Agenda
• Objectives
• Testing Timeline
• CROW 5.25.0.236 Overview
• Test Checklist
• Test Environment
• Expectations
• RMS
• Reference Material
• Recap
• Questions
3
Objectives
• Meeting Objectives
 Provide an overview of the CROW 5.25.0.236
 Provide a review of the testing schedule
 Outline responsibilities of CROW users and SPP
project team
 Address questions from the participants
• Testing Objectives
 Provide CROW users hands-on experience with
the updates and changes that are contained in
the CROW 5.25.0.236 prior to Production
Implementation
 Ensure changes are functioning as designed and
requested
4
Test Timelines
• Oct 28 – Member Test Checklist published to
CWG Project folder
• Nov 4 – Member Test Kick-Off Meeting
• Nov 11 – Start of Member Testing in MTE
• Jan 13 – End of Test Period
• Jan 13 – Last day to return a Test Checklists to
SPP
• Feb 3 – Production Go-Live
5
CROW 5.25.0.236 Overview
• The CROW 5.25.0.236 project is undertaken to
correct defects related to equipment no longer
being listed in the subject line of email and the
inability to update outage profiles through the
API. An enhancement associated with the
release is the ability to submit overlapping
generation rules.
• No software or process changes are expected for
members to be able to continue using CROW.
• Only Asset Owning MPs and Transmission
Operators may participate in the Test.
6
Test Checklist
• The Test Checklist can be found on SPP.org in the
CWG project folder here.
• As tests are completed, document results as
Pass, Fail, or Not Applicable, noting any
Comments as necessary. Once ALL applicable
tests are passed, please return the completed
checklist to SPP.
7
Test Checklist Cont.
8
Test Environment
• All Member testing will be performed in CROW in
SPP's Integrated Test Environment (ITE). The direct
URL is
https://crow.itespp.org/crow/Outages/outage_req_inde
x.aspx.
• SPP supports the latest version of the following web
browsers:
 Internet Explorer
 Chrome
 Firefox
 MS Edge
• During Member testing, ITE will be supported by SPP
during business hours only - Monday thru Friday 8:00
am to 5:00 pm CDT; Members are welcome to test
outside of these times and any issues identified should
be logged via RMS.
9
Expectations
• Testing should be performed by users who are
familiar with usage of the CROW Outage
Management tool as it currently exists and have a
valid client certificate.
• The Liaison will be responsible for coordinating
testing at their company, and reporting back to
SPP on testing progress or issues.
• Complete all tests on the Member Test Checklist
• Turning in your completed test checklist as early
as possible is appreciated but no later than
January 13, 2020 via RMS
• Ask questions or report issues via RMS
10
RMS
• Members can ask questions or submit completed
checklists by completing an RMS ticket using RMS
link: https://spprms.issuetrak.com/login.asp
• Inquiries can be submitted through RMS using the
“Project Inquiries” quick pick and the ‘CROW
5.25.0.236’ Subtype.
11
• If a new user ID is needed for RMS, click on the link
above and follow the directions for “Register Now”.
Reference Materials
• CROW 5.25.0.236 Member Test Checklist
• CROW Release 5.25.0.236 MIPO
12
Recap
• Nov 11: Start of Member Testing in ITE
• Jan 13: Test Period Ends; All Test Checklists Due
to SPP
• Feb 3: Go Live in Production
13
Questions
14

More Related Content

Similar to crow 5.25.0.236 member test kick-off presentation v1.1.pptx

1)Testing-Fundamentals_L_D.pptx
1)Testing-Fundamentals_L_D.pptx1)Testing-Fundamentals_L_D.pptx
1)Testing-Fundamentals_L_D.pptx
gianggiang114
 
Test Execution
Test ExecutionTest Execution
Test Execution
Rajathi-QA
 
Rals freedom project management methodologies training
Rals freedom project management methodologies trainingRals freedom project management methodologies training
Rals freedom project management methodologies trainingfrankdrake
 
ISTQBCH2.ppt
ISTQBCH2.pptISTQBCH2.ppt
ISTQBCH2.ppt
RppsKumar1
 
ISTQBCH2.ppt
ISTQBCH2.pptISTQBCH2.ppt
ISTQBCH2.ppt
ghkadous
 
toaz.info-css-melcs-shs-grd-12pdf-pr_2dcd726faf2c8d56182b4d1361e4b9fd.pdf
toaz.info-css-melcs-shs-grd-12pdf-pr_2dcd726faf2c8d56182b4d1361e4b9fd.pdftoaz.info-css-melcs-shs-grd-12pdf-pr_2dcd726faf2c8d56182b4d1361e4b9fd.pdf
toaz.info-css-melcs-shs-grd-12pdf-pr_2dcd726faf2c8d56182b4d1361e4b9fd.pdf
antipoloshs
 
