SlideShare a Scribd company logo
1 of 14
Download to read offline
Lac qui Parle County
Highway Department
5-Year Construction Plan
2014-2018
APPROVED: August 20, 2013
Lac qui Parle County Highway Department
5 – Year Highway Plan
Back ground:
The 5 – Year Highway Plan is developed by the County Engineer and Highway Department Staff to aid with
budgeting, planning, programming, and construction of roadways and bridge improvement projects.
The 5 – Year Highway Plan is presented at a public meeting and to the County Board for review and approval.
What factors go into the Plan:
Several factors are considered when developing the 5 – Year Highway Plan, below are the most essential:
- Life Cycle: Currently basing on a 85 Year life cycle
- Pavement Quality Index (PQI): PQI below acceptable level typically receive higher priority
- Traffic Volume (ADT = Average Daily Traffic): The higher ADT route typically receive higher priority
- Sufficiency Rating (SR): Used for rating bridges. Lower rating receive higher priority
- Accident Data, Alignment, County Roadway Safety Requirements and Funding Availability are other
consideration taken when creating the Plan
Is this 5 – Year Highway Plan “Set in Stone”?
No – This is only a plan; funding level changes, County Board directives changes, etc. It is the goal of the Lac qui
Parle Highway Department to maintain this schedule to the best of our ability with the resources given to us.
2013
Road Project
Number Number From to Work Type Length
CSAH 20 37-620- CSAH 48 E Co Line Grading 4.9 Miles
Br 90207 (Part of the grading project) Bridge Replacement
CSAH 20 37-620-010 Br 4955 Bridge Replacement
CSAH 19 37-619-018 Br 93764 Bridge Replacement
CSAH 39 37-639-004 Br 90241 Bridge Replacement
Twp.
Bridge 37-599-105 Br 90240 (T-89C) Bridge Replacement
Twp.
Bridge 37-599-106 Br 92415 (T-71C) Bridge Replacement
Twp.
Bridge 37-599-104 Br 384 (Walter Twp) Bridge Replacement
2014
Road Project
Number Number From to Work Type Length
CSAH 19 37-619 CR 26 RR Tracks Bit Overlay 8.0 Mile
CSAH 19 37-619 RR Tracks CR 38 Bit Surf, C & G 0.2 Mile
CSAH 20 37-620-019 CSAH 48 E Co Line Bit Surfacing 4.9 Miles
CSAH 20 37-070-004 CSAH 48 E Co Line HSIP 4.9 Miles
CSAH 21 37-621 1 mi S of CR 34 CR 34 Bit Overlay 1.0 Miles
CSAH 22 37-622 TH 75 CR 19 Bit Overlay 0.5 Miles
CSAH 34 37-634- W Jct of CR 19 TH 119 Bit Overlay 5.4 Miles
CSAH 38 37-638- TH 75 CR 19 Bit Overlay 6.7 Miles
CSAH 203 37-803- Bellingham Bit Overlay 0.28 Mile
CSAH 207 37-807 Bellingham Bit Overlay 0.6 Mile
2015
Road Project
Number Number From to Work Type Length
CSAH 37 37-637- E of City Limits CR 37 Heading South Grading 1.0 Miles
Twp
Bridge 37-599- Br 5941 (T-52C) Bridge Replacement
CSAH 12 37-612- Br 92527 Bridge Replacement
CSAH 13 37-613- Br 90196 Bridge Replacement
Twp
Bridge 37-599- Br L9550 (Baxter) Bridge Replacement
Twp
Bridge 37-599- Br L7789 (Baxter) Bridge Replacement
Twp
Bridge 37-599- Br 90228 (T-53C) Bridge Replacement
2016
Road Project
Number Number From to Work Type Length
CSAH 2 37-602- CR 23 CR 29 Bit Overlay 7.0 Miles
CSAH 29 37-629- S Co Line TH 275 Bit Overlay 3.5 Mile
CSAH 37 37-637- E of City Limits CR 37 Heading South Bit Surfacing 1.0 Mile
CSAH 23 37-623- CR 10 Spruce Street Bit Overlay 0.4 Miles
CSAH 205 37-805- Dawson Bit Overlay 0.4 Miles
2017
Road Project
Number Number From to Work Type Length
CSAH 15 37-615- 1.5 Mi S of CR 40 N Co Line Bit Overlay/Surfacing 4.0 Miles
CSAH 40 37-640- W Co Line CR 15 Bit Overlay 5.6 Mile
CSAH 24 37-624 W Co Line CR 7 Bit Overlay 1.8 Miles
Road Project
Number Number From to Work Type Length
CSAH 7 37-607- Br 7178 Bridge Replacement
2018
2014-2023 LqP County Water Plan

