SlideShare a Scribd company logo
1 of 29
Internship /Professional Practice – 18CVI85 PRESENTATION
“MULTI STOREY RESIDENTIAL BUILDING”
Presented by:
Mr. Neeraj Akarsh Setty (1DB19CV013)
Mr. Suhas L (1DB19CV016)
Mr. Pavan G M (1DB19CV012)
Mr. Daniyal (1DB18CV018)
Under the Guidance of
Mr. Kushnappa B K
Assistant Professor
DEPARTMENT OF CIVIL ENGINEERING
DON BOSCO INSTITUTE OF TECHNOLOGY
Kumbalagodu, Mysore road, Bengaluru-74
1
Visvesvaraya Technological University
“Jnana Sangama”, Belagavi 590018
2022-2023
Contents
• 1. INTRODUCTION
• 2. ABOUT COMPANY
• 3. ABOUT PROJECT
• 4. DAILY PROGRESS OF THE PROJECT
• 5. OUTCOME OF THE INTERNSHIP
• 6. PHOTO GALLERY
2
INTRODUCTION :
 A Building is a structure with a Roof and Walls standing more or less permanently in
one place, such as a house or factory.
 Buildings come in a variety of sizes, shapes and functions, and have been adopted
throughout history for wide number of factors like building materials available,
weather conditions, land prices, ground conditions, specific uses and aesthetic reasons.
 Building serve several needs of society, primarily as shelter from weather, security,
living space, privacy, to store belongings, and to comfortably live and work.
 Buildings are classified based on its occupancy and structure such as Residential
Building, Education building, Institutional building, Assembly building, Business
building, Industrial buildings etc.
 Buildings in which sleeping arrangements are provided with or without cooking
arrangement is called as Residential building which includes single or multi family
dwelling, apartments, lodging, restaurants ,hostels, dormitories and hotels.
3
ABOUT COMPANY :
MFAR is a multi-sectoral conglomerate with extensive expertise in construction, real estate,
hospitality, and manufacturing solutions. With decades of experience across India, MFAR has
since its inception demonstrated innovation, commitment and a passion to become a part of
India’s nation-building efforts.
MFAR thus benefits from the expertise and organizational abilities honed by Dr Ali and his
organizations. Today it has several group companies under its wings : MFAR Constructions,
MFAR Developers, MFAR Hospitality and MFAR Carbon, headquartered at Bengaluru, India.
MFAR has today emerged with a presence in India and South Asia. MFAR Construction has
constructed 62 Million Sq Ft and counting.
Dr. P Mohamed Ali is the Founder of MFAR Groups who is a visionary Global Entrepreneur
and Philanthropist, who was always waiting to invest in his home land, which inspired him to
establish MFAR Constructions Pvt Ltd in 1996 at Bengaluru. Through his vision, the MFAR
group has acquired a powerful presence in the construction, real estate, hospitality and
activated carbon manufacturing fields in India.
4
ABOUT COMPANY :
 MFAR Constructions was established in 1996, headquartered in Bengaluru, it has built a
Pan India presence over the last two decades, building Smart, Green and World-class spaces
in India.
 MFAR Constructions undertakes diverse projects for a range of clients across India.
 MFAR employs construction management techniques that enhance the quality and
efficiency of its projects.
 MFAR has built strong and enduring partnerships with its customers along the way.
 MFAR’s construction portfolio includes IT parks, malls, commercial, institutional,
industrial infrastructure and high rise residential complexes.
 MFAR undertakes civil contracting, and turnkey solutions, including project management.
Over the past 22 years MFAR has successfully delivered projects in Bengaluru, Kolkata ,
Assam, Chennai, Vizag, Manglore, Udupi, Kochi, Goa, Patna, Bhubaneswar, Chattisgarh and
Delhi.
5
ABOUT PROJECT
 Project name : Centreo
 Project Type : Residential Apartments
 Contractor : MFAR Constructions Pvt
Ltd
 Project Location : Kanakapura road,
South Banglore.
 Land Area : 2.72 Acres (Approx)
 No. of Units : 252 Appartments
 No. of Towers : 3 Towers
 No. of Floors : 2B+G+13 Floors
 Unit Variants : 1BHK, 2BHK, & 3BHK
6
7
8
9
10
11
12
13
14
15
DAILY PROGRESS OF THE
PROJECT :
Isolated Column Footing :
Is one of the most used type of foundation to support single columns when they
are arranged at a long distance. An isolated footing must be designed to avoid
exceeding its bearing capacity and provide safety against over turning or sliding
while preventing the ground from settling
