SlideShare a Scribd company logo
1 of 45
Download to read offline
The Short and Long-Term Benefits of Automatically
Collecting OEE Data from Your Machines
Make It Better, Keep It Better
Jim Finnerty
Product Manager
Wintriss Controls Group
www.wintriss.com/sfc
2/24/2017©2014 Wintriss Controls – All rights reservedSlide 2
im·prove [im-proov] verb
1. to bring into a more desirable or
excellent condition
2. to make better use of
Improvement
• All manufacturers want to improve the efficiency of
their operation
• With unlimited resources, you could improve the
productivity of every piece of equipment in your
factory
• Sadly, you don’t have unlimited resources
2/24/2017©2014 Wintriss Controls – All rights reservedSlide 3
Improvement
• This first step toward improvement is to identify
where to focus your resources
• In order to do this, you need accurate information
about how your machines run
• “Tribal knowledge” is not enough – you need to
collect real data from your shop floor
• It’s human nature to remember catastrophic events
and ignore the mundane
• It’s the mundane stuff that’s killing you
2/24/2017©2014 Wintriss Controls – All rights reservedSlide 4
The Goal:
• To collect data that is:
 Timely
 Pertinent
 Accurate
 Unbiased
• And make the data readily available to everyone and
everything
©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 5
Data Collection – What method?
• Data can be collected manually or automatically
• Manually collected data is often biased, late, and
inaccurate
• When production data is manually tracked, the
person recording the information will usually do as
little as possible, as quickly as possible
• If data could be collected automatically, these
problems would disappear
• The problem with automatic data collection is that
it’s hard to do
©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 6
Controllers
• Proprietary controllers
• PLCs
• PC-based controls
©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 7
Data Collection Terminal
©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 8
• Installed on each machine
• Network connection
• Uses a standard protocol
• Built-in operator interface
• “Running” input
• Automatically tracks uptime
and production count data
Data Collection – What Data?
• At the very least, you should collect:
 Part counts
 Status (running, down, changeover, etc.) over time
 Tool, job, and operator info
• This information will allow you to calculate Overall
Equipment Effectiveness
©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 9
What is OEE?
• OEE (Overall Equipment Effectiveness) is a "best
practices" way to monitor and improve the efficiency
of manufacturing processes
• OEE takes the most common and important sources
of manufacturing productivity loss and places them
into three primary categories
• OEE is frequently used as a key metric in Lean
Manufacturing programs
©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 10
• OEE = Availability x Performance x Quality
What is OEE? - Availability
• Availability is the percentage of time that the machine
runs, compared to the total time
• Availability takes downtime loss into account
• There is a distinction between planned and unplanned
downtime
• “Planned downtime” includes lunchtime, breaks, and
planned maintenance
• Unplanned downtime covers everything else
©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 11
What is OEE? - Availability
• Example:
There are 480 minutes in an 8-hour shift, 960 in two shifts
With a ½ hour for lunch and two 15-minute breaks, planned
downtime is 60 minutes/shift. That leaves a net available
time of 840 minutes.
If at the end of two shifts, there’s been a total of 144 minutes
of unplanned downtime, the availability is:
©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 12
(840 minutes – 144 minutes) / 840 minutes = .83
Availability was 83%
What is OEE? - Quality
• Quality is equal to the Good Parts / Total Parts
• Example:
Out of our 30,000 parts, 600 were later rejected.
©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 13
29,400 parts / 30,000 parts = .98
Quality was 98%
What is OEE? - Performance
• Performance takes into account speed loss, which
includes any factors that cause the process to operate at
less than the maximum possible speed, when running.
• For example, if a machine’s maximum operating speed is
100 SPM, the maximum production rate is 6000 parts
per hour (with a one-up die)
• If that machine is run at 75 SPM, there’s a 25% loss
©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 14
What is OEE? - Performance
• Example:
The press’s maximum operating speed is 100 SPM. This
equals a maximum production rate of 6000 parts/hour.
During our (840 minutes –144 minutes) 696 minutes of
operating time, we made 30,000 parts, giving us an
actual production rate of 2586 parts/hour.
©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 15
2586 parts/hour divided by 6000 parts/hour = .43
Performance was 43%
What is OEE?
• OEE = Availability x Quality x Performance
©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 16
Availability (83%) x Quality (98%) x Performance (43%)
OEE = 35%
Where OEE Falls Short…
• Overly simplistic (by design)
• Difficult to average over time because jobs differ in
size (quantity & time)
• Calculations become very difficult for multiple-up
operations
• Performance calculations are skewed
©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 17
OEE - Performance
• Traditional OEE uses the machine’s “Ideal Rate” to
determine performance percentage
• The Ideal Rate is the maximum machine speed, which
traditional OEE holds as the limiting factor for
performance
• For many operations, maximum machine speed is not the
limiting factor
©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 18
Fixing OEE
• Instead of a single machine Ideal Rate, use different
ideal rates for each machine/part combination
• This addresses the true performance limiting factor for
each part, and accounts for multiple-up operations
• Instead of trying to “weight” jobs, simply track and
average the whole period.
• All of this is very difficult to manage manually
©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 19
Fixing OEE
• An automatic system can track which job is in which
machine, and apply the appropriate ideal rate
• Rates can be automatically multiplied for multiple up
processes
• OEE can be displayed in real time as a job is running
• Different sized jobs can be appropriately weighted to
provide accurate OEE for a process over a longer period of
time
©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 20
Downtime Reasons
2/24/2017©2014 Wintriss Controls – All rights reservedSlide 21
Downtime Reasons
• In order to improve a machine’s efficiency, it is essential
that you know what is causing the downtime
