Fundamental of Environmental
Engineering
Primary Treatment of Wastewater
Preliminary “Treatment”
• Equalization
– Smooth out fluctuations in flow rate
– Results in more consistent treatment
• Flow Measurement
– Flow rate information needed for efficient
operation, chemical addition, etc
Equalization
• Objective
– Decrease fluctuations in flow rate, to provide more
consistent treatment
• Accomplished by storing excess wastewater
during high flow periods
• Excess wastewater is released during low flow
periods
Pumping
• Sometimes needed to lift the water to a
higher elevation than the discharge point
of the main trunk sewer line.
• After pumping, the plant is designed to
operate under gravity flow to the point of
discharge at the receiving stream.
A Screw
Pump
Flow Measurement
• Objective
– Measure flow rate to facilitate plant
operation
• Several operations need flow rate data
for good operation
– Chlorination
– pH adjustment
– Also required for NPDES reports
Design of Influent Channel
• Objective
– Design a combination of circular sewer and
rectangular channels to deliver wastewater to the
head works of the treatment plant
• Apply open channel flow hydraulics –
applying Manning’s equation considering:
– Minimum velocity to reduce solids deposition in
the channel
– Hydraulic grade, slope of channel invert to provide
scour of solids
– Channel dimensions that match or transition the
influent circular sewer with a rectangular channel
Primary Treatment
- Designed to remove settleable solids and
reduce the organic load (BOD) on the
secondary units.
- Primary treatment includes
- Bar screen
- Comminutor
- Grit chamber
- Primary clarifier
Bar Screen
Vendor-Provided Equipment
• Purpose: to remove large objects (sticks,
cans, etc) which may cause flow
obstructions.
• Depending on the size of the plant, bar
screens are either hand or mechanically
cleaned.
• Hand cleaned: used primarily at small
plants.
Figure (a) Manually cleaned bar rack (from Peavy, Rowe, and
Tchobanoglous, 1985, p. 218)
Bar Screen
Mechanically Cleaned
• More frequently used because labor and
overflowing are greatly reduced.
• A by-pass channel with a hand cleaned bar
screen must also be provided. A second
mechanically cleaned bar screen can also be
provided.
• The purpose of the by-pass channel is to
provide treatment in case of a mechanical
failure.
• Screens are either front or back cleaned.
Bar Screen
Mechanical Bar Screen
General Design Criteria
• Bar Width: 1/4 to 5/8 in
• Spacing: 5/8 to 3 in
• Depth: 1 to 1.5 inches
• Slope: 30 – 45o from the vertical.
(from Peavy, Rowe, and Tchobanoglous, 1985, p. 219)
Mechanical Bar Screen
General Design Criteria
• Approach velocity – 1.25 fps @ minimum flow
(as determined by the Manning Eqn.), the
purpose in controlling the approach velocity is to
prevent deposition of grit in the channel.
• Velocity through the screen - < 3 fps, to prevent
excessive headloss and to prevent forcing of
screenings through the openings.
• Quantities of screenings – 0.5-5 ft3/ MG,
average 2 ft3/MG
Mechanical Bar Screen
General Design Criteria
• Disposal of screenings – landfill or
incineration
• Density: 80% moisture (60 pcf) right off
the screen, dry (12 pcf)
• hL = 0.5 – 2.5 ft (max)
• hL=(Vs2-vc2)/(2g * 0.7)
– Vs= velocity through the bars
– vc= approach velocity in the upstream channel
Comminutors
Vendor-Provided Equipment
• Purpose: to chop solids between 1/4 - 3/8 inch
to prevent pumps from being clogged.
• Comminutors are installed directly into the
influent channel.
• Since comminutors come in a standard size, it
is not unusual to select the comminutor first,
then size the channel.
• Comminutors should be provided with a
by-pass channel and a hand cleaned bar
screen.
(from Peavy, Rowe, and Tchobanoglous, 1985, p. 220)
Grit Chambers
• Purpose: to remove inorganic material referred
to as grit. Grit includes sand, eggshells, bone
chips, coffee grounds, etc.
• Grit is removed to prevent abrasion of pumps
and to reduce deposits in pipe lines, channels,
and digesters.
Grit Chamber
General Design Criteria
