1
Prof. Yu. LYAPICHEV (Russia)
Safety problem of the Boguchansk rockfill dam with asphaltic concrete (AC) core
1. Introduction
The safety problem of the 77 m high and 1860 m long Boguchansk rockfill dam
with asphaltic concrete (AC) core is considered. This dam is one of the largest in the
world rockfill dam with AC core (slides 1-4).
Now after 15 years of delay due to financional problems the dam and 3000 MW
hydropower plant are again under construction on the Angara river in Siberia. The
hydropower project is being built as part of a joint agreement between aluminium
company RusAl and electricity provider Unified Energy Systems (UES) of Russia to
create an energy and metals conglomerate, which will also incorporate an aluminium
smelter. Approximately US$1.4B will be invested in the project. At present more than
50% of the hydropower plant and spillway dams and only 10% of rockfill dam have
been constructed (slide 5). The first stage (1620 MW) of the huge Boguchansk
hydropower plant is expected be commissioned in 2010 thus shortening time to
improve the old project solutions, adopted 25 years ago and to solve the main safety
problems of the dam.
2. Main safety problems and construction technology of the liquid type AC core
The main safety problems of the Boguchansk dam are connected with a liquid
(flowable) type (of 11-12% bitumen content) AC core and adjacent coarse transition
zones as well as with the seepage control of the AC core foundation.
On the construction site the liquid hot (1500
C) AC was poured in steel forms of 1
m height and 6 m length which were removed in 2-3 day after decrease of temperature
of poured block down to 450
С. Then around the poured block the transition zones of
crushed stones (up to 200 mm diameter) and even rockfill were placed in 3 m thick
layers, practically, without its compaction (as rollers could easily hurt a weak standing
concrete block) followed by placing of the lateral rockfill zones in 6 m thick layers. Then
again the subsequent cycle was repeated starting with erection of steel forms and
pouring of the next upper block thus heightening of the AC core. During preparation,
transportation and pouring of the liquid asphaltic concrete the segregation of its
aggregates was not excluded as well as the stratification of mix with formation of layers
with excessively high content of bitumen (up to 13-15 %).
It creates the obvious danger of possible squeezing or penetration of bitumen into
the large pores (up to 90 mm) of adjacent coarse transition zones under action of high
lateral pressure from the body weight of core and water pressure during impounding of
reservoir that leads to loss of water tightness of the AC core. The applied technology of
asphaltic concrete core construction possesses a number of significant disadvantages:
cyclicity, excessively high consumption of bitumen and dependence on negative
external temperatures, significant laboriousness and, as consequence, an excessive
slowdown of construction time and rise of construction cost. The maximal monthly
average placement of the AC core was reached in 1996 (for the period 1988-1997) and
amounted only to 450 m3
/month. Hence, expected construction time of a dam would
reach 16 years, that, obviously, unacceptable.
In these conditions advantages are obvious for applying of modern technology of
continuous construction of the compacted AC core in 0,2 m thick layers (with the
bitumen content of 6-6,5 %) and transition zones of crushed stones of 0,5-100 mm
diameters vibro compacted by the special mechanized complex of firms "Strabag"
(Germany) or "Kolo Veidekke" (Norway). In compacted AC core the segregation and
stratification of a mix is impossible and the specific consumption of bitumen and
2
volume of a core is almost twice less than in liquid AC core. The continuous effective
control of quality of placement of AC core and transition zones, i.e. the dam safety is
simultaneously provided.
Unfortunately, during designing of the Boguchansk rockfill dam an available world
experience of designing, construction and operation of rockfill dams with compacted
AC cores was ignored. Authors of Boguchansk dam project were going on the "special"
way, accepted technology of construction of a liquid AC core without its serious
scientific and technological validation and without its technical and economic
comparison with a traditional compacted AC core.
However, the main thing, not low technological or economic effectiveness but
danger of loss of water tightness of liquid AC core, i.e. safety of the dam.
3. FE analyses of stress-strain state of the Boguchansk rockfill dam with
compacted and liquid AC cores with use of different models of materials
To compare the behavior of the liquid and compacted AC core the finite element
(FE) analyses of stress-strain state of the dam were performed.
In these analyses the following models of materials were used: for behavior of
rockfill - hyperbolic model and the modified elastoplastic Cam-Clay model, taking into
account the decrease of shear strength of rockfill with the increase of normal stresses;
for behavior of asphaltic concrete - hyperbolic model and two phase visco-elastoplastic
model in which the liquid phase (bitumen) is simulated by visco-elastic mode of the
Maxwell-Norton type and solid phase (aggregates) - by the Cam-Clay model.
Earlier the FE analyses of two well-known rockfill dams with AC core (58 m high
Gross Dunn dam in Germany and 90 m high Storvatn dam in Norway) were performed
and compared with their natural observation data to validate the numerical models of
NLSTRESS and PLSTRESS programs of the author.
Using the occasion I appreciate greatly the assistance of Honorary ICOLD
President Prof. Kaare Hoeg for delivering me some his valuable publications on some
well-known rockfill dams with compacted AC cores.
The calculated and observed displacements of Gross Dunn and Storvatn dams
by the end of construction and reservoir impounding are in close agreement (slides 7-
8) thus proving the validation of numerical models used in FE analyses of the
Boguchansk dam with liquid and compacted AC core.
The main analysis results of the Boguchansk dam are given on slides 9 -12.
These analyses showed much more favorable and safe stress-strain state in
compacted AC core comparing with the liquid one, thus proving the necessity to modify
the dam design and replace the liquid AC core by the compacted one. The behavior of
a liquid AC core is nearly the same as a puddle clay core in embankment dam with
nearly 100% bitumen stresses and small stresses in aggregates thus creating the
danger of possible penetration of bitumen into large pores of coarse transition zones.
The liquid AC core, unlike the compacted AC core, becomes by the end of
construction unstable (mobile) even with well compacted transition zones. Real
insufficient compaction (the relative density less than 70%) of transition zones affects
greatly on the stress-strain state of liquid AC core which becomes dangerously
unstable during construction. The lateral pressure factor in the core reaches 0.9-0.95
and horizontal tensile and vertical compressive deformations in the core are increased
in 2-3 times comparing to compacted AC core. Settlements and horizontal
displacements in liquid AC core are also increased greatly. The high tensile horizontal
deformations occur in the liquid AC core (core greatly extends in both sides) that
creates danger of its cracking before the reservoir impounding and squeezing of
bitumen and aggregates of AC into large pores of the downstream transition zone. In
3
zones of the increased bitumen content (up to 13-15%) in the liquid AC core the lateral
pressure factor comes nearer to 1.0 and there are uncontrolled peaks of extremely high
horizontal tensile deformations. No self-curing of cracks by excess bitumen can prevent
inevitable loss of water tightness and subsequent intensive seepage through the AC
core and erosion of the downstream dam slope. Vertical and horizontal displacements
of dam and liquid AC core after reservoir filling strongly depend on deformability
(density) of adjacent transition zones. Horizontal deformations of AC core are defined
by type of AC: in a liquid AC core these deformations during construction and after
reservoir filling are always tensile and very high that leads to its discontinuity or
permeability. In a compacted AC core horizontal deformations always compressive that
guarantees its water tightness after reservoir filling and under action of seismic forces.
By the end of construction of the dam with compacted AC core placed on the 14 m high
liquid AC core the latter remains very unstable and tensile (extended in both sides),
that creates danger of its discontinuity or permeability, especially, opening of the joint
with the overlaying compacted AC core before reservoir filling. Insufficient compaction
of transition zones around lower liquid part of AC core results in the deterioration of the
stress-strain state of the overlaying compacted AC core.
For revealing advantages of the two-phase AC model the FE analyses of the
Boguchansk dam with liquid AC (bitumen of 5.5%) and compacted AC (bitumen of 9%)
cores were performed by the author. The received results confirmed the main feature
of behavior of this type of dams: the AC core influences only on displacements of
central zone of the dam including AC core and adjacent transition zones and,
practically, does not influence on displacements of lateral rockfill zones. Stresses in
bitumen and aggregates are very different, that allows to understand strong distinction
in behavior of liquid and compacted AC cores.
For bitumen content of 5.5 % in compacted AC core (slide 12, A) stresses in
bitumen and aggregates are of same order, but in a different state: bitumen with its low
shear strength quickly reaches the state of plastic yielding or flow in the isotropic stress
state. In aggregates, on the contrary, the difference between vertical and horizontal
stresses is significant and the ratio σx/σy=0.,55 does not change, practically, in height of
AC core. For bitumen content of 9 % (slide 12, B) bitumen takes up larger part of
pressure that is caused by its low compressibility. Total principal stresses in compacted
and liquid AC cores are of the same order and vertical stresses are much smaller, than
in the adjacent transition zones, but horizontal stresses are similar. In practically
incompressible bitumen horizontal stresses are very close to vertical stresses.
In both AC cores by the end of construction vertical (compressive) deformations
are close (2.6% in compacted AC core and 2.3 % in liquid one). Horizontal
deformations, on the contrary, are various due to different volumetric compressibility of
two AC. In all liquid AC core these deformations are tensile (in average 1 %), i.e. the
AC core extends due to its high horizontal thrust on the transition zones. In all
compacted AC core, on the contrary, horizontal deformations are close to zero that
corresponds to a condition of stability.
During reservoir filling the AC core is subjected mainly to hydrostatic pressure,
horizontal and shear stresses caused by deformations of central part of dam are
strongly increased. Stress distribution in compacted AC core after reservoir filling is
similar to stress distribution by the end of construction (slide 12, A). Stresses in
bitumen increase on 50 % and remain isotropic while in aggregates the main rise of
horizontal stresses occurs in the base of the compacted AC core.
On the other hand, in the liquid AC core almost all hydrostatic pressure is taken up
by bitumen that leads to isotropic total stresses in it (slide 12, B). However shear
4
stresses in the base of AC core increase enough to cause shear resistance of
aggregates in which deviator of stresses grows very quickly. It can be explained by the
dilatation of aggregates which cannot develop due to bitumen, but at the same time it
causes decrease of mean stress in bitumen and, thus increase of same stress in
aggregates. The stress state in the dam foundation reflects these differences,
especially in the AC core, where, depending on the bitumen contents, the stress state
is deviatoric or isotropic. As to deformations the similar tendency is observed in both
AC cores. After reservoir filling the vertical deformations in both cores nearly have not
changed, but horizontal ones have greatly changed. Horizontal compression of
compacted AC core is increased in its foundation up to 1.8 % and in the liquid AC core
the horizontal tension of 1 % is kept in the upper 2/3 of its height and gradually
changed into small compression (0.8 %) without taking into account the possible
bitumen squeezing into adjacent transition zones.
Stresses in the liquid AC core by the end of reservoir filling are always above the
hydrostatic pressure represented by curve W (slide 12, B). Results of the analysis
strongly depend on the bulk modulus of bitumen and how it changes depending on
degree of the bitumen saturation. In general, results of this analysis correspond to
above mentioned results of similar analyses with use of hyperbolic and modified Cam-
Clay models of the AC core and rockfill materials.
4. Simulating of grouting effect of transition zones around the liquid AC core
Tight grouting of coarse transition zones results in considerable improvement of
the stress-strain state of liquid part of AC core and at the same time in partial
deterioration of the same state of the lower part of the compacted AC core. The
grouted transition zones behave as a rigid block preventing lateral extension of liquid
part of AC core but at the same time induce the increase of vertical stresses or
overhanging of upper part of transition zones (slide 11). There is no experience of
rockfill grouting in the world except grouting of gravels and pebbles in very permeable
foundations of some embankment dams that shows the increase of the deformation
modulus of grouted gravels in 2-2,5 times, that it is not enough for rockfill of transition
zones (minimum in 5-10 times).
Strongly advancing placement of lateral rockfill prisms (with difference of 6 m and
more between top elevations of rockfill and AC core) can lead to a rebound (rising) of