Test Life Cycle - Presentation - Important concepts covered
Test Life Cycle - Presentation - Important concepts coveredTest Life Cycle - Presentation - Important concepts covered
Test Life Cycle - Presentation - Important concepts coveredSunil Kumar Gunasekaran
 
NERC CIP Version 5 and Beyond – Compliance and the Vendor’s Role
NERC CIP Version 5 and Beyond – Compliance and the Vendor’s RoleNERC CIP Version 5 and Beyond – Compliance and the Vendor’s Role
NERC CIP Version 5 and Beyond – Compliance and the Vendor’s Role
EnergySec
 
Resilience Planning & How the Empire Strikes Back
Resilience Planning & How the Empire Strikes BackResilience Planning & How the Empire Strikes Back
Resilience Planning & How the Empire Strikes Back
C4Media
 
Case study on Test Automation under RUP
Case study on Test Automation under RUPCase study on Test Automation under RUP
Case study on Test Automation under RUP
Oak Systems
 
2 approaches to system development
2 approaches to system development2 approaches to system development
2 approaches to system developmentcymark09
 
ISTQB, ISEB Lecture Notes- 2
ISTQB, ISEB Lecture Notes- 2ISTQB, ISEB Lecture Notes- 2
ISTQB, ISEB Lecture Notes- 2
onsoftwaretest
 
Running Header 1Quality Assurance ReportG.docx
Running Header  1Quality Assurance ReportG.docxRunning Header  1Quality Assurance ReportG.docx
Running Header 1Quality Assurance ReportG.docx
rtodd599
 
unit-2_20-july-2018 (1).pptx
unit-2_20-july-2018 (1).pptxunit-2_20-july-2018 (1).pptx
unit-2_20-july-2018 (1).pptx
PriyaFulpagare1
 
8.3 Control Quality
8.3 Control Quality8.3 Control Quality
8.3 Control Quality
DavidMcLachlan1
 
Software-Testing-Chapgdgdgsghshshshshshshs
Software-Testing-ChapgdgdgsghshshshshshshsSoftware-Testing-Chapgdgdgsghshshshshshshs
Software-Testing-Chapgdgdgsghshshshshshshs
shaikbab
 
Software Project Management lecture 10
Software Project Management lecture 10Software Project Management lecture 10
Software Project Management lecture 10Syed Muhammad Hammad
 
Implementing and Launching Rubrics in a Clinical Setting
Implementing and Launching Rubrics in a Clinical SettingImplementing and Launching Rubrics in a Clinical Setting
Implementing and Launching Rubrics in a Clinical Setting
ExamSoft
 

Similar to crow 5.25.0.236 member test kick-off presentation v1.1.pptx (20)

1)Testing-Fundamentals_L_D.pptx
1)Testing-Fundamentals_L_D.pptx1)Testing-Fundamentals_L_D.pptx
1)Testing-Fundamentals_L_D.pptx
 
Test Execution
Test ExecutionTest Execution
Test Execution
 
Rals freedom project management methodologies training
Rals freedom project management methodologies trainingRals freedom project management methodologies training
Rals freedom project management methodologies training
 
CV_Vineet_Kumar
CV_Vineet_KumarCV_Vineet_Kumar
CV_Vineet_Kumar
 
ISTQBCH2.ppt
ISTQBCH2.pptISTQBCH2.ppt
ISTQBCH2.ppt
 
ISTQBCH2.ppt
ISTQBCH2.pptISTQBCH2.ppt
ISTQBCH2.ppt
 
toaz.info-css-melcs-shs-grd-12pdf-pr_2dcd726faf2c8d56182b4d1361e4b9fd.pdf
toaz.info-css-melcs-shs-grd-12pdf-pr_2dcd726faf2c8d56182b4d1361e4b9fd.pdftoaz.info-css-melcs-shs-grd-12pdf-pr_2dcd726faf2c8d56182b4d1361e4b9fd.pdf
toaz.info-css-melcs-shs-grd-12pdf-pr_2dcd726faf2c8d56182b4d1361e4b9fd.pdf
 
