SlideShare a Scribd company logo
1 of 10
Download to read offline
ENGINE0-LINE
1250
A B C D E F
ENGINE0-LINE
3156115(270tonCAPACITY)850
277(7656)
3000
3733
6200
8625
3050
8000
6265
12999
1175
4732
522
21000
32140
500
5m Rail 12m Rail
A B C D E F
8
1250
ENGINE0-LINE
12m
5m
12m
5m
1000121362001213
8625
11000
3000
3740
7000 10000
1
1
2
2
3
3
4
4
5
5
6
6
A A
B B
C C
D D
DESCRIPTION: DATE: CHECKED:DRAWN:REV.
FORMAT:SCALE:
SUBJECT:
PROJ.NAME/LOCATION:
CLIENT/LOCATION:
DRAWING No.:
Drostdy st, The Gables
Cleveland
PO Box 40604
Cleveland, 2022
Info@vanguard.co.za
VANGUARD
SHEET:
1/10
JH2016/03/17FOR INFORMATION ONLY
NTS
SLT 00642 - V0109
PROPOSED LIFTING PLAN
GENERATOR INSTALLATION METHODOLOGY
A3
0
METHODOLOGY
· ASSEMBLE THE GANTRY SYSTEM.
· POSITION THE LOAD UNDERNEATH THE
GANTRY SYSTEM (ABOUT 500mm OFFSET
FROM THE ENGINE 0 - LINE IN ORDER TO
AVOID OBSTRUCTING STEEL STRUCTURES)
WHEN SKIDDING DOWN THE ENGINE HALL..
· ATTACH LIFTING GEAR TO THE LOAD
LIFTING POINTS.
ENGINE0-LINE
1250
A B C D E F
ENGINE0-LINE
3156215(270tonCAPACITY)850
277(7656)
3740
6200
8625
3050
8000
6265
12999
1275
4732
522
A B C D E F
8
1250
ENGINE0-LINE
12m
5m
12m
5m
5m Rail 12m Rail
500
1
1
2
2
3
3
4
4
5
5
6
6
A A
B B
C C
D D
DESCRIPTION: DATE: CHECKED:DRAWN:REV.
FORMAT:SCALE:
SUBJECT:
PROJ.NAME/LOCATION:
CLIENT/LOCATION:
DRAWING No.:
Drostdy st, The Gables
Cleveland
PO Box 40604
Cleveland, 2022
Info@vanguard.co.za
VANGUARD
SHEET:
2/10
JH2016/03/17FOR INFORMATION ONLY
NTS
SLT 00642 - V0109
PROPOSED LIFTING PLAN
GENERATOR INSTALLATION METHODOLOGY
A3
0
METHODOLOGY
· LIFT THE LOAD TO REQUIRED HEIGHT AND
REMOVE TRAILER FROM UNDERNEATH THE
SUSPENDED LOAD.
· POSITION THE SLIDE SYSTEM
UNDERNEATH THE LOAD.
ENGINE0-LINE
1250
A B C D E F
ENGINE0-LINE
3155271(270tonCAPACITY)850
277(6712)
6200
8625
3050
8000
6265
12999
4732
522
3740
A B C D E F
8
1250
ENGINE0-LINE
5m
12m
5m
5m Rail 12m Rail
12m
500
1
1
2
2
3
3
4
4
5
5
6
6
A A
B B
C C
D D
DESCRIPTION: DATE: CHECKED:DRAWN:REV.
FORMAT:SCALE:
SUBJECT:
PROJ.NAME/LOCATION:
CLIENT/LOCATION:
DRAWING No.:
Drostdy st, The Gables
Cleveland
PO Box 40604
Cleveland, 2022
Info@vanguard.co.za
VANGUARD
SHEET:
3/10
JH2016/03/17FOR INFORMATION ONLY
NTS
