SlideShare a Scribd company logo
1 of 9
Yasser I. G. Sukkar
CAREER PATH STORIES
Regional Information Technology Institute (RITI)
May1992 till April1995
Title: Technical officer and support engineer
Was
◦ Established with no who’s who
◦ No dedicated infrastructure
◦ Outsourced for other’s training
◦ Public events handling
◦ Limited organization
◦ Shared resources
◦ No technical support for other OU’s
Became
◦ Who’s-who built, filled & tracked
◦ Increased customer base
◦ RITI activities awareness increased
◦ Fully equipped laps and infrastructure
◦ Adopting others and self training
◦ Initiating First distance learning systems
◦ Perform resource & material rescue solely in
several event
◦ Global technical support for many OU’s in RITI,
RITSEC & IDSC
Microsoft Egypt
May1995 till December1996
Title: ECU “Enterprise consultant unit”
Microsoft Was
◦ Being under initiation and legalization
◦ 6 staff members + 6 interims
◦ Depending on Reps
Microsoft Became
◦ Support in closing major deals.
◦ Participate in Microsoft Middle-east act
◦ Third certified MCSE in Middle-east
◦ First certified MS-Networking essentials
◦ Documented for 2 winning stories (replacing
Microsoft back-end SNA) with Mainframe
terminal services)
◦ Installing 2nd major MS-Exchange server
American Chamber of Commerce (Egypt)
Jan1996 till June1997
Title: MIS Manager
AmCham Was
◦ Acquisition platform for AMCHAM, IT
◦ Limited technical support office
◦ No Web-Security
◦ No Financial transactions enabled
◦ Manually fed Databases
◦ Non-layered infrastructure / Networks
AmCham Became
◦ High performance platform established
◦ Internal and external support provisioned
◦ Matchmaking & web interfaces designed
◦ Event related electronic announcements
◦ Enabled Web security and signatures
◦ Enabled Web with financial transactions
◦ Databases are fully interfaced and automated
◦ Networks & infrastructure redesigned and
layered.
Deminex (Before RWE)
June1997 till December1999
Title: IT General Manager
Deminex Cairo offices Was
◦ Legacy (Vax) platform
◦ GroupWise mail system
◦ Very old LAN / WAN infrastructure
◦ Poor tie lines ( 64 KB) over X25
◦ Initial process of RWE Acquisition
◦ No standards sets
◦ Old Voice systems (Meridian mail)
◦ Poor end users’ service provisioning thus
personalized
◦ IT limitations for business strategies and expansions
Deminex Offices Became
◦ Successful and smooth Migration to MS-DC
◦ Legacy system total shutdown
◦ Smooth migration to MS-Exchange 5.5
◦ LAN innovation to UTP CAT 6 / better switches
◦ Upgrading WAN to Frame-relay / Orange Hub
◦ Upgrading / speeding round trips for traffic (100 MS)
◦ Securing lines between sites (Cairo / GMBH)
◦ Initiating the (German Oil and Gas) Brand for acquisition
◦ Setting mutual standards for global objects sets with head
offices
◦ Integrating Voice systems (Meridian mail with Alcatel
systems GMBH)
◦ Initiating New Building setup, coo working with
electromechanical acts
◦ Finalizing central DC, and licenses contracts for clients and
applications
◦ Global participating in Year 2000 shifting plan successfully
(GEOGE) RWE Dea , Egypt
Jan, 2000 till October, 2010
Title: Head of IT integration and strategic planning
GEOGE Was
◦ Not an active member in IT DSS in Main offices
◦ Domestically running its projects and IT standards
◦ No linkage with main office global agreements
◦ Running its local services processes successfully
◦ Initiating documentation for all its standards
◦ Initial phase of transfer to RWE Dea, Egypt instead
◦ Running temporary standards, yet not globalized
◦ Only one building with very advanced infrastructure
◦ Only one data center with simple layout and low security
GEOGE Became RWE Dea, Egypt
◦ Initiating the first Global IT manager semi-annual meeting in GMBH
◦ Exchange and coordinate IT experiences (Cairo / Germany)
◦ Integrated project along the whole RWE Branches
◦ Considering Cairo standards as more expressing sets
◦ IT Centralization for all IT management systems among sites