16
 It consists of ribs spaced at regular interval at perpendicular directions which
are monolithic with slab.
 These grid slabs are generally used for architectural purposes for large spans
such as public assembly halls, auditoriums, showrooms, were to avoid internal
columns in the structure.
17
Grid Beam Slab
 Is a type of scaffolding characterised by a joining method that uses
metal cups to lock beams together. It is a temporary network of frames
used to support workers during construction or renovation of structure.
 They are easy to stand, no nuts, bolts and wedges are required quick,
solid erection and dismantling results in time and labour saving,
lightweight, high load carrying capacity and low maintenance.
18
Cup Lock Scaffolding
Form Work :
19
 A formwork is a temporary structure used as mould for the original
structure.
 There are different materials available to construct the formwork.
 Formwork material is selected depending upon many factors like cost,
requirement, type of structure etc.
 Different formwork materials are used in site for construction, in our
project Conventional formwork and aluminium formwork is used.
Plywood as Formwork Material
 Plywood which is a manufacture of timber is also used for formworks.
 The plywood boards are available in thickness from 7mm to 32mm.
 Plywood can also be cut into required size easily and it is strong,
durable and light in weight
 Very large size plywood board are available which makes construction
quicker and easier. It provides smooth finish on the surface.
20
Aluminium as Formwork
Material
 Aluminium formwork is used often for pre-fabricated formwork. It is getting
more popular because of its light weight and good strength.
 It requires fewer support and ties.
 It is easy to fix and easy to dismantle. It can be reused for many times.
 The walls and slabs of structures can be casted simultaneously.
 Monolithic crack free structures can be built using aluminium formwork
21
Quality control test of fine
aggregate by Sieve Analysis.
This process involves the use of a series of standard sieves, with
decreasing mesh sizes. The steps involved in sieve analysis of fine
aggregates:
 Collecting the sample
 Preparing the sieves
 Weighing of the sieves
 Preparing the pan
 Beginning of sieving is done.
 Retained material is weighed.
 Now the results are calculated
22
Quality control test of fine
aggregate by Sieve Analysis
23
Quality control test conducted for
Compressive strength of concrete
The compressive strength test is one of the most important tests
conducted on concrete. It measures the ability of concrete to withstand
compressive loads without cracking or failing, the steps to conduct the
compressive strength test of concrete:
 Preparation of test specimen (usually 150mm cubes)
 Curing of the test specimen
 Testing of specimen by placing of the cured specimen in compression
testing machine.
 Load is provided at constant rate till the failure occurs
 The load of failure is recorded for further process.
 After the sample failure are calculated,the report is provided.
24
Quality control test conducted for
Compressive strength of concrete
25
Quality control test by Slump to
check the workability of concrete
The slump test is a widely used method for determining the consistency
and workability of fresh concrete. It measures the deformation of a
concrete sample under the influence of gravity,the steps involved in
conducting a slump test:
 Prepare the mould
 Fill the mould with the concrete with 3 equal layers ,and compact each
layer 25 stokes with tamping rod.
 Strike off the surface
 Lift the mould
 Measure the slump
 Determine the consistency of slump
 Recording of the workability of sample of concrete is done
26
Quality control test by Slump to
check the workability of concrete
27
CONCLUSION
 Construction of high rise residential building requires lots of time and
effort depending on the structure.
 The construction methods for the high rise residential building depends
based on its budget.
 High rise residential building requires Recreational aspect like
construction of Gym, Swimming Pool, playground etc
 High Rise Residential Building needs required space for ventilation and
sunlight to provide comfort to the users.
 High rise residential building requires lot of investment and land area
(sq ft)
28
29
THANK YOU