SLT 00642 - V0109
PROPOSED LIFTING PLAN
GENERATOR INSTALLATION METHODOLOGY
A3
0
METHODOLOGY
· LOWER THE LOAD ONTO THE SLIDE
SYSTEM.
· REMOVE LIFTING GEAR FROM THE LOAD.
ENGINE0-LINE
1250
A B C D E F
ENGINE0-LINE
2500
12999
A B C D E F
8
1250
ENGINE0-LINE
5m
12m
5m
5m Rail 12m Rail
500
332
1
1
2
2
3
3
4
4
5
5
6
6
A A
B B
C C
D D
DESCRIPTION: DATE: CHECKED:DRAWN:REV.
FORMAT:SCALE:
SUBJECT:
PROJ.NAME/LOCATION:
CLIENT/LOCATION:
DRAWING No.:
Drostdy st, The Gables
Cleveland
PO Box 40604
Cleveland, 2022
Info@vanguard.co.za
VANGUARD
SHEET:
4/10
JH2016/03/17FOR INFORMATION ONLY
NTS
SLT 00642 - V0109
PROPOSED SLIDING PLAN
GENERATOR INSTALLATION METHODOLOGY
A3
0
METHODOLOGY
· MOVE THE GANTRY SYSTEM ASIDE.
· REMOVE THE OBSTRUCTING 12m RAIL.
· EXTEND THE SLIDE RAILS.
· PUSH AND SLIDE THE LOAD WITH THE
HYDRAULIC RAMS ON THE SLIDE RAILS.
ENGINE0-LINE
1250
A B C D E F
ENGINE0-LINE
12999
A B C D E F
1
2
1250
ENGINE0-LINE
500
500
35
1
1
2
2
3
3
4
4
5
5
6
6
A A
B B
C C
D D
DESCRIPTION: DATE: CHECKED:DRAWN:REV.
FORMAT:SCALE:
SUBJECT:
PROJ.NAME/LOCATION:
CLIENT/LOCATION:
DRAWING No.:
Drostdy st, The Gables
Cleveland
PO Box 40604
Cleveland, 2022
Info@vanguard.co.za
VANGUARD
SHEET:
5/10
JH2016/03/17FOR INFORMATION ONLY
NTS
SLT 00642 - V0109
PROPOSED JACKING & ALIGNMENT PLAN
GENERATOR INSTALLATION METHODOLOGY
A3
0
METHODOLOGY
· SLIDE THE LOAD TO THE REQUIRED
POSITION AND ENGINE BAY.
· POSITION THE JACK AND ALIGNMENT
SYSTEM UNDERNEATH THE DESIGNATED
JACKING POINTS.
· JACK THE LOAD UP.
· REMOVE THE SLIDE RAILS FROM
UNDERNEATH THE SUSPENDED LOAD.
· LOWER THE LOAD TO A SAFE HEIGHT FOR
THE ALIGNMENT OPERATION.
ENGINE0-LINE
1250
A B C D E F
ENGINE0-LINE
12999
A B C D E F
1
2
1250
ENGINE0-LINE
0
0
0
1
1
2
2
3
3
4
4
5
5
6
6
A A
B B
C C
D D
DESCRIPTION: DATE: CHECKED:DRAWN:REV.
FORMAT:SCALE:
SUBJECT:
PROJ.NAME/LOCATION:
CLIENT/LOCATION:
DRAWING No.:
Drostdy st, The Gables
Cleveland
PO Box 40604
Cleveland, 2022
Info@vanguard.co.za
VANGUARD
SHEET:
6/10
JH2016/03/17FOR INFORMATION ONLY
NTS
SLT 00642 - V0109
PROPOSED JACKING & ALIGNMENT PLAN
GENERATOR INSTALLATION METHODOLOGY
A3
0
METHODOLOGY
· SKID THE LOAD WITH THE JACK AND
ALIGNMENT SYSTEM AND ALIGN THE
ENGINE 0 - LINES.
