CBTC Interoperability:
From Real Needs to Real Deployments
New York’s Culver CBTC Test Track Project
Gabriel Colceag and Gerard Yelloz
Metrorail, London, March 28, 2012
Summary
1. Signalling/CBTC Interoperability: Context and History
2. New York Needs: CBTC and Interoperability
3. Culver Interoperability Test Track Project
Project goals, Organization, Schedule
4. System Integration Team Overview
5. CBTC systems
Siemens CBTC system
1
Siemens CBTC system
Thales CBTC system
6. Integrated Test Facility
7. I2S Documents
8. Next Steps and Possible Future Steps
9. Questions & Answers
CBTC Signalling Interoperability Context
“Interoperability is the ability of systems to provide services to,
and accept services from other systems, and to use the services
exchanged to enable them to operate effectively together“
Signalling and Communications Based Train Control (CBTC) Interoperability:
a metro line running with a signalling system provided by at least two different
(sub)systems suppliers
Exclusion of « dual » signalling systems
2
On board provided by supplier X running on a trackside provided by a
supplier Y and vice versa
TracksideTrackside
TrainTrain
Signalling Interoperability History Brief (1/2)
Signalling B.C. era: « Before CBTC » technology
USA: 1970-80’s operation, development by industry of fixed block speed code technoloy
to improve metros with ATP/ATO
Multi sourcing: compatible different US suppliers
Today many metros still run under this US standard technology
France: 1990’s operation, RATP improving suburban network performance, quality and
maintainability with ATP/ATO distance-to-go SACEM, developed by 3 suppliers, with
interoperable and multi-sourcing objectives
Paris RER, Hong Kong MTR TKO line and other metros are still using it
3
ATCS in USA / Canada
Precursor of CBTC and PTC for Main Lines, radio technology retained for further applications
ERTMS / ETCS in Europe
Success for Main Lines interoperability, driven by strong EU policy for borderless,
seamless train travel. Now spreading to others: Asia, Latin America, Australia, Africa
Limited application on Urban and Suburban Railways (performance limitations vs. CBTC)
Possible evolution for urban performance, but not a European policy, nor a priority of
metro operators
Signalling Interoperability History Brief (2/2)
CBTC technology
UGTMS and ModUrban in Europe
CBTC in Paris RATP OCTSYS
5 lines and 200 trains to be re-signalled: multi-sourcing and long term
procurement needs
3 suppliers, on a same agreed specification, developed the overlay CBTC
OCTYS system
4
New York City Transit Authority (NYCTA) network
upgrade
Subject of the following presentation
OCTYS system
4th supplier defined external interfaces for ATS (PCC) and CBI (PMI)
Line 3 in operation 2010, Line 5 for 2012.
New York Needs
Massive signalling modernization for higher
performance and lower Life Cycle Cost (LCC)
From state of good repair to major
performance, safety and service upgrade
CBTC
ATS, Electronic Interlocking
Interoperability across the network, over very long
time and track length
5
Successive, phased projects
Separate procurement: trackside vs. trains
Multiple suppliers for stability, capacity
CBTC Interoperability
Not a desire, a necessity!
New York Projects
Interoperable CBTC modernization program
Technologies assessment with expert independent consultants
6 suppliers competitive proposals, out of which 3 selected for initial phases
Canarsie Line CBTC
Siemens has provided the first whole line CBTC system in operation
Thales has demonstrated sub-systems interoperability on test track
Flushing Line CBTC
Thales is deploying the whole line CBTC system, with additional functions
6
Thales is deploying the whole line CBTC system, with additional functions
Culver Line CBTC Test Track
Interoperability test track contract award to validate multi-supplier CBTC
procurement for the B-division of New York network over the next 30 years.
Interoperable CBTC Subsystems « shares » provided separately by Thales /
Siemens
Siemens & Thales consortium for System Integration « share »
Industry consultations and experience sharing started by NYCTA in 2011 with a
view towards accelerating and expanding the CBTC modernization program
Culver Line Project Goals
Update and finalize the NYCT Standard CBTC System Design and
associated lnteroperability lnterface Specifications (I2S), that will be used as
reference (standard) for future CBTC deployment in the NYCT environment
Provide an operational CBTC simulation testing environment (Integrated Test
Facility) to demonstrate compliance of supplier’s subsystems to the I2S
Provide NYCT a permanent operational CBTC Test Track on the Culver Line
7
Provide safety certification of “mixed” interoperable CBTC system by the
Systems Integrator consortium
TracksideTrackside
TrainTrain
Culver Line Project Contractor Organization
Thales and Siemens have proposed a co-contracting consortium
Contractor operates as a “one team” to deliver the Share 1, with
Siemens responsible for Share 2 (Church Ave.) and Thales responsible
for Share 3 (4th Ave)
NYCT
8
Project Director
Rotation
Combined System
Integration Team
(see separate chart)
Siemens
Project Manager
Thales
Project Manager
Siemens
Development Team
Thales
Development team
InstallationInstallation
Thales/Siemens Co-Contracting Team
Culver Line Project Schedule
Target milestones:
Notice of Award (Sept 30, 2011) month 0
System Design Review month 9
Final Design Review month 12
Delivery in New York of the ITF month 18
SW FAT complete for ITF month 26
9
Interoperability Demonstration on the ITF months 31-34
Field Installation Complete month 29
Integration testing and formal demo months 39-45
Substantial Completion month 46
