David Correia

Name: David A. S. Correia

Place of birth: Lisbon

Date of birth: October 6th 1975

Gender: Male

Street: Jacques Perkstraat 25

Post Code: 3351CP

Country: Netherland

Telephone:

Mob: 0031 (0) 624312396

Email: Info@advanced-automatisation.nl

PSL Nr: M250367

VVA I/II Cert. Nr: HE.02.05.8114



School: 1992-1994 secondary school Reynaldo dos Santos

Equivalences 1: 9grade basic

Equivalences 2: High degree power distribution

Spoken languages: Dutch, English, French, Spanish, and Portuguese
Work experience with the following software:
Office XP

Office 2003

Office 2007

Microsoft Visio

AutoCad

MySql

MSQL2008

WebServer

PHPMyadmin

Dreamweaver CS4

VmWare

RealVnc

Symantec

Network monitoring packages.

System administrator work experience with the following operating systems:
MS-DOS

PC-DOS

UNIX

LINUX

Apple

Windows NT, 95, 2000, 2000 Server, Server2003, server2008, XP, Vista, Win7. (Both 32/64Bit).

Programming, troubleshooting and testing experience with the following system control
software:
MetsoDNA

Metso FA (field Assessor)

Hima ELOPII

Honeywell TDC3000

Honeywell Experion PKS

Honeywell FSC

Yokogawa: Micro XL, Centum XL, Centum CS, CentumCS3000 and PRM.

SCADA HMI Factory Link (Builder)
MES

WIS

Siemens builder software 300/400 PLC’s

Builder and control software for OMRON PLC’S

And various real time data acquisition software packages.

Hobby Projects:
Design, implementation, troubleshooting of 32Ha wireless network up to 60 Clients for a friends
business

Web site building and hosting

Configuration experience following ICT hardware:
Dell servers

Hp Servers

Cisco switches

Jupiner firewall

Netgear

Moxa switches

3Com

Linksys by Cisco

Training & certifications by vendor:
Rosemount MicroMotion
Vega transmitters (micro guided wave, Ultrasonic & Radar)
ABB Drive training & ABB Drive window
Dresser Masonelian SVII Positioner and valves

Dresser Masonelian level displacers

MetsoDNA Field assessor

MetsoDNA operator training

Intel technology Expert (Certified by Intel)
Projects:

 Date:                           Function:                               Company:
 2012-2012                 commissioning engineer                        Attero

       Job description:
 Lead commissioning engineer
 Instrument commissioning




 Date:                           Function:                               Company:
 2011-2012                lead commissioning engineer                    Shell
                         Pre-commissioning, commissioning and start-up

      Job description:
      Start-up support




  Date:                              Function:                               Company:
  2011-2012                  lead commissioning engineer                     AVC
                             Pre-commissioning, commissioning and start-up
 Job description:
 Start-up support /Troubleshooting




    Date:                          Function:                             Company:
    2010-2011       Application engineer / lead commissioning engineer   Neste Oil
                    Pre-commissioning, commissioning and start-up

    Job description:
Application engineer / lead commissioning engineer
Instrument Pre-commissioning
Instrument commissioning
Instrumentation engineer
Start-up support team manager
Loop test team manager
Installation handover acceptance
Loop test
HSE walk downs
Technical support to 3 party hardware vendors




Date:                         Function:                  Company:
2010-2010                     Commissioning engineer     BP (Rig Valhall)

Job description:
Instrument commissioning
Instrument pre-calibrations
Loop test
HSE walk downs
Technical support to 3 party hardware vendors




 Date:                          Function:                Company:
 2009-2009                      Field service engineer   Alewijnse




 Job description:
 E&I Field service engineer plus technical support
 Commissioning function test tanker (Staat Essen)
 Commissioning function test tanker (Milagro)
Date:                          Function:                      Company:
2008-2009                      Lead engineer E&I              Ovako Wire B.V.