· JACK THE LOAD DOWN TO FINAL POSITION.
· REMOVE JACK AND ALIGNMENT SYSTEM.
0
ENGINE 0-LINE
1 2 3 4 5 6 7 8
A
B
C
D
E
F
BAY 1 BAY 2 BAY 3 BAY 4 BAY 5 BAY 6
21000
32140
12m
5m
12m
5m
1000 1213 6200 1213
8625
11000
3000
3740
1
1
2
2
3
3
4
4
5
5
6
6
A A
B B
C C
D D
DESCRIPTION: DATE: CHECKED:DRAWN:REV.
FORMAT:SCALE:
SUBJECT:
PROJ.NAME/LOCATION:
CLIENT/LOCATION:
DRAWING No.:
Drostdy st, The Gables
Cleveland
PO Box 40604
Cleveland, 2022
Info@vanguard.co.za
VANGUARD
SHEET:
7/10
JH2016/03/17FOR INFORMATION ONLY
NTS
SLT 00642 - V0109
PROPOSED LIFTING PLAN
GENERATOR INSTALLATION METHODOLOGY
A3
0
METHODOLOGY
· PLAN VIEW REFERENCE TO PAGE 1.
0
ENGINE 0-LINE
1 2 3 4 5 6 7 8
A
B
C
D
E
F
BAY 1 BAY 2 BAY 3 BAY 4 BAY 5 BAY 6
5m
12m
5m
1
1
2
2
3
3
4
4
5
5
6
6
A A
B B
C C
D D
DESCRIPTION: DATE: CHECKED:DRAWN:REV.
FORMAT:SCALE:
SUBJECT:
PROJ.NAME/LOCATION:
CLIENT/LOCATION:
DRAWING No.:
Drostdy st, The Gables
Cleveland
PO Box 40604
Cleveland, 2022
Info@vanguard.co.za
VANGUARD
SHEET:
8/10
JH2016/03/17FOR INFORMATION ONLY
NTS
SLT 00642 - V0109
PROPOSED SLIDING PLAN
GENERATOR INSTALLATION METHODOLOGY
A3
0
METHODOLOGY
· PLAN VIEW REFERENCE TO PAGE 4.
0
ENGINE 0-LINE
1 2 3 4 5 6 7 8
A
B
C
D
E
F
BAY 1 BAY 2 BAY 3 BAY 4 BAY 5 BAY 6
5m
12m
5m
1
1
2
2
3
3
4
4
5
5
6
6
A A
B B
C C
D D
DESCRIPTION: DATE: CHECKED:DRAWN:REV.
FORMAT:SCALE:
SUBJECT:
PROJ.NAME/LOCATION:
CLIENT/LOCATION:
DRAWING No.:
Drostdy st, The Gables
Cleveland
PO Box 40604
Cleveland, 2022
Info@vanguard.co.za
VANGUARD
SHEET:
9/10
JH2016/03/17FOR INFORMATION ONLY
NTS
SLT 00642 - V0109
PROPOSED JACKING & ALIGNMENT PLAN
GENERATOR INSTALLATION METHODOLOGY
A3
0
METHODOLOGY
· PLAN VIEW REFERENCE TO PAGE 5 & 6.
0
ENGINE 0-LINE
1 2 3 4 5 6 7 8
A
B
C
D
E
F
BAY 1 BAY 2 BAY 3 BAY 4 BAY 5 BAY 6
1
1
2
2
3
3
4
4
5
5
6
6
A A
B B
C C
D D
DESCRIPTION: DATE: CHECKED:DRAWN:REV.
FORMAT:SCALE:
SUBJECT:
PROJ.NAME/LOCATION:
CLIENT/LOCATION:
DRAWING No.:
Drostdy st, The Gables
Cleveland
PO Box 40604
Cleveland, 2022
Info@vanguard.co.za
VANGUARD
SHEET:
10/10
JH2016/03/17FOR INFORMATION ONLY
NTS
SLT 00642 - V0109
GENERATOR INSTALLATION METHODOLOGY
A3
0
METHODOLOGY
· REPEAT OPERATION FOR ALL SIX ENGINES.
· ALL ENGINES IN FINAL POSITION.