Share 1: System Integration Scope Allocation
For all integration
engineering
activities, Thales
and Siemens have
combined
resources to
perform the
activities
Work Item Work Description Share 1 (see Note 2 for Share 2 & 3)
SYS = System
Engineering
DES = Design
Engineering
DEL = SW/HW Deliv. &
Install.
Thales Siemens
System Integration1
SYS Thales support X
System Performance1
SYS Thales support X
System RTM1
SYS X Siemens support
Configuration Management1
SYS X Siemens support
Project Manager - See 'GPM' tab for Project Director rotation
Project Management / Offices -
Syst. Safety Manager,
T&C Manager,
Quality Manager
System Integrator,
Scheduler,
Project Admin
10
In order to be
practical, the SI
supply subsystems
(ATS, ITF, etc.)
have defined
allocations to
Siemens or Thales
Quality Manager Project Admin
System Testing1
- ITF SYS Thales support X
System Testing - Test Track SYS X
Siemens
technical support
System I2S Update SYS See 'I2S' tab for I2S document allocation
Database Management and Tool SYS / DES / DEL X
System Safety1
SYS X
Siemens reviews &
also approves
CBTC ATS SYS / DES / DEL X
ITF Simulator: Including Simulator
engine, Satellite simulators3
and Interoperability test scripts
SYS / DES / DEL X
Share 2: Siemens
Siemens to design, develop, procure, configure, factory test, ship, supervise
installation & engineering field test :
Wayside CBTC equipment for Church Avenue
Carborne CBTC equipment on one train including radio and transponders
Zone Controllers:
ZC for Church Ave Relay Room
ZC for Church Avenue will control CBTC train movements on the test track
and interface with Church Avenue Interlocking
Siemens ZC is based on the Canarsie design with hardware upgrades
11
Siemens ZC is based on the Canarsie design with hardware upgrades
Carborne Controllers:
Modify carborne CBTC equipment set on one 4-car R160 Canarsie train
The equipment set includes OBCU, CIU, CRD, MIU and Digimove
Siemens CC is based on the Canarsie design with hardware upgrades
Share 3: Thales
Thales to design, develop, procure, configure, factory test, ship,
supervise installation & engineering field test :
Zone Controller Equipment
Based on Thales ZC for Flushing
Interface to Interlocking based on NY standard
Two ZCs supplied; 1 at 7th Ave and 1 at 570 CIR
12
On-Board Equipment
Based on Thales OBCU for Flushing
Siemens Radio and Transponder Interrogator
One carborne controller supplied for a 4-car train
Integrated Test Facilities (ITF)
Joint definition of the interoperability test list
Siemens is responsible for the Lab ITF test scripts
Thales is responsible for the Field Test procedures
Each supplier tests its own subsystems, in factory, on the ITF and then
on the Culver Test Track, prior to interoperability testing
Where practical, all test cases performed on site on the Culver Test Track
13
Where practical, all test cases performed on site on the Culver Test Track
will be part of the ITF test plan
The ITF is capable of simulating any NYCT line, including Flushing and
Canarsie
Culver Test Track simulation is included
Additional simulation scenarios can be developed for future lines
ITF Platform
SUN station
HMI computer
OT_ZC
OT_ZC
Thales ZC
Siemens ZC Siemens ATS
I/O
I/O
I/O
Siemens Thales
Physical or Logical
14
HMI computer
OT_CC
OT_CC
Thales CC
Siemens CC
Wayside radioOnboard radio
Ethernet VLAN3 (WCN)
Ethernet VLAN2 (test network)
Ethernet VLAN1 (piloting network)
RF connection
I/O
I/O
Simulation tools Tested equipmentManagement & HMI
System Engineering Activities
Siemens leads the system engineering activities for Culver at the
system level
Full-time SI System Manager primary technical interface to the
customer
Thales has a dedicated full-time system engineer
SI System Manager leads the effort for the System Design Review
with both parties to review and approve any content prior to
15
with both parties to review and approve any content prior to
customer review & approval
SI System Manager manages the technical relationship with the
customer and ensures there is formal acceptance by both parties
Thales leads the RTM activity and documentation of SFS/SDD/I2S
requirements into DOORS
I2S Documents: Shared Responsibilities
I2S document Siemens Thales
SFS X
SDD X
Carborne <-> Wayside CBTC X
Wayside <-> Wayside CBTC X
Carborne <-> Carborne CBTC X
AWS <-> ZC X
16
AWS <-> ZC X
System Database X
Software Database X
Safety Principles X
ATS <-> CBTC X
CC<-> Carborne DCS X
CC <-> TIA (tag reader) X
Next Steps
Potential CBTC opportunities in New York’s
modernization plans
Queens Blvd Line
Union Turnpike to 5thAvenue
8th Ave Line (in next Capital Program)
17
Connect with QBL
6th Ave Line (in next Capital Program)
Connecting with QBL
NYCT Note: "While NYCT generally concurs that the factual information included in this
presentation is accurate, it does not necessarily depict NYCT's future plans or how procurements for
future CBTC program plans will be handled. Funding of its future Capital projects is subject to policy
determinations of its Board and the Governor and is subject to legislative and regulatory actions."
Future
Additional CBTC suppliers may join the NYCT program
Compliance with NYCT I2S standard
Interoperability qualification testing on Culver Test Track
Participation to future competitive procurement process
Benefits of NYCT I2S
Real-life re-signalling deployment and in-service experience
18
I2S specifications stability and control by NYCT owner and operator
Critical procurement mass and long term life cycle synergies
Leading edge, high performance technology proven interoperable, by an
experienced major historical metropolitan operator, accompanied by the
two CBTC industry pioneers, fulfilling its vision for the 21st century
CBTC Interoperability
QUESTIONS