• This information may be known only to the operator,
and cannot be collected automatically
• A good data collection system can coax the operator
into providing this information
• Additional functions are required at the machine
2/24/2017©2014 Wintriss Controls – All rights reservedSlide 22
Data Collection Terminal
©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 23
• Contains a list of downtime reasons
• Tracks the duration of every
stoppage
• Inhibits further machine operation
if it stops for longer than a preset
time
• Removes the inhibit when the
operator selects a downtime
reason
Real Time Data
• An automatic data collection system provides the
most benefit shortly after it is implemented
• Specific areas for improvement are identified, and
improvements are made
• When all the improvements are made, is it possible
to still get significant benefit from the system?
• Yes. Real-time data is the gift that keeps on giving
2/24/2017©2014 Wintriss Controls – All rights reservedSlide 24
Real Time Data
• Machine status display allows personnel to quickly
respond to problems with a machine
2/24/2017©2014 Wintriss Controls – All rights reservedSlide 25
Real Time Data
• Large format displays can be placed around the factory
2/24/2017©2014 Wintriss Controls – All rights reservedSlide 26
Real Time Data
• Detailed job info can reduce “hidden” downtime
2/24/2017©2014 Wintriss Controls – All rights reservedSlide 27
Remember This Slide?
• We still need to address collecting tool, job and operator
details
©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 28
Track Total Hits on Each Tool
• Accurate hits counts are possible
2/24/2017©2014 Wintriss Controls – All rights reservedSlide 29
2/24/2017Page 30
Data Collection Success Stories
• A contract manufacturer was able to realize the
following benefits within six months of installation:
• Determined which jobs they needed to re-quote
(based on efficiency vs. the standard rate)
• Reduced tool maintenance-related downtime by
25% by accurately tracking hits and maintaining the
dies before they got too beat up
©2014 Wintriss Controls – All rights reserved
2/24/2017Page 31
Data Collection Success Stories
• By tracking efficiency by operator, they were able to
determine where they needed to focus their training
efforts.
• Justified a new feed purchase based on ROI from
reduced downtime
©2014 Wintriss Controls – All rights reserved
Downtime Reduction
• The automatically-generated
downtime reports indicated that an
Indiana contract stamper was
spending sixty hours per week
changing coils
• They decided to dedicate a full time
junior setup person to assist with
coil changes
2/24/2017Page 32 ©2014 Wintriss Controls – All rights reserved
Downtime Reduction
• As a result, they were able to
reduce coil change downtime by
two-thirds
• In other words, they exchanged 40
hours of labor for 40 hours of press
uptime
2/24/2017Page 33 ©2014 Wintriss Controls – All rights reserved
More Downtime Reduction
• The same company was also
experiencing excessive downtime
caused by poor setup practices
• By providing additional training to
the setup people, they were able
to minimize setup-related
downtime like sensor faults and
straightener and feed issues
2/24/2017Page 34 ©2014 Wintriss Controls – All rights reserved
More Downtime Reduction
• This resulted in a 15% reduction
• They estimate that a further
downtime reduction of 9% came
from simply displaying real time data
out in the factory
2/24/2017Page 35 ©2014 Wintriss Controls – All rights reserved
Blame it on the New Guy
• A stamper is running 4 identical presses
making motor laminations
• The operators must constantly unload the
parts, so if the operator steps away, he has
to stop the machine
• The 4 machines share a common scrap
conveyor
2/24/2017Page 36 ©2014 Wintriss Controls – All rights reserved
Blame it on the New Guy
2/24/2017Page 37 ©2014 Wintriss Controls – All rights reserved
• Each day, one of the 4 presses would
have significantly more downtime than
the other three
• It was always the same operator that
had the extra downtime
• The additional downtime was caused by
the operator stepping away from the
press to change the scrap dumpster at
the end of the conveyor
Blame it on the New Guy
2/24/2017Page 38 ©2014 Wintriss Controls – All rights reserved
• The other three operators made him
do it because he was the new guy
• By assigning a utility person to the 4-
press cell to change the scrap
dumpster and stage coils, they reduced
downtime by 25%
More Downtime Reduction
• Downtime reports indicated that 15 minutes of every
hour were spent doing coil changes on large presses at
a Chicago-area metal stamper
• They knew it was bad, but the data collection software
allowed them to put hard numbers on it
• Upon review, they decided that their coil change
process was about as efficient as it was going to get
2/24/2017Page 39 ©2014 Wintriss Controls – All rights reserved
More Downtime Reduction
• Using the collected data, they were able to justify the
purchase of larger reels that could handle coils twice
as large
• In the end, they cut their coil change downtime in half
2/24/2017Page 40 ©2014 Wintriss Controls – All rights reserved
Downtime Reduction Team
• The same Chicago-area stamper has a group of
production and engineering people that meet weekly
to go over the “Top Ten” downtime list and identify
recurring problems
• “Waiting for QC” was a big source of downtime, so
they modified their procedures and built more gages
to allow the operators to do more QC at the machine
2/24/2017Page 41 ©2014 Wintriss Controls – All rights reserved
Downtime Reduction Team
• Using the downtime reports, they were able to
identify the operators that required additional
training
• They had the operators with the lowest downtime
number do the actual training
2/24/2017Page 42 ©2014 Wintriss Controls – All rights reserved
Efficiency Improvement
• The Bottom Line:
This manufacturer was able to
increase their plant-wide OEE from
32% to 55%
2/24/2017Page 43 ©2014 Wintriss Controls – All rights reserved
Use the Data
• Once the data is collected and
placed into a database, it
becomes available to all of
your other systems
• Building a system around
standard software
components makes it easier
to share the data
• See more examples of OEE
software applications
2/24/2017©2014 Wintriss Controls – All rights reservedSlide 44
Call on Us for Assistance
• Backed by 60+ years of manufacturing experience, we
developed our first downtime data collection and
efficiency reporting software product in 1985.
• Wintriss has the expertise to help you improve your data
collection, cut down time and boost efficiency.
• Read our data collection whitepaper to learn more
Contact us by:
 Calling (800) 586-8324
 Scheduling a demo
 Submitting a question
2/24/2017©2014 Wintriss Controls – All rights reservedSlide 45