More Related Content

What's hot

SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - E0C
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - E0CSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - E0C
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - E0C
Sunit Dhingra
 
8D Sample -JC 19inch Sidewall Crack
8D Sample -JC 19inch Sidewall Crack8D Sample -JC 19inch Sidewall Crack
8D Sample -JC 19inch Sidewall Crack
Peter Zhou
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITASAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
Sunit Dhingra
 
DENNY_NETWORK_WATERMAP_NAWAF_FINAL
DENNY_NETWORK_WATERMAP_NAWAF_FINALDENNY_NETWORK_WATERMAP_NAWAF_FINAL
DENNY_NETWORK_WATERMAP_NAWAF_FINAL
Nawaf Alfaouri
 
2008 Off-Sites Interconnecting Piping End of Year Review
2008 Off-Sites Interconnecting Piping End of Year Review2008 Off-Sites Interconnecting Piping End of Year Review
2008 Off-Sites Interconnecting Piping End of Year Review
Tom Atkinson
 
WRY-Managment Certificates
WRY-Managment CertificatesWRY-Managment Certificates
WRY-Managment Certificates
Warren Yadon
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
Sunit Dhingra
 
Daniel Reid's Solidworks Drawings
Daniel Reid's Solidworks DrawingsDaniel Reid's Solidworks Drawings
Daniel Reid's Solidworks Drawings
Danny Reid
 
High Voltage Drawing Package.PDF
High Voltage Drawing Package.PDFHigh Voltage Drawing Package.PDF
High Voltage Drawing Package.PDF
Lansing Wei
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
Sunit Dhingra
 

What's hot (18)

SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - E0C
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - E0CSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - E0C
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - E0C
 
Vise base4
Vise base4Vise base4
Vise base4
 
8D Sample -JC 19inch Sidewall Crack
8D Sample -JC 19inch Sidewall Crack8D Sample -JC 19inch Sidewall Crack
8D Sample -JC 19inch Sidewall Crack
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITASAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
 
KBAY AS BUILT 3FEB15
KBAY AS BUILT 3FEB15KBAY AS BUILT 3FEB15
KBAY AS BUILT 3FEB15
 
ViseEXPLODED
ViseEXPLODEDViseEXPLODED
ViseEXPLODED
 
Geneva Wheel
Geneva WheelGeneva Wheel
Geneva Wheel
 
PLT.PDF
PLT.PDFPLT.PDF
PLT.PDF
 
DENNY_NETWORK_WATERMAP_NAWAF_FINAL
DENNY_NETWORK_WATERMAP_NAWAF_FINALDENNY_NETWORK_WATERMAP_NAWAF_FINAL
DENNY_NETWORK_WATERMAP_NAWAF_FINAL
 
2008 Off-Sites Interconnecting Piping End of Year Review
2008 Off-Sites Interconnecting Piping End of Year Review2008 Off-Sites Interconnecting Piping End of Year Review
2008 Off-Sites Interconnecting Piping End of Year Review
 
Masters s
Masters sMasters s
Masters s
 
WRY-Managment Certificates
WRY-Managment CertificatesWRY-Managment Certificates
WRY-Managment Certificates
 
Sign Size and Breakaway Support Relationships
Sign Size and Breakaway Support RelationshipsSign Size and Breakaway Support Relationships
Sign Size and Breakaway Support Relationships
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
 
Legazpi City, Philippines
Legazpi City, PhilippinesLegazpi City, Philippines
Legazpi City, Philippines
 
Daniel Reid's Solidworks Drawings
Daniel Reid's Solidworks DrawingsDaniel Reid's Solidworks Drawings
Daniel Reid's Solidworks Drawings
 
High Voltage Drawing Package.PDF
High Voltage Drawing Package.PDFHigh Voltage Drawing Package.PDF
High Voltage Drawing Package.PDF
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - URS
 

Similar to Genset Installation Methodology

MACHINE ASSY - OP10
MACHINE ASSY - OP10MACHINE ASSY - OP10
MACHINE ASSY - OP10
Vijay Kumar
 
WD3 SLAB SEMESTER 1 2013 _FINAL
WD3 SLAB SEMESTER 1 2013 _FINALWD3 SLAB SEMESTER 1 2013 _FINAL
WD3 SLAB SEMESTER 1 2013 _FINAL
Adrian Ball
 
KZG7_SC02_220KV LINE CRP r0 210423.pdf
KZG7_SC02_220KV LINE CRP r0 210423.pdfKZG7_SC02_220KV LINE CRP r0 210423.pdf
KZG7_SC02_220KV LINE CRP r0 210423.pdf
AmitKunduDVC
 