the top part of AC core and transition zones or to possible softening of its materials,
that is inadmissible. This problem demands special investigations after reception of the
necessary geotechnical data of grouted transition zones before the construction of the
major part of the 1-st stage dam.
5. Static and seismic stability of the dam
In the old dam project the seismic aspects were not considered as the dam site
was located in the low seismic region according to the old (1981) seismic map of the
former USSR. At present according to the new (2003) seismic map of the maximum
possible earthquakes in Russia the seismic intensity of the dam site is 8 grades and
the peak ground acceleration is 0,2g.
In analyses of static and seismic stability of dam slopes by program UST
(modified Terzaghi and Bishop methods) the decrease of the inner friction angle φ of
rockfill with the increase of normal pressure was taken in account that allows to design
an optimum and economic dam structure using anti-seismic layer of large stones (rip-
rap) placed on both slopes and zonification of rockfill according its quality (external
zones of solid rockfill and inner zones of weathered rockfill).
Taking into account the important factor of the variable shear strength of rockfill in
the dam zones the minimum safety coefficients of seismic stability of both slopes for
5
flat sliding surfaces were increased on 10-15% comparing to ignoring this factor. On
the contrary, for deep siding surfaces the average safety coefficients of seismic stability
of both slopes were decreased on the same 10-15% comparing to ignoring this factor.
Thus the favorable smoothing of safety coefficients of seismic stability of both slopes
was received (slide 13)
6. Principal remarks on dam design solutions
a) There is no control of a state of the lower (14 m high) part of the liquid AC core
below el. 144.0 due to unusual support of the core on a separate concrete plate instead
of the special arch roof of the control and grouting gallery as adopted in many large
rockfill dams with compacted AC cores (slide 6).
b) Instead of gravelly moraine (slide 6) on the downstream side of the liquid AC
it was necessary to arrange short (15 m high) AC core or trench cut-off wall (slightly
above maximum downstream water level) to eliminate the downstream water
pressure that could permit to control the lower part of AC core. The similar solution is
often accepted in some large rockfill dams with high downstream water levels.
c) As the grouting curtain is designed under the bottom of gallery instead of
supporting plate of AC core, the reservoir pressure will be applied to the bottom of
core plate, that in the absence of water stops in the joint between gallery block and
core plate can lead to a dangerous leakage and seepage through the joint (slide 6).
d) The adjunction of liquid AC core to practically vertical (V/H=20/1) wall of the
adjacent section of spillway concrete dam is designed without control of the contact
between AC core and concrete wall through a control shaft in this wall or other
possible solutions. This uncontrolled contact is also as well as in case of the joint
between separate gallery block and core support plate is a place of possible
uncontrolled leakage and seepage in the liquid AC core of the dam.
7. Principal recommendations
a) To provide safety of the Boguchansk rockfill dam its design should be changed
and its construction should be continued based on the technology of a compacted
asphaltic concrete (AC) core.
b) To prevent lateral extension and discontinuity of the lower liquid part of
compacted AC core and bitumen and aggregates squeezing from the 14 m high part of
liquid AC core, the transition zones around liquid part of AC core should to be grouted
tightly so that the deformation modulus of the grouted zones can be increased not less
than in 10 times.
c) Tight grouting of transition zones should provide the tight contact between lower
liquid part AC core and these zones to prevent contact opening and lateral core
extension. It’s important to prevent the lateral spreading of grouts in transition zones to
provide the tight contact.
d) The final technology of grouting should be based on the test grouting of transition
zones and results of its control.
e) Due to very severe climate of dam site (-50o
C in winter) and very short
construction season (not more than 6 months) the maximum possible bitumen content
(7-7.5 %) with low viscosity of B180 is preferable for compacted AC core of the dam.
This bitumen content also increases the self-healing of possible cracks in the core and
allows lower heating temperatures during AC placement and compaction.
f) The seismic stability of both dam slopes for 1-st (53m high) and 2-nd (77m) stages
of dam construction can be provided only with the intensive vibrating compaction of
rockfill and placement of 10 m thick anti-seismic rip-rap layer on both slopes.
g) Strongly advanced placement of lateral rockfill zones can lead to a rebound of
the top part of AC core and transition zones or to softening their materials, that is
inadmissible
6
(Presentation of Slides)
Slide 1: General schemed lay-out of the Boruchansk HPP (3000 MW)
Slide 2: HPP and spillway dams view (August 2003)
Slide 3: Downstream view of HPP and spillway dams (March 2003)
7
Slide 4: General lay-out of the Boguchansk rockfill dam (height of 77 m, length of
1860 m) with liquid asphaltic concrete (AC) core
ПК 17+30
ПК 17+30
141.000
142.000
30
29
28
27
26
25
24
23
222120
19
17
16
15
14
13
136.75
136.75
136
0.10
0.10
1:1.4
1:1.4
1:1.4
1:1.4
202.000
187.000
172.000
135
135.5
136
Крепление откоса
каменной наброской.
1:1.41:1.4
1:1.4
1:1.4
202.000
187.000
172.000
151.000
136.5
136.5
212.000
212.00012
диаграммы.
Разбивочная ось асфальтобетонной
34
33
214.031
30
135.5
135
136.5
135.5
136.5
136
136
ПК 13+48
Выход на поверхность "слабых"
глинистых песчанников.
Контур развития элювия-песчаники,разрушенные
до глинистого,реже песчано-глинистого состояния.
Портал.
<1:4.21
<1:4
.21
<1:3.7
Ось верховой перемычки.
Портал.
133.5
1:3
1:3
137.5
137
136.5
136
135.5
134.5
135
135
135.5
133.5
140
150
160
170
180
190
200
210
205
215
220
217.5
215
217.5
220
Конец-плотины.
205
210
187.000
200
190
195
180
170
160
150
140
137.5
137
136.5
136
135.5
135
134.5
134
133.5
133
133
133.5
134
134.5
135
135.5
135.5
136
136
135
135
148.000
Ось низовой перемычки.
0.008
0.008
0.06
152.000
0.06
1:1.4
1:1.4
1:3
0.06
Дрена №2
Дрена №1
Контрбанкет
верхнего
бьефа.
Контрбанкет
нижнего
бьефа.
0.06
0.06
151.000
Пригрузка верх-
него откоса.
Крепление откоса каменной
набраской толщиной 2.5 м.
Противоползневые и противо-
фильтрационные меропртятия.
Цементационная
штольня.
кпричалу.
на промбазу.
145.000
152.000
162.000
178.000
179.500
194.500
212.000
202.000
212.000
165.000
161.000
141.000
145.000
141.000
151.000
141.000
149.000
147.000
144.000
79.60
ПК 13+48
ПК 11+74.10
ПК 11+74.10
136
1:3
136
135.5
135
135.5
135.5
Номера секции
бетонной плотины.
Ось временного судо-
ходного шлюза.
Глухая часть
секции 30 - 34.
Напорная грань
плотины.
Крепление откоса каменной
набраской с проливкой. бетоном
1:3
1:3
1:1.4
1:1.4
1:1.6
1:1.6
Ось верховой перемычки.
Границы пачки "слабых" пород Q1 и к2
Ослабленный контакт между
осадочными породами и долеритами.
Проран
Генплан Богучанской грунтовой плотины на реке Ангара.
143.000
Slide 5: Typical sections of the Boguchansk rockfill dam of the 2006 ready state
and the 1st and 2nd stages of construction
8
Slide 6: Foundation part of the Boguchansk liquid AC core
1 - liquid AC core; 2 - grouting gallery; 3 - transition zones of coarse crushed stones (up to
200 mm); 4 - drainage control pipe; 5 - gravelly moraine; 6 - blanket of sandy clay; 7 - gravel;
8 - transition zone of rock muck; 9 - rockfill
9
Slide 7: Comparision of observed and calculated displacements and
deformations in compacted AC core of Gross Dunn dam (Germany)
Vertical normal stresses (t/m
2
) in the dam by the end of construction
20
40
30
60
50
70
0-10 -5 dx,5 10 (cm)dy-15-20-25-30
1
2
3
y(m)
Horizontal (dx) and vertical (dy) displacements in the core height by the construction end:
1, 2 - calculated displacements (dx) and (dy) (cm); 3 - observed displacements (dy) (cm)
10
20
30
40
50
60
0-0.5-1 , eps-y (%)eps-x10.5 1.5 2
1
2
3
растяжение сжатие
Horizontal (eps-x) and vertical (eps-y) deformations (%) in the core height after reservoir filling:
1, 2 - calculated deformations (eps-y) and (eps-x); 3 - observed deformations (eps-x)
20
40
30
60
50
0-10 -5 dx,5 10 (cm)dy-15-20-25-30
1
2
3
-35
Horizontal (dx) and vertical (dy) displacements in the core height after reservoir filling:
1, 2 - calculated displacements (dx) and (dy) (cm); 3 - observed displacements (dy) (cm)
0.00 20.00 40.00 60.00 80.00 100.00 120.00 140.00 160.00 180.00 200.00 220.00
0.00
20.00
40.00
10
Slide 8: Comparision of observed and calculated displacements and
deformations in compacted AC core of Strorvatn dam (Germany)
3- dx, 4- dy: после наполнения ВБ
1- dx, 2- dy: после строительства
(см) по высоте диафрагмы плотины (Сторватн).
Рис. 4-13. Горизонтальные (dx) и вертикальные (dy) перемещения
2
4
1
3
10
50
-60 -50 -40 -30 -20 -10
10
30
20
40
60
80
70
90
y(м)
20 (cm)0 dydx,
Horizontal (dx) and vertical (dy) calculated displacements (cm) in the core height:
1, 2 - (dx) and (dy) by the construction end; 3, 4 - (dx) and (dy) after reservoir filling
(%) по высоте диафрагмы плотины (Сторватн).
1- (eps-x), 2- (eps-y}: после строительства
3- (eps-x), 4- (eps-y): после наполнения ВБ
Рис. 4-14. Горизонтальные (eps-x) и вертикальные (eps-y) деформации
1
eps-x, eps-y (%)
3
2
4
10
20
30
40
60
50
70
90 y(м)
80
-1 -0.5 0 0.5 1 1.5 2
растяжение сжатие
Horizontal (eps-x) and vertical (eps-y) calculated deformations (%) in the core height:
1, 2 - (eps-x) and (eps-y) by the construction end; 3, 4 - (eps-x) and (eps-y) after reservoir filling
0.00 50.00 100.00 150.00 200.00 250.00
0.00
50.00
Рис. 4-18. Изолинии горизонтальных перемещений (т/кв. м) (случай -(С+ВБ))
90.00--
65.00--
Horizontal calculated displacements (m) in the dam after reservoir filling
Observed displacements (scale in m) of the dam by October 1986
11
Slide 9: Calculated displacements and deformations in liquid type AC core
of the Boguchansk rockfill dam (Russia)
Horizontal (dx) and vertical (dy) displacements (cm) in the core height:
1, 2 - (dx), (dy) for well compacted transition zones by the end of construction; 3, 4 - (dx), (dy) for badly
compacted transition zones by the end of construction; 5, 6 - (dx), (dy) for badly compacted transition
zones after reservoir filling
Horizontal (eps-x) and vertical (eps-y) deformations (%) in the core height:
1, 2 - (eps-x), (eps-y) for well compacted transition zones by the end of construction; 3, 4 - (eps-
x), (eps-y) for badly compacted transition zones by the end of construction; 5, 6 - (eps-x), (eps-
y) for badly compacted transition zones after reservoir filling
12
Slide 10: Calculated displacements and deformations in compacted type
AC core of the Boguchansk rockfill dam (Russia)
Horizontal (dx) and vertical (dy) displacements (cm) in the core height:
1, 2 - (dx), (dy) by the end of construction; 3, 4 - (dx), (dy) after reservoir filling
Horizontal (eps-x) and vertical (eps-y) deformations (%) in the core height:
1, 2 - (eps-x), (eps-y) by the end of construction; 3, 4 - (eps-x), (eps-y) after reservoir filling
13
Slide 11: Calculated deformations in compacted type AC core constructed
above liquid AC core of the Boguchansk rockfill dam
Horizontal (eps-x) and vertical (eps-y) deformations (%) in the core height
by the end of construction without grouting of transition zones
Horizontal (eps-x) and vertical (eps-y) deformations (%) in the core height
by the end of construction with grouting of transition zones
14
Slide 12: Calculated stresses and deformations in bitumen and aggregates
of liquid and compacted type AC core of the Boguchansk dam
A Bh/H h/H
11
0.5 0.5
1 1
1 1
2 2
2 2
sigm-y sigm-y sigm-xsigm-x
0 5 10м 1мра
A
B
0 0 -25-25-5 -5-5 -5-10
Рис. 5-7. Горизонтальные x и вертикальные y напряжения (т/кв.м)по
высоте диафрагмы после строительства плотины (1-
напряжения в битуме, 2 - напряжения в заполнителе)
(А) –укатанной АФБ (Б=6%), (В) – литой АФБ (Б=10%)
Рис. 5-8. Полные главные напряжения sigm-1иsigm-3(масштабв МПа)вцентре
плотиныcтроительства.
(А) –укатанной АФБ(Б=6%), (В) –литой АФБ(Б=10%)
Horizontal (sigm-x) and vertical (sigm-y) stresses (МPa) in height of compacted (A) and
liquid (B) AC cores of the dam by the end of construction:
1 – stresses in bitumen; 2 - stresses in aggregates
h/H
0.50.5
1 1
03 eps
eps-xeps-y
eps-y eps-x
eps2 1 -1
сжатие растяжениесжатие растяжение
A B
3 2 1 0 -1
h/H
Vertical (eps-y) and horizontal (eps-x) deformations (%) in height of compacted (A) and
liquid (B) AC core by the end of construction (extreme right lines) and reservoir filling
(extreme left lines)
Vertical (sigm-y) and horizontal (sigm-x) stresses (t/m
2
) in height of compacted (A) and
liquid (B) AC core after reservoir filling:
1 - stresses in bitumen; 2 – stresses in aggregates; q – deviator of stresses; W – hydrostatic pressure
15
Slide 13: Results of static and seismic stability analyses of slopes of the
Boguchansk dam with the constant shear strength of rockfill
φ = 400
16
Slide 14: Results of static and seismic stability analyses of slopes of the
Boguchansk dam with the variable shear strength of rockfill
τ =1.1σ0.87
17
Slide 15:
Proposed typical sections of the 1-st stage construction of the
Boguchansk rockfill dam with compacted AC core
1 – AC core compacted in 20 cm thick layers; 2 – 1.5 m wide transition zone of
crushed rock muck d=0,5-100 mm compacted in 20 cm thick layers; 3 – 2 m wide
transition zone of crushed stone d=5-300 mm compacted in 40 cm thick layers;
4a – dolerite rockfill d=5-600 mm compacted in 100 cm thick layers; 4b – dolerite
rockfill d=5-1000 mm compacted in 200 cm thick layers; 4c – available dolerite
rockfill compacted within zone 4a; 5 – rip-rap protection with dolerite stones
(average diameter 600 mm); 6 – transition zone of dolerite rockfill; 7 –
compacted gravelly moraine; 8 – blanket of compacted sandy clay; 9 – gravelly
sand filter; 10 – additional dumped rockfill

