SlideShare a Scribd company logo
1 of 9
Download to read offline
Persona
First nam
Surname
Address
Telephon
Mobile: I
Mobile: S
E-mail
National
Date of b
Gender
Desired
Work Ex
Starting
Present
Dates
Name an
of emplo
Occupat
Position
Type of
or secto
 
al informatio
me(s) /
e(s)
s
ne
India
Saudi Arabi
ity
birth
Employmen
xperience
from the
employmen
nd address
oyer
tion or
n held
Business
r
on
GHA
B: 108
In
0091
+919
ia +966
gssh
India
05 S
Male
nt Oil a
Eng
22 y
nt
Jan
JGC Gu
JGC Gu
compan
Lead P
Enginee
ongoing
1. Sitr
The
ANSHYAM S
8 , Alkanada
dia.
120 456825
9958672221
6543763514
hukla5@yah
an
September 1
e
and Gas Pip
gineering Ma
years in Pipe
n 2013 to Til
ulf Internati
ulf Internation
y of JGC Co
ipeline Eng
ering Design
EPC Projec
ra Storage an
Bahrain Ga
SHUKLA
Apartment, R
51
oo.co.in
968
peline Projec
anager
eline Projec
ll Date
onal Comp
nal Co. Ltd.
orporation.
ineer
n & Consulta
ct of Saudi A
nd Pipelines E
s Plant Expa
Rampuri Colo
cts, Piping L
t-India, Midd
any Ltd. Sa
(JGC Gulf) i
ancy Compa
Aramco:
Expansion FEE
ansion Proje
ony, Surya N
ayout, PMC
dle East, Far
audi Arabia
in Saudi Ara
ny based in
ED
ect can be ca
Nagar, Ghazia
C, Departmen
r East.
abia is its wh
,Saudi Arab
ategorized in
abad, Uttar- P
ntal Manage
holly owned
bia and
nto two sect
Pradesh,
er,
tions:
1 
2 
 
• Installation of a new gas plant (CGP-III) which is to be carried out by others.
• The installation of new pipelines & modifications to the Sitra storage facility.
2. Rehabilate Al Mu’ajjiz Crude Oil Terminal LSPB Project
This was Offshore and Offsite Pipeline Rehabilitation Mouth ball Project of 42’’ IPSA
(EWMZ-1) which meets at KP19 of East West Pipeline through 56’’x42’’ Hot tapping
Installation to bypass the product of East West Pipe along with product 8 ‘’C5+ of
Yanbu Terminal which is about 26 k.m.pipeline to deliver into 42” EWMZ- Pipeline
dispatched at Al Mu’ajjiz Terminal.
3. Shale (Unconventional) Gas Development Project Saudi Aramco EPC
Project.
Main activities and
Responsibilities Design, Engineering, Construction and Commissioning of Gas Gathering Station to
Process the shale (unconventional) gas development including cluster of well area
(10 no’s, 2+1Cluster) including surface facilities, with a grouped and complex piping
system to maintain the settle out pressure for fixed flowing days / year with
dedicated pipeline corridor by laying of pipeline(s) of respective
16’’ & 30” diameter and (0.375 ‘’ W.T. 600 psi, 70km) to Saudi Transmission Company.
 Development of Overall Plot plan, Equipment layouts, Piping layouts,
Isometrics, Stress Analysis, Materials, Support Design, Piping MTO, handling and
control for the project.
Review of front end engineering, pipeline hydraulic profile, thickness optimization,
hot-tapping and line stop, de-tour calculation and waiver-application, land use
permit, PFD and GAD Drawing for pipeline in and outside battery limit design
calculation and modeling of surge analysis, pressure& temperature variation study,
Scraper Receiver Launcher Size selection, data- sheet calculation and MTO for
Barred Tee, Hot Induction Bends, Insulating Joint, Anchor Block, Upheaval buckling
calculation etc.
 Submission of Plot Plan, Data Sheet, Specification, Project Design Basis,
Deliverable List for Pipeline, Pump, Valves, Fittings.
 Pipeline material procurement follow up, expected time line delivery of pipe
items –main line pump, ball valves,etc.
                        
Dates Jan 2012 to Jan 2013
Name and
address of employer Byucksan E&C India Pvt Ltd. Gurgaon, India
ByucksanE&C provides comprehensive professional engineering & construction in all
types of engineering sectors.
Occupation or
position held Chief Technical Officer (CTO)
Type of business
or sector Inception& Establishment of South Korean based subsidiary engineering design
based company in Indian Market was initially/ concurrently focused on three
3 
 
major verticals: 1. Infrastructure 2.Environmental 3.Oil and Gas.
Main activities and
responsibilities Preparation of P&ID,GAD, Pipeline Compressor Stations and Terminals Site
Supervision at Various Locations of GAIL, GSPL, ONGC, OIL India Ltd.
 Project Management Consultancy Services for City Gas Pipeline Project in Delhi
NCR and various location of India.
Dates Sep 2011 to Dec 2011
Name and
Address of employer ABSG Consulting Company Abu Dhabi
Type of business
or sector ABSG Consulting is a global safety, risk and integrity management company serving
the oil and gas, chemical and petrochemical, nuclear, Government maritime.
Occupation or
position held On behalf of Client Inspection for Civil Structural and Erection, GASCO, Abu Dhabi.
Main activities and
Responsibilities Civil Inspection and related activity of Engineering, Procurement, Construction and
Commissioning (EPC) works for the SHR Granulated Sulphur Transportation and
Management Project on Lump Sum Turnkey Basis, Ruwais Sulphur Handling Project,
Civil QA/QC Bored Piling, (800MM Dia,14.05m depth Pile Toe 8.05m, Pile Cut Off
5.30m 1150 nos Rail Car Building (Single Pour 950 Cum), Conveyor, Marine &
Dredging Construction Trial Mix -Concrete Mix Design C-50, Nuclear Density Test
Integrity Test.-300Tonne, Slope and Scour Protection Trial Mix -Concrete Mix Design
C-50, Nuclear Density Test Integrity Test.-300Tonne,Slope and Scour Protection for
Causeway and Ship loading area of 2.9m Inspection of the Vibro compaction work-area of
the fill material 463mx38m of the Causeway in between the land and ship loading area.
Dates July2009 to Sep2011
Name and
address of employer MP Birla Group of Company, New Delhi, India
Type of business The Birla Group is one of the largest Industrial House in India to formulate strategy for
accelerated growth of the business as a CNG/PNG Pipeline Operator.
Occupation or
Position held Business head (General Manager) City Gas Pipeline Projects
Main activities
and responsibilities
 GSPC Gas Company Limited: 150 Km City Gas Pipeline Project.
 Bhagya Nagar Gas Limited: 220 Km City Gas Pipeline Project.
 City Gas Station Construction under Haryana State for Gail Gas Limited.
 Gujarat Gas Company Ltd MDPE Laying and Maintenance.
a. To scout for new business opportunities in Contracting in the Oil & Gas sector.
b. To advise the Management on commercial / technical post bid activities fo acquiring
new business. Viabilities of identified opportunities.
c. Single point responsibility for all the pre bid, bidding and develop relationship with
key decision influencers in target organizations for business development&
4 
 
