SlideShare a Scribd company logo
1 of 46
School District of Beloit
REFERENDUM PRESENTATION




      IMAGINE BELOIT
1.   History/Challenge and Opportunity
2.   The cost
3.   The physical plants
4.   Educational Advantages
5.   Fiscal Responsibility and Savings
6.   Economic Development
7.   April 3, 2012
Board of Education:

• Facility study 1998
• Architectural drawings 2008
Board of Education challenge:

  •   8 buildings built before 1928
  •   Newest building built: 1965
  •   Last major improvements: 1994
  •   Non-functional pool: 1968
  •   Deteriorating facilities
2012-2013 Tax Impact
             On a $70 Million Dollar Referendum
             Under Current Funding Aid Formula
                 Estimated Interest at 3.5%
Home Value            Annual Cost       Monthly Cost

$75,000*              $ 67.50               $5.63

• State reimburses District $45 million or 64% of the bond issue
• Beloit tax payers pay only $25 million
• Business 46%
• Residential 54%
*Average home value in the city of Beloit
Success Breeds Success

•   National AP Honor Roll, 1 of 367
•   National Blue Ribbon, Gaston, 1 of 305
•   National GPA award, Girls Swim, 20th
•   National GPA award, Boys Swim, 6th
•   National Jazz Competition, top 15
•   RTI program receiving state and national
    attention
Referendum Plan: Physical Plants
Renovate six elementary schools to PK-3
1. More and larger classrooms for consolidation/team
   teaching
2. Create intervention rooms
3. More gym space
4. Needed repairs
    •Roofing               •Security Upgrade
    •Boiler Systems/HVAC   •Parking/Drop off
    •Building Envelope     •Playgrounds
    •Needed Furnishings    •Technology


5. Food prep and serving areas
Primary Schools
  Cost Approximately $31 million
Approximately 440 Students/Building

East              West
  Todd    $6.0M    Converse $5.6M
  Merrill 4.4M     Hackett   5.1M
  Robinson 5.6M    Gaston    4.2M
Todd
Merrill
Robinson
Converse
Hackett
Gaston
Aldrich and McNeel

$1.2M for new roof & lighting by June 2012
through Federal Energy Efficiency program

 $10M to be allocated from maintenance
     savings over the next 5 years

   Fewer students after reconfiguration
McNeel
Aldrich
New Cunningham 4-8
 Cost Approximately $16 million

• Cunningham 60% increase in square
  footage
• Land area sufficient for expansion
• Large amount of green space remaining
  after expansion
New Cunningham
New SE Intermediate School 4-8
 Cost Approximately $16 million
• Site Acquisition completed by mid March
• In the Morgan neighborhood
New SE Intermediate
New SE Intermediate
Intermediate School Design
1. Separate wings for 4,5,6 and 7,8
2. Separate entrances/pickup and drop off areas
3. Shared spaces for:
  –   Music
  –   Art
  –   Phy Ed
  –   ELL
  –   Special Education
  –   Library Media
Beloit Memorial High School

•   New Swimming Pool – 8 lane
•   Conference and Sectional meets
•   Locker rooms male and female
•   Community Changing Room
•   Bleachers for 500 + people at pool level
•   All mechanical-Electrical-Plumbing
•   Pool Room Heating and Ventilation
Tennis Courts

•   Tear up existing Tennis Courts
•   Relocate west of student parking
•   8 tennis courts complex
•   Tournaments
Life Center
• New equipment relocated from class rooms
• Level playing field for Big 8 athletics
• Relocate to existing pool area
• Current weight room transformed to
  wrestling and/or dance or yoga studio
• Fight childhood obesity
• Lower health care costs of district
  employees
High School
High School
Future Use of District-Owned Buildings
• Buildings Available for    • Possible Uses
  Retirement or Repurposing:    – District Office
   –   Royce                       – Charter School (RCAA)
   –   McLenegan                   – Learning Academy
   –   Kolak                       – Sale to outside party
   –   Morgan
   –   Wright
   –   Burdge
Educational Advantages
PK-3 Grade Alignment
       Educational Advantages