More Related Content

What's hot

CLASSIFICATION OF SOIL
CLASSIFICATION OF SOILCLASSIFICATION OF SOIL
CLASSIFICATION OF SOILkuldeep kumar
 
Fluid mechanic white (cap2.1)
Fluid mechanic   white (cap2.1)Fluid mechanic   white (cap2.1)
Fluid mechanic white (cap2.1)Raul Garcia
 
Numerical Simulation of Pile using PLAXIS
Numerical Simulation of Pile using PLAXISNumerical Simulation of Pile using PLAXIS
Numerical Simulation of Pile using PLAXISDr. Naveen BP
 
Geotechnical Engineering-II [Lec #15 & 16: Schmertmann Method]
Geotechnical Engineering-II [Lec #15 & 16: Schmertmann Method]Geotechnical Engineering-II [Lec #15 & 16: Schmertmann Method]
Geotechnical Engineering-II [Lec #15 & 16: Schmertmann Method]Muhammad Irfan
 
Geotechnical Engineering-II [Lec #0: Course Material]
Geotechnical Engineering-II [Lec #0: Course Material]Geotechnical Engineering-II [Lec #0: Course Material]
Geotechnical Engineering-II [Lec #0: Course Material]Muhammad Irfan
 
Geotechnical Engineering-II [Lec #13: Elastic Settlements]
Geotechnical Engineering-II [Lec #13: Elastic Settlements]Geotechnical Engineering-II [Lec #13: Elastic Settlements]
Geotechnical Engineering-II [Lec #13: Elastic Settlements]Muhammad Irfan
 
Basics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-Agha
Basics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-AghaBasics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-Agha
Basics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-AghaHossam Shafiq II
 
Soil stabilization using plastic bottle strips
Soil stabilization using plastic bottle stripsSoil stabilization using plastic bottle strips
Soil stabilization using plastic bottle stripsTEJASKRIYA PRADHAN
 
Sample problemsstatics
Sample problemsstaticsSample problemsstatics
Sample problemsstaticshazmanyusof
 
Solution manual for mechanics of materials 10th edition hibbeler sample
Solution manual for mechanics of materials 10th edition hibbeler  sampleSolution manual for mechanics of materials 10th edition hibbeler  sample
Solution manual for mechanics of materials 10th edition hibbeler samplezammok
 
Plaxis 2d tutorial manual
Plaxis 2d tutorial manualPlaxis 2d tutorial manual
Plaxis 2d tutorial manualSusie Ye, MA
 
1.3 Soil Phase Relationships.pdf
1.3 Soil Phase Relationships.pdf1.3 Soil Phase Relationships.pdf
1.3 Soil Phase Relationships.pdfJohannaShinana
 
Geotechnical Engineering-I [Lec #9: Atterberg limits]
Geotechnical Engineering-I [Lec #9: Atterberg limits]Geotechnical Engineering-I [Lec #9: Atterberg limits]
Geotechnical Engineering-I [Lec #9: Atterberg limits]Muhammad Irfan
 
Solution Manual for Soil Mechanics Fundamentals – Muni Budhu
Solution Manual for Soil Mechanics Fundamentals – Muni BudhuSolution Manual for Soil Mechanics Fundamentals – Muni Budhu
Solution Manual for Soil Mechanics Fundamentals – Muni BudhuHenningEnoksen
 
