SlideShare a Scribd company logo
1 of 25
1
R. Corsini – CLIC plans for the next European strategy update, and beyond
CLIC plans for the next European strategy update,
and beyond
Roberto Corsini
for the CLIC Accelerator Collaboration
2
R. Corsini – CLIC plans for the next European strategy update, and beyond
CLIC position in the HEP (and CERN) landscape
F. Gianotti,
A great year ahead of us
F. Gianotti,
A great year ahead of us
… should keep the momentumWe know where we stand
3
R. Corsini – CLIC plans for the next European strategy update, and beyond
CLIC Timeline
2013-18 Development Phase
Develop a Project Plan for a
staged implementation in
agreement with LHC findings;
further technical developments
with industry, performance
studies for accelerator parts and
systems, as well as for detectors.
2018-19 Decisions
On the basis of LHC data
and Project Plans (for CLIC and
other potential projects as FCC),
take decisions about next
project(s) at the Energy Frontier.
4-5 year Preparation Phase
Finalise implementation parameters,
Drive Beam Facility and other
system verifications, site
authorisation and preparation for
industrial procurement.
Prepare detailed Technical Proposals
for the detector-systems.
2024-25 Construction Start
Ready for full construction
and main tunnel excavation.
Construction Phase
Stage 1 construction of CLIC, in
parallel with detector
construction.
Preparation for implementation
of further stages.
Commissioning
Becoming ready for data-
taking as the LHC
programme reaches
completion.
DRIVE BEAM
LINAC
CLEX
CLIC Experimental Area
DELAY
LOOP
COMBINER
RING
CTF3 – Layout
10 m
4 A – 1.2 ms
150 MeV
28 A – 140 ns
150 MeV
Two-Beam Test Stand (TBTS)
Test Beam Line (TBL)
4
R. Corsini – CLIC plans for the next European strategy update, and beyond
Development phase
Develop a Project Plan for a staged implementation of CLIC,
consistent with LHC findings, as an option for CERN in post-LHC era,
for consideration in next European Strategy update 2019/20
•Update physics studies in light of LHC results
•Rebaseline, cost/staging strategy with a 20-30 year perspective
•Complete key technical R&D
•More advanced industrialization studies
•Perform more system tests + verification
I PJ u r a M o u n t a in s
L a k e G e n e v a
G e n e v a
L e g e n d
C E R N e x is t in g L H C
C L I C 3 8 0 G e v
C L I C 3 T e V
P o t e n t ia l u n d e r g r o u n d s it in g :
C L I C 1 . 5 T e V
5
R. Corsini – CLIC plans for the next European strategy update, and beyond
Key technical R&D
X-band accelerating structures
Key diagnostics
equipment
Other critical
components
(NbTi Wiggler test
at ANKA)
Module – alignment – assembly
High Efficiency
klystrons
6
R. Corsini – CLIC plans for the next European strategy update, and beyond
High-power X-band testing at CERN
Current test:
Dogleg beam-loading
experiment, TD26CC#1 (in
CTF3 LINAC)
Previous tests:
TD24R05 (CTF2, 2013)
TD26CC#1 (CTF2, 2013)
T24 (Dogleg, 2014-15)
Current test:
T24_OPEN (in halves)
Previous test:
CLIC Crab cavity (2014-
15)
LLRF, pulse compressors
and waveguide network
to be completed at the
end 2015
Medium power test:
3D printed Ti waveguide
(Xbox-3A)
Xbox-1 Xbox-2 Xbox-3
OPERATIONAL OPERATIONAL Xbox-3A: OPERATIONAL
Xbox-3B/C/D: COMMISSIONING
CPI 50MW 1.5us klystron
Scandinova Modulator
Rep Rate 50Hz
CPI 50MW 1.5us klystron
Scandinova Modulator
Rep Rate 50Hz
4x Toshiba 6MW 5us klystron
4x Scandinova Modulators
Rep Rate 400Hz
7
R. Corsini – CLIC plans for the next European strategy update, and beyond
Industrialization
L-band klystrons/modulators
Accelerating structures and other main
components of the Two-Beam Module
• Prepare for industrialization of individual
main components
• Study mass production/qualification
process/assembly/installation procedures
adapted to CLIC requirements
8
R. Corsini – CLIC plans for the next European strategy update, and beyond
X-band technology
http://www.lightsources.org/facility/sacla
https://indico.cern.ch/event/358352/session/7/contribution/40
Linear collider - TeV XFEL – 1 to 10 GeV
Compact Compton source
few 10s MeV
Thompson/Compton
source – few 100s MeV
CLIC SACLA
Tsinghua U.
9
R. Corsini – CLIC plans for the next European strategy update, and beyond
System Tests
Measure of transverse long-range
wake-fields in a CLIC structure @ FACET
ATF2
CTF3
FACET
10
R. Corsini – CLIC plans for the next European strategy update, and beyond
CTF3 Experimental Program 2016
Drive-beam phase
feed-forward tests
• Increase reproducibility
• Demonstrate factor 10
jitter reduction
CLIC two-beam module tests
• Power production, stability + control of RF profile (beam
loading compensation)
• RF phase/amplitude drifts along TBL, PETS switching at full
power
• Alignment tests
Ongoing instrumentation tests
• Wake-Field Monitors
• Main and Drive beam BPMs …
Drive Beam
•Dispersion free-steering, dispersion matching, orbit
control, chromatic corrections, emittance, stability
• Beam deceleration + optics check in TBL
11
R. Corsini – CLIC plans for the next European strategy update, and beyond
Discussions on a CALIFES - based facility
• Keep testing CLIC components (X-band structures, diags…) with beam
• Advance high-gradient e- accelerator R&D
• Support strategic partnerships with relevant communities: XFEL, medical,
industrial, space
• Enable instrumentation/equipment tests for consolidating CERN
accelerator complex (LHC and injectors)
• Provide unique + complementary test facility for CERN’s European (and
worldwide) users
• Maintain accelerator training facility for next generation of accelerator
scientists + engineers
Re-use 1/3 CTF3 area; 80% equipment available
12
R. Corsini – CLIC plans for the next European strategy update, and beyond
Proposal of a CALIFES-based Accelerator Test Stand
13
R. Corsini – CLIC plans for the next European strategy update, and beyond
Development phase - Main goals/deliverables
• Concise project plan document: physics, machine parameters,
cost, power, site, staging, construction schedule, main technical issues,
preparation phase (2019- 2025) summary, detector studies.
• Comprehensive physics and detector documentation: summary
papers planned 2015-2018 covering physics topics, detector studies
and R&D.
• Detailed, consistent technical documentation across project:
EDMS/WBS based.
• Technology transfer/spin-off document, including training (PhDs,
postdocs, fellows).
• Preparation phase plan document: critical parameters, status and
next steps 2019-2025 - what is needed before project construction start
up, strategy, risks and how to address them, inside and outside CERN,
and involving industry.
14
R. Corsini – CLIC plans for the next European strategy update, and beyond
The Preparation phase - “Technical” considerations
• What we will have in 2019:
• A basic design for the first low energy stage
• A reasonable & flexible upgrade scenario
• A credible cost and power consumption update
• Prototypes of several key components (NOT in final state)
• A work plan for the next phase (project preparation, 2020-2025)
• What will be missing, but will be needed before construction could start:
