SlideShare a Scribd company logo
1 of 2
Download to read offline
Timothy C. Odom
7196 Willowood Drive Cincinnati, OH 45241
Cell: (513) 200-8703 odie5070@gmail.com
Construction/Project Manager
Certified Welding Inspector per AWS ♦ Team Management ♦ Operations/Project Discovery & Planning ♦ Risk
Management and Critical Path Expertise ♦ Staff Supervision, Training, and Development ♦ Internal and
External Communications ♦ ASME, API 510, 570, 582RP, 620, 650, 653, 934RP-e and AWS D1.1 ♦ NDT
Interpretation ♦ Microsoft Office Professional Suite, Microsoft Project and Prima Vera P6 ♦ Logistics Expert
Truck, Barge and Rail ♦ Able to Produce from Remote Location
Practical and productive Pressure Vessel & Pressure Vessel Part Manufacturing Management professional with
over 20 years of increasingly responsible and results-oriented experience seeking full-time or part-time assignment
in the Oil & Gas, Petrochemical, Energy Generating or Steel Producing Industries. Experience includes negotiating
complex construction contracts with customers and vendors, vendor approval and surveillance, direct supervision of
all daily manufacturing/fabrication (Shop and Field) operations, QA/QC issues per ASME/API/AWS D1.1 standards
including Customer specifications/standards, as well as, the design and implementation of professional
development, safety training and preventive maintenance programs.
Career Accomplishments
 Promoted through several ranks starting as an outside sales employee to include Quality Control Manager,
Operation Supervisor, and to General Manager directing all activities related to the manufacturing floor.
 Improved Annual Revenue for RK Fabricating, Inc. by 300% from 1993 to 2001.
 Founded Odom Industries, Inc as a Large Scale Custom Fabricator of Pressure Vessel Manufacturer servicing the
Steel Producing, Oil and Gas Producing/Refining, Energy Producing, Petrochemical, Mining and Workboat
Building Industries.
 Industry leading expert in large diameter, cold-formed, U-Stamped, pressure vessels and parts (Heads, Cones
and Double-Knuckled Transitions) in all configurations with all formable metals.
 Die Design and Manufacturing
 Flat Plate Layout
 Burning
 Forming
 Trimming/Beveling
 Fit up
 Finishing (KD, Semi-KD, Tacked & Braced, Welded out complete)
 Shipment by Truck, Barge and Rail.
 ASME Expertise:
 (2000-2001) Consulted with Hartford Steam Boiler-Shanghai (Gong Te Hua, Lead AI) to assist two glass-
lined reactor manufacturers in receiving their ASME U-Stamp Section VIII, Div 1 (Taiji LTD-Zibo City PRC and
Yulong LTD-Nanjing PRC)
 (2002) Worked with HSB (Pat Donovan, Lead AI) to transfer U-Stamp and R-Stamp from RK Fabricating to
Odom Industries, Inc.
 (2005) Worked with HSB (Pat Donovan, Lead AI) to certify Odom Industries with an S-stamp while
simultaneously managing the Joint Review process to renew U-Stamp and R-Stamp.
 (2008) Managed Joint Review Process to renew U-stamp, S-stamp and R-stamp for Odom Industries, Inc.
 (2011) Managed Joint Review Process to renew U-stamp, S-stamp and R-stamp for Odom Industries, Inc.
 (2014) Managed Joint Review Process to renew U-stamp, S-stamp and R-stamp for Odom Industries, Inc.
 (2015) Worked with HSB (Pat Donovan, Lead AI) to certify Hason USA Corp with ASME U-Stamp and R-
Stamp as a new start up entity.
 Purchased the business assets of RK Fabricating, Inc. in November of 2002.
 Moved Odom Industries, Inc. (2006) into a 52,000sqft state of the art facility in Milford, OH, which increased