More Related Content

What's hot

Lean Lego Game Slides - Short Presentation
Lean Lego Game Slides - Short PresentationLean Lego Game Slides - Short Presentation
Lean Lego Game Slides - Short PresentationiSixSigma.com
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment EffectivenessAnand Subramaniam
 
SMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping LineSMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping LineParth Patel
 
Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Brian Thomas
 
The Seven Wastes
The Seven WastesThe Seven Wastes
The Seven WastesJorge Ros
 
Lean Management Basics
Lean Management BasicsLean Management Basics
Lean Management BasicsUpendra K
 
The Lego Lean Game
The Lego Lean GameThe Lego Lean Game
The Lego Lean Gamefrankmt
 
Overall equipment effectiveness
Overall equipment effectivenessOverall equipment effectiveness
Overall equipment effectivenessRachit Laharia
 
SMED - Quick Change Over
SMED - Quick Change OverSMED - Quick Change Over
SMED - Quick Change OverOskar Olofsson
 
Design For OEE (DFOEE)
Design For OEE (DFOEE)Design For OEE (DFOEE)
Design For OEE (DFOEE)Lean Teams USA
 

What's hot (20)

Lean Lego Game Slides - Short Presentation
Lean Lego Game Slides - Short PresentationLean Lego Game Slides - Short Presentation
Lean Lego Game Slides - Short Presentation
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
SMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping LineSMED implementation on Automated Stamping Line
SMED implementation on Automated Stamping Line
 
TPM: Autonomous Maintenance
TPM: Autonomous MaintenanceTPM: Autonomous Maintenance
TPM: Autonomous Maintenance
 
Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)
 
Oee Explained
Oee ExplainedOee Explained
Oee Explained
 
tpm presentation
tpm presentationtpm presentation
tpm presentation
 
The Seven Wastes
The Seven WastesThe Seven Wastes
The Seven Wastes
 
TPM Loss Analysis
TPM  Loss AnalysisTPM  Loss Analysis
TPM Loss Analysis
 
Lean Management Basics
Lean Management BasicsLean Management Basics
Lean Management Basics
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
 
The Lego Lean Game
The Lego Lean GameThe Lego Lean Game
The Lego Lean Game
 
Lean Manufacturing Training
Lean Manufacturing TrainingLean Manufacturing Training
Lean Manufacturing Training
 
Overall equipment effectiveness
Overall equipment effectivenessOverall equipment effectiveness
Overall equipment effectiveness
 
Visual Management
Visual Management Visual Management
Visual Management
 
TPM: Focused Improvement (Kobetsu Kaizen) Poster
TPM: Focused Improvement (Kobetsu Kaizen) PosterTPM: Focused Improvement (Kobetsu Kaizen) Poster
TPM: Focused Improvement (Kobetsu Kaizen) Poster
 
SMED - Quick Change Over
SMED - Quick Change OverSMED - Quick Change Over
SMED - Quick Change Over
 
Design For OEE (DFOEE)
Design For OEE (DFOEE)Design For OEE (DFOEE)
Design For OEE (DFOEE)
 

Viewers also liked

Integrating OEE and Process Improvement
Integrating OEE  and Process ImprovementIntegrating OEE  and Process Improvement
Integrating OEE and Process ImprovementEdward Brown
 
6 OEE overview
6 OEE overview6 OEE overview
6 OEE overviewWebseology
 
The 7 deadly sins of Overall Equipment Effectiveness (OEE)
The 7 deadly sins of Overall Equipment Effectiveness (OEE)The 7 deadly sins of Overall Equipment Effectiveness (OEE)
The 7 deadly sins of Overall Equipment Effectiveness (OEE)Claire Healey
 
Oee on hana overall equipment effectiveness overview aug 2012 (2)
Oee on hana   overall equipment effectiveness overview aug 2012 (2)Oee on hana   overall equipment effectiveness overview aug 2012 (2)
Oee on hana overall equipment effectiveness overview aug 2012 (2)Marco Bueno
 
Visual Management: Leading with what you can see
Visual Management: Leading with what you can seeVisual Management: Leading with what you can see
Visual Management: Leading with what you can seeRenee Troughton
 
OEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing ProductivityOEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing ProductivityParsec_Automation_Corp
 
OEE Apresentação TCC
OEE Apresentação TCCOEE Apresentação TCC
OEE Apresentação TCCMarcos Valle
 
Executive Guide to Leveraging OEE
Executive Guide to Leveraging OEEExecutive Guide to Leveraging OEE
Executive Guide to Leveraging OEEJason Corder
 
Understanding Teep vs OEE
Understanding Teep vs OEEUnderstanding Teep vs OEE
Understanding Teep vs OEEJason Corder
 