More Related Content

What's hot

Automated Governance for the DevOps Institutions.pdf
Automated Governance for the DevOps Institutions.pdfAutomated Governance for the DevOps Institutions.pdf
Automated Governance for the DevOps Institutions.pdfVishwas N
 
Scripting with Python to interact with Capella model
Scripting with Python to interact with Capella modelScripting with Python to interact with Capella model
Scripting with Python to interact with Capella modelObeo
 
Référentiel d'architecture avec TOGAF
Référentiel d'architecture avec TOGAFRéférentiel d'architecture avec TOGAF
Référentiel d'architecture avec TOGAFPierre-Xavier Fouillé
 
Club Urba-EA - Architecture d'entreprise et projets agiles
Club Urba-EA - Architecture d'entreprise et projets agilesClub Urba-EA - Architecture d'entreprise et projets agiles
Club Urba-EA - Architecture d'entreprise et projets agilesClub Urba-EA
 
Multi domain product architecture: start integrated, stay integrated
Multi domain product architecture: start integrated, stay integratedMulti domain product architecture: start integrated, stay integrated
Multi domain product architecture: start integrated, stay integratedObeo
 
A Day in the Life of an Enterprise Architect (Role Play Exercise) 2016
A Day in the Life of an Enterprise Architect (Role Play Exercise) 2016A Day in the Life of an Enterprise Architect (Role Play Exercise) 2016
A Day in the Life of an Enterprise Architect (Role Play Exercise) 2016Daljit Banger
 
Computing and AI technologies for mobile and consumer applications 2021 - Sample
Computing and AI technologies for mobile and consumer applications 2021 - SampleComputing and AI technologies for mobile and consumer applications 2021 - Sample
Computing and AI technologies for mobile and consumer applications 2021 - SampleYole Developpement
 
2.5D / 3D TSV & Wafer-Level Stacking: Technology & Market Updates 2019 Report...
2.5D / 3D TSV & Wafer-Level Stacking: Technology & Market Updates 2019 Report...2.5D / 3D TSV & Wafer-Level Stacking: Technology & Market Updates 2019 Report...
2.5D / 3D TSV & Wafer-Level Stacking: Technology & Market Updates 2019 Report...Yole Developpement
 
ISO/PAS 21448 (SOTIF) in the Development of ADAS and Autonomous Vehicles
ISO/PAS 21448 (SOTIF) in the Development of ADAS and Autonomous VehiclesISO/PAS 21448 (SOTIF) in the Development of ADAS and Autonomous Vehicles
ISO/PAS 21448 (SOTIF) in the Development of ADAS and Autonomous VehiclesIntland Software GmbH
 
Critical Review of Open Group IT4IT Reference Architecture
Critical Review of Open Group IT4IT Reference ArchitectureCritical Review of Open Group IT4IT Reference Architecture
Critical Review of Open Group IT4IT Reference ArchitectureAlan McSweeney
 
Trends in semiconductor industry 2020 converted
Trends in semiconductor industry 2020 convertedTrends in semiconductor industry 2020 converted
Trends in semiconductor industry 2020 convertedJedeSmith
 
Doing Enterprise Architecture
Doing Enterprise ArchitectureDoing Enterprise Architecture
Doing Enterprise ArchitectureJohn Macasio
 
MBSE and Model-Based Testing with Capella
MBSE and Model-Based Testing with CapellaMBSE and Model-Based Testing with Capella
MBSE and Model-Based Testing with CapellaObeo
 
Artificial Intelligence co-regulation
Artificial Intelligence co-regulationArtificial Intelligence co-regulation
Artificial Intelligence co-regulationChrisMarsden13
 
Deploy, Scale and Manage your Application with AWS Elastic Beanstalk
Deploy, Scale and Manage your Application with AWS Elastic BeanstalkDeploy, Scale and Manage your Application with AWS Elastic Beanstalk
Deploy, Scale and Manage your Application with AWS Elastic BeanstalkAmazon Web Services
 
IT Governance Vs IT Management Presentation V0.1
IT Governance Vs IT Management   Presentation V0.1IT Governance Vs IT Management   Presentation V0.1
IT Governance Vs IT Management Presentation V0.1Richard Willis
 
"Accessing Advanced Image Processing Feature Sets with Alvium Cameras Using a...
"Accessing Advanced Image Processing Feature Sets with Alvium Cameras Using a..."Accessing Advanced Image Processing Feature Sets with Alvium Cameras Using a...
"Accessing Advanced Image Processing Feature Sets with Alvium Cameras Using a...Edge AI and Vision Alliance
 

What's hot (20)

