Introduction to building
The Bechtler Museum, located in downtown Charlotte, North
Carolina, was designed by Swiss architect Mario Botta. Established on the 2nd
of January 2010, Bechtler museum exhibits modern artworks from the mid 20th
century. This 3390 square meter four-story structure has a soaring glass atrium
that extends throughout the museum’s core and diffuses natural light into the
building. The dominant feature of this solid structure is its fourth floor which
extends from the core of the building, cantilevered and supported by the
signature column rising from the open atrium below.
A rigorous, yet elegant simplicity selection has been made by Botta
in the palette of materials used which includes the combination of glass, steel,
black granite, terracotta, polished concrete and wood. Botta had designed
intending for a strong, contemporary structures that layer the colours, texture
and materials for a solid architectural and sculptural power that connects to
the dynamic art inside it.
1
Orthographic drawings
Second Floor Plan
Third Floor Plan
Fourth Floor Plan
A A
First Floor Plan
B
B
2
Front elevation Section A-A
3
1
2
4
5
Section B-B
3
4
1. Skylight
2. Terracotta Cladding
3. Wall
4. Composite Concrete Slab
5. Column with Terracotta
Tile
Load Distributions
The cantilever of the building is
supported by W40 x 362 wide flange
steel beams installed in the roof
structure and fourth floor. Above and
below each walls at the cantilever
there will be a cross beam.
The loads from the top are
transferred downward through the
load transferring walls to the
foundation footings.
The column is an important part of
the structure to support the fourth
floor. It is placed in the middle of the
cantilever and directly under the steel
beams
To transfer the load more effectively.
The longer the span of the cantilever and the further it is from the supporting structure, the larger the load.
The cross bracing tension cables are used to strengthen the structure of the glass atrium especially when
large loads are transferred from the top.
5
Detailing
1. Skylight
The load from the top is distributed to the
wide flange steel girders that spans across
the roof and is transferred to the wall
system.
The coffered design of the skylight is used
to lighten the roof weight while concealing
the large steel beams and mechanical
structures.
Front section of skylight
Side section of skylight
Air conditioning duct
Wide flange
steel girder
Water resistant
roof membrane
Wall
Terracotta tile
cladding
Metal
decking
Parapet
Wall
6
Detailing
2. Terracotta cladding
The custom engineered TerraClad™ used is
composed of fire clays, colored aggregate,
and fluxes that were fired to a specific firing
curve allowing the terracotta to be frost
resistant and high freeze thaw.
Sectional view of the
cladding system
1
2
3
1
Clip with isolator
Installation of cladding system
7
Ship lapped design
The incorporation of ship lapped open joint design of the
panel had shield the structure from moisture that enter the
ventilated cavity. Gaskets and isolators of the rain screen
provide a snug fit between panels and the framing system
to prevent wind induced rattle and allow for movement of
the aluminum framing due to thermal expansion.
2
3
8
Detailing
3. Wall
Gypsum Board
Insulation
Plaster
Plywood
The drywalls of the Bechtler Museum allow
for equal load transfers as the walls are more
stable. The insulation also maintains the
temperature in the interior due to the four
seasons experienced in North Carolina. The
gypsum board on the drywall is also fire-
proof and acoustically beneficial causing it to
be a preferable building material.
9
Construction detail of
Drywall
Terracotta
Cladding
Waterproof
Membrane
Metal Stud
Granite Flooring
Concrete
Wide flange steel
girder
C-Channel
4. Composite Concrete Slab
Metal Decking
The composite concrete wall slab acts as a support
for Bechtler museum. It works by increasing the load
capacity of flooring system. The concrete slab
together with in-situ infill in conjunction with welded
shear studs onto I-beam to enable the slabs and the
steel beams to act compositely.
Construction detail of
composite floor system
10
Detailing
Wide flange steel girders are set up to
form the structure of the cantilever. Then
metal decking are fixed to the steel beams
using shear studs. The edge of the metal
decking was folded up to prevent the
poured concrete from flowing out. A layer
of black granite and insulation is used as
the floor finishes.
For the exterior wall, steel studs used as
terracotta tile tracks system are fixed onto
the c-channel.
Detailing
5. Column with terracotta tile cladding
(Pic) The column was first assembled for
visual inspection prior to its disassembly
and transportation to site.
The sculptural column rising up 3 story
(47 feet tall) was constructed with the use
of hot dipped galvanized attachments in
place of stainless steel fasteners onto the
concrete column.
The column is made of concrete with
specified 28-days compressive strength
of 12,000 psi. The reason concrete is
used because it could support larger load
with a slender frame compared to other
materials.
Corrugated Decking
Crossbeam
Flange Girder
Flange Steel
Terra-cotta Pavers
Concrete Floor Slab Aluminum Cladding
Convex Steel Frame
Aluminum Cladding
Column connects with
Steel Anchor Bolts
Terra-cotta Ceiling
Cladding
11
Before applying the cement to the decking, concrete
ratio experiments had been done to find out the most
suitable ratio for the concrete flooring. First trials of
concrete mixing used no sands as the binding agent,
the ratio of cement to water is 2: 1.
After mixing it, the mixture
was left for several hours
under the sun to let it dry.
The final product of the cement
was smooth and powdery. It was
easily crack as it did not has
aggregates such as sand to hold
the concrete mixture.
Corrugated paper was used as metal decking as it
has corrugated surface similar to the metal
decking. Smooth sand was added into the
concrete mixture. The ratio of cement to sand to
water is 2: 1.5: 1.
As the result, the mixture did not go under the wire mesh as the sand
particles are not small enough to pass through the wire mesh. The
corrugated paper was not suitable as metal decking as it absorbs the
water of the concrete mixture.
Modelling process Composite concrete flooring
12
Corrugated paper had been replaced with
plastic board. Plastic board is more suitable
than corrugated paper as it is light and
waterproof. It had been cut into metal
decking shape and sprayed for metallic
surface purpose.
The sand mixture was filtered by using
wire mesh to enable smoother surface
for the final product compared to
previous batches of concrete mixtures.
The ratio of cement to sand to water is
2: 1: 0.5.
During the process of drying,
many bubbles appeared on the
surface of concrete as the
narrow gap between the metal
decking was not completely
filled in with concrete. As the