Geotechnical Engineering-I [Lec #12: AASHTO Soil Classification]
Geotechnical Engineering-I [Lec #12: AASHTO Soil Classification]Geotechnical Engineering-I [Lec #12: AASHTO Soil Classification]
Geotechnical Engineering-I [Lec #12: AASHTO Soil Classification]Muhammad Irfan
 

What's hot (20)

CLASSIFICATION OF SOIL
CLASSIFICATION OF SOILCLASSIFICATION OF SOIL
CLASSIFICATION OF SOIL
 
Examples on seepage
Examples on seepageExamples on seepage
Examples on seepage
 
Fluid mechanic white (cap2.1)
Fluid mechanic   white (cap2.1)Fluid mechanic   white (cap2.1)
Fluid mechanic white (cap2.1)
 
Numerical Simulation of Pile using PLAXIS
Numerical Simulation of Pile using PLAXISNumerical Simulation of Pile using PLAXIS
Numerical Simulation of Pile using PLAXIS
 
Lateral Earth pressure
Lateral Earth pressureLateral Earth pressure
Lateral Earth pressure
 
Geotechnical Engineering-II [Lec #15 & 16: Schmertmann Method]
Geotechnical Engineering-II [Lec #15 & 16: Schmertmann Method]Geotechnical Engineering-II [Lec #15 & 16: Schmertmann Method]
Geotechnical Engineering-II [Lec #15 & 16: Schmertmann Method]
 
Geotechnical Engineering-II [Lec #0: Course Material]
Geotechnical Engineering-II [Lec #0: Course Material]Geotechnical Engineering-II [Lec #0: Course Material]
Geotechnical Engineering-II [Lec #0: Course Material]
 
Geotechnical Engineering-II [Lec #13: Elastic Settlements]
Geotechnical Engineering-II [Lec #13: Elastic Settlements]Geotechnical Engineering-II [Lec #13: Elastic Settlements]
Geotechnical Engineering-II [Lec #13: Elastic Settlements]
 
Phase relations
Phase relationsPhase relations
Phase relations
 
Vane shear test
Vane shear testVane shear test
Vane shear test
 
Basics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-Agha
Basics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-AghaBasics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-Agha
Basics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-Agha
 
Soil stabilization using plastic bottle strips
Soil stabilization using plastic bottle stripsSoil stabilization using plastic bottle strips
Soil stabilization using plastic bottle strips
 
Sample problemsstatics
Sample problemsstaticsSample problemsstatics
Sample problemsstatics
 
Pipeline Design Project
Pipeline Design ProjectPipeline Design Project
Pipeline Design Project
 
Solution manual for mechanics of materials 10th edition hibbeler sample
Solution manual for mechanics of materials 10th edition hibbeler  sampleSolution manual for mechanics of materials 10th edition hibbeler  sample
Solution manual for mechanics of materials 10th edition hibbeler sample
 
Plaxis 2d tutorial manual
Plaxis 2d tutorial manualPlaxis 2d tutorial manual
Plaxis 2d tutorial manual
 
1.3 Soil Phase Relationships.pdf
1.3 Soil Phase Relationships.pdf1.3 Soil Phase Relationships.pdf
1.3 Soil Phase Relationships.pdf
 
Geotechnical Engineering-I [Lec #9: Atterberg limits]
Geotechnical Engineering-I [Lec #9: Atterberg limits]Geotechnical Engineering-I [Lec #9: Atterberg limits]
Geotechnical Engineering-I [Lec #9: Atterberg limits]
 
Solution Manual for Soil Mechanics Fundamentals – Muni Budhu
Solution Manual for Soil Mechanics Fundamentals – Muni BudhuSolution Manual for Soil Mechanics Fundamentals – Muni Budhu
Solution Manual for Soil Mechanics Fundamentals – Muni Budhu
 
Geotechnical Engineering-I [Lec #12: AASHTO Soil Classification]
Geotechnical Engineering-I [Lec #12: AASHTO Soil Classification]Geotechnical Engineering-I [Lec #12: AASHTO Soil Classification]
Geotechnical Engineering-I [Lec #12: AASHTO Soil Classification]
 

Similar to Safety problem of Boguchansk rockfill dam with asphalt concrete core

Lyapichev, Landau. Modern structural & technological solutions for new dams (...
Lyapichev, Landau. Modern structural & technological solutions for new dams (...Lyapichev, Landau. Modern structural & technological solutions for new dams (...
Lyapichev, Landau. Modern structural & technological solutions for new dams (...Yury Lyapichev
 
Lyapichev. New RCC dams (Inter. Conf. on RCC, 2003)
Lyapichev. New RCC dams (Inter. Conf. on RCC, 2003)Lyapichev. New RCC dams (Inter. Conf. on RCC, 2003)
Lyapichev. New RCC dams (Inter. Conf. on RCC, 2003)Yury Lyapichev
 
Lyapichev. Modern structural & technological solutions for new projects of hi...
Lyapichev. Modern structural & technological solutions for new projects of hi...Lyapichev. Modern structural & technological solutions for new projects of hi...
Lyapichev. Modern structural & technological solutions for new projects of hi...Yury Lyapichev
 
Lyapichev. Analysis, design & behavior of CFRDs
Lyapichev. Analysis, design & behavior of CFRDsLyapichev. Analysis, design & behavior of CFRDs
Lyapichev. Analysis, design & behavior of CFRDsYury Lyapichev
 
Lyapichev: Analysis, design & behavior of CFRDs
Lyapichev: Analysis, design & behavior of CFRDsLyapichev: Analysis, design & behavior of CFRDs
Lyapichev: Analysis, design & behavior of CFRDsYury Lyapichev
 
Water NZ Article October 2013_WASTEWATER PUMP STATION 15 – A CASE STUDY IN AS...
Water NZ Article October 2013_WASTEWATER PUMP STATION 15 – A CASE STUDY IN AS...Water NZ Article October 2013_WASTEWATER PUMP STATION 15 – A CASE STUDY IN AS...
Water NZ Article October 2013_WASTEWATER PUMP STATION 15 – A CASE STUDY IN AS...Will Jacobson
 
IRJET- Behavior of Compound Concrete Filled Reinforced PVC Tubes Under Compre...
IRJET- Behavior of Compound Concrete Filled Reinforced PVC Tubes Under Compre...IRJET- Behavior of Compound Concrete Filled Reinforced PVC Tubes Under Compre...
IRJET- Behavior of Compound Concrete Filled Reinforced PVC Tubes Under Compre...IRJET Journal
 
Lyapichev Yury - Innovation structures of very lean RCC dams (Journal of Stru...
Lyapichev Yury - Innovation structures of very lean RCC dams (Journal of Stru...Lyapichev Yury - Innovation structures of very lean RCC dams (Journal of Stru...
Lyapichev Yury - Innovation structures of very lean RCC dams (Journal of Stru...Yury Lyapichev
 
Toutanji 2001.pdf
Toutanji 2001.pdfToutanji 2001.pdf
Toutanji 2001.pdfamineamin10
 
Modernising the Albert Canal thanks to SCIA Engineer software
Modernising the Albert Canal thanks to SCIA Engineer softwareModernising the Albert Canal thanks to SCIA Engineer software
Modernising the Albert Canal thanks to SCIA Engineer softwareRudi Vanmechelen ✉ SCIA
 
Easy chair preprint-2809 (1)
Easy chair preprint-2809 (1)Easy chair preprint-2809 (1)
Easy chair preprint-2809 (1)Jandi11
 
GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16Leo Youngman
 
IRJET- Design of Overhead RCC Rectangular Water Tank by using Working Stre...
IRJET- 	  Design of Overhead RCC Rectangular Water Tank by using Working Stre...IRJET- 	  Design of Overhead RCC Rectangular Water Tank by using Working Stre...
IRJET- Design of Overhead RCC Rectangular Water Tank by using Working Stre...IRJET Journal
 
Design , Analysis and Optimization of Intze Type Water Tank With Sloshing Effect
Design , Analysis and Optimization of Intze Type Water Tank With Sloshing EffectDesign , Analysis and Optimization of Intze Type Water Tank With Sloshing Effect
Design , Analysis and Optimization of Intze Type Water Tank With Sloshing EffectIRJET Journal
 
CH6 Water Passages.pptx
CH6 Water Passages.pptxCH6 Water Passages.pptx
CH6 Water Passages.pptxDawit Girma
 
Ldb Permacultura_Kent gabions_ch3 - gabions in small hydraulic works
Ldb Permacultura_Kent gabions_ch3 - gabions in small hydraulic worksLdb Permacultura_Kent gabions_ch3 - gabions in small hydraulic works
Ldb Permacultura_Kent gabions_ch3 - gabions in small hydraulic workslaboratoridalbasso
 

Similar to Safety problem of Boguchansk rockfill dam with asphalt concrete core (20)

Lyapichev, Landau. Modern structural & technological solutions for new dams (...
Lyapichev, Landau. Modern structural & technological solutions for new dams (...Lyapichev, Landau. Modern structural & technological solutions for new dams (...
Lyapichev, Landau. Modern structural & technological solutions for new dams (...
 
Lyapichev. New RCC dams (Inter. Conf. on RCC, 2003)
Lyapichev. New RCC dams (Inter. Conf. on RCC, 2003)Lyapichev. New RCC dams (Inter. Conf. on RCC, 2003)
Lyapichev. New RCC dams (Inter. Conf. on RCC, 2003)
 
Lyapichev. Modern structural & technological solutions for new projects of hi...
Lyapichev. Modern structural & technological solutions for new projects of hi...Lyapichev. Modern structural & technological solutions for new projects of hi...
Lyapichev. Modern structural & technological solutions for new projects of hi...
 
Lyapichev. Analysis, design & behavior of CFRDs
Lyapichev. Analysis, design & behavior of CFRDsLyapichev. Analysis, design & behavior of CFRDs
Lyapichev. Analysis, design & behavior of CFRDs
 
Lyapichev: Analysis, design & behavior of CFRDs
Lyapichev: Analysis, design & behavior of CFRDsLyapichev: Analysis, design & behavior of CFRDs
Lyapichev: Analysis, design & behavior of CFRDs
 
Water NZ Article October 2013_WASTEWATER PUMP STATION 15 – A CASE STUDY IN AS...
Water NZ Article October 2013_WASTEWATER PUMP STATION 15 – A CASE STUDY IN AS...Water NZ Article October 2013_WASTEWATER PUMP STATION 15 – A CASE STUDY IN AS...
Water NZ Article October 2013_WASTEWATER PUMP STATION 15 – A CASE STUDY IN AS...
 