• Specific gravity of grit: 2.65
• Diameter of grit: 0.22 mm
• Settling velocity: 0.075 fps
• Equivalent overflow rate: 48,400 gpd/ft2
Grit Chamber
General Design Criteria
• Quantity of girt: 1/3 to 24 ft3/MG
– Ave = 4 ft3 /MG
• Disposal of grit: land fill or incineration (Grit
must be washed before disposal)
• Grit chamber storage:
– Small plant: provide storage below the design invert
depending on the quantity and frequency of removal.
– Large plant: continuous removal, the conveyor
hopper is designed based on the size of the
equipment.
Grit Chambers
Types
• Square Clarifier (Detritus Tank)
• Aerated Tanks
Grit Chamber
Square Clarifier (Detritus Tank)
• Detritus tanks are designed so that the
horizontal velocity is 1.0 fps at maximum
flow. This means that at low flow, the
velocity is less than 1.0 fps, and therefore,
organic material will accumulate.
• Organics are removed by counter current
washing as the grit moves up an incline for
disposal.
(from Tchobanoglous and Burton, 1991, p. 456)
Grit Chamber
Square Clarifier (Detritus Tank)
• Basic Design Criteria
– Vs = 0.075 fps @ Average Flow
– td < 1 min
– Overflow rate: 48,400 gpd/ft2
– Vh: 0.75-1.25 fps (keeps organics in
suspension)
Grit Chamber
Aerated Grit Chamber
• Upon discovering that grit accumulated in
the bottom of activated sludge aeration
basins, it has became common practice to
use aerated grit chambers.
• Aeration also provides pretreatment of the
waste by removing odors and inducing
flocculation of the organic material making
primary clarification more effective.
(from Tchobanoglous and Burton, 1991, p. 461)
Aerated Grit Chamber
Benefits of Pre-aeration
• By providing preaeration, primary treatment is
improved through:
– Grit removal
– Flocculation
– Odor Control
– Grease Separation
• Design the detention time and aeration rate to
control all four
Aerated Grit Chamber
General Design Criteria
• Rate of aeration: 5 cfm/ft length (provide for variable
rates of aeration which is adjusted according to the
flow and efficiency of grit removal).
• Width to Depth Ratio: a critical factor in providing an
effective spiral-rolling action in the grit chamber
– W:D = 1 – 2.2 : 1
• Depth = 10 – 15 ft (starting point: set depth first)
• Length:Width Ratio = 3:1, final dimensions are
adjusted so that the detention time is 3-10 minutes.
Primary Clarifier
• Purpose: to remove settleable organics and
floating scum (grease and oils).
• Efficiencies:
– Suspended solids 50 – 65%
– BOD 30 – 35%
• Primary clarifiers are either circular or
rectangular. They are very similar to
sedimentation basins used in water treatment
except that scum removal is always provided in
addition to sludge collection.
A Circular Primary Sedimentation
Tank
An Empty Primary Clarifier
An Operating Primary Clarifier
Oil Skimmer in a Primary Clarifier
Primary Clarifiers
Design Criteria
• Type II Settling Clarifier: during settling organic
solids come in contact with each other and
aggregate increasing the particle size and
settling rate. Aggregation increases with time,
therefore detention time is important.
• Td: 90 – 150 min at average flow (Avg 2 hr)
• Overflow rate: 600 – 1,200 gpd/ft2
• Weir loading rate: 10,000 – 15,000 gpd/ft.
Aerial View Housatonic Wastewater Plant, Milford, CT
(Avg. Flow Rate = 8 MGD)
Aerial View of Blue Plains Wastewater Treatment Plant,
Washington D.C.
(avg. flow rate = 309 Million gals/day)
Sludge Quantities
• Quantity of sludge collected in the primary clarifier depends on:
– Specific gravity of the dry solids
– % moisture
– Efficiency of settling
• The following relationship is used to determine the specific gravity of the sludge (mixture of
solids and water):
S = Sp. Gr. of sludge
Ss = Sp. Gr. of dry solids
Sw = Sp. Gr. of water (1.0)
Ps = % solids (sludge)
Pw = % water (sludge)
w
w
s
s
S
P
S
P
S
1001001
+=
Sludge Quantities
• The volume of sludge can be determined
from the following relationship:
S = specific gravity of sludge
V = sludge volume, gals
Ws = dry weight of solids, lb
= specific weight of water (62.4 lb / ft3)
S
S
Ws
S
Pw
Ws
V
γγ








