Burj Al Arab
Cofferdam & Rigging
Firas Al Shalabi & Sunny Mahajan
CE 505
Project Presentation
1
Background
 Dubai, UAE
 1994 – 1999
 The first 7 stars hotel in the world
 The start of Dubai’s new vision of attracting new investments in
areas outside the oil industry.
 If you want to book a night there it will cost you around $2000
(according to Expedia tonight is $2039)
 1.2 million SF
 321 meters height from the sea.
2
The construction
 Two main phases:
 The manmade Island (our focus)
 The building
3
Building the island
 Temporary tube piles driven into sea bed
 Temporary sheet piles and tie rods
driven into sea bed to support
boundary rocks
Tubular pile
Sheet pile wall
4
Building the island
 Permanent boundary rock bunds (rock armor) deposited on both sides of the sheet
piles
 Hydraulic fill layers deposited between
bunds to displace sea water and form
the island
 No solid ground under the building just weak sand
(up to 180 meters deep with no solid ground). So it
was decided to go with friction piles.
Rock armor
Sand fill
5
Building the island
 Permanent SHED units placed around the island to dissipate the action of waves and
protect it.
 2M (6.5 ft) diameter 43 M (141 ft)
deep piles were driven through the
island and sea bed
SHED units
Main building piles 6
Building the island
 Excavations began in the island to remove the hydraulic fill
 A coffer dam was being built while
excavating
 2M (6.5 ft) thick concrete plug slab laid on the base of
the island to prevent the base from popping out
because of the sea pressure
 Reinforced concrete retaining wall built
 The construction of the basement
started
Concrete slab
7
Completed Island
 Completed in three years
8
Diagonal truss rigging
 Huge tubular triangular truss geometry
 The Diagonal vary from 76m to 90m in length and weigh 160 to 180 ton.
 The Diagonal connects with a 300mm diameter pin connection to the core-wall
and the Rear-leg structure.
 There are six diagonals erected at different levels on both side of the building
 transported as a single fabricated piece from the fabrication shop 15 km away
by special self propelled long trailers.
9
Diagonal truss rigging
 Dealing with the expansion about (2 inches)caused by the desert heat
 Strand jacks supported by Cat heads were connected to the building to
execute the lifting of the Diagonals and Horizontals.
10
Summary
 Many forces can destroy your temporary structures. You have to count them all.
 The safety of the crew is essential for cofferdams construction.
 Rigging elements can’t always be easy and can be more complicated than what we learned
 Putting things in the air is a different story.
 Have to come up with practical innovative on site solutions for uncertain problems
11
Thank you
References:
• Nathan. D., (2006) “Burj Al-Arab, UAE Structural Steel Construction For A Mega Project.”
master builder, 3rd quarter 77-80
http://www.mbam.org.my/mbam/images/MBJ3Q06(pdf)/@BurjAlArb.pdf
• Burj Al Arab, mega structures show. http://www.youtube.com/watch?v=RGzSNZudEHw
• Stonecypher. L., (2009). Building the tallest hotel: Burj Al Arab, Dubai.
http://www.brighthub.com/education/homework-tips/articles/57599.aspx#imgn_3
• Pourabedin. E., (2009). Burj Al Arab construction.
http://www.slideshare.net/shahrozalam210/burj-alarab1203786822334454
• Wright. T., (2000).Creating the Burj Al Arab Dubai
http://wkkarchitects.com/#/burj-al-arab/
12

More Related Content

What's hot

CAPITAL GATE, ABU DHABI
CAPITAL GATE, ABU DHABICAPITAL GATE, ABU DHABI
CAPITAL GATE, ABU DHABISelf employed
 
presentation1Capital Gate Tower.pdf
presentation1Capital Gate Tower.pdfpresentation1Capital Gate Tower.pdf
presentation1Capital Gate Tower.pdfMuhammedJawad6
 
Capital Gate Abu Dhabhi - Case Study
Capital Gate Abu Dhabhi - Case Study Capital Gate Abu Dhabhi - Case Study
Capital Gate Abu Dhabhi - Case Study Jeesmon Babu
 