• A Technical Design
• Site detailed studies and authorizations
• Finalized prototypes of all main components
• Fully developed industrial basis for main components
• Facilities for testing and qualification of components
15
R. Corsini – CLIC plans for the next European strategy update, and beyond
“Other considerations”
• Timeline & resources availability at CERN
• What kind of decision may we expect in 2019?
What will be the approval procedure of the project after that?
What resources may we expect in the period 2020-2025?
• Should we propose a technically limited plan, or anticipate at least to
some extent resources and time constraints?
CLIC CDR CLIC post-CDR development CLIC Project Preparation CONSTRUCTION
16
R. Corsini – CLIC plans for the next European strategy update, and beyond
Finalized prototypes of all main components I
• Modules – status before 2020
• Two-Beam Modules – LAB, design more or less
consistent with CDR parameters, but
not fully representative (use of components
mock-ups, …)
• TBM – CLEX, fully operational components,
but design adapted to CTF3
• PACMAN – Fundamental input to new design
• Klystron-based Modules – Only sketches so far
• Should have full design of both two-beam
and klystron based versions before 2020
• Drive Beam accelerator units
• Klystrons (1st
generation) under procurement in Industry.
• Modulators under development
• Structure design exist
• R&D on higher efficiency klystrons ongoing
• Should have full unit (1st
generation) by 2020, RF tested
17
R. Corsini – CLIC plans for the next European strategy update, and beyond
Finalized prototypes of all main components II
• Main linac modules should be the first priority, will need time to build – and
test – prototypes (even more if we should iterate the process).
• Drive beam linac modules should be in a more advanced state by 2020.
However, in case we will aim at a CLIC Zero like facility for the preparation
phase, they may also be very much on the critical path.
• Of course full prototypes of main linac modules and DB accelerator units
prototypes are mandatory before construction start.
However:
• We should review what other components will need prototyping (mainly
items critical for performance, e.g., extraction kickers, SC wigglers, phase
feed-forward components, specific diagnostics components…).
• Even more than that, we have to define and include in the plan a
meaningful testing program for all prototypes.
18
R. Corsini – CLIC plans for the next European strategy update, and beyond
Fully developed industrial basis for main components
• Modules – still a long way to full industrialization for all components  full
industrialization must be addressed after new generation design.
Further considerations:
• Industrialization of accelerating structures including assembly should be done as
soon as possible
• X-FEL projects based on X-band are an invaluable opportunity to develop
industrial basis
• However, they are not fully applicable to CLIC modules (even for klystron-based)
• Drive Beam Accelerator components – R&D on CLIC front-end
components have put us on the right track
However:
• Modulators will not be fully industrialized in 2020
• Same for accelerator structures (but they are relatively standard components…)
• Klystrons may need a second iteration if R&D on high efficiency tubes successful
• Need to keep momentum and critical mass…
19
R. Corsini – CLIC plans for the next European strategy update, and beyond
Facilities for testing and qualification of components
• Such facilities will be needed at the latest in the early stage of construction
• May have a very long lead time, so their construction should be part of the
project preparation
• CLIC Zero may be one of these, its main use should indeed be the
qualification of two-beam modules. It is therefore critical to understand
early what will be the needs for qualification and the corresponding
procedures
20
R. Corsini – CLIC plans for the next European strategy update, and beyond
RF conditioning, structure qualification,
operational issues
• Possibly the main critical issue linked to that is RF conditioning of
accelerating structure and subsequent breakdown behavior
• It is paramount to collect a good statistics in the high-gradient tests in
order to understand the process and develop a realistic strategy for
conditioning.
Important questions:
• How many structures will have to be rejected? How to detect the faulty ones
early on during conditioning?
• How many structures will have to be (pre-)conditioned in parallel?
• Would it be acceptable to condition the structures in situ?
• How much of the conditioning should be done before?
• Will we need special procedures to preserve performance during transport?
• Will we need to reprocess installed structures occasionally? Do we need a very
fast PETS on-off mechanism?
• …
21
R. Corsini – CLIC plans for the next European strategy update, and beyond
The CLIC Zero issue
• CLIC Zero was proposed in the past as part of the post-CDR phase.
Motivations:
• Focus to develop main components to large scale
• Needed for modules qualification tests
• Gain experience/time in operation of full scale drive beam complex
• Full-scale system test for Two-Beam
• Main issue: cost (~300 MCHF, to be reviewed) and time (a few years)
• Will need a serious commitment
towards CLIC
• May CLIC Zero be integrated in
early construction stage?
• Were will we test modules?
• What kind of facility will we need
if we choose the klystron option?
22
R. Corsini – CLIC plans for the next European strategy update, and beyond
Two-beam and/or klystron based 1st
stage
• Prototypes, testing procedures and testing facilities may be very different
for the two cases
• The two options should be pursued in parallel in the present stage
• However, we should soon define a decision point, in order to not duplicate
efforts in a period were investment will have to go up
• Will we have a decision already before 2020?
• Should we present two alternative plans for the next phase?
23
R. Corsini – CLIC plans for the next European strategy update, and beyond
Conclusion and Outlook
• CLIC is one of the main options for the future of CERN and of high energy
physics in general after LHC.
• We have a well defined mandate to complete and document the CLIC
study in preparation for the next European Strategy exercise (2018/2019),
when an informed decision should be taken (hopefully with good
indications from physics results from LHC run2) and we have a clear plan to
fulfill such a mandate.
• One of the deliverables of the present phase is a detailed plan for the CLIC
Preparation Phase (2020-2025), to bring the project at the start of
construction in case of a positive decision.
• It is now time to start developing in detail such a plan. Most of the needed
information exists, and we should be able to get what is still missing in the
next couple of years, in the framework of the present program.
24
R. Corsini – CLIC plans for the next European strategy update, and beyond
25
R. Corsini – CLIC plans for the next European strategy update, and beyond