More Related Content

What's hot

Transportation Milton, presentation by Tim Dennis, Halton Region
Transportation Milton, presentation by Tim Dennis, Halton RegionTransportation Milton, presentation by Tim Dennis, Halton Region
Transportation Milton, presentation by Tim Dennis, Halton Region
Milton Chamber of Commerce
 
Diverless Services Pipelines
Diverless Services PipelinesDiverless Services Pipelines
Diverless Services Pipelines
Rakesh Kumar
 
BT_TatuanuiCaseStudy_F
BT_TatuanuiCaseStudy_FBT_TatuanuiCaseStudy_F
BT_TatuanuiCaseStudy_F
philip dobson
 
Stockley Xmas 14 - Possession Workshop 25092014
Stockley Xmas 14 - Possession Workshop 25092014Stockley Xmas 14 - Possession Workshop 25092014
Stockley Xmas 14 - Possession Workshop 25092014
Thomas Ingrey
 
Columbus Consolidated Government T-SPLOST Update
Columbus Consolidated Government T-SPLOST UpdateColumbus Consolidated Government T-SPLOST Update
Columbus Consolidated Government T-SPLOST Update
columbusgachamber
 
Matthew_Ruth_Resume_3-15-2016
Matthew_Ruth_Resume_3-15-2016Matthew_Ruth_Resume_3-15-2016
Matthew_Ruth_Resume_3-15-2016
Matthew Ruth
 

What's hot (18)

Wellborn Community Plan
Wellborn Community PlanWellborn Community Plan
Wellborn Community Plan
 
Fort Bragg, NC
Fort Bragg, NCFort Bragg, NC
Fort Bragg, NC
 
Transportation Milton, presentation by Tim Dennis, Halton Region
Transportation Milton, presentation by Tim Dennis, Halton RegionTransportation Milton, presentation by Tim Dennis, Halton Region
Transportation Milton, presentation by Tim Dennis, Halton Region
 
Caltrain 2015 10-21 schedule considerations
Caltrain 2015 10-21 schedule considerationsCaltrain 2015 10-21 schedule considerations
Caltrain 2015 10-21 schedule considerations
 
EWSO
EWSOEWSO
EWSO
 
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...
Hunter Mill Road and Sunset Hills Road Study: Community Meeting #5 - Sept. 15...
 
Diverless Services Pipelines
Diverless Services PipelinesDiverless Services Pipelines
Diverless Services Pipelines
 
BT_TatuanuiCaseStudy_F
BT_TatuanuiCaseStudy_FBT_TatuanuiCaseStudy_F
BT_TatuanuiCaseStudy_F
 
Stockley Xmas 14 - Possession Workshop 25092014
Stockley Xmas 14 - Possession Workshop 25092014Stockley Xmas 14 - Possession Workshop 25092014
Stockley Xmas 14 - Possession Workshop 25092014
 
Fort Hunt Road Walkway
Fort Hunt Road WalkwayFort Hunt Road Walkway
Fort Hunt Road Walkway
 
Diseño de pavimentos
Diseño de pavimentos Diseño de pavimentos
Diseño de pavimentos
 
Route 28 Widening: Citizens Information Meeting - April 3, 2018
Route 28 Widening: Citizens Information Meeting - April 3, 2018Route 28 Widening: Citizens Information Meeting - April 3, 2018
Route 28 Widening: Citizens Information Meeting - April 3, 2018
 
