2. Large-scale
Landfill Installations
◦ California
◦ Colorado
◦ Florida
◦ Illinois
◦ Indiana
◦ Kansas
◦ Kentucky
◦ Louisiana
◦ Michigan
◦ Missouri
◦ Ohio
◦ Oklahoma
◦ Pennsylvania
◦ Tennessee
State DOT
Approvals
◦ Alabama
◦ Florida
◦ Louisiana
◦ Michigan
◦ Mississippi
◦ Missouri
◦ North Dakota
◦ Ohio
◦ Tennessee
◦ West Virginia
◦ Canada DOT
◦ Tennessee Valley
Authority (TVA)
Federal Bureau of
Abandoned Mines
◦ Kentucky
◦ West Virginia
USDA – NRCS
Projects
◦ California
◦ Florida
◦ Indiana
◦ Nebraska
◦ Ohio
◦ West Virginia
USACE Projects
◦ Indiana
◦ Mississippi
◦ Ohio
◦ Pennsylvania
◦ Utah
◦ West Virginia
Numerous
◦ State DNRs
◦ State DEP
◦ State Fish
and Game
◦ Sewer
Districts
◦ Cities
◦ Counties
Various Approvals
3. Concrete : 5000 psi, 6% Air
Entrained, 3/8 Aggregate.
Interlocking Geogrid: Fornit 30-30
Reinforcing Netting: 5 Pick Action
Back.
Underlayment: Organic or Poylester
Weight per sf: 10 lbs
4. Light duty geogrid backing with a
life expectancy of 36 - 42 months
5000 psi concrete fully embedded into a
high strength polyprolene geogrid,
performance life in excess of 75 years.
16. Large-Scale Channel Erosion Tested
(ASTM D 6460)
• Non-vegetated over sandy loam
• 30% Slope
• Achieved 24+ psf (shear) & 19+
ft./sec (velocity)
• Both are “+” because ½ inch
of soil loss was never
achieved. TRI Environmental
Testing facility maxed out it’s
capabilities without Flexamat
allowing any erosion to take
place!
39. Flexamat was used for a low water crossing. This project was
installed May 2012
USACE Project
40.
41.
42.
43. There is a spring that is constantly flowing
here. Flexamat enables vehicles to cross this
wet area without getting stuck. This photo
was taken in August 2012.
44. Flexamat used to armor area where runoff from the pavement
was causing erosion.
District 1 Maintenance Facility