More Related Content

What's hot

Link Adapatation in Mobile Satellite Links: Field Trial Results using SDR and...
Link Adapatation in Mobile Satellite Links: Field Trial Results using SDR and...Link Adapatation in Mobile Satellite Links: Field Trial Results using SDR and...
Link Adapatation in Mobile Satellite Links: Field Trial Results using SDR and...Anxo Tato Arias
 
Critical Review of the Building Downwash Algorithms in AERMOD
Critical Review of the Building Downwash Algorithms in AERMODCritical Review of the Building Downwash Algorithms in AERMOD
Critical Review of the Building Downwash Algorithms in AERMODRon Petersen, PhD, CCM, FASHRAE
 
Nyk and weather routing
Nyk and weather routingNyk and weather routing
Nyk and weather routingydmisra
 
Leos 2008 Th Aa2 20081113 V1.2
Leos 2008 Th Aa2 20081113 V1.2Leos 2008 Th Aa2 20081113 V1.2
Leos 2008 Th Aa2 20081113 V1.2jrothim
 
KGrothe Capstone Project Final Presentation
KGrothe Capstone Project Final PresentationKGrothe Capstone Project Final Presentation
KGrothe Capstone Project Final PresentationKaren Grothe
 
Evaluation of the Theoretical Problems with Building Downwash Using A New Met...
Evaluation of the Theoretical Problems with Building Downwash Using A New Met...Evaluation of the Theoretical Problems with Building Downwash Using A New Met...
Evaluation of the Theoretical Problems with Building Downwash Using A New Met...Sergio A. Guerra
 
Offshore wind turbine performance assessment using CFD
Offshore wind turbine performance assessment using CFDOffshore wind turbine performance assessment using CFD
Offshore wind turbine performance assessment using CFDAhmed Maklid, Msc
 
OTE2016_James_McNaughton_v3
OTE2016_James_McNaughton_v3OTE2016_James_McNaughton_v3
OTE2016_James_McNaughton_v3James McNaughton
 
Seismic QC & Filtering with Geostatistics
Seismic QC & Filtering with GeostatisticsSeismic QC & Filtering with Geostatistics
Seismic QC & Filtering with GeostatisticsGeovariances
 
A coupled Electromagnetic-Mechanical analysis of next generation Radio Telesc...
A coupled Electromagnetic-Mechanical analysis of next generation Radio Telesc...A coupled Electromagnetic-Mechanical analysis of next generation Radio Telesc...
A coupled Electromagnetic-Mechanical analysis of next generation Radio Telesc...Altair
 
Comparison of Wind Tunnel and CFD Modelling for Nearfield Dispersion from an ...
Comparison of Wind Tunnel and CFD Modelling for Nearfield Dispersion from an ...Comparison of Wind Tunnel and CFD Modelling for Nearfield Dispersion from an ...
Comparison of Wind Tunnel and CFD Modelling for Nearfield Dispersion from an ...IES / IAQM
 
Miniaturizing Space: Small-satellites
Miniaturizing Space: Small-satellitesMiniaturizing Space: Small-satellites
Miniaturizing Space: Small-satellitesX. Breogan COSTA
 
Current & Future Spaceborne Sar Systems
Current & Future Spaceborne Sar SystemsCurrent & Future Spaceborne Sar Systems
Current & Future Spaceborne Sar Systemsgpetrie
 
MIRAS: the instrument aboard SMOS
MIRAS: the instrument aboard SMOSMIRAS: the instrument aboard SMOS
MIRAS: the instrument aboard SMOSadrianocamps
 
MIRAS: The SMOS Instrument
MIRAS: The SMOS InstrumentMIRAS: The SMOS Instrument
MIRAS: The SMOS Instrumentadrianocamps
 
Hybrid Evolutionary Approaches to Maximum Lifetime Routing and Energy Efficie...
Hybrid Evolutionary Approaches to Maximum Lifetime Routing and Energy Efficie...Hybrid Evolutionary Approaches to Maximum Lifetime Routing and Energy Efficie...
Hybrid Evolutionary Approaches to Maximum Lifetime Routing and Energy Efficie...Alma Rahat
 
RDC-2016-ST-paper-final-Mukherjee.pdf
RDC-2016-ST-paper-final-Mukherjee.pdfRDC-2016-ST-paper-final-Mukherjee.pdf
RDC-2016-ST-paper-final-Mukherjee.pdfPoulastya Mukherjee
 

What's hot (20)

Link Adapatation in Mobile Satellite Links: Field Trial Results using SDR and...
Link Adapatation in Mobile Satellite Links: Field Trial Results using SDR and...Link Adapatation in Mobile Satellite Links: Field Trial Results using SDR and...
Link Adapatation in Mobile Satellite Links: Field Trial Results using SDR and...
 
General Resume
General ResumeGeneral Resume
General Resume
 
Critical Review of the Building Downwash Algorithms in AERMOD
Critical Review of the Building Downwash Algorithms in AERMODCritical Review of the Building Downwash Algorithms in AERMOD
Critical Review of the Building Downwash Algorithms in AERMOD
 
Nyk and weather routing
Nyk and weather routingNyk and weather routing
Nyk and weather routing
 
Leos 2008 Th Aa2 20081113 V1.2
Leos 2008 Th Aa2 20081113 V1.2Leos 2008 Th Aa2 20081113 V1.2
Leos 2008 Th Aa2 20081113 V1.2
 
KGrothe Capstone Project Final Presentation
KGrothe Capstone Project Final PresentationKGrothe Capstone Project Final Presentation
KGrothe Capstone Project Final Presentation
 
Evaluation of the Theoretical Problems with Building Downwash Using A New Met...
Evaluation of the Theoretical Problems with Building Downwash Using A New Met...Evaluation of the Theoretical Problems with Building Downwash Using A New Met...
Evaluation of the Theoretical Problems with Building Downwash Using A New Met...
 
Offshore wind turbine performance assessment using CFD
Offshore wind turbine performance assessment using CFDOffshore wind turbine performance assessment using CFD
Offshore wind turbine performance assessment using CFD
 
BIO-CAP-UK: Air/Oxy Biomass Combustion with CO2 Capture Technology, UK Study ...
BIO-CAP-UK: Air/Oxy Biomass Combustion with CO2 Capture Technology, UK Study ...BIO-CAP-UK: Air/Oxy Biomass Combustion with CO2 Capture Technology, UK Study ...
BIO-CAP-UK: Air/Oxy Biomass Combustion with CO2 Capture Technology, UK Study ...
 
