SlideShare a Scribd company logo
1 of 12
GROUND POWER UNIT (GPU) ANALYSIS



          ARINTA H. WIJAYA
                 H
             -JKTOSGA-




             JULY 2011




                                   1
GPU Analysis                                                  OVERVIEW

     GPU USAGE
     • Fuel Saving by implement FCP
     • APU Life Saving
     • Significant Cost Saving


     ANALYSYS
     • Calculate GPU needed for RON (Night Rest)
     • Calculate GPU needed for Ex-RON (Before Departure)
     • Calculate GPU needed during prolonged transit
                                 gp      g
     • Identify GPU usage peak time and number of GPU needed




2|
GPU Analysis                                                            ANALYSIS

     ASSUMPTION
     • Analysis based on GA and CT’s biweekly schedule
     • Biweekly schedule used for period 01-15 July 2011
     • Analyze for CGK, DPS, UPG, and SUB station


     RON ANALYSIS
     • Analyze based on Arrival Station and Standard Time Arrival
     • The last flight and the next flight should be in different date
     • The interval between those flight > 3 Hours
                                     g
     • GPU usage assumption 2 hours
     • Sample Result




3|
GPU Analysis                                                      ANALYSIS

     BEFORE DEPARTURE ANALYSIS
     • Analyze based on Departure Station and Standard Time Departure
     • GPU usage assumption 2 hours for W/B and 1.5 hours for N/B A/C before STD
     • Sample Result


     TRANSIT ANALYSIS
     • A l
       Analyze based on Arrival St ti and St d d Ti
               b d      A i l Station d Standard Time A i l
                                                      Arrival
     • GPU usage assumption 2 hours for W/B Aircraft
     • Sample Result




4|
GPU Analysis                                                                                                                    RESULT

     CGK STATION
                                   RON CGK                                                                   TRANSIT CGK
                                                                                             7
                  20
                  19                                                                         6
                  18                                                                         5




                                                                                 NO Of A/C
      NO of A/C




                  17                                                                         4
                  16                                                                         3
                  15                                                                         2
                  14
                                                                                             1
                  13
                  12                                                                         0

                       Sat   Sun   Mon    Tue    Wed     Thu         Fri                         Sat   Sun    Mon   Tue    Wed   Thu   Fri

                                          DAY                                                                       DAY

                             BEFORE DEPARTURE CGK
                  24
                  23
                  22
                  21
                                                                                             • Max GPU usage : 23
      NO of A/C




                  20
                  19                                                                         • Time Period of Max GPU Usage :
                  18
                  17
                  16                                                                             05.00 06.00
                                                                                                 05 00 – 06 00 WIB
                  15
                       Sun   Mon    Tue    Wed     Thu         Fri         Sat
                                           DAY



5|
GPU Analysis                                                                                                                     RESULT

     DPS STATION
                                  RON DPS                                                                    TRANSIT DPS
                  6                                                                         4
                  5
                                                                                            3
                  4
      NO of A/C




                                                                                NO of A/C
                  3                                                                         2
                  2
                                                                                            1
                  1
                  0                                                                         0
                      Sat   Sun   Mon    Tue    Wed     Thu         Fri                          Sat   Sun   Mon   Tue     Wed   Thu   Fri
                                         DAY                                                                       DAY

                            BEFORE DEPARTURE DPS
                  5

                  4
                                                                                                • Max GPU usage : 5
      NO of A/C




                  3

                  2                                                                             • Time Period of Max GPU Usage :
                  1
                                                                                                  22.00 23.00
                                                                                                  22 00 – 23 00 WITA
                  0
                      Sun   Mon    Tue    Wed     Thu         Fri         Sat
                                          DAY



6|
GPU Analysis                                                                                                 RESULT

     UPG RESULT
                                  RON UPG                                             BEFORE DEPARTURE UPG
                  4                                                         4

                  3                                                         3




                                                                NO of A/C
      NO of A/C




                  2                                                         2

                  1                                                         1

                  0                                                         0
                      Sat   Sun   Mon   Tue   Wed   Thu   Fri                   Sun   Mon   Tue   Wed   Thu   Fri   Sat
                                        DAY                                                       DAY




      • Max GPU usage : 3
      • Time Period of Max GPU Usage : 22.00 – 23.00 WITA & 05.00 – 06.00 WITA
      • GPU Usage for Transit : 0
               g