result, the concrete cracked on
the next day.
The ratio of cement to sand to
water is adjusted to 5: 1.5.
Wood shreds were added into
the concrete mixture to reduce
the possibility of cracking of
concrete.
Composite concrete flooring
13
Metal Decking Process
Balsa wood is used as the material for I-beam
under the metal decking. This is because balsa
wood is available in different type of thickness. It
is also a light material hence the floor system will
not be too heavy as the cantilever section is only
supported by one column.
After aligning, both structural system is ready to be glued. Each
connections of the structural systems was connected using hot
glue gun to increase the durability and strength of the structures.
Plastic model pipes are
used as c-channels as it
is light and available in
different sizes. Cutting
mat was used to make
sure all the c-channels
are aligned.
The floor system with materials representing
the black granite, concrete with metal
decking, steel girders, c-channels and metal
studs.
Composite concrete flooring
14
Column making
A white modelling board I-beam was
added in the center of the column
acting as the load structural system
and to also hold the concrete
together.
First trial of the concrete column
without an I-beam in the middle. The
column was made by filling up the
straw mold. It broke off into pieces.
First trial of the frame for the
terracotta tiles of the column.
Soldering tool and alloy were used to
combine the alloy rings. The alloy
could not combine properly and it
took too much time.
Hot glue gun was used instead for
the joint of the frames. A protractor
was used to determine the position of
the vertical frames on the rings.
Load bearing column
After completion of the internal
framing, excess glue stains were
removed with nail polish remover. It
was then sprayed with gray paint.
The column was then inserted into
the alloy frame and column specific
terracotta cladding were attached
onto frame.
15
Grey board was used as a
substitute for the Terracotta
cladding. This is due to the texture
and thickness. Different colours
and paint to water ratio were
tested on the board.
The grey board was cut upon the
surface, the measurements were
scaled from the length and width
to simulate the gaps between
alternating cladding.
A separate set of grey board was cut
into individual pieces to be used as the
ship-lapped design of the panels.
The grey boards was then
painted with brown with a slight
addition of peach in order to
match the colour of the original
cladding.
An issue faced during the cutting of
the cladding is that the pieces tend
to come loose, or break completely
mainly because each cladding were
cut individually and the minute scale
of the cladding.
Due to the cutting of the coloured grey board
into individual strips of cladding, the grey board
was repainted . This caused excess water
from the paint to be absorbed by the board
making the strips flimsy during the assembly
and completion of the cladding.
Terracotta cladding
16
Dry wall composed of several
layers; the first exterior layer was
made of a 0.2mm thick balsa wood
to represent ply wood, 0.1mm balsa
wood as gypsum board and wool in
between the two as insulation.
Long plastic sticks matching the
height of the wall are placed in
intervals along the wall as steel
studs
Putty filler was applied onto the 0.1mm
balsa as the internal plastering and was
smoothened out.
The tile cladding tracks system
made with plastic sticks was
glued onto the external wall.
The terracotta cladding was then
attached to the exterior surface of the
wall.
Dry wall
17
White model making board was
used for the flat surface whereas
the curved surface of the skylight
uses white card as it is more
flexible.
Plastic sheets were curved and
attached onto the gaps of the
upper surface of the skylight.
A difficulty faced during
construction of the curved surface
was the accurate gradient of the
curve causing numerous attempts
of different measurements in
order to achieve the proper
curvature.
The plastic sheets were then
engraved with vertical lines to
allow bending of the sheets.
Due to the fact that the skylight spans horizontally over the whole model with
minimal support from the wall, the weight distribution of the roof and skylight
were an initial problem. It was then solved with the addition of I-beams made
from mounting boards inserted in between the skylight to act as support.
Skylight
18
After this project, we realized appropriate construction method is important to avoid uneven load distribution and
cause structural failure of the building. The materials used should be considerate and tested first before applying
it in final model. In this case, concrete is hard to handle as it may crack easily due to the improper mixture.
During the modelling phase, parts that are made separately required thorough planning to ensure premade parts
are able to connect to one another accurately. This applies to real life construction too as precast parts must be
precise to avoid problems.
In addition, the progress of the model and report should be simultaneous. The materials and model should be
kept properly to avoid loss or damage as this is also a common issue on actual construction sites. As such, our
group should work systematically and on time to meet the deadline requirements.
19
Conclusion & Final Model
Architecture Week, (2010). Bechtler Museum. [image] Available at: http://www.architectureweek.com/2010/0407/design_4-3.html [Accessed
14 Jun. 2014].
Architecture Week, (2010). Bechtler Museum by Botta. [image] Available at: http://www.architectureweek.com/2010/0217/design_1-2.html
[Accessed 13 Jun. 2014].
ArchwebDWG, (2014). Bechtler Museum of Modern Art. [image] Available at:
http://www.archweb.it/dwg/arch_arredi_famosi/mario_botta/Bechtler_Museum/Bechtler_museum_dwg.htm [Accessed 10 Jun. 2014].
Bechtler Museum of Modern Art. (n.d.). 1st ed. [ebook] Available at: http://www.kingguinn.com/libraries/portfolio/publications/317.pdf
[Accessed 13 Jun. 2014].
Boston Valley Terra Cotta. (2014). 1st ed. [ebook] Institute. Available at:
http://www.swrionline.org/UserFiles/File/Fall09/Project%20Showcase%20Presentations/Architectural%20Terra%20Cotta%20Ventilated%20
Ceramic%20Screen%20Wall%20Systems%20by%20Sheri%20Carter.pdf [Accessed 14 Jun. 2014].
Innovative Manufacturing in Architectural Ceramics. (n.d.). 1st ed. [ebook] New York: Boston Valley. Available at: http://www.triton-
ca.com/pdf_files/BV_TerraClad%20Design%20Guide.pdf [Accessed 13 Jun. 2014].
Steelconstruction.info, (2014). Acoustic performance of floors. [online] Available at:
http://www.steelconstruction.info/Acoustic_performance_of_floors [Accessed 15 Jun. 2014].
Worldarchitecturemap.org, (2014). WAM | Bechtler Museum of Modern Art | Charlotte. [online] Available at:
http://www.worldarchitecturemap.org/buildings/bechtler-museum-of-modern-art [Accessed 15 Jun. 2014].
Reference
20