B-Logistics wagon maintenance
B-Logistics wagon maintenanceB-Logistics wagon maintenance
B-Logistics wagon maintenance
 
Columbus Consolidated Government T-SPLOST Update
Columbus Consolidated Government T-SPLOST UpdateColumbus Consolidated Government T-SPLOST Update
Columbus Consolidated Government T-SPLOST Update
 
adaptive signal control technology along sw 8th street pilot project
adaptive signal control technology along sw 8th street pilot projectadaptive signal control technology along sw 8th street pilot project
adaptive signal control technology along sw 8th street pilot project
 
County and Local Transportation Infrastructure Needs
County and Local Transportation Infrastructure NeedsCounty and Local Transportation Infrastructure Needs
County and Local Transportation Infrastructure Needs
 
Franklin Pavement Management Presentation
Franklin Pavement Management PresentationFranklin Pavement Management Presentation
Franklin Pavement Management Presentation
 
Matthew_Ruth_Resume_3-15-2016
Matthew_Ruth_Resume_3-15-2016Matthew_Ruth_Resume_3-15-2016
Matthew_Ruth_Resume_3-15-2016
 

Viewers also liked (15)

2013 SSTS Abatement Grant
2013 SSTS Abatement Grant2013 SSTS Abatement Grant
2013 SSTS Abatement Grant
 
2013 Low Income SSTS Upgrades
2013 Low Income SSTS Upgrades2013 Low Income SSTS Upgrades
2013 Low Income SSTS Upgrades
 
2015 Annual DNR Shoreland Report
2015 Annual DNR Shoreland Report2015 Annual DNR Shoreland Report
2015 Annual DNR Shoreland Report
 
2014 NRBG Summary Report
2014 NRBG Summary Report2014 NRBG Summary Report
2014 NRBG Summary Report
 
2015 Annual LWM Report
2015 Annual LWM Report2015 Annual LWM Report
2015 Annual LWM Report
 
2014 Annual CFO Report
2014 Annual CFO Report2014 Annual CFO Report
2014 Annual CFO Report
 
2014 WCA Annual Report
2014 WCA Annual Report2014 WCA Annual Report
2014 WCA Annual Report
 
2014 Annual LWM Report
2014 Annual LWM Report2014 Annual LWM Report
2014 Annual LWM Report
 
2015 Annual WCA Report
2015 Annual WCA Report2015 Annual WCA Report
2015 Annual WCA Report
 
2014 Annual Report SSTS Abatement Grant
2014 Annual Report SSTS Abatement Grant2014 Annual Report SSTS Abatement Grant
2014 Annual Report SSTS Abatement Grant
 
2014 Annual CFO Supplemental Information Page
2014 Annual CFO Supplemental Information Page2014 Annual CFO Supplemental Information Page
2014 Annual CFO Supplemental Information Page
 
2015 NRBG Summary Report
2015 NRBG Summary Report2015 NRBG Summary Report
2015 NRBG Summary Report
 
2014 Annual DNR Shoreline Report
2014 Annual DNR Shoreline Report2014 Annual DNR Shoreline Report
2014 Annual DNR Shoreline Report
 
Social Media for Broadband Advocacy: Post a picture
Social Media for Broadband Advocacy: Post a pictureSocial Media for Broadband Advocacy: Post a picture
Social Media for Broadband Advocacy: Post a picture
 
2014-2023 LqP County Water Plan
2014-2023 LqP County Water Plan2014-2023 LqP County Water Plan
2014-2023 LqP County Water Plan
 

Similar to 2014-2023 LqP County Water Plan

South Dakota State Bridge Profile
South Dakota State Bridge ProfileSouth Dakota State Bridge Profile
South Dakota State Bridge Profile
artba
 

Similar to 2014-2023 LqP County Water Plan (20)

MSI Developer Council Presentation - February 2017: Regional Transportation D...
MSI Developer Council Presentation - February 2017: Regional Transportation D...MSI Developer Council Presentation - February 2017: Regional Transportation D...
MSI Developer Council Presentation - February 2017: Regional Transportation D...
 
