenance department). MICRO XL, CENTUM XL, CENTUM CS, CENTUM CS3000
and R3.03 hardware
Work involved:
Control and execution from service notes
Troubleshooting from hardware
Calibration from Yokogawa I/O cards
Some experience with PH and conductivity transmitters
Modification from cabinets mechanical and electric
Wiring or modifications on cabinet cross wiring
Execution from cabinet drawings for installation
Mounting, installing, troubleshooting, power up and maintaining complete Yokogawa
DCS system (Cabinets, FCS, NODES, NIU’S, I/O cards, computers and peripheral
equipment transceivers, routers, switches, E.T.C.)
Execution from preventive maintenance above mentioned equipment
Training colleagues for preventive and shutdown maintenance activities
Leading different teams on preventive and shutdown maintenance activities
Shutdown maintenance:
Complete disassembly all Yokogawa system, visual hardware inspection, re-assembly,
testing and loading the application leaving the equipment in working conditions as found
before starting action.
Experience installing, troubleshooting and backup following operating systems :
DOS, Unix, AT&T Unix, Windows NT, W2000 and W2000 Server, Windows XP.
Installation or function test from Human interface stations and software installation
check.
Research from tools to improve system performance, maintenanceand stability in order
to improve quality and speed from delivered equipment and reduce down time at
Yokogawa clients
Execution from maintenance reports for the above mentioned tasks.
Date: Function: Company:
2002-2003 E&I technician Cegelec (Demi-water
factory)
Job description:
11. Directly working for E&I section of the water production sector.
Having preformed the removal and calibration of 90% of instrumentation on respective
sector vo11/12(including ISO calibrations)
Also the commissioning of the valves returned from revisions by subcontractors
The calibrations wore preformed on a TRADINCO table and on the field (hart com.) and
included temp., pressure, level, radar Ph Analyzers, pressure switches and valves
Daily assistance to production
Execution of as built drawings
Date: Function: Company:
2002-2003 E&I technician GTI Marine
Job description:
Assistance in the renovation of an off shore drilling platform
Date: Function: Company:
2002-2003 Technician Van Der Leun
Job description:
Connecting main and partial alimentation cables
Connecting partial installation circuits
Connecting MCC panels as well as all bridge command consoles
Trailing Suction Hopper Dredger Mellina
Trailing Suction Hopper Dredger TONG TAN
12. Date: Function: Company:
2001-2002 Technician ULC (Utilities building)
Job description:
Connecting all main and partial alimentation cables as well as partial installation circuits
Date: Function: Company:
2001-2002 Technician Pietersen Electrical
Job description:
Commissioning and programming P.H. indicators, soft start systems, level and flow
indicators as well as pressure transmitters
Date: Function: Company:
2001-2002 Commissioning engineer Heerema Marine
Contractors
Job description:
Holland
Foreman 4 persons on only commissioning project. Renovation of working platform
“Balder”
Date: Function: Company:
2001-2002 Technician ULC
Job description:
Water treatment station – connecting new main power supply cables on renewed
installation
13. Date: Function: Company:
2001-2002 Technician Croon
Job description:
Gist.DSM”
Cable tray assembly
WeldingProfiles
Replacement of old E. panels
Date: Function: Company:
2001-2002 Technician Frames International
Job description:
Building electrical command panels for offshore platforms (some experience also in
argon welding).
Date: Function: Company:
2001-2002 Technician Imtech Projects
Job description:
Renovation of central surface administration building
Date: Function: Company:
2001-2002 Foreman Getronics
Job description:
(WorldCom Amsterdam)
Leader of 9 person’s team on preparing structured network
14. Date: Function: Company:
2001-2002 Technician Barneveld
Job description:
(Holland printing company)
Electro-pneumatic valves commissioning and connecting for new print room
(Display Electronics)
Building new informatics system on structured network for
Importers Holland
Defining points of utilization connecting patch boxes and commissioning it
(Supermarket (in Reisen)
Project leadership installing fire detection system on
Producing as built drawings
Date: Function: Company:
2000-2001 Technician Croon
Job description:
(Philips Roosendaal)
Building a new lab for Phillips lightning Holland
Date: Function: Company:
2000-2001 Technician Imtech Marine
Job description:
Electrical work on board Star Clipper (ship yard) as sub chief of two floors (e.g. Phone
and P.A. addressee boxes, lighting, steering room commands leading a 5 men team).
15. Date: Function: Company:
2000-200 Foreman Enelec T.P.C.I
Job description:
Connecting and commissioning instrumentation panels and instruments for Enelec
T.P.C.I
Date: Function: Company:
1996-2000 Lead Engineer Ferreira Inacio Lopes
Job description:
Commissioning engineer and project leadership in project’s office
Elaboration of projects with CAD 14/2000 Drawing.
Subspecialties: High tension / Medium tension communication and weak tension.
The job consisted of:
Executing auto cad drawings
Discussing the needs of the client and verifying the characteristics of installation to be
build.
Executing the quantity map’s to be delivered to the sub contractors
Verifying if the materials applied are as specified in lists as well as assembly methods
Performing measurements and corrections on installed equipments as well as last
commissioning and verification if safety norms are in order, before
Placing the installation to use
16. Date: Function: Company:
1995-1997 Airborne Paratrooper 3rd Operational Battalion
Job description:
Army service complete on Portuguese Airborne Special Forces
Preparation and maintenance of electrical material to be assembled on the field
Date: Function: Company:
1987-1991 Student Provimi S.A.
Job description:
Industrial maintenance student