◦ Unified standards deployment for all IT layers and procedures
◦ GEOGE, became RWE Dea Egypt Branches officially
◦ Merging and unifying all IT contracts along the whole sites
◦ Participating in infrastructure, fields plans, drilling activities, contracts, and
supply chain projects along all sites
◦ Yasser I. G. Sukkar became Head of IT sector in Egypt
◦ Yasser I. G. Sukkar elected, participated in the focus leadership program
with remarkable announcement and success rates
◦ Initiating projects for saving man-day time at a specific operational layer
successfully, and globally deployed.
◦ Linking more 4 buildings to the main building including infrastructure
(power / data / voice)
◦ Finalizing full security, access, inventory using RFID applications
◦ Finalizing the second online / mirror data center with full documentation
and infrastructure mapping and life tests.
National Bank of Egypt (NBE)
Nov. 2010 till Present time
Title: Director, Shared services technology group (SSTG)
NBE Was
◦ SSTG activities was newly established
◦ NBE was at transition of IT organization
◦ No fixed scopes, no fixed procedures & processes
◦ Many functional conflict of interests
◦ Yasser I. G. Sukkar received an aggressive plan for renovating IT
environment
◦ Some dead projects for long years blocking innovation activities
◦ Cross cultural conflicts was on the ground
◦ Huge legacies and as-is operations for last many years
◦ Issues with staff skills and knowledge inventory
◦ Many Silos in operations layers.
◦ No written procedures for each operation pillar
◦ No fixed compliance or valid reports to rely on.
SSTG Became
◦ Better matured after re-organization and segregation of authorities
◦ Link functions and creating full procedures documents for each pillar of IT
operations
◦ Re-building knowledge at the service desk activities
◦ Initiating knowledge transfer sessions for all staff in IT
◦ Rebuilding the mission and vision of IT services at the top management level
◦ Increase the communication amongst pillars and enforce openness
◦ Handling one of the biggest dead projects in NBE till its officially closed and
delivered after 13 years of malfunction @ 0 cost
◦ Splitting the huge org-chart and map it to the actual operations
◦ Handling the pillar of sstg Job description and review individual scope
◦ Set KPI’s and measurement for performance, and rewarding methodology to
comply with IT business nature
◦ Build a link between pure business directions and IT practices.
◦ Link IT activities with other compliances and non-IT functioning OU’s
◦ Initiating the concept of IT Decision support systems
◦ Formulating the project of ITSM / IT-DSS in NBE and owned the project
planning and maturity roadmap.
National Bank of Egypt (NBE)
Nov. 2010 till Present time (Continued)
Title: Director, Shared services technology group (SSTG)
Initiating ITSM Pillar as an independent OU
◦ Proposed and gain acceptance for building the ITSM organization chart
within NBE OU’s
◦ Initiating and successfully delivering the enterprise log collection system in
NBE IT environment as a core foundation for user’s / system activities
◦ Generate Straight Through processed reports and near real time
monitoring instead of 24 yours after fact reporting
◦ Recharged the teams and initiate motivation plans to increase their skill
sets on both technical and soft skills aspects
◦ Deploy all self based obtained soft and technical skills to share knowledge
and vision with other coworkers and pears to increase the buy-in for the
renewed approaches
◦ Encourage coworkers to provide more efforts and worked on increasing
their awareness via initiating group meeting and presentation and brain
storming sessions
◦ Participate in Graduate School of Banking technology program in
Wisconsin / Madison
◦ Coordinate and shorten the ITSM – IT/DSS project initiation time line by >
70% by optimizing the project workforce and framework.
Yasser I. G. Sukkar