OTE2016_James_McNaughton_v3
OTE2016_James_McNaughton_v3OTE2016_James_McNaughton_v3
OTE2016_James_McNaughton_v3
 
Seismic QC & Filtering with Geostatistics
Seismic QC & Filtering with GeostatisticsSeismic QC & Filtering with Geostatistics
Seismic QC & Filtering with Geostatistics
 
A coupled Electromagnetic-Mechanical analysis of next generation Radio Telesc...
A coupled Electromagnetic-Mechanical analysis of next generation Radio Telesc...A coupled Electromagnetic-Mechanical analysis of next generation Radio Telesc...
A coupled Electromagnetic-Mechanical analysis of next generation Radio Telesc...
 
Comparison of Wind Tunnel and CFD Modelling for Nearfield Dispersion from an ...
Comparison of Wind Tunnel and CFD Modelling for Nearfield Dispersion from an ...Comparison of Wind Tunnel and CFD Modelling for Nearfield Dispersion from an ...
Comparison of Wind Tunnel and CFD Modelling for Nearfield Dispersion from an ...
 
Introduction to velocity model building
Introduction to velocity model buildingIntroduction to velocity model building
Introduction to velocity model building
 
Miniaturizing Space: Small-satellites
Miniaturizing Space: Small-satellitesMiniaturizing Space: Small-satellites
Miniaturizing Space: Small-satellites
 
Current & Future Spaceborne Sar Systems
Current & Future Spaceborne Sar SystemsCurrent & Future Spaceborne Sar Systems
Current & Future Spaceborne Sar Systems
 
MIRAS: the instrument aboard SMOS
MIRAS: the instrument aboard SMOSMIRAS: the instrument aboard SMOS
MIRAS: the instrument aboard SMOS
 
MIRAS: The SMOS Instrument
MIRAS: The SMOS InstrumentMIRAS: The SMOS Instrument
MIRAS: The SMOS Instrument
 
Hybrid Evolutionary Approaches to Maximum Lifetime Routing and Energy Efficie...
Hybrid Evolutionary Approaches to Maximum Lifetime Routing and Energy Efficie...Hybrid Evolutionary Approaches to Maximum Lifetime Routing and Energy Efficie...
Hybrid Evolutionary Approaches to Maximum Lifetime Routing and Energy Efficie...
 
RDC-2016-ST-paper-final-Mukherjee.pdf
RDC-2016-ST-paper-final-Mukherjee.pdfRDC-2016-ST-paper-final-Mukherjee.pdf
RDC-2016-ST-paper-final-Mukherjee.pdf
 

Similar to CLIC plans for the next European strategy update, and beyond

Case-study by CT-Ingénierie: Capella in the preliminary design of the micro l...
Case-study by CT-Ingénierie: Capella in the preliminary design of the micro l...Case-study by CT-Ingénierie: Capella in the preliminary design of the micro l...
Case-study by CT-Ingénierie: Capella in the preliminary design of the micro l...Obeo
 
Investor teaserpresentationtundrasystems
Investor teaserpresentationtundrasystemsInvestor teaserpresentationtundrasystems
Investor teaserpresentationtundrasystemsBrian Antao
 
ICP Europe Technical Forum 24 September 2015
ICP Europe Technical Forum 24 September 2015ICP Europe Technical Forum 24 September 2015
ICP Europe Technical Forum 24 September 2015Luis Castanheira
 
Clelio alves petrobras english
Clelio alves petrobras englishClelio alves petrobras english
Clelio alves petrobras englishFieldComm Group
 
Andersson, Erik: Requirements for in-situ observations to support the Coperni...
Andersson, Erik: Requirements for in-situ observations to support the Coperni...Andersson, Erik: Requirements for in-situ observations to support the Coperni...
Andersson, Erik: Requirements for in-situ observations to support the Coperni...Integrated Carbon Observation System (ICOS)
 
Stork_Technical_Challenges.ppt
Stork_Technical_Challenges.pptStork_Technical_Challenges.ppt
Stork_Technical_Challenges.pptwixapps
 
05. Development of a Galileo-based timing receiver for critical infrastructures
05. Development of a Galileo-based timing receiver for critical infrastructures05. Development of a Galileo-based timing receiver for critical infrastructures
05. Development of a Galileo-based timing receiver for critical infrastructuresThe European GNSS Agency (GSA)
 
This Helix Nebula Science Cloud Pilot Phase Open Session
This Helix Nebula Science Cloud Pilot Phase Open SessionThis Helix Nebula Science Cloud Pilot Phase Open Session
This Helix Nebula Science Cloud Pilot Phase Open SessionHelix Nebula The Science Cloud
 
European Rotors - PBN and GNSS for Rotorcraft Operations
European Rotors - PBN and GNSS for Rotorcraft OperationsEuropean Rotors - PBN and GNSS for Rotorcraft Operations
European Rotors - PBN and GNSS for Rotorcraft OperationsLeonardo
 
ISCF Future Flight Networking Event - Regulation
ISCF Future Flight Networking Event - RegulationISCF Future Flight Networking Event - Regulation
ISCF Future Flight Networking Event - RegulationKTN
 

Similar to CLIC plans for the next European strategy update, and beyond (20)

Case-study by CT-Ingénierie: Capella in the preliminary design of the micro l...
Case-study by CT-Ingénierie: Capella in the preliminary design of the micro l...Case-study by CT-Ingénierie: Capella in the preliminary design of the micro l...
Case-study by CT-Ingénierie: Capella in the preliminary design of the micro l...
 
ISQ_ESS_Presentation29_01_ppt.ppt
ISQ_ESS_Presentation29_01_ppt.pptISQ_ESS_Presentation29_01_ppt.ppt
ISQ_ESS_Presentation29_01_ppt.ppt
 
Investor teaserpresentationtundrasystems
Investor teaserpresentationtundrasystemsInvestor teaserpresentationtundrasystems
Investor teaserpresentationtundrasystems
 
ptsresume[1]
ptsresume[1]ptsresume[1]
ptsresume[1]
 
ICP Europe Technical Forum 24 September 2015
ICP Europe Technical Forum 24 September 2015ICP Europe Technical Forum 24 September 2015
ICP Europe Technical Forum 24 September 2015
 
Coal Fleet Overview 2010
Coal Fleet Overview   2010Coal Fleet Overview   2010
Coal Fleet Overview 2010
 
Venture Capital World Summit 2015 Agenda Dr Brian Antao
Venture Capital World Summit 2015 Agenda Dr Brian AntaoVenture Capital World Summit 2015 Agenda Dr Brian Antao
Venture Capital World Summit 2015 Agenda Dr Brian Antao
 
Clelio alves petrobras english
Clelio alves petrobras englishClelio alves petrobras english
Clelio alves petrobras english
 
Korean Experience in NPP Construction & SMR
Korean Experience in NPP Construction & SMRKorean Experience in NPP Construction & SMR
Korean Experience in NPP Construction & SMR
 
Korean Experience in NPP Construction & SMR
Korean Experience in NPP Construction & SMRKorean Experience in NPP Construction & SMR
Korean Experience in NPP Construction & SMR
 
Andersson, Erik: Requirements for in-situ observations to support the Coperni...
Andersson, Erik: Requirements for in-situ observations to support the Coperni...Andersson, Erik: Requirements for in-situ observations to support the Coperni...
Andersson, Erik: Requirements for in-situ observations to support the Coperni...
 