manufacturer capacity to vessels 200ft long, 35ft in diameter and weighing over 600,000lbs.
 Rebuilt 70-year old Hydraulic C-Press increasing capacity from 450-tons to 600-tons
 Developed Odom Industries, Inc into a world class supersize Pressure Vessel and Pressure Part fabricator.
 Oversaw the construction of one of the best barge loading docks on the Ohio River (Warsaw, KY).
 Improved Annual Revenues at Odom Industries, Inc. from $8-million to $15-million during the recession of 2009
to 2013.
 Personally managed all aspects of field job site:
 $9-million installation of 4-SS Fermenters at Feed Plant.
 $3-million installation of Lime Water Softener in Fertilizer Plant
 $7-million installation of Blast Furnace Hearth with Bustle Pipe and 3-Stove Domes in Steel Plant
 Heavily involved in HR level employee relations in all staff level postings including hiring, training, employee
morale, disciplinary action, conflict resolution, as well as corporate professional development and safety
programs due to excellent interpersonal and leadership skills.
 Expertise in building FCCU Reactors and Regenerators including API934RP-e Standards.
 Expertise in fabricating equipment and parts with refractory lining per Gunnite, Castable and Hex Mesh
Ramming techniques including dry out activities.
 Experience in implementing Exxon-Mobile (inc. Baton Rouge Refinery), BP Global, Marathon, Valero, UOP, KBR,
Citgo, and Jacobs Eng specifications and standards.
 Sold Odom Industries, Inc. to Hason-Steel, LTD in Montreal, Quebec.
Professional Summary
Odom Industries, Inc. 2001-2014
Owner/Founder, Cincinnati, OH
I created company as a start up in June of 2001 including setting up and implementing all Financing, HR, Safety, QC
(including a Vendor Approval Program), Production, and Sales departments’ practices and infrastructure. Annual
Revenues exceeded $1.5-million in first year. I built the company from a one-employee operation to a $15-million
annual revenue corporation with 75-employees when I sold it to Hason Steel in September of 2014.
RK Fabricating, Inc. 1993 – 2000
General Manager, Cincinnati, OH
I started with the organization in May of 1993 as the only outside sales rep and rose through the ranks of QC,
Production and Administration to be General Manager in September of 1998. I directed the daily activities of all
aspects of a world class multi-million dollar large diameter, pressure vessel cold-formed head, cone and double-
knuckled transition manufacturer.
History Teacher/Multi-Sport Coach 1986 - 1993
History Teacher/Multi-Sport Coach
 Only 100% Pass Rate for West Clermont County SD for Ohio Proficiency Test.
 Lead Simon Kenton HS to its first KHSAA football playoff victory.
 Developed several State Champion Wrestling athletes at Dixie Heights HS and Simon Kenton HS.
 Developed several State Champion Track & Field athletes at Simon Kenton HS.
 Lead Cincinnati Moeller HS to several State Playoff victories as Defensive and Offensive Coordinator.
Certifications
CWI – AWS QC1 #15110391 (Exp. 11-1-2018) – ASME Section II, V, VIII, and IX
Currently Enrolled in PMP Exam Prep via Project Management Campus
API 510 – Signed up to take Exam in May 2016
API 570 – Signed up to take Exam in June 2016
API 653 – Signed up to take Exam in July 2016
API 577 – Signed up to take Exam in August 2016
Education
Bachelor of Arts in History
The Ohio State University
Masters of Education in Organizational Leadership
Xavier University