More Related Content

Similar to Yasser I. G. Sukkar

Similar to Yasser I. G. Sukkar (20)

Adel eid ali resume
Adel eid ali resumeAdel eid ali resume
Adel eid ali resume
 
Khaled hanafy-CV
Khaled hanafy-CVKhaled hanafy-CV
Khaled hanafy-CV
 
CV-Andy Wanless-2016
CV-Andy Wanless-2016CV-Andy Wanless-2016
CV-Andy Wanless-2016
 
OpenStack in the Enterprise - Interop Las Vegas 2014
OpenStack in the Enterprise - Interop Las Vegas 2014OpenStack in the Enterprise - Interop Las Vegas 2014
OpenStack in the Enterprise - Interop Las Vegas 2014
 
Stuart stout cv 2015 v3
Stuart stout  cv 2015 v3Stuart stout  cv 2015 v3
Stuart stout cv 2015 v3
 
Robert Carey, Principal Deputy CIO, DOD Insight session
Robert Carey, Principal Deputy CIO, DOD Insight sessionRobert Carey, Principal Deputy CIO, DOD Insight session
Robert Carey, Principal Deputy CIO, DOD Insight session
 
Dumisani ncube cv_-_2017
Dumisani ncube cv_-_2017Dumisani ncube cv_-_2017
Dumisani ncube cv_-_2017
 
Yasser I. G. Sukkar resume 2015-2
Yasser I. G. Sukkar resume 2015-2Yasser I. G. Sukkar resume 2015-2
Yasser I. G. Sukkar resume 2015-2
 
Resume - LYL
Resume - LYLResume - LYL
Resume - LYL
 
Lars-Ole Slot CV EN
Lars-Ole Slot CV ENLars-Ole Slot CV EN
Lars-Ole Slot CV EN
 
Mahmoud khattab
Mahmoud khattabMahmoud khattab
Mahmoud khattab
 
Eyer
EyerEyer
Eyer
 
Moe Aboelela - Resume - May 17 2015 - Director
Moe Aboelela - Resume - May 17 2015 - DirectorMoe Aboelela - Resume - May 17 2015 - Director
Moe Aboelela - Resume - May 17 2015 - Director
 
IT Head - Resume
IT Head - ResumeIT Head - Resume
IT Head - Resume
 
IT_manager
IT_managerIT_manager
IT_manager
 
WL - Long_Oct 2016
WL -  Long_Oct 2016WL -  Long_Oct 2016
WL - Long_Oct 2016
 
SerdarTekin_CV_ast
SerdarTekin_CV_astSerdarTekin_CV_ast
SerdarTekin_CV_ast
 
GRANT DELP724
GRANT DELP724GRANT DELP724
GRANT DELP724
 
Hossam_Fahmy_Info. graphic CV
Hossam_Fahmy_Info. graphic CVHossam_Fahmy_Info. graphic CV
Hossam_Fahmy_Info. graphic CV
 
HK Resume
HK ResumeHK Resume
HK Resume
 

Recently uploaded

How we scaled to 80K users by doing nothing!.pdf
How we scaled to 80K users by doing nothing!.pdfHow we scaled to 80K users by doing nothing!.pdf
How we scaled to 80K users by doing nothing!.pdfSrushith Repakula
 
Easier, Faster, and More Powerful – Notes Document Properties Reimagined
Easier, Faster, and More Powerful – Notes Document Properties ReimaginedEasier, Faster, and More Powerful – Notes Document Properties Reimagined
Easier, Faster, and More Powerful – Notes Document Properties Reimaginedpanagenda
 
الأمن السيبراني - ما لا يسع للمستخدم جهله
الأمن السيبراني - ما لا يسع للمستخدم جهلهالأمن السيبراني - ما لا يسع للمستخدم جهله
الأمن السيبراني - ما لا يسع للمستخدم جهلهMohamed Sweelam
 
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)Samir Dash
 
ADP Passwordless Journey Case Study.pptx
ADP Passwordless Journey Case Study.pptxADP Passwordless Journey Case Study.pptx
ADP Passwordless Journey Case Study.pptxFIDO Alliance
 
Event-Driven Architecture Masterclass: Challenges in Stream Processing
Event-Driven Architecture Masterclass: Challenges in Stream ProcessingEvent-Driven Architecture Masterclass: Challenges in Stream Processing
Event-Driven Architecture Masterclass: Challenges in Stream ProcessingScyllaDB
 