More Related Content

Similar to internship_presentation_2022-23[1] [Autosaved].pptx

Site report
Site reportSite report
Site reportEric Teo
 
Mivan form wok - aluminium formwork shuttering tecnology
Mivan form wok - aluminium formwork shuttering tecnologyMivan form wok - aluminium formwork shuttering tecnology
Mivan form wok - aluminium formwork shuttering tecnologysravan kumar chilamakuri
 
Presentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniquePresentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniqueIEI GSC
 
Modern Construction Technologies
Modern Construction TechnologiesModern Construction Technologies
Modern Construction TechnologiesRahul Saraswat
 
Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3Yee Len Wan
 
Monolithic concrete construction system
Monolithic concrete construction systemMonolithic concrete construction system
Monolithic concrete construction systemchirag aggarwal
 
COMPARATIVE STUDY ON SEISMIC ANALYSIS OF CONVENTIONAL SLAB AND FLAT SLAB STRU...
COMPARATIVE STUDY ON SEISMIC ANALYSIS OF CONVENTIONAL SLAB AND FLAT SLAB STRU...COMPARATIVE STUDY ON SEISMIC ANALYSIS OF CONVENTIONAL SLAB AND FLAT SLAB STRU...
COMPARATIVE STUDY ON SEISMIC ANALYSIS OF CONVENTIONAL SLAB AND FLAT SLAB STRU...IRJET Journal
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1chongyih2
 
Building technology report
Building technology reportBuilding technology report
Building technology reportChong Yi Hui
 
MIVAN_An Aluminum Formwork Construction Technique
MIVAN_An Aluminum Formwork Construction TechniqueMIVAN_An Aluminum Formwork Construction Technique
MIVAN_An Aluminum Formwork Construction TechniqueSandeep Jain
 
PREFABRICATED CONSTRUCTION
PREFABRICATED CONSTRUCTIONPREFABRICATED CONSTRUCTION
PREFABRICATED CONSTRUCTIONAnushka Bhargava
 
Final Hi Tech Broucher New 12 Page
Final Hi Tech Broucher New 12 PageFinal Hi Tech Broucher New 12 Page
Final Hi Tech Broucher New 12 PageGirish Damle
 
Planning and Scheduling of Shuttering System for Multi-Storeyed Building
Planning and Scheduling of Shuttering System for Multi-Storeyed BuildingPlanning and Scheduling of Shuttering System for Multi-Storeyed Building
Planning and Scheduling of Shuttering System for Multi-Storeyed BuildingIRJET Journal
 
Aeons
AeonsAeons
AeonsPixel
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Chin Tze Wei
 

Similar to internship_presentation_2022-23[1] [Autosaved].pptx (20)

Site report
Site reportSite report
Site report
 
Ez
EzEz
Ez
 
Mivan form wok - aluminium formwork shuttering tecnology
Mivan form wok - aluminium formwork shuttering tecnologyMivan form wok - aluminium formwork shuttering tecnology
Mivan form wok - aluminium formwork shuttering tecnology
 
Presentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction techniquePresentation on MIVAN -- A versatile aluminum formwork construction technique
Presentation on MIVAN -- A versatile aluminum formwork construction technique
 
JEEVA.pptx
JEEVA.pptxJEEVA.pptx
JEEVA.pptx
 
Modern Construction Technologies
Modern Construction TechnologiesModern Construction Technologies
Modern Construction Technologies
 
Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3
 
Monolithic concrete construction system
Monolithic concrete construction systemMonolithic concrete construction system
Monolithic concrete construction system
 
COMPARATIVE STUDY ON SEISMIC ANALYSIS OF CONVENTIONAL SLAB AND FLAT SLAB STRU...
COMPARATIVE STUDY ON SEISMIC ANALYSIS OF CONVENTIONAL SLAB AND FLAT SLAB STRU...COMPARATIVE STUDY ON SEISMIC ANALYSIS OF CONVENTIONAL SLAB AND FLAT SLAB STRU...
COMPARATIVE STUDY ON SEISMIC ANALYSIS OF CONVENTIONAL SLAB AND FLAT SLAB STRU...
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1
 
Building technology report
Building technology reportBuilding technology report
Building technology report
 
MIVAN_An Aluminum Formwork Construction Technique
MIVAN_An Aluminum Formwork Construction TechniqueMIVAN_An Aluminum Formwork Construction Technique
MIVAN_An Aluminum Formwork Construction Technique
 