More Related Content

What's hot (19)

Shane Pyke Resume
Shane Pyke ResumeShane Pyke Resume
Shane Pyke Resume
 
ARIES CURRENT PROFILE
ARIES CURRENT PROFILEARIES CURRENT PROFILE
ARIES CURRENT PROFILE
 
Introduction to PT&P
Introduction to PT&PIntroduction to PT&P
Introduction to PT&P
 
Thomas Dowie CV
Thomas Dowie CVThomas Dowie CV
Thomas Dowie CV
 
Api 600 cast steel catalog (r1)
Api 600 cast steel catalog (r1)Api 600 cast steel catalog (r1)
Api 600 cast steel catalog (r1)
 
Eric Eckles resume
Eric Eckles resumeEric Eckles resume
Eric Eckles resume
 
Resume - W. Travis Scott
Resume - W. Travis ScottResume - W. Travis Scott
Resume - W. Travis Scott
 
Husam CV
Husam CVHusam CV
Husam CV
 
2016 RESUME
2016 RESUME2016 RESUME
2016 RESUME
 
Robert Sasser (1) (1) (1)
Robert Sasser (1) (1) (1)Robert Sasser (1) (1) (1)
Robert Sasser (1) (1) (1)
 
Duane Fox
Duane FoxDuane Fox
Duane Fox
 
Jwood Resume
Jwood ResumeJwood Resume
Jwood Resume
 
vmg resume 2
vmg resume 2vmg resume 2
vmg resume 2
 
khawar Resume
khawar Resumekhawar Resume
khawar Resume
 
Juan Lebron resum and refrence
Juan Lebron resum and refrenceJuan Lebron resum and refrence
Juan Lebron resum and refrence
 
james hawkins resume (1e)
james hawkins resume (1e)james hawkins resume (1e)
james hawkins resume (1e)
 
Feasibility report and how to reach at BEP (ATUL ENGINEERING UDYOG)
Feasibility report and how to reach at BEP (ATUL ENGINEERING UDYOG)Feasibility report and how to reach at BEP (ATUL ENGINEERING UDYOG)
Feasibility report and how to reach at BEP (ATUL ENGINEERING UDYOG)
 
Don's Mechanical Resume
Don's Mechanical ResumeDon's Mechanical Resume
Don's Mechanical Resume
 
ssrrrr
ssrrrrssrrrr
ssrrrr
 

Similar to TCO Construction Project Manager Resume REV 01-24-16

Karl Luke's Resume Doc
Karl Luke's Resume DocKarl Luke's Resume Doc
Karl Luke's Resume Dockarl luke
 
NICHOLAS RADER SANFRANDetailedRESUME2014-2
NICHOLAS RADER SANFRANDetailedRESUME2014-2NICHOLAS RADER SANFRANDetailedRESUME2014-2
NICHOLAS RADER SANFRANDetailedRESUME2014-2Nicholas Rader
 
Rajesh kumar- Project Engineer
Rajesh kumar- Project EngineerRajesh kumar- Project Engineer
Rajesh kumar- Project EngineerRajesh Kumar
 
Wayne Barnes Resume
Wayne Barnes ResumeWayne Barnes Resume
Wayne Barnes ResumeWayne Barnes
 
cv_piping engineer updated
cv_piping engineer updatedcv_piping engineer updated
cv_piping engineer updatedAnwar Alam
 
2015 ryan foster resume copy 2
2015 ryan foster resume copy 22015 ryan foster resume copy 2
2015 ryan foster resume copy 2Ryan Foster
 
Rick Hatlen Resume Oct 2016 A
Rick Hatlen Resume Oct 2016 ARick Hatlen Resume Oct 2016 A
Rick Hatlen Resume Oct 2016 ARick Hatlen
 
James F BurtonII Resume 2016
James F BurtonII Resume 2016James F BurtonII Resume 2016
James F BurtonII Resume 2016Frank Burton
 
11_2014 Resume Dan Kilpatrick
11_2014 Resume Dan Kilpatrick11_2014 Resume Dan Kilpatrick
11_2014 Resume Dan KilpatrickDanny Kilpatrick
 
S Perez Resume1
S Perez Resume1S Perez Resume1
S Perez Resume1Greatdanes
 
Jonathan Todd, P.E. Resume 4-29-18
Jonathan Todd, P.E. Resume 4-29-18Jonathan Todd, P.E. Resume 4-29-18
Jonathan Todd, P.E. Resume 4-29-18Jonathan Todd, P.E.
 

Similar to TCO Construction Project Manager Resume REV 01-24-16 (20)

Karl Luke's Resume Doc
Karl Luke's Resume DocKarl Luke's Resume Doc
Karl Luke's Resume Doc
 
NICHOLAS RADER SANFRANDetailedRESUME2014-2
NICHOLAS RADER SANFRANDetailedRESUME2014-2NICHOLAS RADER SANFRANDetailedRESUME2014-2
NICHOLAS RADER SANFRANDetailedRESUME2014-2
 
Rajesh kumar- Project Engineer
Rajesh kumar- Project EngineerRajesh kumar- Project Engineer
Rajesh kumar- Project Engineer
 
Resume 2016C
Resume 2016CResume 2016C
Resume 2016C
 
Brian_sResume1
Brian_sResume1Brian_sResume1
Brian_sResume1
 
Wayne Barnes Resume
Wayne Barnes ResumeWayne Barnes Resume
Wayne Barnes Resume
 
cv_piping engineer updated
cv_piping engineer updatedcv_piping engineer updated
cv_piping engineer updated
 
My Resume
My ResumeMy Resume
My Resume
 
2015 ryan foster resume copy 2
2015 ryan foster resume copy 22015 ryan foster resume copy 2
2015 ryan foster resume copy 2
 