Job description:
Lead Electro technical Dept. /Planner/ Hardware Technical Advisor
1st line call out support for instrumentation related problems
Control maintenance and design from field equipment
Instrumentation Field devices hardware engineering commissioning and function test
Implementation from network monitoring (hardware & software)
 Upgrade control network to turbo-ring v2
Performing analysis, of plant failures
Implementation reliable hardware in order to reduce production downtime, as well as
maintenance activities
Hardware engineering and software modification (water treatment station, lube-oil. and
furnace) on order to increase reliability and meet process demands
Support to field teams delivering specific wiring diagrams for field instrumentation.
Support to both electrical and to mechanical dept
Planning from preventive maintenance and shutdown maintenance to be preformed
internally (maintenance technical dept) or by subcontractors
2 line call out
Factory start up support
Test and commissioning new installations



Date:                          Function:                      Company:
2007-2008                      Lead Engineer                  SPIE Controlec



Job description:
Lead Engineer (Vopak Botlek ATEX certification)
Control from field equipment vs PID's
Control filed equipment specifications
Technical support and close team work piping engineers in order to achieve maximum
accuracy and technical information on PID's, and therefore meet client demands
Maintenance of local network wired and wireless to guarantee permanent head office
link and minimize engineering downtime




Date:                           Function:                        Company:
2007-2007                       Technical engineer               SPIE Controlec




Job description: (For shell Chemicals Moerdijk II Faze MLO turnaround)
Wiring function test DCS system
Loop wiring plus loop test
Software & hardware support Yokogawa CS3000 R3.03 hardware
Engineering cabinet drawings for as-built
Modification from I/O cabinets
Modification from PC cabinets plus mechanical design modification
Modification from wiring diagrams
Ensure extra system reliability
Engineering test and installation from hardware to allow remote PC access (single end
user plus multiple end users)
Concept and or modification from structured network
Test from new patch panels.
Assembly from new operation console desks fine tuning from monitors
Disassembly from old TDC system Honeywell



Date:                           Function:                        Company:
2007-2007                       Commissioning engineer           Croon



Job description:
(DuPont Nederland Stop 2007)
Preparation for commissioning new power supply distribution panels
Preparation from field equipment to be removed for inspection, maintenance or
replacement
Support to field teams delivering specific wiring diagrams for field instrumentation
Test field instrumentation
Control from preformed job packages by several subcontractors
Factory start up support



Date:                           Function:                       Company:
2006-2007                       Lead Engineer                   Spie Controlec



Job description: (Stop OXY3 2007)
ESD Honeywell function test plus control modification from ESD test protocol
TDC loop test
Preparation from field equipment to be removed for inspection, maintenance or replacement
Rewiring from removed field equipment
Replacement from damaged field equipment
Calibration from field equipment
Factory start up support




Date:                           Function:                       Company:
2006-2007                       Technical Engineer              Spie Control




Job description: (For shell Chemicals Moerdijk I Fase MLO turnaround)
Wiring function test DCS system
Loop wiring plus loop test
Software & hardware support Yokogawa CS3000 R3.03 hardware
Modification from cabinet drawings for as-built
Modification from I/O cabinets
Modification from PC cabinets plus mechanical design modification
Modification from electrical
Ensure system reliability
Design ordering test and installation from hardware to allow remote PC access (single
end user plus multiple end users)
Concept and modification from structured network
Test from new patch panels
Assembly from new operation console desks fine tuning from monitors
Disassembly from old TDC system Honeywell
Programming from switches and routers
Destructive and non destructive hardware analysis after system failures




Date:                          Function:                      Company:
2005-2006                      Maintenance engineer           StorkWorkSphere



Job description:
Technical maintenance engineer
Implementation of industrial maintenance on Hilversum Media Park
Registration from existing equipment
Instrument inspection repair and calibration
E&I inspections
Mechanical adjustment from actuators electrical and pneumatic
Modification from existing equipment for better performance



Date:                          Function:                      Company:
2003-2005                      Service engineer               Yokogawa Nederland