More Related Content

What's hot

High-rise case study in Seagram Building & John Hancock Center
High-rise case study in Seagram Building & John Hancock CenterHigh-rise case study in Seagram Building & John Hancock Center
High-rise case study in Seagram Building & John Hancock CenterNuruzzamanpeash
 
Sanskar Kendra casestudy, ahmedabad, india casestudy
Sanskar Kendra casestudy, ahmedabad, india casestudySanskar Kendra casestudy, ahmedabad, india casestudy
Sanskar Kendra casestudy, ahmedabad, india casestudymanoj chauhan
 
Kanchenjunga Apartments- A Case Study
Kanchenjunga Apartments- A Case StudyKanchenjunga Apartments- A Case Study
Kanchenjunga Apartments- A Case StudyShivangi Shankar
 
Auditorium design ppt
Auditorium design pptAuditorium design ppt
Auditorium design pptAlok Ranjan
 
Acp and glazing
Acp and glazingAcp and glazing
Acp and glazingaduiti
 
Project 1 : Auditorium - A Case Study of Acoustic Design
Project 1 : Auditorium - A Case Study of Acoustic DesignProject 1 : Auditorium - A Case Study of Acoustic Design
Project 1 : Auditorium - A Case Study of Acoustic DesignBryan Yeoh
 
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHERE
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHEREPREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHERE
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHEREShivangi Saini
 
Dr. Bhim Rao Ambedkar Auditorium
Dr. Bhim Rao Ambedkar AuditoriumDr. Bhim Rao Ambedkar Auditorium
Dr. Bhim Rao Ambedkar AuditoriumAmir Azhar
 
Nanyang Technological University School of Art Design and Media Building Scie...
Nanyang Technological University School of Art Design and Media Building Scie...Nanyang Technological University School of Art Design and Media Building Scie...
Nanyang Technological University School of Art Design and Media Building Scie...Adila Zaas
 
Architecture for the deaf by wamugi
Architecture for the deaf  by wamugiArchitecture for the deaf  by wamugi
Architecture for the deaf by wamugiDuncan Wamugi
 
Palazetto Dello sport
Palazetto Dello sportPalazetto Dello sport
Palazetto Dello sportjigarramani1
 
Mix use building case Study
Mix use building case Study Mix use building case Study
Mix use building case Study Nitesh Parmar
 
auditorium sightline
auditorium sightlineauditorium sightline
auditorium sightlineSougata De
 
Flat Grid / Waffle Slab
Flat Grid / Waffle SlabFlat Grid / Waffle Slab
Flat Grid / Waffle SlabAkshay Gawade
 
GERSONSVEJ YOUTH CENTRE CASE STUDY
GERSONSVEJ YOUTH CENTRE CASE STUDYGERSONSVEJ YOUTH CENTRE CASE STUDY
GERSONSVEJ YOUTH CENTRE CASE STUDYAJAYS100
 

What's hot (20)

High-rise case study in Seagram Building & John Hancock Center
High-rise case study in Seagram Building & John Hancock CenterHigh-rise case study in Seagram Building & John Hancock Center
High-rise case study in Seagram Building & John Hancock Center
 
Sanskar Kendra casestudy, ahmedabad, india casestudy
Sanskar Kendra casestudy, ahmedabad, india casestudySanskar Kendra casestudy, ahmedabad, india casestudy
Sanskar Kendra casestudy, ahmedabad, india casestudy
 
Kanchenjunga Apartments- A Case Study
Kanchenjunga Apartments- A Case StudyKanchenjunga Apartments- A Case Study
Kanchenjunga Apartments- A Case Study
 
Auditorium design ppt
Auditorium design pptAuditorium design ppt
Auditorium design ppt
 
Auditorium acoustics
Auditorium acousticsAuditorium acoustics
Auditorium acoustics
 
Acp and glazing
Acp and glazingAcp and glazing
Acp and glazing
 
Project 1 : Auditorium - A Case Study of Acoustic Design
Project 1 : Auditorium - A Case Study of Acoustic DesignProject 1 : Auditorium - A Case Study of Acoustic Design
Project 1 : Auditorium - A Case Study of Acoustic Design
 
Acp panel
Acp panelAcp panel
Acp panel
 
Steel window Designs
Steel window DesignsSteel window Designs
Steel window Designs
 
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHERE
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHEREPREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHERE
PREFABRICATED CONSTRUCTION CASE STUDY: THE HEMISPHERE
 
Dr. Bhim Rao Ambedkar Auditorium
Dr. Bhim Rao Ambedkar AuditoriumDr. Bhim Rao Ambedkar Auditorium
Dr. Bhim Rao Ambedkar Auditorium
 
Nanyang Technological University School of Art Design and Media Building Scie...
Nanyang Technological University School of Art Design and Media Building Scie...Nanyang Technological University School of Art Design and Media Building Scie...
Nanyang Technological University School of Art Design and Media Building Scie...
 
Acoustic Case Study
Acoustic Case Study Acoustic Case Study
Acoustic Case Study
 
Architecture for the deaf by wamugi
Architecture for the deaf  by wamugiArchitecture for the deaf  by wamugi
Architecture for the deaf by wamugi
 
Palazetto Dello sport
Palazetto Dello sportPalazetto Dello sport
Palazetto Dello sport
 
Mix use building case Study
Mix use building case Study Mix use building case Study
Mix use building case Study
 
auditorium sightline
auditorium sightlineauditorium sightline
auditorium sightline
 
Frank Gehry
Frank GehryFrank Gehry
Frank Gehry
 
Flat Grid / Waffle Slab
Flat Grid / Waffle SlabFlat Grid / Waffle Slab
Flat Grid / Waffle Slab
 
GERSONSVEJ YOUTH CENTRE CASE STUDY
GERSONSVEJ YOUTH CENTRE CASE STUDYGERSONSVEJ YOUTH CENTRE CASE STUDY
GERSONSVEJ YOUTH CENTRE CASE STUDY
 

Viewers also liked

Super Insulated Building Enclosures
 Super Insulated Building Enclosures Super Insulated Building Enclosures
Super Insulated Building EnclosuresRDH Building Science
 
Energy Efficient Building Enclosure Design Guidelines for Wood-Frame Buildings
Energy Efficient Building Enclosure Design Guidelines for Wood-Frame BuildingsEnergy Efficient Building Enclosure Design Guidelines for Wood-Frame Buildings
Energy Efficient Building Enclosure Design Guidelines for Wood-Frame BuildingsRDH Building Science
 
