Ala Hasan Alsaheb
B.Eng , MBA , PMP®, PMI-RMP®, PMI-SP®, PMOC®, EVM,
OSHA30®
Email: alsaheb@outlook.com
Mobile: 00966-530370115
Riyadh, Saudi Arabia
Qualifications
Academic Degrees
2004-2009 Bachelor of Mechatronics Engineering(B.Eng)
2009- 2012 Master of Business Administration(MBA)
Certificates
March 2015 Scheduling Professional (PMI-SP®), PMI-SP
ID: 1795474
January 2015 Earned Value Management (EVM) Certificate,
Foundation Level, Certificate Number: 02972098-
01-T6AT
December 2014 Occupational Safety and Health Certification
(OSHA30®)
November 2014 Risk Management Professional (PMI-RMP®)
PMI-RMP ID: 1765051
August 2014 Project Management Office Certified (PMOC®)
PMOC- ID: 14-0802E1-010077
September 2012 Project Management Professional (PMP®)
PMP® ID: 1535672
June 2009 Microprocessor for Industry (PIC) Certification
August 2005 International Enterprise Development Program
" Empretec" Certification
Associations
Palestinian Association of Engineers, Palestine
Jordanian Association of Engineers, Jordan
Saudi Council of Engineers, Kingdom of Saudi Arabia
Project Management Institute, USA
Occupational Safety and Health Association, USA
APMG-International, UK
Additional Skills
Microsoft office Package, AutoCad, Catia, Ansys, Matlab, Spss, PmWeb, Primavera,
Pertmaster
Languages
Arabic
English
French
Professional Experience
May 2013-till Date Project Management Office(PMO) Coordinator at AlFouzan
Trading and General Construction Company
Working as a PMO Coordinator for 7 major health care projects at different locations
in Saudi Arabia and tasked with the following duties:
 Providing support to three medical cities and four hospitals projects.
 Timely distribution of Information to related Stakeholders.
 Consolidation and analysis of the data, generating reports, updating cycle of work
plans, Projects Tracking.
 Conducting Meetings with Consultants to follow up with Technical Issues, Progress
Issues, Safety Issues and Quality Issues.
 Following Up with Payments, Logistic, Quality, and Safety issues.
 Archive project experience and reusable data to improve project management
methods.
 Apply project management processes and best practices of project management
based on PMI standard.
 Maximize the use of project management methodologies and processes.
 Assists in Schedule model management to ensure that all applicable Project
Management Process Groups and Knowledge Areas are properly integrated within
the overall schedule model.
 Tracking the progress of the project, collecting actuals, measuring the performance
against thresholds to provide an objective measurement of what has been achieved
on a project in relation to cost, scope and timescales, and adequate maintenance of
the schedule.
 Ensure all project related documents and data are organized properly and easy to
access.
 Ensure that Program Manager/Project Managers adhere to information gathering
and reporting requirements set by the PMO, whether related to internal or external
stakeholders on daily, weekly and monthly basis.
 Monitor and control Project deliverable items.
 Risk Identification as per PMI Standards and Methodologies, Conducting required
meetings, communicating with risk owners, coordinating with project control to
apply Qualitative and Quantitative risk analysis and devising Risk Response
Strategies after consulting related stakeholders.
 Providing Updated Risk information to project control such as Risk Status, Action
Timing, Risk Response strategies and Risk Analysis to be integrated in weekly,
Biweekly, Monthly and Executive reports.
 Reducing Risk Exposure by applying proper Risk Management Methodologies and
strategies.
 Entering updates regarding risks to the Risk Register, Continuous monitoring for
emerging risks, and directly communicating with risk owners and projects teams.
 Initiating and following up with vatiation orders and extensions of time.
 Provide standardized reporting on projects health, projects progress, metrics that
measure PMO effectiveness, KPIs and issues & risks management.
The PMO was established to manage and support the following projects:
 King Faisal Medical City.
 Prince Mohammad Medical City.
 King Saud Medical City.
 Al Iman Hopsital.
 Prince Salman Hopsital.
 Jeddah Hospital.
 Jizan Hospital.
The client is the Ministry of Health (MOH) and Hill International as the client
representative.
Jan 2009 – Apr 2013 Projects Coordinator at Alsaheb Al Tamimi for Trading
Industrial Company
Worked as a project Coordinator for Various residential and commercial projects at
different locations in West Bank-Palestine and tasked with the following duties:
 Application of Knowledge, tools and techniques to ensure proper project
management.
 Integration of different project management aspects to complete projects as per
client requirement.
 Following up with technical and shopdrawings issues to assure that work on site not
to be affected.
 Documentation to and from the project and PMO are up to date and maintained in
the proper filing structure and systems.
 Coordinating with manufacturing department to ensure delivering customers'
requirements.
 Coordinating the shipping of containers with the Customer, shipping and trucking
companies.
 Tracking transactions, initiating invoices, Confirming purchase orders.
 Information processing and management is done in a timely manner, and
information is up to date, accurate, and reflects actual status of the projects.
 Tracking the project’s progress, assuring adequate development and maintenance
of the schedules.
 Performance measurement and analysis to create valid reports reflecting the
project’s ststus.
 Following up and collecting payments and resolving related problems and
communication with client and financial department.
 Develop and maintain healthy relationships with stakeholders.
 Analyzing Risks and developing risk management strategis and relevant reports.
 Measuring the project’s performance, providing earned value rports and weekly and
monthly reports.
 Manage department and projects communication processes to ensure that all
processes are applied and followed.
 Risk management, including risk assessment strategy and policies for the overall
organization.
 manage department and projects budget, projects integration, department and
projects scope.
 Working in partnership with clients to help meet a satisfactory level of customer
satisfaction.
Projects:
 Various Residential and Commercial buildings at West Bank.
 Supply/Delivery of construction materials (Stone, Marble) to projects.