Test Life Cycle - Presentation - Important concepts covered
Test Life Cycle - Presentation - Important concepts coveredTest Life Cycle - Presentation - Important concepts covered
Test Life Cycle - Presentation - Important concepts covered
 
NERC CIP Version 5 and Beyond – Compliance and the Vendor’s Role
NERC CIP Version 5 and Beyond – Compliance and the Vendor’s RoleNERC CIP Version 5 and Beyond – Compliance and the Vendor’s Role
NERC CIP Version 5 and Beyond – Compliance and the Vendor’s Role
 
Resilience Planning & How the Empire Strikes Back
Resilience Planning & How the Empire Strikes BackResilience Planning & How the Empire Strikes Back
Resilience Planning & How the Empire Strikes Back
 
Case study on Test Automation under RUP
Case study on Test Automation under RUPCase study on Test Automation under RUP
Case study on Test Automation under RUP
 
2 approaches to system development
2 approaches to system development2 approaches to system development
2 approaches to system development
 
Madhu_Resume
Madhu_ResumeMadhu_Resume
Madhu_Resume
 
ISTQB, ISEB Lecture Notes- 2
ISTQB, ISEB Lecture Notes- 2ISTQB, ISEB Lecture Notes- 2
ISTQB, ISEB Lecture Notes- 2
 
Running Header 1Quality Assurance ReportG.docx
Running Header  1Quality Assurance ReportG.docxRunning Header  1Quality Assurance ReportG.docx
Running Header 1Quality Assurance ReportG.docx
 
unit-2_20-july-2018 (1).pptx
unit-2_20-july-2018 (1).pptxunit-2_20-july-2018 (1).pptx
unit-2_20-july-2018 (1).pptx
 
8.3 Control Quality
8.3 Control Quality8.3 Control Quality
8.3 Control Quality
 
Software-Testing-Chapgdgdgsghshshshshshshs
Software-Testing-ChapgdgdgsghshshshshshshsSoftware-Testing-Chapgdgdgsghshshshshshshs
Software-Testing-Chapgdgdgsghshshshshshshs
 
Software Project Management lecture 10
Software Project Management lecture 10Software Project Management lecture 10
Software Project Management lecture 10
 
Implementing and Launching Rubrics in a Clinical Setting
Implementing and Launching Rubrics in a Clinical SettingImplementing and Launching Rubrics in a Clinical Setting
Implementing and Launching Rubrics in a Clinical Setting
 

Recently uploaded

50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
Nguyen Thanh Tu Collection
 
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
Sayali Powar
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
Basic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumersBasic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumers
PedroFerreira53928
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
kaushalkr1407
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
RaedMohamed3
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
Pavel ( NSTU)
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
Jheel Barad
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
DeeptiGupta154
 
How to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsHow to Break the cycle of negative Thoughts
How to Break the cycle of negative Thoughts
Col Mukteshwar Prasad
 
Basic Civil Engineering Notes of Chapter-6, Topic- Ecosystem, Biodiversity G...
Basic Civil Engineering Notes of Chapter-6,  Topic- Ecosystem, Biodiversity G...Basic Civil Engineering Notes of Chapter-6,  Topic- Ecosystem, Biodiversity G...
Basic Civil Engineering Notes of Chapter-6, Topic- Ecosystem, Biodiversity G...
Denish Jangid
 
Cambridge International AS A Level Biology Coursebook - EBook (MaryFosbery J...
Cambridge International AS  A Level Biology Coursebook - EBook (MaryFosbery J...Cambridge International AS  A Level Biology Coursebook - EBook (MaryFosbery J...
Cambridge International AS A Level Biology Coursebook - EBook (MaryFosbery J...
AzmatAli747758
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
Peter Windle
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
siemaillard
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
GeoBlogs
 
Fish and Chips - have they had their chips
Fish and Chips - have they had their chipsFish and Chips - have they had their chips
Fish and Chips - have they had their chips
GeoBlogs
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
Jisc
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
MIRIAMSALINAS13
 

Recently uploaded (20)

50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
50 ĐỀ LUYỆN THI IOE LỚP 9 - NĂM HỌC 2022-2023 (CÓ LINK HÌNH, FILE AUDIO VÀ ĐÁ...
 