• Six PK-3 Schools
• Alignment of resources for learning to read
• Collaborative opportunities
• Intense focus on developmental needs of the
  young child
• Dedicated Art and Music areas
PK-3 Grade Alignment
       Educational Advantages
Higher Parent Involvement

  – More years in the same building
  – Sustained Relationships
  – Fewer transitions
4-8 Grade Alignment
         Educational Advantages
• “Elemiddle” approach
  – Makes smaller grades 6-8, approx 150 per grade
• Alignment of resources for reading to learn
• Use of other resources and shared classrooms
 (e.g. Gym, Tech Ed, Music, Art)
4-8 Grade Alignment
         Educational Advantages
• Collaborative opportunities for
• 4-6 and 7-8 wings
• Culture change in a building with younger and
  older students
• More opportunities to be involved in sports and
  extracurricular activities with smaller classes.
4-8 Grade Alignment
       Educational Advantages
Higher Parent Involvement

  – More years in the same building
  – Sustained Relationships
  – Fewer transitions
The Cost
Primary schools =        $31 million
Intermediate schools =   $32 million
Secondary School =       $ 7 million
                Total=   $70 million

$45 million reimbursed by the State
These are estimated permanent reductions that would assist
   us with our budget challenges in each year going forward.
Cost Savings Area                                          Estimated Annual Cost Savings If
                                                                 Referendum Passes

Rent                                                   $             128,007.00
Utilities (Gas, Electric, Water, Sewer, Storm Water)   $              66,232.00
Reduction of Personnel                                 $           1,019,582.00
Facility and Building Maintenance                      $             978,780.00
Property Services                                      $              28,334.00
Technology Savings-Fiber Lease /Phone
Lines                                                  $              10,446.00
Transportation                                         $              35,730.00
Staff Travel                                           $              30,000.00
   Grand Total                                         $           2,297,111.00
Referendum versus Operating Cost
 • Referendum is a stand-alone loan fund
   – Must be for capital improvements only
   – Not used for operating budget or salaries

 • Yearly Operating budget is effected only by
   the savings incurred by improvements
   – Helps offset the budget challenges we will
     continue to face due to decreasing funding
Fiscal Responsibility
25


20


15
                                           Actual Levy collected
10                                         1995 Levy adjusted for inflation


 5


 0
 1990   1995   2000   2005   2010   2015
2012-2013 Tax Impact
             On a $70 Million Dollar Referendum
             Under Current Funding Aid Formula
                 Estimated Interest at 3.5%
Home Value            Annual Cost       Monthly Cost

$75,000*              $ 67.50               $5.63

• State reimburses District $45 million or 64% of the bond issue
• Beloit tax payers pay only $25 million
• Business 46%
• Residential 54%
*Average home value in the city of Beloit
Economic Development
• Schools are one of the most
  important reasons for business
  start-ups and expansion
• More new employees stay in Beloit
• Increased community pride
• Local construction jobs
• Higher property values
• $45 million in outside investment
• Chamber of Commerce: ENDORSED
• BEDCOR: ENDORSED
• City Council: ENDORSED
• Outside tourism revenue produced
  by visiting spectators of large swim
  meets and tennis tournaments
• Improved image to non-Beloiters
• Continue trend of Beloit
  improvements
• $45 million in outside investment
Discussion
VOTE

April 3, 2012

More Related Content

What's hot

Using TIF to Promote Healthy Communities
Using TIF to Promote Healthy CommunitiesUsing TIF to Promote Healthy Communities
Using TIF to Promote Healthy CommunitiesVierbicher
 
Public Funding-Current Trends & Successful Strategies
Public Funding-Current Trends & Successful StrategiesPublic Funding-Current Trends & Successful Strategies
Public Funding-Current Trends & Successful StrategiesVierbicher
 