Job description:
And stability in order to improve quality and speed from delivered equipment and reduce
down time at Yokogawa clients Yokogawa system maintenance engineer (Service
maintenance department). MICRO XL, CENTUM XL, CENTUM CS, CENTUM CS3000
and R3.03 hardware
Work involved:
Control and execution from service notes
Troubleshooting from hardware
Calibration from Yokogawa I/O cards
Some experience with PH and conductivity transmitters
Modification from cabinets mechanical and electric
Wiring or modifications on cabinet cross wiring
Execution from cabinet drawings for installation
Mounting, installing, troubleshooting, power up and maintaining complete Yokogawa
DCS system (Cabinets, FCS, NODES, NIU’S, I/O cards, computers and peripheral
equipment transceivers, routers, switches, E.T.C.)
Execution from preventive maintenance above mentioned equipment
Training colleagues for preventive and shutdown maintenance activities
Leading different teams on preventive and shutdown maintenance activities
Shutdown maintenance:
Complete disassembly all Yokogawa system, visual hardware inspection, re-assembly,
testing and loading the application leaving the equipment in working conditions as found
before starting action.
Experience installing, troubleshooting and backup following operating systems :
DOS, Unix, AT&T Unix, Windows NT, W2000 and W2000 Server, Windows XP.
Installation or function test from Human interface stations and software installation
check.
Research from tools to improve system performance, maintenance and stability in order
to improve quality and speed from delivered equipment and reduce down time at
Yokogawa clients
Execution from maintenance reports for the above mentioned tasks.



Date:                          Function:                       Company:
2002-2003                      E&I technician                  Cegelec (Demi-water
                                                               factory)



Job description:
Directly working for E&I section of the water production sector.
Having preformed the removal and calibration of 90% of instrumentation on respective
sector vo11/12(including ISO calibrations)
Also the commissioning of the valves returned from revisions by subcontractors
The calibrations wore preformed on a TRADINCO table and on the field (hart com.) and
included temp., pressure, level, radar Ph Analyzers, pressure switches and valves
Daily assistance to production
Execution of as built drawings

Date:                            Function:                       Company:
2002-2003                        E&I technician                  GTI Marine

Job description:
Assistance in the renovation of an off shore drilling platform




Date:                            Function:                       Company:
2002-2003                        Technician                      Van Der Leun

Job description:
Connecting main and partial alimentation cables
Connecting partial installation circuits
Connecting MCC panels as well as all bridge command consoles
Trailing Suction Hopper Dredger Mellina
Trailing Suction Hopper Dredger TONG TAN




Date:                            Function:                       Company:
2001-2002                        Technician                      ULC (Utilities building)
Job description:
Connecting all main and partial alimentation cables as well as partial installation circuits




Date:                            Function:                        Company:
2001-2002                        Technician                       Pietersen Electrical



Job description:
Commissioning and programming P.H. indicators, soft start systems, level and flow
indicators as well as pressure transmitters



Date:                            Function:                        Company:
2001-2002                        Commissioning engineer           Heerema Marine
                                                                  Contractors



Job description:
Holland
Foreman 4 persons on only commissioning project. Renovation of working platform
“Balder”


Date:                            Function:                        Company:
2001-2002                        Technician                       ULC



Job description:
Water treatment station – connecting new main power supply cables on renewed
installation



Date:                            2001-2002                        Function:
Technician                     Company:                       Croon



Job description:
Gist.DSM”
Cable tray assembly
Welding Profiles
Replacement of old E. panels



Date:                          Function:                      Company:
2001-2002                      Technician                     Frames International



Job description:
Building electrical command panels for offshore platforms (some experience also in
argon welding).