PREFABRICATED CONSTRUCTION
PREFABRICATED CONSTRUCTIONPREFABRICATED CONSTRUCTION
PREFABRICATED CONSTRUCTION
 
Site report
Site reportSite report
Site report
 
Final Hi Tech Broucher New 12 Page
Final Hi Tech Broucher New 12 PageFinal Hi Tech Broucher New 12 Page
Final Hi Tech Broucher New 12 Page
 
Planning and Scheduling of Shuttering System for Multi-Storeyed Building
Planning and Scheduling of Shuttering System for Multi-Storeyed BuildingPlanning and Scheduling of Shuttering System for Multi-Storeyed Building
Planning and Scheduling of Shuttering System for Multi-Storeyed Building
 
Aeons
AeonsAeons
Aeons
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)
 
Site report 1
Site report 1Site report 1
Site report 1
 
Construction Site Report
Construction Site ReportConstruction Site Report
Construction Site Report
 

Recently uploaded

Infant Guidance and Counselling and Life Skills Education syllabus.docx
Infant Guidance and Counselling  and Life Skills Education syllabus.docxInfant Guidance and Counselling  and Life Skills Education syllabus.docx
Infant Guidance and Counselling and Life Skills Education syllabus.docxGoldenKahwema
 
TEST BANK For Growth and Development Across the Lifespan, 3rd Edition By Glor...
TEST BANK For Growth and Development Across the Lifespan, 3rd Edition By Glor...TEST BANK For Growth and Development Across the Lifespan, 3rd Edition By Glor...
TEST BANK For Growth and Development Across the Lifespan, 3rd Edition By Glor...rightmanforbloodline
 
Sales Experience Presentation - Angel Lopez
Sales Experience Presentation - Angel LopezSales Experience Presentation - Angel Lopez
Sales Experience Presentation - Angel LopezInfinity Skies Corp
 
Ganga Path Project (marine drive project) Patna ,Bihar .pdf
Ganga Path Project (marine drive project) Patna ,Bihar .pdfGanga Path Project (marine drive project) Patna ,Bihar .pdf
Ganga Path Project (marine drive project) Patna ,Bihar .pdfDeepak15CivilEngg
 
如何办理(VIU毕业证书)温哥华岛大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(VIU毕业证书)温哥华岛大学毕业证成绩单本科硕士学位证留信学历认证如何办理(VIU毕业证书)温哥华岛大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(VIU毕业证书)温哥华岛大学毕业证成绩单本科硕士学位证留信学历认证gkyvm
 
Novo Nordisk Kalundborg. We are expanding our manufacturing hub in Kalundborg...
Novo Nordisk Kalundborg. We are expanding our manufacturing hub in Kalundborg...Novo Nordisk Kalundborg. We are expanding our manufacturing hub in Kalundborg...
Novo Nordisk Kalundborg. We are expanding our manufacturing hub in Kalundborg...Juli Boned
 
Jual obat aborsi Dubai ( 085657271886 ) Cytote pil telat bulan penggugur kand...
Jual obat aborsi Dubai ( 085657271886 ) Cytote pil telat bulan penggugur kand...Jual obat aborsi Dubai ( 085657271886 ) Cytote pil telat bulan penggugur kand...
Jual obat aborsi Dubai ( 085657271886 ) Cytote pil telat bulan penggugur kand...ZurliaSoop
 
LinkedIn For Job Search Presentation May 2024
LinkedIn For Job Search Presentation May 2024LinkedIn For Job Search Presentation May 2024
LinkedIn For Job Search Presentation May 2024Bruce Bennett
 
如何办理(UST毕业证书)圣托马斯大学毕业证成绩单原件一模一样
如何办理(UST毕业证书)圣托马斯大学毕业证成绩单原件一模一样如何办理(UST毕业证书)圣托马斯大学毕业证成绩单原件一模一样
如何办理(UST毕业证书)圣托马斯大学毕业证成绩单原件一模一样muwyto
 
Biography of Doctor Arif Patel Preston UK
Biography of Doctor Arif Patel Preston UKBiography of Doctor Arif Patel Preston UK
Biography of Doctor Arif Patel Preston UKArifPatel42
 