LTSD BUDGET PRESENTATION
LTSD BUDGET PRESENTATIONLTSD BUDGET PRESENTATION
LTSD BUDGET PRESENTATIONMatt Shea
 
Affordable and Senior Housing
Affordable and Senior HousingAffordable and Senior Housing
Affordable and Senior HousingVierbicher
 
Five lamps presentation 2 7 13
Five lamps presentation 2 7 13Five lamps presentation 2 7 13
Five lamps presentation 2 7 13HACThousing
 
Community Energy Planning: Policies and Tools
Community Energy Planning: Policies and ToolsCommunity Energy Planning: Policies and Tools
Community Energy Planning: Policies and Toolssmartplanning
 
Sitka Road System Master Planning & Funding Strategies
Sitka Road System Master Planning & Funding StrategiesSitka Road System Master Planning & Funding Strategies
Sitka Road System Master Planning & Funding StrategiesJustin Otternewzman
 
Community information session presentation final 080513
Community information session presentation final 080513Community information session presentation final 080513
Community information session presentation final 080513maitlandyoursay
 
The Integration Part of Integrated Community Sustainability Planning (ICSP)
The Integration Part of Integrated Community Sustainability Planning (ICSP)The Integration Part of Integrated Community Sustainability Planning (ICSP)
The Integration Part of Integrated Community Sustainability Planning (ICSP)smartplanning
 
Eastwood Village Public Private partnership
Eastwood Village Public Private partnershipEastwood Village Public Private partnership
Eastwood Village Public Private partnershipDennisChurch
 

What's hot (14)

Using TIF to Promote Healthy Communities
Using TIF to Promote Healthy CommunitiesUsing TIF to Promote Healthy Communities
Using TIF to Promote Healthy Communities
 
Public Funding-Current Trends & Successful Strategies
Public Funding-Current Trends & Successful StrategiesPublic Funding-Current Trends & Successful Strategies
Public Funding-Current Trends & Successful Strategies
 
LTSD BUDGET PRESENTATION
LTSD BUDGET PRESENTATIONLTSD BUDGET PRESENTATION
LTSD BUDGET PRESENTATION
 
Affordable and Senior Housing
Affordable and Senior HousingAffordable and Senior Housing
Affordable and Senior Housing
 
What planners need to know
What planners need to knowWhat planners need to know
What planners need to know
 
FY 2020-21 Budget Workshop (July 28)
FY 2020-21 Budget Workshop (July 28)FY 2020-21 Budget Workshop (July 28)
FY 2020-21 Budget Workshop (July 28)
 
Five lamps presentation 2 7 13
Five lamps presentation 2 7 13Five lamps presentation 2 7 13
Five lamps presentation 2 7 13
 
Community Energy Planning: Policies and Tools
Community Energy Planning: Policies and ToolsCommunity Energy Planning: Policies and Tools
Community Energy Planning: Policies and Tools
 
Sitka Road System Master Planning & Funding Strategies
Sitka Road System Master Planning & Funding StrategiesSitka Road System Master Planning & Funding Strategies
Sitka Road System Master Planning & Funding Strategies
 
Community information session presentation final 080513
Community information session presentation final 080513Community information session presentation final 080513
Community information session presentation final 080513
 
levy2
levy2levy2
levy2
 
The Integration Part of Integrated Community Sustainability Planning (ICSP)
The Integration Part of Integrated Community Sustainability Planning (ICSP)The Integration Part of Integrated Community Sustainability Planning (ICSP)
The Integration Part of Integrated Community Sustainability Planning (ICSP)
 
Chapel Hill-Carrboro Region
Chapel Hill-Carrboro RegionChapel Hill-Carrboro Region
Chapel Hill-Carrboro Region
 