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
UNIT – IV_PCI Complaints: Complaints and evaluation of complaints, Handling o...
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
Basic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumersBasic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumers
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
 
Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
 
How to Break the cycle of negative Thoughts
How to Break the cycle of negative ThoughtsHow to Break the cycle of negative Thoughts
How to Break the cycle of negative Thoughts
 
Basic Civil Engineering Notes of Chapter-6, Topic- Ecosystem, Biodiversity G...
Basic Civil Engineering Notes of Chapter-6,  Topic- Ecosystem, Biodiversity G...Basic Civil Engineering Notes of Chapter-6,  Topic- Ecosystem, Biodiversity G...
Basic Civil Engineering Notes of Chapter-6, Topic- Ecosystem, Biodiversity G...
 
Cambridge International AS A Level Biology Coursebook - EBook (MaryFosbery J...
Cambridge International AS  A Level Biology Coursebook - EBook (MaryFosbery J...Cambridge International AS  A Level Biology Coursebook - EBook (MaryFosbery J...
Cambridge International AS A Level Biology Coursebook - EBook (MaryFosbery J...
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
 
Fish and Chips - have they had their chips
Fish and Chips - have they had their chipsFish and Chips - have they had their chips
Fish and Chips - have they had their chips
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
 

crow 5.25.0.236 member test kick-off presentation v1.1.pptx

  • 1.
  • 2. CROW 5.25.0.236 Member Test Kick-Off Meeting 2
  • 3. Agenda • Objectives • Testing Timeline • CROW 5.25.0.236 Overview • Test Checklist • Test Environment • Expectations • RMS • Reference Material • Recap • Questions 3
  • 4. Objectives • Meeting Objectives  Provide an overview of the CROW 5.25.0.236  Provide a review of the testing schedule  Outline responsibilities of CROW users and SPP project team  Address questions from the participants • Testing Objectives  Provide CROW users hands-on experience with the updates and changes that are contained in the CROW 5.25.0.236 prior to Production Implementation  Ensure changes are functioning as designed and requested 4
  • 5. Test Timelines • Oct 28 – Member Test Checklist published to CWG Project folder • Nov 4 – Member Test Kick-Off Meeting • Nov 11 – Start of Member Testing in MTE • Jan 13 – End of Test Period • Jan 13 – Last day to return a Test Checklists to SPP • Feb 3 – Production Go-Live 5
  • 6. CROW 5.25.0.236 Overview • The CROW 5.25.0.236 project is undertaken to correct defects related to equipment no longer being listed in the subject line of email and the inability to update outage profiles through the API. An enhancement associated with the release is the ability to submit overlapping generation rules. • No software or process changes are expected for members to be able to continue using CROW. • Only Asset Owning MPs and Transmission Operators may participate in the Test. 6
  • 7. Test Checklist • The Test Checklist can be found on SPP.org in the CWG project folder here. • As tests are completed, document results as Pass, Fail, or Not Applicable, noting any Comments as necessary. Once ALL applicable tests are passed, please return the completed checklist to SPP. 7
  • 9. Test Environment • All Member testing will be performed in CROW in SPP's Integrated Test Environment (ITE). The direct URL is https://crow.itespp.org/crow/Outages/outage_req_inde x.aspx. • SPP supports the latest version of the following web browsers:  Internet Explorer  Chrome  Firefox  MS Edge • During Member testing, ITE will be supported by SPP during business hours only - Monday thru Friday 8:00 am to 5:00 pm CDT; Members are welcome to test outside of these times and any issues identified should be logged via RMS. 9
  • 10. Expectations • Testing should be performed by users who are familiar with usage of the CROW Outage Management tool as it currently exists and have a valid client certificate. • The Liaison will be responsible for coordinating testing at their company, and reporting back to SPP on testing progress or issues. • Complete all tests on the Member Test Checklist • Turning in your completed test checklist as early as possible is appreciated but no later than January 13, 2020 via RMS • Ask questions or report issues via RMS 10
  • 11. RMS • Members can ask questions or submit completed checklists by completing an RMS ticket using RMS link: https://spprms.issuetrak.com/login.asp • Inquiries can be submitted through RMS using the “Project Inquiries” quick pick and the ‘CROW 5.25.0.236’ Subtype. 11 • If a new user ID is needed for RMS, click on the link above and follow the directions for “Register Now”.
  • 12. Reference Materials • CROW 5.25.0.236 Member Test Checklist • CROW Release 5.25.0.236 MIPO 12
  • 13. Recap • Nov 11: Start of Member Testing in ITE • Jan 13: Test Period Ends; All Test Checklists Due to SPP • Feb 3: Go Live in Production 13