Portfolio Elena Graziano Architect
Portfolio Elena Graziano ArchitectPortfolio Elena Graziano Architect
Portfolio Elena Graziano ArchitectElena Graziano
 
SEC01_BRYAN,BIETSCH_A310-WALLSECTION4
SEC01_BRYAN,BIETSCH_A310-WALLSECTION4SEC01_BRYAN,BIETSCH_A310-WALLSECTION4
SEC01_BRYAN,BIETSCH_A310-WALLSECTION4Bryan Bietsch
 
3-D Form / Spher, Cone / 6 grade
3-D Form / Spher, Cone / 6 grade3-D Form / Spher, Cone / 6 grade
3-D Form / Spher, Cone / 6 gradenatalia w
 
Brochure Space Order Form
Brochure Space Order FormBrochure Space Order Form
Brochure Space Order Formdgamache
 
Dwelling Ecologies in Harrison, NJ (Dobin, Jaewoo)
Dwelling Ecologies in Harrison, NJ (Dobin, Jaewoo)Dwelling Ecologies in Harrison, NJ (Dobin, Jaewoo)
Dwelling Ecologies in Harrison, NJ (Dobin, Jaewoo)dobin6045
 
Tangram, Scale & Proportion 2
Tangram, Scale & Proportion 2Tangram, Scale & Proportion 2
Tangram, Scale & Proportion 2arunogale
 
City Treasure: Mobile Games for Learning Cultural Heritag
City Treasure: Mobile Games for Learning Cultural HeritagCity Treasure: Mobile Games for Learning Cultural Heritag
City Treasure: Mobile Games for Learning Cultural Heritagmuseums and the web
 
Presentation1 plane-FORM SPACE AND ORDER
Presentation1 plane-FORM SPACE AND ORDERPresentation1 plane-FORM SPACE AND ORDER
Presentation1 plane-FORM SPACE AND ORDERSamridhi Gupta
 
Art amazing architecture
Art amazing architectureArt amazing architecture
Art amazing architecturepccastillo2000
 
Arkitekt of the century dt
Arkitekt of the century dtArkitekt of the century dt
Arkitekt of the century dtMike Hobson
 
Michel Angelo Buonarotti
Michel Angelo BuonarottiMichel Angelo Buonarotti
Michel Angelo Buonarottijoserra msm
 
.laminates -BUILDING MATERIAL-LAMINATE
.laminates -BUILDING MATERIAL-LAMINATE.laminates -BUILDING MATERIAL-LAMINATE
.laminates -BUILDING MATERIAL-LAMINATESamridhi Gupta
 
Posmodernismo: Mario Botta
Posmodernismo: Mario BottaPosmodernismo: Mario Botta
Posmodernismo: Mario BottaMichelle Goral
 
Prefabrication : challenges and opportunities for the contractor
Prefabrication : challenges and opportunities for the contractorPrefabrication : challenges and opportunities for the contractor
Prefabrication : challenges and opportunities for the contractorBenoit Parmentier
 
Architectural Design 1 Lectures by Dr. Yasser Mahgoub - Lecture 9 Styles
Architectural Design 1 Lectures by Dr. Yasser Mahgoub - Lecture 9 StylesArchitectural Design 1 Lectures by Dr. Yasser Mahgoub - Lecture 9 Styles
Architectural Design 1 Lectures by Dr. Yasser Mahgoub - Lecture 9 StylesGalala University
 

Viewers also liked (20)

Super Insulated Building Enclosures
 Super Insulated Building Enclosures Super Insulated Building Enclosures
Super Insulated Building Enclosures
 
Energy Efficient Building Enclosure Design Guidelines for Wood-Frame Buildings
Energy Efficient Building Enclosure Design Guidelines for Wood-Frame BuildingsEnergy Efficient Building Enclosure Design Guidelines for Wood-Frame Buildings
Energy Efficient Building Enclosure Design Guidelines for Wood-Frame Buildings
 
Portfolio Elena Graziano Architect
Portfolio Elena Graziano ArchitectPortfolio Elena Graziano Architect
Portfolio Elena Graziano Architect
 
SEC01_BRYAN,BIETSCH_A310-WALLSECTION4
SEC01_BRYAN,BIETSCH_A310-WALLSECTION4SEC01_BRYAN,BIETSCH_A310-WALLSECTION4
SEC01_BRYAN,BIETSCH_A310-WALLSECTION4
 
3-D Form / Spher, Cone / 6 grade
3-D Form / Spher, Cone / 6 grade3-D Form / Spher, Cone / 6 grade
3-D Form / Spher, Cone / 6 grade
 
Brochure Space Order Form
Brochure Space Order FormBrochure Space Order Form
Brochure Space Order Form
 
Dwelling Ecologies in Harrison, NJ (Dobin, Jaewoo)
Dwelling Ecologies in Harrison, NJ (Dobin, Jaewoo)Dwelling Ecologies in Harrison, NJ (Dobin, Jaewoo)
Dwelling Ecologies in Harrison, NJ (Dobin, Jaewoo)
 
26 proportion scale
26   proportion scale26   proportion scale
26 proportion scale
 
Tangram, Scale & Proportion 2
Tangram, Scale & Proportion 2Tangram, Scale & Proportion 2
Tangram, Scale & Proportion 2
 
City Treasure: Mobile Games for Learning Cultural Heritag
City Treasure: Mobile Games for Learning Cultural HeritagCity Treasure: Mobile Games for Learning Cultural Heritag
City Treasure: Mobile Games for Learning Cultural Heritag
 
Presentation1 plane-FORM SPACE AND ORDER
Presentation1 plane-FORM SPACE AND ORDERPresentation1 plane-FORM SPACE AND ORDER
Presentation1 plane-FORM SPACE AND ORDER
 
BS8666 Shapes
BS8666 ShapesBS8666 Shapes
BS8666 Shapes
 
Arc466 Dwelling
Arc466   DwellingArc466   Dwelling
Arc466 Dwelling
 
Art amazing architecture
Art amazing architectureArt amazing architecture
Art amazing architecture
 
Arkitekt of the century dt
Arkitekt of the century dtArkitekt of the century dt
Arkitekt of the century dt
 
