The Route 50 walkway improvements include 1,160 linear feet of new 5-foot wide concrete sidewalk along the south side of Route 50 with 475 linear feet of pedestrian railing at areas near steep slopes.
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Fairfax County Route 50 Walkway Improvements Sept 2020
1. A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
Task Order No. 2
Contract No. CN20304185
Project No. ST-000037-005
Springfield District
Tax Map No. 46-3
September 21, 2020
ROUTE 50 WALKWAY IMPROVEMENTS
2. Project Details
Route 50 Walkway Improvements
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Description:
The Route 50 Walkway Improvements were substantially completed on September 9, 2020. This
project consists of the design of pedestrian improvements from Lee Jackson Hwy and Fair Ridge
Drive Bus Stop to Fairfax Towne Center Service Road. Improvements include installing 1,160 LF of
new 5-foot wide concrete sidewalk along the south side of Route 50 with 475 LF of pedestrian
railing for the areas located near steep slopes and curb ramp at Service Road.
Project Team:
Department of Transportation – Latesa Turner
Utilities Design and Construction Division (UDCD) – Deepak Bhinge & Peter Burdiuja
UDCD Inspections – Hammad Hashmi
Land Survey Branch – Greg Harper, Chris Jensen and Michael Perry
Land Acquisition Division – Lisa Glass
Engineer – Rinker Design Associates (RDA)
Contractor - M&F Concrete Inc.
3. Route 50 Walkway Improvements
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Springfield District, Tax Map No. 46-3
4. Route 50 Walkway Improvements
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
5. Route 50 Walkway Improvements
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Pre-Existing Conditions
6. Route 50 Walkway Improvements
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Construction – Site Clearing
7. Route 50 Walkway Improvements
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Construction – Site Grading
8. Route 50 Walkway Improvements
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Installation of Sidewalk Sub-Base & Concrete
15. Additional Information
For additional Information, please call
www.fairfaxcounty.gov/publicworks
Route 50 Walkway Improvements
Capital Facilities/Utilities Design and Construction Division/Transportation Construction Branch
Irene Haske, Public Information Officer
703-324-5500, TTY 711
Irene.Haske@fairfaxcounty.gov