More Related Content

What's hot (18)

falah.C.V
falah.C.Vfalah.C.V
falah.C.V
 
PERSONAL CAPACITY STATEMENT
PERSONAL CAPACITY STATEMENTPERSONAL CAPACITY STATEMENT
PERSONAL CAPACITY STATEMENT
 
Pyramid Healthcare Brochure
Pyramid Healthcare BrochurePyramid Healthcare Brochure
Pyramid Healthcare Brochure
 
CVver2.0
CVver2.0CVver2.0
CVver2.0
 
Michael Spangler_Resume 2016
Michael Spangler_Resume 2016Michael Spangler_Resume 2016
Michael Spangler_Resume 2016
 
Risk Management Assignment
Risk Management AssignmentRisk Management Assignment
Risk Management Assignment
 
CV Simon Shaw
CV Simon ShawCV Simon Shaw
CV Simon Shaw
 
043 Integrating Risk Management
043 Integrating Risk Management043 Integrating Risk Management
043 Integrating Risk Management
 
Resume Omar
Resume Omar  Resume Omar
Resume Omar
 
Rodney washington-1st-draft-resume2016 aw
Rodney washington-1st-draft-resume2016 awRodney washington-1st-draft-resume2016 aw
Rodney washington-1st-draft-resume2016 aw
 
SuneelCoverLetter-Manager
SuneelCoverLetter-ManagerSuneelCoverLetter-Manager
SuneelCoverLetter-Manager
 
michael-ganley-resume (1)u
michael-ganley-resume (1)umichael-ganley-resume (1)u
michael-ganley-resume (1)u
 
RESUME-MICHAELNISENSON_PMP -As of October 2015
RESUME-MICHAELNISENSON_PMP -As of October 2015RESUME-MICHAELNISENSON_PMP -As of October 2015
RESUME-MICHAELNISENSON_PMP -As of October 2015
 
Resume
ResumeResume
Resume
 
Risk management
Risk managementRisk management
Risk management
 
Risk management poster
Risk management posterRisk management poster
Risk management poster
 
Risk management
Risk managementRisk management
Risk management
 
Estimations
EstimationsEstimations
Estimations
 

Viewers also liked

Passion impacts cognition
Passion impacts cognitionPassion impacts cognition
Passion impacts cognitionPeter Skillen
 