Michel Angelo Buonarotti
Michel Angelo BuonarottiMichel Angelo Buonarotti
Michel Angelo Buonarotti
 
.laminates -BUILDING MATERIAL-LAMINATE
.laminates -BUILDING MATERIAL-LAMINATE.laminates -BUILDING MATERIAL-LAMINATE
.laminates -BUILDING MATERIAL-LAMINATE
 
Posmodernismo: Mario Botta
Posmodernismo: Mario BottaPosmodernismo: Mario Botta
Posmodernismo: Mario Botta
 
Prefabrication : challenges and opportunities for the contractor
Prefabrication : challenges and opportunities for the contractorPrefabrication : challenges and opportunities for the contractor
Prefabrication : challenges and opportunities for the contractor
 
Architectural Design 1 Lectures by Dr. Yasser Mahgoub - Lecture 9 Styles
Architectural Design 1 Lectures by Dr. Yasser Mahgoub - Lecture 9 StylesArchitectural Design 1 Lectures by Dr. Yasser Mahgoub - Lecture 9 Styles
Architectural Design 1 Lectures by Dr. Yasser Mahgoub - Lecture 9 Styles
 

Similar to Bechtler Museum Construction

Building Materials- Concrete.pdf
Building Materials- Concrete.pdfBuilding Materials- Concrete.pdf
Building Materials- Concrete.pdfshahriararch
 
Building Technology Design Solution
Building Technology Design SolutionBuilding Technology Design Solution
Building Technology Design SolutionJia Xin Chee
 
Post Mortem Design Report (featuring Building Structures)
Post Mortem Design Report (featuring Building Structures)Post Mortem Design Report (featuring Building Structures)
Post Mortem Design Report (featuring Building Structures)Carmen Chan
 
Ch 10 Fire-Resistive Construction
Ch 10 Fire-Resistive ConstructionCh 10 Fire-Resistive Construction
Ch 10 Fire-Resistive Constructionsnoshoesam
 
Comparison Presentation Between Light Gauge Steel Frame Construction System a...
Comparison Presentation Between Light Gauge Steel Frame Construction System a...Comparison Presentation Between Light Gauge Steel Frame Construction System a...
Comparison Presentation Between Light Gauge Steel Frame Construction System a...Sankar Anand
 
concrete block properties & types
concrete block properties & typesconcrete block properties & types
concrete block properties & typesAli Rizgar
 
Final steel framing system report
Final steel framing system reportFinal steel framing system report
Final steel framing system reportshensin1015
 
ct3 group assignment
ct3 group assignment ct3 group assignment
ct3 group assignment shensin1015
 
Steel framing system report
Steel framing system reportSteel framing system report
Steel framing system reportw ss
 
Case studies for strengthening of existing structures
Case studies for strengthening of existing structuresCase studies for strengthening of existing structures
Case studies for strengthening of existing structuresParamaAthmeka
 
Experimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor SlabExperimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor SlabIRJET Journal
 
Building Materials Manuel Y Nacho 3ºA
Building Materials  Manuel Y Nacho 3ºABuilding Materials  Manuel Y Nacho 3ºA
Building Materials Manuel Y Nacho 3ºAManuel
 
Late Shri Sanat Mehta's low cost house at gandhinagar, india
Late Shri Sanat Mehta's low cost house at gandhinagar, indiaLate Shri Sanat Mehta's low cost house at gandhinagar, india
Late Shri Sanat Mehta's low cost house at gandhinagar, indiaShirish Avrani
 
Structural elements
Structural elementsStructural elements
Structural elementsvigyanashram
 

Similar to Bechtler Museum Construction (20)

Building Materials- Concrete.pdf
Building Materials- Concrete.pdfBuilding Materials- Concrete.pdf
Building Materials- Concrete.pdf
 
RCC
RCCRCC
RCC
 
Finishingworks.pptx
Finishingworks.pptxFinishingworks.pptx
Finishingworks.pptx
 
Building Technology Design Solution
Building Technology Design SolutionBuilding Technology Design Solution
Building Technology Design Solution
 
Post Mortem Design Report (featuring Building Structures)
Post Mortem Design Report (featuring Building Structures)Post Mortem Design Report (featuring Building Structures)
Post Mortem Design Report (featuring Building Structures)
 
Temporary Works (Form Work)
Temporary Works (Form Work)Temporary Works (Form Work)
Temporary Works (Form Work)
 
Ch 10 Fire-Resistive Construction
Ch 10 Fire-Resistive ConstructionCh 10 Fire-Resistive Construction
Ch 10 Fire-Resistive Construction
 
Comparison Presentation Between Light Gauge Steel Frame Construction System a...
Comparison Presentation Between Light Gauge Steel Frame Construction System a...Comparison Presentation Between Light Gauge Steel Frame Construction System a...
Comparison Presentation Between Light Gauge Steel Frame Construction System a...
 
concrete block properties & types
concrete block properties & typesconcrete block properties & types
concrete block properties & types
 
Final steel framing system report
Final steel framing system reportFinal steel framing system report
Final steel framing system report
 
ct3 group assignment
ct3 group assignment ct3 group assignment
ct3 group assignment
 
Steel framing system report
Steel framing system reportSteel framing system report
Steel framing system report
 
Case studies for strengthening of existing structures
Case studies for strengthening of existing structuresCase studies for strengthening of existing structures
Case studies for strengthening of existing structures
 
Experimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor SlabExperimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor Slab
 
Building Materials Manuel Y Nacho 3ºA
Building Materials  Manuel Y Nacho 3ºABuilding Materials  Manuel Y Nacho 3ºA
Building Materials Manuel Y Nacho 3ºA
 
assignment two civil
assignment two civilassignment two civil
assignment two civil
 
RCC Floor
RCC FloorRCC Floor
RCC Floor
 
Late Shri Sanat Mehta's low cost house at gandhinagar, india
Late Shri Sanat Mehta's low cost house at gandhinagar, indiaLate Shri Sanat Mehta's low cost house at gandhinagar, india
Late Shri Sanat Mehta's low cost house at gandhinagar, india
 
Structural elements
Structural elementsStructural elements
Structural elements
 
the house
 the house the house
the house
 

More from XingYue0907

Project Management | P1
Project Management | P1Project Management | P1
Project Management | P1XingYue0907
 