Stork_Technical_Challenges.ppt
Stork_Technical_Challenges.pptStork_Technical_Challenges.ppt
Stork_Technical_Challenges.ppt
 
H2020 space wp 2018 2020 call 2019
H2020 space wp 2018 2020 call 2019H2020 space wp 2018 2020 call 2019
H2020 space wp 2018 2020 call 2019
 
05. Development of a Galileo-based timing receiver for critical infrastructures
05. Development of a Galileo-based timing receiver for critical infrastructures05. Development of a Galileo-based timing receiver for critical infrastructures
05. Development of a Galileo-based timing receiver for critical infrastructures
 
This Helix Nebula Science Cloud Pilot Phase Open Session
This Helix Nebula Science Cloud Pilot Phase Open SessionThis Helix Nebula Science Cloud Pilot Phase Open Session
This Helix Nebula Science Cloud Pilot Phase Open Session
 
European Rotors - PBN and GNSS for Rotorcraft Operations
European Rotors - PBN and GNSS for Rotorcraft OperationsEuropean Rotors - PBN and GNSS for Rotorcraft Operations
European Rotors - PBN and GNSS for Rotorcraft Operations
 
ISCF Future Flight Networking Event - Regulation
ISCF Future Flight Networking Event - RegulationISCF Future Flight Networking Event - Regulation
ISCF Future Flight Networking Event - Regulation
 
tayssircv_(2)1
tayssircv_(2)1tayssircv_(2)1
tayssircv_(2)1
 
Culver Test Track
Culver Test TrackCulver Test Track
Culver Test Track
 
Ianson
IansonIanson
Ianson
 

Recently uploaded

User Guide: Capricorn FLX™ Weather Station
User Guide: Capricorn FLX™ Weather StationUser Guide: Capricorn FLX™ Weather Station
User Guide: Capricorn FLX™ Weather StationColumbia Weather Systems
 
OECD bibliometric indicators: Selected highlights, April 2024
OECD bibliometric indicators: Selected highlights, April 2024OECD bibliometric indicators: Selected highlights, April 2024
OECD bibliometric indicators: Selected highlights, April 2024innovationoecd
 
LIGHT-PHENOMENA-BY-CABUALDIONALDOPANOGANCADIENTE-CONDEZA (1).pptx
LIGHT-PHENOMENA-BY-CABUALDIONALDOPANOGANCADIENTE-CONDEZA (1).pptxLIGHT-PHENOMENA-BY-CABUALDIONALDOPANOGANCADIENTE-CONDEZA (1).pptx
LIGHT-PHENOMENA-BY-CABUALDIONALDOPANOGANCADIENTE-CONDEZA (1).pptxmalonesandreagweneth
 
Pests of Blackgram, greengram, cowpea_Dr.UPR.pdf
Pests of Blackgram, greengram, cowpea_Dr.UPR.pdfPests of Blackgram, greengram, cowpea_Dr.UPR.pdf
Pests of Blackgram, greengram, cowpea_Dr.UPR.pdfPirithiRaju
 
Bentham & Hooker's Classification. along with the merits and demerits of the ...
Bentham & Hooker's Classification. along with the merits and demerits of the ...Bentham & Hooker's Classification. along with the merits and demerits of the ...
Bentham & Hooker's Classification. along with the merits and demerits of the ...Nistarini College, Purulia (W.B) India
 
Is RISC-V ready for HPC workload? Maybe?
Is RISC-V ready for HPC workload? Maybe?Is RISC-V ready for HPC workload? Maybe?
Is RISC-V ready for HPC workload? Maybe?Patrick Diehl
 
RESPIRATORY ADAPTATIONS TO HYPOXIA IN HUMNAS.pptx
RESPIRATORY ADAPTATIONS TO HYPOXIA IN HUMNAS.pptxRESPIRATORY ADAPTATIONS TO HYPOXIA IN HUMNAS.pptx
RESPIRATORY ADAPTATIONS TO HYPOXIA IN HUMNAS.pptxFarihaAbdulRasheed
 
User Guide: Magellan MX™ Weather Station
User Guide: Magellan MX™ Weather StationUser Guide: Magellan MX™ Weather Station
User Guide: Magellan MX™ Weather StationColumbia Weather Systems
 
Base editing, prime editing, Cas13 & RNA editing and organelle base editing
Base editing, prime editing, Cas13 & RNA editing and organelle base editingBase editing, prime editing, Cas13 & RNA editing and organelle base editing
Base editing, prime editing, Cas13 & RNA editing and organelle base editingNetHelix
 
Vision and reflection on Mining Software Repositories research in 2024
Vision and reflection on Mining Software Repositories research in 2024Vision and reflection on Mining Software Repositories research in 2024
Vision and reflection on Mining Software Repositories research in 2024AyushiRastogi48
 
BUMI DAN ANTARIKSA PROJEK IPAS SMK KELAS X.pdf
BUMI DAN ANTARIKSA PROJEK IPAS SMK KELAS X.pdfBUMI DAN ANTARIKSA PROJEK IPAS SMK KELAS X.pdf
BUMI DAN ANTARIKSA PROJEK IPAS SMK KELAS X.pdfWildaNurAmalia2
 
Davis plaque method.pptx recombinant DNA technology
Davis plaque method.pptx recombinant DNA technologyDavis plaque method.pptx recombinant DNA technology
Davis plaque method.pptx recombinant DNA technologycaarthichand2003
 
Solution chemistry, Moral and Normal solutions
Solution chemistry, Moral and Normal solutionsSolution chemistry, Moral and Normal solutions
Solution chemistry, Moral and Normal solutionsHajira Mahmood
 
preservation, maintanence and improvement of industrial organism.pptx
preservation, maintanence and improvement of industrial organism.pptxpreservation, maintanence and improvement of industrial organism.pptx
preservation, maintanence and improvement of industrial organism.pptxnoordubaliya2003
 
