Vm assignment - presentation slide (1)
1. VALUE MANAGEMENT 60203
Case Study Report on Straits International School
Prepared by:
Muhammad Hasif 0316413 Lee Kim Thiam 0310170 Wong Geng Sen 0321690
Kevin Lee 0315192 Liew Yong Sheng 0315108 Chua Wei Jie 0316323
2. INTRODUCTION
What is Value Management?
- to improve the value and to optimize the cost, facilities and systems of a project.
- often misinterpreted as a cost cutting tool .
- assisting clients demands for better value for money.
What is their primary purpose?
To achieve better value but also deliver the following benefit :-
Identify & Eliminate
Unnecessary Cost
Provide Insight On
Project Objectives
Improve Communication
& Teamwork
Provides practitioners further opportunity to add value to their service
3. By Kevin
STRAITS INTERNATIONAL SCHOOL RAWANG (SIS RAWANG)
Private International School
Straits International Education Group Sdn Bhd
Located in Taman Sari Rawang, Selangor
3 storey building – Max. 1000 students
PROJECT BRIEF SUMMARY
6. Vibrating floor on 3rd floor as the sport activities are active on that floor causing
noise pollution affecting room on the lower level facilities such as Classrooms
The open-air area on the roof floor is not appropriate for badminton court to function
Lack of roofing to sports courts on 3rd floor, affecting the function of the space and
its whole life costing.
Having playground and playroom on the Ground Floor, which both spaces are
supporting function with the same objective
PROBLEM BRIEF SUMMARY
7. Vibrating floor on 3rd floor as the sport activities are active on that floor1
Fast Diagram – Acoustic wall panel
To provide a better sound proof system to the
classroom at second floor to avoid interferences
from the surrounding.
To provide a better study and working
environment for the user.
To prevent idling of the space due to the
distraction from surrounding.
To avoid extra cost of installation after the
building constructed.
8. Vibrating floor on 3rd floor as the sport activities are active on that floor (Cont’d)1
Fast Diagram – Sound and vibration absorbing mat
To install sound and vibration absorbing mat below 3rd floor slab, above ceiling, for all classroom at 2nd floor to absorb
the vibration and noise from the floor above due to heavy activities.
Provide a better environment to the classroom and for user. As for the Multipurpose hall, the sound and vibration
absorbing mat will be adding above the slab to prevent the sound pollution to other activities happen near to the hall.
9. The open-air area on the roof floor is not appropriate for badminton court to function2
Value Tree Diagram
To put the space of badminton court for a
better use, it could be replace by tennis
course where the expenses to build a tennis
court will nearly be the same cost as the
original badminton court.
Tennis game will not affect by the wind
effect at the top floor of the building.
The value tree analysis tool shows that
changing the space to a tennis court is the
most efficient way to add more value to the
space and at the same time it is also the
most cost saving plan.
10. Lack of roofing to sports courts on 3rd floor3
Priority Setting Matrix
11. Lack of roofing to sports courts on 3rd floor (Cont’d)3
Weighted Scoring Matrix
12. Steel roofing lifespan are expected to last a lot longer.
No need for any chemical treatments to maintain the frame and prevent risk of insect infestations
A strong and firm structure and also lightweight, making them easier and quicker to transport and
install.
Any climate changes, steel roofing could withstand it better than the other material.
Lack of roofing to sports courts on 3rd floor (Cont’d)3
14. Playground and playroom on GF, both supporting function with the same objective (Cont’d)4
Creativity Technique
One of the underlying fundamental concepts of VM is to promote innovative solutions. The VM team used
the functional analysis to foster innovation. Solving question such as ‘What must the component do?’ which
raises the level of abstraction enabling the team to come up with alternative ways to fulfill the function
‘What must the component do?’ – To accommodate students and to facilitate activities
Alternative ways to fulfill the function? – Combining the two space into one
15. Playground and playroom on GF, both supporting function with the same objective (Cont’d)4
COMFORT MONITORED
REDUCE RISK FOR DAMAGES & INJURIES and INCREASE VALUE IN HIRED STAFF
ACCESSIBLESAFEFUN
16. TECHNICAL DATA
Proposed changes during the evaluation stage is evaluated with the standards and guidelines listed in
Uniform Building by Law (UBBL).
24. CONCLUSION
The introduction to Value Management during the design stage is vital as it is considered the
perfect timing to address all existing issues of the project as any changes implied to the
design will not be costly and negates all imposition of risk. With both design and functional
aspects resolved, the Client will not have to worry about additional costs of changes to be
implied later on. The total outcome of the design changes will impose an additional sum of
costs, while assuring the low maintenance costs of these elements in the prospective future.