Building Technology 2 P2
Building Technology 2 P2Building Technology 2 P2
Building Technology 2 P2XingYue0907
 
Building Technology report
Building Technology reportBuilding Technology report
Building Technology reportXingYue0907
 
Design studio 5 group board
Design studio 5 group boardDesign studio 5 group board
Design studio 5 group boardXingYue0907
 
Project 1 part 2 Jane Jacobs
Project 1 part 2 Jane JacobsProject 1 part 2 Jane Jacobs
Project 1 part 2 Jane JacobsXingYue0907
 
Project 2 IOI Boulevard and Jane Jacob
Project 2 IOI Boulevard and Jane JacobProject 2 IOI Boulevard and Jane Jacob
Project 2 IOI Boulevard and Jane JacobXingYue0907
 
Theories project 1 group
Theories project 1 groupTheories project 1 group
Theories project 1 groupXingYue0907
 
Building services project 2
Building services project 2Building services project 2
Building services project 2XingYue0907
 
Building services group report
Building services group report Building services group report
Building services group report XingYue0907
 
Solaris Singapore report
Solaris Singapore report Solaris Singapore report
Solaris Singapore report XingYue0907
 
Building Construction tower project
Building Construction tower projectBuilding Construction tower project
Building Construction tower projectXingYue0907
 
Lot 2C2 Building Science Report
Lot 2C2 Building Science ReportLot 2C2 Building Science Report
Lot 2C2 Building Science ReportXingYue0907
 
Building construction 1 group report
Building construction 1 group reportBuilding construction 1 group report
Building construction 1 group reportXingYue0907
 
Bm mood board ..
Bm mood board ..Bm mood board ..
Bm mood board ..XingYue0907
 
CnH 1 Florence Cathedral essay
CnH 1 Florence Cathedral essayCnH 1 Florence Cathedral essay
CnH 1 Florence Cathedral essayXingYue0907
 
CnC photobook xing yue
CnC photobook xing yueCnC photobook xing yue
CnC photobook xing yueXingYue0907
 
Materials and structure
Materials and structure Materials and structure
Materials and structure XingYue0907
 
What is animal cruelty 2
What is animal cruelty 2What is animal cruelty 2
What is animal cruelty 2XingYue0907
 

More from XingYue0907 (19)

Project Management | P1
Project Management | P1Project Management | P1
Project Management | P1
 
Building Technology 2 P2
Building Technology 2 P2Building Technology 2 P2
Building Technology 2 P2
 
Building Technology report
Building Technology reportBuilding Technology report
Building Technology report
 
Design studio 5 group board
Design studio 5 group boardDesign studio 5 group board
Design studio 5 group board
 
Project 1 part 2 Jane Jacobs
Project 1 part 2 Jane JacobsProject 1 part 2 Jane Jacobs
Project 1 part 2 Jane Jacobs
 
Project 2 IOI Boulevard and Jane Jacob
Project 2 IOI Boulevard and Jane JacobProject 2 IOI Boulevard and Jane Jacob
Project 2 IOI Boulevard and Jane Jacob
 
Theories project 1 group
Theories project 1 groupTheories project 1 group
Theories project 1 group
 
Building services project 2
Building services project 2Building services project 2
Building services project 2
 
Building services group report
Building services group report Building services group report
Building services group report
 
Solaris Singapore report
Solaris Singapore report Solaris Singapore report
Solaris Singapore report
 
Building Construction tower project
Building Construction tower projectBuilding Construction tower project
Building Construction tower project
 
Lot 2C2 Building Science Report
Lot 2C2 Building Science ReportLot 2C2 Building Science Report
Lot 2C2 Building Science Report
 
Building construction 1 group report
Building construction 1 group reportBuilding construction 1 group report
Building construction 1 group report
 
Bmats1
Bmats1Bmats1
Bmats1
 
Bm mood board ..
Bm mood board ..Bm mood board ..
Bm mood board ..
 
CnH 1 Florence Cathedral essay
CnH 1 Florence Cathedral essayCnH 1 Florence Cathedral essay
CnH 1 Florence Cathedral essay
 
CnC photobook xing yue
CnC photobook xing yueCnC photobook xing yue
CnC photobook xing yue
 
Materials and structure
Materials and structure Materials and structure
Materials and structure
 
What is animal cruelty 2
What is animal cruelty 2What is animal cruelty 2
What is animal cruelty 2
 

Recently uploaded

CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call GirlsCBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girlsmodelanjalisharma4
 
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...Call Girls in Nagpur High Profile
 
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...SUHANI PANDEY
 
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts ServiceVVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Servicearoranaina404
 
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...ranjana rawat
 
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Delhi Call girls
 
Fashion trends before and after covid.pptx
Fashion trends before and after covid.pptxFashion trends before and after covid.pptx
Fashion trends before and after covid.pptxVanshNarang19
 
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️soniya singh
 
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfThe_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfAmirYakdi
 
Design Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptxDesign Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptxTusharBahuguna2
 
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)amitlee9823
 
Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdftbatkhuu1
 
DragonBall PowerPoint Template for demo.pptx
DragonBall PowerPoint Template for demo.pptxDragonBall PowerPoint Template for demo.pptx
DragonBall PowerPoint Template for demo.pptxmirandajeremy200221
 
SD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptxSD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptxjanettecruzeiro1
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...Pooja Nehwal
 
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵anilsa9823
 
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...babafaisel
 
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Call Girls in Nagpur High Profile
 
Stark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxStark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxjeswinjees
 

Recently uploaded (20)

CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call GirlsCBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
 
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...
 
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...
 
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts ServiceVVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
 
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
 
꧁❤ Hauz Khas Call Girls Service Hauz Khas Delhi ❤꧂ 9999965857 ☎️ Hard And Sex...
꧁❤ Hauz Khas Call Girls Service Hauz Khas Delhi ❤꧂ 9999965857 ☎️ Hard And Sex...꧁❤ Hauz Khas Call Girls Service Hauz Khas Delhi ❤꧂ 9999965857 ☎️ Hard And Sex...
꧁❤ Hauz Khas Call Girls Service Hauz Khas Delhi ❤꧂ 9999965857 ☎️ Hard And Sex...
 
