1. Page 1 of 3
SUDIPTO BHATTACHARJEE, PMP ®
DOB : Aug02,1978
Marital Status : Married
Address : D-203 , AMRAPALI SAPPHIRE,
PLOT GH-01, Sector -45,
NOIDA, U.P.- 201301,
Landline Phone : 0120-4974284
Mobile Phone : +91 9999076079
Email : sudiptobhat02@yahoo.com
Languages Known : English, Hindi & Bengali
Passport No. : L1553315
PROFESSIONAL SUMMARY
To utilize my diverse education background along with skills in establishing a successful career, while gaining rich
professional experience in real life projects, thereby contributing to the growth and success of my mentor organization
To take up challenging assignments in any field of excellence in reputed companies with dynamic growth and to do justice
with the assigned tasks
PROFESSIONAL EXPERIENCE 13 YEARS
A) ALSTOM INDIA LIMITED June 2007 – Till Date
As Project
Manager (Project
Management)
March 2010 – Till
Date
Project Management Department
o Working as the Project Manager for Banharpalli Project (2 x 660 MW) Supercritical Coal Fired 2 Pass Boiler.
o Also associated as Project Manager for Krishnapatnam project (2x800 MW) Supercritical Coal Fired 2 Pass
Boiler.
o Involving in the various Tendering Support from Project Management for the Ongoing Proposals.
Roles &
Responsibilities
As a Project Manager, have a total responsibility and accountability right from the Project Initiation, Planning, Execution,
Monitoring & Controlling till the Closure of the project. Manage the project in terms of Cost, Scope, Quality, Time,
Resources, Risk and Customer Satisfaction. Most importantly PM has to ensure for handling all the concerned
stakeholders -Site, Engg, Quality, Customer, Handling of Regulatory Bodies & Agencies and all other internal / external
stakeholders commercially and technically to have the project move on smoothly with minimum hassles.
As Lead
Commissioning
Engineer)
June 2007 –
March 2010
Roles &
Responsibilities in
Various Projects
assigned
Field Operations Department
Prior to working as a Project Manager, was working as Lead Commissioning Engineer in the below mentioned projects.
Projects:
o M/s. HINDALCO , Renusagar, U.P.(300 TPH Pulverized Fired Boiler of Make ALSTOM)- Involved
as a member of the commissioning team and participated in the Commissioning of the Total Plant
o M/s. PHILIPS CARBON BLACK LIMITED, DURGAPUR, W.B. (130 TPH OIL & Tail Gas Fired
Boiler of make ALSTOM)—Was responsible for the Pre-Commissioning and Commissioning Activities of
the Boiler.
o M/s. Tamil Nadu Electricity Board, Ramanathapuram, Tamil Nadu (115 TPH Triple Pressure HRSG
of Make ALSTOM)—Partly Erection, was identified as the Sole person for the Total Commissioning and
thereafter Stabilization of the plant till final Handover to the customer.
o M/s Tata Power Company (TISCO), Jamshedpur, Jharkhand (2 x 230 TPH Oil and BFG/ COG Fired
Boiler– Involved in the Total Commissioning and Stabilization of the Plant. Posted as Lead Commissioning
Engineer.
o M/s Gujarat State Electricity Corporation Ltd. (370 MW Gas Based Combined Cycle Power Plant,
Utran, Surat, Gujarat) –Turn-key (EPC) project taken by Alstom Projects India Limited. Posted as Lead
Commissioning Engineer--The Job Profile includes performing Hydro test Of Boiler, Commissioning of all
Auxiliaries including Pumps , Motors , Fans, C & I -- Transmitters , Control Valves etc , Performing Alkali Boil
Out , Steam Blowing of different projects and thereafter Operation till the stabilization of the Plant and lastly
Performance Guarantee Test.
2. Page 2 of 3
B) ISGEC JOHN THOMPSON March 2005 – May 2007
As Engineer (Mechanical), March.2005 –
Sep.2007
As Sr. Engineer (Mechanical), October.2007
– May 2007
Construction Department
The Job profile includes the following:
o Erection and Commissioning of total Boiler including Boiler Auxiliaries (Deaerator
charging, Commissioning of Boiler Feed Pump, Fans, Wet Scrubber, Horizontal &
Vertical Clarifier).
o Liasioning with Inspection agencies.
o Coordination and interaction with Clients, Consultants and Vendors and Sub
Contractors.
o Attending Review meetings with Clients and Consultants.