Construction of Burj Al Arab, Dubai
Construction of Burj Al Arab, DubaiConstruction of Burj Al Arab, Dubai
Construction of Burj Al Arab, DubaiAr. Md Shahroz Alam
 
Dubai burj al-arab hotel2 copy
Dubai burj al-arab hotel2 copyDubai burj al-arab hotel2 copy
Dubai burj al-arab hotel2 copyChyi Ong
 
high rise building construction
high rise building constructionhigh rise building construction
high rise building constructionAditya Sanyal
 
Burj khalifa
Burj khalifa Burj khalifa
Burj khalifa shiv404
 
Diagrid structure system - شبكات العقد الاطارية
Diagrid structure system -    شبكات العقد الاطاريةDiagrid structure system -    شبكات العقد الاطارية
Diagrid structure system - شبكات العقد الاطاريةDr.Youssef Hammida
 

What's hot (20)

Burj Al Arab
Burj Al ArabBurj Al Arab
Burj Al Arab
 
Burj Al Arab
Burj Al ArabBurj Al Arab
Burj Al Arab
 
Burj al-arab
Burj al-arabBurj al-arab
Burj al-arab
 
CAPITAL GATE, ABU DHABI
CAPITAL GATE, ABU DHABICAPITAL GATE, ABU DHABI
CAPITAL GATE, ABU DHABI
 
Marina bay sands
Marina bay sandsMarina bay sands
Marina bay sands
 
Burj al arab-uae
Burj al arab-uaeBurj al arab-uae
Burj al arab-uae
 
presentation1Capital Gate Tower.pdf
presentation1Capital Gate Tower.pdfpresentation1Capital Gate Tower.pdf
presentation1Capital Gate Tower.pdf
 
Pm burj case
Pm burj casePm burj case
Pm burj case
 
Capital Gate Abu Dhabhi - Case Study
Capital Gate Abu Dhabhi - Case Study Capital Gate Abu Dhabhi - Case Study
Capital Gate Abu Dhabhi - Case Study
 
KINGDOM TOWER JEDDAH TOWER
KINGDOM TOWER JEDDAH TOWERKINGDOM TOWER JEDDAH TOWER
KINGDOM TOWER JEDDAH TOWER
 
Construction of Burj Al Arab, Dubai
Construction of Burj Al Arab, DubaiConstruction of Burj Al Arab, Dubai
Construction of Burj Al Arab, Dubai
 
Sears tower
Sears tower Sears tower
Sears tower
 
Dubai burj al-arab hotel2 copy
Dubai burj al-arab hotel2 copyDubai burj al-arab hotel2 copy
Dubai burj al-arab hotel2 copy
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
High rise buildings
High rise buildingsHigh rise buildings
High rise buildings
 
High righ presentation
High righ presentationHigh righ presentation
High righ presentation
 
high rise building construction
high rise building constructionhigh rise building construction
high rise building construction
 
Taipei 101
Taipei 101Taipei 101
Taipei 101
 
Burj khalifa
Burj khalifa Burj khalifa
Burj khalifa
 
Diagrid structure system - شبكات العقد الاطارية
Diagrid structure system -    شبكات العقد الاطاريةDiagrid structure system -    شبكات العقد الاطارية
Diagrid structure system - شبكات العقد الاطارية
 

Viewers also liked

Viewers also liked (20)

innovative details in architecture
innovative details in architectureinnovative details in architecture
innovative details in architecture
 
Burj al arab
Burj al arabBurj al arab
Burj al arab
 
Cofferdam
CofferdamCofferdam
Cofferdam
 
Cofferdam
CofferdamCofferdam
Cofferdam
 
Type of caissons
Type of caissonsType of caissons
Type of caissons
 
Burj al arab presentation
Burj al arab presentationBurj al arab presentation
Burj al arab presentation
 