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
 
Fashion trends before and after covid.pptx
Fashion trends before and after covid.pptxFashion trends before and after covid.pptx
Fashion trends before and after covid.pptx
 
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
 
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdfThe_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
The_Canvas_of_Creative_Mastery_Newsletter_April_2024_Version.pdf
 
Design Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptxDesign Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptx
 
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
 
Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdf
 
DragonBall PowerPoint Template for demo.pptx
DragonBall PowerPoint Template for demo.pptxDragonBall PowerPoint Template for demo.pptx
DragonBall PowerPoint Template for demo.pptx
 
SD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptxSD_The MATATAG Curriculum Training Design.pptx
SD_The MATATAG Curriculum Training Design.pptx
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
 
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵
 
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
 
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
 
Stark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxStark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptx
 

Bechtler Museum Construction

  • 1. Introduction to building The Bechtler Museum, located in downtown Charlotte, North Carolina, was designed by Swiss architect Mario Botta. Established on the 2nd of January 2010, Bechtler museum exhibits modern artworks from the mid 20th century. This 3390 square meter four-story structure has a soaring glass atrium that extends throughout the museum’s core and diffuses natural light into the building. The dominant feature of this solid structure is its fourth floor which extends from the core of the building, cantilevered and supported by the signature column rising from the open atrium below. A rigorous, yet elegant simplicity selection has been made by Botta in the palette of materials used which includes the combination of glass, steel, black granite, terracotta, polished concrete and wood. Botta had designed intending for a strong, contemporary structures that layer the colours, texture and materials for a solid architectural and sculptural power that connects to the dynamic art inside it. 1
  • 2. Orthographic drawings Second Floor Plan Third Floor Plan Fourth Floor Plan A A First Floor Plan B B 2
  • 4. 1 2 4 5 Section B-B 3 4 1. Skylight 2. Terracotta Cladding 3. Wall 4. Composite Concrete Slab 5. Column with Terracotta Tile
  • 5. Load Distributions The cantilever of the building is supported by W40 x 362 wide flange steel beams installed in the roof structure and fourth floor. Above and below each walls at the cantilever there will be a cross beam. The loads from the top are transferred downward through the load transferring walls to the foundation footings. The column is an important part of the structure to support the fourth floor. It is placed in the middle of the cantilever and directly under the steel beams To transfer the load more effectively. The longer the span of the cantilever and the further it is from the supporting structure, the larger the load. The cross bracing tension cables are used to strengthen the structure of the glass atrium especially when large loads are transferred from the top. 5
  • 6. Detailing 1. Skylight The load from the top is distributed to the wide flange steel girders that spans across the roof and is transferred to the wall system. The coffered design of the skylight is used to lighten the roof weight while concealing the large steel beams and mechanical structures. Front section of skylight Side section of skylight Air conditioning duct Wide flange steel girder Water resistant roof membrane Wall Terracotta tile cladding Metal decking Parapet Wall 6
  • 7. Detailing 2. Terracotta cladding The custom engineered TerraClad™ used is composed of fire clays, colored aggregate, and fluxes that were fired to a specific firing curve allowing the terracotta to be frost resistant and high freeze thaw. Sectional view of the cladding system 1 2 3 1 Clip with isolator Installation of cladding system 7
  • 8. Ship lapped design The incorporation of ship lapped open joint design of the panel had shield the structure from moisture that enter the ventilated cavity. Gaskets and isolators of the rain screen provide a snug fit between panels and the framing system to prevent wind induced rattle and allow for movement of the aluminum framing due to thermal expansion. 2 3 8
  • 9. Detailing 3. Wall Gypsum Board Insulation Plaster Plywood The drywalls of the Bechtler Museum allow for equal load transfers as the walls are more stable. The insulation also maintains the temperature in the interior due to the four seasons experienced in North Carolina. The gypsum board on the drywall is also fire- proof and acoustically beneficial causing it to be a preferable building material. 9 Construction detail of Drywall Terracotta Cladding Waterproof Membrane Metal Stud
  • 10. Granite Flooring Concrete Wide flange steel girder C-Channel 4. Composite Concrete Slab Metal Decking The composite concrete wall slab acts as a support for Bechtler museum. It works by increasing the load capacity of flooring system. The concrete slab together with in-situ infill in conjunction with welded shear studs onto I-beam to enable the slabs and the steel beams to act compositely. Construction detail of composite floor system 10 Detailing Wide flange steel girders are set up to form the structure of the cantilever. Then metal decking are fixed to the steel beams using shear studs. The edge of the metal decking was folded up to prevent the poured concrete from flowing out. A layer of black granite and insulation is used as the floor finishes. For the exterior wall, steel studs used as terracotta tile tracks system are fixed onto the c-channel.
  • 11. Detailing 5. Column with terracotta tile cladding (Pic) The column was first assembled for visual inspection prior to its disassembly and transportation to site. The sculptural column rising up 3 story (47 feet tall) was constructed with the use of hot dipped galvanized attachments in place of stainless steel fasteners onto the concrete column. The column is made of concrete with specified 28-days compressive strength of 12,000 psi. The reason concrete is used because it could support larger load with a slender frame compared to other materials. Corrugated Decking Crossbeam Flange Girder Flange Steel Terra-cotta Pavers Concrete Floor Slab Aluminum Cladding Convex Steel Frame Aluminum Cladding Column connects with Steel Anchor Bolts Terra-cotta Ceiling Cladding 11
  • 12. Before applying the cement to the decking, concrete ratio experiments had been done to find out the most suitable ratio for the concrete flooring. First trials of concrete mixing used no sands as the binding agent, the ratio of cement to water is 2: 1. After mixing it, the mixture was left for several hours under the sun to let it dry. The final product of the cement was smooth and powdery. It was easily crack as it did not has aggregates such as sand to hold the concrete mixture. Corrugated paper was used as metal decking as it has corrugated surface similar to the metal decking. Smooth sand was added into the concrete mixture. The ratio of cement to sand to water is 2: 1.5: 1. As the result, the mixture did not go under the wire mesh as the sand particles are not small enough to pass through the wire mesh. The corrugated paper was not suitable as metal decking as it absorbs the water of the concrete mixture. Modelling process Composite concrete flooring 12