We’re looking for a junior patent engineer to join our Team!
We’re looking for a junior patent engineer to join our Team!We’re looking for a junior patent engineer to join our Team!
We’re looking for a junior patent engineer to join our Team!Juli Boned
 
Career opportunities after 12th Science 2024 Biology group
Career opportunities after 12th Science 2024 Biology groupCareer opportunities after 12th Science 2024 Biology group
Career opportunities after 12th Science 2024 Biology groupMohmmedirfan Momin
 
如何办理(USC毕业证书)南加利福尼亚大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(USC毕业证书)南加利福尼亚大学毕业证成绩单本科硕士学位证留信学历认证如何办理(USC毕业证书)南加利福尼亚大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(USC毕业证书)南加利福尼亚大学毕业证成绩单本科硕士学位证留信学历认证gakamzu
 
Ochsen Screenplay Coverage - JACOB - 10.16.23.pdf
Ochsen Screenplay Coverage - JACOB - 10.16.23.pdfOchsen Screenplay Coverage - JACOB - 10.16.23.pdf
Ochsen Screenplay Coverage - JACOB - 10.16.23.pdfRachel Ochsenschlager
 
Prest Reed Portfolio revamp Full Sail Presentation 2
Prest Reed Portfolio revamp Full Sail Presentation 2Prest Reed Portfolio revamp Full Sail Presentation 2
Prest Reed Portfolio revamp Full Sail Presentation 25203records
 
如何办理(Columbia毕业证书)哥伦比亚大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(Columbia毕业证书)哥伦比亚大学毕业证成绩单本科硕士学位证留信学历认证如何办理(Columbia毕业证书)哥伦比亚大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(Columbia毕业证书)哥伦比亚大学毕业证成绩单本科硕士学位证留信学历认证epyhpep
 
Launch Your Research Career: A Beginner's Guide
Launch Your Research Career: A Beginner's GuideLaunch Your Research Career: A Beginner's Guide
Launch Your Research Career: A Beginner's GuideKaziFaisalAlam
 
如何办理(CQU毕业证书)中央昆士兰大学毕业证成绩单原件一模一样
如何办理(CQU毕业证书)中央昆士兰大学毕业证成绩单原件一模一样如何办理(CQU毕业证书)中央昆士兰大学毕业证成绩单原件一模一样
如何办理(CQU毕业证书)中央昆士兰大学毕业证成绩单原件一模一样muwyto
 
Specialize in a MSc within Biomanufacturing, and work part-time as Process En...
Specialize in a MSc within Biomanufacturing, and work part-time as Process En...Specialize in a MSc within Biomanufacturing, and work part-time as Process En...
Specialize in a MSc within Biomanufacturing, and work part-time as Process En...Juli Boned
 

Recently uploaded (20)

Infant Guidance and Counselling and Life Skills Education syllabus.docx
Infant Guidance and Counselling  and Life Skills Education syllabus.docxInfant Guidance and Counselling  and Life Skills Education syllabus.docx
Infant Guidance and Counselling and Life Skills Education syllabus.docx
 
TEST BANK For Growth and Development Across the Lifespan, 3rd Edition By Glor...
TEST BANK For Growth and Development Across the Lifespan, 3rd Edition By Glor...TEST BANK For Growth and Development Across the Lifespan, 3rd Edition By Glor...
TEST BANK For Growth and Development Across the Lifespan, 3rd Edition By Glor...
 
Sales Experience Presentation - Angel Lopez
Sales Experience Presentation - Angel LopezSales Experience Presentation - Angel Lopez
Sales Experience Presentation - Angel Lopez
 
Ganga Path Project (marine drive project) Patna ,Bihar .pdf
Ganga Path Project (marine drive project) Patna ,Bihar .pdfGanga Path Project (marine drive project) Patna ,Bihar .pdf
Ganga Path Project (marine drive project) Patna ,Bihar .pdf
 
如何办理(VIU毕业证书)温哥华岛大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(VIU毕业证书)温哥华岛大学毕业证成绩单本科硕士学位证留信学历认证如何办理(VIU毕业证书)温哥华岛大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(VIU毕业证书)温哥华岛大学毕业证成绩单本科硕士学位证留信学历认证
 
Novo Nordisk Kalundborg. We are expanding our manufacturing hub in Kalundborg...
Novo Nordisk Kalundborg. We are expanding our manufacturing hub in Kalundborg...Novo Nordisk Kalundborg. We are expanding our manufacturing hub in Kalundborg...
Novo Nordisk Kalundborg. We are expanding our manufacturing hub in Kalundborg...
 