Rick Hatlen Resume Oct 2016 A
Rick Hatlen Resume Oct 2016 ARick Hatlen Resume Oct 2016 A
Rick Hatlen Resume Oct 2016 A
 
Husam cv
Husam cvHusam cv
Husam cv
 
James F BurtonII Resume 2016
James F BurtonII Resume 2016James F BurtonII Resume 2016
James F BurtonII Resume 2016
 
Mithran j cv21316
Mithran j cv21316 Mithran j cv21316
Mithran j cv21316
 
Mithran J CV21316
Mithran J CV21316Mithran J CV21316
Mithran J CV21316
 
muthu_kumaran
muthu_kumaranmuthu_kumaran
muthu_kumaran
 
PHD Presentation In Madinah-KSA (Materials)
PHD Presentation In Madinah-KSA (Materials)PHD Presentation In Madinah-KSA (Materials)
PHD Presentation In Madinah-KSA (Materials)
 
resume
resumeresume
resume
 
11_2014 Resume Dan Kilpatrick
11_2014 Resume Dan Kilpatrick11_2014 Resume Dan Kilpatrick
11_2014 Resume Dan Kilpatrick
 
S Perez Resume1
S Perez Resume1S Perez Resume1
S Perez Resume1
 
Jonathan Todd, P.E. Resume 4-29-18
Jonathan Todd, P.E. Resume 4-29-18Jonathan Todd, P.E. Resume 4-29-18
Jonathan Todd, P.E. Resume 4-29-18
 