interfacing with Clients at various levels.
d. Identify JV partners for eligibility & technology and negotiation.
e. Identify, negotiate and close deals with sub-contractors for execution of the pipeline
projects.
f. Develop framework and guidelines for sub- contractors.
g. Established detailed operational / deliverable milestone for pipeline projects.
Dates June2008–July2009
Name and
address HPCL MITTAL ENERGY Ltd. (HMEL), Noida, India
Type of business Hindustan Mittal Energy Limited (HMEL) a joint venture between HPCL and Mittal Energy
or sector Limited, a company owned by L N Mittal (HMEL) Company for Implementation of Guru
Gobind Singh Refinery. A Green field refinery project with an initial capacity of 9 MMTPA
and a 1,017 km pipeline from Mundra to Bhatinda.
Occupation or
position held Manager Pipeline
Main activities
and responsibilities To scrutinize crude oil pipeline bid-offer, reply of the technical queries, the crude oil pipeline
project-bid finalization and contract award, reviewed the pre bid-award documents of
followings:
 The Crude Oil Terminal of over 8,00,000 KL capacity at Mundra Port.
 The 1,014 Km long Crude Oil Pipeline from KOT at Mundra, Gujarat to Guru
Gobind Singh Refinery at Bathinda, Punjab along with associated facilities.
 Main-line pumping cum Intermediate Pigging (IP) Station at Dhansa. 2 IP
stations, 17 SV stations and one Dispatch Station at Kot which involves all Civil,
Electrical, and Piping. Mechanical and Instrumentation work.
Dates JULY 2004 to JUNE 2008
Name and
address of employer Petronet MHB Ltd.,(ISO-9001:2001,ISO-14001 :2004 &OHSAS-18001: 1999) accredited
mulity-product petroleum transport pipeline company Bangalore, India.
Type of business
Or sector PMHBL is a company promoted by Oil & Natural Gas Corporation Limited Hindustan
Petroleum Corporation Limited and Petronet India Limited with 28.77%&7.89% equity shares
by each company. Apart from this the leading banks are having 34.57% stake, after
restructuring.
Occupation or
Position held Station-In-Charge Hassan Pumping & Receiving Station, India
Main activities
and responsibilities Overall responsibility of operation, maintenance, inspection, major equipment station facilities,
mainline & ROW Patrolling, safety & firefighting system, environmental impact assessment.
5 
 
 Pipeline Operations at Hassan for delivering the product to HPCL terminal & flow
diversion to Bangalore end.
 Monitoring of all equipment’s & Mainline stations.
 ROU Inspection& CP Check.
 To upkeep original licenses of CCOE, Factory NOC, Excise Dept, Joint Directors-
Legal /Statutory cases.
 Compliance of Third Party Audit Reports.
 Prepare Preventive Maintenance Plan for Pump, Motors, Valves, Fire Fighting
Pump, etc.
 Monthly Reconciliation, Recovery, Throughput Loss-Gain, Monthly Freight
Charges Invoice Submission and Payment Follow-up,PLT Planning on monthly
basis with MRPL Refinery and Oil Marketing Companies.
 Pipeline Integrity Test and correspondence with District Authority during Pilferage,
Sabotage and preparedness report during such incident.
Dates MAY 2001 to JULY 2004
Name and
address of employer Petronet VK Ltd., Reliance (MTF), Sikka, Jamnagar ,India
Type of business
sector A Joint Venture Company of Petronet India Ltd., (PIL), Indian Oil Corporation Ltd(IOCL) &
Reliance Industries Limited (RIL) to construct a pipeline between Vadinar to Kandla (117Km)
to transport petroleum products manufactured by RIL Refinery, the pipeline was having
operating capacity of 7.5 MMTPA (24”OD 17 KmX0.281”- 24”ODX56KmX0.438” (Offshore)-
24” ODX44Km 0.406” API5L52 Grade).
Occupation or
position held Station-In-Charge SIKKA Pumping @ RIL Marine Tank Farm
Main activities
and responsibilities Tank farm and terminal station jobs from inlet manifold to delivery manifold through different
tank hook-ups, tank fabrication, erection, civil works from excavation to dyke wall formation,
mass concreting, brick masonry, structural works etc,civil rehabilitation jobs during quake
effected terminal station building done under strict guidelines of CBR Code, application
grouting materials on damaged portions – control room buildings, township buildings at both
locations done by inserting holes of 16 mm dia Drill inserting to BRASS nozzle by putting 1:1
mix of epoxy,resin hardener by applying the required compressed air pressure,VHF tower
installation and erection, to provide supports to tank farm, Jetty Structures. Smooth & safe
operation of product pipeline PLC- SCADA, updating of daily throughput,oil-accounting
&monthly reconciliation report, manual tank gauging, coordinating and integrating with IOC for
day to day pumping as per SPM, checking of dip-memo, shift production optimization, ensure
proper entry &upkeep of the log-book, checking the monthly reconciliation report,
coordinating with other location- in charges in respect to arrival of parcel/delivery of product at
mouth/interface quantities,review and modify standard operation procedures when required
& conduct related training to subordinates,delegation of tasks to subordinates and close
monitoring also, attending the monthly meeting with others PSU' s to decide the next month
SPM.
Dodsal Ltd., Bangalore
SEP 2000 to APRIL 2001
Worked as: Spread-In Charge
6 
 
