The document provides information about the 765/400/220kV Fatehpur Substation located in Uttar Pradesh. Key details include:
- The substation has 50 bays total with 13 220kV bays, 26 400kV bays, and 11 765kV bays.
- There are 10 transformers and 20 reactors installed, with a total transformation capacity of 4130MVA.
- The substation is responsible for 1150.12km of transmission lines across 28 lines with 3045 total towers.
- Major ongoing work includes the construction of residential quarters and two new 220kV line bays.
2. LOCATION
1. Situated on Fatehpur-Lucknow National Highway (NH-232).
2. 2.5 KM from Delhi-Kolkata Highway NH-29.
3. 120KM from Prayagraj.
4. 120KM from Lucknow.
5. 80KM from Kanpur.
LAND ACQUIRED
1. Total Land Acquired – 45.6082 Ha
4. (765/400/220KV Fatehpur Substation)
Brief Description about Substation & Transmission Lines
Substation:-
765/400/220KV Fatehpur Substation is one of the UHV Substation of POWERGRID NR-III having 06
nos. 220 KV Transmission line, 10 nos. 400 KV Transmission Line and 04 nos. 765 KV Transmission
Line. In addition to this Fatehpur Substation having 13 nos. 220KV Bays,26 nos. 400KV Bays and 11
nos. 765KV Bays (Total=50 Bays).
Fatehpur Substation is in operation since Dec 2011.
Total 32 nos. oil filled equipment's(Transformers/Reactors) at Fatehpur Substation in which 30 nos. are
under charged condition and 02 nos. are kept as cold spare.
400 KV ICT = 03 nos. (02 nos.315 MVA Capacity and 1 no. 500 MVA Capacity)
765 kV ICT = 06 nos. + 01 Spare (500 MVA Capacity each)
400 KV Bus Reactor = 02 nos. (125 MVAR Capacity each)
400 KV Line Reactor = 01 no. (80 MVAR Capacity)
765 kV ICT = 06 nos. + 01 Spare (500 MVA Capacity each)
765 KV Bus Reactor = 03 nos. + 01 Spare (110 MVAR Capacity each)
765 KV Line Reactor =12 nos. + 01 Spare (110 MVAR Capacity each)
765 KV Cold Spare ICT = 01 no. 500 MVA Capacity (M/s GE Make)
400 KV Cold Spare Reactor = 01 no. 125 MVAR Capacity (M/s TBEA Make)
Transformation Capacity=4130MVA
5. 765/400/220kV Substation, Fatehpur, NR-3
O&M
765kV 400kV 220 kV Total
Number of Transformers 07 03 00 10
Number of Reactors 17 03 00 20
Number of Circuit Breakers 13 26 13 52
Number of CTs 33 81 39 153
Number of CVTs 18 36 30 84
Number of Isolators 90 81 49 220
Number of LAs 36 58 33 127
Number of Lines 04 10 06 20
Number of Bays 12 26 13 51
Details of O&M Assets
6. Details of TL Spare in Store Area :
• Fatehpur store is designated as central store for TL tower storage & its accessories .
• Storage of 5800 number polymer insulator of 120 KN , 210KN & 260KN.
• Presently total appx 3000MT tower parts of different type tower stored at Fatehpur .
Spare Towers for 765 KV S/C Delta Transmission Line under NR3 as on 15.06.20
Sl. No. Type of Tower
Fatehpur Incomplete
A A-Suspension
1 Stub & cleats 9 1
2 Basic Body 12
3 +0 12
4 +3
5 +6
6 +9 2
B B-Tension
1 Stub & cleats 1
2 Basic Body
3 +0
4 +3 1
5 +6 1
6 +9 1
C C-Tension
1 Stub & cleats 3
2 Basic Body 1
3 +0 1
4 +3 1
5 +6 1
6 +9
4 D-Tension
D Stub & cleats 2
1 Basic Body 3
2 +0 3
3 +3 1
4 +6 1
5 +9 1
6 +18 1
7 +25
8 D+18/D+25 stub & cleats
Horizontal Spare Towers for 765 KV S/C Transmission Line under NR-III as on 15.02.20