Automated Governance for the DevOps Institutions.pdf
Automated Governance for the DevOps Institutions.pdfAutomated Governance for the DevOps Institutions.pdf
Automated Governance for the DevOps Institutions.pdf
 
Scripting with Python to interact with Capella model
Scripting with Python to interact with Capella modelScripting with Python to interact with Capella model
Scripting with Python to interact with Capella model
 
Chaos Engineering
Chaos EngineeringChaos Engineering
Chaos Engineering
 
Mes iot ai in smart factory
Mes iot ai in smart factoryMes iot ai in smart factory
Mes iot ai in smart factory
 
Référentiel d'architecture avec TOGAF
Référentiel d'architecture avec TOGAFRéférentiel d'architecture avec TOGAF
Référentiel d'architecture avec TOGAF
 
Club Urba-EA - Architecture d'entreprise et projets agiles
Club Urba-EA - Architecture d'entreprise et projets agilesClub Urba-EA - Architecture d'entreprise et projets agiles
Club Urba-EA - Architecture d'entreprise et projets agiles
 
Multi domain product architecture: start integrated, stay integrated
Multi domain product architecture: start integrated, stay integratedMulti domain product architecture: start integrated, stay integrated
Multi domain product architecture: start integrated, stay integrated
 
AWS reInvent 2018 recap edition
AWS reInvent 2018 recap editionAWS reInvent 2018 recap edition
AWS reInvent 2018 recap edition
 
A Day in the Life of an Enterprise Architect (Role Play Exercise) 2016
A Day in the Life of an Enterprise Architect (Role Play Exercise) 2016A Day in the Life of an Enterprise Architect (Role Play Exercise) 2016
A Day in the Life of an Enterprise Architect (Role Play Exercise) 2016
 
Computing and AI technologies for mobile and consumer applications 2021 - Sample
Computing and AI technologies for mobile and consumer applications 2021 - SampleComputing and AI technologies for mobile and consumer applications 2021 - Sample
Computing and AI technologies for mobile and consumer applications 2021 - Sample
 
2.5D / 3D TSV & Wafer-Level Stacking: Technology & Market Updates 2019 Report...
2.5D / 3D TSV & Wafer-Level Stacking: Technology & Market Updates 2019 Report...2.5D / 3D TSV & Wafer-Level Stacking: Technology & Market Updates 2019 Report...
2.5D / 3D TSV & Wafer-Level Stacking: Technology & Market Updates 2019 Report...
 
ISO/PAS 21448 (SOTIF) in the Development of ADAS and Autonomous Vehicles
ISO/PAS 21448 (SOTIF) in the Development of ADAS and Autonomous VehiclesISO/PAS 21448 (SOTIF) in the Development of ADAS and Autonomous Vehicles
ISO/PAS 21448 (SOTIF) in the Development of ADAS and Autonomous Vehicles
 
Critical Review of Open Group IT4IT Reference Architecture
Critical Review of Open Group IT4IT Reference ArchitectureCritical Review of Open Group IT4IT Reference Architecture
Critical Review of Open Group IT4IT Reference Architecture
 
Trends in semiconductor industry 2020 converted
Trends in semiconductor industry 2020 convertedTrends in semiconductor industry 2020 converted
Trends in semiconductor industry 2020 converted
 
Doing Enterprise Architecture
Doing Enterprise ArchitectureDoing Enterprise Architecture
Doing Enterprise Architecture
 
MBSE and Model-Based Testing with Capella
MBSE and Model-Based Testing with CapellaMBSE and Model-Based Testing with Capella
MBSE and Model-Based Testing with Capella
 
Artificial Intelligence co-regulation
Artificial Intelligence co-regulationArtificial Intelligence co-regulation
Artificial Intelligence co-regulation
 
Deploy, Scale and Manage your Application with AWS Elastic Beanstalk
Deploy, Scale and Manage your Application with AWS Elastic BeanstalkDeploy, Scale and Manage your Application with AWS Elastic Beanstalk
Deploy, Scale and Manage your Application with AWS Elastic Beanstalk
 
IT Governance Vs IT Management Presentation V0.1
IT Governance Vs IT Management   Presentation V0.1IT Governance Vs IT Management   Presentation V0.1
IT Governance Vs IT Management Presentation V0.1
 
"Accessing Advanced Image Processing Feature Sets with Alvium Cameras Using a...
"Accessing Advanced Image Processing Feature Sets with Alvium Cameras Using a..."Accessing Advanced Image Processing Feature Sets with Alvium Cameras Using a...
"Accessing Advanced Image Processing Feature Sets with Alvium Cameras Using a...
 