Date:                          Function:                      Company:
2001-2002                      Technician                     Imtech Projects




Job description:
Renovation of central surface administration building

Date:                          Function:                      Company:
2001-2002                      Foreman                        Getronics



Job description:
(WorldCom Amsterdam)

Leader of 9 person’s team on preparing structured network
Date:                            Function:                      Company:
2001-2002                        Technician                     Barneveld

Job description:
(Holland printing company)
Electro-pneumatic valves commissioning and connecting for new print room

(Display Electronics)
Building new informatics system on structured network for
Importers Holland
Defining points of utilization connecting patch boxes and commissioning it

(Supermarket (in Reisen)
Project leadership installing fire detection system on
Producing as built drawings



Date:                            Function:                      Company:
2000-2001                        Technician                     Croon



Job description:
(Philips Roosendaal)
Building a new lab for Phillips lightning Holland




Date:                            Function:                      Company:
2000-2001                        Technician                     Imtech Marine

Job description:
Electrical work on board Star Clipper (ship yard) as sub chief of two floors (e.g. Phone
and P.A. addressee boxes, lighting, steering room commands leading a 5 men team).
Date:                            Function:                        Company:
2000-200                         Foreman                          Enelec T.P.C.I



Job description:
Connecting and commissioning instrumentation panels and instruments for Enelec
T.P.C.I



Date:                            Function:                        Company:
1996-2000                        Lead Engineer                    Ferreira Inacio Lopes



Job description:
Commissioning engineer and project leadership in project’s office
Elaboration of projects with CAD 14/2000 Drawing.
Subspecialties: High tension / Medium tension communication and weak tension.
The job consisted of:
Executing auto cad drawings

Discussing the needs of the client and verifying the characteristics of installation to be
build.
Executing the quantity map’s to be delivered to the sub contractors
Verifying if the materials applied are as specified in lists as well as assembly methods
Performing measurements and corrections on installed equipments as well as last
commissioning and verification if safety norms are in order, before
Placing the installation to use




Date:                            Function:                        Company:
1995-1997                        Airborne Paratrooper             3rd Operational Battalion
Job description:
Army service complete on Portuguese Airborne Special Forces
Preparation and maintenance of electrical material to be assembled on the field




Date:                            Function:                    Company:
1987-1991                        Student                      Provimi S.A.



Job description:
Industrial maintenance student

More Related Content

What's hot (20)

Stretton CV
Stretton CVStretton CV
Stretton CV
 
noel cv
noel cvnoel cv
noel cv
 
Resume iif 2020
Resume iif 2020Resume iif 2020
Resume iif 2020
 
PRATIK PATEL
PRATIK PATELPRATIK PATEL
PRATIK PATEL
 
My CV
My CVMy CV
My CV
 
CV Patrick Balmer May2016
CV Patrick Balmer May2016CV Patrick Balmer May2016
CV Patrick Balmer May2016
 
Resume_11Jan17
Resume_11Jan17Resume_11Jan17
Resume_11Jan17
 
Iprofessional
IprofessionalIprofessional
Iprofessional
 
PEW Company Profile-Rev.12-2014
PEW Company Profile-Rev.12-2014PEW Company Profile-Rev.12-2014
PEW Company Profile-Rev.12-2014
 
Shweta-CV
Shweta-CVShweta-CV
Shweta-CV
 
Francis resume
Francis resumeFrancis resume
Francis resume
 
Automation_Engineer_with_7.6_Years_of_Experience_in_MES_and_Industrial_Automa...
Automation_Engineer_with_7.6_Years_of_Experience_in_MES_and_Industrial_Automa...Automation_Engineer_with_7.6_Years_of_Experience_in_MES_and_Industrial_Automa...
Automation_Engineer_with_7.6_Years_of_Experience_in_MES_and_Industrial_Automa...
 