Sl. No. Type of Tower
Availaibility
Fatehpur
A SA-Suspension
1 Stub & cleats 17
2 Basic Body 23
3 +0 22
4 +3 2
5 +6 2
6 +9 2
B SB-Tension
1 Stub & cleats 3
2 Basic Body 6
3 +0 6
4 +6 2
5 +9 2
C SD-Tension
1 Stub & cleats 1
2 Basic Body 2
3 +0 2
4 +3 2
5 +6 1
6 +9 1
D SE-Tension
1 Stub & cleats 1
2 Basic Body 10
3 +0 10
4 +3 2
5 +6 2
6 +9 2
7 +18 2
8 +25 2
9
E+18/+25 stub & cleats
2
Spare towers for 400 KV D/C Quad Moose Line as on 30.05.20
Sl. No. Type of Tower Availability
FATEHPUR
A DA - Suspension towers
1 Stub & cleats
2 Basic Body
3 + 0
4 + 3 1
5 + 6 1
6 + 9 1
7 + 18 1
8 + 25
9 +18/25 with stub and cleats
B DB - Tension towers
1 Stub & cleats
2 Basic Body 1
3 + 0 1
4 + 3 1
5 + 6
6 + 9 1
7 + 18
8 + 25
9 +18 with stub and cleats
C DC - Tension towers
1 Stub & cleats 1
2 Basic Body 1
3 + 0 1
4 + 3 1
5 + 6 1
6 + 9 1
7 + 18
8 + 25
9 +18 with stub and cleats
D DD - Tension towers
1 Stub & cleats
2 Basic Body
3 + 0
4 + 3 1
5 + 6 1
6 + 9 1
7 + 18 1
8 + 25 1
9 +18/25 with stub and cleats
7. Tower diverted from Fatehpur store
S. No. Description Remarks
1 D Type Tower 1 Agra
Tower parts were diverted at the time of break down of different
765 KV Line at Agra in April, May-2018
2 D Type Tower 2 Agra
3 D Type Tower 3 Agra
4 Delta A Tower1 Agra/K frame
5 Delta A Tower2 Agra/K frame
6 Delta A Tower3 Agra/K frame
7 Delta A Tower4 Agra/K frame
8 Delta A Tower5 Agra/K frame
9 Delta A Tower6 Agra/K frame
10 Delta B complete tower 01 Nos.
11 Delta A complete tower 15 number
12 Delta C Tower Agra
Tower parts were diverted at the time of break down of Line and as
per request in May-2018
13 765 KV Delta A Tower 1 Prayagraj
Tower parts were diverted at the time of break down of 765 KV
Varanasi- Fatehpur Line-1in May-2020
14 765 KV Delta A Tower 2 Prayagraj
15 765 KV Delta A Tower 3 Prayagraj
16 765 KV Delta A Tower 4 Prayagraj
17 765 KV Delta A Tower 5 Prayagraj
18 765 KV Delta A Tower 6 Prayagraj
19 Delta A Tower7 Prayagraj
20 Delta A Tower8 Prayagraj
21 Delta A Tower9 Prayagraj
22 BSQD 400 KV Tower-02 nos. Agra complete Tower parts were diverted at the time of break down of 400 KV
Agra- Sikar Line and as per request June-2020
23 BSQD 400 KV Tower-2 Agra
24 Delta D tower 01 number
Tower parts were diverted to Jalaun in Bundhelkhand expressway
May-2021
8. Ongoing CC/RHQ awarded Work Under
Construction
• Construction of 02 nos. 220 KV Line Bay (For Northern Central Railway
under consultancy project). NOA dt.25.06.2021 Supply: Rs.4.05 and
Services: 1.07 Cr. Completion schedule: 24.06.2022(12 months).
• Construction of 12 nos. residential quarters (04 nos. C Type ,04 nos.
B2 Type and 04 nos. B3 Type). NOA dt. 10.01.2019. Cost: 5.09 Cr.
Scheduled completion 09 months i.e. Oct 2019. Time extension :
30.09.2021.
9. Sr.
No.
Name of Transmission Line Voltage Level Length of line
(in KM)
Total Number of
Towers in nos.
1 Fatehpur Fatehpur-1 &2 (D/C) 220 KV 6.17 KM 21
2 Fatehpur Kanpur South 220 KV 5.20 KM 23
3 Fatehpur Naubasta 220 KV 5.20 KM 23
4 Unchahar Kanpur -1 &2 (D/C) 220 KV 62.0 KM 181
5 Unchahar Kanpur -3 &4 (D/C) 220 KV 62.0 KM 181
6 Unchahar Fatehpur 1&2 (D/C) 400 KV 53.37 KM 145
7 Fatehpur Allahabad-3 400 KV 86.92 KM 237
8 Fatehpur Kanpur-2 400 KV 43.37 KM 119
9 Fatehpur Singrauli 400 KV 88.45 KM 237
10 Fatehpur Kanpur -1 400 KV 45.32 KM 125
Brief Description about Transmission Lines: Fatehpur TLM looks after
total 1723.53 Circuit KM Transmission line under which total 28 nos. Transmission Line of NR-III
region.
Transmission Line Route KM under Fatehpur TLM Jurisdiction =1150.12KM
Total nos. of Towers under Fatehpur TLM Jurisdiction = 3045 nos.