Client: Bangalore Water Supply & Sewerage board (BWSSB).
Contract no. W-4C. Const. of Clean Water Transmission
Name of project: Bangalore water supply (l.9m OD X Plate thickness 11mmX12.5mm internal
lining, + 30mm gunniting).Project Planning & Scheduling for laying of pipeline, from the river
Cauvery, which was 98km from the city, under the four stages head, water is pumped in stage
against total head of 545metres, Construction of VALVE CHAMBERS, THRUST-BLOCKS,
RAFT INVERT-LEVEL, SADDLES, SCOUR-VALVES, MAN HOLES, KINETIC AIR- VALVES,
BUTTERFLY VALVES, ENCASED CONCRETE, PIPE SPECIAL BENDS,TEES,REDUCERS,
EXPANDERS etc. along the route road/rail crossing, gunniting for bare-pipes, bedding (Class
A,S&N), bends as per angles, horizontal & vertical upward, downward vertical for transmission
main. Contract-agreement with local vendors, resource planning, coordination with other
departments to execution, test-pack preparation, documentation with clients and close
monitoring over sub- contractors job progress. Organizing and participating management
review meetings and making presentations. Develop resource mobilization chart for material /
manpower.Project monitoring on a weekly & monthly basis to ensure that no slippage occurs &
when unavoidable problems occur, to find solutions such that the intermediate & final
milestones are not jeopardized whilst ensuring that the overall cost of the project is not
increased.
Dodsal Co. L.L.C. SULTANATE OF OMAN
NOV 1999 to JULY 2000
Worked as: QC Inspector (Civil)
Client: Petroleum Development of OMAN (P.D.O.).
Contract no. C889008
Name of Project: ATHEL Project, AL-NOOR-Phase-l (Facilities)
Carry out inspections & verifications for all civil & structural works, inclusive material ensure that
the excavation, concrete, bbs, pour cards, erection, grouting of all civil & equipment & test plan
for the civil, equipment,installation, carries out the installation, the various stage inspection&
tests, records findings, Liaison with the client’s inspection & construction staff intermediate &
final acceptance PMC’s work, carry-out inspection of works & nominated sub-contractors
/suppliers as directed by approved inspection & test plan, Carried out vendor inspection of
material equipment, when required, prior to shipment of material/equipment to site.Informed PM
staff of poor quality work deficiencies detected during inspections & assist/advice on remedial
works required, report deviations from requirements from contract documents Construction of
Production station crude oil,batching-plant operation, operation on round the clock basis, mass-
Concrete production, inspection with third party for structural concrete up to dia.36mm & M-35,
grouting with insert- plates,foundation-bolts etc. Quality-assurance documentation,
qualification, validation & audits.To support the site engineers in respect to monitoring the
requisite quality of the job in compliance with requirements of the QTP & Guidelines of contract
document, supervise the quality of production-concrete at batching-plant& plant area / battery
limit area and calibrate the batching- plant as per requirements too also, maintain the
throughput of production- concrete inspection of heavy reinforcement & checking pour
cards upto 36 mm dia. of reinforcement, preparation of stacking bends (cold), preparation of
BBS, Grouting of structural foundation-bolts, insert-plates, cube-test, etc.
Dodsal Pte Ltd. DUBAI U.A.E.
JUNE 1999 to OCT 1999
Worked as: Pipeline QA&QC Engineer
Client: SNAMPROGRETTI-ITALY (ADNOC), U.A.E. Contract no.304700
Name of Project: ASAB-GAS Development & Gathering Station, ABUDHABI.
Laying of pipeline from ASAB to RUWAIS, cased crossing under HDD, civil construction works
at different valve stations, PROCTER Test over BERMING, various civil activities done by M/S
GRANITE Company of UAE for Gathering Station from Excavation to Erection of equipment's,
7 
 
joint concrete coating done over the pipeline joints applying epoxy, also handled the receipt of
shipment, cargo-handling for the materials which were being used in the project. Perform
PROCTOR test on soil-surface to find-out the maximum dry density (MDD) and optimum
moisture-content etc. Report for project expenditure and schedule progress on a regular basis
to head office.Coordinate technical tendering evaluation activities relating to specific job with
local companies also, negotiating to reduce the cost of the same, assisting in compliance of
budgets and coordinates approvals with Management, cost-estimates, obtaining quotations,
specific vendor liaison and securing various regulatory permissions.
Dodsal &CO.L.L.C. Sultanate of OMAN
JAN 1998 to MARCH 1999
Worked as: Civil Engineer
Client: CHIYODA FOSTER WHEELER&CO. L.L.C
Contract no. ON-PLOT PIPING
Name of project:2x3.3 MMTPA OMAN LNG TRAINI&TRAIN2, SUR.
was a Joint Venture Company in Sultanate of Oman to fabrication, Erection of Piping ,
Equipment Piping, Equipment and Structural Works of comprising Piping of 497158 inch Dia,
Equipment Erection of 424 no structural steel of 5787 MT. Receipt, Stacking and Transportation
of structural steels from dump-yard to working site after doing some modifications as per
schedule structural drawings. Establish the location of TOWER-CRANES at the site also did the
required mass concreting for the foundations etc Camp-construction & finishing, joinery works,
plumbing and drainage works, power cables laying with looping with feeder, soak-pits, kitchen
flooring, false ceiling flooring etc. for capacity of 2000 Workers & Staff to provide amenities as
per Client HSE Policy.Constructions and Erection of FAB. SHOP for CS/ MS/SS/,Car-washing
&maintenance facilities,To-establish RIGGING- PLAN, checking foundations, and Crane-
signaling s keeping all safety precautions to confirm the erection drawing.
Dodsal Ltd. Baroda India
APR 1996 to JAN 1998
Worked as: Pipeline Construction Engineer
Client: ENGINEERS INDIA Ltd./IPCL-BARODA/DAHEJ.BOOT BASIS
Name of Project:DAHEJ-GANDHAR-BARODA, PLANT/SV Stations
Engineering, Coordinating for Laying of 3 pipelines namely Naphtha, Propylene & Ethylene {8",
6", 6") liquid.Condense vapor and Semi- reach gas pipeline project which was based on BOOT
BASIS. Preparation and consolidation of project schedules by using PERT /CPM tools,
monitoring progress status and analysis of project monitoring progress status and analysis of
project variances using "S" curves.Construction of Battery Limit Area,Control-roam Building-
MCC.H.T.Room,UPS- Room, C/R A.C.duct, Telecom-room,Master Control Station SCADA
Installation TATA HONEYWELL, providing conceal-conduits, Jetty civil & piping job to hook-up
at DAHEJ & concrete-coated pipes lowering on floating & buoyancy basis with DRAG-LINE,
Hand—rail fabrication and erection.
Dodsal Ltd. Bharatpur India
AUG 1995 to MAR 1996
Worked as: Pipeline construction engineer
Client: ENGINEERS INDIA Ltd./GAS AUTHORITY of INDIA Ltd. (RAJ).
Name of Project: 36" Dia., 505 Km Gas Rehabilitation. GAIL (India) Ltd. and Expansion Project
(HBJ Up gradation).
Pipeline-execution from STRINGING to HYDROTEST PIG-RECIEVING,assisting in allocation
of manpower requirements at different locations of R.O.W.,installation PIPE RACK its platforms
etc.Installation of Pipeline warning-markers, Boundary-markers, Directional markers,Logo-
marking, Spray-painting etc. Supervise the job of the temporary C.P. included casting,
transportation & erection of foundations at different locations along with R.O.W. Measured C.P.
voltage as per std.also, measuring the voltage of (-1.5VTO -0.8V) on the extrude surface of
8 
 