Jual obat aborsi Dubai ( 085657271886 ) Cytote pil telat bulan penggugur kand...
Jual obat aborsi Dubai ( 085657271886 ) Cytote pil telat bulan penggugur kand...Jual obat aborsi Dubai ( 085657271886 ) Cytote pil telat bulan penggugur kand...
Jual obat aborsi Dubai ( 085657271886 ) Cytote pil telat bulan penggugur kand...
 
Cara Gugurkan Kandungan Awal Kehamilan 1 bulan (087776558899)
Cara Gugurkan Kandungan Awal Kehamilan 1 bulan (087776558899)Cara Gugurkan Kandungan Awal Kehamilan 1 bulan (087776558899)
Cara Gugurkan Kandungan Awal Kehamilan 1 bulan (087776558899)
 
LinkedIn For Job Search Presentation May 2024
LinkedIn For Job Search Presentation May 2024LinkedIn For Job Search Presentation May 2024
LinkedIn For Job Search Presentation May 2024
 
如何办理(UST毕业证书)圣托马斯大学毕业证成绩单原件一模一样
如何办理(UST毕业证书)圣托马斯大学毕业证成绩单原件一模一样如何办理(UST毕业证书)圣托马斯大学毕业证成绩单原件一模一样
如何办理(UST毕业证书)圣托马斯大学毕业证成绩单原件一模一样
 
Biography of Doctor Arif Patel Preston UK
Biography of Doctor Arif Patel Preston UKBiography of Doctor Arif Patel Preston UK
Biography of Doctor Arif Patel Preston UK
 
We’re looking for a junior patent engineer to join our Team!
We’re looking for a junior patent engineer to join our Team!We’re looking for a junior patent engineer to join our Team!
We’re looking for a junior patent engineer to join our Team!
 
Career opportunities after 12th Science 2024 Biology group
Career opportunities after 12th Science 2024 Biology groupCareer opportunities after 12th Science 2024 Biology group
Career opportunities after 12th Science 2024 Biology group
 
如何办理(USC毕业证书)南加利福尼亚大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(USC毕业证书)南加利福尼亚大学毕业证成绩单本科硕士学位证留信学历认证如何办理(USC毕业证书)南加利福尼亚大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(USC毕业证书)南加利福尼亚大学毕业证成绩单本科硕士学位证留信学历认证
 
Ochsen Screenplay Coverage - JACOB - 10.16.23.pdf
Ochsen Screenplay Coverage - JACOB - 10.16.23.pdfOchsen Screenplay Coverage - JACOB - 10.16.23.pdf
Ochsen Screenplay Coverage - JACOB - 10.16.23.pdf
 
Prest Reed Portfolio revamp Full Sail Presentation 2
Prest Reed Portfolio revamp Full Sail Presentation 2Prest Reed Portfolio revamp Full Sail Presentation 2
Prest Reed Portfolio revamp Full Sail Presentation 2
 
如何办理(Columbia毕业证书)哥伦比亚大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(Columbia毕业证书)哥伦比亚大学毕业证成绩单本科硕士学位证留信学历认证如何办理(Columbia毕业证书)哥伦比亚大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(Columbia毕业证书)哥伦比亚大学毕业证成绩单本科硕士学位证留信学历认证
 
Launch Your Research Career: A Beginner's Guide
Launch Your Research Career: A Beginner's GuideLaunch Your Research Career: A Beginner's Guide
Launch Your Research Career: A Beginner's Guide
 
如何办理(CQU毕业证书)中央昆士兰大学毕业证成绩单原件一模一样
如何办理(CQU毕业证书)中央昆士兰大学毕业证成绩单原件一模一样如何办理(CQU毕业证书)中央昆士兰大学毕业证成绩单原件一模一样
如何办理(CQU毕业证书)中央昆士兰大学毕业证成绩单原件一模一样
 