10. Sr. No. Name of Transmission Line Voltage Level Length of line
(in KM)
Total Number of
Towers
11 Allahabad Kanpur-2 400 KV 74.59 KM 231
12 Allahabad Kanpur-1 & 2 (GIS) (D/C) 400 KV 84.35 KM 227
13 Fatehpur Allahabad 1 & 2 (D/C) 400 KV 68.62 KM 190
14 Fatehpur Mainpuri 1 &2 (D/C) 400 KV 36.92 KM 154
15 Rihand Dadri (HVDC) +/- 500 KV 107.11 KM 273
16 Varanasi-Kanpur 1 & 2 (GIS) (D/C) 765 KV 79.88 KM 212
17 Fatehpur Varanasi 765 KV 63.12 KM 166
18 Fatehpur Sasaram 765 KV 62.84 KM 169
19 Fatehpur Agra-1 765 KV 51.17 KM 133
20 Fatehpur Agra-2 765 KV 63.47 KM 174
11. Major Achievements'
1) Commissioning of 1 X 500MVA 400/220/33kV M/s BHEL make ICT’s and its
associated bays.(Package TR-07)
2) Commissioning of 02 nos. Line Bays constructed for 220kV UPPTCL,
Fatehpur.(Package SS-25)
3) In house replacement of support column of 400kV M/s CG power make Circuit
breaker.(411-52 Y phase)-was replaced after observation of SF6 gas from support
column coupling.
4) Early restoration of 400kv Fatehpur Mainpuri-1 & 2 line after de-capping of insulator
string (Disc Insulator make- BHEL).
5) In House repairing of M/s Ascensor make online DGA device .
6) Successful commissioning of Access Control System in 19 nos. SPR at Fatehpur
Substation.
7) 765/400/220KV Fatehpur Substation has been declared as Prohibited Area
8) Achieving Nil SF6 gas leakage since last 03 Financial year.
9) Won 3rd Prize in Intra Regional Flower show competition.
13. 2 No. Porcelain Insulator String is replaced with 2 Nos. long Rod Polymer Insulator after
porcelain insulator failure in Y Phase at Loc No: 18 in 400 KV Fatehpur-Mainpuri 1 TL
15. Major Targets to be achieved
1) Renovation of defective 591 Toilets in 302 schools built under स्वच्छ विद्यालय
अवियान at Fatehpur district’s 14 nos. blocks - CSR activity.
2) After completion of PID scanning of 400 KV BHEL make disc insulator string’s
the defective one needs to be replaced by CLR insulator on priority basis. These
insulators are installed in LILO portion of 400KV D/C FTP-ALLD Line and 400KV
D/C FTP-MNP Line.
3) With in schedule (i.e.12 months from the date of award) Commissioning of 02
nos. 220kV Line Bays for Northern central railway(NCR) under consultancy
projects.
4) Installation of OPGW in 765kV Kanpur-Varanasi Line #1.
5) Construction of 12 nos. Residential Quarters.
6) Overhauling of 16 nos. 10 year old M/s CG power make Circuit Breakers.
7) Modification in layout of firefighting pipeline to avoid underground
leakage.(765kV ICT & Bus Reactor section).
8) Upgradation of Siemens make PAS SCADA system.
9) Replacement of all 23 nos. obsolete VMS cameras.
16. Critical Issues
Sl
No.
Critical Issues Total area of the
Substation
(HECTRAES)
Mutated Land
(HECTRAES)
Balance area of land
for which Mutation is
pending (HECTRAES)
Present Status
1. Status of Title Deed of
Land
45.6082 43.0988 2.5094 Order for balance land
being pursued by RHQ
HR from Secretary ,Urja
Anubhagh , U.P.
IOM and reply of ADM,
LA, Kanpur/ SDM,
Fatehpur sent to RHQ HR
for the same .
Status of Title Deed of Land:-
NOC from Central Ground Water Authority (CGWA) for Ground Water
Sl No. Critical Issues NOC received (Yes/No) Present Status (if not)
1. NOC from CGWA No Registration has been
Completed and NOC renewal
applied under Form 8 (C) on
portal.
17. 17
Availability of manpower for Substation Maintenance
Sr. no. Name Emp. No. Designation Looking after
1 PANKAJ KUMAR 00968 General Manager Group I/C
2 ATUL KUMAR 02677 Manager S/S Maintenance
3 MANISH KUMAR 03140 Dy. Manager T&C
4 CHANDRSHEKHAR SHARMA 03917 Asst. Manager S/S Maintenance
5 ADITYA RAJ ARTHAN 75016 Jr. Engineer T&C
6 VINAY GUPTA 16799 Jr. Engineer T&C
7 NITISH KUMAR 11837 Jr. Engineer S/S Maintenance
8 SURENDRA KUMAR 75042 Jr. Engineer S/S Maintenance
9 RAJNEESH KUMAR 11548 Technician S/S Maintenance
18. 18
Availability of manpower for Line Maintenance
Sr. no. Name Emp. No. Designation Looking after
1 ARVIND KUMAR PATIL 51302 Chief Manager Line and HR I/C
2 B.B.TIWARI 10810 Chief Manager Line Maintenance
3 BIMLESH KUMAR RENU 03121 Dy. Manager Line, Civil & CSR
4 V.N.SINGH 10692 Jr. Engineer Line Maintenance
5 R.P.SINGH 51154 Jr. Engineer Line Maintenance
6 ABHIJEET VERMA 11527 Jr. Engineer Line Maintenance
7 B.MAJHI 50794 Jr. Engineer Line Maintenance
8 GULAB CHAND 10736 Jr. Engineer Line Maintenance
9 RAMESH CHANDRA 11657 Technician Line Maintenance