pipeline. Evaluating the consumption-rate of ANODE PLATE on the basis of project
specification.
Dodsal ltd., SOJAT City Road India
DEC 1993 to AUG 1995
Client: SKODA INDIA Ltd. SOJAT CITY ROAD (RAJASTHAN).
Name of Project: KANDLA BATHINDA PRODUCT PIPELINES.
22' '/14"dia. product pipeline of KBPL. Construction of SV Stations, Surveying (setting out),
stringing, ROW preparation. Levels (Bench- Mark), trenching (controlled blasting with third
party), Mainline Welding, TI-EN welding, Field joint coating (PEEL-TEST, thickness
measurement), Rail/Road crossing, chain age marking, pressure-header fabrication, Pre Hydro-
Testing & Post Hydro-Testing for major crossing,OFC Laying, Splice-test, block station
construction, barbed wire fencing etc. Cable laying for CP at SV"s and cable related by using
10 sq.mm & 65sq. mm armor cables permanent CP on both banks, Sacrificial CP unit
installation.
Major Professional
Achievements
 Successfully commissioned Dahej Gandhar Baroda Multi Product Pipelines
 Horizontal Directional Drilling Completed across the Chambal River Crossing for
HBJ-Up gradation project.
 Commissioned the Crude Oil Pumping Station in PDO-Oman Project Al-Noor Site.
 Civil & Structural Jobs handled for Oman LNG project (Train I & II).
 Pumping Exposure for Indian Oil Product Pipeline Operation, which was, originated
from Reliance MTF under SCADA-PLC.
 Worked as Senior Civil Consultant on behalf of M/s Petroleum India International
Ltd to check the drawings of China Petroleum Pipeline Engineering Corporation at
Lang fang, in Hebi Province.
Name: Ghanshyam Shukla.
Father's name: Late Shri Suryabhan Shukla.
Mother’s name: Smt. Sulochana Devi Shukla
Permanent Address: Late Shri Suryabhan Shukla, Sahadatpura nai-basti, behind L.I.C.office,
Post Office: MauNath Bhanjan, District Mau [Uttar- Pradesh]
Present contact
address: B-108; Alkanada Apartment, Rampuri Colony, Surya Nagar, Ghaziabad,
Phone no. 0091-0120-4568251
Mobile No. +919958672221/ +966543763514
E-mail: gsshukla5@yahoo.co.in alternate mail ghanshyamshukla@rediffmail.com
Date of birth: 05-09-1968
Nationality: Indian
Passport No. G4883261
Place of Issue: Bangalore
Date of Issue: 10/09/2007
Date of Expiry: 09/09/2017
9 
 
Marital status: Wife and two dependent
Educational
qualification: B.E. (Civil) from Pune University in 1993
Hangout ID: gsshukla5@gmail.com
Skype ID: facebook:ghanshayam.shukla
Saudi Aramco
Contractor ID : 8098726

More Related Content

What's hot

Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj KisnadwalaSr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj KisnadwalaPankaj Kisnadwala
 
Resume Justin mathew - Mechanical Test - Trails - Commissioning engineer - ma...
Resume Justin mathew - Mechanical Test - Trails - Commissioning engineer - ma...Resume Justin mathew - Mechanical Test - Trails - Commissioning engineer - ma...
Resume Justin mathew - Mechanical Test - Trails - Commissioning engineer - ma...Justin Mathew
 
Resume - MOHD YUNUS BIN MOHD NAFI
Resume - MOHD YUNUS BIN MOHD NAFIResume - MOHD YUNUS BIN MOHD NAFI
Resume - MOHD YUNUS BIN MOHD NAFIMohd Yunus
 
P.Koshalendra-2009H106472P-Projects
P.Koshalendra-2009H106472P-ProjectsP.Koshalendra-2009H106472P-Projects
P.Koshalendra-2009H106472P-ProjectsKoshalendra Pandey
 
Resume Tariq mohd
Resume Tariq mohdResume Tariq mohd
Resume Tariq mohdTariq mohd
 
ResumeR - VishwasBShende 7th Sep 16
ResumeR - VishwasBShende 7th Sep 16ResumeR - VishwasBShende 7th Sep 16
ResumeR - VishwasBShende 7th Sep 16Vishwas Shende
 
Sam Sun_Sr. Mechanical Engineer
Sam Sun_Sr. Mechanical EngineerSam Sun_Sr. Mechanical Engineer
Sam Sun_Sr. Mechanical EngineerSam Sun
 
CV of Karan Vinayak - piping design engineer
CV of  Karan Vinayak - piping design engineerCV of  Karan Vinayak - piping design engineer
CV of Karan Vinayak - piping design engineerKaran Vinayak
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningMohamed Mustafa
 
CV_S.Athan_2017_01
CV_S.Athan_2017_01CV_S.Athan_2017_01
CV_S.Athan_2017_01Steve Athan
 
Amal Raj - CV
Amal Raj - CVAmal Raj - CV
Amal Raj - CVAmal Raj
 

What's hot (20)

Mps resume
Mps resume Mps resume
Mps resume
 
updated CV
updated CVupdated CV
updated CV
 
RESUME_RAJENDRA PRAJAPAT
RESUME_RAJENDRA PRAJAPATRESUME_RAJENDRA PRAJAPAT
RESUME_RAJENDRA PRAJAPAT
 
Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj KisnadwalaSr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
 
Resume Justin mathew - Mechanical Test - Trails - Commissioning engineer - ma...
Resume Justin mathew - Mechanical Test - Trails - Commissioning engineer - ma...Resume Justin mathew - Mechanical Test - Trails - Commissioning engineer - ma...
Resume Justin mathew - Mechanical Test - Trails - Commissioning engineer - ma...
 
