The document contains a cost pool allocation schedule that allocates $1.8 million of total overhead costs across various production activity cost pools. It allocates costs to machine set-up, special processing, and general factory direct labor activity cost pools based on measures like number of set-ups, machine hours, and direct labor hours. The allocations total $615,000 to overhead cost pools and $1,185,000 directly to production activities.