45 in beam mAIN ASSEM 05-05-2015
45 in beam mAIN ASSEM 05-05-201545 in beam mAIN ASSEM 05-05-2015
45 in beam mAIN ASSEM 05-05-2015
Javier Pena
 
NWC-D-JCS-07-HIG-07005 C02
NWC-D-JCS-07-HIG-07005 C02NWC-D-JCS-07-HIG-07005 C02
NWC-D-JCS-07-HIG-07005 C02
Michael McManus
 
Lcl users manual electrical drawings
Lcl users manual electrical drawingsLcl users manual electrical drawings
Lcl users manual electrical drawings
bibimisael
 
DFM & M-Flow Report-TQC ST Cap
DFM & M-Flow Report-TQC ST CapDFM & M-Flow Report-TQC ST Cap
DFM & M-Flow Report-TQC ST Cap
Kanissh GK
 

Similar to Genset Installation Methodology (20)

Government Contracting - FAR Supplements - DEAR - Energy
Government Contracting - FAR Supplements - DEAR - EnergyGovernment Contracting - FAR Supplements - DEAR - Energy
Government Contracting - FAR Supplements - DEAR - Energy
 
MACHINE ASSY - OP10
MACHINE ASSY - OP10MACHINE ASSY - OP10
MACHINE ASSY - OP10
 
MCC PANEL WIRING, GA and BOM Sample
MCC PANEL WIRING, GA and BOM SampleMCC PANEL WIRING, GA and BOM Sample
MCC PANEL WIRING, GA and BOM Sample
 
WD3 SLAB SEMESTER 1 2013 _FINAL
WD3 SLAB SEMESTER 1 2013 _FINALWD3 SLAB SEMESTER 1 2013 _FINAL
WD3 SLAB SEMESTER 1 2013 _FINAL
 
KZG7_SC02_220KV LINE CRP r0 210423.pdf
KZG7_SC02_220KV LINE CRP r0 210423.pdfKZG7_SC02_220KV LINE CRP r0 210423.pdf
KZG7_SC02_220KV LINE CRP r0 210423.pdf
 
Government Contracting - FAR Supplements - AFFARS - Air Force
Government Contracting - FAR Supplements - AFFARS - Air ForceGovernment Contracting - FAR Supplements - AFFARS - Air Force
Government Contracting - FAR Supplements - AFFARS - Air Force
 
Cold storage layout
Cold storage layoutCold storage layout
Cold storage layout
 
45 in beam mAIN ASSEM 05-05-2015
45 in beam mAIN ASSEM 05-05-201545 in beam mAIN ASSEM 05-05-2015
45 in beam mAIN ASSEM 05-05-2015
 
Fabrication Drawings
Fabrication DrawingsFabrication Drawings
Fabrication Drawings
 
Cable Laying Pulling Equipment Low High Voltage Cables - Catalogue
Cable Laying Pulling Equipment Low High Voltage Cables - CatalogueCable Laying Pulling Equipment Low High Voltage Cables - Catalogue
Cable Laying Pulling Equipment Low High Voltage Cables - Catalogue
 
SEB Cable Pulling & Laying Equipment Catalogue
SEB Cable Pulling & Laying Equipment CatalogueSEB Cable Pulling & Laying Equipment Catalogue
SEB Cable Pulling & Laying Equipment Catalogue
 
Cable Pulling & Laying Equipment for Street Lighting
Cable Pulling & Laying Equipment for Street LightingCable Pulling & Laying Equipment for Street Lighting
Cable Pulling & Laying Equipment for Street Lighting
 
SEB - Cable Pulling & Cable Laying Equipment For Low & High Voltage Cables In...
SEB - Cable Pulling & Cable Laying Equipment For Low & High Voltage Cables In...SEB - Cable Pulling & Cable Laying Equipment For Low & High Voltage Cables In...
SEB - Cable Pulling & Cable Laying Equipment For Low & High Voltage Cables In...
 