IRJET- Behavior of Compound Concrete Filled Reinforced PVC Tubes Under Compre...
IRJET- Behavior of Compound Concrete Filled Reinforced PVC Tubes Under Compre...IRJET- Behavior of Compound Concrete Filled Reinforced PVC Tubes Under Compre...
IRJET- Behavior of Compound Concrete Filled Reinforced PVC Tubes Under Compre...
 
Lyapichev Yury - Innovation structures of very lean RCC dams (Journal of Stru...
Lyapichev Yury - Innovation structures of very lean RCC dams (Journal of Stru...Lyapichev Yury - Innovation structures of very lean RCC dams (Journal of Stru...
Lyapichev Yury - Innovation structures of very lean RCC dams (Journal of Stru...
 
Chapter 4 embankment dams
Chapter 4 embankment damsChapter 4 embankment dams
Chapter 4 embankment dams
 
Toutanji 2001.pdf
Toutanji 2001.pdfToutanji 2001.pdf
Toutanji 2001.pdf
 
Modernising the Albert Canal thanks to SCIA Engineer software
Modernising the Albert Canal thanks to SCIA Engineer softwareModernising the Albert Canal thanks to SCIA Engineer software
Modernising the Albert Canal thanks to SCIA Engineer software
 
Easy chair preprint-2809 (1)
Easy chair preprint-2809 (1)Easy chair preprint-2809 (1)
Easy chair preprint-2809 (1)
 
S7
S7S7
S7
 
Paper
PaperPaper
Paper
 
GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16
 
IRJET- Design of Overhead RCC Rectangular Water Tank by using Working Stre...
IRJET- 	  Design of Overhead RCC Rectangular Water Tank by using Working Stre...IRJET- 	  Design of Overhead RCC Rectangular Water Tank by using Working Stre...
IRJET- Design of Overhead RCC Rectangular Water Tank by using Working Stre...
 
Auckland
AucklandAuckland
Auckland
 
Design , Analysis and Optimization of Intze Type Water Tank With Sloshing Effect
Design , Analysis and Optimization of Intze Type Water Tank With Sloshing EffectDesign , Analysis and Optimization of Intze Type Water Tank With Sloshing Effect
Design , Analysis and Optimization of Intze Type Water Tank With Sloshing Effect
 
CH6 Water Passages.pptx
CH6 Water Passages.pptxCH6 Water Passages.pptx
CH6 Water Passages.pptx
 
Ldb Permacultura_Kent gabions_ch3 - gabions in small hydraulic works
Ldb Permacultura_Kent gabions_ch3 - gabions in small hydraulic worksLdb Permacultura_Kent gabions_ch3 - gabions in small hydraulic works
Ldb Permacultura_Kent gabions_ch3 - gabions in small hydraulic works
 

More from Yury Lyapichev

Soluciones nuevas en presas en paises con alta sismisidad
Soluciones nuevas en presas en paises con alta sismisidadSoluciones nuevas en presas en paises con alta sismisidad
Soluciones nuevas en presas en paises con alta sismisidadYury Lyapichev
 
Curso postgrado internacional
Curso postgrado internacionalCurso postgrado internacional
Curso postgrado internacionalYury Lyapichev
 
Boletin inicial del curso internacional (Lyapichev)
Boletin inicial del curso internacional (Lyapichev)Boletin inicial del curso internacional (Lyapichev)
Boletin inicial del curso internacional (Lyapichev)Yury Lyapichev
 
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...Ляпичев. Проектирование, строительство и поведение современных высоких плотин...
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...Yury Lyapichev
 
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...Ляпичев. Проектирование, строительство и поведение современных высоких плотин...
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...Yury Lyapichev
 
Ляпичев. Проблема безопасности Богучанской КНП (HydroVision Russia, 2010)
Ляпичев. Проблема безопасности Богучанской КНП (HydroVision Russia, 2010)Ляпичев. Проблема безопасности Богучанской КНП (HydroVision Russia, 2010)
Ляпичев. Проблема безопасности Богучанской КНП (HydroVision Russia, 2010)Yury Lyapichev
 
ремонт центрального водосброса Саяно-Шушенской ГЭС
ремонт центрального водосброса Саяно-Шушенской ГЭС ремонт центрального водосброса Саяно-Шушенской ГЭС
ремонт центрального водосброса Саяно-Шушенской ГЭС Yury Lyapichev
 
Lyapichev. Laboratorio de segiridad de obras hidraulicas
Lyapichev. Laboratorio de segiridad de obras hidraulicasLyapichev. Laboratorio de segiridad de obras hidraulicas
Lyapichev. Laboratorio de segiridad de obras hidraulicasYury Lyapichev
 
Lyapichev. Research & teaching laboratory Safety of hydraulic structures (29 ...
Lyapichev. Research & teaching laboratory Safety of hydraulic structures (29 ...Lyapichev. Research & teaching laboratory Safety of hydraulic structures (29 ...
Lyapichev. Research & teaching laboratory Safety of hydraulic structures (29 ...Yury Lyapichev
 
Ляпичев. Программа школы Оценка рисков в гидротехнике (РУДН)
Ляпичев. Программа школы Оценка рисков в гидротехнике (РУДН)Ляпичев. Программа школы Оценка рисков в гидротехнике (РУДН)
Ляпичев. Программа школы Оценка рисков в гидротехнике (РУДН)Yury Lyapichev
 
Guidelines of Intern. Society for design of high CFRDs
Guidelines of Intern. Society for design of high CFRDsGuidelines of Intern. Society for design of high CFRDs
Guidelines of Intern. Society for design of high CFRDsYury Lyapichev
 
Seguridad de presas (Banco Mundial)
Seguridad de presas (Banco Mundial)Seguridad de presas (Banco Mundial)
Seguridad de presas (Banco Mundial)Yury Lyapichev
 
Lyapichev. Curso seguridad sismica de presas según de ICOLD
Lyapichev. Curso seguridad sismica de presas según de ICOLDLyapichev. Curso seguridad sismica de presas según de ICOLD
Lyapichev. Curso seguridad sismica de presas según de ICOLDYury Lyapichev
 
Lyapichev. Seguridad sismica de presas (ICOLD Congreso, 2003)
Lyapichev. Seguridad sismica de presas (ICOLD Congreso, 2003)Lyapichev. Seguridad sismica de presas (ICOLD Congreso, 2003)
Lyapichev. Seguridad sismica de presas (ICOLD Congreso, 2003)Yury Lyapichev
 
Lyapichev. Direcciones para gestión de seguridad de grandes presas y obras hi...
Lyapichev. Direcciones para gestión de seguridad de grandes presas y obras hi...Lyapichev. Direcciones para gestión de seguridad de grandes presas y obras hi...
Lyapichev. Direcciones para gestión de seguridad de grandes presas y obras hi...Yury Lyapichev
 
Lyapichev. Soluciones nuevas para grandes presas en Rusia y países con alta s...
Lyapichev. Soluciones nuevas para grandes presas en Rusia y países con alta s...Lyapichev. Soluciones nuevas para grandes presas en Rusia y países con alta s...
Lyapichev. Soluciones nuevas para grandes presas en Rusia y países con alta s...Yury Lyapichev
 
Ляпичев. Достоверность численных расчетов плотин
Ляпичев. Достоверность численных расчетов плотин Ляпичев. Достоверность численных расчетов плотин
Ляпичев. Достоверность численных расчетов плотин Yury Lyapichev
 
Ляпичев. Оценка банковского отчета ТЭО фирмы Коин и Белье по Богучанской ГЭС
Ляпичев. Оценка банковского отчета ТЭО фирмы Коин и Белье по Богучанской ГЭСЛяпичев. Оценка банковского отчета ТЭО фирмы Коин и Белье по Богучанской ГЭС
Ляпичев. Оценка банковского отчета ТЭО фирмы Коин и Белье по Богучанской ГЭСYury Lyapichev
 
Lyapichev. Safety problems of Boguchansk rockfill & HPP concrete dams (in Rus...
Lyapichev. Safety problems of Boguchansk rockfill & HPP concrete dams (in Rus...Lyapichev. Safety problems of Boguchansk rockfill & HPP concrete dams (in Rus...
Lyapichev. Safety problems of Boguchansk rockfill & HPP concrete dams (in Rus...Yury Lyapichev
 

More from Yury Lyapichev (20)

My abstracts
My abstractsMy abstracts
My abstracts
 
Soluciones nuevas en presas en paises con alta sismisidad
Soluciones nuevas en presas en paises con alta sismisidadSoluciones nuevas en presas en paises con alta sismisidad
Soluciones nuevas en presas en paises con alta sismisidad
 
Curso postgrado internacional
Curso postgrado internacionalCurso postgrado internacional
Curso postgrado internacional
 
Boletin inicial del curso internacional (Lyapichev)
Boletin inicial del curso internacional (Lyapichev)Boletin inicial del curso internacional (Lyapichev)
Boletin inicial del curso internacional (Lyapichev)
 
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...Ляпичев. Проектирование, строительство и поведение современных высоких плотин...
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...
 
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...Ляпичев. Проектирование, строительство и поведение современных высоких плотин...
Ляпичев. Проектирование, строительство и поведение современных высоких плотин...
 