Specialize in a MSc within Biomanufacturing, and work part-time as Process En...
Specialize in a MSc within Biomanufacturing, and work part-time as Process En...Specialize in a MSc within Biomanufacturing, and work part-time as Process En...
Specialize in a MSc within Biomanufacturing, and work part-time as Process En...
 

internship_presentation_2022-23[1] [Autosaved].pptx

  • 1. Internship /Professional Practice – 18CVI85 PRESENTATION “MULTI STOREY RESIDENTIAL BUILDING” Presented by: Mr. Neeraj Akarsh Setty (1DB19CV013) Mr. Suhas L (1DB19CV016) Mr. Pavan G M (1DB19CV012) Mr. Daniyal (1DB18CV018) Under the Guidance of Mr. Kushnappa B K Assistant Professor DEPARTMENT OF CIVIL ENGINEERING DON BOSCO INSTITUTE OF TECHNOLOGY Kumbalagodu, Mysore road, Bengaluru-74 1 Visvesvaraya Technological University “Jnana Sangama”, Belagavi 590018 2022-2023
  • 2. Contents • 1. INTRODUCTION • 2. ABOUT COMPANY • 3. ABOUT PROJECT • 4. DAILY PROGRESS OF THE PROJECT • 5. OUTCOME OF THE INTERNSHIP • 6. PHOTO GALLERY 2
  • 3. INTRODUCTION :  A Building is a structure with a Roof and Walls standing more or less permanently in one place, such as a house or factory.  Buildings come in a variety of sizes, shapes and functions, and have been adopted throughout history for wide number of factors like building materials available, weather conditions, land prices, ground conditions, specific uses and aesthetic reasons.  Building serve several needs of society, primarily as shelter from weather, security, living space, privacy, to store belongings, and to comfortably live and work.  Buildings are classified based on its occupancy and structure such as Residential Building, Education building, Institutional building, Assembly building, Business building, Industrial buildings etc.  Buildings in which sleeping arrangements are provided with or without cooking arrangement is called as Residential building which includes single or multi family dwelling, apartments, lodging, restaurants ,hostels, dormitories and hotels. 3
  • 4. ABOUT COMPANY : MFAR is a multi-sectoral conglomerate with extensive expertise in construction, real estate, hospitality, and manufacturing solutions. With decades of experience across India, MFAR has since its inception demonstrated innovation, commitment and a passion to become a part of India’s nation-building efforts. MFAR thus benefits from the expertise and organizational abilities honed by Dr Ali and his organizations. Today it has several group companies under its wings : MFAR Constructions, MFAR Developers, MFAR Hospitality and MFAR Carbon, headquartered at Bengaluru, India. MFAR has today emerged with a presence in India and South Asia. MFAR Construction has constructed 62 Million Sq Ft and counting. Dr. P Mohamed Ali is the Founder of MFAR Groups who is a visionary Global Entrepreneur and Philanthropist, who was always waiting to invest in his home land, which inspired him to establish MFAR Constructions Pvt Ltd in 1996 at Bengaluru. Through his vision, the MFAR group has acquired a powerful presence in the construction, real estate, hospitality and activated carbon manufacturing fields in India. 4
  • 5. ABOUT COMPANY :  MFAR Constructions was established in 1996, headquartered in Bengaluru, it has built a Pan India presence over the last two decades, building Smart, Green and World-class spaces in India.  MFAR Constructions undertakes diverse projects for a range of clients across India.  MFAR employs construction management techniques that enhance the quality and efficiency of its projects.  MFAR has built strong and enduring partnerships with its customers along the way.  MFAR’s construction portfolio includes IT parks, malls, commercial, institutional, industrial infrastructure and high rise residential complexes.  MFAR undertakes civil contracting, and turnkey solutions, including project management. Over the past 22 years MFAR has successfully delivered projects in Bengaluru, Kolkata , Assam, Chennai, Vizag, Manglore, Udupi, Kochi, Goa, Patna, Bhubaneswar, Chattisgarh and Delhi. 5
  • 6. ABOUT PROJECT  Project name : Centreo  Project Type : Residential Apartments  Contractor : MFAR Constructions Pvt Ltd  Project Location : Kanakapura road, South Banglore.  Land Area : 2.72 Acres (Approx)  No. of Units : 252 Appartments  No. of Towers : 3 Towers  No. of Floors : 2B+G+13 Floors  Unit Variants : 1BHK, 2BHK, & 3BHK 6
  • 7. 7
  • 8. 8
  • 9. 9
  • 10. 10
  • 11. 11
  • 12. 12
  • 13. 13
  • 14. 14
  • 15. 15