Viewers also liked

CAR TRACK SOLUTIONS
CAR TRACK SOLUTIONSCAR TRACK SOLUTIONS
CAR TRACK SOLUTIONScartrack
 
TTC Procurement Authorization for ATC-CBTC
TTC Procurement Authorization for ATC-CBTCTTC Procurement Authorization for ATC-CBTC
TTC Procurement Authorization for ATC-CBTCGerman Camargo
 
Ansaldo STS at CPExpo 2013: The role of satellite technologies and GALILEO fo...
Ansaldo STS at CPExpo 2013: The role of satellite technologies and GALILEO fo...Ansaldo STS at CPExpo 2013: The role of satellite technologies and GALILEO fo...
Ansaldo STS at CPExpo 2013: The role of satellite technologies and GALILEO fo...Leonardo
 
CBTC Communications Based Train Control conference March 12th 2014
CBTC Communications Based Train Control conference March 12th 2014 CBTC Communications Based Train Control conference March 12th 2014
CBTC Communications Based Train Control conference March 12th 2014 James Nesbitt
 
Electronics Division Linked In
Electronics Division   Linked InElectronics Division   Linked In
Electronics Division Linked Injpguy
 
Balise Evaluation Tool
Balise Evaluation ToolBalise Evaluation Tool
Balise Evaluation ToolCEIT
 
Radio communications for safe and efficient Rail Operation
Radio communications for safe and efficient Rail OperationRadio communications for safe and efficient Rail Operation
Radio communications for safe and efficient Rail OperationIbrahim Al-Hudhaif
 

Viewers also liked (7)

CAR TRACK SOLUTIONS
CAR TRACK SOLUTIONSCAR TRACK SOLUTIONS
CAR TRACK SOLUTIONS
 
TTC Procurement Authorization for ATC-CBTC
TTC Procurement Authorization for ATC-CBTCTTC Procurement Authorization for ATC-CBTC
TTC Procurement Authorization for ATC-CBTC
 
Ansaldo STS at CPExpo 2013: The role of satellite technologies and GALILEO fo...
Ansaldo STS at CPExpo 2013: The role of satellite technologies and GALILEO fo...Ansaldo STS at CPExpo 2013: The role of satellite technologies and GALILEO fo...
Ansaldo STS at CPExpo 2013: The role of satellite technologies and GALILEO fo...
 
CBTC Communications Based Train Control conference March 12th 2014
CBTC Communications Based Train Control conference March 12th 2014 CBTC Communications Based Train Control conference March 12th 2014
CBTC Communications Based Train Control conference March 12th 2014
 
Electronics Division Linked In
Electronics Division   Linked InElectronics Division   Linked In
Electronics Division Linked In
 
Balise Evaluation Tool
Balise Evaluation ToolBalise Evaluation Tool
Balise Evaluation Tool
 
Radio communications for safe and efficient Rail Operation
Radio communications for safe and efficient Rail OperationRadio communications for safe and efficient Rail Operation
Radio communications for safe and efficient Rail Operation
 

Similar to Culver Test Track

Vehicle to vehicle communication in COM2REACT (Alberto Los Santos)
Vehicle to vehicle communication in COM2REACT (Alberto Los Santos)Vehicle to vehicle communication in COM2REACT (Alberto Los Santos)
Vehicle to vehicle communication in COM2REACT (Alberto Los Santos)Alberto Los Santos Aransay
 
Ertms solutions - Our Success Stories
Ertms solutions - Our Success StoriesErtms solutions - Our Success Stories
Ertms solutions - Our Success StoriesERTMS Solutions
 
Communications Based Train Control Conference London March 12 2014
Communications Based Train Control Conference London March 12 2014 Communications Based Train Control Conference London March 12 2014
Communications Based Train Control Conference London March 12 2014 James Nesbitt
 
VANETS Vehicular Adhoc NETworkS
VANETS Vehicular Adhoc NETworkSVANETS Vehicular Adhoc NETworkS
VANETS Vehicular Adhoc NETworkSSridhar Raghavan
 
Chipkin Automation - S4 Case Study - Calgary International Airport
Chipkin Automation - S4 Case Study - Calgary International AirportChipkin Automation - S4 Case Study - Calgary International Airport
Chipkin Automation - S4 Case Study - Calgary International AirportSteve Jones
 
Sesar swim master class best in class 2014 overview of the submissions
Sesar swim master class best in class 2014 overview of the submissionsSesar swim master class best in class 2014 overview of the submissions
Sesar swim master class best in class 2014 overview of the submissionsSESAR Joint Undertaking
 
CV_Hany Youssif_12-2015_english
CV_Hany Youssif_12-2015_englishCV_Hany Youssif_12-2015_english
CV_Hany Youssif_12-2015_englishHany Youssif
 
CAN and TTP are the two wired network protocols used for distributed .pdf
CAN and TTP are the two wired network protocols used for distributed .pdfCAN and TTP are the two wired network protocols used for distributed .pdf
CAN and TTP are the two wired network protocols used for distributed .pdfssuserc77a341
 
Quality of Service for Video Streaming using EDCA in MANET
Quality of Service for Video Streaming using EDCA in MANETQuality of Service for Video Streaming using EDCA in MANET
Quality of Service for Video Streaming using EDCA in MANETijsrd.com
 
Solutions and Protocolos for Vehicles Accident Notifications Using IoT
Solutions and Protocolos for Vehicles Accident Notifications Using IoTSolutions and Protocolos for Vehicles Accident Notifications Using IoT
Solutions and Protocolos for Vehicles Accident Notifications Using IoTDiego C. Zuñiga
 
Technology, Business and Regulation of the Connected Car
Technology, Business and Regulation of the Connected CarTechnology, Business and Regulation of the Connected Car
Technology, Business and Regulation of the Connected Carmentoresd
 
Sro Project Brief
Sro Project BriefSro Project Brief
Sro Project Briefenergyvijay
 