Design
DesignDesign
Design
 
NWC-D-JCS-07-HIG-07005 C02
NWC-D-JCS-07-HIG-07005 C02NWC-D-JCS-07-HIG-07005 C02
NWC-D-JCS-07-HIG-07005 C02
 
Lcl users manual electrical drawings
Lcl users manual electrical drawingsLcl users manual electrical drawings
Lcl users manual electrical drawings
 
panel designing software
panel designing softwarepanel designing software
panel designing software
 
DFM & M-Flow Report-TQC ST Cap
DFM & M-Flow Report-TQC ST CapDFM & M-Flow Report-TQC ST Cap
DFM & M-Flow Report-TQC ST Cap
 
Government Contracting - FAR Supplements - AFARS - Army
Government Contracting - FAR Supplements - AFARS - ArmyGovernment Contracting - FAR Supplements - AFARS - Army
Government Contracting - FAR Supplements - AFARS - Army
 
12 - SD - SIGNAGE.pdf
12 - SD - SIGNAGE.pdf12 - SD - SIGNAGE.pdf
12 - SD - SIGNAGE.pdf
 

Genset Installation Methodology

  • 1. ENGINE0-LINE 1250 A B C D E F ENGINE0-LINE 3156115(270tonCAPACITY)850 277(7656) 3000 3733 6200 8625 3050 8000 6265 12999 1175 4732 522 21000 32140 500 5m Rail 12m Rail A B C D E F 8 1250 ENGINE0-LINE 12m 5m 12m 5m 1000121362001213 8625 11000 3000 3740 7000 10000 1 1 2 2 3 3 4 4 5 5 6 6 A A B B C C D D DESCRIPTION: DATE: CHECKED:DRAWN:REV. FORMAT:SCALE: SUBJECT: PROJ.NAME/LOCATION: CLIENT/LOCATION: DRAWING No.: Drostdy st, The Gables Cleveland PO Box 40604 Cleveland, 2022 Info@vanguard.co.za VANGUARD SHEET: 1/10 JH2016/03/17FOR INFORMATION ONLY NTS SLT 00642 - V0109 PROPOSED LIFTING PLAN GENERATOR INSTALLATION METHODOLOGY A3 0 METHODOLOGY · ASSEMBLE THE GANTRY SYSTEM. · POSITION THE LOAD UNDERNEATH THE GANTRY SYSTEM (ABOUT 500mm OFFSET FROM THE ENGINE 0 - LINE IN ORDER TO AVOID OBSTRUCTING STEEL STRUCTURES) WHEN SKIDDING DOWN THE ENGINE HALL.. · ATTACH LIFTING GEAR TO THE LOAD LIFTING POINTS.
  • 2. ENGINE0-LINE 1250 A B C D E F ENGINE0-LINE 3156215(270tonCAPACITY)850 277(7656) 3740 6200 8625 3050 8000 6265 12999 1275 4732 522 A B C D E F 8 1250 ENGINE0-LINE 12m 5m 12m 5m 5m Rail 12m Rail 500 1 1 2 2 3 3 4 4 5 5 6 6 A A B B C C D D DESCRIPTION: DATE: CHECKED:DRAWN:REV. FORMAT:SCALE: SUBJECT: PROJ.NAME/LOCATION: CLIENT/LOCATION: DRAWING No.: Drostdy st, The Gables Cleveland PO Box 40604 Cleveland, 2022 Info@vanguard.co.za VANGUARD SHEET: 2/10 JH2016/03/17FOR INFORMATION ONLY NTS SLT 00642 - V0109 PROPOSED LIFTING PLAN GENERATOR INSTALLATION METHODOLOGY A3 0 METHODOLOGY · LIFT THE LOAD TO REQUIRED HEIGHT AND REMOVE TRAILER FROM UNDERNEATH THE SUSPENDED LOAD. · POSITION THE SLIDE SYSTEM UNDERNEATH THE LOAD.