Burjalarab 091001090618-phpapp01-1
Burjalarab 091001090618-phpapp01-1Burjalarab 091001090618-phpapp01-1
Burjalarab 091001090618-phpapp01-1
 
Caisson types
Caisson typesCaisson types
Caisson types
 
Cofferdam
CofferdamCofferdam
Cofferdam
 
NEW BLENDED CEMENTS
NEW BLENDED CEMENTSNEW BLENDED CEMENTS
NEW BLENDED CEMENTS
 
Coffer dams types
Coffer dams  typesCoffer dams  types
Coffer dams types
 
Burj Al Arab - Dubai
Burj Al Arab - DubaiBurj Al Arab - Dubai
Burj Al Arab - Dubai
 
Burj al arab technology homework
Burj al arab technology homeworkBurj al arab technology homework
Burj al arab technology homework
 
Cofferdam 02
Cofferdam 02Cofferdam 02
Cofferdam 02
 
Burj-Al-Arab
Burj-Al-ArabBurj-Al-Arab
Burj-Al-Arab
 
Burj Al Arab
Burj Al ArabBurj Al Arab
Burj Al Arab
 
Burj ul arab
Burj ul arabBurj ul arab
Burj ul arab
 
Burj Al Arab Conceptos De Fuerza Original
Burj Al Arab Conceptos De Fuerza OriginalBurj Al Arab Conceptos De Fuerza Original
Burj Al Arab Conceptos De Fuerza Original
 
Cofferdam
CofferdamCofferdam
Cofferdam
 
Burj Al arab
Burj Al arabBurj Al arab
Burj Al arab
 

Similar to Burj al arab (Cofferdam&Rigging)

Burj al-arab
Burj al-arabBurj al-arab
Burj al-arabmilyas143
 
BURJ AL ARAB Presentation on Structural System
BURJ AL ARAB Presentation on Structural SystemBURJ AL ARAB Presentation on Structural System
BURJ AL ARAB Presentation on Structural SystemABDURRAB ANSARI
 
Introduction of Burj Al Arab, Dubai
Introduction of Burj Al Arab, DubaiIntroduction of Burj Al Arab, Dubai
Introduction of Burj Al Arab, DubaiAr. Md Shahroz Alam
 
115903034-Burj-Al-Arab.pptx
115903034-Burj-Al-Arab.pptx115903034-Burj-Al-Arab.pptx
115903034-Burj-Al-Arab.pptxGhaziMoe
 
20150421031337318
2015042103133731820150421031337318
20150421031337318James Prs
 
ANSHU PPT NARDEY SIR.pptx
ANSHU PPT NARDEY SIR.pptxANSHU PPT NARDEY SIR.pptx
ANSHU PPT NARDEY SIR.pptxAnshuBarmase
 
Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...
Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...
Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...Tonyamis
 
MODERN BUILDING (BURJ AL-ARAB)
MODERN BUILDING (BURJ AL-ARAB) MODERN BUILDING (BURJ AL-ARAB)
MODERN BUILDING (BURJ AL-ARAB) sathish sak
 
GE Presentation 6th October 2010
GE Presentation 6th October 2010GE Presentation 6th October 2010
GE Presentation 6th October 2010Tonyamis
 
Structure and Details of Burj Al Arab, Dubai
Structure and Details of Burj Al Arab, DubaiStructure and Details of Burj Al Arab, Dubai
Structure and Details of Burj Al Arab, DubaiAr. Md Shahroz Alam
 
Project Management - Marina bay Sands
Project Management - Marina bay SandsProject Management - Marina bay Sands
Project Management - Marina bay SandsBimenpreet Kaur
 
Busan geoje fixed link
Busan   geoje fixed linkBusan   geoje fixed link
Busan geoje fixed linkVicky Matwan
 
Seminar artificial island.pptx
Seminar  artificial island.pptxSeminar  artificial island.pptx
Seminar artificial island.pptxVismayaChandran3
 

Similar to Burj al arab (Cofferdam&Rigging) (20)