SMED Hunt Activity
SMED Hunt ActivitySMED Hunt Activity
SMED Hunt ActivityTom Curtis
 
the shortest version of #MINDSHIFT
the shortest version of #MINDSHIFTthe shortest version of #MINDSHIFT
the shortest version of #MINDSHIFTFrits Oukes
 
The Data Science behind Predictive Maintenance for Connected Vehicles
The Data Science behind Predictive Maintenance for Connected VehiclesThe Data Science behind Predictive Maintenance for Connected Vehicles
The Data Science behind Predictive Maintenance for Connected VehiclesEsther Vasiete
 
Chattanooga sme oee down time presentation
Chattanooga sme oee down time presentationChattanooga sme oee down time presentation
Chattanooga sme oee down time presentationJames Mansfield
 
Lean Game Development
Lean Game DevelopmentLean Game Development
Lean Game DevelopmentSeth Sivak
 

Viewers also liked (20)

Integrating OEE and Process Improvement
Integrating OEE  and Process ImprovementIntegrating OEE  and Process Improvement
Integrating OEE and Process Improvement
 
6 OEE overview
6 OEE overview6 OEE overview
6 OEE overview
 
The 7 deadly sins of Overall Equipment Effectiveness (OEE)
The 7 deadly sins of Overall Equipment Effectiveness (OEE)The 7 deadly sins of Overall Equipment Effectiveness (OEE)
The 7 deadly sins of Overall Equipment Effectiveness (OEE)
 
Oee guide
Oee guideOee guide
Oee guide
 
OEE
OEEOEE
OEE
 
Oee on hana overall equipment effectiveness overview aug 2012 (2)
Oee on hana   overall equipment effectiveness overview aug 2012 (2)Oee on hana   overall equipment effectiveness overview aug 2012 (2)
Oee on hana overall equipment effectiveness overview aug 2012 (2)
 
OEE
OEEOEE
OEE
 
Smed simulation game_intro
Smed simulation game_introSmed simulation game_intro
Smed simulation game_intro
 
Visual Management: Leading with what you can see
Visual Management: Leading with what you can seeVisual Management: Leading with what you can see
Visual Management: Leading with what you can see
 
OEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing ProductivityOEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing Productivity
 
OEE Apresentação TCC
OEE Apresentação TCCOEE Apresentação TCC
OEE Apresentação TCC
 
Executive Guide to Leveraging OEE
Executive Guide to Leveraging OEEExecutive Guide to Leveraging OEE
Executive Guide to Leveraging OEE
 
Understanding Teep vs OEE
Understanding Teep vs OEEUnderstanding Teep vs OEE
Understanding Teep vs OEE
 
SMED Hunt Activity
SMED Hunt ActivitySMED Hunt Activity
SMED Hunt Activity
 
the shortest version of #MINDSHIFT
the shortest version of #MINDSHIFTthe shortest version of #MINDSHIFT
the shortest version of #MINDSHIFT
 
The Data Science behind Predictive Maintenance for Connected Vehicles
The Data Science behind Predictive Maintenance for Connected VehiclesThe Data Science behind Predictive Maintenance for Connected Vehicles
The Data Science behind Predictive Maintenance for Connected Vehicles
 
Module 4-5S
Module 4-5SModule 4-5S
Module 4-5S
 
Chattanooga sme oee down time presentation
Chattanooga sme oee down time presentationChattanooga sme oee down time presentation
Chattanooga sme oee down time presentation
 
Lean Games
Lean GamesLean Games
Lean Games
 
Lean Game Development
Lean Game DevelopmentLean Game Development
Lean Game Development
 

Similar to Benefits of Collecting OEE Data with Production Tracking Software

Unlocking Greater Efficiency: The Why and How of OEE Implementation
Unlocking Greater Efficiency: The Why and How of OEE ImplementationUnlocking Greater Efficiency: The Why and How of OEE Implementation
Unlocking Greater Efficiency: The Why and How of OEE ImplementationInductive Automation
 
Kloudq Conteknik presentation
Kloudq Conteknik presentationKloudq Conteknik presentation
Kloudq Conteknik presentationAmol Sarin
 
Measuring and Maximizing the Business Impact of Network Automation
Measuring and Maximizing the Business Impact of Network AutomationMeasuring and Maximizing the Business Impact of Network Automation
Measuring and Maximizing the Business Impact of Network AutomationItential
 
Brainshare 2014 Presentation Final
Brainshare 2014 Presentation FinalBrainshare 2014 Presentation Final
Brainshare 2014 Presentation FinalTom Lockhart
 
AutomationWorld Webinar - Tacoma Power Turned to Virtualization to Reduce Cos...
AutomationWorld Webinar - Tacoma Power Turned to Virtualization to Reduce Cos...AutomationWorld Webinar - Tacoma Power Turned to Virtualization to Reduce Cos...
AutomationWorld Webinar - Tacoma Power Turned to Virtualization to Reduce Cos...CBPacific
 
seminar report on computerised maintenance management system (CMMS)
seminar report on computerised maintenance management system (CMMS)seminar report on computerised maintenance management system (CMMS)
seminar report on computerised maintenance management system (CMMS)Jayesh Gupta
 
2022 Consortium for Self-Aware Machining and Metrology
2022 Consortium for Self-Aware Machining and Metrology 2022 Consortium for Self-Aware Machining and Metrology
2022 Consortium for Self-Aware Machining and Metrology Pure Precision
 
MineExcellence Drilling Platform
MineExcellence Drilling Platform MineExcellence Drilling Platform
MineExcellence Drilling Platform MineExcellence
 