  • 3. ENGINE0-LINE 1250 A B C D E F ENGINE0-LINE 3155271(270tonCAPACITY)850 277(6712) 6200 8625 3050 8000 6265 12999 4732 522 3740 A B C D E F 8 1250 ENGINE0-LINE 5m 12m 5m 5m Rail 12m Rail 12m 500 1 1 2 2 3 3 4 4 5 5 6 6 A A B B C C D D DESCRIPTION: DATE: CHECKED:DRAWN:REV. FORMAT:SCALE: SUBJECT: PROJ.NAME/LOCATION: CLIENT/LOCATION: DRAWING No.: Drostdy st, The Gables Cleveland PO Box 40604 Cleveland, 2022 Info@vanguard.co.za VANGUARD SHEET: 3/10 JH2016/03/17FOR INFORMATION ONLY NTS SLT 00642 - V0109 PROPOSED LIFTING PLAN GENERATOR INSTALLATION METHODOLOGY A3 0 METHODOLOGY · LOWER THE LOAD ONTO THE SLIDE SYSTEM. · REMOVE LIFTING GEAR FROM THE LOAD.
  • 4. ENGINE0-LINE 1250 A B C D E F ENGINE0-LINE 2500 12999 A B C D E F 8 1250 ENGINE0-LINE 5m 12m 5m 5m Rail 12m Rail 500 332 1 1 2 2 3 3 4 4 5 5 6 6 A A B B C C D D DESCRIPTION: DATE: CHECKED:DRAWN:REV. FORMAT:SCALE: SUBJECT: PROJ.NAME/LOCATION: CLIENT/LOCATION: DRAWING No.: Drostdy st, The Gables Cleveland PO Box 40604 Cleveland, 2022 Info@vanguard.co.za VANGUARD SHEET: 4/10 JH2016/03/17FOR INFORMATION ONLY NTS SLT 00642 - V0109 PROPOSED SLIDING PLAN GENERATOR INSTALLATION METHODOLOGY A3 0 METHODOLOGY · MOVE THE GANTRY SYSTEM ASIDE. · REMOVE THE OBSTRUCTING 12m RAIL. · EXTEND THE SLIDE RAILS. · PUSH AND SLIDE THE LOAD WITH THE HYDRAULIC RAMS ON THE SLIDE RAILS.
  • 5. ENGINE0-LINE 1250 A B C D E F ENGINE0-LINE 12999 A B C D E F 1 2 1250 ENGINE0-LINE 500 500 35 1 1 2 2 3 3 4 4 5 5 6 6 A A B B C C D D DESCRIPTION: DATE: CHECKED:DRAWN:REV. FORMAT:SCALE: SUBJECT: PROJ.NAME/LOCATION: CLIENT/LOCATION: DRAWING No.: Drostdy st, The Gables Cleveland PO Box 40604 Cleveland, 2022 Info@vanguard.co.za VANGUARD SHEET: 5/10 JH2016/03/17FOR INFORMATION ONLY NTS SLT 00642 - V0109 PROPOSED JACKING & ALIGNMENT PLAN GENERATOR INSTALLATION METHODOLOGY A3 0 METHODOLOGY · SLIDE THE LOAD TO THE REQUIRED POSITION AND ENGINE BAY. · POSITION THE JACK AND ALIGNMENT SYSTEM UNDERNEATH THE DESIGNATED JACKING POINTS. · JACK THE LOAD UP. · REMOVE THE SLIDE RAILS FROM UNDERNEATH THE SUSPENDED LOAD. · LOWER THE LOAD TO A SAFE HEIGHT FOR THE ALIGNMENT OPERATION.