Photos Philippe
Photos PhilippePhotos Philippe
Photos Philippechawan
 
Running a webinar - best practices
Running a webinar - best practicesRunning a webinar - best practices
Running a webinar - best practicesPeter Skillen
 
Integrated Marketing - Overman
Integrated Marketing - OvermanIntegrated Marketing - Overman
Integrated Marketing - OvermanEric Overman
 
Radiolinfvvi
RadiolinfvviRadiolinfvvi
RadiolinfvviOspedale
 
Riesgos GeolóGicos Internos
Riesgos GeolóGicos InternosRiesgos GeolóGicos Internos
Riesgos GeolóGicos Internosguesta908337f
 
Quotations about questioning
Quotations about questioningQuotations about questioning
Quotations about questioningPeter Skillen
 
PBL for PLP ConnectU
PBL for PLP ConnectUPBL for PLP ConnectU
PBL for PLP ConnectUPeter Skillen
 
Using power point for elearning - an intro
Using power point for elearning - an introUsing power point for elearning - an intro
Using power point for elearning - an introPeter Skillen
 
Online Free Bets
Online Free BetsOnline Free Bets
Online Free Betsjimchin
 
Reflective Thinking with Web 2.0 Tools
Reflective Thinking with Web 2.0 ToolsReflective Thinking with Web 2.0 Tools
Reflective Thinking with Web 2.0 ToolsPeter Skillen
 
Organisation maintenance 3
Organisation maintenance 3Organisation maintenance 3
Organisation maintenance 3ONCF
 

Viewers also liked (16)

Gina B Resume
Gina B ResumeGina B Resume
Gina B Resume
 
BRIDEE
BRIDEE BRIDEE
BRIDEE
 
Passion impacts cognition
Passion impacts cognitionPassion impacts cognition
Passion impacts cognition
 
Photos Philippe
Photos PhilippePhotos Philippe
Photos Philippe
 
Running a webinar - best practices
Running a webinar - best practicesRunning a webinar - best practices
Running a webinar - best practices
 
Objeto Del Aprendizaje
Objeto Del AprendizajeObjeto Del Aprendizaje
Objeto Del Aprendizaje
 
Jz show
Jz showJz show
Jz show
 
Integrated Marketing - Overman
Integrated Marketing - OvermanIntegrated Marketing - Overman
Integrated Marketing - Overman
 
Radiolinfvvi
RadiolinfvviRadiolinfvvi
Radiolinfvvi
 
Riesgos GeolóGicos Internos
Riesgos GeolóGicos InternosRiesgos GeolóGicos Internos
Riesgos GeolóGicos Internos
 
Quotations about questioning
Quotations about questioningQuotations about questioning
Quotations about questioning
 
PBL for PLP ConnectU
PBL for PLP ConnectUPBL for PLP ConnectU
PBL for PLP ConnectU
 
Using power point for elearning - an intro
Using power point for elearning - an introUsing power point for elearning - an intro
Using power point for elearning - an intro
 
Online Free Bets
Online Free BetsOnline Free Bets
Online Free Bets
 
Reflective Thinking with Web 2.0 Tools
Reflective Thinking with Web 2.0 ToolsReflective Thinking with Web 2.0 Tools
Reflective Thinking with Web 2.0 Tools
 
Organisation maintenance 3
Organisation maintenance 3Organisation maintenance 3
Organisation maintenance 3
 

Similar to Ala Hasan Alsaheb

Similar to Ala Hasan Alsaheb (20)

Michelle Andree, PMP, SSGBC - Senior Project Manager Resume 120114
Michelle Andree, PMP, SSGBC - Senior Project Manager Resume 120114Michelle Andree, PMP, SSGBC - Senior Project Manager Resume 120114
Michelle Andree, PMP, SSGBC - Senior Project Manager Resume 120114
 
Resume - Apeksha Mehta
Resume - Apeksha MehtaResume - Apeksha Mehta
Resume - Apeksha Mehta
 