Design, transform and run intelligent industrial asset optimization operations
Design, transform and run intelligent industrial asset optimization operations Design, transform and run intelligent industrial asset optimization operations
Design, transform and run intelligent industrial asset optimization operations Genpact Ltd
 
Cutomize sap webinar
Cutomize sap webinarCutomize sap webinar
Cutomize sap webinargabrielsyst
 
TPM Training HON Torrance
TPM Training HON TorranceTPM Training HON Torrance
TPM Training HON TorranceWayne Miller
 
Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)MohammedLahssaini1
 
V center operations standard presentation
V center operations standard presentationV center operations standard presentation
V center operations standard presentationsolarisyourep
 

Similar to Benefits of Collecting OEE Data with Production Tracking Software (20)

Unlocking Greater Efficiency: The Why and How of OEE Implementation
Unlocking Greater Efficiency: The Why and How of OEE ImplementationUnlocking Greater Efficiency: The Why and How of OEE Implementation
Unlocking Greater Efficiency: The Why and How of OEE Implementation
 
Kloudq Conteknik presentation
Kloudq Conteknik presentationKloudq Conteknik presentation
Kloudq Conteknik presentation
 
BQ-RTPT 2012
BQ-RTPT 2012BQ-RTPT 2012
BQ-RTPT 2012
 
Tpm
TpmTpm
Tpm
 
Lm
LmLm
Lm
 
Measuring and Maximizing the Business Impact of Network Automation
Measuring and Maximizing the Business Impact of Network AutomationMeasuring and Maximizing the Business Impact of Network Automation
Measuring and Maximizing the Business Impact of Network Automation
 
Brainshare 2014 Presentation Final
Brainshare 2014 Presentation FinalBrainshare 2014 Presentation Final
Brainshare 2014 Presentation Final
 
AutomationWorld Webinar - Tacoma Power Turned to Virtualization to Reduce Cos...
AutomationWorld Webinar - Tacoma Power Turned to Virtualization to Reduce Cos...AutomationWorld Webinar - Tacoma Power Turned to Virtualization to Reduce Cos...
AutomationWorld Webinar - Tacoma Power Turned to Virtualization to Reduce Cos...
 
seminar report on computerised maintenance management system (CMMS)
seminar report on computerised maintenance management system (CMMS)seminar report on computerised maintenance management system (CMMS)
seminar report on computerised maintenance management system (CMMS)
 
2022 Consortium for Self-Aware Machining and Metrology
2022 Consortium for Self-Aware Machining and Metrology 2022 Consortium for Self-Aware Machining and Metrology
2022 Consortium for Self-Aware Machining and Metrology
 
Tpm
TpmTpm
Tpm
 
MineExcellence Drilling Platform
MineExcellence Drilling Platform MineExcellence Drilling Platform
MineExcellence Drilling Platform
 
eFACiLiTY Presentation
eFACiLiTY PresentationeFACiLiTY Presentation
eFACiLiTY Presentation
 
CMMS For Manufacturing
CMMS For ManufacturingCMMS For Manufacturing
CMMS For Manufacturing
 
Design, transform and run intelligent industrial asset optimization operations
Design, transform and run intelligent industrial asset optimization operations Design, transform and run intelligent industrial asset optimization operations
Design, transform and run intelligent industrial asset optimization operations
 
Cutomize sap webinar
Cutomize sap webinarCutomize sap webinar
Cutomize sap webinar
 
eFACiLiTY Maintenance Management System
eFACiLiTY Maintenance Management SystemeFACiLiTY Maintenance Management System
eFACiLiTY Maintenance Management System
 
TPM Training HON Torrance
TPM Training HON TorranceTPM Training HON Torrance
TPM Training HON Torrance
 
Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)
 
V center operations standard presentation
V center operations standard presentationV center operations standard presentation
V center operations standard presentation
 

Recently uploaded

IMA MSN - Medical Students Network (2).pptx
IMA MSN - Medical Students Network (2).pptxIMA MSN - Medical Students Network (2).pptx
IMA MSN - Medical Students Network (2).pptxdolaknnilon
 
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...soniya singh
 
Defining Constituents, Data Vizzes and Telling a Data Story
Defining Constituents, Data Vizzes and Telling a Data StoryDefining Constituents, Data Vizzes and Telling a Data Story
Defining Constituents, Data Vizzes and Telling a Data StoryJeremy Anderson
 
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptxEMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptxthyngster
 
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一F sss
 
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
Advanced Machine Learning for Business Professionals
Advanced Machine Learning for Business ProfessionalsAdvanced Machine Learning for Business Professionals
Advanced Machine Learning for Business ProfessionalsVICTOR MAESTRE RAMIREZ
 
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.pptdokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.pptSonatrach
 
Easter Eggs From Star Wars and in cars 1 and 2
Easter Eggs From Star Wars and in cars 1 and 2Easter Eggs From Star Wars and in cars 1 and 2
Easter Eggs From Star Wars and in cars 1 and 217djon017
 
Beautiful Sapna Vip Call Girls Hauz Khas 9711199012 Call /Whatsapps
Beautiful Sapna Vip  Call Girls Hauz Khas 9711199012 Call /WhatsappsBeautiful Sapna Vip  Call Girls Hauz Khas 9711199012 Call /Whatsapps
Beautiful Sapna Vip Call Girls Hauz Khas 9711199012 Call /Whatsappssapnasaifi408
 
Identifying Appropriate Test Statistics Involving Population Mean
Identifying Appropriate Test Statistics Involving Population MeanIdentifying Appropriate Test Statistics Involving Population Mean
Identifying Appropriate Test Statistics Involving Population MeanMYRABACSAFRA2
 