=





 −
=
100
%
48.7
100
100
48.7
γ
(from Peavy, Rowe, and Tchobanoglous, 1985, p. 228)
Primary Treatment Efficiency
• BOD = 30 – 35% SS = 50 – 65%
• Wastewater entering secondary treatment
Strong: BOD = 260–280 mg/L
SS= 120–175 mg/L
Medium: BOD= 145–155 mg/L
SS= 80–110 mg/L
Weak: BOD= 70–80 mg/L
SS= 35–50 mg/L
Forms of BOD: (a) Colloidal
(b) Soluble/Dissolved
Ex. Determine the quantity of primary sludge per million
gallons for domestic sewage with the following
characteristics: SS = 200 mg/L
Ss = 1.4 % moisture = 95%
Suspended solids removal efficiency = 60%
MG
gal
Ss
Ws
V
S
Sw
Pw
Ss
Ps
S
lbM
LmgMG
lb
LmgMGM
EfficiencyQCM
sludge
sludge
sludge
2375
01.1*4.62*05.0
1000*48.7
)100/(%
48.7
01.1
99.0
0.1
95.0
4.1
05.0100/100/1
1000
6.0
/*
34.8
*/200*1
*
==
+
=
=
=+=+=
=






=
=
γ
References
• Peavy, Howard S., Rowe, Donald R., and
Tchobanoglous, George (1985)
Environmental Engineering. McGraw-Hill.
New York.
• Tchobanoglous, George and Burton,
Franklin L. (1991) Wastewater Engineering
Treatment, Disposal, and Reuse. Metcalf
and Eddy, Inc. Irwin McGraw-Hill, Boston.
• www.slideshare.net/arpit026

More Related Content

What's hot

Grit chamber
Grit chamberGrit chamber
Grit chamberRaviSaha6
 
2. screen chamber
 2. screen chamber 2. screen chamber
2. screen chambervvsasane
 
Water Treatment Process (Screening)
Water Treatment Process (Screening)Water Treatment Process (Screening)
Water Treatment Process (Screening)Zairul Zaiky
 
WATER & WASTE WATER ENGINEERING - water treatment process & units
WATER & WASTE WATER ENGINEERING -  water treatment process & unitsWATER & WASTE WATER ENGINEERING -  water treatment process & units
WATER & WASTE WATER ENGINEERING - water treatment process & unitsEddy Ankit Gangani
 
Design of Sewage Treatment Plant
Design of Sewage Treatment PlantDesign of Sewage Treatment Plant
Design of Sewage Treatment PlantPhurba Tamang
 
01 Sewage Generation, Collection and Conveyance
01 Sewage Generation, Collection and Conveyance01 Sewage Generation, Collection and Conveyance
01 Sewage Generation, Collection and Conveyanceakashpadole
 
Plain sedimentation tanks ,Types & Design considerations
Plain sedimentation tanks ,Types & Design considerations Plain sedimentation tanks ,Types & Design considerations
Plain sedimentation tanks ,Types & Design considerations Anshika Saxena
 
Water softining
Water softiningWater softining
Water softiningManoj Mota
 
Waste water treatment
Waste water treatmentWaste water treatment
Waste water treatmentDivya Goel
 
Troubules in rapid sand filters
Troubules in rapid sand filtersTroubules in rapid sand filters
Troubules in rapid sand filtersDr. M Prasad
 
Physical Unit Operations (screens )
Physical Unit Operations (screens )Physical Unit Operations (screens )
Physical Unit Operations (screens )GAURAV. H .TANDON
 
06 - Neutralisation, Equalisation & Proportioning.pptx
06 - Neutralisation, Equalisation & Proportioning.pptx06 - Neutralisation, Equalisation & Proportioning.pptx
06 - Neutralisation, Equalisation & Proportioning.pptxPRACHI DESSAI
 

What's hot (20)

Grit chamber
Grit chamberGrit chamber
Grit chamber
 
Wwwe
WwweWwwe
Wwwe
 
2. screen chamber
 2. screen chamber 2. screen chamber
2. screen chamber
 
Water Treatment Process (Screening)
Water Treatment Process (Screening)Water Treatment Process (Screening)
Water Treatment Process (Screening)
 
WATER & WASTE WATER ENGINEERING - water treatment process & units
WATER & WASTE WATER ENGINEERING -  water treatment process & unitsWATER & WASTE WATER ENGINEERING -  water treatment process & units
WATER & WASTE WATER ENGINEERING - water treatment process & units
 
Design of Sewage Treatment Plant
Design of Sewage Treatment PlantDesign of Sewage Treatment Plant
Design of Sewage Treatment Plant
 
L 11 screen chamber
L 11 screen chamberL 11 screen chamber
L 11 screen chamber
 
01 Sewage Generation, Collection and Conveyance
01 Sewage Generation, Collection and Conveyance01 Sewage Generation, Collection and Conveyance
01 Sewage Generation, Collection and Conveyance
 