Dirgi shabozai 8 9-2019
Dirgi shabozai 8 9-2019Dirgi shabozai 8 9-2019
Dirgi shabozai 8 9-2019
 
Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4
Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4
Hunter Mill Road and Sunset Hills Road Study-Community Meeting #4
 
RTE Roundabout Analysis - Technical Data
RTE Roundabout Analysis - Technical DataRTE Roundabout Analysis - Technical Data
RTE Roundabout Analysis - Technical Data
 
MPR OCT-22 PPT COMBINE.pptx
MPR OCT-22 PPT COMBINE.pptxMPR OCT-22 PPT COMBINE.pptx
MPR OCT-22 PPT COMBINE.pptx
 
Presentation for DHA on project progress(08-09-22).pptx
Presentation for DHA on project progress(08-09-22).pptxPresentation for DHA on project progress(08-09-22).pptx
Presentation for DHA on project progress(08-09-22).pptx
 
Crosspointe Pond Retrofit 2014
Crosspointe Pond Retrofit 2014Crosspointe Pond Retrofit 2014
Crosspointe Pond Retrofit 2014
 
October 13, 2020 BPAC Virtual Meeting
October 13, 2020 BPAC Virtual Meeting October 13, 2020 BPAC Virtual Meeting
October 13, 2020 BPAC Virtual Meeting
 
NCDOT Master Plan Presentation
NCDOT Master Plan PresentationNCDOT Master Plan Presentation
NCDOT Master Plan Presentation
 
Route 123 and Jermantown Rd. Intersection Improvements November 2020
Route 123 and Jermantown Rd. Intersection Improvements November 2020Route 123 and Jermantown Rd. Intersection Improvements November 2020
Route 123 and Jermantown Rd. Intersection Improvements November 2020
 
Silverbrook Road & Southrun Road Intersection Improvements
Silverbrook Road & Southrun Road Intersection ImprovementsSilverbrook Road & Southrun Road Intersection Improvements
Silverbrook Road & Southrun Road Intersection Improvements
 
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
 
The Condition of Anderson County [SC] Roads (2015)
The Condition of Anderson County [SC] Roads (2015)The Condition of Anderson County [SC] Roads (2015)
The Condition of Anderson County [SC] Roads (2015)
 
San Bernardino County Transportation Funding Update
San Bernardino County Transportation Funding UpdateSan Bernardino County Transportation Funding Update
San Bernardino County Transportation Funding Update
 
Fairfax County Route 50 Walkway Improvements Sept 2020
Fairfax County Route 50 Walkway Improvements Sept 2020Fairfax County Route 50 Walkway Improvements Sept 2020
Fairfax County Route 50 Walkway Improvements Sept 2020
 
Cinder Bed Road Realignment
Cinder Bed Road RealignmentCinder Bed Road Realignment
Cinder Bed Road Realignment
 
Braddock Rd. and Roberts Rd. Intersection and Sidewalk Improvements
Braddock Rd. and Roberts Rd. Intersection and Sidewalk ImprovementsBraddock Rd. and Roberts Rd. Intersection and Sidewalk Improvements
Braddock Rd. and Roberts Rd. Intersection and Sidewalk Improvements
 
Senior Design Capstone Presentation
Senior Design Capstone PresentationSenior Design Capstone Presentation
Senior Design Capstone Presentation
 
South Dakota State Bridge Profile
South Dakota State Bridge ProfileSouth Dakota State Bridge Profile
South Dakota State Bridge Profile
 
Jirapur susner-mp-rj-border road ppt...7.01.19
Jirapur susner-mp-rj-border road ppt...7.01.19Jirapur susner-mp-rj-border road ppt...7.01.19
Jirapur susner-mp-rj-border road ppt...7.01.19
 

More from Ann Treacy

Surveys, Data and Stories to Inform Policy and Investment
Surveys, Data and Stories to Inform Policy and InvestmentSurveys, Data and Stories to Inform Policy and Investment
Surveys, Data and Stories to Inform Policy and Investment
Ann Treacy
 