Eastwood Village Public Private partnership
Eastwood Village Public Private partnershipEastwood Village Public Private partnership
Eastwood Village Public Private partnership
 

Viewers also liked

Analyzing events through the lens of social media
Analyzing events through the lens of social mediaAnalyzing events through the lens of social media
Analyzing events through the lens of social mediaDebanjan Mahata
 
Lumiturvallisuus human factor
Lumiturvallisuus human factorLumiturvallisuus human factor
Lumiturvallisuus human factorJarmo Rinkinen
 
Formalist film theory presentation
Formalist film theory presentationFormalist film theory presentation
Formalist film theory presentationSolidR0ck
 
Luonto- ja elämyspedagogiikka
Luonto- ja elämyspedagogiikkaLuonto- ja elämyspedagogiikka
Luonto- ja elämyspedagogiikkaJarmo Rinkinen
 
From Chirps to Whistles - Discovering Event-specific Informative Content from...
From Chirps to Whistles - Discovering Event-specific Informative Content from...From Chirps to Whistles - Discovering Event-specific Informative Content from...
From Chirps to Whistles - Discovering Event-specific Informative Content from...Debanjan Mahata
 
Luonto- ja elämyspedagogikka
Luonto- ja elämyspedagogikkaLuonto- ja elämyspedagogikka
Luonto- ja elämyspedagogikkaJarmo Rinkinen
 
Ecoblue power point presentation
Ecoblue power point presentationEcoblue power point presentation
Ecoblue power point presentationjticsay
 
Retkeilijän ilmasto ja sää
Retkeilijän ilmasto ja sääRetkeilijän ilmasto ja sää
Retkeilijän ilmasto ja sääJarmo Rinkinen
 
A Framework for Collecting, Extracting and Managing Event Identity Informatio...
A Framework for Collecting, Extracting and Managing Event Identity Informatio...A Framework for Collecting, Extracting and Managing Event Identity Informatio...
A Framework for Collecting, Extracting and Managing Event Identity Informatio...Debanjan Mahata
 
Kadonneen maastoetsintämuodot
Kadonneen maastoetsintämuodotKadonneen maastoetsintämuodot
Kadonneen maastoetsintämuodotJarmo Rinkinen
 
An Introduction to NOSQL, Graph Databases and Neo4j
An Introduction to NOSQL, Graph Databases and Neo4jAn Introduction to NOSQL, Graph Databases and Neo4j
An Introduction to NOSQL, Graph Databases and Neo4jDebanjan Mahata
 
Vaelluksella kohdattuja ongelmatilanteita ja ratkaisuja niihin
Vaelluksella kohdattuja ongelmatilanteita ja ratkaisuja niihinVaelluksella kohdattuja ongelmatilanteita ja ratkaisuja niihin
Vaelluksella kohdattuja ongelmatilanteita ja ratkaisuja niihinJarmo Rinkinen
 
Marketing Communications
Marketing CommunicationsMarketing Communications
Marketing CommunicationsLisiDiaz
 
Anthropologie's Brand Position
Anthropologie's Brand PositionAnthropologie's Brand Position
Anthropologie's Brand PositionLisiDiaz
 

Viewers also liked (16)

Analyzing events through the lens of social media
Analyzing events through the lens of social mediaAnalyzing events through the lens of social media
Analyzing events through the lens of social media
 
Lumiturvallisuus human factor
Lumiturvallisuus human factorLumiturvallisuus human factor
Lumiturvallisuus human factor
 
Quantum Teaching AZKA Syifa Budi
Quantum Teaching AZKA Syifa BudiQuantum Teaching AZKA Syifa Budi
Quantum Teaching AZKA Syifa Budi
 
Formalist film theory presentation
Formalist film theory presentationFormalist film theory presentation
Formalist film theory presentation
 
Luonto- ja elämyspedagogiikka
Luonto- ja elämyspedagogiikkaLuonto- ja elämyspedagogiikka
Luonto- ja elämyspedagogiikka
 
From Chirps to Whistles - Discovering Event-specific Informative Content from...
From Chirps to Whistles - Discovering Event-specific Informative Content from...From Chirps to Whistles - Discovering Event-specific Informative Content from...
From Chirps to Whistles - Discovering Event-specific Informative Content from...
 