Plain sedimentation tanks ,Types & Design considerations
Plain sedimentation tanks ,Types & Design considerations Plain sedimentation tanks ,Types & Design considerations
Plain sedimentation tanks ,Types & Design considerations
 
Water softining
Water softiningWater softining
Water softining
 
UASB reactors
UASB reactorsUASB reactors
UASB reactors
 
Waste water treatment
Waste water treatmentWaste water treatment
Waste water treatment
 
Troubules in rapid sand filters
Troubules in rapid sand filtersTroubules in rapid sand filters
Troubules in rapid sand filters
 
L 20 High rate Trickling Filter
L 20 High rate Trickling FilterL 20 High rate Trickling Filter
L 20 High rate Trickling Filter
 
L 18 trickling filter
L 18 trickling filterL 18 trickling filter
L 18 trickling filter
 
Filtration in water treatment
Filtration in water treatmentFiltration in water treatment
Filtration in water treatment
 
Physical Unit Operations (screens )
Physical Unit Operations (screens )Physical Unit Operations (screens )
Physical Unit Operations (screens )
 
Sludge management and Sludge digesters
Sludge management and Sludge digestersSludge management and Sludge digesters
Sludge management and Sludge digesters
 
L 9 aeration
L 9 aerationL 9 aeration
L 9 aeration
 
06 - Neutralisation, Equalisation & Proportioning.pptx
06 - Neutralisation, Equalisation & Proportioning.pptx06 - Neutralisation, Equalisation & Proportioning.pptx
06 - Neutralisation, Equalisation & Proportioning.pptx
 

Viewers also liked

Primary and secondary wastewater treatment..
Primary and secondary wastewater treatment..Primary and secondary wastewater treatment..
Primary and secondary wastewater treatment..snehalmenon92
 
Circular clarifiers
Circular clarifiersCircular clarifiers
Circular clarifiersmurtazag46
 
Clarifier by Adam
Clarifier by AdamClarifier by Adam
Clarifier by AdamAdvmharith
 
15 secondary sedimentation
15 secondary sedimentation15 secondary sedimentation
15 secondary sedimentationAkepati S. Reddy
 
Solid waste management
Solid waste managementSolid waste management
Solid waste managementParth Jadhav
 
Fairburn, GA Wastewater Treatment Plant Project
Fairburn, GA Wastewater Treatment Plant ProjectFairburn, GA Wastewater Treatment Plant Project
Fairburn, GA Wastewater Treatment Plant ProjectBenjamin Moss, E.I.T.
 
Types of Air Pollutent, effect and Remidies
Types of Air Pollutent, effect and RemidiesTypes of Air Pollutent, effect and Remidies
Types of Air Pollutent, effect and Remidiessikander kushwaha
 
Interview Fundamentals ACFE Chapter Training
Interview Fundamentals ACFE Chapter TrainingInterview Fundamentals ACFE Chapter Training
Interview Fundamentals ACFE Chapter TrainingSteven Patterson
 
Sewage Treatment: Primary Treatment
Sewage Treatment: Primary TreatmentSewage Treatment: Primary Treatment
Sewage Treatment: Primary TreatmentAkepati S. Reddy
 
Primary & Advanced Primary Wastewater Treatement
Primary & Advanced Primary Wastewater TreatementPrimary & Advanced Primary Wastewater Treatement
Primary & Advanced Primary Wastewater TreatementIlyana Causing
 
Fundamentals of facing interviews
Fundamentals of facing interviewsFundamentals of facing interviews
Fundamentals of facing interviewsYakshika Vats
 
Final Disposal of Solid Waste Management in Bangladesh
Final Disposal of Solid Waste Management in Bangladesh Final Disposal of Solid Waste Management in Bangladesh
Final Disposal of Solid Waste Management in Bangladesh A. R. Atiq
 
Solid waste disposal
Solid waste disposalSolid waste disposal
Solid waste disposaljnr
 
AIR POLLUTION AND ITS EFFECT ON THE STRUCTURE
AIR POLLUTION AND ITS EFFECT ON THE STRUCTUREAIR POLLUTION AND ITS EFFECT ON THE STRUCTURE
AIR POLLUTION AND ITS EFFECT ON THE STRUCTUREAmit Singh
 
Primary waste water treatment powerpointb presntation
Primary waste water treatment powerpointb  presntationPrimary waste water treatment powerpointb  presntation
Primary waste water treatment powerpointb presntationkanchan jadon
 

Viewers also liked (20)

Primary and secondary wastewater treatment..
Primary and secondary wastewater treatment..Primary and secondary wastewater treatment..
Primary and secondary wastewater treatment..
 