PPT ON BURJ AL ARAB
PPT ON BURJ AL ARABPPT ON BURJ AL ARAB
PPT ON BURJ AL ARAB
 
Burj al-arab
Burj al-arabBurj al-arab
Burj al-arab
 
Burj al-arab
Burj al-arabBurj al-arab
Burj al-arab
 
BurjAlArab.pdf
BurjAlArab.pdfBurjAlArab.pdf
BurjAlArab.pdf
 
BURJ AL ARAB Presentation on Structural System
BURJ AL ARAB Presentation on Structural SystemBURJ AL ARAB Presentation on Structural System
BURJ AL ARAB Presentation on Structural System
 
Introduction of Burj Al Arab, Dubai
Introduction of Burj Al Arab, DubaiIntroduction of Burj Al Arab, Dubai
Introduction of Burj Al Arab, Dubai
 
115903034-Burj-Al-Arab.pptx
115903034-Burj-Al-Arab.pptx115903034-Burj-Al-Arab.pptx
115903034-Burj-Al-Arab.pptx
 
20150421031337318
2015042103133731820150421031337318
20150421031337318
 
ANSHU PPT NARDEY SIR.pptx
ANSHU PPT NARDEY SIR.pptxANSHU PPT NARDEY SIR.pptx
ANSHU PPT NARDEY SIR.pptx
 
Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...
Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...
Integrating Geothermal Loops into the Diaphragm walls of the Knightsbridge Pa...
 
MODERN BUILDING (BURJ AL-ARAB)
MODERN BUILDING (BURJ AL-ARAB) MODERN BUILDING (BURJ AL-ARAB)
MODERN BUILDING (BURJ AL-ARAB)
 
Palm island
Palm islandPalm island
Palm island
 
GE Presentation 6th October 2010
GE Presentation 6th October 2010GE Presentation 6th October 2010
GE Presentation 6th October 2010
 
Monolithic dome ppt
Monolithic dome pptMonolithic dome ppt
Monolithic dome ppt
 
Structure and Details of Burj Al Arab, Dubai
Structure and Details of Burj Al Arab, DubaiStructure and Details of Burj Al Arab, Dubai
Structure and Details of Burj Al Arab, Dubai
 
Project Management - Marina bay Sands
Project Management - Marina bay SandsProject Management - Marina bay Sands
Project Management - Marina bay Sands
 
Al dar hq
Al dar hqAl dar hq
Al dar hq
 
burj khalifa
burj khalifaburj khalifa
burj khalifa
 
Busan geoje fixed link
Busan   geoje fixed linkBusan   geoje fixed link
Busan geoje fixed link
 
Seminar artificial island.pptx
Seminar  artificial island.pptxSeminar  artificial island.pptx
Seminar artificial island.pptx
 

More from Sunny Mahajan

Usage of RAP on gravel roads
Usage of RAP on gravel roadsUsage of RAP on gravel roads
Usage of RAP on gravel roadsSunny Mahajan
 
Off site fabrication
Off site fabricationOff site fabrication
Off site fabricationSunny Mahajan
 
Frugal innovation-sankalp
Frugal innovation-sankalpFrugal innovation-sankalp
Frugal innovation-sankalpSunny Mahajan
 
Marketing101-The Geek
Marketing101-The GeekMarketing101-The Geek
Marketing101-The GeekSunny Mahajan
 
Project Complexity (Case study)
Project Complexity (Case study)Project Complexity (Case study)
Project Complexity (Case study)Sunny Mahajan
 
Optimal RAP content for Minnesota Roads
Optimal RAP content for Minnesota RoadsOptimal RAP content for Minnesota Roads
Optimal RAP content for Minnesota RoadsSunny Mahajan
 

More from Sunny Mahajan (7)

Usage of RAP on gravel roads
Usage of RAP on gravel roadsUsage of RAP on gravel roads
Usage of RAP on gravel roads
 
Off site fabrication
Off site fabricationOff site fabrication
Off site fabrication
 
Frugal innovation-sankalp
Frugal innovation-sankalpFrugal innovation-sankalp
Frugal innovation-sankalp
 