Intro to Passkeys and the State of Passwordless.pptx
Intro to Passkeys and the State of Passwordless.pptxIntro to Passkeys and the State of Passwordless.pptx
Intro to Passkeys and the State of Passwordless.pptxFIDO Alliance
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontologyjohnbeverley2021
 
Generative AI Use Cases and Applications.pdf
Generative AI Use Cases and Applications.pdfGenerative AI Use Cases and Applications.pdf
Generative AI Use Cases and Applications.pdfalexjohnson7307
 
2024 May Patch Tuesday
2024 May Patch Tuesday2024 May Patch Tuesday
2024 May Patch TuesdayIvanti
 
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...Skynet Technologies
 
ChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps ProductivityChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps ProductivityVictorSzoltysek
 
Portal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russePortal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russe中 央社
 
AI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAnitaRaj43
 
UiPath manufacturing technology benefits and AI overview
UiPath manufacturing technology benefits and AI overviewUiPath manufacturing technology benefits and AI overview
UiPath manufacturing technology benefits and AI overviewDianaGray10
 
Design Guidelines for Passkeys 2024.pptx
Design Guidelines for Passkeys 2024.pptxDesign Guidelines for Passkeys 2024.pptx
Design Guidelines for Passkeys 2024.pptxFIDO Alliance
 
Microsoft CSP Briefing Pre-Engagement - Questionnaire
Microsoft CSP Briefing Pre-Engagement - QuestionnaireMicrosoft CSP Briefing Pre-Engagement - Questionnaire
Microsoft CSP Briefing Pre-Engagement - QuestionnaireExakis Nelite
 
Introduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDMIntroduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDMKumar Satyam
 
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...panagenda
 

Recently uploaded (20)

How we scaled to 80K users by doing nothing!.pdf
How we scaled to 80K users by doing nothing!.pdfHow we scaled to 80K users by doing nothing!.pdf
How we scaled to 80K users by doing nothing!.pdf
 
Easier, Faster, and More Powerful – Notes Document Properties Reimagined
Easier, Faster, and More Powerful – Notes Document Properties ReimaginedEasier, Faster, and More Powerful – Notes Document Properties Reimagined
Easier, Faster, and More Powerful – Notes Document Properties Reimagined
 
الأمن السيبراني - ما لا يسع للمستخدم جهله
الأمن السيبراني - ما لا يسع للمستخدم جهلهالأمن السيبراني - ما لا يسع للمستخدم جهله
الأمن السيبراني - ما لا يسع للمستخدم جهله
 
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
AI+A11Y 11MAY2024 HYDERBAD GAAD 2024 - HelloA11Y (11 May 2024)
 
ADP Passwordless Journey Case Study.pptx
ADP Passwordless Journey Case Study.pptxADP Passwordless Journey Case Study.pptx
ADP Passwordless Journey Case Study.pptx
 
Event-Driven Architecture Masterclass: Challenges in Stream Processing
Event-Driven Architecture Masterclass: Challenges in Stream ProcessingEvent-Driven Architecture Masterclass: Challenges in Stream Processing
Event-Driven Architecture Masterclass: Challenges in Stream Processing
 
Intro to Passkeys and the State of Passwordless.pptx
Intro to Passkeys and the State of Passwordless.pptxIntro to Passkeys and the State of Passwordless.pptx
Intro to Passkeys and the State of Passwordless.pptx
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 
Overview of Hyperledger Foundation
Overview of Hyperledger FoundationOverview of Hyperledger Foundation
Overview of Hyperledger Foundation
 
Generative AI Use Cases and Applications.pdf
Generative AI Use Cases and Applications.pdfGenerative AI Use Cases and Applications.pdf
Generative AI Use Cases and Applications.pdf
 
2024 May Patch Tuesday
2024 May Patch Tuesday2024 May Patch Tuesday
2024 May Patch Tuesday
 
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
 
ChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps ProductivityChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps Productivity
 
Portal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russePortal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russe
 
AI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by Anitaraj
 
UiPath manufacturing technology benefits and AI overview
UiPath manufacturing technology benefits and AI overviewUiPath manufacturing technology benefits and AI overview
UiPath manufacturing technology benefits and AI overview
 