Asma resume strategy business solutions final
Asma resume strategy business solutions finalAsma resume strategy business solutions final
Asma resume strategy business solutions final
 
Chandler, M - RM Resume
Chandler, M - RM ResumeChandler, M - RM Resume
Chandler, M - RM Resume
 
Greg Robinson resume
Greg Robinson resumeGreg Robinson resume
Greg Robinson resume
 
Vinay_Resume
Vinay_ResumeVinay_Resume
Vinay_Resume
 
CV DAVID EDWARD FISHER
CV DAVID EDWARD FISHERCV DAVID EDWARD FISHER
CV DAVID EDWARD FISHER
 
Layo BA c.v.
Layo BA c.v.Layo BA c.v.
Layo BA c.v.
 
CV PHILLIS SKONTOS_ Jun_2016
CV PHILLIS SKONTOS_ Jun_2016CV PHILLIS SKONTOS_ Jun_2016
CV PHILLIS SKONTOS_ Jun_2016
 
Neetu lead pmo cv
Neetu lead pmo cvNeetu lead pmo cv
Neetu lead pmo cv
 
Lindsey R. Whitney-2015.1.2.3
Lindsey R. Whitney-2015.1.2.3Lindsey R. Whitney-2015.1.2.3
Lindsey R. Whitney-2015.1.2.3
 
REsume - Janine Strydom
REsume - Janine StrydomREsume - Janine Strydom
REsume - Janine Strydom
 
REsume - Janine Strydom
REsume - Janine StrydomREsume - Janine Strydom
REsume - Janine Strydom
 
Badari garapati resume
Badari garapati resumeBadari garapati resume
Badari garapati resume
 
MDacey_Bus Exp
MDacey_Bus ExpMDacey_Bus Exp
MDacey_Bus Exp
 
CV_AldoObregon_12282016
CV_AldoObregon_12282016CV_AldoObregon_12282016
CV_AldoObregon_12282016
 
SSCG Project Management Services
SSCG Project Management ServicesSSCG Project Management Services
SSCG Project Management Services
 
Resume -pd 241020106 (2)
Resume -pd 241020106 (2)Resume -pd 241020106 (2)
Resume -pd 241020106 (2)
 