  • 16. DAILY PROGRESS OF THE PROJECT : Isolated Column Footing : Is one of the most used type of foundation to support single columns when they are arranged at a long distance. An isolated footing must be designed to avoid exceeding its bearing capacity and provide safety against over turning or sliding while preventing the ground from settling 16
  • 17.  It consists of ribs spaced at regular interval at perpendicular directions which are monolithic with slab.  These grid slabs are generally used for architectural purposes for large spans such as public assembly halls, auditoriums, showrooms, were to avoid internal columns in the structure. 17 Grid Beam Slab
  • 18.  Is a type of scaffolding characterised by a joining method that uses metal cups to lock beams together. It is a temporary network of frames used to support workers during construction or renovation of structure.  They are easy to stand, no nuts, bolts and wedges are required quick, solid erection and dismantling results in time and labour saving, lightweight, high load carrying capacity and low maintenance. 18 Cup Lock Scaffolding
  • 19. Form Work : 19  A formwork is a temporary structure used as mould for the original structure.  There are different materials available to construct the formwork.  Formwork material is selected depending upon many factors like cost, requirement, type of structure etc.  Different formwork materials are used in site for construction, in our project Conventional formwork and aluminium formwork is used.
  • 20. Plywood as Formwork Material  Plywood which is a manufacture of timber is also used for formworks.  The plywood boards are available in thickness from 7mm to 32mm.  Plywood can also be cut into required size easily and it is strong, durable and light in weight  Very large size plywood board are available which makes construction quicker and easier. It provides smooth finish on the surface. 20
  • 21. Aluminium as Formwork Material  Aluminium formwork is used often for pre-fabricated formwork. It is getting more popular because of its light weight and good strength.  It requires fewer support and ties.  It is easy to fix and easy to dismantle. It can be reused for many times.  The walls and slabs of structures can be casted simultaneously.  Monolithic crack free structures can be built using aluminium formwork 21
  • 22. Quality control test of fine aggregate by Sieve Analysis. This process involves the use of a series of standard sieves, with decreasing mesh sizes. The steps involved in sieve analysis of fine aggregates:  Collecting the sample  Preparing the sieves  Weighing of the sieves  Preparing the pan  Beginning of sieving is done.  Retained material is weighed.  Now the results are calculated 22
  • 23. Quality control test of fine aggregate by Sieve Analysis 23
  • 24. Quality control test conducted for Compressive strength of concrete The compressive strength test is one of the most important tests conducted on concrete. It measures the ability of concrete to withstand compressive loads without cracking or failing, the steps to conduct the compressive strength test of concrete:  Preparation of test specimen (usually 150mm cubes)  Curing of the test specimen  Testing of specimen by placing of the cured specimen in compression testing machine.  Load is provided at constant rate till the failure occurs  The load of failure is recorded for further process.  After the sample failure are calculated,the report is provided. 24
  • 25. Quality control test conducted for Compressive strength of concrete 25
  • 26. Quality control test by Slump to check the workability of concrete The slump test is a widely used method for determining the consistency and workability of fresh concrete. It measures the deformation of a concrete sample under the influence of gravity,the steps involved in conducting a slump test:  Prepare the mould  Fill the mould with the concrete with 3 equal layers ,and compact each layer 25 stokes with tamping rod.  Strike off the surface  Lift the mould  Measure the slump  Determine the consistency of slump  Recording of the workability of sample of concrete is done 26
  • 27. Quality control test by Slump to check the workability of concrete 27
  • 28. CONCLUSION  Construction of high rise residential building requires lots of time and effort depending on the structure.  The construction methods for the high rise residential building depends based on its budget.  High rise residential building requires Recreational aspect like construction of Gym, Swimming Pool, playground etc  High Rise Residential Building needs required space for ventilation and sunlight to provide comfort to the users.  High rise residential building requires lot of investment and land area (sq ft) 28