User Guide: Orion™ Weather Station (Columbia Weather Systems)
User Guide: Orion™ Weather Station (Columbia Weather Systems)User Guide: Orion™ Weather Station (Columbia Weather Systems)
User Guide: Orion™ Weather Station (Columbia Weather Systems)Columbia Weather Systems
 
Pests of safflower_Binomics_Identification_Dr.UPR.pdf
Pests of safflower_Binomics_Identification_Dr.UPR.pdfPests of safflower_Binomics_Identification_Dr.UPR.pdf
Pests of safflower_Binomics_Identification_Dr.UPR.pdfPirithiRaju
 
Citronella presentation SlideShare mani upadhyay
Citronella presentation SlideShare mani upadhyayCitronella presentation SlideShare mani upadhyay
Citronella presentation SlideShare mani upadhyayupadhyaymani499
 
Call Girls in Majnu Ka Tilla Delhi 🔝9711014705🔝 Genuine
Call Girls in Majnu Ka Tilla Delhi 🔝9711014705🔝 GenuineCall Girls in Majnu Ka Tilla Delhi 🔝9711014705🔝 Genuine
Call Girls in Majnu Ka Tilla Delhi 🔝9711014705🔝 Genuinethapagita
 
Neurodevelopmental disorders according to the dsm 5 tr
Neurodevelopmental disorders according to the dsm 5 trNeurodevelopmental disorders according to the dsm 5 tr
Neurodevelopmental disorders according to the dsm 5 trssuser06f238
 

Recently uploaded (20)

User Guide: Capricorn FLX™ Weather Station
User Guide: Capricorn FLX™ Weather StationUser Guide: Capricorn FLX™ Weather Station
User Guide: Capricorn FLX™ Weather Station
 
Volatile Oils Pharmacognosy And Phytochemistry -I
Volatile Oils Pharmacognosy And Phytochemistry -IVolatile Oils Pharmacognosy And Phytochemistry -I
Volatile Oils Pharmacognosy And Phytochemistry -I
 
OECD bibliometric indicators: Selected highlights, April 2024
OECD bibliometric indicators: Selected highlights, April 2024OECD bibliometric indicators: Selected highlights, April 2024
OECD bibliometric indicators: Selected highlights, April 2024
 
LIGHT-PHENOMENA-BY-CABUALDIONALDOPANOGANCADIENTE-CONDEZA (1).pptx
LIGHT-PHENOMENA-BY-CABUALDIONALDOPANOGANCADIENTE-CONDEZA (1).pptxLIGHT-PHENOMENA-BY-CABUALDIONALDOPANOGANCADIENTE-CONDEZA (1).pptx
LIGHT-PHENOMENA-BY-CABUALDIONALDOPANOGANCADIENTE-CONDEZA (1).pptx
 
Pests of Blackgram, greengram, cowpea_Dr.UPR.pdf
Pests of Blackgram, greengram, cowpea_Dr.UPR.pdfPests of Blackgram, greengram, cowpea_Dr.UPR.pdf
Pests of Blackgram, greengram, cowpea_Dr.UPR.pdf
 
Bentham & Hooker's Classification. along with the merits and demerits of the ...
Bentham & Hooker's Classification. along with the merits and demerits of the ...Bentham & Hooker's Classification. along with the merits and demerits of the ...
Bentham & Hooker's Classification. along with the merits and demerits of the ...
 
Is RISC-V ready for HPC workload? Maybe?
Is RISC-V ready for HPC workload? Maybe?Is RISC-V ready for HPC workload? Maybe?
Is RISC-V ready for HPC workload? Maybe?
 
RESPIRATORY ADAPTATIONS TO HYPOXIA IN HUMNAS.pptx
RESPIRATORY ADAPTATIONS TO HYPOXIA IN HUMNAS.pptxRESPIRATORY ADAPTATIONS TO HYPOXIA IN HUMNAS.pptx
RESPIRATORY ADAPTATIONS TO HYPOXIA IN HUMNAS.pptx
 
User Guide: Magellan MX™ Weather Station
User Guide: Magellan MX™ Weather StationUser Guide: Magellan MX™ Weather Station
User Guide: Magellan MX™ Weather Station
 
Base editing, prime editing, Cas13 & RNA editing and organelle base editing
Base editing, prime editing, Cas13 & RNA editing and organelle base editingBase editing, prime editing, Cas13 & RNA editing and organelle base editing
Base editing, prime editing, Cas13 & RNA editing and organelle base editing
 
Vision and reflection on Mining Software Repositories research in 2024
Vision and reflection on Mining Software Repositories research in 2024Vision and reflection on Mining Software Repositories research in 2024
Vision and reflection on Mining Software Repositories research in 2024
 
BUMI DAN ANTARIKSA PROJEK IPAS SMK KELAS X.pdf
BUMI DAN ANTARIKSA PROJEK IPAS SMK KELAS X.pdfBUMI DAN ANTARIKSA PROJEK IPAS SMK KELAS X.pdf
BUMI DAN ANTARIKSA PROJEK IPAS SMK KELAS X.pdf
 
Davis plaque method.pptx recombinant DNA technology
Davis plaque method.pptx recombinant DNA technologyDavis plaque method.pptx recombinant DNA technology
Davis plaque method.pptx recombinant DNA technology
 
Solution chemistry, Moral and Normal solutions
Solution chemistry, Moral and Normal solutionsSolution chemistry, Moral and Normal solutions
Solution chemistry, Moral and Normal solutions
 
preservation, maintanence and improvement of industrial organism.pptx
preservation, maintanence and improvement of industrial organism.pptxpreservation, maintanence and improvement of industrial organism.pptx
preservation, maintanence and improvement of industrial organism.pptx
 
User Guide: Orion™ Weather Station (Columbia Weather Systems)
User Guide: Orion™ Weather Station (Columbia Weather Systems)User Guide: Orion™ Weather Station (Columbia Weather Systems)
User Guide: Orion™ Weather Station (Columbia Weather Systems)
 
Pests of safflower_Binomics_Identification_Dr.UPR.pdf
Pests of safflower_Binomics_Identification_Dr.UPR.pdfPests of safflower_Binomics_Identification_Dr.UPR.pdf
Pests of safflower_Binomics_Identification_Dr.UPR.pdf
 
Citronella presentation SlideShare mani upadhyay
Citronella presentation SlideShare mani upadhyayCitronella presentation SlideShare mani upadhyay
Citronella presentation SlideShare mani upadhyay
 