  • 6. ENGINE0-LINE 1250 A B C D E F ENGINE0-LINE 12999 A B C D E F 1 2 1250 ENGINE0-LINE 0 0 0 1 1 2 2 3 3 4 4 5 5 6 6 A A B B C C D D DESCRIPTION: DATE: CHECKED:DRAWN:REV. FORMAT:SCALE: SUBJECT: PROJ.NAME/LOCATION: CLIENT/LOCATION: DRAWING No.: Drostdy st, The Gables Cleveland PO Box 40604 Cleveland, 2022 Info@vanguard.co.za VANGUARD SHEET: 6/10 JH2016/03/17FOR INFORMATION ONLY NTS SLT 00642 - V0109 PROPOSED JACKING & ALIGNMENT PLAN GENERATOR INSTALLATION METHODOLOGY A3 0 METHODOLOGY · SKID THE LOAD WITH THE JACK AND ALIGNMENT SYSTEM AND ALIGN THE ENGINE 0 - LINES. · JACK THE LOAD DOWN TO FINAL POSITION. · REMOVE JACK AND ALIGNMENT SYSTEM.
  • 7. 0 ENGINE 0-LINE 1 2 3 4 5 6 7 8 A B C D E F BAY 1 BAY 2 BAY 3 BAY 4 BAY 5 BAY 6 21000 32140 12m 5m 12m 5m 1000 1213 6200 1213 8625 11000 3000 3740 1 1 2 2 3 3 4 4 5 5 6 6 A A B B C C D D DESCRIPTION: DATE: CHECKED:DRAWN:REV. FORMAT:SCALE: SUBJECT: PROJ.NAME/LOCATION: CLIENT/LOCATION: DRAWING No.: Drostdy st, The Gables Cleveland PO Box 40604 Cleveland, 2022 Info@vanguard.co.za VANGUARD SHEET: 7/10 JH2016/03/17FOR INFORMATION ONLY NTS SLT 00642 - V0109 PROPOSED LIFTING PLAN GENERATOR INSTALLATION METHODOLOGY A3 0 METHODOLOGY · PLAN VIEW REFERENCE TO PAGE 1.
  • 8. 0 ENGINE 0-LINE 1 2 3 4 5 6 7 8 A B C D E F BAY 1 BAY 2 BAY 3 BAY 4 BAY 5 BAY 6 5m 12m 5m 1 1 2 2 3 3 4 4 5 5 6 6 A A B B C C D D DESCRIPTION: DATE: CHECKED:DRAWN:REV. FORMAT:SCALE: SUBJECT: PROJ.NAME/LOCATION: CLIENT/LOCATION: DRAWING No.: Drostdy st, The Gables Cleveland PO Box 40604 Cleveland, 2022 Info@vanguard.co.za VANGUARD SHEET: 8/10 JH2016/03/17FOR INFORMATION ONLY NTS SLT 00642 - V0109 PROPOSED SLIDING PLAN GENERATOR INSTALLATION METHODOLOGY A3 0 METHODOLOGY · PLAN VIEW REFERENCE TO PAGE 4.
  • 9. 0 ENGINE 0-LINE 1 2 3 4 5 6 7 8 A B C D E F BAY 1 BAY 2 BAY 3 BAY 4 BAY 5 BAY 6 5m 12m 5m 1 1 2 2 3 3 4 4 5 5 6 6 A A B B C C D D DESCRIPTION: DATE: CHECKED:DRAWN:REV. FORMAT:SCALE: SUBJECT: PROJ.NAME/LOCATION: CLIENT/LOCATION: DRAWING No.: Drostdy st, The Gables Cleveland PO Box 40604 Cleveland, 2022 Info@vanguard.co.za VANGUARD SHEET: 9/10 JH2016/03/17FOR INFORMATION ONLY NTS SLT 00642 - V0109 PROPOSED JACKING & ALIGNMENT PLAN GENERATOR INSTALLATION METHODOLOGY A3 0 METHODOLOGY · PLAN VIEW REFERENCE TO PAGE 5 & 6.
  • 10. 0 ENGINE 0-LINE 1 2 3 4 5 6 7 8 A B C D E F BAY 1 BAY 2 BAY 3 BAY 4 BAY 5 BAY 6 1 1 2 2 3 3 4 4 5 5 6 6 A A B B C C D D DESCRIPTION: DATE: CHECKED:DRAWN:REV. FORMAT:SCALE: SUBJECT: PROJ.NAME/LOCATION: CLIENT/LOCATION: DRAWING No.: Drostdy st, The Gables Cleveland PO Box 40604 Cleveland, 2022 Info@vanguard.co.za VANGUARD SHEET: 10/10 JH2016/03/17FOR INFORMATION ONLY NTS SLT 00642 - V0109 GENERATOR INSTALLATION METHODOLOGY A3 0 METHODOLOGY · REPEAT OPERATION FOR ALL SIX ENGINES. · ALL ENGINES IN FINAL POSITION.