Design Guidelines for Passkeys 2024.pptx
Design Guidelines for Passkeys 2024.pptxDesign Guidelines for Passkeys 2024.pptx
Design Guidelines for Passkeys 2024.pptx
 
Microsoft CSP Briefing Pre-Engagement - Questionnaire
Microsoft CSP Briefing Pre-Engagement - QuestionnaireMicrosoft CSP Briefing Pre-Engagement - Questionnaire
Microsoft CSP Briefing Pre-Engagement - Questionnaire
 
Introduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDMIntroduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDM
 
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
 

Yasser I. G. Sukkar

  • 1. Yasser I. G. Sukkar CAREER PATH STORIES
  • 2. Regional Information Technology Institute (RITI) May1992 till April1995 Title: Technical officer and support engineer Was ◦ Established with no who’s who ◦ No dedicated infrastructure ◦ Outsourced for other’s training ◦ Public events handling ◦ Limited organization ◦ Shared resources ◦ No technical support for other OU’s Became ◦ Who’s-who built, filled & tracked ◦ Increased customer base ◦ RITI activities awareness increased ◦ Fully equipped laps and infrastructure ◦ Adopting others and self training ◦ Initiating First distance learning systems ◦ Perform resource & material rescue solely in several event ◦ Global technical support for many OU’s in RITI, RITSEC & IDSC
  • 3. Microsoft Egypt May1995 till December1996 Title: ECU “Enterprise consultant unit” Microsoft Was ◦ Being under initiation and legalization ◦ 6 staff members + 6 interims ◦ Depending on Reps Microsoft Became ◦ Support in closing major deals. ◦ Participate in Microsoft Middle-east act ◦ Third certified MCSE in Middle-east ◦ First certified MS-Networking essentials ◦ Documented for 2 winning stories (replacing Microsoft back-end SNA) with Mainframe terminal services) ◦ Installing 2nd major MS-Exchange server
  • 4. American Chamber of Commerce (Egypt) Jan1996 till June1997 Title: MIS Manager AmCham Was ◦ Acquisition platform for AMCHAM, IT ◦ Limited technical support office ◦ No Web-Security ◦ No Financial transactions enabled ◦ Manually fed Databases ◦ Non-layered infrastructure / Networks AmCham Became ◦ High performance platform established ◦ Internal and external support provisioned ◦ Matchmaking & web interfaces designed ◦ Event related electronic announcements ◦ Enabled Web security and signatures ◦ Enabled Web with financial transactions ◦ Databases are fully interfaced and automated ◦ Networks & infrastructure redesigned and layered.
  • 5. Deminex (Before RWE) June1997 till December1999 Title: IT General Manager Deminex Cairo offices Was ◦ Legacy (Vax) platform ◦ GroupWise mail system ◦ Very old LAN / WAN infrastructure ◦ Poor tie lines ( 64 KB) over X25 ◦ Initial process of RWE Acquisition ◦ No standards sets ◦ Old Voice systems (Meridian mail) ◦ Poor end users’ service provisioning thus personalized ◦ IT limitations for business strategies and expansions Deminex Offices Became ◦ Successful and smooth Migration to MS-DC ◦ Legacy system total shutdown ◦ Smooth migration to MS-Exchange 5.5 ◦ LAN innovation to UTP CAT 6 / better switches ◦ Upgrading WAN to Frame-relay / Orange Hub ◦ Upgrading / speeding round trips for traffic (100 MS) ◦ Securing lines between sites (Cairo / GMBH) ◦ Initiating the (German Oil and Gas) Brand for acquisition ◦ Setting mutual standards for global objects sets with head offices ◦ Integrating Voice systems (Meridian mail with Alcatel systems GMBH) ◦ Initiating New Building setup, coo working with electromechanical acts ◦ Finalizing central DC, and licenses contracts for clients and applications ◦ Global participating in Year 2000 shifting plan successfully