Luonto- ja elämyspedagogikka
Luonto- ja elämyspedagogikkaLuonto- ja elämyspedagogikka
Luonto- ja elämyspedagogikka
 
Ecoblue power point presentation
Ecoblue power point presentationEcoblue power point presentation
Ecoblue power point presentation
 
Retkeilijän ilmasto ja sää
Retkeilijän ilmasto ja sääRetkeilijän ilmasto ja sää
Retkeilijän ilmasto ja sää
 
A Framework for Collecting, Extracting and Managing Event Identity Informatio...
A Framework for Collecting, Extracting and Managing Event Identity Informatio...A Framework for Collecting, Extracting and Managing Event Identity Informatio...
A Framework for Collecting, Extracting and Managing Event Identity Informatio...
 
Eisenstein
EisensteinEisenstein
Eisenstein
 
Kadonneen maastoetsintämuodot
Kadonneen maastoetsintämuodotKadonneen maastoetsintämuodot
Kadonneen maastoetsintämuodot
 
An Introduction to NOSQL, Graph Databases and Neo4j
An Introduction to NOSQL, Graph Databases and Neo4jAn Introduction to NOSQL, Graph Databases and Neo4j
An Introduction to NOSQL, Graph Databases and Neo4j
 
Vaelluksella kohdattuja ongelmatilanteita ja ratkaisuja niihin
Vaelluksella kohdattuja ongelmatilanteita ja ratkaisuja niihinVaelluksella kohdattuja ongelmatilanteita ja ratkaisuja niihin
Vaelluksella kohdattuja ongelmatilanteita ja ratkaisuja niihin
 
Marketing Communications
Marketing CommunicationsMarketing Communications
Marketing Communications
 
Anthropologie's Brand Position
Anthropologie's Brand PositionAnthropologie's Brand Position
Anthropologie's Brand Position
 

Similar to Imagine Beloit - Pro Referendum Presentation

School district-referendum-presentation-3-30
School district-referendum-presentation-3-30School district-referendum-presentation-3-30
School district-referendum-presentation-3-30Rick McGrath
 
Effective Energy Management - California Savings Summit 2013
Effective Energy Management - California Savings Summit 2013Effective Energy Management - California Savings Summit 2013
Effective Energy Management - California Savings Summit 2013SchoolDude
 
Funding our future community information session nov 2013
Funding our future community information session nov 2013Funding our future community information session nov 2013
Funding our future community information session nov 2013maitlandyoursay
 
Referendum presentation 2012
Referendum presentation 2012Referendum presentation 2012
Referendum presentation 2012rcox726
 
Holyoke Two Middle Schools Proposal
Holyoke Two Middle Schools ProposalHolyoke Two Middle Schools Proposal
Holyoke Two Middle Schools Proposalyestoinvest
 
Mark Sandeen MAS 2017
Mark Sandeen MAS 2017Mark Sandeen MAS 2017
Mark Sandeen MAS 2017GWT
 
Achieve Success at the Zoning Table - International Builders' Show 2014
Achieve Success at the Zoning Table - International Builders' Show 2014Achieve Success at the Zoning Table - International Builders' Show 2014
Achieve Success at the Zoning Table - International Builders' Show 2014KEPHART
 
Iced Eggs And Issues Presentations
Iced Eggs And Issues PresentationsIced Eggs And Issues Presentations
Iced Eggs And Issues PresentationsIndependence EDC
 
Power4Schools and SchoolDude
Power4Schools and SchoolDude Power4Schools and SchoolDude
Power4Schools and SchoolDude SchoolDude
 