Automation and Control System Capabilities
Automation and Control System Capabilities Automation and Control System Capabilities
Automation and Control System Capabilities
 
Resume_Shruti Maurya
Resume_Shruti MauryaResume_Shruti Maurya
Resume_Shruti Maurya
 
Fpso fso automation
Fpso fso automationFpso fso automation
Fpso fso automation
 
Mario Gali Cv
Mario Gali CvMario Gali Cv
Mario Gali Cv
 
My_RESUME
My_RESUMEMy_RESUME
My_RESUME
 
Srinivas avioinics 6yrs
Srinivas avioinics 6yrsSrinivas avioinics 6yrs
Srinivas avioinics 6yrs
 
01.Nedumaran Instrument Engineer
01.Nedumaran Instrument Engineer01.Nedumaran Instrument Engineer
01.Nedumaran Instrument Engineer
 
Sreekumar_Resume
Sreekumar_ResumeSreekumar_Resume
Sreekumar_Resume
 

Similar to David Correia Cv V5 (20)

Resume-Uday-6+years,DCS,PLC's,Controls design
Resume-Uday-6+years,DCS,PLC's,Controls designResume-Uday-6+years,DCS,PLC's,Controls design
Resume-Uday-6+years,DCS,PLC's,Controls design
 
Farookh Engr
Farookh EngrFarookh Engr
Farookh Engr
 
Somchai J.(2015)r8
Somchai J.(2015)r8Somchai J.(2015)r8
Somchai J.(2015)r8
 
Yuvraj_Resume
Yuvraj_ResumeYuvraj_Resume
Yuvraj_Resume
 
HATIM_HASSAN_ALI--CV (1)
HATIM_HASSAN_ALI--CV (1)HATIM_HASSAN_ALI--CV (1)
HATIM_HASSAN_ALI--CV (1)
 
Somchai J.'s CV_2016
Somchai J.'s CV_2016Somchai J.'s CV_2016
Somchai J.'s CV_2016
 
ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)
 
Peter Vinh Resume
Peter Vinh ResumePeter Vinh Resume
Peter Vinh Resume
 
Mohamed Shawky Ashour CV
Mohamed Shawky Ashour CVMohamed Shawky Ashour CV
Mohamed Shawky Ashour CV
 
Mohamed Shawky Ashour CV
Mohamed Shawky Ashour CVMohamed Shawky Ashour CV
Mohamed Shawky Ashour CV
 
Athar CV updated
Athar CV updatedAthar CV updated
Athar CV updated
 
Resume
ResumeResume
Resume
 
CV-Nidhin
CV-NidhinCV-Nidhin
CV-Nidhin
 
MuhammadImran(CV)
MuhammadImran(CV)MuhammadImran(CV)
MuhammadImran(CV)
 
CV 2016 new
CV 2016 newCV 2016 new
CV 2016 new
 
CV-Nidhin
CV-NidhinCV-Nidhin
CV-Nidhin
 
Ranhnel R Navarez Resume
Ranhnel R Navarez ResumeRanhnel R Navarez Resume
Ranhnel R Navarez Resume
 
ALLEN HEINRICHS RESUME
ALLEN HEINRICHS RESUME ALLEN HEINRICHS RESUME
ALLEN HEINRICHS RESUME
 
Mike Leeper Resume
Mike Leeper ResumeMike Leeper Resume
Mike Leeper Resume
 
n electrical engineer resume
n electrical engineer resumen electrical engineer resume
n electrical engineer resume
 