7|
GPU Analysis                                                                                                 RESULT

     RESULT SUB
                                  RON SUB                                                    BD SUB
                  6                                                         7
                  5                                                         6
                  4                                                         5




                                                                NO of A/C
      NO of A/C




                                                                            4
                  3
                                                                            3
                  2                                                         2
                  1                                                         1
                  0                                                         0
                      Sat   Sun   Mon   Tue   Wed   Thu   Fri                   Sun   Mon   Tue   Wed   Thu   Fri   Sat
                                        DAY                                                       DAY




                  • Max GPU usage : 6
                  • Time Period of Max GPU Usage : 05.00 – 06.00 WIB
                  • GPU Usage for Transit : 0
                           g
                  • Calculation include Citilink A/C



8|
GPU Analysis           THANK YOU




                THANK
                 H NK
                YOU….




9|
GPU Analysis                                                                           SAMPLE RESULT
                                                 RON CGK JULY 3'rd  
            PK‐GZP
            PK‐GPJ
            PK‐GMQ
            PK‐GMP
            PK‐GMO
            PK‐GMG
            PK‐GME
            PK‐GMD
            PK‐GMC
            PK‐GMA
            PK‐GHX
            PK‐GHW
            PK‐GGR
  A/C REG




            PK‐GGO
            PK‐GGG
            PK‐GGC
            PK‐GGA
            PK‐GFP
            PK GFP
            PK‐GFI
            PK‐GFG
            PK‐GFE
            PK‐GFA
            PK‐GEQ
            PK GEQ
            PK‐GEO
            PK‐GEK
            PK‐GEJ
            PK‐GEI
            PK GEH
            PK‐GEH
            PK‐GEG
            PK‐GEF

                 14:00   15:00   16:00   17:00   18:00   19:00     20:00     21:00   22:00   23:00   00:00   01:00

                                                                 STA ‐ WIB


10 |
GPU Analysis                                                                          SAMPLE RESULT

                                                TRANSIT CGK JULY 6 th
                                                TRANSIT CGK JULY 6'th
                           PK‐GSI

                           PK‐GSH
                           PK GSH

                           PK‐GPL
                      EG




                           PK‐GPI
                           PK GPI
                 A/C RE




                           PK‐GPG

                           PK GPA
                           PK‐GPA

                           PK‐GMQ

                           PK GMD
                           PK‐GMD

                                14:00   15:00   16:00   17:00   18:00   19:00   20:00   21:00   22:00

                                                                 STA ‐ WIB




11 |
GPU Analysis                                            SAMPLE RESULT
                                   BD CGK JULY 6'th
             PK‐GZP
             PK‐GSI
             PK‐GPJ
             PK‐GMO
             PK‐GML
             PK‐GMK
             PK‐GMF
             PK‐GMC
             PK‐GMA
             PK‐GHX
             PK‐GHW
             PK‐GGR
             PK‐GGG
   A/C REG




             PK‐GGD
             PK‐GGA
             PK‐GFP
             PK‐GFM
             PK‐GFK
             PK GFK
             PK‐GFH
             PK‐GFD
             PK‐GFC
             PK‐GFA
             PK‐GEQ
             PK GEQ
             PK‐GEN
             PK‐GEL
             PK‐GEK
             PK‐GEI
             PK GEH
             PK‐GEH
             PK‐GEG
             PK‐GEF

                  03:00   04:00   05:00     06:00     07:00    08:00

                                          STA ‐ WIB


12 |

More Related Content

Recently uploaded

Recently uploaded (20)

WebAssembly is Key to Better LLM Performance
WebAssembly is Key to Better LLM PerformanceWebAssembly is Key to Better LLM Performance
WebAssembly is Key to Better LLM Performance
 
Designing for Hardware Accessibility at Comcast
Designing for Hardware Accessibility at ComcastDesigning for Hardware Accessibility at Comcast
Designing for Hardware Accessibility at Comcast
 
A Business-Centric Approach to Design System Strategy
A Business-Centric Approach to Design System StrategyA Business-Centric Approach to Design System Strategy
A Business-Centric Approach to Design System Strategy
 
ECS 2024 Teams Premium - Pretty Secure
ECS 2024   Teams Premium - Pretty SecureECS 2024   Teams Premium - Pretty Secure
ECS 2024 Teams Premium - Pretty Secure
 