Resume - MOHD YUNUS BIN MOHD NAFI
Resume - MOHD YUNUS BIN MOHD NAFIResume - MOHD YUNUS BIN MOHD NAFI
Resume - MOHD YUNUS BIN MOHD NAFI
 
Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15
 
Vinoth2016 - CV
Vinoth2016 - CVVinoth2016 - CV
Vinoth2016 - CV
 
P.Koshalendra-2009H106472P-Projects
P.Koshalendra-2009H106472P-ProjectsP.Koshalendra-2009H106472P-Projects
P.Koshalendra-2009H106472P-Projects
 
Resume Tariq mohd
Resume Tariq mohdResume Tariq mohd
Resume Tariq mohd
 
ResumeR - VishwasBShende 7th Sep 16
ResumeR - VishwasBShende 7th Sep 16ResumeR - VishwasBShende 7th Sep 16
ResumeR - VishwasBShende 7th Sep 16
 
CV D Schroeder 2016
CV D Schroeder 2016CV D Schroeder 2016
CV D Schroeder 2016
 
Sam Sun_Sr. Mechanical Engineer
Sam Sun_Sr. Mechanical EngineerSam Sun_Sr. Mechanical Engineer
Sam Sun_Sr. Mechanical Engineer
 
CV of Karan Vinayak - piping design engineer
CV of  Karan Vinayak - piping design engineerCV of  Karan Vinayak - piping design engineer
CV of Karan Vinayak - piping design engineer
 
CURRICULUM VITE
CURRICULUM VITECURRICULUM VITE
CURRICULUM VITE
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
 
CV_S.Athan_2017_01
CV_S.Athan_2017_01CV_S.Athan_2017_01
CV_S.Athan_2017_01
 
Suprabhat Kumar Das - Resume
Suprabhat Kumar Das - ResumeSuprabhat Kumar Das - Resume
Suprabhat Kumar Das - Resume
 
Amal Raj - CV
Amal Raj - CVAmal Raj - CV
Amal Raj - CV
 
R3 CV_GLG-doc
R3 CV_GLG-docR3 CV_GLG-doc
R3 CV_GLG-doc
 

Similar to GSShukla 2016 (20)

DRS
DRSDRS
DRS
 
GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_GOBINATH SENIOR PROJECT ENGG MANAGER_
GOBINATH SENIOR PROJECT ENGG MANAGER_
 
Bhavdeep Resume
Bhavdeep ResumeBhavdeep Resume
Bhavdeep Resume
 
RESUME - Abhay Paranjape
RESUME - Abhay ParanjapeRESUME - Abhay Paranjape
RESUME - Abhay Paranjape
 
CV-VA- March2016
CV-VA- March2016CV-VA- March2016
CV-VA- March2016
 
cv
cvcv
cv
 
@RAJENDRA YADAV Resume_1
@RAJENDRA YADAV Resume_1@RAJENDRA YADAV Resume_1
@RAJENDRA YADAV Resume_1
 
Resume UAE
Resume UAEResume UAE
Resume UAE
 
RESUME.pdf
RESUME.pdfRESUME.pdf
RESUME.pdf
 
Dhanasekaran_Resume
Dhanasekaran_ResumeDhanasekaran_Resume
Dhanasekaran_Resume
 
Dhanasekaran_Resume
Dhanasekaran_ResumeDhanasekaran_Resume
Dhanasekaran_Resume
 
CTM
CTMCTM
CTM
 
Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisor
 
Elamathi Panneerselvam CV
Elamathi Panneerselvam CVElamathi Panneerselvam CV
Elamathi Panneerselvam CV
 
Santosh singh
Santosh singhSantosh singh
Santosh singh
 
B.Tech (Mechanical Engineer.)
B.Tech (Mechanical Engineer.)B.Tech (Mechanical Engineer.)
B.Tech (Mechanical Engineer.)
 
Hisham Resume ( CV )
Hisham Resume ( CV )Hisham Resume ( CV )
Hisham Resume ( CV )
 
DOCTOR OF LETTER - MADHANKUMAR THANGARAJ
DOCTOR OF LETTER - MADHANKUMAR THANGARAJDOCTOR OF LETTER - MADHANKUMAR THANGARAJ
DOCTOR OF LETTER - MADHANKUMAR THANGARAJ
 
Doctor Of Letter - Madhankumar.T
Doctor Of Letter - Madhankumar.TDoctor Of Letter - Madhankumar.T
Doctor Of Letter - Madhankumar.T
 