David Correia Cv V5

  • 1. David Correia Name: David A. S. Correia Place of birth: Lisbon Date of birth: October 6th 1975 Gender: Male Street: Jacques Perkstraat 25 Post Code: 3351CP Country: Netherland Telephone: Mob: 0031 (0) 624312396 Email: Info@advanced-automatisation.nl PSL Nr: M250367 VVA I/II Cert. Nr: HE.02.05.8114 School: 1992-1994 secondary school Reynaldo dos Santos Equivalences 1: 9grade basic Equivalences 2: High degree power distribution Spoken languages: Dutch, English, French, Spanish, and Portuguese
  • 2. Work experience with the following software: Office XP Office 2003 Office 2007 Microsoft Visio AutoCad MySql MSQL2008 WebServer PHPMyadmin Dreamweaver CS4 VmWare RealVnc Symantec Network monitoring packages. System administrator work experience with the following operating systems: MS-DOS PC-DOS UNIX LINUX Apple Windows NT, 95, 2000, 2000 Server, Server2003, server2008, XP, Vista, Win7. (Both 32/64Bit). Programming, troubleshooting and testing experience with the following system control software: MetsoDNA Metso FA (field Assessor) Hima ELOPII Honeywell TDC3000 Honeywell Experion PKS Honeywell FSC Yokogawa: Micro XL, Centum XL, Centum CS, CentumCS3000 and PRM. SCADA HMI Factory Link (Builder)
  • 3. MES WIS Siemens builder software 300/400 PLC’s Builder and control software for OMRON PLC’S And various real time data acquisition software packages. Hobby Projects: Design, implementation, troubleshooting of 32Ha wireless network up to 60 Clients for a friends business Web site building and hosting Configuration experience following ICT hardware: Dell servers Hp Servers Cisco switches Jupiner firewall Netgear Moxa switches 3Com Linksys by Cisco Training & certifications by vendor: Rosemount MicroMotion Vega transmitters (micro guided wave, Ultrasonic & Radar) ABB Drive training & ABB Drive window Dresser Masonelian SVII Positioner and valves Dresser Masonelian level displacers MetsoDNA Field assessor MetsoDNA operator training Intel technology Expert (Certified by Intel)
  • 4. Projects: Date: Function: Company: 2012-2012 commissioning engineer Attero Job description: Lead commissioning engineer Instrument commissioning Date: Function: Company: 2011-2012 lead commissioning engineer Shell Pre-commissioning, commissioning and start-up Job description: Start-up support Date: Function: Company: 2011-2012 lead commissioning engineer AVC Pre-commissioning, commissioning and start-up Job description: Start-up support /Troubleshooting Date: Function: Company: 2010-2011 Application engineer / lead commissioning engineer Neste Oil Pre-commissioning, commissioning and start-up Job description:
  • 5. Application engineer / lead commissioning engineer Instrument Pre-commissioning Instrument commissioning Instrumentation engineer Start-up support team manager Loop test team manager Installation handover acceptance Loop test HSE walk downs Technical support to 3 party hardware vendors Date: Function: Company: 2010-2010 Commissioning engineer BP (Rig Valhall) Job description: Instrument commissioning Instrument pre-calibrations Loop test HSE walk downs Technical support to 3 party hardware vendors Date: Function: Company: 2009-2009 Field service engineer Alewijnse Job description: E&I Field service engineer plus technical support Commissioning function test tanker (Staat Essen) Commissioning function test tanker (Milagro)
  • 6. Date: Function: Company: 2008-2009 Lead engineer E&I Ovako Wire B.V. Job description: Lead Electro technical Dept. /Planner/ Hardware Technical Advisor 1st line call out support for instrumentation related problems Control maintenance and design from field equipment Instrumentation Field devices hardware engineering commissioning and function test Implementation from network monitoring (hardware & software) Upgrade control network to turbo-ring v2 Performing analysis, of plant failures Implementation reliable hardware in order to reduce production downtime, as well as maintenance activities Hardware engineering and software modification (water treatment station, lube-oil. and furnace) on order to increase reliability and meet process demands Support to field teams delivering specific wiring diagrams for field instrumentation. Support to both electrical and to mechanical dept Planning from preventive maintenance and shutdown maintenance to be preformed internally (maintenance technical dept) or by subcontractors 2 line call out Factory start up support Test and commissioning new installations Date: Function: Company: 2007-2008 Lead Engineer SPIE Controlec Job description: Lead Engineer (Vopak Botlek ATEX certification) Control from field equipment vs PID's Control filed equipment specifications Technical support and close team work piping engineers in order to achieve maximum accuracy and technical information on PID's, and therefore meet client demands