Speed Wins: From Kafka to APIs in Minutes
Speed Wins: From Kafka to APIs in MinutesSpeed Wins: From Kafka to APIs in Minutes
Speed Wins: From Kafka to APIs in Minutes
 
Custom Approval Process: A New Perspective, Pavel Hrbacek & Anindya Halder
Custom Approval Process: A New Perspective, Pavel Hrbacek & Anindya HalderCustom Approval Process: A New Perspective, Pavel Hrbacek & Anindya Halder
Custom Approval Process: A New Perspective, Pavel Hrbacek & Anindya Halder
 
Integrating Telephony Systems with Salesforce: Insights and Considerations, B...
Integrating Telephony Systems with Salesforce: Insights and Considerations, B...Integrating Telephony Systems with Salesforce: Insights and Considerations, B...
Integrating Telephony Systems with Salesforce: Insights and Considerations, B...
 
Simplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdf
Simplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdfSimplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdf
Simplified FDO Manufacturing Flow with TPMs _ Liam at Infineon.pdf
 
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
 
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdfIntroduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
 
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...
 
AI presentation and introduction - Retrieval Augmented Generation RAG 101
AI presentation and introduction - Retrieval Augmented Generation RAG 101AI presentation and introduction - Retrieval Augmented Generation RAG 101
AI presentation and introduction - Retrieval Augmented Generation RAG 101
 
Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...
Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...
Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...
 
How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdf
How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdfHow Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdf
How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdf
 
The Value of Certifying Products for FDO _ Paul at FIDO Alliance.pdf
The Value of Certifying Products for FDO _ Paul at FIDO Alliance.pdfThe Value of Certifying Products for FDO _ Paul at FIDO Alliance.pdf
The Value of Certifying Products for FDO _ Paul at FIDO Alliance.pdf
 
IESVE for Early Stage Design and Planning
IESVE for Early Stage Design and PlanningIESVE for Early Stage Design and Planning
IESVE for Early Stage Design and Planning
 
Where to Learn More About FDO _ Richard at FIDO Alliance.pdf
Where to Learn More About FDO _ Richard at FIDO Alliance.pdfWhere to Learn More About FDO _ Richard at FIDO Alliance.pdf
Where to Learn More About FDO _ Richard at FIDO Alliance.pdf
 
Optimizing NoSQL Performance Through Observability
Optimizing NoSQL Performance Through ObservabilityOptimizing NoSQL Performance Through Observability
Optimizing NoSQL Performance Through Observability
 
TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...
TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...
TEST BANK For, Information Technology Project Management 9th Edition Kathy Sc...
 
Salesforce Adoption – Metrics, Methods, and Motivation, Antone Kom
Salesforce Adoption – Metrics, Methods, and Motivation, Antone KomSalesforce Adoption – Metrics, Methods, and Motivation, Antone Kom
Salesforce Adoption – Metrics, Methods, and Motivation, Antone Kom
 

Featured

Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
Kurio // The Social Media Age(ncy)
 

Featured (20)

Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
 
ChatGPT webinar slides
ChatGPT webinar slidesChatGPT webinar slides
ChatGPT webinar slides
 
More than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike RoutesMore than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike Routes
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
 