Ляпичев. Проблема безопасности Богучанской КНП (HydroVision Russia, 2010)
Ляпичев. Проблема безопасности Богучанской КНП (HydroVision Russia, 2010)Ляпичев. Проблема безопасности Богучанской КНП (HydroVision Russia, 2010)
Ляпичев. Проблема безопасности Богучанской КНП (HydroVision Russia, 2010)
 
ремонт центрального водосброса Саяно-Шушенской ГЭС
ремонт центрального водосброса Саяно-Шушенской ГЭС ремонт центрального водосброса Саяно-Шушенской ГЭС
ремонт центрального водосброса Саяно-Шушенской ГЭС
 
Lyapichev. Laboratorio de segiridad de obras hidraulicas
Lyapichev. Laboratorio de segiridad de obras hidraulicasLyapichev. Laboratorio de segiridad de obras hidraulicas
Lyapichev. Laboratorio de segiridad de obras hidraulicas
 
Lyapichev. Research & teaching laboratory Safety of hydraulic structures (29 ...
Lyapichev. Research & teaching laboratory Safety of hydraulic structures (29 ...Lyapichev. Research & teaching laboratory Safety of hydraulic structures (29 ...
Lyapichev. Research & teaching laboratory Safety of hydraulic structures (29 ...
 
Ляпичев. Программа школы Оценка рисков в гидротехнике (РУДН)
Ляпичев. Программа школы Оценка рисков в гидротехнике (РУДН)Ляпичев. Программа школы Оценка рисков в гидротехнике (РУДН)
Ляпичев. Программа школы Оценка рисков в гидротехнике (РУДН)
 
Guidelines of Intern. Society for design of high CFRDs
Guidelines of Intern. Society for design of high CFRDsGuidelines of Intern. Society for design of high CFRDs
Guidelines of Intern. Society for design of high CFRDs
 
Seguridad de presas (Banco Mundial)
Seguridad de presas (Banco Mundial)Seguridad de presas (Banco Mundial)
Seguridad de presas (Banco Mundial)
 
Lyapichev. Curso seguridad sismica de presas según de ICOLD
Lyapichev. Curso seguridad sismica de presas según de ICOLDLyapichev. Curso seguridad sismica de presas según de ICOLD
Lyapichev. Curso seguridad sismica de presas según de ICOLD
 
Lyapichev. Seguridad sismica de presas (ICOLD Congreso, 2003)
Lyapichev. Seguridad sismica de presas (ICOLD Congreso, 2003)Lyapichev. Seguridad sismica de presas (ICOLD Congreso, 2003)
Lyapichev. Seguridad sismica de presas (ICOLD Congreso, 2003)
 
Lyapichev. Direcciones para gestión de seguridad de grandes presas y obras hi...
Lyapichev. Direcciones para gestión de seguridad de grandes presas y obras hi...Lyapichev. Direcciones para gestión de seguridad de grandes presas y obras hi...
Lyapichev. Direcciones para gestión de seguridad de grandes presas y obras hi...
 
Lyapichev. Soluciones nuevas para grandes presas en Rusia y países con alta s...
Lyapichev. Soluciones nuevas para grandes presas en Rusia y países con alta s...Lyapichev. Soluciones nuevas para grandes presas en Rusia y países con alta s...
Lyapichev. Soluciones nuevas para grandes presas en Rusia y países con alta s...
 
Ляпичев. Достоверность численных расчетов плотин
Ляпичев. Достоверность численных расчетов плотин Ляпичев. Достоверность численных расчетов плотин
Ляпичев. Достоверность численных расчетов плотин
 
Ляпичев. Оценка банковского отчета ТЭО фирмы Коин и Белье по Богучанской ГЭС
Ляпичев. Оценка банковского отчета ТЭО фирмы Коин и Белье по Богучанской ГЭСЛяпичев. Оценка банковского отчета ТЭО фирмы Коин и Белье по Богучанской ГЭС
Ляпичев. Оценка банковского отчета ТЭО фирмы Коин и Белье по Богучанской ГЭС
 
Lyapichev. Safety problems of Boguchansk rockfill & HPP concrete dams (in Rus...
Lyapichev. Safety problems of Boguchansk rockfill & HPP concrete dams (in Rus...Lyapichev. Safety problems of Boguchansk rockfill & HPP concrete dams (in Rus...
Lyapichev. Safety problems of Boguchansk rockfill & HPP concrete dams (in Rus...
 

Recently uploaded

(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 

Recently uploaded (20)

Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 

Safety problem of Boguchansk rockfill dam with asphalt concrete core

  • 1. 1 Prof. Yu. LYAPICHEV (Russia) Safety problem of the Boguchansk rockfill dam with asphaltic concrete (AC) core 1. Introduction The safety problem of the 77 m high and 1860 m long Boguchansk rockfill dam with asphaltic concrete (AC) core is considered. This dam is one of the largest in the world rockfill dam with AC core (slides 1-4). Now after 15 years of delay due to financional problems the dam and 3000 MW hydropower plant are again under construction on the Angara river in Siberia. The hydropower project is being built as part of a joint agreement between aluminium company RusAl and electricity provider Unified Energy Systems (UES) of Russia to create an energy and metals conglomerate, which will also incorporate an aluminium smelter. Approximately US$1.4B will be invested in the project. At present more than 50% of the hydropower plant and spillway dams and only 10% of rockfill dam have been constructed (slide 5). The first stage (1620 MW) of the huge Boguchansk hydropower plant is expected be commissioned in 2010 thus shortening time to improve the old project solutions, adopted 25 years ago and to solve the main safety problems of the dam. 2. Main safety problems and construction technology of the liquid type AC core The main safety problems of the Boguchansk dam are connected with a liquid (flowable) type (of 11-12% bitumen content) AC core and adjacent coarse transition zones as well as with the seepage control of the AC core foundation. On the construction site the liquid hot (1500 C) AC was poured in steel forms of 1 m height and 6 m length which were removed in 2-3 day after decrease of temperature of poured block down to 450 С. Then around the poured block the transition zones of crushed stones (up to 200 mm diameter) and even rockfill were placed in 3 m thick layers, practically, without its compaction (as rollers could easily hurt a weak standing concrete block) followed by placing of the lateral rockfill zones in 6 m thick layers. Then again the subsequent cycle was repeated starting with erection of steel forms and pouring of the next upper block thus heightening of the AC core. During preparation, transportation and pouring of the liquid asphaltic concrete the segregation of its aggregates was not excluded as well as the stratification of mix with formation of layers with excessively high content of bitumen (up to 13-15 %). It creates the obvious danger of possible squeezing or penetration of bitumen into the large pores (up to 90 mm) of adjacent coarse transition zones under action of high lateral pressure from the body weight of core and water pressure during impounding of reservoir that leads to loss of water tightness of the AC core. The applied technology of asphaltic concrete core construction possesses a number of significant disadvantages: cyclicity, excessively high consumption of bitumen and dependence on negative external temperatures, significant laboriousness and, as consequence, an excessive slowdown of construction time and rise of construction cost. The maximal monthly average placement of the AC core was reached in 1996 (for the period 1988-1997) and amounted only to 450 m3 /month. Hence, expected construction time of a dam would reach 16 years, that, obviously, unacceptable. In these conditions advantages are obvious for applying of modern technology of continuous construction of the compacted AC core in 0,2 m thick layers (with the bitumen content of 6-6,5 %) and transition zones of crushed stones of 0,5-100 mm diameters vibro compacted by the special mechanized complex of firms "Strabag" (Germany) or "Kolo Veidekke" (Norway). In compacted AC core the segregation and stratification of a mix is impossible and the specific consumption of bitumen and
  • 2. 2 volume of a core is almost twice less than in liquid AC core. The continuous effective control of quality of placement of AC core and transition zones, i.e. the dam safety is simultaneously provided. Unfortunately, during designing of the Boguchansk rockfill dam an available world experience of designing, construction and operation of rockfill dams with compacted AC cores was ignored. Authors of Boguchansk dam project were going on the "special" way, accepted technology of construction of a liquid AC core without its serious scientific and technological validation and without its technical and economic comparison with a traditional compacted AC core. However, the main thing, not low technological or economic effectiveness but danger of loss of water tightness of liquid AC core, i.e. safety of the dam. 3. FE analyses of stress-strain state of the Boguchansk rockfill dam with compacted and liquid AC cores with use of different models of materials To compare the behavior of the liquid and compacted AC core the finite element (FE) analyses of stress-strain state of the dam were performed. In these analyses the following models of materials were used: for behavior of rockfill - hyperbolic model and the modified elastoplastic Cam-Clay model, taking into account the decrease of shear strength of rockfill with the increase of normal stresses; for behavior of asphaltic concrete - hyperbolic model and two phase visco-elastoplastic model in which the liquid phase (bitumen) is simulated by visco-elastic mode of the Maxwell-Norton type and solid phase (aggregates) - by the Cam-Clay model. Earlier the FE analyses of two well-known rockfill dams with AC core (58 m high Gross Dunn dam in Germany and 90 m high Storvatn dam in Norway) were performed and compared with their natural observation data to validate the numerical models of NLSTRESS and PLSTRESS programs of the author. Using the occasion I appreciate greatly the assistance of Honorary ICOLD President Prof. Kaare Hoeg for delivering me some his valuable publications on some well-known rockfill dams with compacted AC cores. The calculated and observed displacements of Gross Dunn and Storvatn dams by the end of construction and reservoir impounding are in close agreement (slides 7- 8) thus proving the validation of numerical models used in FE analyses of the Boguchansk dam with liquid and compacted AC core. The main analysis results of the Boguchansk dam are given on slides 9 -12. These analyses showed much more favorable and safe stress-strain state in compacted AC core comparing with the liquid one, thus proving the necessity to modify the dam design and replace the liquid AC core by the compacted one. The behavior of a liquid AC core is nearly the same as a puddle clay core in embankment dam with nearly 100% bitumen stresses and small stresses in aggregates thus creating the danger of possible penetration of bitumen into large pores of coarse transition zones. The liquid AC core, unlike the compacted AC core, becomes by the end of construction unstable (mobile) even with well compacted transition zones. Real insufficient compaction (the relative density less than 70%) of transition zones affects greatly on the stress-strain state of liquid AC core which becomes dangerously unstable during construction. The lateral pressure factor in the core reaches 0.9-0.95 and horizontal tensile and vertical compressive deformations in the core are increased in 2-3 times comparing to compacted AC core. Settlements and horizontal displacements in liquid AC core are also increased greatly. The high tensile horizontal deformations occur in the liquid AC core (core greatly extends in both sides) that creates danger of its cracking before the reservoir impounding and squeezing of bitumen and aggregates of AC into large pores of the downstream transition zone. In
  • 3. 3 zones of the increased bitumen content (up to 13-15%) in the liquid AC core the lateral pressure factor comes nearer to 1.0 and there are uncontrolled peaks of extremely high horizontal tensile deformations. No self-curing of cracks by excess bitumen can prevent inevitable loss of water tightness and subsequent intensive seepage through the AC core and erosion of the downstream dam slope. Vertical and horizontal displacements of dam and liquid AC core after reservoir filling strongly depend on deformability (density) of adjacent transition zones. Horizontal deformations of AC core are defined by type of AC: in a liquid AC core these deformations during construction and after reservoir filling are always tensile and very high that leads to its discontinuity or permeability. In a compacted AC core horizontal deformations always compressive that guarantees its water tightness after reservoir filling and under action of seismic forces. By the end of construction of the dam with compacted AC core placed on the 14 m high liquid AC core the latter remains very unstable and tensile (extended in both sides), that creates danger of its discontinuity or permeability, especially, opening of the joint with the overlaying compacted AC core before reservoir filling. Insufficient compaction of transition zones around lower liquid part of AC core results in the deterioration of the stress-strain state of the overlaying compacted AC core. For revealing advantages of the two-phase AC model the FE analyses of the Boguchansk dam with liquid AC (bitumen of 5.5%) and compacted AC (bitumen of 9%) cores were performed by the author. The received results confirmed the main feature of behavior of this type of dams: the AC core influences only on displacements of central zone of the dam including AC core and adjacent transition zones and, practically, does not influence on displacements of lateral rockfill zones. Stresses in bitumen and aggregates are very different, that allows to understand strong distinction in behavior of liquid and compacted AC cores. For bitumen content of 5.5 % in compacted AC core (slide 12, A) stresses in bitumen and aggregates are of same order, but in a different state: bitumen with its low shear strength quickly reaches the state of plastic yielding or flow in the isotropic stress state. In aggregates, on the contrary, the difference between vertical and horizontal stresses is significant and the ratio σx/σy=0.,55 does not change, practically, in height of AC core. For bitumen content of 9 % (slide 12, B) bitumen takes up larger part of pressure that is caused by its low compressibility. Total principal stresses in compacted and liquid AC cores are of the same order and vertical stresses are much smaller, than in the adjacent transition zones, but horizontal stresses are similar. In practically incompressible bitumen horizontal stresses are very close to vertical stresses. In both AC cores by the end of construction vertical (compressive) deformations are close (2.6% in compacted AC core and 2.3 % in liquid one). Horizontal deformations, on the contrary, are various due to different volumetric compressibility of two AC. In all liquid AC core these deformations are tensile (in average 1 %), i.e. the AC core extends due to its high horizontal thrust on the transition zones. In all compacted AC core, on the contrary, horizontal deformations are close to zero that corresponds to a condition of stability. During reservoir filling the AC core is subjected mainly to hydrostatic pressure, horizontal and shear stresses caused by deformations of central part of dam are strongly increased. Stress distribution in compacted AC core after reservoir filling is similar to stress distribution by the end of construction (slide 12, A). Stresses in bitumen increase on 50 % and remain isotropic while in aggregates the main rise of horizontal stresses occurs in the base of the compacted AC core. On the other hand, in the liquid AC core almost all hydrostatic pressure is taken up by bitumen that leads to isotropic total stresses in it (slide 12, B). However shear
  • 4. 4 stresses in the base of AC core increase enough to cause shear resistance of aggregates in which deviator of stresses grows very quickly. It can be explained by the dilatation of aggregates which cannot develop due to bitumen, but at the same time it causes decrease of mean stress in bitumen and, thus increase of same stress in aggregates. The stress state in the dam foundation reflects these differences, especially in the AC core, where, depending on the bitumen contents, the stress state is deviatoric or isotropic. As to deformations the similar tendency is observed in both AC cores. After reservoir filling the vertical deformations in both cores nearly have not changed, but horizontal ones have greatly changed. Horizontal compression of compacted AC core is increased in its foundation up to 1.8 % and in the liquid AC core the horizontal tension of 1 % is kept in the upper 2/3 of its height and gradually changed into small compression (0.8 %) without taking into account the possible bitumen squeezing into adjacent transition zones. Stresses in the liquid AC core by the end of reservoir filling are always above the hydrostatic pressure represented by curve W (slide 12, B). Results of the analysis strongly depend on the bulk modulus of bitumen and how it changes depending on degree of the bitumen saturation. In general, results of this analysis correspond to above mentioned results of similar analyses with use of hyperbolic and modified Cam- Clay models of the AC core and rockfill materials. 4. Simulating of grouting effect of transition zones around the liquid AC core Tight grouting of coarse transition zones results in considerable improvement of the stress-strain state of liquid part of AC core and at the same time in partial deterioration of the same state of the lower part of the compacted AC core. The grouted transition zones behave as a rigid block preventing lateral extension of liquid part of AC core but at the same time induce the increase of vertical stresses or overhanging of upper part of transition zones (slide 11). There is no experience of rockfill grouting in the world except grouting of gravels and pebbles in very permeable foundations of some embankment dams that shows the increase of the deformation modulus of grouted gravels in 2-2,5 times, that it is not enough for rockfill of transition zones (minimum in 5-10 times). Strongly advancing placement of lateral rockfill prisms (with difference of 6 m and more between top elevations of rockfill and AC core) can lead to a rebound (rising) of the top part of AC core and transition zones or to possible softening of its materials, that is inadmissible. This problem demands special investigations after reception of the necessary geotechnical data of grouted transition zones before the construction of the major part of the 1-st stage dam. 5. Static and seismic stability of the dam In the old dam project the seismic aspects were not considered as the dam site was located in the low seismic region according to the old (1981) seismic map of the former USSR. At present according to the new (2003) seismic map of the maximum possible earthquakes in Russia the seismic intensity of the dam site is 8 grades and the peak ground acceleration is 0,2g. In analyses of static and seismic stability of dam slopes by program UST (modified Terzaghi and Bishop methods) the decrease of the inner friction angle φ of rockfill with the increase of normal pressure was taken in account that allows to design an optimum and economic dam structure using anti-seismic layer of large stones (rip- rap) placed on both slopes and zonification of rockfill according its quality (external zones of solid rockfill and inner zones of weathered rockfill). Taking into account the important factor of the variable shear strength of rockfill in the dam zones the minimum safety coefficients of seismic stability of both slopes for