Predictive Analysis for Loan Default Presentation : Data Analysis Project PPT
Predictive Analysis for Loan Default  Presentation : Data Analysis Project PPTPredictive Analysis for Loan Default  Presentation : Data Analysis Project PPT
Predictive Analysis for Loan Default Presentation : Data Analysis Project PPTBoston Institute of Analytics
 
How we prevented account sharing with MFA
How we prevented account sharing with MFAHow we prevented account sharing with MFA
How we prevented account sharing with MFAAndrei Kaleshka
 
20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdf20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdfHuman37
 
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改yuu sss
 
RABBIT: A CLI tool for identifying bots based on their GitHub events.
RABBIT: A CLI tool for identifying bots based on their GitHub events.RABBIT: A CLI tool for identifying bots based on their GitHub events.
RABBIT: A CLI tool for identifying bots based on their GitHub events.natarajan8993
 
ASML's Taxonomy Adventure by Daniel Canter
ASML's Taxonomy Adventure by Daniel CanterASML's Taxonomy Adventure by Daniel Canter
ASML's Taxonomy Adventure by Daniel Cantervoginip
 
RadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdfRadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdfgstagge
 
Top 5 Best Data Analytics Courses In Queens
Top 5 Best Data Analytics Courses In QueensTop 5 Best Data Analytics Courses In Queens
Top 5 Best Data Analytics Courses In Queensdataanalyticsqueen03
 

Recently uploaded (20)

IMA MSN - Medical Students Network (2).pptx
IMA MSN - Medical Students Network (2).pptxIMA MSN - Medical Students Network (2).pptx
IMA MSN - Medical Students Network (2).pptx
 
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...
High Class Call Girls Noida Sector 39 Aarushi 🔝8264348440🔝 Independent Escort...
 
Defining Constituents, Data Vizzes and Telling a Data Story
Defining Constituents, Data Vizzes and Telling a Data StoryDefining Constituents, Data Vizzes and Telling a Data Story
Defining Constituents, Data Vizzes and Telling a Data Story
 
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptxEMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
 
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一
 
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
 
Advanced Machine Learning for Business Professionals
Advanced Machine Learning for Business ProfessionalsAdvanced Machine Learning for Business Professionals
Advanced Machine Learning for Business Professionals
 
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.pptdokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
 
Easter Eggs From Star Wars and in cars 1 and 2
Easter Eggs From Star Wars and in cars 1 and 2Easter Eggs From Star Wars and in cars 1 and 2
Easter Eggs From Star Wars and in cars 1 and 2
 
Beautiful Sapna Vip Call Girls Hauz Khas 9711199012 Call /Whatsapps
Beautiful Sapna Vip  Call Girls Hauz Khas 9711199012 Call /WhatsappsBeautiful Sapna Vip  Call Girls Hauz Khas 9711199012 Call /Whatsapps
Beautiful Sapna Vip Call Girls Hauz Khas 9711199012 Call /Whatsapps
 
Identifying Appropriate Test Statistics Involving Population Mean
Identifying Appropriate Test Statistics Involving Population MeanIdentifying Appropriate Test Statistics Involving Population Mean
Identifying Appropriate Test Statistics Involving Population Mean
 
Predictive Analysis for Loan Default Presentation : Data Analysis Project PPT
Predictive Analysis for Loan Default  Presentation : Data Analysis Project PPTPredictive Analysis for Loan Default  Presentation : Data Analysis Project PPT
Predictive Analysis for Loan Default Presentation : Data Analysis Project PPT
 
Call Girls in Saket 99530🔝 56974 Escort Service
Call Girls in Saket 99530🔝 56974 Escort ServiceCall Girls in Saket 99530🔝 56974 Escort Service
Call Girls in Saket 99530🔝 56974 Escort Service
 
How we prevented account sharing with MFA
How we prevented account sharing with MFAHow we prevented account sharing with MFA
How we prevented account sharing with MFA
 
20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdf20240419 - Measurecamp Amsterdam - SAM.pdf
20240419 - Measurecamp Amsterdam - SAM.pdf
 
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
 
RABBIT: A CLI tool for identifying bots based on their GitHub events.
RABBIT: A CLI tool for identifying bots based on their GitHub events.RABBIT: A CLI tool for identifying bots based on their GitHub events.
RABBIT: A CLI tool for identifying bots based on their GitHub events.
 
ASML's Taxonomy Adventure by Daniel Canter
ASML's Taxonomy Adventure by Daniel CanterASML's Taxonomy Adventure by Daniel Canter
ASML's Taxonomy Adventure by Daniel Canter
 
RadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdfRadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdf
 
Top 5 Best Data Analytics Courses In Queens
Top 5 Best Data Analytics Courses In QueensTop 5 Best Data Analytics Courses In Queens
Top 5 Best Data Analytics Courses In Queens
 