Regional Broadband meeting in NW MN from Office of Broadband Development
Regional Broadband meeting in NW MN from Office of Broadband DevelopmentRegional Broadband meeting in NW MN from Office of Broadband Development
Regional Broadband meeting in NW MN from Office of Broadband Development
Ann Treacy
 
SMIF Regional Broadband Forum: Le Sueur Count Broadband Initative
SMIF Regional Broadband Forum: Le Sueur Count Broadband InitativeSMIF Regional Broadband Forum: Le Sueur Count Broadband Initative
SMIF Regional Broadband Forum: Le Sueur Count Broadband Initative
Ann Treacy
 

More from Ann Treacy (20)

Adoption challenges in rural minnesota, BBTF March 2022.pptx
Adoption challenges in rural minnesota, BBTF March 2022.pptxAdoption challenges in rural minnesota, BBTF March 2022.pptx
Adoption challenges in rural minnesota, BBTF March 2022.pptx
 
Office of Broadband Development Overview and Broadband Funding Streams
Office of Broadband Development Overview and Broadband Funding StreamsOffice of Broadband Development Overview and Broadband Funding Streams
Office of Broadband Development Overview and Broadband Funding Streams
 
Broadband Presentation for MN PUC
Broadband Presentation for MN PUCBroadband Presentation for MN PUC
Broadband Presentation for MN PUC
 
Digital Solutions with RW healh
Digital Solutions with RW healhDigital Solutions with RW healh
Digital Solutions with RW healh
 
Farm Fresh Broadband
Farm Fresh BroadbandFarm Fresh Broadband
Farm Fresh Broadband
 
Rural Newcomer Telecommuters
Rural Newcomer TelecommutersRural Newcomer Telecommuters
Rural Newcomer Telecommuters
 
Connected mn mn blandin broadband conference 10-13-21
Connected mn mn blandin broadband conference   10-13-21Connected mn mn blandin broadband conference   10-13-21
Connected mn mn blandin broadband conference 10-13-21
 
Surveys, Data and Stories to Inform Policy and Investment
Surveys, Data and Stories to Inform Policy and InvestmentSurveys, Data and Stories to Inform Policy and Investment
Surveys, Data and Stories to Inform Policy and Investment
 
Community approaches to broadband in Minnesota
Community approaches to broadband in MinnesotaCommunity approaches to broadband in Minnesota
Community approaches to broadband in Minnesota
 
Obd update on federal broabdand funding
Obd update on federal broabdand fundingObd update on federal broabdand funding
Obd update on federal broabdand funding
 
Broadband in se mn 2021 survey
Broadband in se mn 2021 surveyBroadband in se mn 2021 survey
Broadband in se mn 2021 survey
 
Broadband 101 mn bb conf 2021
Broadband 101 mn bb conf 2021Broadband 101 mn bb conf 2021
Broadband 101 mn bb conf 2021
 
Region 5 mn broadband event
Region 5 mn broadband eventRegion 5 mn broadband event
Region 5 mn broadband event
 
Regional Broadband meeting in NW MN from Office of Broadband Development
Regional Broadband meeting in NW MN from Office of Broadband DevelopmentRegional Broadband meeting in NW MN from Office of Broadband Development
Regional Broadband meeting in NW MN from Office of Broadband Development
 
MN Broadband regional meeting in west central
MN Broadband regional meeting in  west centralMN Broadband regional meeting in  west central
MN Broadband regional meeting in west central
 
SMIF Regional Broadband Forum: Le Sueur Count Broadband Initative
SMIF Regional Broadband Forum: Le Sueur Count Broadband InitativeSMIF Regional Broadband Forum: Le Sueur Count Broadband Initative
SMIF Regional Broadband Forum: Le Sueur Count Broadband Initative
 
Broadband Stories that Inspire in MN
Broadband Stories that Inspire in MNBroadband Stories that Inspire in MN
Broadband Stories that Inspire in MN
 