GPU Analysis

  • 1. GROUND POWER UNIT (GPU) ANALYSIS ARINTA H. WIJAYA H -JKTOSGA- JULY 2011 1
  • 2. GPU Analysis OVERVIEW GPU USAGE • Fuel Saving by implement FCP • APU Life Saving • Significant Cost Saving ANALYSYS • Calculate GPU needed for RON (Night Rest) • Calculate GPU needed for Ex-RON (Before Departure) • Calculate GPU needed during prolonged transit gp g • Identify GPU usage peak time and number of GPU needed 2|
  • 3. GPU Analysis ANALYSIS ASSUMPTION • Analysis based on GA and CT’s biweekly schedule • Biweekly schedule used for period 01-15 July 2011 • Analyze for CGK, DPS, UPG, and SUB station RON ANALYSIS • Analyze based on Arrival Station and Standard Time Arrival • The last flight and the next flight should be in different date • The interval between those flight > 3 Hours g • GPU usage assumption 2 hours • Sample Result 3|
  • 4. GPU Analysis ANALYSIS BEFORE DEPARTURE ANALYSIS • Analyze based on Departure Station and Standard Time Departure • GPU usage assumption 2 hours for W/B and 1.5 hours for N/B A/C before STD • Sample Result TRANSIT ANALYSIS • A l Analyze based on Arrival St ti and St d d Ti b d A i l Station d Standard Time A i l Arrival • GPU usage assumption 2 hours for W/B Aircraft • Sample Result 4|
  • 5. GPU Analysis RESULT CGK STATION RON CGK TRANSIT CGK 7 20 19 6 18 5 NO Of A/C NO of A/C 17 4 16 3 15 2 14 1 13 12 0 Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri DAY DAY BEFORE DEPARTURE CGK 24 23 22 21 • Max GPU usage : 23 NO of A/C 20 19 • Time Period of Max GPU Usage : 18 17 16 05.00 06.00 05 00 – 06 00 WIB 15 Sun Mon Tue Wed Thu Fri Sat DAY 5|
  • 6. GPU Analysis RESULT DPS STATION RON DPS TRANSIT DPS 6 4 5 3 4 NO of A/C NO of A/C 3 2 2 1 1 0 0 Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri DAY DAY BEFORE DEPARTURE DPS 5 4 • Max GPU usage : 5 NO of A/C 3 2 • Time Period of Max GPU Usage : 1 22.00 23.00 22 00 – 23 00 WITA 0 Sun Mon Tue Wed Thu Fri Sat DAY 6|
  • 7. GPU Analysis RESULT UPG RESULT RON UPG BEFORE DEPARTURE UPG 4 4 3 3 NO of A/C NO of A/C 2 2 1 1 0 0 Sat Sun Mon Tue Wed Thu Fri Sun Mon Tue Wed Thu Fri Sat DAY DAY • Max GPU usage : 3 • Time Period of Max GPU Usage : 22.00 – 23.00 WITA & 05.00 – 06.00 WITA • GPU Usage for Transit : 0 g 7|
  • 8. GPU Analysis RESULT RESULT SUB RON SUB BD SUB 6 7 5 6 4 5 NO of A/C NO of A/C 4 3 3 2 2 1 1 0 0 Sat Sun Mon Tue Wed Thu Fri Sun Mon Tue Wed Thu Fri Sat DAY DAY • Max GPU usage : 6 • Time Period of Max GPU Usage : 05.00 – 06.00 WIB • GPU Usage for Transit : 0 g • Calculation include Citilink A/C 8|
  • 9. GPU Analysis THANK YOU THANK H NK YOU…. 9|
  • 10. GPU Analysis SAMPLE RESULT RON CGK JULY 3'rd   PK‐GZP PK‐GPJ PK‐GMQ PK‐GMP PK‐GMO PK‐GMG PK‐GME PK‐GMD PK‐GMC PK‐GMA PK‐GHX PK‐GHW PK‐GGR A/C REG PK‐GGO PK‐GGG PK‐GGC PK‐GGA PK‐GFP PK GFP PK‐GFI PK‐GFG PK‐GFE PK‐GFA PK‐GEQ PK GEQ PK‐GEO PK‐GEK PK‐GEJ PK‐GEI PK GEH PK‐GEH PK‐GEG PK‐GEF 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 00:00 01:00 STA ‐ WIB 10 |
  • 11. GPU Analysis SAMPLE RESULT TRANSIT CGK JULY 6 th TRANSIT CGK JULY 6'th PK‐GSI PK‐GSH PK GSH PK‐GPL EG PK‐GPI PK GPI A/C RE PK‐GPG PK GPA PK‐GPA PK‐GMQ PK GMD PK‐GMD 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 STA ‐ WIB 11 |
  • 12. GPU Analysis SAMPLE RESULT BD CGK JULY 6'th PK‐GZP PK‐GSI PK‐GPJ PK‐GMO PK‐GML PK‐GMK PK‐GMF PK‐GMC PK‐GMA PK‐GHX PK‐GHW PK‐GGR PK‐GGG A/C REG PK‐GGD PK‐GGA PK‐GFP PK‐GFM PK‐GFK PK GFK PK‐GFH PK‐GFD PK‐GFC PK‐GFA PK‐GEQ PK GEQ PK‐GEN PK‐GEL PK‐GEK PK‐GEI PK GEH PK‐GEH PK‐GEG PK‐GEF 03:00 04:00 05:00 06:00 07:00 08:00 STA ‐ WIB 12 |