Proposed bond referendum community
Proposed bond referendum communityProposed bond referendum community
Proposed bond referendum communityPCSTech
 
Facilities Master Plan OUSD
Facilities Master Plan OUSDFacilities Master Plan OUSD
Facilities Master Plan OUSDaaronjacoby
 
Vote Yes for Tipp City Schools 2012
Vote Yes for Tipp City Schools 2012Vote Yes for Tipp City Schools 2012
Vote Yes for Tipp City Schools 2012Michael McDermott
 
Olene Walker Housing Loan Fund ENERGY Star Policy Results
Olene Walker Housing Loan Fund ENERGY Star Policy ResultsOlene Walker Housing Loan Fund ENERGY Star Policy Results
Olene Walker Housing Loan Fund ENERGY Star Policy ResultsState of Utah, Salt Lake City
 
High Performance Building Program Presentation 2011
High Performance Building Program Presentation 2011High Performance Building Program Presentation 2011
High Performance Building Program Presentation 2011Conor Merrigan
 
Bracken Hendricks | Innovation Showcase | 2014 Solar Symposium
Bracken Hendricks | Innovation Showcase | 2014 Solar SymposiumBracken Hendricks | Innovation Showcase | 2014 Solar Symposium
Bracken Hendricks | Innovation Showcase | 2014 Solar SymposiumGW Solar Institute
 
Hillsborough County
Hillsborough CountyHillsborough County
Hillsborough CountyFMA Summits
 

Similar to Imagine Beloit - Pro Referendum Presentation (20)

School district-referendum-presentation-3-30
School district-referendum-presentation-3-30School district-referendum-presentation-3-30
School district-referendum-presentation-3-30
 
Effective Energy Management - California Savings Summit 2013
Effective Energy Management - California Savings Summit 2013Effective Energy Management - California Savings Summit 2013
Effective Energy Management - California Savings Summit 2013
 
Levy presentation2
Levy presentation2Levy presentation2
Levy presentation2
 
2012 usd263 bond
2012 usd263 bond2012 usd263 bond
2012 usd263 bond
 
Funding our future community information session nov 2013
Funding our future community information session nov 2013Funding our future community information session nov 2013
Funding our future community information session nov 2013
 
Referendum presentation 2012
Referendum presentation 2012Referendum presentation 2012
Referendum presentation 2012
 
Holyoke Two Middle Schools Proposal
Holyoke Two Middle Schools ProposalHolyoke Two Middle Schools Proposal
Holyoke Two Middle Schools Proposal
 
Mark Sandeen MAS 2017
Mark Sandeen MAS 2017Mark Sandeen MAS 2017
Mark Sandeen MAS 2017
 
Achieve Success at the Zoning Table - International Builders' Show 2014
Achieve Success at the Zoning Table - International Builders' Show 2014Achieve Success at the Zoning Table - International Builders' Show 2014
Achieve Success at the Zoning Table - International Builders' Show 2014
 
Iced Eggs And Issues Presentations
Iced Eggs And Issues PresentationsIced Eggs And Issues Presentations
Iced Eggs And Issues Presentations
 
Power4Schools and SchoolDude
Power4Schools and SchoolDude Power4Schools and SchoolDude
Power4Schools and SchoolDude
 
NYASBO Webinar
NYASBO Webinar NYASBO Webinar
NYASBO Webinar
 
Proposed bond referendum community
Proposed bond referendum communityProposed bond referendum community
Proposed bond referendum community
 
Facilities Master Plan OUSD
Facilities Master Plan OUSDFacilities Master Plan OUSD
Facilities Master Plan OUSD
 
Vote Yes for Tipp City Schools 2012
Vote Yes for Tipp City Schools 2012Vote Yes for Tipp City Schools 2012
Vote Yes for Tipp City Schools 2012
 