Broadband in Southeast MN 2021 survey
Broadband in Southeast MN 2021 surveyBroadband in Southeast MN 2021 survey
Broadband in Southeast MN 2021 survey
 
Regional Broadband MN - presentation from Office of Broadband Development
Regional Broadband MN - presentation from Office of Broadband DevelopmentRegional Broadband MN - presentation from Office of Broadband Development
Regional Broadband MN - presentation from Office of Broadband Development
 
Chisago Lakes Community Broadband Survey
Chisago Lakes Community Broadband SurveyChisago Lakes Community Broadband Survey
Chisago Lakes Community Broadband Survey
 

Recently uploaded

Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
BrixsonLajara
 
Corporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptxCorporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptx
arnab132
 
case-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdfcase-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdf
garthraymundo123
 

Recently uploaded (20)

Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery NewsletterYil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
 
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
 
IFLA ENSULIB Webinar Series #12: Sustainability - Bringing Nature and Communi...
IFLA ENSULIB Webinar Series #12: Sustainability - Bringing Nature and Communi...IFLA ENSULIB Webinar Series #12: Sustainability - Bringing Nature and Communi...
IFLA ENSULIB Webinar Series #12: Sustainability - Bringing Nature and Communi...
 
Introduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxIntroduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptx
 
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
2024-05-08 Composting at Home 101 for the Rotary Club of Pinecrest.pptx
 
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...Hook Up Call Girls Rajgir   9332606886  High Profile Call Girls You Can Get T...
Hook Up Call Girls Rajgir 9332606886 High Profile Call Girls You Can Get T...
 
Enhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionEnhancing forest data transparency for climate action
Enhancing forest data transparency for climate action
 
Climate Change
Climate ChangeClimate Change
Climate Change
 
Sustainable Recovery and Reconstruction Framework (SURRF)(1).pdf
Sustainable Recovery and Reconstruction Framework  (SURRF)(1).pdfSustainable Recovery and Reconstruction Framework  (SURRF)(1).pdf
Sustainable Recovery and Reconstruction Framework (SURRF)(1).pdf
 
How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...
How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...
How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...
 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
 
Corporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptxCorporate_Science-based_Target_Setting.pptx
Corporate_Science-based_Target_Setting.pptx
 
FYP1 FINAL PRESENTATION POLITEKNIK MALAYSIA
FYP1 FINAL PRESENTATION POLITEKNIK MALAYSIAFYP1 FINAL PRESENTATION POLITEKNIK MALAYSIA
FYP1 FINAL PRESENTATION POLITEKNIK MALAYSIA
 
case-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdfcase-study-marcopper-disaster in the philippines.pdf
case-study-marcopper-disaster in the philippines.pdf
 
Call girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl servicesCall girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl services
 
NO1 Google Kala Jadu Expert Specialist In Qatar Kala Jadu Expert Specialist I...
NO1 Google Kala Jadu Expert Specialist In Qatar Kala Jadu Expert Specialist I...NO1 Google Kala Jadu Expert Specialist In Qatar Kala Jadu Expert Specialist I...
NO1 Google Kala Jadu Expert Specialist In Qatar Kala Jadu Expert Specialist I...
 
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
Call Girls in Gachibowli / 8250092165 Genuine Call girls with real Photos and...
 
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your Area
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your AreaVip Salem Call Girls 8250092165 Low Price Escorts Service in Your Area
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your Area
 