Benefits of Collecting OEE Data with Production Tracking Software

  • 1. The Short and Long-Term Benefits of Automatically Collecting OEE Data from Your Machines Make It Better, Keep It Better Jim Finnerty Product Manager Wintriss Controls Group www.wintriss.com/sfc
  • 2. 2/24/2017©2014 Wintriss Controls – All rights reservedSlide 2 im·prove [im-proov] verb 1. to bring into a more desirable or excellent condition 2. to make better use of
  • 3. Improvement • All manufacturers want to improve the efficiency of their operation • With unlimited resources, you could improve the productivity of every piece of equipment in your factory • Sadly, you don’t have unlimited resources 2/24/2017©2014 Wintriss Controls – All rights reservedSlide 3
  • 4. Improvement • This first step toward improvement is to identify where to focus your resources • In order to do this, you need accurate information about how your machines run • “Tribal knowledge” is not enough – you need to collect real data from your shop floor • It’s human nature to remember catastrophic events and ignore the mundane • It’s the mundane stuff that’s killing you 2/24/2017©2014 Wintriss Controls – All rights reservedSlide 4
  • 5. The Goal: • To collect data that is:  Timely  Pertinent  Accurate  Unbiased • And make the data readily available to everyone and everything ©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 5
  • 6. Data Collection – What method? • Data can be collected manually or automatically • Manually collected data is often biased, late, and inaccurate • When production data is manually tracked, the person recording the information will usually do as little as possible, as quickly as possible • If data could be collected automatically, these problems would disappear • The problem with automatic data collection is that it’s hard to do ©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 6
  • 7. Controllers • Proprietary controllers • PLCs • PC-based controls ©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 7
  • 8. Data Collection Terminal ©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 8 • Installed on each machine • Network connection • Uses a standard protocol • Built-in operator interface • “Running” input • Automatically tracks uptime and production count data
  • 9. Data Collection – What Data? • At the very least, you should collect:  Part counts  Status (running, down, changeover, etc.) over time  Tool, job, and operator info • This information will allow you to calculate Overall Equipment Effectiveness ©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 9
  • 10. What is OEE? • OEE (Overall Equipment Effectiveness) is a "best practices" way to monitor and improve the efficiency of manufacturing processes • OEE takes the most common and important sources of manufacturing productivity loss and places them into three primary categories • OEE is frequently used as a key metric in Lean Manufacturing programs ©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 10 • OEE = Availability x Performance x Quality
  • 11. What is OEE? - Availability • Availability is the percentage of time that the machine runs, compared to the total time • Availability takes downtime loss into account • There is a distinction between planned and unplanned downtime • “Planned downtime” includes lunchtime, breaks, and planned maintenance • Unplanned downtime covers everything else ©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 11
  • 12. What is OEE? - Availability • Example: There are 480 minutes in an 8-hour shift, 960 in two shifts With a ½ hour for lunch and two 15-minute breaks, planned downtime is 60 minutes/shift. That leaves a net available time of 840 minutes. If at the end of two shifts, there’s been a total of 144 minutes of unplanned downtime, the availability is: ©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 12 (840 minutes – 144 minutes) / 840 minutes = .83 Availability was 83%
  • 13. What is OEE? - Quality • Quality is equal to the Good Parts / Total Parts • Example: Out of our 30,000 parts, 600 were later rejected. ©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 13 29,400 parts / 30,000 parts = .98 Quality was 98%
  • 14. What is OEE? - Performance • Performance takes into account speed loss, which includes any factors that cause the process to operate at less than the maximum possible speed, when running. • For example, if a machine’s maximum operating speed is 100 SPM, the maximum production rate is 6000 parts per hour (with a one-up die) • If that machine is run at 75 SPM, there’s a 25% loss ©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 14
  • 15. What is OEE? - Performance • Example: The press’s maximum operating speed is 100 SPM. This equals a maximum production rate of 6000 parts/hour. During our (840 minutes –144 minutes) 696 minutes of operating time, we made 30,000 parts, giving us an actual production rate of 2586 parts/hour. ©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 15 2586 parts/hour divided by 6000 parts/hour = .43 Performance was 43%
  • 16. What is OEE? • OEE = Availability x Quality x Performance ©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 16 Availability (83%) x Quality (98%) x Performance (43%) OEE = 35%
  • 17. Where OEE Falls Short… • Overly simplistic (by design) • Difficult to average over time because jobs differ in size (quantity & time) • Calculations become very difficult for multiple-up operations • Performance calculations are skewed ©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 17
  • 18. OEE - Performance • Traditional OEE uses the machine’s “Ideal Rate” to determine performance percentage • The Ideal Rate is the maximum machine speed, which traditional OEE holds as the limiting factor for performance • For many operations, maximum machine speed is not the limiting factor ©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 18
  • 19. Fixing OEE • Instead of a single machine Ideal Rate, use different ideal rates for each machine/part combination • This addresses the true performance limiting factor for each part, and accounts for multiple-up operations • Instead of trying to “weight” jobs, simply track and average the whole period. • All of this is very difficult to manage manually ©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 19
  • 20. Fixing OEE • An automatic system can track which job is in which machine, and apply the appropriate ideal rate • Rates can be automatically multiplied for multiple up processes • OEE can be displayed in real time as a job is running • Different sized jobs can be appropriately weighted to provide accurate OEE for a process over a longer period of time ©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 20
  • 21. Downtime Reasons 2/24/2017©2014 Wintriss Controls – All rights reservedSlide 21