APTA Transitech Presentation- Commuter Rail Wireless Mesh
APTA Transitech Presentation- Commuter Rail Wireless MeshAPTA Transitech Presentation- Commuter Rail Wireless Mesh
APTA Transitech Presentation- Commuter Rail Wireless MeshAngela Miller
 
Chittaranjan Bai Rolling stock and Signalling electrical engineer with 10 yea...
Chittaranjan Bai Rolling stock and Signalling electrical engineer with 10 yea...Chittaranjan Bai Rolling stock and Signalling electrical engineer with 10 yea...
Chittaranjan Bai Rolling stock and Signalling electrical engineer with 10 yea...Chittaranjan Bai
 

Similar to Culver Test Track (20)

Vehicle to vehicle communication in COM2REACT (Alberto Los Santos)
Vehicle to vehicle communication in COM2REACT (Alberto Los Santos)Vehicle to vehicle communication in COM2REACT (Alberto Los Santos)
Vehicle to vehicle communication in COM2REACT (Alberto Los Santos)
 
Ertms solutions - Our Success Stories
Ertms solutions - Our Success StoriesErtms solutions - Our Success Stories
Ertms solutions - Our Success Stories
 
Communications Based Train Control Conference London March 12 2014
Communications Based Train Control Conference London March 12 2014 Communications Based Train Control Conference London March 12 2014
Communications Based Train Control Conference London March 12 2014
 
Divaker resume updated
Divaker resume updatedDivaker resume updated
Divaker resume updated
 
CATS Brochure
CATS BrochureCATS Brochure
CATS Brochure
 
VANETS Vehicular Adhoc NETworkS
VANETS Vehicular Adhoc NETworkSVANETS Vehicular Adhoc NETworkS
VANETS Vehicular Adhoc NETworkS
 
Chipkin Automation - S4 Case Study - Calgary International Airport
Chipkin Automation - S4 Case Study - Calgary International AirportChipkin Automation - S4 Case Study - Calgary International Airport
Chipkin Automation - S4 Case Study - Calgary International Airport
 
Sesar swim master class best in class 2014 overview of the submissions
Sesar swim master class best in class 2014 overview of the submissionsSesar swim master class best in class 2014 overview of the submissions
Sesar swim master class best in class 2014 overview of the submissions
 
CV_Hany Youssif_12-2015_english
CV_Hany Youssif_12-2015_englishCV_Hany Youssif_12-2015_english
CV_Hany Youssif_12-2015_english
 
CAN and TTP are the two wired network protocols used for distributed .pdf
CAN and TTP are the two wired network protocols used for distributed .pdfCAN and TTP are the two wired network protocols used for distributed .pdf
CAN and TTP are the two wired network protocols used for distributed .pdf
 
Quality of Service for Video Streaming using EDCA in MANET
Quality of Service for Video Streaming using EDCA in MANETQuality of Service for Video Streaming using EDCA in MANET
Quality of Service for Video Streaming using EDCA in MANET
 
Solutions and Protocolos for Vehicles Accident Notifications Using IoT
Solutions and Protocolos for Vehicles Accident Notifications Using IoTSolutions and Protocolos for Vehicles Accident Notifications Using IoT
Solutions and Protocolos for Vehicles Accident Notifications Using IoT
 
CBTC World Congress paper on creating safe CBTC system without secondary dete...
CBTC World Congress paper on creating safe CBTC system without secondary dete...CBTC World Congress paper on creating safe CBTC system without secondary dete...
CBTC World Congress paper on creating safe CBTC system without secondary dete...
 
Technology, Business and Regulation of the Connected Car
Technology, Business and Regulation of the Connected CarTechnology, Business and Regulation of the Connected Car
Technology, Business and Regulation of the Connected Car
 
Sro Project Brief
Sro Project BriefSro Project Brief
Sro Project Brief
 
Crossrail - Integrated Assurance, 17 May 2016,
Crossrail - Integrated Assurance, 17 May 2016, Crossrail - Integrated Assurance, 17 May 2016,
Crossrail - Integrated Assurance, 17 May 2016,
 
APTA Transitech Presentation- Commuter Rail Wireless Mesh
APTA Transitech Presentation- Commuter Rail Wireless MeshAPTA Transitech Presentation- Commuter Rail Wireless Mesh
APTA Transitech Presentation- Commuter Rail Wireless Mesh
 
Carrier Ethernet
Carrier EthernetCarrier Ethernet
Carrier Ethernet
 
Dubai metro paper in ASPECT Conference
Dubai metro paper in ASPECT Conference Dubai metro paper in ASPECT Conference
Dubai metro paper in ASPECT Conference
 
Chittaranjan Bai Rolling stock and Signalling electrical engineer with 10 yea...
Chittaranjan Bai Rolling stock and Signalling electrical engineer with 10 yea...Chittaranjan Bai Rolling stock and Signalling electrical engineer with 10 yea...
Chittaranjan Bai Rolling stock and Signalling electrical engineer with 10 yea...
 