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
 

2014-2023 LqP County Water Plan

  • 1. Lac qui Parle County Highway Department 5-Year Construction Plan 2014-2018 APPROVED: August 20, 2013
  • 2. Lac qui Parle County Highway Department 5 – Year Highway Plan Back ground: The 5 – Year Highway Plan is developed by the County Engineer and Highway Department Staff to aid with budgeting, planning, programming, and construction of roadways and bridge improvement projects. The 5 – Year Highway Plan is presented at a public meeting and to the County Board for review and approval. What factors go into the Plan: Several factors are considered when developing the 5 – Year Highway Plan, below are the most essential: - Life Cycle: Currently basing on a 85 Year life cycle - Pavement Quality Index (PQI): PQI below acceptable level typically receive higher priority - Traffic Volume (ADT = Average Daily Traffic): The higher ADT route typically receive higher priority - Sufficiency Rating (SR): Used for rating bridges. Lower rating receive higher priority - Accident Data, Alignment, County Roadway Safety Requirements and Funding Availability are other consideration taken when creating the Plan Is this 5 – Year Highway Plan “Set in Stone”? No – This is only a plan; funding level changes, County Board directives changes, etc. It is the goal of the Lac qui Parle Highway Department to maintain this schedule to the best of our ability with the resources given to us.
  • 3. 2013 Road Project Number Number From to Work Type Length CSAH 20 37-620- CSAH 48 E Co Line Grading 4.9 Miles Br 90207 (Part of the grading project) Bridge Replacement CSAH 20 37-620-010 Br 4955 Bridge Replacement CSAH 19 37-619-018 Br 93764 Bridge Replacement CSAH 39 37-639-004 Br 90241 Bridge Replacement Twp. Bridge 37-599-105 Br 90240 (T-89C) Bridge Replacement Twp. Bridge 37-599-106 Br 92415 (T-71C) Bridge Replacement Twp. Bridge 37-599-104 Br 384 (Walter Twp) Bridge Replacement
  • 4.
  • 5. 2014 Road Project Number Number From to Work Type Length CSAH 19 37-619 CR 26 RR Tracks Bit Overlay 8.0 Mile CSAH 19 37-619 RR Tracks CR 38 Bit Surf, C & G 0.2 Mile CSAH 20 37-620-019 CSAH 48 E Co Line Bit Surfacing 4.9 Miles CSAH 20 37-070-004 CSAH 48 E Co Line HSIP 4.9 Miles CSAH 21 37-621 1 mi S of CR 34 CR 34 Bit Overlay 1.0 Miles CSAH 22 37-622 TH 75 CR 19 Bit Overlay 0.5 Miles CSAH 34 37-634- W Jct of CR 19 TH 119 Bit Overlay 5.4 Miles CSAH 38 37-638- TH 75 CR 19 Bit Overlay 6.7 Miles CSAH 203 37-803- Bellingham Bit Overlay 0.28 Mile CSAH 207 37-807 Bellingham Bit Overlay 0.6 Mile
  • 6.
  • 7. 2015 Road Project Number Number From to Work Type Length CSAH 37 37-637- E of City Limits CR 37 Heading South Grading 1.0 Miles Twp Bridge 37-599- Br 5941 (T-52C) Bridge Replacement CSAH 12 37-612- Br 92527 Bridge Replacement CSAH 13 37-613- Br 90196 Bridge Replacement Twp Bridge 37-599- Br L9550 (Baxter) Bridge Replacement Twp Bridge 37-599- Br L7789 (Baxter) Bridge Replacement Twp Bridge 37-599- Br 90228 (T-53C) Bridge Replacement
  • 8.
  • 9. 2016 Road Project Number Number From to Work Type Length CSAH 2 37-602- CR 23 CR 29 Bit Overlay 7.0 Miles CSAH 29 37-629- S Co Line TH 275 Bit Overlay 3.5 Mile CSAH 37 37-637- E of City Limits CR 37 Heading South Bit Surfacing 1.0 Mile CSAH 23 37-623- CR 10 Spruce Street Bit Overlay 0.4 Miles CSAH 205 37-805- Dawson Bit Overlay 0.4 Miles
  • 10.
  • 11. 2017 Road Project Number Number From to Work Type Length CSAH 15 37-615- 1.5 Mi S of CR 40 N Co Line Bit Overlay/Surfacing 4.0 Miles CSAH 40 37-640- W Co Line CR 15 Bit Overlay 5.6 Mile CSAH 24 37-624 W Co Line CR 7 Bit Overlay 1.8 Miles
  • 12.
  • 13. Road Project Number Number From to Work Type Length CSAH 7 37-607- Br 7178 Bridge Replacement 2018