  • 13. Corrugated paper had been replaced with plastic board. Plastic board is more suitable than corrugated paper as it is light and waterproof. It had been cut into metal decking shape and sprayed for metallic surface purpose. The sand mixture was filtered by using wire mesh to enable smoother surface for the final product compared to previous batches of concrete mixtures. The ratio of cement to sand to water is 2: 1: 0.5. During the process of drying, many bubbles appeared on the surface of concrete as the narrow gap between the metal decking was not completely filled in with concrete. As the result, the concrete cracked on the next day. The ratio of cement to sand to water is adjusted to 5: 1.5. Wood shreds were added into the concrete mixture to reduce the possibility of cracking of concrete. Composite concrete flooring 13
  • 14. Metal Decking Process Balsa wood is used as the material for I-beam under the metal decking. This is because balsa wood is available in different type of thickness. It is also a light material hence the floor system will not be too heavy as the cantilever section is only supported by one column. After aligning, both structural system is ready to be glued. Each connections of the structural systems was connected using hot glue gun to increase the durability and strength of the structures. Plastic model pipes are used as c-channels as it is light and available in different sizes. Cutting mat was used to make sure all the c-channels are aligned. The floor system with materials representing the black granite, concrete with metal decking, steel girders, c-channels and metal studs. Composite concrete flooring 14
  • 15. Column making A white modelling board I-beam was added in the center of the column acting as the load structural system and to also hold the concrete together. First trial of the concrete column without an I-beam in the middle. The column was made by filling up the straw mold. It broke off into pieces. First trial of the frame for the terracotta tiles of the column. Soldering tool and alloy were used to combine the alloy rings. The alloy could not combine properly and it took too much time. Hot glue gun was used instead for the joint of the frames. A protractor was used to determine the position of the vertical frames on the rings. Load bearing column After completion of the internal framing, excess glue stains were removed with nail polish remover. It was then sprayed with gray paint. The column was then inserted into the alloy frame and column specific terracotta cladding were attached onto frame. 15
  • 16. Grey board was used as a substitute for the Terracotta cladding. This is due to the texture and thickness. Different colours and paint to water ratio were tested on the board. The grey board was cut upon the surface, the measurements were scaled from the length and width to simulate the gaps between alternating cladding. A separate set of grey board was cut into individual pieces to be used as the ship-lapped design of the panels. The grey boards was then painted with brown with a slight addition of peach in order to match the colour of the original cladding. An issue faced during the cutting of the cladding is that the pieces tend to come loose, or break completely mainly because each cladding were cut individually and the minute scale of the cladding. Due to the cutting of the coloured grey board into individual strips of cladding, the grey board was repainted . This caused excess water from the paint to be absorbed by the board making the strips flimsy during the assembly and completion of the cladding. Terracotta cladding 16
  • 17. Dry wall composed of several layers; the first exterior layer was made of a 0.2mm thick balsa wood to represent ply wood, 0.1mm balsa wood as gypsum board and wool in between the two as insulation. Long plastic sticks matching the height of the wall are placed in intervals along the wall as steel studs Putty filler was applied onto the 0.1mm balsa as the internal plastering and was smoothened out. The tile cladding tracks system made with plastic sticks was glued onto the external wall. The terracotta cladding was then attached to the exterior surface of the wall. Dry wall 17
  • 18. White model making board was used for the flat surface whereas the curved surface of the skylight uses white card as it is more flexible. Plastic sheets were curved and attached onto the gaps of the upper surface of the skylight. A difficulty faced during construction of the curved surface was the accurate gradient of the curve causing numerous attempts of different measurements in order to achieve the proper curvature. The plastic sheets were then engraved with vertical lines to allow bending of the sheets. Due to the fact that the skylight spans horizontally over the whole model with minimal support from the wall, the weight distribution of the roof and skylight were an initial problem. It was then solved with the addition of I-beams made from mounting boards inserted in between the skylight to act as support. Skylight 18
  • 19. After this project, we realized appropriate construction method is important to avoid uneven load distribution and cause structural failure of the building. The materials used should be considerate and tested first before applying it in final model. In this case, concrete is hard to handle as it may crack easily due to the improper mixture. During the modelling phase, parts that are made separately required thorough planning to ensure premade parts are able to connect to one another accurately. This applies to real life construction too as precast parts must be precise to avoid problems. In addition, the progress of the model and report should be simultaneous. The materials and model should be kept properly to avoid loss or damage as this is also a common issue on actual construction sites. As such, our group should work systematically and on time to meet the deadline requirements. 19 Conclusion & Final Model
  • 20. Architecture Week, (2010). Bechtler Museum. [image] Available at: http://www.architectureweek.com/2010/0407/design_4-3.html [Accessed 14 Jun. 2014]. Architecture Week, (2010). Bechtler Museum by Botta. [image] Available at: http://www.architectureweek.com/2010/0217/design_1-2.html [Accessed 13 Jun. 2014]. ArchwebDWG, (2014). Bechtler Museum of Modern Art. [image] Available at: http://www.archweb.it/dwg/arch_arredi_famosi/mario_botta/Bechtler_Museum/Bechtler_museum_dwg.htm [Accessed 10 Jun. 2014]. Bechtler Museum of Modern Art. (n.d.). 1st ed. [ebook] Available at: http://www.kingguinn.com/libraries/portfolio/publications/317.pdf [Accessed 13 Jun. 2014]. Boston Valley Terra Cotta. (2014). 1st ed. [ebook] Institute. Available at: http://www.swrionline.org/UserFiles/File/Fall09/Project%20Showcase%20Presentations/Architectural%20Terra%20Cotta%20Ventilated%20 Ceramic%20Screen%20Wall%20Systems%20by%20Sheri%20Carter.pdf [Accessed 14 Jun. 2014]. Innovative Manufacturing in Architectural Ceramics. (n.d.). 1st ed. [ebook] New York: Boston Valley. Available at: http://www.triton- ca.com/pdf_files/BV_TerraClad%20Design%20Guide.pdf [Accessed 13 Jun. 2014]. Steelconstruction.info, (2014). Acoustic performance of floors. [online] Available at: http://www.steelconstruction.info/Acoustic_performance_of_floors [Accessed 15 Jun. 2014]. Worldarchitecturemap.org, (2014). WAM | Bechtler Museum of Modern Art | Charlotte. [online] Available at: http://www.worldarchitecturemap.org/buildings/bechtler-museum-of-modern-art [Accessed 15 Jun. 2014]. Reference 20