Culver Test Track

  • 1. CBTC Interoperability: From Real Needs to Real Deployments New York’s Culver CBTC Test Track Project Gabriel Colceag and Gerard Yelloz Metrorail, London, March 28, 2012
  • 2. Summary 1. Signalling/CBTC Interoperability: Context and History 2. New York Needs: CBTC and Interoperability 3. Culver Interoperability Test Track Project Project goals, Organization, Schedule 4. System Integration Team Overview 5. CBTC systems Siemens CBTC system 1 Siemens CBTC system Thales CBTC system 6. Integrated Test Facility 7. I2S Documents 8. Next Steps and Possible Future Steps 9. Questions & Answers
  • 3. CBTC Signalling Interoperability Context “Interoperability is the ability of systems to provide services to, and accept services from other systems, and to use the services exchanged to enable them to operate effectively together“ Signalling and Communications Based Train Control (CBTC) Interoperability: a metro line running with a signalling system provided by at least two different (sub)systems suppliers Exclusion of « dual » signalling systems 2 On board provided by supplier X running on a trackside provided by a supplier Y and vice versa TracksideTrackside TrainTrain
  • 4. Signalling Interoperability History Brief (1/2) Signalling B.C. era: « Before CBTC » technology USA: 1970-80’s operation, development by industry of fixed block speed code technoloy to improve metros with ATP/ATO Multi sourcing: compatible different US suppliers Today many metros still run under this US standard technology France: 1990’s operation, RATP improving suburban network performance, quality and maintainability with ATP/ATO distance-to-go SACEM, developed by 3 suppliers, with interoperable and multi-sourcing objectives Paris RER, Hong Kong MTR TKO line and other metros are still using it 3 ATCS in USA / Canada Precursor of CBTC and PTC for Main Lines, radio technology retained for further applications ERTMS / ETCS in Europe Success for Main Lines interoperability, driven by strong EU policy for borderless, seamless train travel. Now spreading to others: Asia, Latin America, Australia, Africa Limited application on Urban and Suburban Railways (performance limitations vs. CBTC) Possible evolution for urban performance, but not a European policy, nor a priority of metro operators
  • 5. Signalling Interoperability History Brief (2/2) CBTC technology UGTMS and ModUrban in Europe CBTC in Paris RATP OCTSYS 5 lines and 200 trains to be re-signalled: multi-sourcing and long term procurement needs 3 suppliers, on a same agreed specification, developed the overlay CBTC OCTYS system 4 New York City Transit Authority (NYCTA) network upgrade Subject of the following presentation OCTYS system 4th supplier defined external interfaces for ATS (PCC) and CBI (PMI) Line 3 in operation 2010, Line 5 for 2012.
  • 6. New York Needs Massive signalling modernization for higher performance and lower Life Cycle Cost (LCC) From state of good repair to major performance, safety and service upgrade CBTC ATS, Electronic Interlocking Interoperability across the network, over very long time and track length 5 Successive, phased projects Separate procurement: trackside vs. trains Multiple suppliers for stability, capacity CBTC Interoperability Not a desire, a necessity!
  • 7. New York Projects Interoperable CBTC modernization program Technologies assessment with expert independent consultants 6 suppliers competitive proposals, out of which 3 selected for initial phases Canarsie Line CBTC Siemens has provided the first whole line CBTC system in operation Thales has demonstrated sub-systems interoperability on test track Flushing Line CBTC Thales is deploying the whole line CBTC system, with additional functions 6 Thales is deploying the whole line CBTC system, with additional functions Culver Line CBTC Test Track Interoperability test track contract award to validate multi-supplier CBTC procurement for the B-division of New York network over the next 30 years. Interoperable CBTC Subsystems « shares » provided separately by Thales / Siemens Siemens & Thales consortium for System Integration « share » Industry consultations and experience sharing started by NYCTA in 2011 with a view towards accelerating and expanding the CBTC modernization program
  • 8. Culver Line Project Goals Update and finalize the NYCT Standard CBTC System Design and associated lnteroperability lnterface Specifications (I2S), that will be used as reference (standard) for future CBTC deployment in the NYCT environment Provide an operational CBTC simulation testing environment (Integrated Test Facility) to demonstrate compliance of supplier’s subsystems to the I2S Provide NYCT a permanent operational CBTC Test Track on the Culver Line 7 Provide safety certification of “mixed” interoperable CBTC system by the Systems Integrator consortium TracksideTrackside TrainTrain
  • 9. Culver Line Project Contractor Organization Thales and Siemens have proposed a co-contracting consortium Contractor operates as a “one team” to deliver the Share 1, with Siemens responsible for Share 2 (Church Ave.) and Thales responsible for Share 3 (4th Ave) NYCT 8 Project Director Rotation Combined System Integration Team (see separate chart) Siemens Project Manager Thales Project Manager Siemens Development Team Thales Development team InstallationInstallation Thales/Siemens Co-Contracting Team
  • 10. Culver Line Project Schedule Target milestones: Notice of Award (Sept 30, 2011) month 0 System Design Review month 9 Final Design Review month 12 Delivery in New York of the ITF month 18 SW FAT complete for ITF month 26 9 Interoperability Demonstration on the ITF months 31-34 Field Installation Complete month 29 Integration testing and formal demo months 39-45 Substantial Completion month 46