  • 22. Downtime Reasons • In order to improve a machine’s efficiency, it is essential that you know what is causing the downtime • This information may be known only to the operator, and cannot be collected automatically • A good data collection system can coax the operator into providing this information • Additional functions are required at the machine 2/24/2017©2014 Wintriss Controls – All rights reservedSlide 22
  • 23. Data Collection Terminal ©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 23 • Contains a list of downtime reasons • Tracks the duration of every stoppage • Inhibits further machine operation if it stops for longer than a preset time • Removes the inhibit when the operator selects a downtime reason
  • 24. Real Time Data • An automatic data collection system provides the most benefit shortly after it is implemented • Specific areas for improvement are identified, and improvements are made • When all the improvements are made, is it possible to still get significant benefit from the system? • Yes. Real-time data is the gift that keeps on giving 2/24/2017©2014 Wintriss Controls – All rights reservedSlide 24
  • 25. Real Time Data • Machine status display allows personnel to quickly respond to problems with a machine 2/24/2017©2014 Wintriss Controls – All rights reservedSlide 25
  • 26. Real Time Data • Large format displays can be placed around the factory 2/24/2017©2014 Wintriss Controls – All rights reservedSlide 26
  • 27. Real Time Data • Detailed job info can reduce “hidden” downtime 2/24/2017©2014 Wintriss Controls – All rights reservedSlide 27
  • 28. Remember This Slide? • We still need to address collecting tool, job and operator details ©2014 Wintriss Controls – All rights reserved 2/24/2017Slide 28
  • 29. Track Total Hits on Each Tool • Accurate hits counts are possible 2/24/2017©2014 Wintriss Controls – All rights reservedSlide 29
  • 30. 2/24/2017Page 30 Data Collection Success Stories • A contract manufacturer was able to realize the following benefits within six months of installation: • Determined which jobs they needed to re-quote (based on efficiency vs. the standard rate) • Reduced tool maintenance-related downtime by 25% by accurately tracking hits and maintaining the dies before they got too beat up ©2014 Wintriss Controls – All rights reserved
  • 31. 2/24/2017Page 31 Data Collection Success Stories • By tracking efficiency by operator, they were able to determine where they needed to focus their training efforts. • Justified a new feed purchase based on ROI from reduced downtime ©2014 Wintriss Controls – All rights reserved
  • 32. Downtime Reduction • The automatically-generated downtime reports indicated that an Indiana contract stamper was spending sixty hours per week changing coils • They decided to dedicate a full time junior setup person to assist with coil changes 2/24/2017Page 32 ©2014 Wintriss Controls – All rights reserved
  • 33. Downtime Reduction • As a result, they were able to reduce coil change downtime by two-thirds • In other words, they exchanged 40 hours of labor for 40 hours of press uptime 2/24/2017Page 33 ©2014 Wintriss Controls – All rights reserved
  • 34. More Downtime Reduction • The same company was also experiencing excessive downtime caused by poor setup practices • By providing additional training to the setup people, they were able to minimize setup-related downtime like sensor faults and straightener and feed issues 2/24/2017Page 34 ©2014 Wintriss Controls – All rights reserved
  • 35. More Downtime Reduction • This resulted in a 15% reduction • They estimate that a further downtime reduction of 9% came from simply displaying real time data out in the factory 2/24/2017Page 35 ©2014 Wintriss Controls – All rights reserved
  • 36. Blame it on the New Guy • A stamper is running 4 identical presses making motor laminations • The operators must constantly unload the parts, so if the operator steps away, he has to stop the machine • The 4 machines share a common scrap conveyor 2/24/2017Page 36 ©2014 Wintriss Controls – All rights reserved
  • 37. Blame it on the New Guy 2/24/2017Page 37 ©2014 Wintriss Controls – All rights reserved • Each day, one of the 4 presses would have significantly more downtime than the other three • It was always the same operator that had the extra downtime • The additional downtime was caused by the operator stepping away from the press to change the scrap dumpster at the end of the conveyor
  • 38. Blame it on the New Guy 2/24/2017Page 38 ©2014 Wintriss Controls – All rights reserved • The other three operators made him do it because he was the new guy • By assigning a utility person to the 4- press cell to change the scrap dumpster and stage coils, they reduced downtime by 25%
  • 39. More Downtime Reduction • Downtime reports indicated that 15 minutes of every hour were spent doing coil changes on large presses at a Chicago-area metal stamper • They knew it was bad, but the data collection software allowed them to put hard numbers on it • Upon review, they decided that their coil change process was about as efficient as it was going to get 2/24/2017Page 39 ©2014 Wintriss Controls – All rights reserved
  • 40. More Downtime Reduction • Using the collected data, they were able to justify the purchase of larger reels that could handle coils twice as large • In the end, they cut their coil change downtime in half 2/24/2017Page 40 ©2014 Wintriss Controls – All rights reserved
  • 41. Downtime Reduction Team • The same Chicago-area stamper has a group of production and engineering people that meet weekly to go over the “Top Ten” downtime list and identify recurring problems • “Waiting for QC” was a big source of downtime, so they modified their procedures and built more gages to allow the operators to do more QC at the machine 2/24/2017Page 41 ©2014 Wintriss Controls – All rights reserved
  • 42. Downtime Reduction Team • Using the downtime reports, they were able to identify the operators that required additional training • They had the operators with the lowest downtime number do the actual training 2/24/2017Page 42 ©2014 Wintriss Controls – All rights reserved
  • 43. Efficiency Improvement • The Bottom Line: This manufacturer was able to increase their plant-wide OEE from 32% to 55% 2/24/2017Page 43 ©2014 Wintriss Controls – All rights reserved
  • 44. Use the Data • Once the data is collected and placed into a database, it becomes available to all of your other systems • Building a system around standard software components makes it easier to share the data • See more examples of OEE software applications 2/24/2017©2014 Wintriss Controls – All rights reservedSlide 44
  • 45. Call on Us for Assistance • Backed by 60+ years of manufacturing experience, we developed our first downtime data collection and efficiency reporting software product in 1985. • Wintriss has the expertise to help you improve your data collection, cut down time and boost efficiency. • Read our data collection whitepaper to learn more Contact us by:  Calling (800) 586-8324  Scheduling a demo  Submitting a question 2/24/2017©2014 Wintriss Controls – All rights reservedSlide 45