Call Girls in Majnu Ka Tilla Delhi 🔝9711014705🔝 Genuine
Call Girls in Majnu Ka Tilla Delhi 🔝9711014705🔝 GenuineCall Girls in Majnu Ka Tilla Delhi 🔝9711014705🔝 Genuine
Call Girls in Majnu Ka Tilla Delhi 🔝9711014705🔝 Genuine
 
Neurodevelopmental disorders according to the dsm 5 tr
Neurodevelopmental disorders according to the dsm 5 trNeurodevelopmental disorders according to the dsm 5 tr
Neurodevelopmental disorders according to the dsm 5 tr
 

CLIC plans for the next European strategy update, and beyond

  • 1. 1 R. Corsini – CLIC plans for the next European strategy update, and beyond CLIC plans for the next European strategy update, and beyond Roberto Corsini for the CLIC Accelerator Collaboration
  • 2. 2 R. Corsini – CLIC plans for the next European strategy update, and beyond CLIC position in the HEP (and CERN) landscape F. Gianotti, A great year ahead of us F. Gianotti, A great year ahead of us … should keep the momentumWe know where we stand
  • 3. 3 R. Corsini – CLIC plans for the next European strategy update, and beyond CLIC Timeline 2013-18 Development Phase Develop a Project Plan for a staged implementation in agreement with LHC findings; further technical developments with industry, performance studies for accelerator parts and systems, as well as for detectors. 2018-19 Decisions On the basis of LHC data and Project Plans (for CLIC and other potential projects as FCC), take decisions about next project(s) at the Energy Frontier. 4-5 year Preparation Phase Finalise implementation parameters, Drive Beam Facility and other system verifications, site authorisation and preparation for industrial procurement. Prepare detailed Technical Proposals for the detector-systems. 2024-25 Construction Start Ready for full construction and main tunnel excavation. Construction Phase Stage 1 construction of CLIC, in parallel with detector construction. Preparation for implementation of further stages. Commissioning Becoming ready for data- taking as the LHC programme reaches completion. DRIVE BEAM LINAC CLEX CLIC Experimental Area DELAY LOOP COMBINER RING CTF3 – Layout 10 m 4 A – 1.2 ms 150 MeV 28 A – 140 ns 150 MeV Two-Beam Test Stand (TBTS) Test Beam Line (TBL)
  • 4. 4 R. Corsini – CLIC plans for the next European strategy update, and beyond Development phase Develop a Project Plan for a staged implementation of CLIC, consistent with LHC findings, as an option for CERN in post-LHC era, for consideration in next European Strategy update 2019/20 •Update physics studies in light of LHC results •Rebaseline, cost/staging strategy with a 20-30 year perspective •Complete key technical R&D •More advanced industrialization studies •Perform more system tests + verification I PJ u r a M o u n t a in s L a k e G e n e v a G e n e v a L e g e n d C E R N e x is t in g L H C C L I C 3 8 0 G e v C L I C 3 T e V P o t e n t ia l u n d e r g r o u n d s it in g : C L I C 1 . 5 T e V
  • 5. 5 R. Corsini – CLIC plans for the next European strategy update, and beyond Key technical R&D X-band accelerating structures Key diagnostics equipment Other critical components (NbTi Wiggler test at ANKA) Module – alignment – assembly High Efficiency klystrons
  • 6. 6 R. Corsini – CLIC plans for the next European strategy update, and beyond High-power X-band testing at CERN Current test: Dogleg beam-loading experiment, TD26CC#1 (in CTF3 LINAC) Previous tests: TD24R05 (CTF2, 2013) TD26CC#1 (CTF2, 2013) T24 (Dogleg, 2014-15) Current test: T24_OPEN (in halves) Previous test: CLIC Crab cavity (2014- 15) LLRF, pulse compressors and waveguide network to be completed at the end 2015 Medium power test: 3D printed Ti waveguide (Xbox-3A) Xbox-1 Xbox-2 Xbox-3 OPERATIONAL OPERATIONAL Xbox-3A: OPERATIONAL Xbox-3B/C/D: COMMISSIONING CPI 50MW 1.5us klystron Scandinova Modulator Rep Rate 50Hz CPI 50MW 1.5us klystron Scandinova Modulator Rep Rate 50Hz 4x Toshiba 6MW 5us klystron 4x Scandinova Modulators Rep Rate 400Hz
  • 7. 7 R. Corsini – CLIC plans for the next European strategy update, and beyond Industrialization L-band klystrons/modulators Accelerating structures and other main components of the Two-Beam Module • Prepare for industrialization of individual main components • Study mass production/qualification process/assembly/installation procedures adapted to CLIC requirements
  • 8. 8 R. Corsini – CLIC plans for the next European strategy update, and beyond X-band technology http://www.lightsources.org/facility/sacla https://indico.cern.ch/event/358352/session/7/contribution/40 Linear collider - TeV XFEL – 1 to 10 GeV Compact Compton source few 10s MeV Thompson/Compton source – few 100s MeV CLIC SACLA Tsinghua U.
  • 9. 9 R. Corsini – CLIC plans for the next European strategy update, and beyond System Tests Measure of transverse long-range wake-fields in a CLIC structure @ FACET ATF2 CTF3 FACET
  • 10. 10 R. Corsini – CLIC plans for the next European strategy update, and beyond CTF3 Experimental Program 2016 Drive-beam phase feed-forward tests • Increase reproducibility • Demonstrate factor 10 jitter reduction CLIC two-beam module tests • Power production, stability + control of RF profile (beam loading compensation) • RF phase/amplitude drifts along TBL, PETS switching at full power • Alignment tests Ongoing instrumentation tests • Wake-Field Monitors • Main and Drive beam BPMs … Drive Beam •Dispersion free-steering, dispersion matching, orbit control, chromatic corrections, emittance, stability • Beam deceleration + optics check in TBL
  • 11. 11 R. Corsini – CLIC plans for the next European strategy update, and beyond Discussions on a CALIFES - based facility • Keep testing CLIC components (X-band structures, diags…) with beam • Advance high-gradient e- accelerator R&D • Support strategic partnerships with relevant communities: XFEL, medical, industrial, space • Enable instrumentation/equipment tests for consolidating CERN accelerator complex (LHC and injectors) • Provide unique + complementary test facility for CERN’s European (and worldwide) users • Maintain accelerator training facility for next generation of accelerator scientists + engineers Re-use 1/3 CTF3 area; 80% equipment available
  • 12. 12 R. Corsini – CLIC plans for the next European strategy update, and beyond Proposal of a CALIFES-based Accelerator Test Stand
  • 13. 13 R. Corsini – CLIC plans for the next European strategy update, and beyond Development phase - Main goals/deliverables • Concise project plan document: physics, machine parameters, cost, power, site, staging, construction schedule, main technical issues, preparation phase (2019- 2025) summary, detector studies. • Comprehensive physics and detector documentation: summary papers planned 2015-2018 covering physics topics, detector studies and R&D. • Detailed, consistent technical documentation across project: EDMS/WBS based. • Technology transfer/spin-off document, including training (PhDs, postdocs, fellows). • Preparation phase plan document: critical parameters, status and next steps 2019-2025 - what is needed before project construction start up, strategy, risks and how to address them, inside and outside CERN, and involving industry.