  • 11. Share 1: System Integration Scope Allocation For all integration engineering activities, Thales and Siemens have combined resources to perform the activities Work Item Work Description Share 1 (see Note 2 for Share 2 & 3) SYS = System Engineering DES = Design Engineering DEL = SW/HW Deliv. & Install. Thales Siemens System Integration1 SYS Thales support X System Performance1 SYS Thales support X System RTM1 SYS X Siemens support Configuration Management1 SYS X Siemens support Project Manager - See 'GPM' tab for Project Director rotation Project Management / Offices - Syst. Safety Manager, T&C Manager, Quality Manager System Integrator, Scheduler, Project Admin 10 In order to be practical, the SI supply subsystems (ATS, ITF, etc.) have defined allocations to Siemens or Thales Quality Manager Project Admin System Testing1 - ITF SYS Thales support X System Testing - Test Track SYS X Siemens technical support System I2S Update SYS See 'I2S' tab for I2S document allocation Database Management and Tool SYS / DES / DEL X System Safety1 SYS X Siemens reviews & also approves CBTC ATS SYS / DES / DEL X ITF Simulator: Including Simulator engine, Satellite simulators3 and Interoperability test scripts SYS / DES / DEL X
  • 12. Share 2: Siemens Siemens to design, develop, procure, configure, factory test, ship, supervise installation & engineering field test : Wayside CBTC equipment for Church Avenue Carborne CBTC equipment on one train including radio and transponders Zone Controllers: ZC for Church Ave Relay Room ZC for Church Avenue will control CBTC train movements on the test track and interface with Church Avenue Interlocking Siemens ZC is based on the Canarsie design with hardware upgrades 11 Siemens ZC is based on the Canarsie design with hardware upgrades Carborne Controllers: Modify carborne CBTC equipment set on one 4-car R160 Canarsie train The equipment set includes OBCU, CIU, CRD, MIU and Digimove Siemens CC is based on the Canarsie design with hardware upgrades
  • 13. Share 3: Thales Thales to design, develop, procure, configure, factory test, ship, supervise installation & engineering field test : Zone Controller Equipment Based on Thales ZC for Flushing Interface to Interlocking based on NY standard Two ZCs supplied; 1 at 7th Ave and 1 at 570 CIR 12 On-Board Equipment Based on Thales OBCU for Flushing Siemens Radio and Transponder Interrogator One carborne controller supplied for a 4-car train
  • 14. Integrated Test Facilities (ITF) Joint definition of the interoperability test list Siemens is responsible for the Lab ITF test scripts Thales is responsible for the Field Test procedures Each supplier tests its own subsystems, in factory, on the ITF and then on the Culver Test Track, prior to interoperability testing Where practical, all test cases performed on site on the Culver Test Track 13 Where practical, all test cases performed on site on the Culver Test Track will be part of the ITF test plan The ITF is capable of simulating any NYCT line, including Flushing and Canarsie Culver Test Track simulation is included Additional simulation scenarios can be developed for future lines
  • 15. ITF Platform SUN station HMI computer OT_ZC OT_ZC Thales ZC Siemens ZC Siemens ATS I/O I/O I/O Siemens Thales Physical or Logical 14 HMI computer OT_CC OT_CC Thales CC Siemens CC Wayside radioOnboard radio Ethernet VLAN3 (WCN) Ethernet VLAN2 (test network) Ethernet VLAN1 (piloting network) RF connection I/O I/O Simulation tools Tested equipmentManagement & HMI
  • 16. System Engineering Activities Siemens leads the system engineering activities for Culver at the system level Full-time SI System Manager primary technical interface to the customer Thales has a dedicated full-time system engineer SI System Manager leads the effort for the System Design Review with both parties to review and approve any content prior to 15 with both parties to review and approve any content prior to customer review & approval SI System Manager manages the technical relationship with the customer and ensures there is formal acceptance by both parties Thales leads the RTM activity and documentation of SFS/SDD/I2S requirements into DOORS
  • 17. I2S Documents: Shared Responsibilities I2S document Siemens Thales SFS X SDD X Carborne <-> Wayside CBTC X Wayside <-> Wayside CBTC X Carborne <-> Carborne CBTC X AWS <-> ZC X 16 AWS <-> ZC X System Database X Software Database X Safety Principles X ATS <-> CBTC X CC<-> Carborne DCS X CC <-> TIA (tag reader) X
  • 18. Next Steps Potential CBTC opportunities in New York’s modernization plans Queens Blvd Line Union Turnpike to 5thAvenue 8th Ave Line (in next Capital Program) 17 Connect with QBL 6th Ave Line (in next Capital Program) Connecting with QBL NYCT Note: "While NYCT generally concurs that the factual information included in this presentation is accurate, it does not necessarily depict NYCT's future plans or how procurements for future CBTC program plans will be handled. Funding of its future Capital projects is subject to policy determinations of its Board and the Governor and is subject to legislative and regulatory actions."
  • 19. Future Additional CBTC suppliers may join the NYCT program Compliance with NYCT I2S standard Interoperability qualification testing on Culver Test Track Participation to future competitive procurement process Benefits of NYCT I2S Real-life re-signalling deployment and in-service experience 18 I2S specifications stability and control by NYCT owner and operator Critical procurement mass and long term life cycle synergies Leading edge, high performance technology proven interoperable, by an experienced major historical metropolitan operator, accompanied by the two CBTC industry pioneers, fulfilling its vision for the 21st century