  • 6. (GEOGE) RWE Dea , Egypt Jan, 2000 till October, 2010 Title: Head of IT integration and strategic planning GEOGE Was ◦ Not an active member in IT DSS in Main offices ◦ Domestically running its projects and IT standards ◦ No linkage with main office global agreements ◦ Running its local services processes successfully ◦ Initiating documentation for all its standards ◦ Initial phase of transfer to RWE Dea, Egypt instead ◦ Running temporary standards, yet not globalized ◦ Only one building with very advanced infrastructure ◦ Only one data center with simple layout and low security GEOGE Became RWE Dea, Egypt ◦ Initiating the first Global IT manager semi-annual meeting in GMBH ◦ Exchange and coordinate IT experiences (Cairo / Germany) ◦ Integrated project along the whole RWE Branches ◦ Considering Cairo standards as more expressing sets ◦ IT Centralization for all IT management systems among sites ◦ Unified standards deployment for all IT layers and procedures ◦ GEOGE, became RWE Dea Egypt Branches officially ◦ Merging and unifying all IT contracts along the whole sites ◦ Participating in infrastructure, fields plans, drilling activities, contracts, and supply chain projects along all sites ◦ Yasser I. G. Sukkar became Head of IT sector in Egypt ◦ Yasser I. G. Sukkar elected, participated in the focus leadership program with remarkable announcement and success rates ◦ Initiating projects for saving man-day time at a specific operational layer successfully, and globally deployed. ◦ Linking more 4 buildings to the main building including infrastructure (power / data / voice) ◦ Finalizing full security, access, inventory using RFID applications ◦ Finalizing the second online / mirror data center with full documentation and infrastructure mapping and life tests.
  • 7. National Bank of Egypt (NBE) Nov. 2010 till Present time Title: Director, Shared services technology group (SSTG) NBE Was ◦ SSTG activities was newly established ◦ NBE was at transition of IT organization ◦ No fixed scopes, no fixed procedures & processes ◦ Many functional conflict of interests ◦ Yasser I. G. Sukkar received an aggressive plan for renovating IT environment ◦ Some dead projects for long years blocking innovation activities ◦ Cross cultural conflicts was on the ground ◦ Huge legacies and as-is operations for last many years ◦ Issues with staff skills and knowledge inventory ◦ Many Silos in operations layers. ◦ No written procedures for each operation pillar ◦ No fixed compliance or valid reports to rely on. SSTG Became ◦ Better matured after re-organization and segregation of authorities ◦ Link functions and creating full procedures documents for each pillar of IT operations ◦ Re-building knowledge at the service desk activities ◦ Initiating knowledge transfer sessions for all staff in IT ◦ Rebuilding the mission and vision of IT services at the top management level ◦ Increase the communication amongst pillars and enforce openness ◦ Handling one of the biggest dead projects in NBE till its officially closed and delivered after 13 years of malfunction @ 0 cost ◦ Splitting the huge org-chart and map it to the actual operations ◦ Handling the pillar of sstg Job description and review individual scope ◦ Set KPI’s and measurement for performance, and rewarding methodology to comply with IT business nature ◦ Build a link between pure business directions and IT practices. ◦ Link IT activities with other compliances and non-IT functioning OU’s ◦ Initiating the concept of IT Decision support systems ◦ Formulating the project of ITSM / IT-DSS in NBE and owned the project planning and maturity roadmap.
  • 8. National Bank of Egypt (NBE) Nov. 2010 till Present time (Continued) Title: Director, Shared services technology group (SSTG) Initiating ITSM Pillar as an independent OU ◦ Proposed and gain acceptance for building the ITSM organization chart within NBE OU’s ◦ Initiating and successfully delivering the enterprise log collection system in NBE IT environment as a core foundation for user’s / system activities ◦ Generate Straight Through processed reports and near real time monitoring instead of 24 yours after fact reporting ◦ Recharged the teams and initiate motivation plans to increase their skill sets on both technical and soft skills aspects ◦ Deploy all self based obtained soft and technical skills to share knowledge and vision with other coworkers and pears to increase the buy-in for the renewed approaches ◦ Encourage coworkers to provide more efforts and worked on increasing their awareness via initiating group meeting and presentation and brain storming sessions ◦ Participate in Graduate School of Banking technology program in Wisconsin / Madison ◦ Coordinate and shorten the ITSM – IT/DSS project initiation time line by > 70% by optimizing the project workforce and framework.