  • 14. 14 R. Corsini – CLIC plans for the next European strategy update, and beyond The Preparation phase - “Technical” considerations • What we will have in 2019: • A basic design for the first low energy stage • A reasonable & flexible upgrade scenario • A credible cost and power consumption update • Prototypes of several key components (NOT in final state) • A work plan for the next phase (project preparation, 2020-2025) • What will be missing, but will be needed before construction could start: • A Technical Design • Site detailed studies and authorizations • Finalized prototypes of all main components • Fully developed industrial basis for main components • Facilities for testing and qualification of components
  • 15. 15 R. Corsini – CLIC plans for the next European strategy update, and beyond “Other considerations” • Timeline & resources availability at CERN • What kind of decision may we expect in 2019? What will be the approval procedure of the project after that? What resources may we expect in the period 2020-2025? • Should we propose a technically limited plan, or anticipate at least to some extent resources and time constraints? CLIC CDR CLIC post-CDR development CLIC Project Preparation CONSTRUCTION
  • 16. 16 R. Corsini – CLIC plans for the next European strategy update, and beyond Finalized prototypes of all main components I • Modules – status before 2020 • Two-Beam Modules – LAB, design more or less consistent with CDR parameters, but not fully representative (use of components mock-ups, …) • TBM – CLEX, fully operational components, but design adapted to CTF3 • PACMAN – Fundamental input to new design • Klystron-based Modules – Only sketches so far • Should have full design of both two-beam and klystron based versions before 2020 • Drive Beam accelerator units • Klystrons (1st generation) under procurement in Industry. • Modulators under development • Structure design exist • R&D on higher efficiency klystrons ongoing • Should have full unit (1st generation) by 2020, RF tested
  • 17. 17 R. Corsini – CLIC plans for the next European strategy update, and beyond Finalized prototypes of all main components II • Main linac modules should be the first priority, will need time to build – and test – prototypes (even more if we should iterate the process). • Drive beam linac modules should be in a more advanced state by 2020. However, in case we will aim at a CLIC Zero like facility for the preparation phase, they may also be very much on the critical path. • Of course full prototypes of main linac modules and DB accelerator units prototypes are mandatory before construction start. However: • We should review what other components will need prototyping (mainly items critical for performance, e.g., extraction kickers, SC wigglers, phase feed-forward components, specific diagnostics components…). • Even more than that, we have to define and include in the plan a meaningful testing program for all prototypes.
  • 18. 18 R. Corsini – CLIC plans for the next European strategy update, and beyond Fully developed industrial basis for main components • Modules – still a long way to full industrialization for all components  full industrialization must be addressed after new generation design. Further considerations: • Industrialization of accelerating structures including assembly should be done as soon as possible • X-FEL projects based on X-band are an invaluable opportunity to develop industrial basis • However, they are not fully applicable to CLIC modules (even for klystron-based) • Drive Beam Accelerator components – R&D on CLIC front-end components have put us on the right track However: • Modulators will not be fully industrialized in 2020 • Same for accelerator structures (but they are relatively standard components…) • Klystrons may need a second iteration if R&D on high efficiency tubes successful • Need to keep momentum and critical mass…
  • 19. 19 R. Corsini – CLIC plans for the next European strategy update, and beyond Facilities for testing and qualification of components • Such facilities will be needed at the latest in the early stage of construction • May have a very long lead time, so their construction should be part of the project preparation • CLIC Zero may be one of these, its main use should indeed be the qualification of two-beam modules. It is therefore critical to understand early what will be the needs for qualification and the corresponding procedures
  • 20. 20 R. Corsini – CLIC plans for the next European strategy update, and beyond RF conditioning, structure qualification, operational issues • Possibly the main critical issue linked to that is RF conditioning of accelerating structure and subsequent breakdown behavior • It is paramount to collect a good statistics in the high-gradient tests in order to understand the process and develop a realistic strategy for conditioning. Important questions: • How many structures will have to be rejected? How to detect the faulty ones early on during conditioning? • How many structures will have to be (pre-)conditioned in parallel? • Would it be acceptable to condition the structures in situ? • How much of the conditioning should be done before? • Will we need special procedures to preserve performance during transport? • Will we need to reprocess installed structures occasionally? Do we need a very fast PETS on-off mechanism? • …
  • 21. 21 R. Corsini – CLIC plans for the next European strategy update, and beyond The CLIC Zero issue • CLIC Zero was proposed in the past as part of the post-CDR phase. Motivations: • Focus to develop main components to large scale • Needed for modules qualification tests • Gain experience/time in operation of full scale drive beam complex • Full-scale system test for Two-Beam • Main issue: cost (~300 MCHF, to be reviewed) and time (a few years) • Will need a serious commitment towards CLIC • May CLIC Zero be integrated in early construction stage? • Were will we test modules? • What kind of facility will we need if we choose the klystron option?
  • 22. 22 R. Corsini – CLIC plans for the next European strategy update, and beyond Two-beam and/or klystron based 1st stage • Prototypes, testing procedures and testing facilities may be very different for the two cases • The two options should be pursued in parallel in the present stage • However, we should soon define a decision point, in order to not duplicate efforts in a period were investment will have to go up • Will we have a decision already before 2020? • Should we present two alternative plans for the next phase?
  • 23. 23 R. Corsini – CLIC plans for the next European strategy update, and beyond Conclusion and Outlook • CLIC is one of the main options for the future of CERN and of high energy physics in general after LHC. • We have a well defined mandate to complete and document the CLIC study in preparation for the next European Strategy exercise (2018/2019), when an informed decision should be taken (hopefully with good indications from physics results from LHC run2) and we have a clear plan to fulfill such a mandate. • One of the deliverables of the present phase is a detailed plan for the CLIC Preparation Phase (2020-2025), to bring the project at the start of construction in case of a positive decision. • It is now time to start developing in detail such a plan. Most of the needed information exists, and we should be able to get what is still missing in the next couple of years, in the framework of the present program.
  • 24. 24 R. Corsini – CLIC plans for the next European strategy update, and beyond
  • 25. 25 R. Corsini – CLIC plans for the next European strategy update, and beyond