  • 5. 5 flat sliding surfaces were increased on 10-15% comparing to ignoring this factor. On the contrary, for deep siding surfaces the average safety coefficients of seismic stability of both slopes were decreased on the same 10-15% comparing to ignoring this factor. Thus the favorable smoothing of safety coefficients of seismic stability of both slopes was received (slide 13) 6. Principal remarks on dam design solutions a) There is no control of a state of the lower (14 m high) part of the liquid AC core below el. 144.0 due to unusual support of the core on a separate concrete plate instead of the special arch roof of the control and grouting gallery as adopted in many large rockfill dams with compacted AC cores (slide 6). b) Instead of gravelly moraine (slide 6) on the downstream side of the liquid AC it was necessary to arrange short (15 m high) AC core or trench cut-off wall (slightly above maximum downstream water level) to eliminate the downstream water pressure that could permit to control the lower part of AC core. The similar solution is often accepted in some large rockfill dams with high downstream water levels. c) As the grouting curtain is designed under the bottom of gallery instead of supporting plate of AC core, the reservoir pressure will be applied to the bottom of core plate, that in the absence of water stops in the joint between gallery block and core plate can lead to a dangerous leakage and seepage through the joint (slide 6). d) The adjunction of liquid AC core to practically vertical (V/H=20/1) wall of the adjacent section of spillway concrete dam is designed without control of the contact between AC core and concrete wall through a control shaft in this wall or other possible solutions. This uncontrolled contact is also as well as in case of the joint between separate gallery block and core support plate is a place of possible uncontrolled leakage and seepage in the liquid AC core of the dam. 7. Principal recommendations a) To provide safety of the Boguchansk rockfill dam its design should be changed and its construction should be continued based on the technology of a compacted asphaltic concrete (AC) core. b) To prevent lateral extension and discontinuity of the lower liquid part of compacted AC core and bitumen and aggregates squeezing from the 14 m high part of liquid AC core, the transition zones around liquid part of AC core should to be grouted tightly so that the deformation modulus of the grouted zones can be increased not less than in 10 times. c) Tight grouting of transition zones should provide the tight contact between lower liquid part AC core and these zones to prevent contact opening and lateral core extension. It’s important to prevent the lateral spreading of grouts in transition zones to provide the tight contact. d) The final technology of grouting should be based on the test grouting of transition zones and results of its control. e) Due to very severe climate of dam site (-50o C in winter) and very short construction season (not more than 6 months) the maximum possible bitumen content (7-7.5 %) with low viscosity of B180 is preferable for compacted AC core of the dam. This bitumen content also increases the self-healing of possible cracks in the core and allows lower heating temperatures during AC placement and compaction. f) The seismic stability of both dam slopes for 1-st (53m high) and 2-nd (77m) stages of dam construction can be provided only with the intensive vibrating compaction of rockfill and placement of 10 m thick anti-seismic rip-rap layer on both slopes. g) Strongly advanced placement of lateral rockfill zones can lead to a rebound of the top part of AC core and transition zones or to softening their materials, that is inadmissible
  • 6. 6 (Presentation of Slides) Slide 1: General schemed lay-out of the Boruchansk HPP (3000 MW) Slide 2: HPP and spillway dams view (August 2003) Slide 3: Downstream view of HPP and spillway dams (March 2003)
  • 7. 7 Slide 4: General lay-out of the Boguchansk rockfill dam (height of 77 m, length of 1860 m) with liquid asphaltic concrete (AC) core ПК 17+30 ПК 17+30 141.000 142.000 30 29 28 27 26 25 24 23 222120 19 17 16 15 14 13 136.75 136.75 136 0.10 0.10 1:1.4 1:1.4 1:1.4 1:1.4 202.000 187.000 172.000 135 135.5 136 Крепление откоса каменной наброской. 1:1.41:1.4 1:1.4 1:1.4 202.000 187.000 172.000 151.000 136.5 136.5 212.000 212.00012 диаграммы. Разбивочная ось асфальтобетонной 34 33 214.031 30 135.5 135 136.5 135.5 136.5 136 136 ПК 13+48 Выход на поверхность "слабых" глинистых песчанников. Контур развития элювия-песчаники,разрушенные до глинистого,реже песчано-глинистого состояния. Портал. <1:4.21 <1:4 .21 <1:3.7 Ось верховой перемычки. Портал. 133.5 1:3 1:3 137.5 137 136.5 136 135.5 134.5 135 135 135.5 133.5 140 150 160 170 180 190 200 210 205 215 220 217.5 215 217.5 220 Конец-плотины. 205 210 187.000 200 190 195 180 170 160 150 140 137.5 137 136.5 136 135.5 135 134.5 134 133.5 133 133 133.5 134 134.5 135 135.5 135.5 136 136 135 135 148.000 Ось низовой перемычки. 0.008 0.008 0.06 152.000 0.06 1:1.4 1:1.4 1:3 0.06 Дрена №2 Дрена №1 Контрбанкет верхнего бьефа. Контрбанкет нижнего бьефа. 0.06 0.06 151.000 Пригрузка верх- него откоса. Крепление откоса каменной набраской толщиной 2.5 м. Противоползневые и противо- фильтрационные меропртятия. Цементационная штольня. кпричалу. на промбазу. 145.000 152.000 162.000 178.000 179.500 194.500 212.000 202.000 212.000 165.000 161.000 141.000 145.000 141.000 151.000 141.000 149.000 147.000 144.000 79.60 ПК 13+48 ПК 11+74.10 ПК 11+74.10 136 1:3 136 135.5 135 135.5 135.5 Номера секции бетонной плотины. Ось временного судо- ходного шлюза. Глухая часть секции 30 - 34. Напорная грань плотины. Крепление откоса каменной набраской с проливкой. бетоном 1:3 1:3 1:1.4 1:1.4 1:1.6 1:1.6 Ось верховой перемычки. Границы пачки "слабых" пород Q1 и к2 Ослабленный контакт между осадочными породами и долеритами. Проран Генплан Богучанской грунтовой плотины на реке Ангара. 143.000 Slide 5: Typical sections of the Boguchansk rockfill dam of the 2006 ready state and the 1st and 2nd stages of construction
  • 8. 8 Slide 6: Foundation part of the Boguchansk liquid AC core 1 - liquid AC core; 2 - grouting gallery; 3 - transition zones of coarse crushed stones (up to 200 mm); 4 - drainage control pipe; 5 - gravelly moraine; 6 - blanket of sandy clay; 7 - gravel; 8 - transition zone of rock muck; 9 - rockfill
  • 9. 9 Slide 7: Comparision of observed and calculated displacements and deformations in compacted AC core of Gross Dunn dam (Germany) Vertical normal stresses (t/m 2 ) in the dam by the end of construction 20 40 30 60 50 70 0-10 -5 dx,5 10 (cm)dy-15-20-25-30 1 2 3 y(m) Horizontal (dx) and vertical (dy) displacements in the core height by the construction end: 1, 2 - calculated displacements (dx) and (dy) (cm); 3 - observed displacements (dy) (cm) 10 20 30 40 50 60 0-0.5-1 , eps-y (%)eps-x10.5 1.5 2 1 2 3 растяжение сжатие Horizontal (eps-x) and vertical (eps-y) deformations (%) in the core height after reservoir filling: 1, 2 - calculated deformations (eps-y) and (eps-x); 3 - observed deformations (eps-x) 20 40 30 60 50 0-10 -5 dx,5 10 (cm)dy-15-20-25-30 1 2 3 -35 Horizontal (dx) and vertical (dy) displacements in the core height after reservoir filling: 1, 2 - calculated displacements (dx) and (dy) (cm); 3 - observed displacements (dy) (cm) 0.00 20.00 40.00 60.00 80.00 100.00 120.00 140.00 160.00 180.00 200.00 220.00 0.00 20.00 40.00
  • 10. 10 Slide 8: Comparision of observed and calculated displacements and deformations in compacted AC core of Strorvatn dam (Germany) 3- dx, 4- dy: после наполнения ВБ 1- dx, 2- dy: после строительства (см) по высоте диафрагмы плотины (Сторватн). Рис. 4-13. Горизонтальные (dx) и вертикальные (dy) перемещения 2 4 1 3 10 50 -60 -50 -40 -30 -20 -10 10 30 20 40 60 80 70 90 y(м) 20 (cm)0 dydx, Horizontal (dx) and vertical (dy) calculated displacements (cm) in the core height: 1, 2 - (dx) and (dy) by the construction end; 3, 4 - (dx) and (dy) after reservoir filling (%) по высоте диафрагмы плотины (Сторватн). 1- (eps-x), 2- (eps-y}: после строительства 3- (eps-x), 4- (eps-y): после наполнения ВБ Рис. 4-14. Горизонтальные (eps-x) и вертикальные (eps-y) деформации 1 eps-x, eps-y (%) 3 2 4 10 20 30 40 60 50 70 90 y(м) 80 -1 -0.5 0 0.5 1 1.5 2 растяжение сжатие Horizontal (eps-x) and vertical (eps-y) calculated deformations (%) in the core height: 1, 2 - (eps-x) and (eps-y) by the construction end; 3, 4 - (eps-x) and (eps-y) after reservoir filling 0.00 50.00 100.00 150.00 200.00 250.00 0.00 50.00 Рис. 4-18. Изолинии горизонтальных перемещений (т/кв. м) (случай -(С+ВБ)) 90.00-- 65.00-- Horizontal calculated displacements (m) in the dam after reservoir filling Observed displacements (scale in m) of the dam by October 1986
  • 11. 11 Slide 9: Calculated displacements and deformations in liquid type AC core of the Boguchansk rockfill dam (Russia) Horizontal (dx) and vertical (dy) displacements (cm) in the core height: 1, 2 - (dx), (dy) for well compacted transition zones by the end of construction; 3, 4 - (dx), (dy) for badly compacted transition zones by the end of construction; 5, 6 - (dx), (dy) for badly compacted transition zones after reservoir filling Horizontal (eps-x) and vertical (eps-y) deformations (%) in the core height: 1, 2 - (eps-x), (eps-y) for well compacted transition zones by the end of construction; 3, 4 - (eps- x), (eps-y) for badly compacted transition zones by the end of construction; 5, 6 - (eps-x), (eps- y) for badly compacted transition zones after reservoir filling
  • 12. 12 Slide 10: Calculated displacements and deformations in compacted type AC core of the Boguchansk rockfill dam (Russia) Horizontal (dx) and vertical (dy) displacements (cm) in the core height: 1, 2 - (dx), (dy) by the end of construction; 3, 4 - (dx), (dy) after reservoir filling Horizontal (eps-x) and vertical (eps-y) deformations (%) in the core height: 1, 2 - (eps-x), (eps-y) by the end of construction; 3, 4 - (eps-x), (eps-y) after reservoir filling
  • 13. 13 Slide 11: Calculated deformations in compacted type AC core constructed above liquid AC core of the Boguchansk rockfill dam Horizontal (eps-x) and vertical (eps-y) deformations (%) in the core height by the end of construction without grouting of transition zones Horizontal (eps-x) and vertical (eps-y) deformations (%) in the core height by the end of construction with grouting of transition zones
  • 14. 14 Slide 12: Calculated stresses and deformations in bitumen and aggregates of liquid and compacted type AC core of the Boguchansk dam A Bh/H h/H 11 0.5 0.5 1 1 1 1 2 2 2 2 sigm-y sigm-y sigm-xsigm-x 0 5 10м 1мра A B 0 0 -25-25-5 -5-5 -5-10 Рис. 5-7. Горизонтальные x и вертикальные y напряжения (т/кв.м)по высоте диафрагмы после строительства плотины (1- напряжения в битуме, 2 - напряжения в заполнителе) (А) –укатанной АФБ (Б=6%), (В) – литой АФБ (Б=10%) Рис. 5-8. Полные главные напряжения sigm-1иsigm-3(масштабв МПа)вцентре плотиныcтроительства. (А) –укатанной АФБ(Б=6%), (В) –литой АФБ(Б=10%) Horizontal (sigm-x) and vertical (sigm-y) stresses (МPa) in height of compacted (A) and liquid (B) AC cores of the dam by the end of construction: 1 – stresses in bitumen; 2 - stresses in aggregates h/H 0.50.5 1 1 03 eps eps-xeps-y eps-y eps-x eps2 1 -1 сжатие растяжениесжатие растяжение A B 3 2 1 0 -1 h/H Vertical (eps-y) and horizontal (eps-x) deformations (%) in height of compacted (A) and liquid (B) AC core by the end of construction (extreme right lines) and reservoir filling (extreme left lines) Vertical (sigm-y) and horizontal (sigm-x) stresses (t/m 2 ) in height of compacted (A) and liquid (B) AC core after reservoir filling: 1 - stresses in bitumen; 2 – stresses in aggregates; q – deviator of stresses; W – hydrostatic pressure
  • 15. 15 Slide 13: Results of static and seismic stability analyses of slopes of the Boguchansk dam with the constant shear strength of rockfill φ = 400
  • 16. 16 Slide 14: Results of static and seismic stability analyses of slopes of the Boguchansk dam with the variable shear strength of rockfill τ =1.1σ0.87
  • 17. 17 Slide 15: Proposed typical sections of the 1-st stage construction of the Boguchansk rockfill dam with compacted AC core 1 – AC core compacted in 20 cm thick layers; 2 – 1.5 m wide transition zone of crushed rock muck d=0,5-100 mm compacted in 20 cm thick layers; 3 – 2 m wide transition zone of crushed stone d=5-300 mm compacted in 40 cm thick layers; 4a – dolerite rockfill d=5-600 mm compacted in 100 cm thick layers; 4b – dolerite rockfill d=5-1000 mm compacted in 200 cm thick layers; 4c – available dolerite rockfill compacted within zone 4a; 5 – rip-rap protection with dolerite stones (average diameter 600 mm); 6 – transition zone of dolerite rockfill; 7 – compacted gravelly moraine; 8 – blanket of compacted sandy clay; 9 – gravelly sand filter; 10 – additional dumped rockfill