  • 7. Maintenance of local network wired and wireless to guarantee permanent head office link and minimize engineering downtime Date: Function: Company: 2007-2007 Technical engineer SPIE Controlec Job description: (For shell Chemicals Moerdijk II Faze MLO turnaround) Wiring function test DCS system Loop wiring plus loop test Software & hardware support Yokogawa CS3000 R3.03 hardware Engineering cabinet drawings for as-built Modification from I/O cabinets Modification from PC cabinets plus mechanical design modification Modification from wiring diagrams Ensure extra system reliability Engineering test and installation from hardware to allow remote PC access (single end user plus multiple end users) Concept and or modification from structured network Test from new patch panels. Assembly from new operation console desks fine tuning from monitors Disassembly from old TDC system Honeywell Date: Function: Company: 2007-2007 Commissioning engineer Croon Job description: (DuPont Nederland Stop 2007) Preparation for commissioning new power supply distribution panels Preparation from field equipment to be removed for inspection, maintenance or replacement Support to field teams delivering specific wiring diagrams for field instrumentation
  • 8. Test field instrumentation Control from preformed job packages by several subcontractors Factory start up support Date: Function: Company: 2006-2007 Lead Engineer Spie Controlec Job description: (Stop OXY3 2007) ESD Honeywell function test plus control modification from ESD test protocol TDC loop test Preparation from field equipment to be removed for inspection, maintenance or replacement Rewiring from removed field equipment Replacement from damaged field equipment Calibration from field equipment Factory start up support Date: Function: Company: 2006-2007 Technical Engineer Spie Control Job description: (For shell Chemicals Moerdijk I Fase MLO turnaround) Wiring function test DCS system Loop wiring plus loop test Software & hardware support Yokogawa CS3000 R3.03 hardware Modification from cabinet drawings for as-built
  • 9. Modification from I/O cabinets Modification from PC cabinets plus mechanical design modification Modification from electrical Ensure system reliability Design ordering test and installation from hardware to allow remote PC access (single end user plus multiple end users) Concept and modification from structured network Test from new patch panels Assembly from new operation console desks fine tuning from monitors Disassembly from old TDC system Honeywell Programming from switches and routers Destructive and non destructive hardware analysis after system failures Date: Function: Company: 2005-2006 Maintenance engineer StorkWorkSphere Job description: Technical maintenance engineer Implementation of industrial maintenance on Hilversum Media Park Registration from existing equipment Instrument inspection repair and calibration E&I inspections Mechanical adjustment from actuators electrical and pneumatic Modification from existing equipment for better performance Date: Function: Company: 2003-2005 Service engineer Yokogawa Nederland Job description: And stability in order to improve quality and speed from delivered equipment and reduce down time at Yokogawa clients Yokogawa system maintenance engineer (Service
  • 10. maintenance department). MICRO XL, CENTUM XL, CENTUM CS, CENTUM CS3000 and R3.03 hardware Work involved: Control and execution from service notes Troubleshooting from hardware Calibration from Yokogawa I/O cards Some experience with PH and conductivity transmitters Modification from cabinets mechanical and electric Wiring or modifications on cabinet cross wiring Execution from cabinet drawings for installation Mounting, installing, troubleshooting, power up and maintaining complete Yokogawa DCS system (Cabinets, FCS, NODES, NIU’S, I/O cards, computers and peripheral equipment transceivers, routers, switches, E.T.C.) Execution from preventive maintenance above mentioned equipment Training colleagues for preventive and shutdown maintenance activities Leading different teams on preventive and shutdown maintenance activities Shutdown maintenance: Complete disassembly all Yokogawa system, visual hardware inspection, re-assembly, testing and loading the application leaving the equipment in working conditions as found before starting action. Experience installing, troubleshooting and backup following operating systems : DOS, Unix, AT&T Unix, Windows NT, W2000 and W2000 Server, Windows XP. Installation or function test from Human interface stations and software installation check. Research from tools to improve system performance, maintenance and stability in order to improve quality and speed from delivered equipment and reduce down time at Yokogawa clients Execution from maintenance reports for the above mentioned tasks. Date: Function: Company: 2002-2003 E&I technician Cegelec (Demi-water factory) Job description: Directly working for E&I section of the water production sector. Having preformed the removal and calibration of 90% of instrumentation on respective sector vo11/12(including ISO calibrations)