Circular clarifiers
Circular clarifiersCircular clarifiers
Circular clarifiers
 
Clarifier by Adam
Clarifier by AdamClarifier by Adam
Clarifier by Adam
 
VOCs
VOCsVOCs
VOCs
 
15 secondary sedimentation
15 secondary sedimentation15 secondary sedimentation
15 secondary sedimentation
 
Solid waste management
Solid waste managementSolid waste management
Solid waste management
 
Fairburn, GA Wastewater Treatment Plant Project
Fairburn, GA Wastewater Treatment Plant ProjectFairburn, GA Wastewater Treatment Plant Project
Fairburn, GA Wastewater Treatment Plant Project
 
Types of Air Pollutent, effect and Remidies
Types of Air Pollutent, effect and RemidiesTypes of Air Pollutent, effect and Remidies
Types of Air Pollutent, effect and Remidies
 
Ppt
PptPpt
Ppt
 
Interview Fundamentals ACFE Chapter Training
Interview Fundamentals ACFE Chapter TrainingInterview Fundamentals ACFE Chapter Training
Interview Fundamentals ACFE Chapter Training
 
Disposal
DisposalDisposal
Disposal
 
Sewage Treatment: Primary Treatment
Sewage Treatment: Primary TreatmentSewage Treatment: Primary Treatment
Sewage Treatment: Primary Treatment
 
Primary & Advanced Primary Wastewater Treatement
Primary & Advanced Primary Wastewater TreatementPrimary & Advanced Primary Wastewater Treatement
Primary & Advanced Primary Wastewater Treatement
 
Facing an interview
Facing an interviewFacing an interview
Facing an interview
 
Fundamentals of facing interviews
Fundamentals of facing interviewsFundamentals of facing interviews
Fundamentals of facing interviews
 
Final Disposal of Solid Waste Management in Bangladesh
Final Disposal of Solid Waste Management in Bangladesh Final Disposal of Solid Waste Management in Bangladesh
Final Disposal of Solid Waste Management in Bangladesh
 
Solid waste disposal
Solid waste disposalSolid waste disposal
Solid waste disposal
 
Air Pollution Presentation
Air Pollution PresentationAir Pollution Presentation
Air Pollution Presentation
 
AIR POLLUTION AND ITS EFFECT ON THE STRUCTURE
AIR POLLUTION AND ITS EFFECT ON THE STRUCTUREAIR POLLUTION AND ITS EFFECT ON THE STRUCTURE
AIR POLLUTION AND ITS EFFECT ON THE STRUCTURE
 
Primary waste water treatment powerpointb presntation
Primary waste water treatment powerpointb  presntationPrimary waste water treatment powerpointb  presntation
Primary waste water treatment powerpointb presntation
 

Similar to Fundamentals of Primary Wastewater Treatment

drillingfluids-171223201136.pptx
drillingfluids-171223201136.pptxdrillingfluids-171223201136.pptx
drillingfluids-171223201136.pptxMuammerAlakary
 
drillingfluids-22.pptx
drillingfluids-22.pptxdrillingfluids-22.pptx
drillingfluids-22.pptxMuammerAlakary
 
Drilling fluids
Drilling fluidsDrilling fluids
Drilling fluidsAAPG SU SC
 
Domestic Waste water treatment
 Domestic Waste water treatment   Domestic Waste water treatment
Domestic Waste water treatment Ghassan Hadi
 
Irrigation_methods__96_slayt.ppt
Irrigation_methods__96_slayt.pptIrrigation_methods__96_slayt.ppt
Irrigation_methods__96_slayt.pptAhmedAdenAli
 
Blue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drillBlue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drillDeanGarratt
 
Integrated Historical Data Workflow: Maximizing the Value of a Mature Asset
Integrated Historical Data Workflow: Maximizing the Value of a Mature AssetIntegrated Historical Data Workflow: Maximizing the Value of a Mature Asset
Integrated Historical Data Workflow: Maximizing the Value of a Mature AssetSociety of Petroleum Engineers
 
Cdw sed tank_tech_memo1111
Cdw sed tank_tech_memo1111Cdw sed tank_tech_memo1111
Cdw sed tank_tech_memo1111Mazen Alqadi
 
Oil gas water metering
Oil gas water meteringOil gas water metering
Oil gas water meteringHassan Awedan
 
Irrigation water measurement technique
Irrigation water measurement techniqueIrrigation water measurement technique
Irrigation water measurement techniqueSuyog Khose
 
Hydraulic Design of Sprinkler System,
Hydraulic Design of Sprinkler System, Hydraulic Design of Sprinkler System,
Hydraulic Design of Sprinkler System, Suyog Khose
 