Marketing101-The Geek
Marketing101-The GeekMarketing101-The Geek
Marketing101-The Geek
 
Project Complexity (Case study)
Project Complexity (Case study)Project Complexity (Case study)
Project Complexity (Case study)
 
Optimal RAP content for Minnesota Roads
Optimal RAP content for Minnesota RoadsOptimal RAP content for Minnesota Roads
Optimal RAP content for Minnesota Roads
 
BIM case study
BIM case studyBIM case study
BIM case study
 

Recently uploaded

Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoordharasingh5698
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 

Recently uploaded (20)

Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 

Burj al arab (Cofferdam&Rigging)

  • 1. Burj Al Arab Cofferdam & Rigging Firas Al Shalabi & Sunny Mahajan CE 505 Project Presentation 1
  • 2. Background  Dubai, UAE  1994 – 1999  The first 7 stars hotel in the world  The start of Dubai’s new vision of attracting new investments in areas outside the oil industry.  If you want to book a night there it will cost you around $2000 (according to Expedia tonight is $2039)  1.2 million SF  321 meters height from the sea. 2
  • 3. The construction  Two main phases:  The manmade Island (our focus)  The building 3
  • 4. Building the island  Temporary tube piles driven into sea bed  Temporary sheet piles and tie rods driven into sea bed to support boundary rocks Tubular pile Sheet pile wall 4
  • 5. Building the island  Permanent boundary rock bunds (rock armor) deposited on both sides of the sheet piles  Hydraulic fill layers deposited between bunds to displace sea water and form the island  No solid ground under the building just weak sand (up to 180 meters deep with no solid ground). So it was decided to go with friction piles. Rock armor Sand fill 5
  • 6. Building the island  Permanent SHED units placed around the island to dissipate the action of waves and protect it.  2M (6.5 ft) diameter 43 M (141 ft) deep piles were driven through the island and sea bed SHED units Main building piles 6
  • 7. Building the island  Excavations began in the island to remove the hydraulic fill  A coffer dam was being built while excavating  2M (6.5 ft) thick concrete plug slab laid on the base of the island to prevent the base from popping out because of the sea pressure  Reinforced concrete retaining wall built  The construction of the basement started Concrete slab 7
  • 9. Diagonal truss rigging  Huge tubular triangular truss geometry  The Diagonal vary from 76m to 90m in length and weigh 160 to 180 ton.  The Diagonal connects with a 300mm diameter pin connection to the core-wall and the Rear-leg structure.  There are six diagonals erected at different levels on both side of the building  transported as a single fabricated piece from the fabrication shop 15 km away by special self propelled long trailers. 9
  • 10. Diagonal truss rigging  Dealing with the expansion about (2 inches)caused by the desert heat  Strand jacks supported by Cat heads were connected to the building to execute the lifting of the Diagonals and Horizontals. 10
  • 11. Summary  Many forces can destroy your temporary structures. You have to count them all.  The safety of the crew is essential for cofferdams construction.  Rigging elements can’t always be easy and can be more complicated than what we learned  Putting things in the air is a different story.  Have to come up with practical innovative on site solutions for uncertain problems 11
  • 12. Thank you References: • Nathan. D., (2006) “Burj Al-Arab, UAE Structural Steel Construction For A Mega Project.” master builder, 3rd quarter 77-80 http://www.mbam.org.my/mbam/images/MBJ3Q06(pdf)/@BurjAlArb.pdf • Burj Al Arab, mega structures show. http://www.youtube.com/watch?v=RGzSNZudEHw • Stonecypher. L., (2009). Building the tallest hotel: Burj Al Arab, Dubai. http://www.brighthub.com/education/homework-tips/articles/57599.aspx#imgn_3 • Pourabedin. E., (2009). Burj Al Arab construction. http://www.slideshare.net/shahrozalam210/burj-alarab1203786822334454 • Wright. T., (2000).Creating the Burj Al Arab Dubai http://wkkarchitects.com/#/burj-al-arab/ 12