Olene Walker Housing Loan Fund ENERGY Star Policy Results
Olene Walker Housing Loan Fund ENERGY Star Policy ResultsOlene Walker Housing Loan Fund ENERGY Star Policy Results
Olene Walker Housing Loan Fund ENERGY Star Policy Results
 
High Performance Building Program Presentation 2011
High Performance Building Program Presentation 2011High Performance Building Program Presentation 2011
High Performance Building Program Presentation 2011
 
Bracken Hendricks | Innovation Showcase | 2014 Solar Symposium
Bracken Hendricks | Innovation Showcase | 2014 Solar SymposiumBracken Hendricks | Innovation Showcase | 2014 Solar Symposium
Bracken Hendricks | Innovation Showcase | 2014 Solar Symposium
 
Referendum Presentation
Referendum PresentationReferendum Presentation
Referendum Presentation
 
Hillsborough County
Hillsborough CountyHillsborough County
Hillsborough County
 

Recently uploaded

Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.MateoGardella
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxVishalSingh1417
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...KokoStevan
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxnegromaestrong
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 

Recently uploaded (20)

Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 

Imagine Beloit - Pro Referendum Presentation

  • 1. School District of Beloit REFERENDUM PRESENTATION IMAGINE BELOIT
  • 2. 1. History/Challenge and Opportunity 2. The cost 3. The physical plants 4. Educational Advantages 5. Fiscal Responsibility and Savings 6. Economic Development 7. April 3, 2012
  • 3. Board of Education: • Facility study 1998 • Architectural drawings 2008
  • 4. Board of Education challenge: • 8 buildings built before 1928 • Newest building built: 1965 • Last major improvements: 1994 • Non-functional pool: 1968 • Deteriorating facilities
  • 5. 2012-2013 Tax Impact On a $70 Million Dollar Referendum Under Current Funding Aid Formula Estimated Interest at 3.5% Home Value Annual Cost Monthly Cost $75,000* $ 67.50 $5.63 • State reimburses District $45 million or 64% of the bond issue • Beloit tax payers pay only $25 million • Business 46% • Residential 54% *Average home value in the city of Beloit
  • 6. Success Breeds Success • National AP Honor Roll, 1 of 367 • National Blue Ribbon, Gaston, 1 of 305 • National GPA award, Girls Swim, 20th • National GPA award, Boys Swim, 6th • National Jazz Competition, top 15 • RTI program receiving state and national attention
  • 8. Renovate six elementary schools to PK-3 1. More and larger classrooms for consolidation/team teaching 2. Create intervention rooms 3. More gym space 4. Needed repairs •Roofing •Security Upgrade •Boiler Systems/HVAC •Parking/Drop off •Building Envelope •Playgrounds •Needed Furnishings •Technology 5. Food prep and serving areas
  • 9. Primary Schools Cost Approximately $31 million Approximately 440 Students/Building East West Todd $6.0M Converse $5.6M Merrill 4.4M Hackett 5.1M Robinson 5.6M Gaston 4.2M
  • 10. Todd
  • 16. Aldrich and McNeel $1.2M for new roof & lighting by June 2012 through Federal Energy Efficiency program $10M to be allocated from maintenance savings over the next 5 years Fewer students after reconfiguration
  • 19. New Cunningham 4-8 Cost Approximately $16 million • Cunningham 60% increase in square footage • Land area sufficient for expansion • Large amount of green space remaining after expansion
  • 21. New SE Intermediate School 4-8 Cost Approximately $16 million • Site Acquisition completed by mid March • In the Morgan neighborhood
  • 24. Intermediate School Design 1. Separate wings for 4,5,6 and 7,8 2. Separate entrances/pickup and drop off areas 3. Shared spaces for: – Music – Art – Phy Ed – ELL – Special Education – Library Media
  • 25. Beloit Memorial High School • New Swimming Pool – 8 lane • Conference and Sectional meets • Locker rooms male and female • Community Changing Room • Bleachers for 500 + people at pool level • All mechanical-Electrical-Plumbing • Pool Room Heating and Ventilation