Resume - Anirvan
Resume - AnirvanResume - Anirvan
Resume - Anirvan
 

GSShukla 2016

  • 1. Persona First nam Surname Address Telephon Mobile: I Mobile: S E-mail National Date of b Gender Desired Work Ex Starting Present Dates Name an of emplo Occupat Position Type of or secto   al informatio me(s) / e(s) s ne India Saudi Arabi ity birth Employmen xperience from the employmen nd address oyer tion or n held Business r on GHA B: 108 In 0091 +919 ia +966 gssh India 05 S Male nt Oil a Eng 22 y nt Jan JGC Gu JGC Gu compan Lead P Enginee ongoing 1. Sitr The ANSHYAM S 8 , Alkanada dia. 120 456825 9958672221 6543763514 hukla5@yah an September 1 e and Gas Pip gineering Ma years in Pipe n 2013 to Til ulf Internati ulf Internation y of JGC Co ipeline Eng ering Design EPC Projec ra Storage an Bahrain Ga SHUKLA Apartment, R 51 oo.co.in 968 peline Projec anager eline Projec ll Date onal Comp nal Co. Ltd. orporation. ineer n & Consulta ct of Saudi A nd Pipelines E s Plant Expa Rampuri Colo cts, Piping L t-India, Midd any Ltd. Sa (JGC Gulf) i ancy Compa Aramco: Expansion FEE ansion Proje ony, Surya N ayout, PMC dle East, Far audi Arabia in Saudi Ara ny based in ED ect can be ca Nagar, Ghazia C, Departmen r East. abia is its wh ,Saudi Arab ategorized in abad, Uttar- P ntal Manage holly owned bia and nto two sect Pradesh, er, tions: 1 
  • 2. 2    • Installation of a new gas plant (CGP-III) which is to be carried out by others. • The installation of new pipelines & modifications to the Sitra storage facility. 2. Rehabilate Al Mu’ajjiz Crude Oil Terminal LSPB Project This was Offshore and Offsite Pipeline Rehabilitation Mouth ball Project of 42’’ IPSA (EWMZ-1) which meets at KP19 of East West Pipeline through 56’’x42’’ Hot tapping Installation to bypass the product of East West Pipe along with product 8 ‘’C5+ of Yanbu Terminal which is about 26 k.m.pipeline to deliver into 42” EWMZ- Pipeline dispatched at Al Mu’ajjiz Terminal. 3. Shale (Unconventional) Gas Development Project Saudi Aramco EPC Project. Main activities and Responsibilities Design, Engineering, Construction and Commissioning of Gas Gathering Station to Process the shale (unconventional) gas development including cluster of well area (10 no’s, 2+1Cluster) including surface facilities, with a grouped and complex piping system to maintain the settle out pressure for fixed flowing days / year with dedicated pipeline corridor by laying of pipeline(s) of respective 16’’ & 30” diameter and (0.375 ‘’ W.T. 600 psi, 70km) to Saudi Transmission Company.  Development of Overall Plot plan, Equipment layouts, Piping layouts, Isometrics, Stress Analysis, Materials, Support Design, Piping MTO, handling and control for the project. Review of front end engineering, pipeline hydraulic profile, thickness optimization, hot-tapping and line stop, de-tour calculation and waiver-application, land use permit, PFD and GAD Drawing for pipeline in and outside battery limit design calculation and modeling of surge analysis, pressure& temperature variation study, Scraper Receiver Launcher Size selection, data- sheet calculation and MTO for Barred Tee, Hot Induction Bends, Insulating Joint, Anchor Block, Upheaval buckling calculation etc.  Submission of Plot Plan, Data Sheet, Specification, Project Design Basis, Deliverable List for Pipeline, Pump, Valves, Fittings.  Pipeline material procurement follow up, expected time line delivery of pipe items –main line pump, ball valves,etc.                          Dates Jan 2012 to Jan 2013 Name and address of employer Byucksan E&C India Pvt Ltd. Gurgaon, India ByucksanE&C provides comprehensive professional engineering & construction in all types of engineering sectors. Occupation or position held Chief Technical Officer (CTO) Type of business or sector Inception& Establishment of South Korean based subsidiary engineering design based company in Indian Market was initially/ concurrently focused on three
  • 3. 3    major verticals: 1. Infrastructure 2.Environmental 3.Oil and Gas. Main activities and responsibilities Preparation of P&ID,GAD, Pipeline Compressor Stations and Terminals Site Supervision at Various Locations of GAIL, GSPL, ONGC, OIL India Ltd.  Project Management Consultancy Services for City Gas Pipeline Project in Delhi NCR and various location of India. Dates Sep 2011 to Dec 2011 Name and Address of employer ABSG Consulting Company Abu Dhabi Type of business or sector ABSG Consulting is a global safety, risk and integrity management company serving the oil and gas, chemical and petrochemical, nuclear, Government maritime. Occupation or position held On behalf of Client Inspection for Civil Structural and Erection, GASCO, Abu Dhabi. Main activities and Responsibilities Civil Inspection and related activity of Engineering, Procurement, Construction and Commissioning (EPC) works for the SHR Granulated Sulphur Transportation and Management Project on Lump Sum Turnkey Basis, Ruwais Sulphur Handling Project, Civil QA/QC Bored Piling, (800MM Dia,14.05m depth Pile Toe 8.05m, Pile Cut Off 5.30m 1150 nos Rail Car Building (Single Pour 950 Cum), Conveyor, Marine & Dredging Construction Trial Mix -Concrete Mix Design C-50, Nuclear Density Test Integrity Test.-300Tonne, Slope and Scour Protection Trial Mix -Concrete Mix Design C-50, Nuclear Density Test Integrity Test.-300Tonne,Slope and Scour Protection for Causeway and Ship loading area of 2.9m Inspection of the Vibro compaction work-area of the fill material 463mx38m of the Causeway in between the land and ship loading area. Dates July2009 to Sep2011 Name and address of employer MP Birla Group of Company, New Delhi, India Type of business The Birla Group is one of the largest Industrial House in India to formulate strategy for accelerated growth of the business as a CNG/PNG Pipeline Operator. Occupation or Position held Business head (General Manager) City Gas Pipeline Projects Main activities and responsibilities  GSPC Gas Company Limited: 150 Km City Gas Pipeline Project.  Bhagya Nagar Gas Limited: 220 Km City Gas Pipeline Project.  City Gas Station Construction under Haryana State for Gail Gas Limited.  Gujarat Gas Company Ltd MDPE Laying and Maintenance. a. To scout for new business opportunities in Contracting in the Oil & Gas sector. b. To advise the Management on commercial / technical post bid activities fo acquiring new business. Viabilities of identified opportunities. c. Single point responsibility for all the pre bid, bidding and develop relationship with key decision influencers in target organizations for business development&