  • 11. Also the commissioning of the valves returned from revisions by subcontractors The calibrations wore preformed on a TRADINCO table and on the field (hart com.) and included temp., pressure, level, radar Ph Analyzers, pressure switches and valves Daily assistance to production Execution of as built drawings Date: Function: Company: 2002-2003 E&I technician GTI Marine Job description: Assistance in the renovation of an off shore drilling platform Date: Function: Company: 2002-2003 Technician Van Der Leun Job description: Connecting main and partial alimentation cables Connecting partial installation circuits Connecting MCC panels as well as all bridge command consoles Trailing Suction Hopper Dredger Mellina Trailing Suction Hopper Dredger TONG TAN Date: Function: Company: 2001-2002 Technician ULC (Utilities building)
  • 12. Job description: Connecting all main and partial alimentation cables as well as partial installation circuits Date: Function: Company: 2001-2002 Technician Pietersen Electrical Job description: Commissioning and programming P.H. indicators, soft start systems, level and flow indicators as well as pressure transmitters Date: Function: Company: 2001-2002 Commissioning engineer Heerema Marine Contractors Job description: Holland Foreman 4 persons on only commissioning project. Renovation of working platform “Balder” Date: Function: Company: 2001-2002 Technician ULC Job description: Water treatment station – connecting new main power supply cables on renewed installation Date: 2001-2002 Function:
  • 13. Technician Company: Croon Job description: Gist.DSM” Cable tray assembly Welding Profiles Replacement of old E. panels Date: Function: Company: 2001-2002 Technician Frames International Job description: Building electrical command panels for offshore platforms (some experience also in argon welding). Date: Function: Company: 2001-2002 Technician Imtech Projects Job description: Renovation of central surface administration building Date: Function: Company: 2001-2002 Foreman Getronics Job description: (WorldCom Amsterdam) Leader of 9 person’s team on preparing structured network
  • 14. Date: Function: Company: 2001-2002 Technician Barneveld Job description: (Holland printing company) Electro-pneumatic valves commissioning and connecting for new print room (Display Electronics) Building new informatics system on structured network for Importers Holland Defining points of utilization connecting patch boxes and commissioning it (Supermarket (in Reisen) Project leadership installing fire detection system on Producing as built drawings Date: Function: Company: 2000-2001 Technician Croon Job description: (Philips Roosendaal) Building a new lab for Phillips lightning Holland Date: Function: Company: 2000-2001 Technician Imtech Marine Job description: Electrical work on board Star Clipper (ship yard) as sub chief of two floors (e.g. Phone and P.A. addressee boxes, lighting, steering room commands leading a 5 men team).
  • 15. Date: Function: Company: 2000-200 Foreman Enelec T.P.C.I Job description: Connecting and commissioning instrumentation panels and instruments for Enelec T.P.C.I Date: Function: Company: 1996-2000 Lead Engineer Ferreira Inacio Lopes Job description: Commissioning engineer and project leadership in project’s office Elaboration of projects with CAD 14/2000 Drawing. Subspecialties: High tension / Medium tension communication and weak tension. The job consisted of: Executing auto cad drawings Discussing the needs of the client and verifying the characteristics of installation to be build. Executing the quantity map’s to be delivered to the sub contractors Verifying if the materials applied are as specified in lists as well as assembly methods Performing measurements and corrections on installed equipments as well as last commissioning and verification if safety norms are in order, before Placing the installation to use Date: Function: Company: 1995-1997 Airborne Paratrooper 3rd Operational Battalion
  • 16. Job description: Army service complete on Portuguese Airborne Special Forces Preparation and maintenance of electrical material to be assembled on the field Date: Function: Company: 1987-1991 Student Provimi S.A. Job description: Industrial maintenance student