Mark the correct answer for each multiple-choice question. (1 point each) 1) Which of the following is not true about an IT project? A) It is a unique endeavor B) It has interdependent activities C) It is temporary in nature D) It entails outsourcing IT requirements to another company 2) The planning phase of a systems development project is about: A) Understanding which features are needed in the system B) Understanding why the IT system is needed and how to go about building it C) Planning the hardware and networking specifications D) Building a prototype to share with the user 3) Which of the following is a well-known system development methodology? A) Local area networking B) SQL method C) The waterfall method D) Document analysis and direct observation approach 4) Throwaway prototyping is the best option under which condition? A) When the system being built is well-understood and requirements are clear B) When the system being built is not well-understood and the requirements are unclear C) When the system being built is highly interdependent on another system D) When the system being built is a module of an ERP system 5) The most important aspect of agile system development is? A) Delivering working software B) Being completely thorough with initial system planning and analysis C) Complete documentation and clarity D) Interviewing top managers to ensure their requirements are met.