  • 4. 4    interfacing with Clients at various levels. d. Identify JV partners for eligibility & technology and negotiation. e. Identify, negotiate and close deals with sub-contractors for execution of the pipeline projects. f. Develop framework and guidelines for sub- contractors. g. Established detailed operational / deliverable milestone for pipeline projects. Dates June2008–July2009 Name and address HPCL MITTAL ENERGY Ltd. (HMEL), Noida, India Type of business Hindustan Mittal Energy Limited (HMEL) a joint venture between HPCL and Mittal Energy or sector Limited, a company owned by L N Mittal (HMEL) Company for Implementation of Guru Gobind Singh Refinery. A Green field refinery project with an initial capacity of 9 MMTPA and a 1,017 km pipeline from Mundra to Bhatinda. Occupation or position held Manager Pipeline Main activities and responsibilities To scrutinize crude oil pipeline bid-offer, reply of the technical queries, the crude oil pipeline project-bid finalization and contract award, reviewed the pre bid-award documents of followings:  The Crude Oil Terminal of over 8,00,000 KL capacity at Mundra Port.  The 1,014 Km long Crude Oil Pipeline from KOT at Mundra, Gujarat to Guru Gobind Singh Refinery at Bathinda, Punjab along with associated facilities.  Main-line pumping cum Intermediate Pigging (IP) Station at Dhansa. 2 IP stations, 17 SV stations and one Dispatch Station at Kot which involves all Civil, Electrical, and Piping. Mechanical and Instrumentation work. Dates JULY 2004 to JUNE 2008 Name and address of employer Petronet MHB Ltd.,(ISO-9001:2001,ISO-14001 :2004 &OHSAS-18001: 1999) accredited mulity-product petroleum transport pipeline company Bangalore, India. Type of business Or sector PMHBL is a company promoted by Oil & Natural Gas Corporation Limited Hindustan Petroleum Corporation Limited and Petronet India Limited with 28.77%&7.89% equity shares by each company. Apart from this the leading banks are having 34.57% stake, after restructuring. Occupation or Position held Station-In-Charge Hassan Pumping & Receiving Station, India Main activities and responsibilities Overall responsibility of operation, maintenance, inspection, major equipment station facilities, mainline & ROW Patrolling, safety & firefighting system, environmental impact assessment.
  • 5. 5     Pipeline Operations at Hassan for delivering the product to HPCL terminal & flow diversion to Bangalore end.  Monitoring of all equipment’s & Mainline stations.  ROU Inspection& CP Check.  To upkeep original licenses of CCOE, Factory NOC, Excise Dept, Joint Directors- Legal /Statutory cases.  Compliance of Third Party Audit Reports.  Prepare Preventive Maintenance Plan for Pump, Motors, Valves, Fire Fighting Pump, etc.  Monthly Reconciliation, Recovery, Throughput Loss-Gain, Monthly Freight Charges Invoice Submission and Payment Follow-up,PLT Planning on monthly basis with MRPL Refinery and Oil Marketing Companies.  Pipeline Integrity Test and correspondence with District Authority during Pilferage, Sabotage and preparedness report during such incident. Dates MAY 2001 to JULY 2004 Name and address of employer Petronet VK Ltd., Reliance (MTF), Sikka, Jamnagar ,India Type of business sector A Joint Venture Company of Petronet India Ltd., (PIL), Indian Oil Corporation Ltd(IOCL) & Reliance Industries Limited (RIL) to construct a pipeline between Vadinar to Kandla (117Km) to transport petroleum products manufactured by RIL Refinery, the pipeline was having operating capacity of 7.5 MMTPA (24”OD 17 KmX0.281”- 24”ODX56KmX0.438” (Offshore)- 24” ODX44Km 0.406” API5L52 Grade). Occupation or position held Station-In-Charge SIKKA Pumping @ RIL Marine Tank Farm Main activities and responsibilities Tank farm and terminal station jobs from inlet manifold to delivery manifold through different tank hook-ups, tank fabrication, erection, civil works from excavation to dyke wall formation, mass concreting, brick masonry, structural works etc,civil rehabilitation jobs during quake effected terminal station building done under strict guidelines of CBR Code, application grouting materials on damaged portions – control room buildings, township buildings at both locations done by inserting holes of 16 mm dia Drill inserting to BRASS nozzle by putting 1:1 mix of epoxy,resin hardener by applying the required compressed air pressure,VHF tower installation and erection, to provide supports to tank farm, Jetty Structures. Smooth & safe operation of product pipeline PLC- SCADA, updating of daily throughput,oil-accounting &monthly reconciliation report, manual tank gauging, coordinating and integrating with IOC for day to day pumping as per SPM, checking of dip-memo, shift production optimization, ensure proper entry &upkeep of the log-book, checking the monthly reconciliation report, coordinating with other location- in charges in respect to arrival of parcel/delivery of product at mouth/interface quantities,review and modify standard operation procedures when required & conduct related training to subordinates,delegation of tasks to subordinates and close monitoring also, attending the monthly meeting with others PSU' s to decide the next month SPM. Dodsal Ltd., Bangalore SEP 2000 to APRIL 2001 Worked as: Spread-In Charge
  • 6. 6    Client: Bangalore Water Supply & Sewerage board (BWSSB). Contract no. W-4C. Const. of Clean Water Transmission Name of project: Bangalore water supply (l.9m OD X Plate thickness 11mmX12.5mm internal lining, + 30mm gunniting).Project Planning & Scheduling for laying of pipeline, from the river Cauvery, which was 98km from the city, under the four stages head, water is pumped in stage against total head of 545metres, Construction of VALVE CHAMBERS, THRUST-BLOCKS, RAFT INVERT-LEVEL, SADDLES, SCOUR-VALVES, MAN HOLES, KINETIC AIR- VALVES, BUTTERFLY VALVES, ENCASED CONCRETE, PIPE SPECIAL BENDS,TEES,REDUCERS, EXPANDERS etc. along the route road/rail crossing, gunniting for bare-pipes, bedding (Class A,S&N), bends as per angles, horizontal & vertical upward, downward vertical for transmission main. Contract-agreement with local vendors, resource planning, coordination with other departments to execution, test-pack preparation, documentation with clients and close monitoring over sub- contractors job progress. Organizing and participating management review meetings and making presentations. Develop resource mobilization chart for material / manpower.Project monitoring on a weekly & monthly basis to ensure that no slippage occurs & when unavoidable problems occur, to find solutions such that the intermediate & final milestones are not jeopardized whilst ensuring that the overall cost of the project is not increased. Dodsal Co. L.L.C. SULTANATE OF OMAN NOV 1999 to JULY 2000 Worked as: QC Inspector (Civil) Client: Petroleum Development of OMAN (P.D.O.). Contract no. C889008 Name of Project: ATHEL Project, AL-NOOR-Phase-l (Facilities) Carry out inspections & verifications for all civil & structural works, inclusive material ensure that the excavation, concrete, bbs, pour cards, erection, grouting of all civil & equipment & test plan for the civil, equipment,installation, carries out the installation, the various stage inspection& tests, records findings, Liaison with the client’s inspection & construction staff intermediate & final acceptance PMC’s work, carry-out inspection of works & nominated sub-contractors /suppliers as directed by approved inspection & test plan, Carried out vendor inspection of material equipment, when required, prior to shipment of material/equipment to site.Informed PM staff of poor quality work deficiencies detected during inspections & assist/advice on remedial works required, report deviations from requirements from contract documents Construction of Production station crude oil,batching-plant operation, operation on round the clock basis, mass- Concrete production, inspection with third party for structural concrete up to dia.36mm & M-35, grouting with insert- plates,foundation-bolts