  • 26. Tennis Courts • Tear up existing Tennis Courts • Relocate west of student parking • 8 tennis courts complex • Tournaments
  • 27. Life Center • New equipment relocated from class rooms • Level playing field for Big 8 athletics • Relocate to existing pool area • Current weight room transformed to wrestling and/or dance or yoga studio • Fight childhood obesity • Lower health care costs of district employees
  • 30. Future Use of District-Owned Buildings • Buildings Available for • Possible Uses Retirement or Repurposing: – District Office – Royce – Charter School (RCAA) – McLenegan – Learning Academy – Kolak – Sale to outside party – Morgan – Wright – Burdge
  • 32. PK-3 Grade Alignment Educational Advantages • Six PK-3 Schools • Alignment of resources for learning to read • Collaborative opportunities • Intense focus on developmental needs of the young child • Dedicated Art and Music areas
  • 33. PK-3 Grade Alignment Educational Advantages Higher Parent Involvement – More years in the same building – Sustained Relationships – Fewer transitions
  • 34. 4-8 Grade Alignment Educational Advantages • “Elemiddle” approach – Makes smaller grades 6-8, approx 150 per grade • Alignment of resources for reading to learn • Use of other resources and shared classrooms (e.g. Gym, Tech Ed, Music, Art)
  • 35. 4-8 Grade Alignment Educational Advantages • Collaborative opportunities for • 4-6 and 7-8 wings • Culture change in a building with younger and older students • More opportunities to be involved in sports and extracurricular activities with smaller classes.
  • 36. 4-8 Grade Alignment Educational Advantages Higher Parent Involvement – More years in the same building – Sustained Relationships – Fewer transitions
  • 37. The Cost Primary schools = $31 million Intermediate schools = $32 million Secondary School = $ 7 million Total= $70 million $45 million reimbursed by the State
  • 38. These are estimated permanent reductions that would assist us with our budget challenges in each year going forward. Cost Savings Area Estimated Annual Cost Savings If Referendum Passes Rent $ 128,007.00 Utilities (Gas, Electric, Water, Sewer, Storm Water) $ 66,232.00 Reduction of Personnel $ 1,019,582.00 Facility and Building Maintenance $ 978,780.00 Property Services $ 28,334.00 Technology Savings-Fiber Lease /Phone Lines $ 10,446.00 Transportation $ 35,730.00 Staff Travel $ 30,000.00 Grand Total $ 2,297,111.00
  • 39. Referendum versus Operating Cost • Referendum is a stand-alone loan fund – Must be for capital improvements only – Not used for operating budget or salaries • Yearly Operating budget is effected only by the savings incurred by improvements – Helps offset the budget challenges we will continue to face due to decreasing funding
  • 40. Fiscal Responsibility 25 20 15 Actual Levy collected 10 1995 Levy adjusted for inflation 5 0 1990 1995 2000 2005 2010 2015
  • 41. 2012-2013 Tax Impact On a $70 Million Dollar Referendum Under Current Funding Aid Formula Estimated Interest at 3.5% Home Value Annual Cost Monthly Cost $75,000* $ 67.50 $5.63 • State reimburses District $45 million or 64% of the bond issue • Beloit tax payers pay only $25 million • Business 46% • Residential 54% *Average home value in the city of Beloit
  • 43. • Schools are one of the most important reasons for business start-ups and expansion • More new employees stay in Beloit • Increased community pride • Local construction jobs • Higher property values • $45 million in outside investment
  • 44. • Chamber of Commerce: ENDORSED • BEDCOR: ENDORSED • City Council: ENDORSED • Outside tourism revenue produced by visiting spectators of large swim meets and tennis tournaments • Improved image to non-Beloiters • Continue trend of Beloit improvements • $45 million in outside investment

Editor's Notes

  1. Welcome. Thank the community for their support of our programs.