TCO Construction Project Manager Resume REV 01-24-16

  • 1. Timothy C. Odom 7196 Willowood Drive Cincinnati, OH 45241 Cell: (513) 200-8703 odie5070@gmail.com Construction/Project Manager Certified Welding Inspector per AWS ♦ Team Management ♦ Operations/Project Discovery & Planning ♦ Risk Management and Critical Path Expertise ♦ Staff Supervision, Training, and Development ♦ Internal and External Communications ♦ ASME, API 510, 570, 582RP, 620, 650, 653, 934RP-e and AWS D1.1 ♦ NDT Interpretation ♦ Microsoft Office Professional Suite, Microsoft Project and Prima Vera P6 ♦ Logistics Expert Truck, Barge and Rail ♦ Able to Produce from Remote Location Practical and productive Pressure Vessel & Pressure Vessel Part Manufacturing Management professional with over 20 years of increasingly responsible and results-oriented experience seeking full-time or part-time assignment in the Oil & Gas, Petrochemical, Energy Generating or Steel Producing Industries. Experience includes negotiating complex construction contracts with customers and vendors, vendor approval and surveillance, direct supervision of all daily manufacturing/fabrication (Shop and Field) operations, QA/QC issues per ASME/API/AWS D1.1 standards including Customer specifications/standards, as well as, the design and implementation of professional development, safety training and preventive maintenance programs. Career Accomplishments  Promoted through several ranks starting as an outside sales employee to include Quality Control Manager, Operation Supervisor, and to General Manager directing all activities related to the manufacturing floor.  Improved Annual Revenue for RK Fabricating, Inc. by 300% from 1993 to 2001.  Founded Odom Industries, Inc as a Large Scale Custom Fabricator of Pressure Vessel Manufacturer servicing the Steel Producing, Oil and Gas Producing/Refining, Energy Producing, Petrochemical, Mining and Workboat Building Industries.  Industry leading expert in large diameter, cold-formed, U-Stamped, pressure vessels and parts (Heads, Cones and Double-Knuckled Transitions) in all configurations with all formable metals.  Die Design and Manufacturing  Flat Plate Layout  Burning  Forming  Trimming/Beveling  Fit up  Finishing (KD, Semi-KD, Tacked & Braced, Welded out complete)  Shipment by Truck, Barge and Rail.  ASME Expertise:  (2000-2001) Consulted with Hartford Steam Boiler-Shanghai (Gong Te Hua, Lead AI) to assist two glass- lined reactor manufacturers in receiving their ASME U-Stamp Section VIII, Div 1 (Taiji LTD-Zibo City PRC and Yulong LTD-Nanjing PRC)  (2002) Worked with HSB (Pat Donovan, Lead AI) to transfer U-Stamp and R-Stamp from RK Fabricating to Odom Industries, Inc.  (2005) Worked with HSB (Pat Donovan, Lead AI) to certify Odom Industries with an S-stamp while simultaneously managing the Joint Review process to renew U-Stamp and R-Stamp.  (2008) Managed Joint Review Process to renew U-stamp, S-stamp and R-stamp for Odom Industries, Inc.  (2011) Managed Joint Review Process to renew U-stamp, S-stamp and R-stamp for Odom Industries, Inc.  (2014) Managed Joint Review Process to renew U-stamp, S-stamp and R-stamp for Odom Industries, Inc.  (2015) Worked with HSB (Pat Donovan, Lead AI) to certify Hason USA Corp with ASME U-Stamp and R- Stamp as a new start up entity.  Purchased the business assets of RK Fabricating, Inc. in November of 2002.  Moved Odom Industries, Inc. (2006) into a 52,000sqft state of the art facility in Milford, OH, which increased manufacturer capacity to vessels 200ft long, 35ft in diameter and weighing over 600,000lbs.  Rebuilt 70-year old Hydraulic C-Press increasing capacity from 450-tons to 600-tons
  • 2.  Developed Odom Industries, Inc into a world class supersize Pressure Vessel and Pressure Part fabricator.  Oversaw the construction of one of the best barge loading docks on the Ohio River (Warsaw, KY).  Improved Annual Revenues at Odom Industries, Inc. from $8-million to $15-million during the recession of 2009 to 2013.  Personally managed all aspects of field job site:  $9-million installation of 4-SS Fermenters at Feed Plant.  $3-million installation of Lime Water Softener in Fertilizer Plant  $7-million installation of Blast Furnace Hearth with Bustle Pipe and 3-Stove Domes in Steel Plant  Heavily involved in HR level employee relations in all staff level postings including hiring, training, employee morale, disciplinary action, conflict resolution, as well as corporate professional development and safety programs due to excellent interpersonal and leadership skills.  Expertise in building FCCU Reactors and Regenerators including API934RP-e Standards.  Expertise in fabricating equipment and parts with refractory lining per Gunnite, Castable and Hex Mesh Ramming techniques including dry out activities.  Experience in implementing Exxon-Mobile (inc. Baton Rouge Refinery), BP Global, Marathon, Valero, UOP, KBR, Citgo, and Jacobs Eng specifications and standards.  Sold Odom Industries, Inc. to Hason-Steel, LTD in Montreal, Quebec. Professional Summary Odom Industries, Inc. 2001-2014 Owner/Founder, Cincinnati, OH I created company as a start up in June of 2001 including setting up and implementing all Financing, HR, Safety, QC (including a Vendor Approval Program), Production, and Sales departments’ practices and infrastructure. Annual Revenues exceeded $1.5-million in first year. I built the company from a one-employee operation to a $15-million annual revenue corporation with 75-employees when I sold it to Hason Steel in September of 2014. RK Fabricating, Inc. 1993 – 2000 General Manager, Cincinnati, OH I started with the organization in May of 1993 as the only outside sales rep and rose through the ranks of QC, Production and Administration to be General Manager in September of 1998. I directed the daily activities of all aspects of a world class multi-million dollar large diameter, pressure vessel cold-formed head, cone and double- knuckled transition manufacturer. History Teacher/Multi-Sport Coach 1986 - 1993 History Teacher/Multi-Sport Coach  Only 100% Pass Rate for West Clermont County SD for Ohio Proficiency Test.  Lead Simon Kenton HS to its first KHSAA football playoff victory.  Developed several State Champion Wrestling athletes at Dixie Heights HS and Simon Kenton HS.  Developed several State Champion Track & Field athletes at Simon Kenton HS.  Lead Cincinnati Moeller HS to several State Playoff victories as Defensive and Offensive Coordinator. Certifications CWI – AWS QC1 #15110391 (Exp. 11-1-2018) – ASME Section II, V, VIII, and IX Currently Enrolled in PMP Exam Prep via Project Management Campus API 510 – Signed up to take Exam in May 2016 API 570 – Signed up to take Exam in June 2016 API 653 – Signed up to take Exam in July 2016 API 577 – Signed up to take Exam in August 2016 Education Bachelor of Arts in History The Ohio State University Masters of Education in Organizational Leadership Xavier University