Similar to Fundamentals of Primary Wastewater Treatment (20)

Wastewater
WastewaterWastewater
Wastewater
 
Horizontal directional drilling
Horizontal directional drillingHorizontal directional drilling
Horizontal directional drilling
 
drillingfluids-171223201136.pptx
drillingfluids-171223201136.pptxdrillingfluids-171223201136.pptx
drillingfluids-171223201136.pptx
 
drillingfluids-22.pptx
drillingfluids-22.pptxdrillingfluids-22.pptx
drillingfluids-22.pptx
 
Lec_7.pptx
Lec_7.pptxLec_7.pptx
Lec_7.pptx
 
Drilling fluids
Drilling fluidsDrilling fluids
Drilling fluids
 
Domestic Waste water treatment
 Domestic Waste water treatment   Domestic Waste water treatment
Domestic Waste water treatment
 
Irrigation_methods__96_slayt.ppt
Irrigation_methods__96_slayt.pptIrrigation_methods__96_slayt.ppt
Irrigation_methods__96_slayt.ppt
 
Blue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drillBlue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drill
 
Low Cost Sanitation Systems
Low Cost Sanitation SystemsLow Cost Sanitation Systems
Low Cost Sanitation Systems
 
September 1 - 0239 - Eileen Kladivko
September 1 - 0239 - Eileen KladivkoSeptember 1 - 0239 - Eileen Kladivko
September 1 - 0239 - Eileen Kladivko
 
Integrated Historical Data Workflow: Maximizing the Value of a Mature Asset
Integrated Historical Data Workflow: Maximizing the Value of a Mature AssetIntegrated Historical Data Workflow: Maximizing the Value of a Mature Asset
Integrated Historical Data Workflow: Maximizing the Value of a Mature Asset
 
Cdw sed tank_tech_memo1111
Cdw sed tank_tech_memo1111Cdw sed tank_tech_memo1111
Cdw sed tank_tech_memo1111
 
Oil gas water metering
Oil gas water meteringOil gas water metering
Oil gas water metering
 
Irrigation water measurement technique
Irrigation water measurement techniqueIrrigation water measurement technique
Irrigation water measurement technique
 
Hydraulic Design of Sprinkler System,
Hydraulic Design of Sprinkler System, Hydraulic Design of Sprinkler System,
Hydraulic Design of Sprinkler System,
 
Pumping test
Pumping testPumping test
Pumping test
 
Boat Washpad Designs To Meet NPDES
Boat Washpad Designs To Meet NPDESBoat Washpad Designs To Meet NPDES
Boat Washpad Designs To Meet NPDES
 
Sewerage design
Sewerage designSewerage design
Sewerage design
 
Stormwater Filtering Design
Stormwater Filtering DesignStormwater Filtering Design
Stormwater Filtering Design
 

Recently uploaded

Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 

Recently uploaded (20)

Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 

Fundamentals of Primary Wastewater Treatment

  • 2. Preliminary “Treatment” • Equalization – Smooth out fluctuations in flow rate – Results in more consistent treatment • Flow Measurement – Flow rate information needed for efficient operation, chemical addition, etc
  • 3. Equalization • Objective – Decrease fluctuations in flow rate, to provide more consistent treatment • Accomplished by storing excess wastewater during high flow periods • Excess wastewater is released during low flow periods
  • 4. Pumping • Sometimes needed to lift the water to a higher elevation than the discharge point of the main trunk sewer line. • After pumping, the plant is designed to operate under gravity flow to the point of discharge at the receiving stream.
  • 6. Flow Measurement • Objective – Measure flow rate to facilitate plant operation • Several operations need flow rate data for good operation – Chlorination – pH adjustment – Also required for NPDES reports
  • 7. Design of Influent Channel • Objective – Design a combination of circular sewer and rectangular channels to deliver wastewater to the head works of the treatment plant • Apply open channel flow hydraulics – applying Manning’s equation considering: – Minimum velocity to reduce solids deposition in the channel – Hydraulic grade, slope of channel invert to provide scour of solids – Channel dimensions that match or transition the influent circular sewer with a rectangular channel
  • 8. Primary Treatment - Designed to remove settleable solids and reduce the organic load (BOD) on the secondary units. - Primary treatment includes - Bar screen - Comminutor - Grit chamber - Primary clarifier
  • 9. Bar Screen Vendor-Provided Equipment • Purpose: to remove large objects (sticks, cans, etc) which may cause flow obstructions. • Depending on the size of the plant, bar screens are either hand or mechanically cleaned. • Hand cleaned: used primarily at small plants.
  • 10. Figure (a) Manually cleaned bar rack (from Peavy, Rowe, and Tchobanoglous, 1985, p. 218)
  • 11. Bar Screen Mechanically Cleaned • More frequently used because labor and overflowing are greatly reduced. • A by-pass channel with a hand cleaned bar screen must also be provided. A second mechanically cleaned bar screen can also be provided. • The purpose of the by-pass channel is to provide treatment in case of a mechanical failure. • Screens are either front or back cleaned.
  • 13. Mechanical Bar Screen General Design Criteria • Bar Width: 1/4 to 5/8 in • Spacing: 5/8 to 3 in • Depth: 1 to 1.5 inches • Slope: 30 – 45o from the vertical.
  • 14. (from Peavy, Rowe, and Tchobanoglous, 1985, p. 219)
  • 15. Mechanical Bar Screen General Design Criteria • Approach velocity – 1.25 fps @ minimum flow (as determined by the Manning Eqn.), the purpose in controlling the approach velocity is to prevent deposition of grit in the channel. • Velocity through the screen - < 3 fps, to prevent excessive headloss and to prevent forcing of screenings through the openings. • Quantities of screenings – 0.5-5 ft3/ MG, average 2 ft3/MG
  • 16. Mechanical Bar Screen General Design Criteria • Disposal of screenings – landfill or incineration • Density: 80% moisture (60 pcf) right off the screen, dry (12 pcf) • hL = 0.5 – 2.5 ft (max) • hL=(Vs2-vc2)/(2g * 0.7) – Vs= velocity through the bars – vc= approach velocity in the upstream channel
  • 17. Comminutors Vendor-Provided Equipment • Purpose: to chop solids between 1/4 - 3/8 inch to prevent pumps from being clogged. • Comminutors are installed directly into the influent channel. • Since comminutors come in a standard size, it is not unusual to select the comminutor first, then size the channel. • Comminutors should be provided with a by-pass channel and a hand cleaned bar screen.
  • 18. (from Peavy, Rowe, and Tchobanoglous, 1985, p. 220)
  • 19. Grit Chambers • Purpose: to remove inorganic material referred to as grit. Grit includes sand, eggshells, bone chips, coffee grounds, etc. • Grit is removed to prevent abrasion of pumps and to reduce deposits in pipe lines, channels, and digesters.
  • 20. Grit Chamber General Design Criteria • Specific gravity of grit: 2.65 • Diameter of grit: 0.22 mm • Settling velocity: 0.075 fps • Equivalent overflow rate: 48,400 gpd/ft2
  • 21. Grit Chamber General Design Criteria • Quantity of girt: 1/3 to 24 ft3/MG – Ave = 4 ft3 /MG • Disposal of grit: land fill or incineration (Grit must be washed before disposal) • Grit chamber storage: – Small plant: provide storage below the design invert depending on the quantity and frequency of removal. – Large plant: continuous removal, the conveyor hopper is designed based on the size of the equipment.
  • 22. Grit Chambers Types • Square Clarifier (Detritus Tank) • Aerated Tanks