etc. Quality-assurance documentation, qualification, validation & audits.To support the site engineers in respect to monitoring the requisite quality of the job in compliance with requirements of the QTP & Guidelines of contract document, supervise the quality of production-concrete at batching-plant& plant area / battery limit area and calibrate the batching- plant as per requirements too also, maintain the throughput of production- concrete inspection of heavy reinforcement & checking pour cards upto 36 mm dia. of reinforcement, preparation of stacking bends (cold), preparation of BBS, Grouting of structural foundation-bolts, insert-plates, cube-test, etc. Dodsal Pte Ltd. DUBAI U.A.E. JUNE 1999 to OCT 1999 Worked as: Pipeline QA&QC Engineer Client: SNAMPROGRETTI-ITALY (ADNOC), U.A.E. Contract no.304700 Name of Project: ASAB-GAS Development & Gathering Station, ABUDHABI. Laying of pipeline from ASAB to RUWAIS, cased crossing under HDD, civil construction works at different valve stations, PROCTER Test over BERMING, various civil activities done by M/S GRANITE Company of UAE for Gathering Station from Excavation to Erection of equipment's,
  • 7. 7    joint concrete coating done over the pipeline joints applying epoxy, also handled the receipt of shipment, cargo-handling for the materials which were being used in the project. Perform PROCTOR test on soil-surface to find-out the maximum dry density (MDD) and optimum moisture-content etc. Report for project expenditure and schedule progress on a regular basis to head office.Coordinate technical tendering evaluation activities relating to specific job with local companies also, negotiating to reduce the cost of the same, assisting in compliance of budgets and coordinates approvals with Management, cost-estimates, obtaining quotations, specific vendor liaison and securing various regulatory permissions. Dodsal &CO.L.L.C. Sultanate of OMAN JAN 1998 to MARCH 1999 Worked as: Civil Engineer Client: CHIYODA FOSTER WHEELER&CO. L.L.C Contract no. ON-PLOT PIPING Name of project:2x3.3 MMTPA OMAN LNG TRAINI&TRAIN2, SUR. was a Joint Venture Company in Sultanate of Oman to fabrication, Erection of Piping , Equipment Piping, Equipment and Structural Works of comprising Piping of 497158 inch Dia, Equipment Erection of 424 no structural steel of 5787 MT. Receipt, Stacking and Transportation of structural steels from dump-yard to working site after doing some modifications as per schedule structural drawings. Establish the location of TOWER-CRANES at the site also did the required mass concreting for the foundations etc Camp-construction & finishing, joinery works, plumbing and drainage works, power cables laying with looping with feeder, soak-pits, kitchen flooring, false ceiling flooring etc. for capacity of 2000 Workers & Staff to provide amenities as per Client HSE Policy.Constructions and Erection of FAB. SHOP for CS/ MS/SS/,Car-washing &maintenance facilities,To-establish RIGGING- PLAN, checking foundations, and Crane- signaling s keeping all safety precautions to confirm the erection drawing. Dodsal Ltd. Baroda India APR 1996 to JAN 1998 Worked as: Pipeline Construction Engineer Client: ENGINEERS INDIA Ltd./IPCL-BARODA/DAHEJ.BOOT BASIS Name of Project:DAHEJ-GANDHAR-BARODA, PLANT/SV Stations Engineering, Coordinating for Laying of 3 pipelines namely Naphtha, Propylene & Ethylene {8", 6", 6") liquid.Condense vapor and Semi- reach gas pipeline project which was based on BOOT BASIS. Preparation and consolidation of project schedules by using PERT /CPM tools, monitoring progress status and analysis of project monitoring progress status and analysis of project variances using "S" curves.Construction of Battery Limit Area,Control-roam Building- MCC.H.T.Room,UPS- Room, C/R A.C.duct, Telecom-room,Master Control Station SCADA Installation TATA HONEYWELL, providing conceal-conduits, Jetty civil & piping job to hook-up at DAHEJ & concrete-coated pipes lowering on floating & buoyancy basis with DRAG-LINE, Hand—rail fabrication and erection. Dodsal Ltd. Bharatpur India AUG 1995 to MAR 1996 Worked as: Pipeline construction engineer Client: ENGINEERS INDIA Ltd./GAS AUTHORITY of INDIA Ltd. (RAJ). Name of Project: 36" Dia., 505 Km Gas Rehabilitation. GAIL (India) Ltd. and Expansion Project (HBJ Up gradation). Pipeline-execution from STRINGING to HYDROTEST PIG-RECIEVING,assisting in allocation of manpower requirements at different locations of R.O.W.,installation PIPE RACK its platforms etc.Installation of Pipeline warning-markers, Boundary-markers, Directional markers,Logo- marking, Spray-painting etc. Supervise the job of the temporary C.P. included casting, transportation & erection of foundations at different locations along with R.O.W. Measured C.P. voltage as per std.also, measuring the voltage of (-1.5VTO -0.8V) on the extrude surface of
  • 8. 8    pipeline. Evaluating the consumption-rate of ANODE PLATE on the basis of project specification. Dodsal ltd., SOJAT City Road India DEC 1993 to AUG 1995 Client: SKODA INDIA Ltd. SOJAT CITY ROAD (RAJASTHAN). Name of Project: KANDLA BATHINDA PRODUCT PIPELINES. 22' '/14"dia. product pipeline of KBPL. Construction of SV Stations, Surveying (setting out), stringing, ROW preparation. Levels (Bench- Mark), trenching (controlled blasting with third party), Mainline Welding, TI-EN welding, Field joint coating (PEEL-TEST, thickness measurement), Rail/Road crossing, chain age marking, pressure-header fabrication, Pre Hydro- Testing & Post Hydro-Testing for major crossing,OFC Laying, Splice-test, block station construction, barbed wire fencing etc. Cable laying for CP at SV"s and cable related by using 10 sq.mm & 65sq. mm armor cables permanent CP on both banks, Sacrificial CP unit installation. Major Professional Achievements  Successfully commissioned Dahej Gandhar Baroda Multi Product Pipelines  Horizontal Directional Drilling Completed across the Chambal River Crossing for HBJ-Up gradation project.  Commissioned the Crude Oil Pumping Station in PDO-Oman Project Al-Noor Site.  Civil & Structural Jobs handled for Oman LNG project (Train I & II).  Pumping Exposure for Indian Oil Product Pipeline Operation, which was, originated from Reliance MTF under SCADA-PLC.  Worked as Senior Civil Consultant on behalf of M/s Petroleum India International Ltd to check the drawings of China Petroleum Pipeline Engineering Corporation at Lang fang, in Hebi Province. Name: Ghanshyam Shukla. Father's name: Late Shri Suryabhan Shukla. Mother’s name: Smt. Sulochana Devi Shukla Permanent Address: Late Shri Suryabhan Shukla, Sahadatpura nai-basti, behind L.I.C.office, Post Office: MauNath Bhanjan, District Mau [Uttar- Pradesh] Present contact address: B-108; Alkanada Apartment, Rampuri Colony, Surya Nagar, Ghaziabad, Phone no. 0091-0120-4568251 Mobile No. +919958672221/ +966543763514 E-mail: gsshukla5@yahoo.co.in alternate mail ghanshyamshukla@rediffmail.com Date of birth: 05-09-1968 Nationality: Indian Passport No. G4883261 Place of Issue: Bangalore Date of Issue: 10/09/2007 Date of Expiry: 09/09/2017
  • 9. 9    Marital status: Wife and two dependent Educational qualification: B.E. (Civil) from Pune University in 1993 Hangout ID: gsshukla5@gmail.com Skype ID: facebook:ghanshayam.shukla Saudi Aramco Contractor ID : 8098726