Roles & Responsibilities in Various Projects
assigned
Projects:
o M/s. TATA METALIKS, KHARAGPUR, W.B.(22.5 TPH OIL & Gas Fired
Boiler of IJT make)— Complete Pre-commissioning and Commissioning
Activities
o M/s. NEO METALIKS, DURGAPUR, W.B. (23 TPH OIL & Gas Fired
Boiler of IJT make)— Worked Single Handedly as a Site In-charge, responsible
for the Total Installation of the Boiler including guiding the sub-contractor at
every step of installation, along with dealing with Sub contractor and IBR Agency.
After the installation was also responsible for the Pre-commissioning of Boiler.
o M/s. HINDALCO, MURI,JHARKHAND.(140TPH AFBC Boiler of IJT
make)— Involved in Installation Activities.
o M/s. BAJAJ HINDUSTAN LTD, BASTI. (90 TPH Bagasse fired Boiler of
IJT make) — Worked as a Site In-charge, responsible for the Total Installation
of the Boiler including guiding the sub-contractor at every step of installation
along with dealing with Sub contractor and IBR Agency. Thereafter also
performed the Commissioning of Boiler and was involved till the smooth
operation of the Boiler.
C) TRIVENI ENGG. & INDUSTRIES LTD. June 2004 – February 2005
As Engineer (Mechanical), Power Plant
Division; June.2004 – Feb.2005
Operation & Maintenance Department
Was Responsible for Operation and Maintenance of the Boiler and Turbine
Operation. Worked in Shifts.
Was also involved in the Erection and Commissioning phase as well. Also
involved in the fine tuning stages and taking handover from the Vendor for the
Safe operation of Boiler and Turbine.
Roles & Responsibilities The Job profile includes the following:
o Operation of 120 TPH ,87 Kgf/cm2 Boiler(IJT Make) & 22 MW Turbine( Skoda
Make)
o Supervision of Maintenance of all Auxiliaries including Cooling Tower by M/s
Paharpur make, Ash-handling system (Dense phase & bottom ash pneumatic type)
by M/s Macawber Beekay and M/s Hyquip projects, Fuel handling system by M/s
Hyquip Projects, Reverse Osmosis type water treatment plant by M/s Ion-
Exchange Indion Ltd.
o Providing technical support to Process team for new developments and
operational improvement. Active member of commissioning team for boiler,
turbine & ESP systems.
o Project Planning, Procurement for new Boiler and maintaining spares for older
ones.
D) NPTI,BADARPUR June.2003 – June.2004
As Engineer Trainee , NPTI Badarpur
(June.2003 – June.2004)
o Acquired the required knowledge of the working of a Thermal Power Plant with
appropriate trainings.
The complete course is considered as an experience with certificate in the Thermal
Power Plant.
PROFESSIONAL TRAININGS / CERTIFICATIONS
o Simulation Training of 210 MW Power Plant at Badarpur Thermal Power Station, NTPC, Badarpur, New Delhi.
3. Page 3 of 3
o Rotational 'On job' training as a part of PGDC curriculum in 210 MW (IV Unit) at BTPS at pre-identified locations of operational area
of duration six weeks from Badarpur Thermal Power Station, NTPC, Badarpur, New Delhi.
o Training during study in different plant locations as per the orientation schedule of duration four weeks from Harduaganj Thermal
Power Station, Aligarh.
o Completed the worldwide recognized AIEP (Alstom International EHS Passport Training) successfully.
EDUCATIONAL BACKGROUND
PMP
Certifications
PMI ( USA) Project Management Successful
Post Graduate
Diploma in
Thermal Power
Plant
NPTI , Badarpur Thermal Power Plant 76%
Post Graduate
Diploma in
Marketing &
Sales
Bharatiya Vidya Bhawan Marketing & Sales Successful
B.E. ZHCET, Aligarh Muslim University (AMU), Aligarh Mechanical Engineering 77.56 %
10+2 St. Francis School , Hathras , Dist. Aligarh PCM 61.2 %
High School St. Francis School , Hathras , Dist. Aligarh Common 72 %
Achievements &
Awards
Secured 3rd Rank in B. E., AMU, Aligarh.
PERSONAL INTERESTS
o An Excellent team player with Fair Communication & Analytical skills.
o An Enthusiastic individual with high Moral and Ethical values.
o Extremely fond of playing Table Tennis and Football.
DECLARATION
I hereby declare that the above information is true and correct to the best of my knowledge.
(Sudipto Bhattacharjee)