  • 23. Grit Chamber Square Clarifier (Detritus Tank) • Detritus tanks are designed so that the horizontal velocity is 1.0 fps at maximum flow. This means that at low flow, the velocity is less than 1.0 fps, and therefore, organic material will accumulate. • Organics are removed by counter current washing as the grit moves up an incline for disposal.
  • 24. (from Tchobanoglous and Burton, 1991, p. 456)
  • 25. Grit Chamber Square Clarifier (Detritus Tank) • Basic Design Criteria – Vs = 0.075 fps @ Average Flow – td < 1 min – Overflow rate: 48,400 gpd/ft2 – Vh: 0.75-1.25 fps (keeps organics in suspension)
  • 26. Grit Chamber Aerated Grit Chamber • Upon discovering that grit accumulated in the bottom of activated sludge aeration basins, it has became common practice to use aerated grit chambers. • Aeration also provides pretreatment of the waste by removing odors and inducing flocculation of the organic material making primary clarification more effective.
  • 27. (from Tchobanoglous and Burton, 1991, p. 461)
  • 28. Aerated Grit Chamber Benefits of Pre-aeration • By providing preaeration, primary treatment is improved through: – Grit removal – Flocculation – Odor Control – Grease Separation • Design the detention time and aeration rate to control all four
  • 29. Aerated Grit Chamber General Design Criteria • Rate of aeration: 5 cfm/ft length (provide for variable rates of aeration which is adjusted according to the flow and efficiency of grit removal). • Width to Depth Ratio: a critical factor in providing an effective spiral-rolling action in the grit chamber – W:D = 1 – 2.2 : 1 • Depth = 10 – 15 ft (starting point: set depth first) • Length:Width Ratio = 3:1, final dimensions are adjusted so that the detention time is 3-10 minutes.
  • 30. Primary Clarifier • Purpose: to remove settleable organics and floating scum (grease and oils). • Efficiencies: – Suspended solids 50 – 65% – BOD 30 – 35% • Primary clarifiers are either circular or rectangular. They are very similar to sedimentation basins used in water treatment except that scum removal is always provided in addition to sludge collection.
  • 31. A Circular Primary Sedimentation Tank
  • 32. An Empty Primary Clarifier
  • 33. An Operating Primary Clarifier
  • 34. Oil Skimmer in a Primary Clarifier
  • 35. Primary Clarifiers Design Criteria • Type II Settling Clarifier: during settling organic solids come in contact with each other and aggregate increasing the particle size and settling rate. Aggregation increases with time, therefore detention time is important. • Td: 90 – 150 min at average flow (Avg 2 hr) • Overflow rate: 600 – 1,200 gpd/ft2 • Weir loading rate: 10,000 – 15,000 gpd/ft.
  • 36.
  • 37.
  • 38. Aerial View Housatonic Wastewater Plant, Milford, CT (Avg. Flow Rate = 8 MGD)
  • 39. Aerial View of Blue Plains Wastewater Treatment Plant, Washington D.C. (avg. flow rate = 309 Million gals/day)
  • 40. Sludge Quantities • Quantity of sludge collected in the primary clarifier depends on: – Specific gravity of the dry solids – % moisture – Efficiency of settling • The following relationship is used to determine the specific gravity of the sludge (mixture of solids and water): S = Sp. Gr. of sludge Ss = Sp. Gr. of dry solids Sw = Sp. Gr. of water (1.0) Ps = % solids (sludge) Pw = % water (sludge) w w s s S P S P S 1001001 +=
  • 41. Sludge Quantities • The volume of sludge can be determined from the following relationship: S = specific gravity of sludge V = sludge volume, gals Ws = dry weight of solids, lb = specific weight of water (62.4 lb / ft3) S S Ws S Pw Ws V γγ         =       − = 100 % 48.7 100 100 48.7 γ
  • 42. (from Peavy, Rowe, and Tchobanoglous, 1985, p. 228)
  • 43. Primary Treatment Efficiency • BOD = 30 – 35% SS = 50 – 65% • Wastewater entering secondary treatment Strong: BOD = 260–280 mg/L SS= 120–175 mg/L Medium: BOD= 145–155 mg/L SS= 80–110 mg/L Weak: BOD= 70–80 mg/L SS= 35–50 mg/L Forms of BOD: (a) Colloidal (b) Soluble/Dissolved
  • 44. Ex. Determine the quantity of primary sludge per million gallons for domestic sewage with the following characteristics: SS = 200 mg/L Ss = 1.4 % moisture = 95% Suspended solids removal efficiency = 60% MG gal Ss Ws V S Sw Pw Ss Ps S lbM LmgMG lb LmgMGM EfficiencyQCM sludge sludge sludge 2375 01.1*4.62*05.0 1000*48.7 )100/(% 48.7 01.1 99.0 0.1 95.0 4.1 05.0100/100/1 1000 6.0 /* 34.8 */200*1 * == + = = =+=+= =       = = γ
  • 45. References • Peavy, Howard S., Rowe, Donald R., and Tchobanoglous, George (1985) Environmental Engineering. McGraw-Hill. New York. • Tchobanoglous, George and Burton, Franklin L. (1991) Wastewater Engineering Treatment, Disposal, and Reuse. Metcalf and Eddy, Inc. Irwin McGraw-Hill, Boston. • www.slideshare.net/arpit026

Editor's Notes

  1. &amp;lt;number&amp;gt;
  2. &amp;lt;number&amp;gt;
  3. &amp;lt;number&amp;gt;
  4. &amp;lt;number&amp;gt;
  5. &amp;lt;number&amp;gt;
  6. &amp;lt;number&amp;gt;
  7. &amp;lt;number&amp;gt;
  8. &amp;lt;number&amp;gt;
  9. &amp;lt;number&amp;gt;
  10. &amp;lt;number&amp;gt;
  11. &amp;lt;number&amp;gt;
  12. &amp;lt;number&amp;gt;
  13. &amp;lt;number&amp;gt;
  14. &amp;lt;number&amp;gt;