AnilSethResume
AnilSethResumeAnilSethResume
AnilSethResume
 
BF CV - 18th Nov16
BF CV - 18th Nov16BF CV - 18th Nov16
BF CV - 18th Nov16
 

Ala Hasan Alsaheb

  • 1. Ala Hasan Alsaheb B.Eng , MBA , PMP®, PMI-RMP®, PMI-SP®, PMOC®, EVM, OSHA30® Email: alsaheb@outlook.com Mobile: 00966-530370115 Riyadh, Saudi Arabia Qualifications Academic Degrees 2004-2009 Bachelor of Mechatronics Engineering(B.Eng) 2009- 2012 Master of Business Administration(MBA) Certificates March 2015 Scheduling Professional (PMI-SP®), PMI-SP ID: 1795474 January 2015 Earned Value Management (EVM) Certificate, Foundation Level, Certificate Number: 02972098- 01-T6AT December 2014 Occupational Safety and Health Certification (OSHA30®) November 2014 Risk Management Professional (PMI-RMP®) PMI-RMP ID: 1765051 August 2014 Project Management Office Certified (PMOC®) PMOC- ID: 14-0802E1-010077 September 2012 Project Management Professional (PMP®) PMP® ID: 1535672 June 2009 Microprocessor for Industry (PIC) Certification August 2005 International Enterprise Development Program " Empretec" Certification Associations Palestinian Association of Engineers, Palestine Jordanian Association of Engineers, Jordan Saudi Council of Engineers, Kingdom of Saudi Arabia Project Management Institute, USA Occupational Safety and Health Association, USA APMG-International, UK
  • 2. Additional Skills Microsoft office Package, AutoCad, Catia, Ansys, Matlab, Spss, PmWeb, Primavera, Pertmaster Languages Arabic English French Professional Experience May 2013-till Date Project Management Office(PMO) Coordinator at AlFouzan Trading and General Construction Company Working as a PMO Coordinator for 7 major health care projects at different locations in Saudi Arabia and tasked with the following duties:  Providing support to three medical cities and four hospitals projects.  Timely distribution of Information to related Stakeholders.  Consolidation and analysis of the data, generating reports, updating cycle of work plans, Projects Tracking.  Conducting Meetings with Consultants to follow up with Technical Issues, Progress Issues, Safety Issues and Quality Issues.  Following Up with Payments, Logistic, Quality, and Safety issues.  Archive project experience and reusable data to improve project management methods.  Apply project management processes and best practices of project management based on PMI standard.  Maximize the use of project management methodologies and processes.  Assists in Schedule model management to ensure that all applicable Project Management Process Groups and Knowledge Areas are properly integrated within the overall schedule model.  Tracking the progress of the project, collecting actuals, measuring the performance against thresholds to provide an objective measurement of what has been achieved on a project in relation to cost, scope and timescales, and adequate maintenance of the schedule.  Ensure all project related documents and data are organized properly and easy to access.  Ensure that Program Manager/Project Managers adhere to information gathering and reporting requirements set by the PMO, whether related to internal or external stakeholders on daily, weekly and monthly basis.
  • 3.  Monitor and control Project deliverable items.  Risk Identification as per PMI Standards and Methodologies, Conducting required meetings, communicating with risk owners, coordinating with project control to apply Qualitative and Quantitative risk analysis and devising Risk Response Strategies after consulting related stakeholders.  Providing Updated Risk information to project control such as Risk Status, Action Timing, Risk Response strategies and Risk Analysis to be integrated in weekly, Biweekly, Monthly and Executive reports.  Reducing Risk Exposure by applying proper Risk Management Methodologies and strategies.  Entering updates regarding risks to the Risk Register, Continuous monitoring for emerging risks, and directly communicating with risk owners and projects teams.  Initiating and following up with vatiation orders and extensions of time.  Provide standardized reporting on projects health, projects progress, metrics that measure PMO effectiveness, KPIs and issues & risks management. The PMO was established to manage and support the following projects:  King Faisal Medical City.  Prince Mohammad Medical City.  King Saud Medical City.  Al Iman Hopsital.  Prince Salman Hopsital.  Jeddah Hospital.  Jizan Hospital. The client is the Ministry of Health (MOH) and Hill International as the client representative. Jan 2009 – Apr 2013 Projects Coordinator at Alsaheb Al Tamimi for Trading Industrial Company Worked as a project Coordinator for Various residential and commercial projects at different locations in West Bank-Palestine and tasked with the following duties:  Application of Knowledge, tools and techniques to ensure proper project management.  Integration of different project management aspects to complete projects as per client requirement.  Following up with technical and shopdrawings issues to assure that work on site not to be affected.
  • 4.  Documentation to and from the project and PMO are up to date and maintained in the proper filing structure and systems.  Coordinating with manufacturing department to ensure delivering customers' requirements.  Coordinating the shipping of containers with the Customer, shipping and trucking companies.  Tracking transactions, initiating invoices, Confirming purchase orders.  Information processing and management is done in a timely manner, and information is up to date, accurate, and reflects actual status of the projects.  Tracking the project’s progress, assuring adequate development and maintenance of the schedules.  Performance measurement and analysis to create valid reports reflecting the project’s ststus.  Following up and collecting payments and resolving related problems and communication with client and financial department.  Develop and maintain healthy relationships with stakeholders.  Analyzing Risks and developing risk management strategis and relevant reports.  Measuring the project’s performance, providing earned value rports and weekly and monthly reports.  Manage department and projects communication processes to ensure that all processes are applied and followed.  Risk management, including risk assessment strategy and policies for the overall organization.  manage department and projects budget, projects integration, department and projects scope.  Working in partnership with clients to help meet a satisfactory level of customer satisfaction. Projects:  Various Residential and Commercial buildings at West Bank.  Supply/Delivery of construction materials (Stone, Marble) to projects.